Mcps 1256 bigpicturepowerpoint
-
Upload
missoula-county-public-schools -
Category
Documents
-
view
249 -
download
0
description
Transcript of Mcps 1256 bigpicturepowerpoint
![Page 1: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/1.jpg)
October 13, 2014
![Page 2: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/2.jpg)
MISSOULA COUNTY
PUBLIC SCHOOLS
To serve all students in a 21st
Century Educational Culture.
To support the achievement
and graduation of all students.
To be fiscally responsible, while
preparing for today and the
future.
![Page 3: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/3.jpg)
THE SMART SCHOOLS PROCESS
School Centric: School-specific teams:
Looked global, acted local.
Collaborative: Input and feedback sought.
Realistic: School team — Smart Schools
Steering Committee — MCPS Board of
Trustees.
Public: Everyone invited to review options
and weigh in. Final support for the
initiative: November 2015 public election.
![Page 4: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/4.jpg)
Smart School Facilities Support 21st Century Educational Culture in three ways:
SecurityA secure environment where all students and teachers can concentrate on learning.
TechnologyAllow for rapidly evolving technology to be implemented into education well into the future.
EnvironmentFeature dynamic layouts that are open and flexible, enabling multiuse, class-to-class collaboration and evolution of curriculum over time.
![Page 5: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/5.jpg)
The 21st Century Model
of Education
![Page 6: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/6.jpg)
This is what we have today.
![Page 7: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/7.jpg)
Missoula County keeps growing.*U.S. Census Bureau.
** McKibben Demographic Research, for MCPS.
1980
76,016*
2010
109,299*
2020
115,600**
![Page 8: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/8.jpg)
![Page 9: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/9.jpg)
Best ideas 7 options 1 “best”
Business as Usual
Consolidate
Expand
Light Touch
Out of the Box
Realign & Relocate
Start Over
![Page 10: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/10.jpg)
Collaboration with /
Input from beyond
MCPS community
• City and county
governments
• UM
• State of Montana
![Page 11: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/11.jpg)
NOW IS THE TIME TO INVEST
IN SMARTER SCHOOLS
The average age of our buildings is 57 years.
The community created a vision for 21st-century education.
Strong schools attract economicdevelopment.
![Page 12: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/12.jpg)
MCPS buildings aren’t keeping up.
Some are actually failing.
Deferred maintenance • Mechanical / HVAC / electrical needs •
Overcrowding • Safety issues • Upgrade infrastructure for technology
![Page 13: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/13.jpg)
Education Quality of life
High-quality education High-quality community
![Page 14: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/14.jpg)
Elementary Schools
Expand, remodel, replace:
Lowell, Russell, Franklin,
Cold Springs
Deal with needed
maintenance, security,
technology, overcrowding:
Chief Charlo, Lewis & Clark,
Paxson, Hawthorne, Rattlesnake
![Page 15: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/15.jpg)
Middle Schools
Expand and remodel:
C.S. Porter, Meadow Hill,
Washington
Deal with needed
maintenance, security,
technology, overcrowding
![Page 16: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/16.jpg)
High SchoolsSentinel — expand & consolidate
music, automotive, STEM programs
Hellgate — expand & remodel
Big Sky — expand & remodel
Vo-Ag — add processing kitchen
Seeley-Swan — add theater
performance facilities
Willard — rebuild
Deal with needed maintenance,
security, technology, overcrowding
![Page 17: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/17.jpg)
MCPS-owned leased, raw land, administrative
• New K-12 Performing Arts facility (Sentinel).
• Renovate Business Building into district training & technology center.
• Consolidate all admin personnel into one building (Missoula College).
• RFP for sale of Whittier, 55th / Whitaker.RFP for lease of Casaloma land.Continued lease of Prescott School.
• Mount Jumbo & Missoula College as swing spaces during construction projects.
• Long-term lease of Duncan Drive property.
• Improve Missoula County Stadium.
![Page 18: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/18.jpg)
Bonding financing:
Public vote
November 3, 2015
![Page 19: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/19.jpg)
K-8 / Elementary Bond$96,000,000*
Per household: $15/month,
$180/year, $3,600/20 years
• Flexible learning environments, deferred
maintenance, security, technology in all
buildings.
• Capacity and future flexibility addressed
in all schools.
* Pending adjustments to current bonding
capacity from the Montana Legislature.
![Page 20: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/20.jpg)
9-12 / High School Bond$66,000,000 bond
Per household: $6/month,
$72/year, $1,440/20 years
• Flexible learning environments, deferred
maintenance, security, technology in all
buildings.
• Capacity and future flexibility addressed
in all schools.
• Does not include Missoula County Stadium
or any athletic facility upgrades.
![Page 21: Mcps 1256 bigpicturepowerpoint](https://reader033.fdocuments.net/reader033/viewer/2022042513/568ca7e91a28ab186d9736a2/html5/thumbnails/21.jpg)
Smart Schools 2020
Teaching and learning for all in a
21st Century Educational Culture
More info:
Systemwide: www.mcpsmt.org / Hatton Littman at
School specific: www.mcpsmt.org & navigate to the
school’s webpages / contact principal by email.
Thank you.