Metallurgical Aspects of Boiler Tube Failures – A Few Case Studies
B.G.SettySr. Manager R&D Centre, Noida
Metallurgical analysis
– Failure analysis– Health/ Condition Assessment – Residual Life Assessment– Indegenisation / Material Development
Components
– Boiler tubes– Turbine components– High Energy Piping– CHP Components– Grinding elements– Gas Turbine Components
Failure Mechanisms(Water Touched Tubes)
Corrosion FatigueFlyash ErosionHydrogen DamageAcid Phosphate corrosionCaustic GougingFireside CorrosionThermal FatigueErosion CorrosionSootblower Erosion
Short Term Overheating Low Temperature CreepChemical Cleaning DamageFatigue PittingCoal Particle ErosionFalling Slag DamageAcid Dew Point Corrosion
Failure Mechanisms(Steam Touched Tubes)
Long Term Overheating / CreepFire Side CorrosionDissimilar Metal Weld Short Term OverheatingStress Corrosion CrackingSH/RH Sootblower Erosion
FatigueRubbing Tubes / FrettingPittingGraphitisationSH /RH Chemical Cleaning
Stages in Failure Analysis
Visual Examination.Collection of background data.Identification of sampling locations.Laboratory investigationsAnalysis of data
Visual examination of damaged parts is the first and most critical step in failure investigation
Case Studies in Failure Investigation
Singarauli STPS
Boiler No.3Date of Failure: 05/04/2004Zone: Economiser Lower BankLocation: Coil No.02Material: SA210 A1R&D Ref: 2210
Kahalgaon STPS
Boiler No.2Date of Failure: 28/03/2004Zone: Convection Pass Wall (RHS)Location: Front Tube-01 (from RHS)Material: C20R&D Ref: 2209
Ramagundam STPS
Boiler No.1Date of Failure: 01/03/2004Zone: Economiser LHS wallLocation: Bank no.03 (from rear)Material: SA210 A1R&D Ref: 2198
Corrosion Fatigue
Ramagundam STPS
Boiler No.2Date of Failure: 27/02/2004Zone: ReheaterLocation: Bank-05, Coil-22, Tube-07Material: SA213 T22R&D Ref: 2199
Korba STPS
Boiler No.1Date of Failure: 09/01/2004Zone: ReheaterLocation: Panel-31, 3rd Bend, 2nd BunchMaterial: SA213 T11R&D Ref: 2132
Long Term Overheating
Talcher #2, Stage –I
S-Panel Water Wall Tube Failure
Dated 09/01/2004
Report: R&D/MET/2130
Pinhole on weld
Vindhyachal #8
S-Panel Water Wall Tube Failure
Dated 06/12/2003
Report No R&D/MET/2073
2073
Origin of Leak
Origin of Leak
NCPP Dadri #2
S-Panel Water Wall Tube Failure
Dated 05/11/2003
Report No. R&D/MET/R-2118
TANDA Unit #2
Hydrogen Damage Failure in Water Wall
NCPP Dadri Unit #2
Weld Porosity in Economiser Tube
Talcher Thermal Unit #6
Weld Defects in Economiser Tube
Water wall Tube (near Man hole)Material: SA210 GrA1
Thermal Fatigue
Hydrogen Damage
Usefulness of Failure Analysis
Establishing the main reason of failureEstablishing the main reason of failureTaking remedial action to prevent further Taking remedial action to prevent further
failuresfailuresReduces forced outagesReduces forced outagesHelps in taking decisions for making design Helps in taking decisions for making design
modifications, if necessarymodifications, if necessary
Water wall (Rear Side- tube no. 139 - S-Panel bend)Water wall (Rear Side- tube no. 139 - S-Panel bend)
Short Term Overheating