Metropolitan Transit Commission...Metropolitan Transit Commission Meeting Summary November 28, 2018...
Transcript of Metropolitan Transit Commission...Metropolitan Transit Commission Meeting Summary November 28, 2018...
Metropolitan Transit Commission
January 23, 2019
Metropolitan Transit Commission January 23, 2019 Agenda
METROPOLITAN TRANSIT COMMISSION Wednesday, January 23, 2019
5:30pm Charlotte Mecklenburg Government Center
Room 267 AGENDA
I. Call to Order ...................................................................................................... Mayor Vi Lyles
II. Action Items
• Selection of MTC Vice Chairman .......................................................................... MTC
III. Approval of the November 28, 2018 Summary (p.3-10) ................................... Vice Chairman
IV. Report from the Chair of the Transit Service Advisory Committee (TSAC) .... Sam Grundman
V. Report from the Chair of the Citizens Transit Advisory Group (CTAG) ......... Edward Tillman
VI. Public Comments
VII. Information Items • LYNX System Update: Staff Recommendations (p.11-15) ................. Jason Lawrence • FY2020 Budget & FY2020-24 CIP Overview (p.16-67) John Lewis/Blanche Sherman • FY2019 Operating & CIP Budget Amendment (p.68-69) ................. Blanche Sherman
VIII. Chief Executive Officer’s Report ........................................................................ John Lewis, Jr
IX. Other Business .................................................................................................... Vice Chairman
X. Adjourn
Metropolitan Transit Commission Meeting Summary November 28, 2018 Page 1 of 8
METROPOLITAN TRANSIT COMMISSION
MEETING SUMMARY
November 28, 2018
Presiding: Ella Scarborough (Chair, Mecklenburg County Commission)
Present: Mayor Vi Lyles, (City of Charlotte) Danny Pleasant (Charlotte Assistant City Manager) Bill Thunberg (Mooresville Representative) Mayor Walker Reid (Gastonia)
Larry Faison (City Manager, Monroe) William Coxe (Town Planner, Huntersville) Mayor Paul Bailey (Matthews) Andrew Grant (Cornelius Town Manager)
Deputy Director: John Muth
I. Call to OrderThe regular meeting of the Metropolitan Transit Commission was called to order at 5:00 p.m. byMTC’s Chairman, Commissioner Scarborough.
II. Review of Meeting SummaryThe meeting summary of October 24, 2018 was approved as written.
III. Transit Services Advisory Committee (TSAC) Chair’s ReportChris Maloy - Chairman reported that the Transportation Services Advisory Committee met on
Thursday, November 8th and had 1 action item and 2 information items.
1) The action item that we received, was to review and approve the February service changeand TSAC did approve that motion with Ms. Pamela White presenting.
2) The first information item we received an update Mr. John Lewis on the transit outage aswell as some other activities that are going on within the CATS system and laid out some ofthe goals.
3) The second information item we received an update from Olaf Kinard on technologyincluding the CATS apps. The real-time app as well as Uber and the Lyft application.
Also, Mr. Maloy shared that this would be his last meeting as TSAC chair. In December, TSAC will be electing a new chair for the following year. He has been honored to provide MTC updates and serve as chair. The MTC Thanked Mr. Malory for his service as the chairman.
IV. Citizens Transit Advisory Group (CTAG) Chair’s ReportCo-Chairman Edward Tillman gave the CTAG’s Report. CTAG received several updates at the
November 20nd, meeting. 1) First update was the state and federal legislative agendas.2) Second update was the Envision My Ride initiative, and the long-term goal of this initiative is
to get the average ride time down to 30 minutes to any of our designated job centers. Rightnow, that time is currently anywhere from 60 minutes to 90 minutes in some cases, butthey're moving toward getting that much tighter. There has been a success with some of
3
Metropolitan Transit Commission Meeting Summary November 28, 2018 Page 2 of 8
that. There was also a discussion about using the last mile project and trying to coordinate that with the Envision My Ride, but there hasn't been, I would say, a significant usage of the last mile project in which we utilized Lyft and other services to get people to that spot. So that might not be something that moves forward.
3) Third update was on Hurricane Michael and Florence and the delays regarding that; eight-day delay overall. Bus services never stopped. One of the items that came out of that was arealization that better communication to our clients is a very necessary aspect, and sothere's now been a usage of SPOKEN-Hub, which is another social media application thatwill allow more direct communication to clients of our system and specifically giving theminformation about CATS, not having to go through filters of Facebook which gets a little lostin the messaging.
4) Last update was on the Ride CATS app. A company is in place to do the updates, but there'sbeen a bit of a slow-down because of the hacking issues from earlier this year. It's beenfunded and decisions are ready to move forward, but just having some difficulty with thesecurity issues.
V. Public Comments. Ms. Meg Fencil - Program Director at Sustain Charlotte shared a statement ofsupport where Sustain Charlotte gathered over 2,400 signatures from area residents. About 900of these are online and the rest collected at various events, neighborhood association meetings,and outreach events. This is a broad statement of support addressed really to Charlotte CityCouncil and Mecklenburg County Commissioners. I wanted to share it with you all tonightbecause the MTC plays such a pivotal role in supporting transit.
And I specifically wanted to draw your attention to the public support for the Envision My Rideinitiative and completion of the projects in the 2030 transit plan. I encourage you let us know ifthere's anything else that Sustain Charlotte can do to help to support transit.
Mayor Bailey ask if it would be worthwhile to talk with the six small towns to have them jointhe support of Sustain Charlotte. It would and Sustain Charlotte will reach out to them.
VI. Action Items.a. 2019-2020 State & Federal Legislative Agendas Dana Fenton
Resolution: Mayor Paul Bailey (Matthews) motioned to approve the 2019-2020 State &Federal Legislative Agendas; William Coxe (Huntersville) seconded the motion, which passedunanimously.
b. 1) Travel Markets Policy Larry Kopf Larry Kopf, Chief Operations Planning Officer presented two policies up for review. These are MTC policies that help to direct staff. First one is the travel markets policy which determines which markets CATS will compete for business in. These are policies that are established by MTC and they provide guidance to staff in terms of how we develop our service, and the other policies and the transit service guidelines policy which gets into issue such as load standard, stop spacing, and where amenities are placed, and just a summary of the changes. This is an action item. We're looking for, either feedback or approval of these items. Discussion: WILLIAM COXE (Huntersville): Madam Chair, first, let me apologize to the group for not being able to attend the last several meetings. Personal matters kept me away. Larry Kopf and have I been collaborating on it a little bit today. Here is the issue that I want to raise. The changes on the surface of the documents, the change to 2025 transit land use
4
Metropolitan Transit Commission Meeting Summary November 28, 2018 Page 3 of 8
plan to the 2030 transit corridor services plan seem to be reasonable because that's sort of the update of the 2025 plan. The issue is that the 2030 transit corridor services plan does not say that as a goal for what we all do together in this arena doesn't say that as a goal of that we're trying to achieve a land use vision for the region. What it says in the 2030 plan is these are what we want to do in each corridor. It doesn't say why. The 2025 plan approved in 1998 does, in fact, say that this is our regional vision for growth, the five regular transit corridors, the rapid transit corridors, in particular, are what will help us achieve that. And I think that is an important aspect of what we do collectively in that we're trying to achieve something with this investment, not only with this, but our roads and parks and schools and so forth. I have suggested or I would like to suggest a couple of modifications to the policies that you have in front of you to try to bring back in that focus on land goals, land development goals as part of these documents so that as future groups have to deal with -- I hope we don't have to deal with production of service again, we may, I don't know. But as we deal with decisions on the services that are provided by CATS, we have that land use element as one of the foundational goals. So, with that prelude, Larry simply went back in and suggested, and I absolutely concur, that in the travel markets policy where we had stricken the reference to the 2025 integrated -- 2025 transit land use plan that we simply reinsert 2025 transit land use plan as amended and updated by the 2030 transit corridor system plan. So simply that change of events. Then when we get down into primary markets, there may be a better way, a more succinct way of phrasing this, but the suggested language that I'm going to suggest, these markets must be well-served to achieve the goals of the centers, corridors, and wedges growth framework as adopted by the city of Charlotte because that document is now a city of Charlotte document. And the goals of the individual town growth plans. These markets must also be well-served to achieve the goals of the 2025 land use plan as amended and updated by 2030. So simply again to bring back in the land use elements to that. MAYOR LYLES (City of Charlotte): I'm not sure that I understood under the primary markets of CATS solicited priority order. I don't have the wording and I'm trying to figure out what you said. It sounded fair, but would it be appropriate to kind of say the primary markets for CATS listed in priority are below or are -- is it somewhere to -- is it number 7 or is it a statement after number 6? MR. COXE: The document as it exists today starts off under primary markets saying these markets must be well-served to achieve these goals. And all I did was simply take those documents wherein those goals are supposed to be embedded and change the wording to call out on the documents. MAYOR LYLES: So in these it will say these markets must be well-served to achieve the goals of the adopted. MR. COXE: Of the centers, corridors, and wedges growth forecast as adopted by the City of Charlotte and the goals of the individual town growth plans, which brings the towns back into the picture. These markets must also be well-served to achieve the goals of the 2025 transit land use plan as amended and updated by the 2030 transit corridor services plan. MAYOR LYLES: I think the sense of what you're saying is incorporated and so it's not the subject. I'm just trying to figure out where it is and I guess the thing that I would say is everyone is in agreement on the staff that this is appropriate? JOHN MUTH (CATS): Yes, at staff level, Bill and Larry talked to them today. We also talked to them. We're comfortable with Bill's recommendations.
5
Metropolitan Transit Commission Meeting Summary November 28, 2018 Page 4 of 8
MR. KOPF: The issue is that the centers, corridors, and wedges plan is a document that was adopted by the City of Charlotte but not adopted by the towns. We wanted to incorporate the towns also by talking about, you know, making a reference to the town growth plans. And that it was to pull the towns into as well. It's just a reference. It doesn't change the point of this policy. It's just a reference that's in the policy.
Resolution: Mayor Vi Lyles (City of Charlotte) motioned to approve the Travel Markets, as updated by the previous discussion; William Coxe (Huntersville) seconded the motion, which passed unanimously.
b. 2) Transit Services Guidelines Policy Larry Kopf Larry Kopf, Chief Operations Planning Officer presented second policy up for approval – The Transit Service Guideline Policy. Discussion: WILLIAM COXE (Huntersville): Under the transit services guidelines there is, again, a call out to the transit market guidelines. And the proposed language under 2.1 simply changes where Larry had originally proposed the 2030 transit corridor system to say the 2025 transit land use plan as amended and updated by the 2030. BILL THUNBERG (Mooresville Representative): There's some changes in here particularly that articulate like the amenities, etc. I'm just pointing this out as a matter of procedure. If since these changes have occurred and there frequently are questions about what CATS policy is with regards to providing amenities, I would encourage you that the staff send this out to a local jurisdiction and highlight those areas so that if they need to amend their land use plans or ordinances or whatever to reference this document or any portion of the document, that they're aware that that -- those changes have been made.
Resolution: Mayor Vi Lyles (City of Charlotte) motioned to approve the Transit Services Guideline Policy, as updated by the previous discussion; William Coxe (Huntersville) seconded the motion, which passed unanimously.
c. North Mecklenburg Express Services Larry Kopf Larry Kopf, Chief Operations Planning Officer seeking approval of the propose changes to the North Mecklenburg Express Service. Whenever making a change that affects over 25% of a bus route, it does take MTC approval to make that change. We are planning to update the bus routes to take advantage of the express lanes that will be completed next year on I-77. Public input has been included in creating the changes. Also, worked with the towns tocome up with these changes. The first is to change 53X North Meck Express to takeadvantage of the direct connect on Lakeview and to express lanes into uptown.
In the morning the bus would get off at Hamright and then go up through the office park to the park and ride lot at Huntersville Gateway and then pick up people in Huntersville and come straight back on the highway. It would be the reverse in the afternoon.
Now, we will implement this incrementally as this project proceeds and as things open, trying to have a moving target in terms of when things are going to be open. We will implement this. This is the ultimate plan when everything is opened.
The next is to change the service that comes from Davidson and have that service go to the Cornelius park and ride lots and will provide a quicker trip for people in Davidson and from the Cornelius park and ride lot. Then offer direct service that covers Northcross park and ride lot with reverse service on Statesville.
6
Metropolitan Transit Commission Meeting Summary November 28, 2018 Page 5 of 8
We will change the uptown route to take advantage of the direct connect on the Brookshire Freeway, which will be a direct connect from the express lanes into the Brookshire Freeway and then we'll use Church and College to operate in uptown.
We hope to get this started in the first quarter of next year. We're working with the construction companies on when things are going to open. And it's up for your approval tonight.
Comments: WILLIAM COXE (Huntersville): This is actually very exciting, Madam Chair, we are going to now have this corridor truly begin to fulfill the vision that was created quite some time ago. It's good. CHRIS MALOY (Chairman – TSAC): As a daily rider of this service, I am excited as well. I echo those comments.
The second thing I have, as we are moving, and this is more of a procedural thing as well. As we implement this, as we talked about, communication is critical if we're going to be hitting a moving targeted and we're not doing this with regular service change on a specific date, e-mail alerts, the on the bus fliers, something on every seat. That information is critical especially for those riders to make sure they're getting the right bus at the right time.
Resolution: Mayor Vi Lyles (City of Charlotte) motioned to approve the changes to the North Mecklenburg Express Services; Mayor Paul Bailey (Matthews) seconded the motion, which passed unanimously.
d. Cancellation of December 2018 MTC Meeting John Muth Resolution: Mayor Vi Lyles (City of Charlotte) motioned to cancel the December 2018 MTC Meeting; Mayor Paul Bailey (Matthews) seconded the motion, which passed unanimously.
VII. Information Itemsa. Regional Transit Plan Update Michelle Nance
Michelle NANCE of CCOG presented the following update on the Regional Transit Plan. I justwanted to provide a quick update on what we've been up to with this process since thetransit summer especially. And just as a reminder, the regional transit initiative is acooperative effort between the MTC and centralized -- it's a continuation to connect ourfuture dialogue about transit. And over the past year these are the kind of the key thingsthat have really emerged from our engagement. And it's about, you know, the population isgrowing. We need to have additional options for transportation, especially transit. Weknow that economic opportunity is a major issue, and in order to be competitive bothregionally, nationally, and globally, transit is an increasingly important piece of that puzzle.There were many things that the engagement suggested that we start working on. Butperhaps the most exciting thing is an update on the regional transit plan.
And just a reminder, the regional transit plan is really looking at how CATS servicesand other transit service providers within the region can better coordinate, especially acrosscounty lines. We're looking at long-term initiatives such as you heard loud and clear fromsome of the counties that they want an extension of the light rail. But we know that that'sabout preserving right-of-way. We know it's about land uses well ahead of getting the --getting any type of transit there. We're going to submit that we have to be right. Folks haveto be preparing for it ahead of time.
7
Metropolitan Transit Commission Meeting Summary November 28, 2018 Page 6 of 8
But the transit plan is also about very near term initiatives and we heard loud and clear from the human services side of transit that there needs to be a better coordinated system for getting people across county lines. A lot of times folks are trying to get into Mecklenburg County for medical services. They're trying to get here for educational opportunities. And the need for that human services transit and kind of day to day is there.
We also want to make sure that we integrate with local transit plans. We know in order to get down on the ground and effect those land uses, whatever comes out of the transit plan really needs to go into local plans, MPO, transportation long range plans, and into land use plans at the local level.
So many of you were at the transit summit in May. And the purpose of that was really to reiterate all that we had learned up to that date. And we had elected officials from across the region that talked about why regional transit was important to them. We had folks from the business community that were there, over 80 agencies, 12 counties, 2 states were represented. At the end of the day a call to action for doing the regional transit plan.
Since that time, we formed a trans advisory committee. It's kind of a small group, but it represents the region, mostly technical folks, to really help us guide the -- putting together a scope for the regional transit plan. And you can see they're from across the region, transit providers from Gastonia Rider Transit and Kannapolis in Cabarrus County and others.
In addition to that advisory committee, we've had a lot more engagement. The star is basically where we are today. Lots of engagement occurred early in 2017 where we were just asking what are the opportunities and what are your needs. That rolled into the transit summit. In October we were out to each county and at those meetings there were managers from cities and counties and elected officials from local governments. We also had staffers from federal government and staffers from state and Congressional delegates as well. And, really, the focus there was what do we need in this transit plan scope to meet the needs of our county. What do we need to have in there to make sure their needs are addressed?
In November we went out and we had 15 forums. And those were state corridor committees. There were groups that represented the economy, that represented opportunity, and then other groups that represented community development. Just to give you a sampling of was at those meetings, it was hospitals, it was major employers, it was bike and pedestrian advocates. It was work force development people, people that work at community colleges.
So, really, this was an opportunity for us to have some smaller meetings, but to really get down a little bit deeper into what were the transit needs for those particular stakeholders. At those meetings we heard a lot about messaging. What transit messaging would work, and heard a lot of really great stories that we would be able to roll into the transit planning effort.
January 2019 we're going to be out to the rural counties. This was specifically requested by the North Carolina Department of Transportation. They wanted to make sure that the rural counties in the region were involved and at least understood what was going on to see how they could be part of the process. And the idea is that in 2019 we would go forward with a request for proposals with a scope out for consultant review and then start the plan in 2019 into 2020. This is just a representation of what those meetings liked like that I was just talking about, the October meetings, November meetings, and those that will happen early 2019.
What's next? rural scope development meetings. We'll have a draft of that actually in December. We will be vetting with CATS staff, going out for the RFP. And there is a
8
Metropolitan Transit Commission Meeting Summary November 28, 2018 Page 7 of 8
whole kind of another layer of activities that's going on there, and that's really searching for funding for the regional transit plan. And we're getting federal agencies, state agencies, and locals for that. It's really looking at all three of those.
You may ask why do all this engagement before the plan. The answer -- we have found out so much that we've kind of dug through the weeds. We're going to be handing a consultant a lot of great information. We feel like they can come out, pretty quickly, and tell us where some potential light rail corridors could be. They could talk to us about the coordination. We would hear a lot of express bus services, the need for van pools. Every county we've been in, they've raised their hands, they've been very excited about that opportunity. We think that that's going to save time and money frankly, but from the consultant side to be able to have that information ready.
VIII. Chief Executive Officer’s Report John Muth Under the CEO’s report, Mr. Muth discussed the following:
a. Sales Tax Report:
CATS’ Deputy Director Muth: The August 2018 receipts were about 14 percent above the August receipts from last year and that the receipts in August were also about 24 percent above our budgetary for the month. We're projecting these will hopefully come in at 7-1/2 percent above what we budgeted for this year, around 105 million. For now, the sales tax are still continuing to grow at a good rate.
b. Ridership ReportCATS’ Deputy Director John Muth, reported the following: LYNX Blue Line -- the
average daily weekday ridership was 19,900. Remember that we had 11 days of service outage on the Blue Line for the month of October. That's why the numbers of 19,964. In July the Blue Line averaged 24,700; August, it was a little over 27,000; in September 26,200. We would expect November and December to rebound back to those type of numbers above 19,964. If you looked at that number later and had any questions about it, that's what we attribute that to.
IX. Other Business.a. Charlotte Gateway Station Dirt Contamination:Mayor Paul Bailey (Matthews) asked about the material dirt over at the new station, therewas some contamination in that dirt?JOHN MUTH (CATS): That's the Charlotte Gateway Station project. That site, we're workingclosely with the state, and the state has issued contracts for construction. Construction isunderway. Over the course of time we've known that there is contamination over in thatarea and there have been phase one and phase two assessments and there have been Ithink some wells that hadn't been drilled over there to monitor.
The standard course of doing the project, there was a report put together by Hart Hickman for the state as part of the project. They're over there monitoring all the excavation that occurs. We knew about it, we're treating the material appropriately, and removing it from the site as we excavate.
b. Thank You Outgoing Chairman:
9
Metropolitan Transit Commission Meeting Summary November 28, 2018 Page 8 of 8
MAYOR Vi LYLES (City of Charlotte) shared to this with MTC. I know that this is your last meeting as chair since the December meeting is canceled. I am not looking forward to taking on this role, but I am looking tonight to say thank you for the work that you've done this past year and all that you've put into it. We all know what it takes – everyone in this room knows what it takes to chair anything. And so I want to say thank you and our greatest appreciation to you, Ms. Scarborough. Chairman Ella SCARBOROUGH (Board of Commissions): Thank you very much. I appreciate it.
X. AdjournThe meeting was adjourned at 5:43 p.m. by Commissioner Scarborough.
NEXT MTC MEETING: WEDNESDAY, JANUARY 23, 2019, 5:30 P.M.
10
METROPOLITAN TRANSIT COMMISSION INFORMATION ITEM STAFF SUMMARY
SUBJECT: LYNX System Update: Staff Recommendations DATE: January 23, 2019
1.0 PURPOSE/SCOPE: CATS is conducting transit studies for the LYNX Red Line/North Corridor and LYNX West Corridor. This effort will also include a system integration study for all CATS services existing and planned in Uptown Charlotte. The primary purpose of the study is to provide the necessary land use and transportation technical analysis including stakeholder and public outreach to support the selection by the MTC of updated Locally Preferred Alternatives (LPA).
Completion of this effort will achieve the following
• Staff recommendation for West Corridor rapid transit mode and alignment.• Updated plans for the LYNX Red Line as well as additional proposed North
Corridor rapid transit options.• Update on how the corridors will integrate with the existing LYNX Blue Line,
CityLYNX Gold Line, and Bus services, including the future Charlotte GatewayStation and LYNX Silver Line
• Identify future corridor transit needs through public input.
2.0 BACKGROUND/JUSTIFICATION: Since July 2017, the CATS project team has engaged the public and stakeholders on rapid transit options for the North and West Corridors as well as system integration options (Attachment A, B and C). Between public workshops, stakeholder meetings, civic organizations and informal coffee chats, CATS have engaged well over 2,200 people. Through digital engagement platforms such as MetroQuest and Facebook over 3,200 survey responses were received and 2,800 people streamed our public workshops live.
The LYNX System Update project team will present to the Metropolitan Transit Commission (MTC) staff recommendations for the West Corridor and System Integration as well a path forward for the North Corridor options at the January 23rd, 2019 MTC Meeting. Additionally, based on public input received, there are a number of recommendations to expand and improve transit service throughout CATS service area.
3.0 PROCUREMENT BACKGROUND: N/A
4.0 POLICY IMPACT: N/A
5.0 ECONOMIC IMPACT: N/A
6.0 ALTERNATIVES: N/A
7.0 RECOMMENDATION: This item is presented as information in preparation for action at the February 27, 2018 MTC meeting
11
8.0 ATTACHMENT(S): (A) North Corridor Rapid Transit Options(B) West Corridor Rapid Transit Options(C) Center City System Integration Options
SUBMITTED AND RECOMMENDED BY:
__________________________________________ John M. Lewis, Jr. Chief Executive Officer, Charlotte Area Transit System Director of Public Transit, City of Charlotte
12
Attachment A North Corridor Rapid Transit Options
13
Attachment B West Corridor Rapid Transit Options
14
Attachment C Center City System Integration
15
METROPOLITAN TRANSIT COMMISSION INFORMATION ITEM STAFF SUMMARY
SUBJECT: CEO Recommended DATE: January 23, 2019 FY2020 Preliminary Operating and Debt Service Budget FY2020-2024 Community Investment Plan
1.0 PURPOSE/SCOPE: This item advises that the Chief Executive Officer will present CATS’ FY2020 Preliminary Operating and Debt Service Budgets, and the FY2020-2024 Community Investment Plan (CIP) to the Metropolitan Transit Commission on January 23, 2019.
2.0 BACKGROUND/JUSTIFICATION: The CATS FY2020 Preliminary Operating and Debt Service Budgets and the FY2020-2024 Community Investment Plan (CIP) will be presented in compliance with the Transit Governance Interlocal Agreement. The balanced budgets were developed in compliance with CATS’ Financial Policy guidelines and objectives.
The FY2020 Preliminary Operating and Debt Service Budgets maintain and enhance current services and commitments, with a focus on providing flexible mobility options. The FY2020 Preliminary Operating Budget highlights include the Blue Line Extension (BLE), North Corridor Direct Connect Studies, and the Mobile Payment Application.
The FY2020-2024 Community Investment Plan (CIP) advances the 2030 Transit Corridor System Plan while providing enhanced mobility options. Key capital expenses include State of Good Repair, City Federated Video Monitoring System (VMS) Project, and Technology upgrades.
3.0 PROCUREMENT BACKGROUND: N/A
4.0 POLICY IMPACT: The recommended FY2020 Preliminary Operating and Debt Service Budget and FY2020-2024 Community Investment Plan (CIP) were developed in compliance with the following MTC Policy directives:
1) CATS Mission, Vision and Strategic Goals2) CATS Financial Policies (Rev. 2016)3) The 2030 Transit Corridor System Plan4) CATS Service and Fare Policies
5.0 ECONOMIC IMPACT: N/A
6.0 ALTERNATIVES: N/A
7.0 RECOMMENDATION: Not applicable at this time since information is being presented for review by the MTC.
8.0 ATTACHMENT(S): None
SUBMITTED AND RECOMMENDED BY:
__________________________________________ John M. Lewis, Jr. Chief Executive Officer, Charlotte Area Transit System Director of Public Transit, City of Charlotte
16
FY2020 PRELIMINARY OPERATING BUDGET
FY2020 – FY2024 PRELIMINARY CIP
17
January 23, 2019
To: The Chair and Members of the Metropolitan Transit Commission
Charlotte, North Carolina
I am pleased to present to you the recommended FY2020 Preliminary Operating Budget, which
includes the Operating and Debt Service Budgets, Financial and Business Performance Targets, and the
FY2020-FY2024 Community Investment Plan (CIP) for the Charlotte Area Transit System (CATS). The
balanced budget maintains and enhances current services and commitments, with a focus on providing
flexible mobility options.
FY2020 Priorities:
The FY2020 budgets reflect priorities in the Metropolitan Transit Commission’s approved Mission and
Strategic Goals for CATS.
• Outstanding community-wide public transportation services
• Focused regional growth
• Safety and accountability
• Safe, affordable mobility options to jobs, education and housing
• Contribution to economic development in the County and region
• Investment in employees
FY2020 Budget Highlights:
• The Blue Line Extension (BLE) - after a full-year of revenue service of the 9.3 miles from Center
City Charlotte through the North Davidson historic arts district and University City area to a
terminus on the campus of the University of North Carolina, Charlotte (UNCC), requires additional
operating assistance to properly maintain the system. The system includes 11 new light rail
stations, with approximately 3,100 parking spaces at four stations with parking facilities. The
FY2020 Preliminary Operating Budget includes approximately $1.3 million to cover additional
expenses for staffing and technology equipment contract maintenance fees related to the BLE.
• North Corridor Direct Connect Studies is an Advanced Transit System Plan pertaining to the
North Corridor. This is the next step from the system plan update that defined rail fixed
guideway alignments to serve the airport and the north corridor areas to determine the
appropriate transit mode for each of these corridors.
• Mobile Payment Application full implementation now gives transit riders an electronic payment
option to purchase transit fare on their phones, and maintain cash balances on individual
customer accounts for future use.
• State of Good Repair priorities including replacement of fixed-route buses, Special
Transportation Services (STS) buses and Vanpool vehicles; repairs and renovations to transit
facilities; and on-going light rail vehicle overhaul program.
FY2020 Preliminary Budget CEO’s Transmittal Letter | 1
Chief Executive Officer’s Transmittal Letter
18
FY2020 Budget Highlights (continued):
• City Federated Video Monitoring System (VMS) Project will focus around Genetec Technology.
CATS will be replacing its current system to integrate with the City’s VMS. This solution will reduce
the number of recorders and increase system capability to share video with City Departments.
• Technology Upgrades to enhance delivery of transit services and customer traveling experience,
including replacement of mobile gateway modems on bus and rail for compatibility with City
services.
CATS FY2020 budget is supported primarily by the transit sales tax, fare revenues, service
reimbursements, maintenance of effort, operating and capital assistance from the Federal and State
governments and other miscellaneous sources.
CATS continues to deliver innovative projects that will improve the transit landscape for our region’s
residents, and to respond to the transit needs of the community within its available resources. In order
to advance the 2030 Transit Corridor System Plan, significant new funding sources are required. CATS
continues to work with state and regional stakeholders to raise awareness of our infrastructure needs
and advocate for a new, sustainable source of funding.
Respectfully submitted,
John M. Lewis, Jr.
Chief Executive Officer
CEO’s Transmittal Letter | 2FY2020 Preliminary Budget
Chief Executive Officer’s Transmittal Letter
19
Table of Contents | 3FY2020 Preliminary Budget
Table of Contents
Executive Summary 4
Section I – Operating Budget 5
Section II – Debt Service Budget 11
Section III - Revenue Reserve Fund 11
Section IV – Community Investment Plan 12
Section V – Performance Objectives 15
Section VI – CATS Services & Ridership 16
Section VII – CATS Program Profiles 17
Appendix 1 – Operating Budget Summary 18
Appendix 2 – Performance Objectives 19
Appendix 3 – Staffing Summary 20
Appendix 4 – Operating Budget 21
Appendix 5 – Debt Service Summary 23
Appendix 6 – Community Investment Plan 26
Appendix 7 – Grant-Funded Operating Projects 30
Appendix 8 – Other Capital Projects Managed by CATS 31
Appendix 9 – FY2020 Budget Schedule 33
20
FY2019 was the first full-year of revenue service for the Blue Line Extension (BLE). Riders can now
travel on 18.9 miles of light rail from UNCC in the Northeast Corridor, through Center City Charlotte
and onwards to the I-485 South Corridor for access to jobs, education, sports and other events. Trains
operate seven days a week from 5:26 am – 1:26 am daily, arriving at stations every 7.5 minutes
during rush hour and every 15 minutes at other times during the week. Weekend service operates
every 20 minutes during the day and every 30 minutes during late night hours.
CATS has effectively controlled operating costs in FY2019 and continues to maintain expense controls
through FY2020. Fuel costs remain low due to the hedging program, providing locked pricing and
budget stability. Sales tax growth and increased interest earnings are expected to continue into
FY2020.
Executive Summary | 4FY2020 Preliminary Budget
Executive Summary
BUDGET SUMMARY
FY2019 FY2020
Adopted Budget
(millions)
Preliminary Budget
(millions)
Operating Revenues 152.6$ 162.4$
CATS Control Account 2.0 -
Total Operating Revenue 154.6$ 162.4$
Operating Expenditures 154.4$ 162.4$
Transfer to Capital 0.2 -
Total Operating Expenditures and Transfers 154.6$ 162.4$
Debt Service Budget 125.9$ 115.3$
Capital Budget 319.4$ 24.5$
21
Section I. Operating Budget | 5
I. OPERATING BUDGET
The FY2020 Preliminary Operating Budget is $162.4 million.
Reference: Appendix 1
The FY2020 Preliminary Operating Budget covers cost for transit provided by City and contracted
employees. Approximately 63.8% (or $103.7 million) of the Operating Budget includes Personal
Services with the remaining 36.2% covering other operating expenses (or $58.8 million).
Direct services account for 88.9% (or $144.4 million) of the Operating Budget. Support services and
other indirect services account for 11.1% (or $18.0 million) of the Operating Budget.
Budget Summary
FY2020 Preliminary Budget
BUDGET SUMMARY
FY2019 FY2020 Variance Variance
Adopted Budget
(millions)
Preliminary Budget
(millions)(millions) (%)
Operating Revenues 152.6$ 162.4$ 9.8$ 6.4%
CATS Control Account 2.0 - (2.0)$ -100.0%
Total Operating Revenue 154.6$ 162.4$ 7.8$ 5.0%
Operating Expenditures
Current Service Levels 153.9$ 161.6$ 7.7$ 5.0%
Service Level Changes 0.5 0.8$ 0.3$ 64.9%
Subtotal Operating Expenditures 154.4$ 162.4$ 8.0$ 5.2%
Transfer to Capital 0.2 - (0.2) -100.0%
Total Operating Expenditures and Transfers 154.6$ 162.4$ 7.8$ 5.0%
22
Section I. Operating Budget | 6
A. Operating Revenues: $162.4 million
In FY2020, operating revenues are projected at $162.4 million, an increase of $7.8 compared to the
FY2019 Adopted Budget, which represents an increase of 5.0%. The increase is primarily due to an
increase in the operating allocation that reflects an updated sales tax trendline, and an accounting re-
classification of grant-funded operating activities. Prior to FY2019, grant-funded operating revenues
were accounted for in the capital budget. For FY2020, these grant-funded operating revenues
continue to be accounted for in the operating budget, causing an increase in the operating revenues.
Operating revenues consists of system-generated revenue such as passenger fares, advertising and
leases, and also includes the State Maintenance Assistance Program (SMAP) and Maintenance of Effort
funding from the City of Charlotte, Mecklenburg County and the Town of Huntersville. The majority of
operating revenues come from sales tax revenue, which is projected to continue growing steadily.
The following chart identifies the sources of the $162.4 million in revenue that will fund the FY2020
operating programs.
Fares & Svc Reimb.
$29.9 18%
Sales Tax Allocation$75.5 47%
Maint. Of Effort$22.6
14%
Operating Assist.$7.5
5%
Non Operating $23.1 14%
Other Misc.$3.7
2%
FY2020: Where the Money Comes From
Budget Summary
FY2020 Preliminary Budget
23
Budget Summary
Key changes in revenue in the FY2020 Preliminary Operating Budget versus the FY2019 Adopted
Operating Budget are as follows:
Section I. Operating Budget | 7FY2020 Preliminary Budget
FY2019 FY2020 Variance Variance
Adopted Budget
(millions)
Preliminary
Operating Budget
(millions)(millions ) (%)
Operating Allocation 69.3$ 75.5$ 6.3$ 9.1%
Operating Allocation increase reflects an
updated sales tax trendline provided by the City
Treasurer’s Office
Fare Revenues and Service Reimbursements 33.1$ 29.9$ (3.2)$ -9.6%
The decrease is primarily due to updated fare
revenue projections for BLE light rail opening
year services, elimination or reduction of some
services to include the UNCC Shuttle and the
Airport Connector bus services.
Maintenance of Effort 22.0$ 22.6$ 0.7$ 3.0%
Maintenance of Effort are funds received from
the City of Charlotte, which are paid to CATS in
compliance with state law. The City of Charlotte
increases its annual contribution by 3%.
Operating Assistance 6.1$ 7.5$ 1.4$ 23.7%
Operating Assistance includes funds from the
City of Charlotte for Goldline Phase 1, and $6.03
million from the federal government for
implementation of the BLE light rail service. For
FY2020 there is no longer a reimbursement from
NCDOT and the private sector for construction
mitigation services on the I-77 Corridor.
Other (Miscellaneous) 3.2$ 3.7$ 0.5$ 14.5%
Other Miscellaneous revenues include
advertising, leasing, and interest earned.
CATS Control Account 2.00$ -$ (2.0)$ -100.0%
CATS does not plan to transfer revenue from the
Control Account in FY2020
Non-Operating Revenue 19.0$ 23.1$ 4.1$ 21.7%
Grant funding revenue received for operating
exenses, this includes the State Maintenance
Assistance Program (SMAP) and Operating
Assistance from Mecklenburg County and the
Town of Huntersville.
Total Operating Budgetary Increases (Decreases) 154.6$ 162.4$ 7.8$ 5.0%
Revenue Source
24
Section I. Operating Budget | 8
B. Operating Expenditures: $162.4 million
In FY2020, operating expenses are projected at $162.4 million, an increase of $7.8 million compared
to the FY2019 Adopted Budget, or 5.0% increase. Part of this increase is due to additional BLE-
related expenses for staffing and technology equipment contract maintenance fees for equipment no
longer under warranty. It is also due to an accounting re-classification of grant-funded operating
activities such as corridor studies. Previously, grant-funded operating expenditures were accounted for
in the capital budget but starting in FY2019 these grant-funded operating expenditures are
accounted for in the operating budget, causing an increase in the operating expenditures.
C. Operating Balance: $0.0 million
The Operating Balance is transferred to the capital program and provides a portion of the ‘matching
fund’ dollars required by Federal and/or State grants as well as being programmed to fund capital
projects that do not receive grant funds. As the CATS control account continues to grow it provides an
opportunity to reduce the amount of operating funds used for capital. In FY2019 the department only
transferred $0.2 million from operating while using the control account to fund the remaining portion.
In FY2020 the department will utilize the CATS control account to fund all capital programs eliminating
any transfers from Operating to Capital.
Where the Money Goes in FY2020
Budget Summary
FY2020 Preliminary Budget
PersonalServices$103.7
64% Fuel$7.7 5%
Other$51.1 31%
25
Section I. Operating Budget | 9
Key changes in expenditures in the FY2020 Preliminary Operating Budget versus the FY2019
Adopted Operating Budget are as follows:
Budget Summary
FY2020 Preliminary Budget
FY2019 FY2020 Variance Variance
Adopted Budget
(millions)
Preliminary
Operating Budget
(millions)
(millions ) (%)
Personal Services 102.6$ 103.7$ 1.0$ 1.0%
- 3.0% increase in merit for City employees
- 5% increase in health insurance cost for City
employees
Fuel 7.1$ 7.4$ 0.2$ 3.0%
Diesel fuel for Bus & STS Operations is forward
purchased at approximately $2.03/gallon of the
FY2020 estimated usage.
Other Operating Expense 44.6$ 51.4$ 6.8$ 15.2%
Increased operating costs for Facilities, BOD
Maintenance, Maintenance of Way, Transit
Security, Administration, Development, Quality
Assurance and Technology.
Transfer to Capital 0.2$ -$ (0.2)$ -100.0%
Decrease in transfer from CATS operating to
capital projects
Total Operating Budgetary Increases (Decreases) 154.6$ 162.4$ 7.8$ 5.0%
Expenditure
26
Section I. Operating Budget | 10
D. Service Level Changes
The FY2020 Preliminary Operating Budget includes service level changes totaling $0.8 million in
additional expenditures tied to an additional 17 City full-time equivalent (FTE) positions:
E. Staffing
The FY2020 Operating Budget provides for 551.75 full-time equivalent (FTE) positions, which includes
the Service Level Changes of 17.00 FTE. Additionally, the CATS FY2020 Preliminary Budget provides
for 3 ‘project term’ positions to be maintained through the closing date of the grants on each of the
capital investment projects. Of the 7.50 temporary positions, 3 are expected to be funded by NCDOT’s
annual intern program. A staffing summary by section can be found in Appendix 3.
Budget Summary
FY2020 Preliminary Budget
Section FTE Additional Budget
414030 - Technology Business Systems Spec. Lead 1.00 116,606$
416011 - Rail Administration Training Specialist 1.00 84,115
416012 - Rail Maintenance Transportation Elect. Technician II 10.00 386,010
416012 - Rail Maintenance Rail Car Maintenance Supervisor 2.00 104,519
416012 - Rail Maintenance Rail Maintenance Assistant 2.00 51,969
419010 - HR & CR Administrative Officer II 1.00 81,361
17.00 824,580$
Position
Total additional FTE & budget tied to SLCs
27
Section II. Debt Service Budget | 11
II. DEBT SERVICE BUDGET
A. Debt Service Revenues: $115.3 million
No new debt financing is planned for FY2020. Key sources of revenue for payment of the current
debt expenses are the transit sales tax (local), Federal and State grants.
Debt financing proceeds are utilized to fund CATS capital investment projects.
B. Debt Service Expenditures: $115.3 million
Debt service expenditures include principal and interest costs on project financings, together with fees
and miscellaneous costs associated with capital financings.
In FY2020, debt service expenditures are as follows:
• $115.2 million is for principal and interest payments shown below
• $0.1 million covers miscellaneous fees
Reference: Appendix 5
III. REVENUE RESERVE FUND
In 2016, the MTC approved revision of CATS Financial Policies which created a CATS Control Account.
This account would receive sales tax revenue in excess of the sales tax trend line only when the
balance in the Revenue Reserve Fund has reached the maximum required balance of $30 million.
The Revenue Reserve Fund (RRF) reached the required balance of $30 million in FY2017. Therefore,
the projected FY2020 $11 million of sales tax dollars that would have been deposited into this fund
will transfer directly to the CATS Control Account. In accordance with Section 3.3 of MTC Financial
Policies MTC-01, the Transit CEO may recommend use of such funds, for operating or capital programs,
to the Metropolitan Transit Commission as a part of the CEO Recommended Budget in January of each
year.
Project/Description FY2020
Principal & Interest
(millions)
Source of Funding
South Corridor – Blue Line $ 4.2 Local
South Tryon Bus Garage 3.7 Federal & Local
Various Bus Facilities, Fleet & Other 2.3 Local
Northeast Corridor – Blue Line Extension 105.0 Federal, State & Local
Miscellaneous Fees 0.1 Local
TOTAL $ 115.3
Budget Summary
FY2020 Preliminary Budget
28
Section IV. Community Investment Plan | 12
IV. COMMUNITY INVESTMENT PLAN (CIP)
CATS $95.0 million 5-year CIP is prioritized to continue the systems State of Good Repair by
replacing vehicles, repairing and renovating facilities and technology upgrades.
Notes:
1. Excludes Grant-Funded Operating Projects totaling $51.1 million for FY2020 – FY2024
2. Includes some prior year re-allocation but excludes carry over
Capital Revenues: $95.0 million
Revenues for CATS 5-year capital program includes funds from Federal and State grants, transit sales
tax and private funding.
The FY2020 to FY2024 CATS capital program consist of the following:
• $60.3 million from Federal grants including Federal New Starts, Formula Funding, Bus and Bus
Facilities and Enhanced Mobility.
• $6.5 million from State grants including Competitive funding for Advanced Technology and Urban
State Matching Funds for Vehicle purchases.
• $0.7 million prior year re-allocations
• $27.5 million from transit sales tax (transfer from the Operating Balance, CATS Control Account
and CATS Fund Balance), private funding and prior year savings re-allocated.
FY2020 FY2021 FY2022 FY2023 FY2024
TOTAL
FY2020 –
FY2024
Revenues 24.5 17.1 17.7 17.7 17.8 95.0
Expenditures 24.5 17.1 17.7 17.7 17.8 95.0
Budget Summary
FY2020 Preliminary Budget
29
Section IV. Community Investment Plan | 13
Capital Expenditures: $95.0 million
CATS 5-year capital program key expenditures include the following:
Notes:
1. Excludes Grant-Funded Operating Projects totaling $51.1 million for FY2020 – FY2024
2. Includes some prior year re-allocation but excludes carry over
Capital Program/Project FY2020-FY2024 Total
State of Good Repair - Vehicle Replacements
Replacement of revenue service vehicles that have reached the end of their
useful life. In FY20 CATS will replace 10 Buses, 17 Special Transportation Vehicles,
16 Vanpool vehicles and 5 expansion vehicles for the Vanpool program.
$ 59.1 million
State of Good Repair - Facilities and Others
Replacement, upgrades or repair of transit assets including renovations/repairs of
transit facilities to comply with federal Transit Asset Management guidelines.$ 0.7 million
Transit Safety & Security
Programs and projects to advance safe, reliable, and equitable transit service
throughout the system including camera replacements and dispatch upgrades.$ 1.3 million
Transit Long Range Capital Improvement
Design services for rapid transit, rail, bus, streetcar and facility improvements to
better serve the region. Projects include Lynx Blue Line Extension and a new
South end Station.
$ 19.4 million
Non-Revenue Vehicles
Purchase and replacement of non revenue vehicles for supervisory staff,
maintenance and repair calls.$ 3.2 million
Transit New Equipment
The purchase of new equipment such as steam bay lifts, a track backhoe and
technology upgrades.$ 6.3 million
Other Programs
Other programs included in the five-year capital program include Enhanced
Mobility projects and technology upgrades.$ 4.3 million
Carry Over Projects 1
Continued funding for existing capital projects. $ 0.7 million
Total Five-Year Capital Program 2 $95.0 million
Budget Summary
FY2020 Preliminary Budget
30
Section IV. Community Investment Plan | 14
CAPITAL PROGRAMS MANAGED BY CATS
CATS manages two transit capital investment programs which receive funds from the Federal and State
governments and the City of Charlotte. Reference: Appendix 8
The Charlotte Gateway Station – Rail Project (Phase I)
The Charlotte Gateway Station (CGS) Project is a planned multi-modal transit center located in Center
City Charlotte.
The City of Charlotte and the North Carolina Department of Transportation (NCDOT) are partners in
the phased implementation of this project which:
• Improves both regional (Amtrak) passenger rail service and regional freight rail operations through
the construction of track and bridge improvements
• Includes a future multi-modal passenger station facility, the completion of which will mark the return
of Amtrak service to Uptown Charlotte, with supporting modal connections to CityLYNX GoldLine,
regional bus connections and CATS local bus routes.
Design and engineering of the first phase of the Project is underway with construction of the initial
track and bridge improvements began in 2018. Phase 1 is being funded with federal, state and City
of Charlotte (local) funds.
The CityLYNX GoldLine Streetcar Project – Phase II
The CityLYNX GoldLine Streetcar project - Phase II is an extension of the approximately 1.5 mile
CityLYNX GoldLine Phase 1 project completed in July 2015. Phase II consists of the design and
construction of approximately 2.5 miles of double-track in-street running streetcar line. This will result
in approximately a total of a 4-mile long double-track streetcar system which will extend from
Johnson C. Smith University through Center City Charlotte, to Novant Health and Sunnyside Avenue.
The project is being funded by a Federal Small Starts Grant for $74,999,999 and with a local match
of $75 million funded by the City of Charlotte. Construction began in early 2017 and is scheduled to
be completed by August 2020.
Budget Summary
FY2020 Preliminary Budget
31
Section V. Performance Objectives | 15
FINANCIAL PERFORMANCE OBJECTIVES
CATS Financial Policies provide guidelines on how financial resources shall be utilized to fulfill the
mission of the transit system, meet obligations and to protect the public interest.
BALANCED SCORECARD OBJECTIVES
CATS Balanced Scorecard (BSC) is developed on high level outcomes that determine the efficiency and
effectiveness of the transit system. These outcomes establish high level expectations for CATS and are
comparable to national standards for a medium to large transit agency. Outcomes are based on
performance metrics established for CATS operations and services. The BSC performance objectives
are referenced in Appendix 2
Performance Objectives
FY2020 Preliminary Budget
32
Section VI. Services & Ridership | 16
CATS SERVICES AND RIDERSHIP
CATS will provide approximately 23.5 million rides in FY2020 on its bus, light rail, streetcar, vanpool
and Special Transportation services.
The Blue Line Extension finished it’s first full-year of revenue service in FY2019, providing service to
eleven new station locations from 9th Street in Uptown Charlotte to the UNC-Charlotte campus.
Ridership was lower than projected but is expected to increase in FY2020 as construction projects at
the Sugar Creek, 36th Street and UCB stations is completed. The light rail system captures a number of
riders who previously used the bus system, although not as many as included in initial projections.
Customers wholly new to transit are also expected to contribute to an increase in light rail ridership as
ridership matures over the first few years of operations.
The FY2020 budget proposes a net increase of approximately 6,383 in bus service hours. The Special
Transportation Service ridership is expected to continue to increase in FY2020. CATS is planning to
upgrade the existing paratransit scheduling system to help manage the increased ridership.
CATS Services and Ridership
FY2020 Preliminary Budget
FY2019 FY2020 FY2021 FY2019 FY2020 FY2021
Bus 13,996,284 14,180,816 14,283,243 835,247 841,630 840,460
Light Rail 8,524,585 8,780,323 8,868,126 71,004 71,239 71,144
Streetcar 295,083 147,542 1,127,500 10,739 10,739 27,810
Special Transportation Svc. 267,083 267,083 267,083 153,048 153,048 153,048
Vanpool 135,149 135,149 135,149 33,731 33,731 33,731
Total 23,218,184 23,510,913 24,681,101 1,103,769 1,110,387 1,126,193
Ridership Revenue Service HoursMode
33
Section VII. CATS Program Profiles | 17
LIGHT RAIL / STREETCAR
Projected to provide over 71,000 hours and over 1.2 million miles of service to over 12 million passengers annually
DEVELOPMENT
Responsible for planning and construction of transit projects including quality control and assurance of all
project developments
SAFETY & SECURITY
Responsible for safety & security of all CATS amenities, facilities and individuals that come in
contact with CATS
CUSTOMER SERVICE, MARKETING & TECHNOLOGY
Manage public relations, customer service requests, trip planning assistance and technology for transit operations
HUMAN RESOURCE & CIVIL RIGHTS
Oversee compliance with federal, state & local guidelines to ensure fair and equal treatment of
customers and employees
BUS / STS / VANPOOL
Provides approximately 1 million hours and over 16 million miles of services to over 15 million passengers annually
FINANCE & PROCUREMENT
Manage all fiscal aspects and procurements for transit operations and capital projects including
budget, grants, debt financing, revenue collections & financial reporting
CHIEF EXECUTIVE OFFICE Sets strategic direction for the department and manages the overall operation and administration, including
budgeting, training, coordinating with City Manager’s office and support of the Metropolitan Transit Commission
FACILITIES
Manage and maintain light rail stations, park & ride lots, parking decks, bus garages, light rail facilities, transit centers, and bus stops
The City provides additional support to CATS through a City Cost Allocation Plan.
CATS Program Profiles
FY2020 Preliminary Budget
34
Operating Fund
Sales Tax Allocation
FY2017 Actuals
FY2018 Actuals
FY2019 Adopted Budget
FY2019 Year-End
Projection
FY2020 Preliminary
Budget
Appendices | 18FY2020 Preliminary Budget
Appendix 1 – Operating Budget Summary
A Sales Tax Receipts 92,601,412$ 103,021,757$ 98,211,941$ 105,530,167$ 109,933,384$
B Less Sales Tax Trendline (78,272,224) (84,704,000) (87,499,000) (87,499,000) (93,147,033)
A - B = C Net Difference 14,329,188$ 18,317,757$ 10,712,941$ 18,031,167$ 16,786,351$
Sales Tax Available for Allocation:
D Transfer to (from) Revenue Reserve 14,329,188$ -$ -$ -$ -$
E Transfer to Debt Service Fund 15,134,210 14,211,644 18,224,238 18,224,238 17,602,538
F Transfer to Operating Fund (Operating Alloc) 63,138,014 70,492,356 69,274,762 69,274,762 75,544,495
G CATS Control Account - 18,317,757 10,712,941 18,031,167 16,786,351
F + G + H = I Sales Tax Allocation to Other Funds 92,601,412$ 103,021,757$ 98,211,941$ 105,530,167$ 109,933,384$
Revenues:
Operating Revenues:
Sales Tax Operating Allocation 63,138,014$ 70,492,356$ 69,274,762$ 69,274,762$ 75,544,495$
Fares and Service Reimbursements 29,740,399 27,115,399 33,086,391 28,837,267 29,912,726
Maintenance of Effort - Charlotte 20,709,362 21,330,643 21,970,562 21,970,562 22,629,679
Operating Assistance 1,533,357 7,045,263 6,063,665 9,519,516 7,502,896
CATS Control Account - - 2,000,000 1,000,000 -
Other (Advertising, Misc) 2,728,384 3,455,940 3,231,211 3,583,240 3,698,971
Subtotal 117,849,516$ 129,439,601$ 135,626,591$ 134,185,347$ 139,288,767$
Non-Operating Revenue 12,053,293$ 21,434,421$ 19,014,288$ 15,687,291$ 23,140,268$
Total Operating Revenues 129,902,809$ 150,874,022$ 154,640,879$ 149,872,638$ 162,429,035$
Operating Expenditures
Transportation Services 120,787,533$ 133,822,293$ 139,404,875$ 135,330,152$ 144,355,232$
Transit Development 2,969,167 3,836,648 3,739,876 3,533,817 4,778,876
Marketing and Communications 3,433,428 3,529,291 4,145,939 3,822,768 4,482,711
Executive and Administration 8,112,747 15,591,021 9,989,226 9,824,938 10,649,640
Subtotal 135,302,875 150,279,253 157,279,916 152,511,675 164,266,458
Transfers to Eligible CIP Projects (13,674,704) (4,980,262) (2,879,019) (2,879,019) (1,837,423)
Total Net Operating Expense 121,628,171 145,298,991 154,400,898 149,632,657 162,429,035
Transfer from Operating to CIP 9,241,562 4,607,165 239,982 239,982 -
Total Operating Expenditures 130,603,986$ 149,906,156$ 154,640,879$ 149,872,638$ 162,429,035$
35
FY2017 Actuals
FY2018 Actuals
FY2019 Adopted Budget
FY2019 Year-End
Projection
FY2020 Preliminary
Budget
FY2016 Actuals
Appendices | 19FY2020 Preliminary Budget
Appendix 2 – Performance Objectives
SYSTEM SUBSIDY
≤ 80% of Total Operating Cost 72.0% 73.3% 79.0% 76.5% 78.3% 79.3%
OPERATING RATIO (W/O Capital Interest) 28.0% 26.7% 21.0% 23.5% 21.7% 20.7%
PASSENGERS PER HOUR
(Bus ≥ 20 passengers per hour) 21.64 20.15 17.73 18.24 16.76 16.85
(Light Rail ≥ 90 passengers per hour) 121.71 117.89 109.52 185.25 107.90 116.54
ADMINISTRATIVE OVERHEAD 7.6% 9.5% 9.2% 10.8% 10.6% 12.5%
(≤ 15%)
GROSS DEBT SERVICE COVERAGE 5.38 5.82 6.09 4.93 5.21 5.86
(> 3.0)
NET DEBT SERVICE COVERAGE
(≥ 1.15) 2.25 2.07 2.05 1.42 1.70 1.67
36
FY2020 Preliminary Budget Appendices | 20
Appendix 3 – Staffing Summary
Approved in
FY2019FY2020 SLC TOTAL FTES
Bus Operations Division (BOD) Employees
Transportation Services
415010 BOD - Operations 627.00 - 627.00 - -
415011 BOD - Administration 14.00 - 14.00 - -
415012 BOD - Maintenance 178.00 - 178.00 - -
415013 BOD - STS Maintenance 9.00 - 9.00 - -
Subtotal BOD Employees 828.00 0.00 828.00 - -
City Employees
Transportation Services
415050 Special Transportation Services 125.75 - 125.75 4.50 -
411060 Treasury/Revenues 19.00 - 19.00 - -
412010 Transit Center Operations - - - - -
415020 County Human Svc Trans - - - - -
412020 Facilities 14.00 - 14.00 - -
414020 Customer Svc & Information 21.00 - 21.00 - -
416010 Light Rail Operations 89.00 - 89.00 - -
416011 Light Rail Administration 17.00 1.00 18.00 - -
416012 Light Rail Maintenance 60.00 14.00 74.00 - -
416013 Maintenance of Way 58.00 - 58.00 - -
416020 CityLYNX GoldLine 15.00 - 15.00 - -
417010 Transit Security 17.00 - 17.00 - -
415001 Bus General Management 4.00 - 4.00 1.00 -
418010 Planning And Scheduling 11.00 - 11.00 - -
415040 Van Pool Division 4.00 - 4.00 - -
Transit Development
413001 Development Administration 7.00 - 7.00 - -
413002 Quality Assurance 6.00 - 6.00 1.00 -
413003 Engineering - - - - -
413020 North/CGS Corridor 1.00 - 1.00 - -
413050 Northeast Corridor Development 10.00 - 10.00 - -
Marketing & Communications
414010 Marketing & Communications 12.00 - 12.00 - -
414030 Technology 11.00 1.00 12.00 - 1.00
Executive & Administration
411010 Administration Division 15.00 - 15.00 1.00 1.00
411070 City Support Costs - - - - -
419010 HR and Civil Rights 8.00 1.00 9.00 - -
411040 Executive Division 2.00 - 2.00 - -
411050 MTC & Committees Division - - - - -
411020 Procurement Services 8.00 - 8.00 - 1.00
Subtotal City Employees 534.75 17.00 551.75 7.50 3.00
Total Employees 1,362.75 17.00 1,379.75 7.50 3.00
FTE
FY2020 Staffing Levels
Temps
Grant-
Funded
Term
37Novant Health SPR Board of Trustees Orientation @ Noon7
FY2020 Preliminary Budget Appendices | 21
Appendix 4 – Operating Budget
FY2017 Actuals
FY2018
Actuals
FY2019 Adopted Budget
FY2019 Year-End
Projection
FY2020 Preliminary
Budget
Operating Revenues
Service Passenger Fares
Bus 19,206,656$ 17,772,685$ 17,656,781$ 16,811,946$ 16,931,894$
Light Rail 5,464,159 5,802,079 11,472,561 7,877,715 8,718,860
Vanpool 451,626 377,119 469,692 378,620 369,345
Paratransit 741,372 759,210 761,872 730,923 814,870
Subtotal 25,863,813$ 24,711,093$ 30,360,906$ 25,799,204$ 26,834,969$
Service Reimb & Funding Partners
Airport Connector Services 2,333,803$ 1,165,744$ 200,000$ 450,661$ 200,000$
Fort Mill (WellsFargo) Rt 44 Carowinds 28,845 6,075 8,409 8,409 8,661
UNCC Shuttle 1,009,490 - - -
UNCC Pass Purchases - 253,630 1,050,000 1,050,000 1,275,000
Union County Express 74x 99,737 126,396 126,557 126,557 130,354
Concord Express Commuter Bus 90,827 90,534 - - -
Rock Hill Express Commuter Bus - 125,640 152,369 152,369 156,940
Gastonia Express Commuter Bus 85,283 98,928 159,423 159,423 164,206
Kings Mtn 85x - 44,500 44,500 44,500
Carowinds (N&BS U MYEP) 119,076 75,922 44,411 44,411 45,743
DSS 7,025 7,150 7,025 7,025 7,025
Gold Rush 100,000 - -
CMGS - 484,787 484,787 484,787
Concord Mills (LMS) 2,500 - -
Parking - BLE Decks - 350,000 350,000 391,368
Parking - CGS - 285,829 98,004 98,004 98,004
CPCC Levine Campus - - -
Ramsey Creek Beach Park 149,954 52,665 52,665
Volkswagen Parking Lease 18,504 9,252 18,504
Subtotal 3,876,586$ 2,404,306$ 2,725,485$ 3,038,063$ 3,077,757$
Service Income
Charlotte Transit Center -$ 417,032$ 452,468$ 452,468$ 452,468$
Advertising 1,466,815 1,774,667 1,545,000 1,545,000 1,906,800
Interest Earned 281,422 843,251 641,000 834,521 941,000
Agreements/Leases 260,533 33,528 42,059 42,659 33,670
Miscellaneous 719,613 387,462 550,684 708,592 365,033
Subtotal 2,728,383$ 3,455,940$ 3,231,211$ 3,583,240$ 3,698,971$
Sales Tax Revenue
Operating Allocation 63,138,014$ 70,492,356$ 69,274,762$ 69,274,762$ 75,544,495$
CATS Control Account - 2,000,000 1,000,000
Subtotal 63,138,014$ 70,492,356$ 71,274,762$ 70,274,762$ 75,544,495$
Maintenance of Effort
City of Charlotte 20,709,362$ 21,330,643$ 21,970,562$ 21,970,562$ 22,629,679$
Subtotal 20,709,362$ 21,330,643$ 21,970,562$ 21,970,562$ 22,629,679$
Operating Assistance
Federal CMAQ (for Service Expansions) -$ 4,000,000$ 4,000,000$ 7,200,000$ 6,031,000$
City of Charlotte - GoldLine Phase 1 1,533,357 1,920,596 1,736,360 1,736,360 1,471,896
NCDOT (I-77 Mitigation) - 908,350 265,500 521,351 -
Sugar Creek (I-77 Mitigation) - 216,317 61,805 61,805 -
Subtotal 1,533,357$ 7,045,263$ 6,063,665$ 9,519,516$ 7,502,896$
Non Operating Revenue
Grant Funded Operating Projects - Fed 390,749$ 10,004,618$ 7,376,605$ 7,376,605$ 14,823,942$
Grant Funded Operating Projects - State - 155,090 231,352 231,352 221,237
State Maintenance Assist. Prog. (SMAP) 11,451,036 11,063,205 11,194,823 7,867,826 7,883,581
Mecklenburg County 192,942 192,942 192,942 192,942 192,942
Town of Huntersville 18,566 18,566 18,566 18,566 18,566 Subtotal 12,053,293$ 21,434,421$ 19,014,288$ 15,687,291$ 23,140,268$
TOTAL OPERATING REVENUES 129,902,809$ 150,874,023$ 154,640,879$ 149,872,638$ 162,429,035$
38
Appendices | 22FY2020 Preliminary Budget
Appendix 4 – Operating Budget
Operating Expenditures
FY2017 Actuals
FY2018
Actuals
FY2019 Adopted Budget
FY2019 Year-End
Projection
FY2020 Preliminary
Budget
Transportation Services
411060 Treasury/Revenues 1,323,198$ 1,370,044$ 1,585,157$ 1,366,534$ 1,577,089$
412010 Transit Center Operations 1,009,873 1,222,891 1,176,685 1,176,685 1,023,944
412020 Facilities 3,940,032 5,259,118 6,438,972 6,408,133 7,850,983
414020 Customer Svc & Information 1,526,409 1,663,151 1,938,191 1,856,765 2,124,609
415001 Bus General Management 205,914 365,133 948,573 406,632 520,082
415010 BOD - Operations 57,879,967 61,080,524 57,571,696 57,717,294 58,137,798
415011 BOD - Administration 2,045,399 2,116,774 2,145,763 2,145,763 2,162,945
415012 BOD - Maintenance 13,914,622 20,721,194 19,385,959 18,513,973 20,771,130
415013 BOD - STS Maintenance 848,529 1,167,669 824,312 1,274,235 1,004,562
415020 County Human Svc Transp 307,025 307,150 315,180 315,180 315,180
418010 Planning And Scheduling 1,204,223 1,286,085 1,594,593 1,500,408 1,573,515
415040 Van Pool Division 554,679 645,113 669,906 573,317 727,455
415050 Special Transportation Svc 8,369,907 8,121,632 9,295,651 8,551,301 9,137,261
416010 Light Rail Operations 5,852,164 8,225,569 11,268,465 10,947,500 11,557,491
416011 Light Rail Administration 1,035,184 1,339,551 1,733,309 1,487,542 1,697,361
416012 Light Rail Maintenance 1,892,842 7,124,052 7,278,462 6,924,057 8,173,868
416013 Maintenance of Way 2,034,845 3,169,314 4,654,370 4,255,077 5,135,260
416020 CityLYNX GoldLine 1,165,354 1,051,718 1,736,360 1,632,086 1,471,896
417010 Transit Security 5,678,982 6,737,236 8,843,272 8,277,670 9,392,803
Subtotal 110,789,146$ 132,973,918$ 139,404,875$ 135,330,152$ 144,355,232$
Executive & Administration
411010 Administration Division 1,594,237$ 2,094,067$ 1,655,401$ 1,622,819$ 2,243,437$
411020 Procurement Services 543,166 552,158 559,229 423,794 564,509
419010 HR and Civil Rights 553,442 571,154 693,317 700,903 965,470
411040 Executive Division 608,802 607,528 998,713 995,322 1,005,222
411050 MTC & Committees Division 67,372 66,474 51,775 51,308 67,332
411070 City Support Costs 3,795,407 4,411,542 5,140,375 5,140,375 5,302,509
Subtotal 7,162,425$ 8,302,923$ 9,098,810$ 8,934,521$ 10,148,478$
Transit Development
413001 Development 474,544$ 1,200,025$ 1,400,188$ 1,341,421$ 2,905,638$
413002 Quality Assurance 407,376 282,323 351,086 203,794 536,977
Subtotal 881,920$ 1,482,347$ 1,751,274$ 1,545,215$ 3,442,615$
Marketing & Technology
414010 Marketing & Communications 1,390,721$ 1,679,899$ 2,169,262$ 2,054,605$ 1,580,009$
414030 Technology 1,138,212 859,904 1,976,678 1,768,163 2,902,702
Subtotal 2,528,933$ 2,539,803$ 4,145,939$ 3,822,768$ 4,482,711$
Transfer to Capital 9,241,562$ 4,607,165$ 239,982$ 239,982$ -$
Total Operating Expenditures 130,603,986$ 149,906,156$ 154,640,879$ 149,872,638$ 162,429,035$
39
Appendices | 23FY2020 Preliminary Budget
Appendix 5 – Debt Service Summary
FY2018 FY2019
ActualsAdopted
Budget
REVENUES
Federal Grants-BLE 3,125,412$ 78,194,100$
Federal Grants- Non-BLE 2,922,193 2,930,075
State Grants-BLE 1,562,706 26,597,050
State Grants-Non-BLE - -
Local Sales Tax 14,211,644 18,224,238
Interest on Investments 55,265 -
TOTAL REVENUES 21,877,220$ 125,945,463$
EXPENDITURES
Principal Payments-BLE -$ 103,740,857$
Principal Payments-Non-BLE 4,825,000 5,065,000
Interest Payments-BLE 11,608,851 11,914,200
Interest Payments-Non-BLE 5,332,882 5,111,406
Other Payments 110,487 114,000
Transfers to Other - -
TOTAL EXPENDITURES 21,877,220$ 125,945,463$
FY2020 FY2021 FY2022 FY2023 FY2024 FY2020-FY2024
Preliminary
BudgetPlan Plan Plan Plan Total
REVENUES
Federal Grants-BLE 68,834,588$ 6,766,200$ 1,847,100$ -$ -$ 77,447,888$
Federal Grants- Non-BLE 2,928,075 2,927,075 2,929,475 2,929,475 2,927,875 14,641,975$
State Grants-BLE 25,970,800 25,923,550 17,251,462 - - 69,145,812$
State Grants-Non-BLE - - - - - -$
Local Sales Tax 17,602,538 17,552,289 17,552,639 16,632,088 17,105,259 86,444,813$
Interest on Investments - - - - - -$
TOTAL REVENUES 115,336,001$ 53,169,114$ 39,580,676$ 19,561,563$ 20,033,134$ 247,680,488$
EXPENDITURES
Principal Payments-BLE 95,741,276$ 33,900,194$ 20,423,975$ 4,221,812$ 4,348,466$ 158,635,723$
Principal Payments-Non-BLE 5,300,000 5,555,000 5,790,000 6,060,000 6,286,600 28,991,600
Interest Payments-BLE 9,301,768 8,979,963 8,864,994 5,045,044 5,196,395 37,388,164
Interest Payments-Non-BLE 4,878,957 4,619,957 4,387,707 4,120,707 4,087,673 22,095,001
Other Payments 114,000 114,000 114,000 114,000 114,000 570,000
Transfers to Other - - - - - -
TOTAL EXPENDITURES 115,336,001$ 53,169,114$ 39,580,676$ 19,561,563$ 20,033,134$ 247,680,488$
40
Append
ices
| 2
4FY
202
0 P
relim
inary
Bud
get
Ap
pen
dix
5 –
Deb
t Se
rvic
e Su
mm
ary
FY20
20FY
2021
FY20
22FY
2023
FY20
24FY
2020
-FY
2024
BLE
= B
lue
Lin
e Ex
ten
sio
nP
reli
min
ary
Bu
dge
tP
lan
Pla
nP
lan
Pla
nTO
TAL
De
bt
Serv
ice
Re
nu
e D
eta
ils
REV
ENU
ES B
LE-
CO
PS
Pri
nci
pa
l On
ly F
ed
era
l66
,892
,988
$
4,
919,
100
$
-
$
-
$
-$
71
,812
,088
$
Sta
te25
,000
,000
25,0
00,0
00
16
,327
,912
- -
66,3
27,9
12$
L
oca
l-
- -
- -
-$
S
ub
tota
l91
,892
,988
$
29
,919
,100
$
16
,327
,912
$
-
$
-
$
138,
140,
000
$
BLE
- C
OP
S In
tere
st O
nly
Fe
de
ral (
50%
)1,
941,
600
$
1,
847,
100
$
1,
847,
100
$
-
$
-
$
5,63
5,80
0$
S
tate
(25
%)
970,
800
92
3,55
0
923,
550
-
- 2,
817,
900
$
Lo
cal (
25%
)97
0,80
0
923,
550
92
3,55
0
- -
2,81
7,90
0$
S
ub
tota
l3,
883,
200
$
3,
694,
200
$
3,
694,
200
$
-
$
-
$
11,2
71,6
00$
BLE
- T
IFIA
On
ly -
Pri
nci
pa
l & In
tere
st F
ed
era
l (0%
)-
$
-
$
-$
-
$
-$
-
$
Sta
te (
0%)
- -
- -
- -
$
Lo
cal (
100%
)9,
266,
856
9,
266,
857
9,
266,
857
9,
266,
856
9,
544,
862
46
,612
,288
$
S
ub
tota
l9,
266,
856
$
9,
266,
857
$
9,
266,
857
$
9,
266,
856
$
9,
544,
862
$
46
,612
,288
$
No
n-B
LE -
Pri
nci
pa
l & In
tere
st 2
013C
CO
PS
Fe
de
ral (
80%
)2,
928,
075
$
2,
927,
075
$
2,
929,
475
$
2,
929,
475
$
2,
927,
875
$
14
,641
,976
$
S
tate
(0%
)-
- -
- -
-$
L
oca
l (20
%)
732,
019
73
1,76
9
732,
369
73
2,36
9
731,
969
3,
660,
494
$
S
ub
tota
l3,
660,
094
$
3,
658,
844
$
3,
661,
844
$
3,
661,
844
$
3,
659,
844
$
18
,302
,470
$
-
200
8A C
OP
S (1
00%
Lo
cal)
2,35
2,00
0$
2,35
2,75
0$
2,35
0,75
0$
2,35
1,00
0$
2,42
1,53
0$
11,8
28,0
30$
201
5B C
OP
S (1
00%
Lo
cal)
4,16
6,86
3
4,16
3,36
3
4,16
5,11
3
4,16
7,86
3
4,29
2,89
9
20,9
56,1
01$
Oth
er
(100
% L
oca
l)11
4,00
0
114,
000
11
4,00
0
114,
000
11
4,00
0
570,
000
$
S
ub
tota
l6,
632,
863
$
6,
630,
113
$
6,
629,
863
$
6,
632,
863
$
6,
828,
429
$
33
,354
,131
$
TOTA
L R
EVEN
UES
115,
336,
001
$
53
,169
,114
$
39
,580
,676
$
19
,561
,563
$
20
,033
,134
$
24
7,68
0,48
8$
41
Append
ices
| 2
5FY
202
0 P
relim
inary
Bud
get
Ap
pen
dix
5 –
Deb
t Se
rvic
e Su
mm
ary
FY20
20FY
2021
FY20
22FY
2023
FY20
24FY
2020
-FY
2024
BLE
= B
lue
Lin
e Ex
ten
sio
nP
reli
min
ary
Bu
dge
tP
lan
Pla
nP
lan
Pla
nTO
TAL
EXP
END
ITU
RES
PR
INC
IPA
L B
lue
Lin
e Ex
ten
sio
n 2
013B
CO
PS
76,8
92,9
88$
29,9
19,1
00$
16,3
27,9
12$
-$
-$
12
3,14
0,00
0$
201
3F C
OP
S15
,000
,000
- -
- -
15,0
00,0
00$
201
5D T
IFIA
3,84
8,28
8
3,98
1,09
4
4,09
6,06
3
4,22
1,81
2
4,34
8,46
6
20,4
95,7
23$
Su
bto
tal
95,7
41,2
76$
33,9
00,1
94$
20,4
23,9
75$
4,22
1,81
2$
4,34
8,46
6$
158,
635,
723
$
No
n-B
lue
Lin
e Ex
ten
sio
n 2
008A
CO
PS
1,08
5,00
0$
1,14
0,00
0$
1,19
5,00
0$
1,25
5,00
0$
1,29
2,65
0$
5,96
7,65
0$
201
3C C
OP
S2,
045,
000
2,
140,
000
2,
250,
000
2,
340,
000
2,
455,
000
11
,230
,000
$
2
015B
CO
PS
2,17
0,00
0
2,27
5,00
0
2,34
5,00
0
2,46
5,00
0
2,53
8,95
0
11,7
93,9
50$
Su
bto
tal
5,30
0,00
0$
5,55
5,00
0$
5,79
0,00
0$
6,06
0,00
0$
6,28
6,60
0$
28,9
91,6
00$
INTE
RES
T B
lue
Lin
e Ex
ten
sio
n -
CO
PS
On
ly 2
013B
CO
PS
3,69
4,20
0$
3,69
4,20
0$
3,69
4,20
0$
-$
-$
11
,082
,600
$
201
3F C
OP
S18
9,00
0
- -
- -
189,
000
$
Su
bto
tal
3,88
3,20
0$
3,69
4,20
0$
3,69
4,20
0$
-$
-$
11
,271
,600
$
Blu
e Li
ne
Exte
nsi
on
-TI
FIA
On
ly 2
015D
TIF
IA5,
418,
568
$
5,
285,
763
$
5,
170,
794
$
5,
045,
044
$
5,
196,
395
$
26
,116
,564
$
S
ub
tota
l5,
418,
568
$
5,
285,
763
$
5,
170,
794
$
5,
045,
044
$
5,
196,
395
$
26
,116
,564
$
No
n-B
lue
Lin
e Ex
ten
sio
n 2
008A
CO
PS
1,26
7,00
0$
1,21
2,75
0$
1,15
5,75
0$
1,09
6,00
0$
1,12
8,88
0$
5,86
0,38
0$
201
3C C
OP
S1,
615,
094
1,
518,
844
1,
411,
844
1,
321,
844
1,
204,
844
7,
072,
470
$
2
015B
CO
PS
1,99
6,86
3
1,88
8,36
3
1,82
0,11
3
1,70
2,86
3
1,75
3,94
9
9,16
2,15
1$
Su
bto
tal
4,87
8,95
7$
4,61
9,95
7$
4,38
7,70
7$
4,12
0,70
7$
4,08
7,67
3$
22,0
95,0
01$
INTE
RES
T O
the
r Fe
es
114,
000
$
11
4,00
0$
114,
000
$
11
4,00
0$
114,
000
$
57
0,00
0$
Su
bto
tal
114,
000
$
11
4,00
0$
114,
000
$
11
4,00
0$
114,
000
$
57
0,00
0$
TOTA
L EX
PEN
DIT
UR
ES11
5,33
6,00
1$
53,1
69,1
14$
39,5
80,6
76$
19,5
61,5
63$
20,0
33,1
34$
247,
680,
488
$
42
Appendices | 26
Appendix 6 – Community Investment Plan (CIP)
CIP Revenues & Expenditures
Notes:
1. Excludes Grant-Funded Operating Projects totaling $51.1 million for FY2020 – FY2024
2. Includes some prior year re-allocation but excludes carry over
FY2020 Preliminary Budget
FY2020 FY2021 FY2022 FY2023 FY2024 Total
Preliminary
BudgetPlan Plan Plan Plan
FY2020 -
FY2024
CAPITAL REVENUES
Federal Funding
Formula Apportionment 6,367,572$ 8,582,885$ 8,261,855$ 8,251,044$ 8,240,448$ 39,703,804$
Enhanced Mobility 804,430 804,430 804,430 804,430 804,430 4,022,150
Bus & Bus Facilities 3,110,281 1,969,000 1,998,000 2,057,940 2,057,940 11,193,161
Federal New Starts 5,400,000 - - - - 5,400,000
Total Federal Funding 15,682,283$ 11,356,315$ 11,064,285$ 11,113,414$ 11,102,818$ 60,319,115
State Funding
State Grants-Advanced Technology 212,220$ -$ -$ -$ -$ 212,220$
Urban Match State Grants 1,415,608 1,581,717 1,105,948 1,050,740 1,126,780 6,280,793
Total State Funding 1,627,828$ 1,581,717$ 1,105,948$ 1,050,740$ 1,126,780$ 6,493,013
Local Funding
Southend Station -Private Funding -$ -$ 1,894,052$ 1,949,260$ 1,873,220$ 5,716,532$
Southend Station -Local Funding 1,415,608 1,581,717 1,105,948 1,050,740 1,126,780 6,280,793
Re-allocated to New Projects 1,500,000 - - - - 1,500,000
CATS Control Account 3,625,847 2,637,971 2,564,964 2,577,246 2,574,597 13,980,625
Total Local Funding 6,541,455$ 4,219,688$ 5,564,964$ 5,577,246$ 5,574,597$ 27,477,950
Carry Over Project Balance
Re-allocated from Prior Year Savings- Federal 535,040$ -$ -$ -$ -$ 535,040$
Re-allocated from Prior Year Savings- State - - - - -
Re-allocated from Prior Year Savings- Local 133,760 - - - - 133,760
Total Re-allocated 668,800$ -$ -$ -$ -$ 668,800$
Continue Existing Projects- Federal -$ -$ -$ -$ -$ -$
Continue Existing Projects- State - - - - - -
Continue Existing Projects- Local - - - - - -
Total Continue Existing Projects 2 -$ -$ -$ -$ -$ -$
Total Capital Revenues 1 24,520,366$ 17,157,720$ 17,735,197$ 17,741,400$ 17,804,195$ 94,958,878$
FY2020 FY2021 FY2022 FY2023 FY2024 Total
Preliminary
BudgetPlan Plan Plan Plan
FY2020 -
FY2024
CAPITAL EXPENDITURES
State of Good Repair- Vehicle Replacement 9,816,779$ 12,641,199$ 11,613,344$ 12,318,543$ 12,714,889$ 59,104,754
State of Good Repair- Facilities & Others 725,000 - - - - 725,000
Transit Safety & Security 390,718 220,395 222,144 223,897 226,136 1,283,290
8,048,412 1,781,717 3,200,000 3,200,000 3,200,000 19,430,129
1,240,200 685,010 530,320 390,530 320,740 3,166,800
Transit New Equipment 2,590,227 1,024,969 1,364,959 804,000 538,000 6,322,155
Transit- Other Programs 1,040,230 804,430 804,430 804,430 804,430 4,257,950
Carry Over Projects 668,800 - - - - 668,800
Total Capital Expenditures 1 24,520,366$ 17,157,720$ 17,735,197$ 17,741,400$ 17,804,195$ 94,958,878$
Transit Long Range Capital Improvement
Non-Revenue Vehicle
43
Append
ices
| 2
7FY
202
0 P
relim
inary
Bud
get
Ap
pen
dix
6 –
Cap
ital
Exp
end
itu
re D
etai
ls
FY2
02
0FY
20
21
FY2
02
2FY
20
23
FY2
02
4FY
20
20
-
FY2
02
4
Pro
po
sed
Pro
po
sed
Pla
n P
lan
Pla
n T
OTA
L
Stat
e o
f G
oo
d R
ep
air-
Ve
hic
le R
ep
lace
me
nt
Bu
s R
ep
lace
me
nts
Bu
sA
nn
ual
Bu
s R
ep
lace
me
nts
pe
r ye
ar
Ave
rage
co
st in
clu
de
s co
st o
f ca
me
ra's
an
d p
lan
t vi
sits
FY20
: Re
pla
ce 1
0 B
use
s av
era
ge c
ost
$59
4,01
8
FY21
: Re
pla
ce 1
4 B
use
s av
era
ge c
ost
$61
1,92
1
FY22
: Re
pla
ce 1
3 B
use
s av
era
ge c
ost
$62
9,82
4
FY23
: Re
pla
ce 1
4 B
use
s av
era
ge c
ost
$64
7,72
7
FY24
: Re
pla
ce 1
4 B
use
s av
era
ge c
ost
$66
5,63
0
5,94
0,18
2$
8,56
6,89
7$
8,18
7,71
6$
9,06
8,18
2$
9,31
8,82
5$
41,0
81,8
02$
STS
Re
pla
cem
en
tsST
STo
tal A
nn
ual
STS
Re
pla
cem
en
ts=
17 p
er
year
Ap
pro
xim
ate
Ve
hic
le c
ost
pe
r ye
ar in
clu
de
s ca
me
ra's
an
d p
lan
t vi
sit
FY20
: $10
0,41
1
FY21
: $10
3,47
0
FY22
: $10
6,62
1
FY23
:$10
9,86
7
FY24
: $11
3,20
9
1,70
6,99
0
1,75
8,99
5
1,81
2,56
0
1,86
7,73
1
1,92
4,55
8
9,07
0,83
4
Van
po
ol R
ep
lace
me
nts
Van
po
ol
An
nu
al V
anp
oo
l Re
pla
cem
en
ts a
nd
exp
ansi
on
ve
hic
les
pe
r ye
ar
Ap
pro
xim
ate
Ve
hic
le c
ost
pe
r ye
ar in
clu
de
s ca
me
ra's
an
d p
lan
t vi
sit
FY20
: 16
rep
lace
me
nt
and
5 e
xpan
sio
ns=
21
6 Fo
rd T
ran
sits
+ 1
5 M
iniV
ans/
Ford
Exp
lore
r
FY21
: 16
rep
lace
me
nt
and
5 e
xpan
sio
ns=
21
15
(7)
pas
sen
ger
van
s +
6 (1
5) P
asse
nge
r V
ans
FY22
: 14
Re
pla
cem
en
ts
10 m
iniv
ans
+ 4
Van
s
FY23
: 9 R
ep
lace
me
nts
2 (1
5) p
asse
nge
r va
ns+
7 (
7) p
asse
nge
r V
ans
FY24
: 21
Re
pla
cem
en
ts
1
5 m
iniv
ans+
6 V
ans
754,
000
73
3,59
0
507,
120
331,
890
344,
726
2,67
1,32
6
Bu
sN
CD
OT
Urb
an M
atch
fo
r B
us
Pu
rch
ase
s1,
415,
607
1,
581,
717
1,
105,
948
1,
050,
740
1,
126,
780
6,
280,
792
Sub
tota
l9,
816,
779
$
12
,641
,199
$
11
,613
,344
$
12,3
18,5
43$
12
,714
,889
$
59,1
04,7
54$
Stat
e o
f G
oo
d R
ep
air-
Fac
ilit
ies
& O
the
rs
Sou
th T
ryo
n H
VA
C a
nd
He
atin
g
Equ
ipm
en
t R
ep
lace
me
nts
Faci
liti
es
Re
pla
ce H
VA
C u
nit
s at
So
uth
Try
on
Bu
s Fa
cili
ty t
o im
pro
ve e
ne
rgy
con
sum
pti
on
an
d
red
uce
co
st. R
ep
lace
me
nts
incl
ud
e B
oil
ers
, Ch
ille
rs a
nd
Air
Han
dle
rs
325,
000
$
-
$
-
$
-$
-
$
325,
000
$
No
rth
Dav
idso
n B
us
Was
hB
us
Re
pla
ce B
us
Was
h a
t N
ort
h D
avid
son
Mai
nte
nan
ce F
acil
ity
400,
000
-
- -
- 40
0,00
0
Sub
tota
l72
5,00
0$
-$
-$
-
$
-$
72
5,00
0$
Tran
sit
Safe
ty &
Se
curi
ty
BLE
Cam
era
sSa
fety
&
Secu
rity
Re
pla
ce C
ame
ra's
alo
ng
the
ali
gnm
en
t21
8,64
9$
220,
395
$
22
2,14
4$
223,
897
$
22
6,13
6$
1,11
1,22
1$
Tran
sit
Po
lice
Dis
pat
ch U
pgr
ade
Safe
ty &
Secu
rity
Re
loca
te D
isp
atch
to
Su
gar
Cre
ek
par
kin
g d
eck
; re
pla
ce e
xisi
tin
g ca
me
ras
on
th
e w
all,
pu
rch
ase
th
e c
orr
ect
co
nso
les
an
d u
pgr
ade
var
iou
s o
pe
rati
ng
syst
em
s.
172,
069
-
- -
- 17
2,06
9
Sub
tota
l39
0,71
8$
220,
395
$
22
2,14
4$
223,
897
$
22
6,13
6$
1,28
3,29
0$
Tran
sit
Lon
g R
ange
Cap
ital
Imp
rove
me
nt
BLE
- L
oca
l Sh
are
De
velo
pm
en
tC
on
tin
ue
fu
nd
ing
the
loca
l sh
are
of
the
BLE
pro
ject
1,23
2,80
4$
-$
-$
-
$
-$
1,
232,
804
$
BLE
- F
ed
era
l Sh
are
De
velo
pm
en
tC
on
tin
ue
fe
de
ral f
un
din
g fo
r th
e B
LE p
roje
ct5,
400,
000
-
- -
- 5,
400,
000
AD
AD
eve
lop
me
nt
Re
sult
s fr
om
2 y
ear
AD
A A
sse
sme
nt
to im
ple
me
nt
corr
ect
ion
s, e
nh
ance
me
nts
an
d
imp
rove
me
nts
re
qu
ire
d u
nd
er
AD
A
- 20
0,00
0
200,
000
200,
000
200,
000
800,
000
Ne
w S
ou
the
nd
Sta
tio
n
De
velo
pm
en
tC
om
ple
te d
esi
gn a
nd
co
nst
ruct
a n
ew
Sta
tio
n
1,41
5,60
8
1,58
1,71
7
3,00
0,00
0
3,00
0,00
0
3,00
0,00
0
11,9
97,3
25
Sub
tota
l8,
048,
412
$
1,
781,
717
$
3,
200,
000
$
3,
200,
000
$
3,
200,
000
$
19
,430
,129
$
Append
ices
| 2
8FY
202
0 P
relim
inary
Bud
get
Ap
pen
dix
6 –
Cap
ital
Exp
end
itu
re D
etai
ls
FY20
20FY
2021
FY20
22FY
2023
FY20
24FY
2020
-
FY20
24 P
rop
ose
d P
rop
ose
d P
lan
Pla
n P
lan
TO
TAL
No
n-R
eve
nu
e V
eh
icle
Bu
s O
pe
rati
on
s (B
OD
) N
on
Re
ven
ue
Ve
hic
le
Bu
sTo
tal A
nn
ual
re
pla
cem
en
t p
er
year
= 5
Ap
pro
xim
ate
ly $
25,0
00 p
er
veh
icle
+ 3
% e
scal
atio
n p
lus
$7,7
00 f
or
Safe
ty E
qu
ipm
en
t an
d R
adio
s
132,
700
$
13
6,45
0$
140,
200
$
14
3,95
0$
151,
200
$
70
4,50
0$
Bu
s M
ain
ten
ance
(B
OD
) N
on
-
Re
ven
ue
Ve
hic
le
Bu
sTo
tal A
nn
ual
Re
pla
cem
en
t
FY20
=3
FY21
=3
FY22
=3
FY23
=1
Ap
pro
xim
ate
ly $
70,0
00 p
er
veh
icle
+ 3
% e
scal
atio
n p
lus
$3,5
00 f
or
eq
uip
me
nt
213,
500
21
9,80
0
226,
100
79,8
00
- 73
9,20
0
STS
No
n-R
eve
nu
e V
eh
icle
STS
Tota
l An
nu
al R
ep
lace
me
nt
pe
r ye
ar =
4
Ap
pro
xim
ate
ly $
46,0
00 p
er
veh
icle
+ 3
% e
scal
atio
n p
lus
$3,0
00 f
or
Cam
era
s, $
2,00
0 fo
r B
ran
din
g
and
$1,
500
for
safe
ty e
qu
ipm
en
t
98,5
00
101,
260
10
4,02
0
10
6,78
0
10
9,54
0
52
0,10
0
Rai
l Tra
ns.
No
n R
ev
Ve
hic
le
Re
pla
cem
en
t
Rai
lR
ep
lace
cu
rre
nt
veh
icle
wit
h a
sm
all 4
x4 S
UV
33,0
00
- -
- -
33,0
00
MO
W T
rack
- N
on
Re
ven
ue
Re
spo
nse
Ve
hic
les
Rai
lFY
20=
Re
pla
ce C
TU-0
45 w
ith
F35
0 H
i Rai
l Tru
ck
FY21
= R
ep
lace
tw
o F
ord
Tau
rus,
CTA
-060
& C
TA-0
62, w
ith
tw
o s
mal
l SU
Vs
85,0
00
60,0
00
- -
- 14
5,00
0
MO
W T
rain
Co
ntr
ol-
No
n
Re
ven
ue
Re
spo
nse
Ve
hic
les
Rai
lR
ep
lace
tw
o F
ord
F35
0, C
TJ11
4 &
CTJ
115
133,
000
-
- -
- 13
3,00
0
MO
W T
ract
ion
Po
we
r- N
on
Re
ven
ue
Re
spo
nse
Ve
hic
les
Rai
lR
ep
lace
CTU
-047
, 200
5 Fo
rd F
350
66,5
00
- -
- -
66,5
00
Eme
rge
ncy
Re
po
nse
Ve
hic
leR
ail
Join
t ve
hic
le f
or
RC
M &
MO
W t
o s
erv
ice
an
d r
esc
ue
str
and
ed
LR
Vs
on
th
e a
lign
me
nt.
Th
e c
urr
en
t
swin
gmas
ter
is n
ot
ade
qu
ate
to
re
scu
e a
n L
RV
on
th
e B
lue
Lin
e E
xte
nsi
on
. M
OW
wil
l be
ab
le t
o
use
th
e v
eh
icle
to
ass
ist
in r
ep
laci
ng
OC
S an
d m
ovi
ng
trac
k se
ctio
n, a
lon
g w
ith
oth
er
req
uir
ed
mai
nte
nan
ce.
446,
000
10
7,50
0
- -
- 55
3,50
0
Faci
liti
es
Mai
nte
nan
ce S
up
po
rt
Ve
hic
les
Faci
liti
es
Re
pla
ce N
on
Re
ven
ue
Ve
hic
les
use
d b
y Fa
cili
tie
s
CTU
-011
: 200
6 Fo
rd T
auru
s
CTU
-018
: 200
5 C
he
vy 2
500H
D
CTA
-061
: 200
5 Fo
rd T
auru
s
CTA
-023
: 200
3 Fo
rd T
auru
s
32,0
00
60,0
00
60,0
00
60,0
00
60,0
00
272,
000
Sub
tota
l1,
240,
200
$
68
5,01
0$
530,
320
$
39
0,53
0$
320,
740
$
3,
166,
800
$
45
Append
ices
| 2
9FY
202
0 P
relim
inary
Bud
get
Ap
pen
dix
6 –
Cap
ital
Exp
end
itu
re D
etai
ls
FY20
20FY
2021
FY20
22FY
2023
FY20
24FY
2020
-
FY20
24 P
rop
ose
d P
rop
ose
d P
lan
Pla
n P
lan
TO
TAL
Tran
sit
Ne
w E
qu
ipm
en
t
Cit
y Fe
de
rate
d V
MS
Pro
ject
Tech
no
logy
The
Cit
y is
pro
curi
ng
a fe
de
rate
d v
ide
o s
yste
m t
o f
ocu
s ar
ou
nd
th
e G
en
ete
c Te
chn
olo
gy.
The
VM
S so
luti
on
wil
l re
du
ce t
he
nu
mb
er
of
reco
rde
rs a
nd
incr
eas
e s
yste
m c
apab
ilit
y to
sh
are
vid
eo
wit
h C
ity
De
par
tme
nts
1,50
0,00
0$
549,
000
$
1,
000,
000
$
77
0,00
0$
-$
3,81
9,00
0$
Serv
er
Re
fre
sh (
TMP
2.4
)Te
chn
olo
gyYe
arly
re
fre
sh o
f o
lde
r se
rve
rs.
Use
ful l
ife
sp
an is
fo
ur
year
s p
er
Cit
y st
and
ard
s13
0,50
0
164,
000
13
3,50
0
34
,000
53
8,00
0
1,
000,
000
Ste
am B
ay L
ifts
Bu
sP
urc
has
e t
hre
e (
3) s
team
bay
lift
s fo
r N
ort
h D
avid
son
Mai
nte
nan
ce F
acil
ity.
37
9,39
1
- -
- -
379,
391
MO
W T
rack
Bac
kho
eR
ail
Pu
rch
ase
a B
ackh
oe
to
avo
id m
on
thly
re
nta
l co
st o
f $2
,000
pe
r m
on
th.
Bac
kho
e is
a n
orm
al
wo
rkin
g co
mp
on
en
t o
f m
ain
ten
ance
an
d w
ill i
ncl
ud
e a
tra
ile
r to
mo
ve p
iece
s o
f m
ach
ine
ry
aro
un
d t
he
ali
gnm
en
t as
ne
ed
ed
100,
000
-
- -
100,
000
Cit
y o
f C
har
lott
e E
RP
Init
iait
ves
Fin
ance
Am
ou
nt
rep
rese
nts
CA
TS p
ort
ion
of
Cit
y's
CIP
exp
en
ses
(~11
% o
f to
tal)
: MU
NIS
up
grad
es;
rep
ort
ing
solu
tio
ns;
MW
SBE/
DB
E m
od
ule
; tra
inin
g in
itit
ativ
es;
tra
vel m
od
ule
; eP
rocu
rem
en
t
mo
du
le; B
ud
get
Syst
em
up
grad
e
262,
285
31
1,96
9
231,
459
- 80
5,71
3
Mo
bil
e A
pp
lica
tio
nTe
chn
olo
gyM
ob
ile
ap
pli
cati
on
an
d t
icke
tin
g21
8,05
1
- -
- 21
8,05
1
Sub
tota
l2,
590,
227
$
1,
024,
969
$
1,
364,
959
$
80
4,00
0$
538,
000
$
6,
322,
155
$
Tran
sit-
Oth
er
Pro
gram
s
Enh
ance
d M
ob
ilit
yC
ivil
Rig
hts
Sub
reci
pie
nt
& C
ATS
pro
ject
pro
po
sals
are
su
bm
itte
d a
nn
ual
ly f
or
reiv
ew
80
4,43
0$
804,
430
$
80
4,43
0$
804,
430
$
80
4,43
0$
4,02
2,15
0$
Firs
tNe
t A
T&T
Pri
vate
Mo
bil
e
Ne
two
rk
Tech
no
logy
Re
pla
ce m
ob
ile
gat
ew
ay m
od
em
s o
n b
us
and
rai
l fo
r co
mp
atib
ilit
y w
ith
AT&
T Fi
rstN
et.
Fir
stN
et
pro
vid
es
a p
riva
te m
ob
ile
ban
d f
or
secu
re d
ata
com
mu
nic
atio
ns
and
gu
aran
tee
d b
and
wid
th
Pro
ject
ed
fu
nd
ed
wit
h F
Y20
NC
DO
T A
dva
nce
d T
ech
no
logy
Gra
nt
and
Car
ryo
ver
fun
ds
fro
m
Form
ula
17
235,
800
-
- -
- 23
5,80
0
Sub
tota
l1,
040,
230
$
80
4,43
0$
804,
430
$
80
4,43
0$
804,
430
$
4,
257,
950
$
Gra
nt-
Fun
de
d C
apit
al P
roje
cts
Sub
tota
l23
,851
,566
$
17
,157
,720
$
17
,735
,197
$
17,7
41,4
00$
17
,804
,195
$
94,2
90,0
78$
Car
ry O
ver
Cap
ital
Pro
ject
s
Tech
no
logy
Firs
t N
et
AT&
T P
riva
te M
ob
ile
Ne
two
rk (
Form
ula
Fu
nd
ing)
668,
800
$
-
$
-
$
-$
-
$
668,
800
$
Car
ry O
ver
Pro
ject
s Su
bto
tal
668,
800
$
-
$
-
$
-$
-
$
668,
800
$
TOTA
L In
clu
din
g C
arry
Ove
r C
apit
al P
roje
cts,
Exc
lud
ing
Gra
nt-
Fun
de
d O
pe
rati
ng
Pro
ject
s24
,520
,366
$
17
,157
,720
$
17
,735
,197
$
17,7
41,4
00$
17
,804
,195
$
94,9
58,8
78$
Un
exp
en
de
d a
pp
rop
riat
ion
s, e
stim
ate
d a
s o
f 11
/30/
2018
, fo
r p
revi
ou
sly
auth
ori
zed
mu
lti-
year
cap
ital
pro
ject
s o
r gr
ant
pro
ject
s ar
e r
e-a
pp
rop
riat
ed
fo
r e
xpe
nd
itu
re in
FY2
020;
loca
l gra
nt-
mat
chin
g o
bli
gati
on
s th
at w
ere
pre
vio
usl
y au
tho
rize
d a
s p
art
of
mu
lti-
year
gra
nt
pro
ject
s ar
e a
lso
re
-ap
pro
pri
ate
d f
or
exp
en
dit
ure
in F
Y202
0.
Note
s:
1.
Excl
udes
Gra
nt-F
unded
Oper
ating
Pro
ject
s to
talin
g $
51.1
mill
ion
for
FY2
02
0 –
FY2
02
4
2.
Incl
udes
som
e pri
or
year
re-a
lloca
tion
but
excl
udes
carr
y ove
r
46
Append
ices
| 3
0FY
202
0 P
relim
inary
Bud
get
Ap
pen
dix
7 –
Gra
nt-
Fun
ded
Op
erat
ing
Pro
ject
s
FY20
20FY
2021
FY20
22FY
2023
FY20
24FY
2020
-
FY20
24 P
rop
ose
d P
rop
ose
d P
lan
Pla
n P
lan
TO
TAL
Gra
nt
Fun
de
d O
pe
rati
ng
Pro
ject
s- F
ed
era
l Sh
are
On
ly
Re
gio
nal
Tra
nsi
t P
lan
Stu
dy-
UP
WP
Pro
ject
s
De
velo
pm
en
t36
0,00
0$
400,
000
$
40
0,00
0$
400,
000
$
40
0,00
0$
1,96
0,00
0$
AD
A S
tud
y-U
PW
P P
roje
cts
De
velo
pm
en
t2n
d y
ear
of
Cit
y's
AD
A A
cce
ssib
ilit
y A
sse
sme
nt.
CA
TS is
re
qu
ire
d t
o f
un
d o
ur
po
rtio
n o
f th
e s
tud
y
260,
000
-
- -
- 26
0,00
0$
Enh
ance
d M
ob
ilit
y P
roje
ct
Ad
min
istr
atio
n
Civ
il R
igh
tsFe
de
ral f
un
din
g fo
r ad
min
iste
rin
g En
han
ced
Mo
bil
ity
Gra
nt
and
mo
nit
ori
ng
sub
reci
pie
nt
pro
ject
s.
87,5
50
87,5
50
87,5
50
87,5
50
87,5
50
437,
750
$
Wo
rkst
atio
ns
Tech
no
logy
Year
ly r
efr
esh
of
old
er
wo
rkst
atio
ns,
val
ue
d u
nd
er
$5,0
00 p
er
un
it.
174,
440
22
3,60
0
261,
984
233,
120
225,
120
1,11
8,26
4$
Pre
ven
tive
Mai
nte
nan
ce -
Bu
sB
us
5,88
2,31
7
4,30
5,00
0
4,30
5,00
0
4,30
5,00
0
4,30
5,00
0
23,1
02,3
17$
Pre
ven
tive
Mai
nte
nan
ce -
Rai
lR
ail
5,65
0,67
6
850,
000
85
0,00
0
85
0,00
0
85
0,00
0
9,
050,
676
$
Pre
ven
tive
Mai
nte
nan
ce -
STS
STS
375,
000
37
5,00
0
375,
000
375,
000
375,
000
1,87
5,00
0$
Engi
ne
s &
Tra
nsm
issi
on
sB
us
625,
000
62
5,00
0
625,
000
625,
000
625,
000
3,12
5,00
0$
S70
Ove
rhau
l En
gin
ee
rin
gR
ail
The
S70
Ove
rhau
l En
gin
ee
rin
g is
ne
cess
ary
to p
rovi
de
su
pp
ort
an
d Q
A s
erv
ice
s fo
r
the
ove
rhau
ls b
ein
g p
erf
orm
ed
by
an o
ff-s
ite
ve
nd
or.
Th
e e
ngi
ne
eri
ng
sup
po
rt
wil
l be
pro
vid
ed
fo
r th
e f
oll
ow
ing
pro
ject
s: T
ruck
Ove
rhau
l, n
ece
ssar
y
mai
nte
nan
ce e
lect
rica
l an
d m
ech
anic
al u
pgr
ade
s o
f LR
V s
yste
ms
and
su
b-s
yste
m.
This
wil
l co
ver
de
velo
pm
en
t an
d im
ple
me
nta
tio
n (
bas
e o
n h
isto
rica
l
info
rmat
ion
) an
d e
ngi
ne
eri
ng
to c
ove
r th
e O
EM r
eco
mm
en
de
d m
ain
ten
ance
serv
ice
s at
dir
ect
ed
inte
rval
s fo
r ve
hic
le s
yste
ms.
Th
e s
yste
ms
cove
red
are
:
Pan
togr
aph
, Co
up
ler,
Tru
cks,
Wh
ee
l Axl
es
sets
(tr
acti
on
mo
tors
an
d G
ear
bo
xes)
,
Au
xili
ary
Po
we
r in
vert
er,
Do
ors
, HV
AC
, Pro
pu
lsio
n, C
om
mu
nic
atio
n, D
est
inat
ion
Sign
s, S
usp
en
sio
n s
yste
m, B
raki
ng
syst
em
Eve
nt
reco
rde
r an
d J
ou
rnal
Be
arin
gs.
224,
609
25
8,30
1
297,
046
208,
283
266,
050
1,25
4,28
9
S70
Ove
rhau
l Eq
uip
me
nt
Rai
lTh
e S
70 O
verh
aul P
rogr
am w
ill c
ove
r th
e f
oll
ow
ing
pro
ject
s: T
ruck
Ove
rhau
l,
ne
cess
ary
mai
nte
nan
ce u
pgr
ade
s o
f LR
V s
yste
ms
and
su
b-s
yste
m.
This
pro
ject
cove
rs t
he
OEM
re
com
me
nd
ed
mai
nte
nan
ce s
erv
ice
s at
dir
ect
ed
inte
rval
s fo
r
veh
icle
sys
tem
s. T
he
sys
tem
s co
vere
d a
re:
Pan
togr
aph
, Co
up
ler,
Tru
cks,
Wh
ee
l
Axl
es
sets
(tr
acti
on
mo
tors
an
d G
ear
bo
xes)
, Au
xili
ary
Po
we
r in
vert
er,
Do
ors
,
HV
AC
, Pro
pu
lsio
n, C
om
mu
nic
atio
n, D
est
inat
ion
Sig
ns,
Su
spe
nsi
on
sys
tem
,
Bra
kin
g sy
ste
m E
ven
t re
cord
er
and
Jo
urn
al B
ear
ings
. Th
is o
verh
aul b
ud
get
cove
rs
the
20
veh
icle
fle
et.
Th
e 1
0 ye
ar o
verh
aul p
reli
min
ary
est
imat
es
are
incl
ud
ed
in
this
bu
dge
t. T
he
pro
ject
ed
co
st f
or
the
10
year
ove
rhau
l wil
l be
est
imat
ed
12
mil
lio
n d
oll
ars.
Th
eS7
0 o
verh
aul p
rogr
am w
ill b
e p
erf
orm
ed
by
con
trac
tor.
1,18
4,35
0
1,43
0,12
3
1,77
3,49
5
2,25
8,86
6
2,32
6,63
2
8,97
3,46
6
Gra
nt-
Fun
de
d O
pe
rati
ng
Pro
ject
s Su
bto
tal
14,8
23,9
42$
8,55
4,57
4$
8,97
5,07
5$
9,34
2,81
9$
9,46
0,35
2$
51,1
56,7
62$
CIP
Reve
nues
&G
rant
Fund
ed O
pera
ting
Pro
ject
s –
Federa
l Sha
re O
nly
47
Appendices | 31
Appendix 8 – Other Capital Projects Managed by CATS
FY2020 Preliminary Budget
Charlotte Gateway Station
Sources of Capital Funding Funding Share Amount
Federal Railroad Administration Cooperative Agreement
Federal TIGER VII Grant Program (FRA) 56.9053% 30,000,000$
Match to TIGER VII Grant 43.0946% 22,719,131
FRA Federal Project Total 100.0000% 52,719,131$
Federal Highway Administration Block Grant 80.0000% 9,140,773$
Match to FHWA Block Grant 20.0000% 2,285,193
Non-FRA Federal Project Total 100.0000% 11,425,966$
FRA Cooperative Agreement Total 64,145,097$
Federal Transit Administration Grants
Federal Grants NC-04-006 & NC-04-0018 for engineering & construction 80.0000% 22,030,772$
Match to FTA 20.0000% 5,507,693
FTA Project Total 100.0000% 27,538,465$
Other Funding Sources & Uses
Surface Transportation Block Grant 18,750,000$
Strategic Transportation Investments (STI- Preliminary Engineering &
Construction) 12,480,869
Proceeds from Sale of Land 11,841,625
NCDOT Rail Division PE Funds 400,000
City of Charlotte funds for engineering, construction & other uses 33,000,000
Other Funding Sources Total 76,472,494$
TOTAL PROJECT BUDGET 168,156,056$
48
Appendices | 32
Appendix 8 – Other Capital Projects Managed by CATS
FY2020 Preliminary Budget
CityLYNX Goldline Phase II
Sources of Capital Funding Funding Share Amount
Federal Section 5309 Small Starts Federal Funds 50% 74,999,999$
Local Funds (City of Charlotte) 50% 75,000,000
TOTAL PROJECT BUDGET 100% 149,999,999$
Uses of Capital Funding (Expense as of 11/30/2018) Budget Expense Amount
10. Guideway & Track Elements 18,549,374$ 1,741,464$
20. Stations, Stops, Terminals, Intermodal 1,747,200 -
30. Support Facilities: Yards, Shops, Admin Buildings - -
40.Sitework & Special Conditions 31,185,674 8,725,191
50. Systems 26,514,844 718,370
60. ROW, Land, Exisiting Improvements 1,201,415 656,789
70. Vehicles 41,319,984 10,066,780
80. Professional Services 22,528,395 15,678,898
90. Unallocated Contingency 6,953,113 -
100. Finance Charges - -
100% Local Funded Art in Transit 99,185
TOTAL PROJECT EXPENSE 149,999,999$ 37,686,677$
49
Appendices | 33
Appendix 9 – FY2020 Budget Schedule
FY2020 Preliminary Budget
Month Date Present/Deliver To Details
Nov 2 City Strategy & Budget FY20-FY24 Capital Budget & FY20 – FY29 Capital Needs Assessment due to City Budget
21 City Strategy & Budget FY20/21 Operating Budget due to City Budget
Jan 23 Metropolitan Transit Commission (MTC)
CEO Recommended Budget: Overview
Feb 7 Council Budget Committee CEO Recommended Budget: Overview
7 Transit Services Advisory Committee (TSAC)
CEO Recommended Budget: Overview
19 Citizen Transit Advisory Group (CTAG)
CEO Recommended Budget: Overview
20 MTC Managers Presentation of Key Operating & Capital Programs:
• Bus/STS/Vanpool
• Service Planning
• Light Rail/Streetcar/Facilities
• Safety & Security
20 City Council Budget Workshop
CEO Recommended Budget: Overview
27 MTC Presentation of Key Operating & Capital Programs:
• Bus/STS/Vanpool
• Service Planning
• Light Rail/Streetcar/Facilities
• Safety & Security
Mar 20 MTC Managers Presentation of Key Community Investment Plan (CIP) Presentation of Adjustments to FY2020 Preliminary Budget
27 MTC Presentation of Key Community Investment Plan (CIP) Presentation of Adjustments to FY2020 Preliminary Budget
Apr 16 CTAG Presentation of Key Community Investment Plan (CIP) Presentation of Adjustments to FY2020 Preliminary Budget Recommendation of CEO Recommended Budget to MTC
17 MTC Managers Recommendation of CEO Recommended Budget to City Council
24 MTC Recommendation of CEO Recommended Budget to City Council
Jun City Council Adopt Budget
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
METROPOLITAN TRANSIT COMMISSION INFORMATION ITEM STAFF SUMMARY
SUBJECT: CEO Recommended DATE: January 23, 2019 FY2019 Operating and Community Investment Plan Budget Amendment
1.0 PURPOSE/SCOPE: This item advises that the Chief Executive Officer will recommend an amendment to the CATS FY2019 Operating and Community Investment Plan Budget.
2.0 BACKGROUND/JUSTIFICATION: On April 25, 2018; the Metropolitan Transit Commission took action to approve the FY2019 Transit Operating Budget and the FY2019-2023 Transit Community Investment Plan (CIP) budget. The CATS FY2019 Operating Budget and FY2019-2023 Community Investment Plan (CIP) were presented in compliance with the Transit Governance Interlocal Agreement. The balanced budgets were developed in compliance with CATS Financial Policy guidelines and objectives.
In the months following approval, CATS received Notice of Funding Opportunities (NOFO) from Federal Transit Administration and North Carolina Department of Transportation. The NOFO’s allowed the department to purchase vehicles and receive additional operating assistance.
Changes to the FY2019 Operating Budget are below • Transit Oriented Development (TOD) planning grant for Lynx Silver Line awarded
for $920,000 in Federal Funding.• Reduction of State Maintenance Assistance Program (SMAP) funds by
$3,311,242• Increase of Federal CMAQ Operating Funds for Lynx Blue Line $3,200,000• Projects originally budgeted in CIP moved to Operating due to the nature of the
task.o ADA Study $300,000 o Regional Transit Plan Study $325,000o Corridor Studies $1,079,095
68
Changes to the FY2019 CIP Budget are below • Bus Infrastructure grant to purchase MCI Buses $5,932,800 in Federal Funding.• Reduce CIP budget for projects moved to Operating budget
o ADA Study $300,000o Regional Transit Plan Study $325,000o Corridor Studies $1,079,095
3.0 PROCUREMENT BACKGROUND: N/A
4.0 POLICY IMPACT: The recommended FY2019 Operating and Community Investment Plan (CIP) Budget Amendment remain in compliance with the following MTC Policy directives:
1) CATS Mission, Vision and Strategic Goals2) CATS Financial Policies (Rev. 2016)3) The 2030 Transit Corridor System Plan4) CATS Service and Fare Policies
5.0 ECONOMIC IMPACT: N/A
6.0 ALTERNATIVES: N/A
7.0 RECOMMENDATION: Not applicable at this time since information is being presented for review by the MTC.
8.0 ATTACHMENT(S): N/A
SUBMITTED AND RECOMMENDED BY:
__________________________________________ John M. Lewis, Jr. Chief Executive Officer, Charlotte Area Transit System Director of Public Transit, City of Charlotte
69
Mode / Service YTD YTD Percent
Dec-17 FY 2019 FY 2018 Increase/Decrease WeekDay Saturday Sunday
Local
BOD Local 1,020,416 5,897,148 6,543,069 -9.9% 35,570 22,461 13,232
Subtotal 1,020,416 5,897,148 6,543,069 -9.9% 35,570 22,461 13,232
Local Express
Arboretum Express 3,094 22,500 23,608 -4.7% 158 - -
Carmel Road Express 905 3,654 7,647 -52.2% - - -
Harrisburg Road Express 3,054 14,407 21,566 -33.2% 91 - -
Huntersville Express 6,588 49,318 51,608 -4.4% 312 - -
Idlewild Road Express 2,326 13,232 16,888 -21.6% 82 - -
Independence Blvd Express 3,714 25,802 27,502 -6.2% 170 - -
Lawyers Road Express 2,512 16,489 19,326 -14.7% 101 - -
Matthews Express 2,954 21,349 24,365 -12.4% 141 - -
Mountain Island Express 1,226 7,162 8,086 -11.4% 51 - -
Northlake Express 4,691 37,918 33,897 11.9% 239 - -
North Mecklenburg Express 9,972 76,026 78,170 -2.7% 493 - -
Rea Road Express 1,850 16,585 14,614 13.5% 123 - -
Steele Creek Express 1,344 9,941 11,593 -14.2% 61 - -
University Research Park Express 7,916 - 61,431 n/a - - -
Huntersville Greenhouse Express - 1,540 - n/a 6 - -
Airport Connector - Northlake 5,381 14,282 34,346 -58.4% - - -
Subtotal 57,527 330,205 434,647 -24.0% 2,028 - -
Regional Express
Concord Express 2,216 - 14,976 n/a - - -
Gastonia Express 2,465 19,902 16,855 18.1% 138 - -
Rock Hill Express 1,692 15,811 14,248 11.0% 109 - -
Union County Express 1,811 13,453 14,760 -8.9% 85 - -
Subtotal 8,184 49,166 60,839 -19.2% 332 - -6,295 -23.1%
2,622 6.4%
2,062 21.9%
1,611 -11.0%
38,405 -33.2%
- n/a
- n/a
60 n/a
- n/a
9,335 -6.4%
2,336 26.3%
1,160 -13.7%
2,708 -8.3%
959 -21.8%
4,530 -3.4%
1,547 -33.5%
3,223 -13.2%
1,905 -24.2%
- n/a
1,719 -43.7%
5,911 -10.3%
878,008 -14.0%
3,012 -2.7%
Avg Daily Ridership per Month
Dec-18 Increase/Decrease
878,008 -14.0%
Metropolitan Transit CommissionCharlotte Area Transit System Ridership ReportDec-18
Percent
70
Metropolitan Transit CommissionCharlotte Area Transit System Ridership ReportDec-18Community Circulator
Neighborhood Shuttles 42,816 196,612 282,659 -30.4% 1,121 786 295
Beatties Ford Neighborhood Shuttle 13,403 - 85,826 n/a - - -
Eastland Neighborhood Shuttle 17,095 106,459 110,233 -3.4% 582 467 257
Pineville-Matthews Road 3,338 19,670 22,843 -13.9% 115 66 -
Village Rider 6,461 39,419 42,053 -6.3% 243 157 75
Subtotal 83,113 362,160 543,614 -33.4% 2,061 1,476 627
Activity Center Circulators
Gold Rush - - 23,831 n/a - - -
Subtotal - - 23,831 n/a - -
Human Services Transportation
Special Transportation Services 19,328 127,738 128,163 -0.3% 834 248 174
DSS 371 2,101 2,741 -23.3% 17 - -
Subtotal 19,699 129,839 130,904 -0.8% 851 248 174
Rideshare Services
Vanpool 11,520 65,843 72,494 -9.2% 637 - -
Subtotal 11,520 65,843 72,494 -9.2% 637 -
Rail
LYNX Blue Line 381,563 3,807,850 2,476,738 53.7% 22,720 15,298 8,187
CityLynx Gold Line 24,376 127,981 200,473 -36.2% 771 465 307
Subtotal 405,939 3,935,831 2,677,211 47.0% 23,491 15,763 8,494
Total 1,606,398 10,770,192 10,486,609 2.7% 64,970 39,952 22,534
591,114 45.6%
1,596,199 -0.6%
572,601 50.1%
18,513 -24.1%
12,096 5.0%
12,096 5.0%
18,383 -4.9%
320 -13.7%
18,703 -5.1%
- n/a
- n/a
5,977 -7.5%
51,578 -37.9%
- n/a
15,350 -10.2%
2,574 -22.9%
27,677 -35.4%
71
Sales Tax Collections and Distribution – October 2018 October 2018 receipts of $8,067,019 were $252,892 (3.2%) above the budget target
for the month October 2018 receipts were $183,306 (2.3%) above October of 2017
Sales Tax Budget Data The model projects FY2019 year-end receipts of $105,872,659, which is $7,318,226
(7.5%) above the budget target FY2019 sales tax budget is $98,211,941 FY2018 actual sales tax was $103,021,757
Local Government Sales and Use Tax Distribution Source: North Carolina Department of Revenue Sales & Use Distribution Report for
the month ending November 30, 2018 Published by NC Secretary of Revenue on 1/10/2019 with actual receipts through
October 2018 CATS sales tax report only includes Mecklenburg County Article 43 sales tax
FY2019 Sales Tax Receipts
Sales Tax Receipts: FY2015 – FY2018Fiscal Year Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June Total
FY2018 8,147,197$ 8,436,960$ 8,784,051$ 7,883,713$ 8,884,437$ 9,324,267$ 6,897,695$ 7,842,800$ 9,303,951$ 8,539,748$ 9,277,676$ 9,699,263$ 103,021,757$ FY2017 6,706,169 8,123,310 8,099,598 6,984,259 8,275,157 9,927,120 5,142,666 7,510,515 9,105,261 7,459,176 6,747,425 8,520,759 92,601,412 FY2016 7,470,371 6,971,746 7,551,677 6,188,499 6,607,520 9,383,261 6,142,552 6,944,204 7,858,189 7,952,022 7,781,259 8,765,518 89,616,819 FY2015 6,087,774 6,938,945 5,932,063 7,114,003 6,853,209 8,378,347 5,947,801 5,641,898 6,914,523 6,057,389 7,522,357 7,762,101 81,150,409
CATS Sales Tax Report FY2019
Jurisdiction Population % of Total Jul 18actuals
Aug 18actuals
Sep 18actuals
Oct 18actuals
Nov 18accrual
Dec 18 accrual
Jan 19 Feb 19 Mar 19 Apr 19 May 19 June 19 Total
Charlotte 830,258 40.5% 3,128,556$ 3,904,914$ 3,694,818$ 3,274,062$ 3,571,708$ 4,064,710$ -$ -$ -$ -$ -$ -$ 21,638,768$ Cornelius 30,207 1.5% 112,497 140,413 132,859 117,729 129,948 147,885 - - - - - - 781,331 Davidson 12,572 0.6% 47,218 58,935 55,764 49,414 54,084 61,549 - - - - - - 326,965 Huntersville 57,145 2.8% 212,533 265,273 251,001 222,418 245,833 279,766 - - - - - - 1,476,824 Matthew s 30,849 1.5% 116,044 144,841 137,048 121,441 132,710 151,028 - - - - - - 803,112 Mint Hill 26,690 1.3% 99,810 124,579 117,876 104,453 114,818 130,667 - - - - - - 692,203 Pineville 8,873 0.4% 33,350 41,626 39,387 34,902 38,171 43,440 - - - - - - 230,876 Meck. County 1,053,545 51.4% 3,958,494 4,940,804 4,674,973 4,142,600 4,532,271 5,157,860 - - - - - - 27,407,002
Total 2,050,139 100.0% 7,708,503$ 9,621,386$ 9,103,726$ 8,067,019$ 8,819,544$ 10,036,904$ 53,357,082$
-5.4% 14.0% 3.6% 2.3% -0.7% 7.6% - - - - - - 2.8%8,079,462$ 7,747,794$ 7,725,621$ 7,814,127$ 7,201,246$ 10,297,775$ 6,971,686$ 7,624,864$ 8,920,485$ 8,081,597$ 8,353,234$ 9,394,050$ 98,211,941
7.8% 17.6% 26.9% 35.1% 44.1% 54.3% 54.3% 54.3% 54.3% 54.3% 54.3% 54.3% 54.3%FY19 Budget Target% of FY19 Budget Achieved
Year-over-Year Comparison (FY19-FY18)
$0
$10
$20
$30
$40
$50
$60
$70
$80
$90
$100
$110
$120
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Cum
ulat
ive M
onth
ly R
ecei
pts/
Fore
cast
Sales Tax Receipts and FY2019 Forecast($ millions)
FY19 Receipts FY19 Budget Target FY18 Receipts FY19 Forecast Trendline