Facility Layout
Operations Management
P. Kalyanasundaram
![Page 2: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/2.jpg)
What is Facility Layout?
Location or arrangement of everything within & around buildings
Objectives are to maximize Customer/client interaction/satisfaction Utilization of space, equipment, & people Efficient flow of information, material, & people Employee morale & safety
![Page 3: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/3.jpg)
Constraints on Layout Objectives Product design & volume Process equipment & capacity Quality of work life Building & site
![Page 4: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/4.jpg)
Layout Types Fixed-position layout Process-oriented layout Office layout Retail/service layout Warehouse layout Product-oriented layout
![Page 5: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/5.jpg)
Fixed-Position Layout Design is for stationary project Workers & equipment come to site Complicating factors
Limited space at site Changing material needs
Examples Ship building Highway construction
![Page 6: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/6.jpg)
Process-Oriented Layout Design places departments with large flows of
material or people together Dept. areas have similar processes
e.g., All x-ray machines in same area Used with process-focused processes Examples
Hospitals Machine shops
![Page 7: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/7.jpg)
Process Layout+ Allows specialization - focus on one skill
+ Allows economies of scale - worker can watch several machines at once
+ High level of product flexibility
-- Encourages large lot sizes
-- Difficult to incorporate into JIT
-- Makes cross-training difficult
![Page 8: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/8.jpg)
Process-Oriented Layout
Office
Tool Room
Drill Presses
Table Saws
© 1995 Corel Corp.
© 1995 Corel Corp.
![Page 9: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/9.jpg)
Construct ‘from-to-matrix’ Determine space needs for each dept. Develop initial schematic diagram
Determine layout cost, Xij • Cij
By trial-and-error, improve initial layout Prepare detailed plan
Includes factors besides cost
Process-Oriented Layout Steps
![Page 10: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/10.jpg)
50 100 0 0 20
30 50 10 0
20 0 100
50 0
0
From-to-Matrix
5
1 2 3 4 5 6Department
Dept.
1
2
3
4
6
Number of Trips
![Page 11: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/11.jpg)
Process-Oriented Layout ExampleYou work in facilities engineering. You want to find the cost of this layout. The cost of moving 1 load between adjacent dept. is $1. The cost between nonadjacent dept. is $2.
60 ft.
40 ft.
Room 1 Room 2 Room 3
Dept. 1 Dept. 2 Dept. 3
Dept. 4 Dept. 5 Dept. 6
Room 4 Room 5 Room 6
![Page 12: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/12.jpg)
20
100
50 30
50
50
10
20
Schematic Diagram & CostDept. Dept. Cost
1 3 $2001 2 $ 501 6 $ 404 2 $ 504 3 $ 404 5 $ 502 5 $ 102 3 $ 303 6 $100
Total Cost $570
1 2 3
64 5
100
![Page 13: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/13.jpg)
20
30
50 100
50
50
10
20
Schematic Diagram & CostDept. Dept. Cost
1 2 $ 501 3 $1001 6 $ 204 2 $ 504 3 $ 404 5 $ 502 5 $ 102 3 $ 603 6 $100
Total Cost $480
2 1 3
64 5
100
![Page 14: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/14.jpg)
Larger Layout ProblemsMethod works fine for small problems
Larger problems require software CRAFT-tries to minimize material handling
costs Rearrange many large departments to reduce
costs Human “judgement calls” impossible to
computerize
![Page 15: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/15.jpg)
Product-Oriented Layout
Facility organized around product Design minimizes line imbalance
Delay between work stations Types: Fabrication line; assembly line Examples
Auto assembly line Brewery Paper manufacturing.
![Page 16: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/16.jpg)
1 3
2
4
5
Product-Oriented Layout
Office
Belt Conveyor
Operations
![Page 17: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/17.jpg)
Assembles fabricated parts
Uses workstation Repetitive process Paced by tasks Balanced by moving
tasks
Builds components Uses series of
machines Repetitive process Machine paced Balanced by physical
redesign
Product-Oriented Layout TypesFabrication Line Assembly Line
![Page 18: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/18.jpg)
Cellular Layout (Work Cells) Special case of process-oriented layout Consists of different machines brought
together to make a product May be temporary or permanent Example: Assembly line set up to produce
3000 identical parts in a job shop
![Page 19: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/19.jpg)
Work Cell Floor Plan
Office
Tool RoomWork Cell
Saws Drills
![Page 20: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/20.jpg)
Work Cell Advantages
Reduces:
Inventory
Floor space
Direct labor costs
Increases:
Equipment utilization
Employee participation
Quality
![Page 21: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/21.jpg)
Work Cell Layout+ Facilitates cross-training
+ Can easily adjust production volumes
+ Easy to incorporate into JIT
-- Requires higher volumes to justify
-- May require more capital for equipment
![Page 22: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/22.jpg)
Office Layout Example
![Page 23: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/23.jpg)
Relationship Chart
12
3
Ordinary closeness: President (1) & costing (2)
Absolutely necessary: President (1) & secretary (4)
4
I = Important; U = Unimportant
1 PresidentO
2 Costing UA A
3 Engineering IO
4 President’s Secretary
![Page 24: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/24.jpg)
Relationship Chart
A
OE
OU
UU
UU
U
IO
II
IO
UU
UU
UU
UO
UU
I
IU
UEU
IUE
UUA
UA
II
U
U
E
U
34
21
8765
9
10
12
34
56
78
910
![Page 25: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/25.jpg)
Fast-Food Restaurant
IE
UU
UU
OE
EAA
O
12
34
56
X
UU
1 Cooking Burgers
2 Cooking Fries
3 Packing and Storing
4 Drink Dispensers
5 Counter Service
6 Drive-Up Service
I
![Page 26: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/26.jpg)
Example
21
54 6
3
![Page 27: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/27.jpg)
Example
21
54 6
3
![Page 28: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/28.jpg)
Point Scoring System
Assign points for having two items next to each other (including touching corners)A = 16
E = 8
I = 4
O = 1
U = 0
X = -80
![Page 29: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/29.jpg)
Score for Our SolutionTo
From 1 2 3 4 5 6 Total
1 -80 0 0 0 0 -80
2 4 0 0 0 4
3 0 8 8 16
4 16 0 16
5 1 1
Total -43
![Page 30: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/30.jpg)
Retail/Service Layout Design maximizes product exposure to customers,
profitability per square foot Use Closeness ratings to develop service layouts Decision variables
Store flow pattern Allocation of (shelf) space to products
Types Grid design Free-flow design Video
![Page 31: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/31.jpg)
Retail/Service Layout Grid Design
Office CartsCheck-out
Grocery Store
MeatBread
Mil
k
![Page 32: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/32.jpg)
Retail/Service Layout Free-Flow Design
Feature
Display Table
Trans.Counter
Apparel Store
![Page 33: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/33.jpg)
Warehouse Layout Design balances space (cube)
utilization & handling cost Similar to process layout
Items moved between dock & various storage areas
Optimum layout depends on Variety of items
stored No. items picked
© 1995 Corel Corp.
![Page 34: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/34.jpg)
Warehouse Flow
Receiving Shipping
![Page 35: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/35.jpg)
Warehouse Layout
Try to organize storage in such a way that order pickerscan move through the product in a logical and timely manner.
![Page 36: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/36.jpg)
Warehouse Layout
Fastest near the front Fastest within easy reach Bulk storage vs. Single item picking Serpentine vs. oval picking order Restocking: frequency, safety stock Should be designed around the type of
material handling equipment used (like fork-lift trucks, etc)
![Page 37: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/37.jpg)
Cross-Docking Transferring goods
from incoming trucks at receiving docks
to outgoing trucks at shipping docks
Avoids placing goods into storage
In-comingOutgoing
© 1984-1994 T/Maker Co.
© 1995 Corel Corp.
![Page 38: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/38.jpg)
Conclusion Defined facility layout & its objectives Described the 6 types of layout Did load-distance analysis of process layouts Relationship chart & weighting method Defined work cell Stated the retail store flow guidelines Balanced assembly lines
![Page 39: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/39.jpg)
Readiness Assesment Test (RAT)
1. In a layout, work stations are arranged according to the general function they perform without regard to any particular product. a) product, b) process, c) fixed position, d) storage
2. A product layout is more suited to situations where product demand is stable than when it is fluctuating. a) True, b) False
3. Fixed position layouts are used in projects where the product cannot be moved, and therefore equipment, workers, and materials are brought to it. a) True, b) False
4. In general, work-in-process inventory is large for a product layout and small for a process layout. a) True, b) False
5. Which of the following characteristics is associated with process layout? a) stable demand b) less skilled workers c) specialized machinery d) low volume e) product for general market
![Page 40: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/40.jpg)
RAT – Solution 1. In a Process layout, work stations are arranged according to the general
function they perform without regard to any particular product.
2. True. A product layout is more suited to situations where product demand is stable than when it is fluctuating.
3. True. Fixed position layouts are used in projects where the product cannot be moved, and therefore equipment, workers, and materials are brought to it.
4. False. In general, work-in-process inventory is large for a process layout and small for a product layout.
5. Low Volume is associated with process layout.
![Page 41: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/41.jpg)
Line Balancing is the process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements.
Design Product Layouts: Line Balancing
![Page 42: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/42.jpg)
Cycle time is the maximum time allowed at each workstation tocomplete its set of tasks on a unit.
Cycle Time
![Page 43: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/43.jpg)
D
OT = timecycle = CT
rateoutput Desired= D
dayper timeoperating OT
CT
OT = rateOutput
D
OT = timecycle = CT
rateoutput Desired= D
dayper timeoperating OT
CT
OT = rateOutput
Determine Maximum Output
![Page 44: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/44.jpg)
task timeof sum = t
CT
t)( =N
Determine the Minimum Number of Workstations Required
![Page 45: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/45.jpg)
Precedence diagram: Tool used in line balancing to display elemental tasks and sequence requirements
A Simple Precedence Diagrama b
c d e
0.1 min.
0.7 min.
1.0 min.
0.5 min. 0.2 min.
Precedence Diagram
![Page 46: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/46.jpg)
Arrange tasks shown in Figure into three workstations. Use a cycle time of 1.0 minute Assign tasks in order of the most number
of followers
Example 1: Assembly Line Balancing
![Page 47: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/47.jpg)
WorkstationTimeRemaining
Eligible AssignTask
RevisedTime Remaining
StationIdle Time
1 1.0
0.9
0.2
a, c
c
none
a
c
-
0.9
0.2
0.2
2 1.0 b b 0.0 0.0
3 1.0
0.5
0.3
d
e
-
d
e
-
0.5
0.3 0.3
0.5
Example 1 Solution
![Page 48: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/48.jpg)
Percent idle time = Idle time per cycle
(N)(CT)
Efficiency = 1 – Percent idle time
Calculate Percent Idle Time
![Page 49: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/49.jpg)
Assign tasks in order of most following tasks.
Count the number of tasks that follow
Assign tasks in order of greatest positional weight.
Positional weight is the sum of each task’s time and the times of all following tasks.
Some Heuristic (intuitive) Rules:Line Balancing Rules
![Page 50: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/50.jpg)
Ranked Positional Weight Heuristic A task is prioritized based on the cumulative assembly
time associated with itself and its successors. Tasks are assigned in this order to the lowest
numbered feasible workstation. Cumulative remaining assembly time constrains the
number of workstations required. Procedure requires computation of positional weight
PW(i) of each task.
![Page 51: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/51.jpg)
Data Known : Two 4 hour-shifts, 4 days a week will be used for
assembly. Each shift receives two 10 minute breaks. Planned production rate of 1500 units/week.
Model Car Production – Example
![Page 52: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/52.jpg)
RPW Procedure - Example
Task Activity Assembly Time
Immediate Predecessor
a Insert Front Axle / Wheels
20 -
b Insert Fan Rod 6 a
c Insert Fan Rod Cover
5 b
d Insert Rear Axle / Wheels
21 -
e Insert Hood to Wheel Frame
8 -
f Glue Windows to top 35 -
g Insert Gear Assembly
15 c, d
h Insert Gear Spacers 10 g
i Secure Front Wheel Frame
15 e, h
j Insert Engine 5 c
k Attach Top 46 f, i, j
l Add Decals 16 k
![Page 53: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/53.jpg)
Example Solution – Cont…
C = 70 Seconds. N = 202/70 = 2.88 workstations (or) 3
unit
minutes17.1
shift
minutes220
day
shifts2
week
days4
Units1500
Week1C
![Page 54: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/54.jpg)
Example SolutionModel Car Precedence Structure
a
d
e
f
b c j
g h
i k l
20
21
8
35
6 5 5
15 10
15 46 16
![Page 55: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/55.jpg)
RPW Procedure - SolutionPositional Weight calculated based on
the precedence structure (previous slide).
PWl = its task time = 16
PWk = tk + PWl = 46+16 = 62
PWj = tj + PWk = 5+62 = 67
Task PW Ranked PW
a 138 1
b 118 3
c 112 4
d 123 2
e 85 8
f 97 6
g 102 5
h 87 7
i 77 9
j 67 10
k 62 11
l 16 12
![Page 56: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/56.jpg)
RPW Solution Cont… Assignment order is given by the rankings. Task a assigned to station 1.
c - ta = 70 – 20 = 50 seconds left in Station 1.
Next Assign task d 50 – 21 = 29 seconds left in Station 1.
j, k, l70, 65, 19, 33
f, h, e, i70, 35, 25, 17, 22
a, d, b, c, g70, 50, 29, 23, 18, 31
TasksTime RemainingStation
![Page 57: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/57.jpg)
Team Exercise Assembly of a product has been divided into elemental tasks suitable for assignment to unskilled workers. Task times and constraints are given below. Solve by RPW Procedure
g14h
e, f6g
c, d7f
b6e
a10d
a6c
-18b
-20a
Immediate Predecessors
TimeTask
![Page 58: MBA IInd SEM POM Chapter02 Layoutsimplfied](https://reader033.fdocuments.net/reader033/viewer/2022061116/5465cdeab4af9fad6c8b4739/html5/thumbnails/58.jpg)
Exercise Solution
a
b
d
e
c
f
g h
20
18
6
1010
6
7
6 14
Task PWi Rank
a 63 1
b 44 2
c 33 4
d 37 3
e 26 6
f 27 5
g 20 7
h 14 8Workstation Assigned
TasksRemaining
Time
1 a, d 30, 10, 0
2 b, c, e 30, 12, 6, 0
3 f, g, h 30, 23, 17, 3