Megger - Substation overview

105
1

description

Megger - Substation overview. 170 product groups, 2600 products. MEGGERInsulation testers, fibre optic testing MULTI-AMPCircuit breaker test tests BIDDLEHigh voltage test sets AVO Multimeters,Training , software DUCTEROhm meters FOSTEROil test sets STATESTerminal blocks - PowerPoint PPT Presentation

Transcript of Megger - Substation overview

Page 1: Megger - Substation  overview

1

Page 2: Megger - Substation  overview

2

Page 3: Megger - Substation  overview

3

Page 4: Megger - Substation  overview

4

Megger - Substation overview

Page 5: Megger - Substation  overview

5

170 product groups, 2600 products

Page 6: Megger - Substation  overview

6

MEGGER Insulation testers, fibre optic testing MULTI-AMP Circuit breaker test tests BIDDLE High voltage test sets AVO Multimeters,Training, software DUCTER Ohm meters FOSTER Oil test sets STATES Terminal blocks METROSONICS Critical systems monitoring PROGRAMMA Relay/ Circuit Breaker/ Battery Testing PAX DIAGNOSTIC Transformer, Insulation Products

Megger Brand Names

Page 7: Megger - Substation  overview

7

IEC 61850 STANDARD IN SUBSTATION AUTOMATION

Main purpose of the standard is to achieve interoperability among different devices from different vendors within the same substation.

Page 8: Megger - Substation  overview

8

IEC 61850 STANDARD IN SUBSTATION AUTOMATION

Page 9: Megger - Substation  overview

9

IEC 61850 STANDARD IN SUBSTATION AUTOMATION

What is Substation Automation?

We need to know what we are talking about, in order to understand what needs to be standardized.

Page 10: Megger - Substation  overview

10

Page 11: Megger - Substation  overview

11

Page 12: Megger - Substation  overview

12

THE POWER SUBSTATIONIn a substation there are Primary Equipments:

Page 13: Megger - Substation  overview

13

THE POWER SUBSTATION

The Primary equipments in the Substation need to be ”controlled”.

The word CONTROL in a substation has nothing to do with Process Control, where the word CONTROL is usually associated to ”feedback systems”:

Page 14: Megger - Substation  overview

14

THE POWER SUBSTATION

Page 15: Megger - Substation  overview

15

THE POWER SUBSTATIONBusbar change. Load is on Busbar 2

Page 16: Megger - Substation  overview

16

THE POWER SUBSTATIONBusbar change. Connecting Busbar 1 to Busbar 2

Page 17: Megger - Substation  overview

17

THE POWER SUBSTATIONBusbar change: Connecting the Feeders to Busbar 1

Page 18: Megger - Substation  overview

18

THE POWER SUBSTATIONBusbar change: Disconnecting feeders from Busbar 2

Page 19: Megger - Substation  overview

19

THE POWER SUBSTATIONBusbar change: Disconecting Busbar 2 from the system

Page 20: Megger - Substation  overview

20

THE POWER SUBSTATIONBusbar change. Busbar 1 in service

Page 21: Megger - Substation  overview

21

THE POWER SUBSTATION

Page 22: Megger - Substation  overview

22

THE POWER SUBSTATIONOne very simple interlocking: Earthing Switch and DisconnectorI can OPEN / CLOSE the Disconnector ONLY if the Earthing Switch is OPEN.If the Earthing Switch is CLOSED I cannot operate the Disconnector.

Page 23: Megger - Substation  overview

23

THE POWER SUBSTATIONEARTHING SWITCH CLOSED

Page 24: Megger - Substation  overview

24

THE POWER SUBSTATIONEARTHING SWITCH OPEN

Page 25: Megger - Substation  overview

25

THE INTERLOCKING SYSTEM

Page 26: Megger - Substation  overview

26

A Local Action (open/close) may require:THE INTERLOCKING SYSTEM

Remote information (from different bays)Local information (from the same bay)

Page 27: Megger - Substation  overview

27

Page 28: Megger - Substation  overview

28

THE INTERLOCKING SYSTEM

Page 29: Megger - Substation  overview

29

THE INTERLOCKING SYSTEM

Page 30: Megger - Substation  overview

30

THE IEC 61850 INTERLOCKING SYSTEM

Page 31: Megger - Substation  overview

31

CONTROL / INTERLOCKING in an IEC 61850 substation

Page 32: Megger - Substation  overview

32

IEC 61850 Standard

Page 33: Megger - Substation  overview

33

THE POWER SUBSTATIONIn a substation there are Primary Equipments…..

Page 34: Megger - Substation  overview

34

THE POWER SUBSTATION… that must be protected.

Page 35: Megger - Substation  overview

35

THE PROTECTION RELAYS

Page 36: Megger - Substation  overview

36

THE PROTECTION RELAYS

Page 37: Megger - Substation  overview

37

THE PROTECTION RELAYS

The circuit breaker opens and interrupts the fault current. The relay sees no fault conditions anymore and it resets. Circuit breaker remains open, the fault has been cleared.

Page 38: Megger - Substation  overview

38

THE PROTECTION SYSTEM

Page 39: Megger - Substation  overview

39

THE PROTECTION SYSTEMRadial Feeders: No communication

Page 40: Megger - Substation  overview

40

THE PROTECTION SYSTEMRadial Feeders: No communication

Page 41: Megger - Substation  overview

41

THE PROTECTION SYSTEMRadial Feeders: No communication

Page 42: Megger - Substation  overview

42

THE PROTECTION SYSTEMRadial Feeders: No communication

Page 43: Megger - Substation  overview

43

THE PROTECTION SYSTEMRadial Feeders: Communication

Page 44: Megger - Substation  overview

44

THE PROTECTION SYSTEMRadial Feeders: Communication

Page 45: Megger - Substation  overview

45

THE PROTECTION SYSTEMRadial Feeders: Communication

Page 46: Megger - Substation  overview

46

THE PROTECTION SYSTEMRadial Feeders: Communication

Page 47: Megger - Substation  overview

47

PROTECTION signals (Trip, Block, Acceleration..) are sent through the station bus.Horizontal communication

IEC 61850 APPLICATION: PROTECTION

Page 48: Megger - Substation  overview

48

GOOSE = Generic Object Oriented System Event.Is an unacknowledged multicast message that is repeated with a certain strategy allowing the supervision of the Horizontal Communication.

GOOSE communication for PROTECTION and CONTROL

Page 49: Megger - Substation  overview

49

GOOSE or Contact (Conventional) ?

Page 50: Megger - Substation  overview

50

GOOSE or Contact (Conventional) ?

Page 51: Megger - Substation  overview

51

GOOSE or Contact (Conventional) ?

Page 52: Megger - Substation  overview

52

GOOSE or Contact (Conventional) ?

Page 53: Megger - Substation  overview

53

IEC 61850 Standard

Page 54: Megger - Substation  overview

54

Page 55: Megger - Substation  overview

55

Proprietary communication protocols were / are still available.Handling correctly all protocols was and is still a challenge

”BEFORE standardisation”: REPORTING TO SCADA / RTU

Page 56: Megger - Substation  overview

56

”BEFORE”: PROTOCOL CONVERTERS / IMPLEMENTATIONS

Page 57: Megger - Substation  overview

57

IEDs from different vendors can exchange and use information over a common communications media. No need to have protocol converters.Reporting: Vertical Communication.

IEC 61850 APPLICATION: REPORTING TO SCADA / RTU

Page 58: Megger - Substation  overview

58

IEC 61850 APPLICATION: SCADA/RTU COMMUNICATION

The communication between SCADA / RTU and the IEDsis defined in the IEC 61850 standard (MMS / FTP).

Data exchanged can be:

• Control (operating primary objects)• Log• Reporting of events• Disturbance Files Upload

Page 59: Megger - Substation  overview

59

IEC 61850 Standard

Page 60: Megger - Substation  overview

60

IEC 61850: NETWORK TOPOLOGY

The data traffic runs on Ethernet, 100 Mbit/s.

This means that in the IEC 61850 substation there are Ethernet switches.

Protection and Control signals are dependent on the correct functionality of the communication system, which has in the Ethernet switches one of its most important factors.

Page 61: Megger - Substation  overview

61

IEC 61850: NETWORK TOPOLOGY

Star

Ring

Page 62: Megger - Substation  overview

62

IEC 61850 Standard

Page 63: Megger - Substation  overview

63

IEDs and Substations are described through XML files.The “IEC 61850 language used in the XML files” is called SCL language.

SCL: Substation Configuration Language.

IEC 61850: The SCL language

Page 64: Megger - Substation  overview

64

IEC 61850: The SCL language (IED Modelling)

Page 65: Megger - Substation  overview

65

Bay A Bay Unit (IED)

PTRC (Trip, Operate)

IEC 61850: The SCL language (IED modelling)

Page 66: Megger - Substation  overview

66

Bay Unit (IED)

PTRC (Trip, Operate)

SCLBay A

IEC 61850: The SCL language (IED modelling)

Page 67: Megger - Substation  overview

67

Bay Unit (IED)

PTRC (Trip, Operate)

SCLBay A

IEC 61850: The SCL language (IED modelling)

Page 68: Megger - Substation  overview

68

Bay Unit (IED)

PTRC (Trip, Operate)SCL

Bay A

IEC 61850: The SCL language (IED modelling)

Page 69: Megger - Substation  overview

69

SCLSCLIEC 61850: The SCL language (IED modelling)

It is possible to “structure” the Logical Nodes, and group them under different Logical Devices.The “rules” of this structure are described in the XML file.

Page 70: Megger - Substation  overview

70

The SCL file also describes what the IED can do (services). In this case it seems that the IED cannot offer upload of disturbance recorder file, as the “FileHandling Service” is not listed:

IEC 61850: Services (IED modelling)

While this IED allows to upload the disturbance recorder files (FileHandling Service” is listed):

Page 71: Megger - Substation  overview

71

Depending on the information they carry, there are different types of SCL files:

ICD (IED Capability Description)CID (Configured IED Description)SCD (Substation Configuration Description)

SSD (System Specification Description)

IID (Instantiated IED Description)SED (System Exchange Description)

IEC 61850: Different SCL files

Page 72: Megger - Substation  overview

72

IEC 61850 Standard

Page 73: Megger - Substation  overview

73

IEC 61850: Engineering Process

Page 74: Megger - Substation  overview

74

An IEC 61850 substation is described by one special SCL file, called SCD file (Substation Configuration Description).

IEC 61850: Engineering Process

Page 75: Megger - Substation  overview

75

IEC 61850: Engineering Process

There are software tools that can extract engineering information from the SCD file and represent them in a comfortable way to the user:

Page 76: Megger - Substation  overview

76

IEC 61850: Engineering ProcessREPORTING Vertical Communication

All the IEC 61850 devices (IEDs) describe themselves withhelp of the SCL language.

SCL information from all IEDs are integrated into theIEC 61850 Engineering Tool.

Page 77: Megger - Substation  overview

77

IEC 61850: Engineering Process

The SCADA system is also IEC 61850 compliant, and it can read the SCD files understanding how the substation looks like, which IEDs are present and which information they send to the SCADA system .

SCADA / RTU Vertical Communication

Page 78: Megger - Substation  overview

78

IEC 61850: Engineering Process

GOOSE Horizontal Communication

In the SCL file there is written which IED talks to which IED.The standard messages among IEDs in the same substation are called

GOOSE messages (Generic Object Oriented Substation Event).GOOSE messages can contain protection application information (TRIP, Block etc.).

Page 79: Megger - Substation  overview

79

IEC 61850: Engineering Process

The IEC 61850 Engineering Tool

One IEC 61850 Engineering Tool is in principle a “software that handles SCL files”.

The initial SCL files are provided by the IED vendor software tools, and they are called ICD files (IED Capability Description).

The ICD files are imported in the IEC 61850 Engineering TOOL and GOOSE – Reporting information are added for each IED, creating the so called SCD file (Substation Configuration Description).

The SCD file is then exported from the Engineering Tool. IED vendor tools will import that file and will download in the IEDs the IEC 61850 information that are written in the SCD files.

Page 80: Megger - Substation  overview

80

IEC 61850:Engineering Process

Page 81: Megger - Substation  overview

81

IEC 61850: Engineering Tools

Documentation

The SCD file describes the substation in IEC 61850 language (SCL).The IEC 61850 tool is able to elaborate such information and to show it in human readable format, like a PDF file.

Page 82: Megger - Substation  overview

82

IEC 61850: Engineering Tools

Page 83: Megger - Substation  overview

83

IEC 61850 Standard

Page 84: Megger - Substation  overview

84

PROCESS BUS

Sampled Values(SV)9-2

Merging Units (MU)

IEC 61850-9-2NCITPROCESS

BUS

Page 85: Megger - Substation  overview

85

FULLY IEC 61850 SUBSTATION

Page 86: Megger - Substation  overview

86

THE RELAY

Page 87: Megger - Substation  overview

87

Replacement of BO cards

GOOSE OUT

Page 88: Megger - Substation  overview

88

Replacement of BI cards

GOOSE OUT

GOOSE IN

Page 89: Megger - Substation  overview

89

GOOSE OUT

GOOSE IN

Page 90: Megger - Substation  overview

90

THE IEC 61850-8-1 IED

GOOSE IN GOOSE OUT

IEC 61850-8-1 Station Bus

Page 91: Megger - Substation  overview

91

Replacement of analog cards + A/D conversion

GOOSE IN GOOSE OUT

IEC 61850-8-1 Station Bus

SAMPLED VALUES (SV)

Page 92: Megger - Substation  overview

92

GOOSE IN GOOSE OUT

IEC 61850-8-1 Station Bus

SAMPLED VALUES

Page 93: Megger - Substation  overview

93

THE FULLY IEC 61850 COMPLIANT IED

GOOSE IN GOOSE OUT

IEC 61850-8-1 Station Bus

SAMPLED VALUES

IEC 61850-9-2Process Bus

Page 94: Megger - Substation  overview

94

WHERE ARE THE SAMPLED VALUES COMING FROM?

SAM

PLED

VA

LUES

Page 95: Megger - Substation  overview

95

Merging Units

Page 96: Megger - Substation  overview

96

Merging Units

Page 97: Megger - Substation  overview

97

IEC 61850 Standard

Page 98: Megger - Substation  overview

98

IEC 61850 Standard

Page 99: Megger - Substation  overview

99

IEC 61850: TESTING

How do we test all of this?

How do we test the Network Topology (Switches)?

How do we test the Vertical Communication to SCADA?(IEC 61850-8-1, MMS, Reporting)

How do we test Interlockings?(IEC 61850-8-1 GOOSE)

How do we test Protection Schemes?(IEC 61850-8-1 GOOSE and IEC 61850-9-2 SV)

Page 100: Megger - Substation  overview

100

IEC 61850: TESTING

Page 101: Megger - Substation  overview

101

Information about IEC 61850KTH: Kungliga Tekniska Högskolan

University courses on IEC 61850for SA (Substation Automation)

Page 102: Megger - Substation  overview

102

Information about IEC 61850Tissues (Technical Issues) databasewww.tissues.iec61850.comIEC 61850 standard is a dynamic standard!. You must follow it!

Page 103: Megger - Substation  overview

103

IEC 61850 Blog

Information on new IEC 61850 documents

Information on IEC 61850 events

Information on new instruments and techniques on the IEC 61850

www.blog.iec61850.comCompetent and fast up to date blog on IEC 61850

Information about IEC 61850

Page 104: Megger - Substation  overview

104

Information om IEC 61850Elforsk www.elforsk.se

Page 105: Megger - Substation  overview

105

Megger http://www.megger.comIEC 61850 test equipment, tools and litterature

Information om IEC 61850