Megger - Substation overview
description
Transcript of Megger - Substation overview
1
2
3
4
Megger - Substation overview
5
170 product groups, 2600 products
6
MEGGER Insulation testers, fibre optic testing MULTI-AMP Circuit breaker test tests BIDDLE High voltage test sets AVO Multimeters,Training, software DUCTER Ohm meters FOSTER Oil test sets STATES Terminal blocks METROSONICS Critical systems monitoring PROGRAMMA Relay/ Circuit Breaker/ Battery Testing PAX DIAGNOSTIC Transformer, Insulation Products
Megger Brand Names
7
IEC 61850 STANDARD IN SUBSTATION AUTOMATION
Main purpose of the standard is to achieve interoperability among different devices from different vendors within the same substation.
8
IEC 61850 STANDARD IN SUBSTATION AUTOMATION
9
IEC 61850 STANDARD IN SUBSTATION AUTOMATION
What is Substation Automation?
We need to know what we are talking about, in order to understand what needs to be standardized.
10
11
12
THE POWER SUBSTATIONIn a substation there are Primary Equipments:
13
THE POWER SUBSTATION
The Primary equipments in the Substation need to be ”controlled”.
The word CONTROL in a substation has nothing to do with Process Control, where the word CONTROL is usually associated to ”feedback systems”:
14
THE POWER SUBSTATION
15
THE POWER SUBSTATIONBusbar change. Load is on Busbar 2
16
THE POWER SUBSTATIONBusbar change. Connecting Busbar 1 to Busbar 2
17
THE POWER SUBSTATIONBusbar change: Connecting the Feeders to Busbar 1
18
THE POWER SUBSTATIONBusbar change: Disconnecting feeders from Busbar 2
19
THE POWER SUBSTATIONBusbar change: Disconecting Busbar 2 from the system
20
THE POWER SUBSTATIONBusbar change. Busbar 1 in service
21
THE POWER SUBSTATION
22
THE POWER SUBSTATIONOne very simple interlocking: Earthing Switch and DisconnectorI can OPEN / CLOSE the Disconnector ONLY if the Earthing Switch is OPEN.If the Earthing Switch is CLOSED I cannot operate the Disconnector.
23
THE POWER SUBSTATIONEARTHING SWITCH CLOSED
24
THE POWER SUBSTATIONEARTHING SWITCH OPEN
25
THE INTERLOCKING SYSTEM
26
A Local Action (open/close) may require:THE INTERLOCKING SYSTEM
Remote information (from different bays)Local information (from the same bay)
27
28
THE INTERLOCKING SYSTEM
29
THE INTERLOCKING SYSTEM
30
THE IEC 61850 INTERLOCKING SYSTEM
31
CONTROL / INTERLOCKING in an IEC 61850 substation
32
IEC 61850 Standard
33
THE POWER SUBSTATIONIn a substation there are Primary Equipments…..
34
THE POWER SUBSTATION… that must be protected.
35
THE PROTECTION RELAYS
36
THE PROTECTION RELAYS
37
THE PROTECTION RELAYS
The circuit breaker opens and interrupts the fault current. The relay sees no fault conditions anymore and it resets. Circuit breaker remains open, the fault has been cleared.
38
THE PROTECTION SYSTEM
39
THE PROTECTION SYSTEMRadial Feeders: No communication
40
THE PROTECTION SYSTEMRadial Feeders: No communication
41
THE PROTECTION SYSTEMRadial Feeders: No communication
42
THE PROTECTION SYSTEMRadial Feeders: No communication
43
THE PROTECTION SYSTEMRadial Feeders: Communication
44
THE PROTECTION SYSTEMRadial Feeders: Communication
45
THE PROTECTION SYSTEMRadial Feeders: Communication
46
THE PROTECTION SYSTEMRadial Feeders: Communication
47
PROTECTION signals (Trip, Block, Acceleration..) are sent through the station bus.Horizontal communication
IEC 61850 APPLICATION: PROTECTION
48
GOOSE = Generic Object Oriented System Event.Is an unacknowledged multicast message that is repeated with a certain strategy allowing the supervision of the Horizontal Communication.
GOOSE communication for PROTECTION and CONTROL
49
GOOSE or Contact (Conventional) ?
50
GOOSE or Contact (Conventional) ?
51
GOOSE or Contact (Conventional) ?
52
GOOSE or Contact (Conventional) ?
53
IEC 61850 Standard
54
55
Proprietary communication protocols were / are still available.Handling correctly all protocols was and is still a challenge
”BEFORE standardisation”: REPORTING TO SCADA / RTU
56
”BEFORE”: PROTOCOL CONVERTERS / IMPLEMENTATIONS
57
IEDs from different vendors can exchange and use information over a common communications media. No need to have protocol converters.Reporting: Vertical Communication.
IEC 61850 APPLICATION: REPORTING TO SCADA / RTU
58
IEC 61850 APPLICATION: SCADA/RTU COMMUNICATION
The communication between SCADA / RTU and the IEDsis defined in the IEC 61850 standard (MMS / FTP).
Data exchanged can be:
• Control (operating primary objects)• Log• Reporting of events• Disturbance Files Upload
59
IEC 61850 Standard
60
IEC 61850: NETWORK TOPOLOGY
The data traffic runs on Ethernet, 100 Mbit/s.
This means that in the IEC 61850 substation there are Ethernet switches.
Protection and Control signals are dependent on the correct functionality of the communication system, which has in the Ethernet switches one of its most important factors.
61
IEC 61850: NETWORK TOPOLOGY
Star
Ring
62
IEC 61850 Standard
63
IEDs and Substations are described through XML files.The “IEC 61850 language used in the XML files” is called SCL language.
SCL: Substation Configuration Language.
IEC 61850: The SCL language
64
IEC 61850: The SCL language (IED Modelling)
65
Bay A Bay Unit (IED)
PTRC (Trip, Operate)
IEC 61850: The SCL language (IED modelling)
66
Bay Unit (IED)
PTRC (Trip, Operate)
SCLBay A
IEC 61850: The SCL language (IED modelling)
67
Bay Unit (IED)
PTRC (Trip, Operate)
SCLBay A
IEC 61850: The SCL language (IED modelling)
68
Bay Unit (IED)
PTRC (Trip, Operate)SCL
Bay A
IEC 61850: The SCL language (IED modelling)
69
SCLSCLIEC 61850: The SCL language (IED modelling)
It is possible to “structure” the Logical Nodes, and group them under different Logical Devices.The “rules” of this structure are described in the XML file.
70
The SCL file also describes what the IED can do (services). In this case it seems that the IED cannot offer upload of disturbance recorder file, as the “FileHandling Service” is not listed:
IEC 61850: Services (IED modelling)
While this IED allows to upload the disturbance recorder files (FileHandling Service” is listed):
71
Depending on the information they carry, there are different types of SCL files:
ICD (IED Capability Description)CID (Configured IED Description)SCD (Substation Configuration Description)
SSD (System Specification Description)
IID (Instantiated IED Description)SED (System Exchange Description)
IEC 61850: Different SCL files
72
IEC 61850 Standard
73
IEC 61850: Engineering Process
74
An IEC 61850 substation is described by one special SCL file, called SCD file (Substation Configuration Description).
IEC 61850: Engineering Process
75
IEC 61850: Engineering Process
There are software tools that can extract engineering information from the SCD file and represent them in a comfortable way to the user:
76
IEC 61850: Engineering ProcessREPORTING Vertical Communication
All the IEC 61850 devices (IEDs) describe themselves withhelp of the SCL language.
SCL information from all IEDs are integrated into theIEC 61850 Engineering Tool.
77
IEC 61850: Engineering Process
The SCADA system is also IEC 61850 compliant, and it can read the SCD files understanding how the substation looks like, which IEDs are present and which information they send to the SCADA system .
SCADA / RTU Vertical Communication
78
IEC 61850: Engineering Process
GOOSE Horizontal Communication
In the SCL file there is written which IED talks to which IED.The standard messages among IEDs in the same substation are called
GOOSE messages (Generic Object Oriented Substation Event).GOOSE messages can contain protection application information (TRIP, Block etc.).
79
IEC 61850: Engineering Process
The IEC 61850 Engineering Tool
One IEC 61850 Engineering Tool is in principle a “software that handles SCL files”.
The initial SCL files are provided by the IED vendor software tools, and they are called ICD files (IED Capability Description).
The ICD files are imported in the IEC 61850 Engineering TOOL and GOOSE – Reporting information are added for each IED, creating the so called SCD file (Substation Configuration Description).
The SCD file is then exported from the Engineering Tool. IED vendor tools will import that file and will download in the IEDs the IEC 61850 information that are written in the SCD files.
80
IEC 61850:Engineering Process
81
IEC 61850: Engineering Tools
Documentation
The SCD file describes the substation in IEC 61850 language (SCL).The IEC 61850 tool is able to elaborate such information and to show it in human readable format, like a PDF file.
82
IEC 61850: Engineering Tools
83
IEC 61850 Standard
84
PROCESS BUS
Sampled Values(SV)9-2
Merging Units (MU)
IEC 61850-9-2NCITPROCESS
BUS
85
FULLY IEC 61850 SUBSTATION
86
THE RELAY
87
Replacement of BO cards
GOOSE OUT
88
Replacement of BI cards
GOOSE OUT
GOOSE IN
89
GOOSE OUT
GOOSE IN
90
THE IEC 61850-8-1 IED
GOOSE IN GOOSE OUT
IEC 61850-8-1 Station Bus
91
Replacement of analog cards + A/D conversion
GOOSE IN GOOSE OUT
IEC 61850-8-1 Station Bus
SAMPLED VALUES (SV)
92
GOOSE IN GOOSE OUT
IEC 61850-8-1 Station Bus
SAMPLED VALUES
93
THE FULLY IEC 61850 COMPLIANT IED
GOOSE IN GOOSE OUT
IEC 61850-8-1 Station Bus
SAMPLED VALUES
IEC 61850-9-2Process Bus
94
WHERE ARE THE SAMPLED VALUES COMING FROM?
SAM
PLED
VA
LUES
95
Merging Units
96
Merging Units
97
IEC 61850 Standard
98
IEC 61850 Standard
99
IEC 61850: TESTING
How do we test all of this?
How do we test the Network Topology (Switches)?
How do we test the Vertical Communication to SCADA?(IEC 61850-8-1, MMS, Reporting)
How do we test Interlockings?(IEC 61850-8-1 GOOSE)
How do we test Protection Schemes?(IEC 61850-8-1 GOOSE and IEC 61850-9-2 SV)
100
IEC 61850: TESTING
101
Information about IEC 61850KTH: Kungliga Tekniska Högskolan
University courses on IEC 61850for SA (Substation Automation)
102
Information about IEC 61850Tissues (Technical Issues) databasewww.tissues.iec61850.comIEC 61850 standard is a dynamic standard!. You must follow it!
103
IEC 61850 Blog
Information on new IEC 61850 documents
Information on IEC 61850 events
Information on new instruments and techniques on the IEC 61850
www.blog.iec61850.comCompetent and fast up to date blog on IEC 61850
Information about IEC 61850
104
Information om IEC 61850Elforsk www.elforsk.se
105
Megger http://www.megger.comIEC 61850 test equipment, tools and litterature
Information om IEC 61850