May 17, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC 20005-4128 Dear Cliff: Certified Mail Tracking Number: 70993400000905153085 As information, enclosed is a copy of the Second and Final Post Implementation Review (PIR) for the Winchester, Virginia area mail processing study. If you have any questions, please contact Barry Carpenter at (202) 268-6892. John W. Dockins Manager Contract Administration (APWU) Enclosure (CA2011-422)

Transcript of May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first...

Page 1: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

May 17, 2011

Mr. Cliff GuffeyPresidentAmerican Postal Workers

Union (APWU), AFL-CIO1300 L Street, NWWashington, DC 20005-4128

Dear Cliff:

Certified Mail Tracking Number:70993400000905153085

As information, enclosed is a copy of the Second and Final Post Implementation Review (PIR) forthe Winchester, Virginia area mail processing study.

If you have any questions, please contact Barry Carpenter at (202) 268-6892.

John W. DockinsManagerContract Administration (APWU)

Enclosure

(CA2011-422)

Page 2: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Dec-31-2010

05-16-2011 07:49

Type of Distribution Consolidated: Orig & Dest

Facility Name & Type: Winchester PO

Street Address: 340 N Pleasant Valley Road

City: Winchester

State: VA50 Facility ZIP Code: 22601

District: Northern VirginiaArea: Capital Metro

Finance Number:Current 3D ZIP Code(s): 226

Miles to Gaining Facility: 48.3

EXFC office: Yes

Plant Manager: Judith O'Hara

Senior Plant Manager: Isaac S. Cronkhite

District Manager: Mike Furey

Facility Name & Type: Dulles P&DC

Street Address: 447150Prentice Drive

City: Dulles

State: VA50 Facility ZIP Code: 20101

District: Northern Virginia

Area: Capital Metro

Finance Number:Current 3D ZIP Code(s): 201

EXFC office: Yes

Plant Manager: Frank Veal (A)

Senior Plant Manager: Isaac S. Cronkhite

District Manager: Mike Furey

Approval Date: July 22, 2009

Implementation Date: Jan-D1-2010

PIR Type: Final PIR

Date Range of Data: Jan-01-2010:

Processing Days per Year: 310

Bargaining Unit Hours per Year: 1,750

EAS Hours per Year: 1,825

Date of HQ memo, DAR Factors/Cost of Borrowing!November 28,2008

New Facility Start-up Costs Update 1--------------1Date & Time this workbook was last saved:

Area Vice President: David C. Fields

Vice President Network Operations: David E. Williams

Area AMP Coordinator: Janet Hester

NAI Contact: Doris Billingslea

PIR Data Entry Page

Page 3: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

LCl!:U19 P~1l11Y ..". .!Kll'ypt~

"~ZJPCge;:

I'~""""':ClJm!flf SCF • ~~

t'lJ>e 01 O.lTlOttUQn~d:

~lltl"9I'"'l!ty~ tad T~:F&dtlsy ZJP CoM:"l~.~.

C........1lt $C"D" ~s):

Impiemtolttilltion De..: 11~1!10 PIR Type: F",a.t Pi~__

Dee·31·2tilC~"'~I1._,..a."....,..... .......... Rdm, II" •• t

>"''''1'1':r...lf~Nr ~< 4';i,;';l\Jlft"lllWfl' :-.~""...,~r",~ ..~",.",oq1)'~W~;,!: ;"''"'"'' '-'-"""lI"'1<1t""""it~__w,.".,.,..~_."'~~~""".ao' "'~_~'_"'"."__ ,~,.

~. :;;.", "..,,..,,, >:1 .~~ J::,-g,··r4 t~-'1.~"" .,.i/'"~10;0Stm2 PAC1UJ.V;

Plant Manager:

L S*,*or PWIt ....wr.tJ~ I~,~~~I'.

OIetrict 1ttanlapr:

tkloJ F\!!¥

VlClII PfMid_ NelWOt1t~;

OavldE,~

t..) '*j!

~'l.t"'1&:.~,

2. ,,:2Y- f I..~--

~------ -------_...._-"~'

--_..- ..._. --'---'- - --- - " ..--_ ..•._---~.

Page 4: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Executive SummaryLast Saved: May 16, 2011 Date Date Range:

PIR Type: Final PIRJan-Q1-2010 - Dec-31-2010

Losing Facility Name and Type:Street Address:

City:

State:

Current SCF ZIP Code(s):

Type of Distribution Consolidated:

Gaining Facility Name and Type:Street Address:

City:

State:

Current SCF ZIP Code(s):

Sayings/Costs

Function 1 Workhour SaVings

Non-Processing Craft Workhour SaVings(less MaintlTrans)

PCESIEAS Workhour Savings

Transportation SaVings

Maintenance Savings

Space Savings

Total Annual Savings

Total One-Time Costs

Total First Year Savings

StaffingCraft Position Loss

PCESIEAS Position Loss

Service

First-Class Mail Service Perfonnance (EXFC OIN)

First-Class Mail Service Perfonnance (EXFC 2 Day)

First-Class Mail Service Perfonnance (EXFC 3 Day)

Customer Experience Measurement 01Residential at PFC level

Customer Experience Measurement 01Small Business at PFC level

Winchester PO340 N Pleasant Valley RoadWinchesterVA226

Orig & Dest

Dulles P&DC447150Prentice DriveDullesVA

Final PIR vs Pre AMP

$1,513,494

$270,587

$325,741

$665,293

($1,694,546)

$0

$1,080,569

($18,244)

$1,062,325

12

7

Winchester PO Current Qtr

91.45%

88.08%

83.03%

83.3%

81.0%

Final PIR vs Approved

$192,951

$270,587

$221,243

$691,433

($1,879,588)

$0

($503,374)

$8,636

($494,738)

(7)

8

Dulles Current Qtr

95.79%

96.08%

95.05%

from Workhour Cost. - Combined

from Other CUrT vs Prop

from Other CUrT va Prop

from Transportation HCRand Transportation PVS

from Maintenance

from Space Evaluation ano Other Costs

from Space Evaluation ano Other Costs

from Staftlng-Cratt

from Stafting-PCESIEAS

from Service Performance & CSM

from Service Performance & CSM

from Service Performance & CSM

from Service Performance & CSM

from Service Performance & CSM

PIR Executive Summary

Page 5: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Calculation ReferencesCombined Losing and Gaining Facility Data: Pre AMP Proposed Final PIR

Function 1 VVorkhour Costs $36,001,542 $34,680,999 $34,488,048Non-Processing Craft Workhour Costs

$8,134,671 $8,134,670 $7,864,083(less Maintenance & Transportation)

PCES/EAS Wor1<hour Costs $4,735,205 $4,630,707 $4,409,464Transportation Costs $4,493,469 $4,519,609 $3,828,176

Maintenance Costs $9,520,552 $9,335,510 $11,215,098Space Savings $0 $0 $0

Total Annual Cost $62,885,439 $61,301,495 $61,804,870

Total One-Time Costs $0 ($26,880) ($18,244)

Total First Year $62,885,439 $61,274,615 $61,786,626

Staffing

Craft Position Total On-Rolls 765 746 753PCES/EAS Position Total On-Rolls 45 46 38

Final PIR vs Proposed

Final PIR vs Pre-AMP (Approved) AMP Approved AMP

Function 1 VVorkhour Savings $1,513,494 $192,951 $1,320,543Non-Processing Craft WOrkhour saVings $270,587 $270,587 $0(lass MaintITrans)

PCESIEAS VVorkhour SaVings $325,741 $221,243 $104,498Transportation Savings $665,293 $691,433 ($26,140)

Maintenance Savings ($1,694,546) ($1,879,588) $185,043Space SaVings $0 $0 $0

Total Annual Savings $1,080,569 ($503375) $1,583,944 so

Total One-Time Costs ($18244) $8,636 ($26,880)

Total First Year Savings $1,062,325 ($494,739) $1,557,064

~Craft Position Loss 12 (7) 19

PCES/EAS Position Loss 7 8 (1)

PIR Executive Summary

Page 6: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Summary Narrativelast Saved: May 16, 2011

Losing Facility Name and Type: Winchester POCurrent SCF ZIP Code(s): 226

Type of Distribution Consolidated: Orig & Dest

Gaining Facility Name and Type: Dulles P&DCCurrent SCF ZIP Code(s): 201

WINCHESTER VA AREA MAIL PROCESSING (AMP)FINAL POST IMPLEMENTATION REVIEW (PIR)

EXECUTIVE SUMMARY BRIEF

Background:Capital Metro Area, with the assistance from the Northern Virginia Performance Cluster,has completed the Final Post Implementation Review (PIR) of the Area Mail Processing(AMP) that consolidated originating imd destinating mail from the Winchester, VA PostOffice to the Dulles VA P&DC. This final PIR used data for the first twelve monthsfollowing implementation and then annualized savings to determine if the Postal Serviceincreased efficiency by consolidating mail processing operations from the Winchester VAPO to the Dulles VA P&DC. The AMP was approved July 22, 2009 and moved all mailprocessing operations for the ZIP code 226 to the Dulles VA P&DC. The transfer ofvolumes to the Dulles VA P&DC was completed on January 2,2010.

The Winchester VA PO is located approximately 48 miles from the Dulles VA P&DC.

Financial Summary:

Total Annual Savings:

Total First Year:

Final PIR vs. Pre AMP

$ 1,080,569

$ 1,062,325

Final PIR vs. Proposed

($ 503,374)

($ 494,738)

The consolidation shifted an approximate average daily volume of 316,195 first handlingmail pieces (Base Period) from the Winchester VA PO to the Dulles VA P&DC. Therewere numerous service upgrades and no downgrades for First Class Mail.

Customer Service Considerations:The AMP proposal identified overnight service commitment improvements as noted inthe evaluation. For Quarter 1 2011, the combined overnight percentage was 94% forDulles VA P&DC

The Dulles VA P&DC EXFC First Class Mail Service Performance from TTMS for theAMP impacted ZIP codes is shown below:

After AMP

93.5494.4694.3388.9687.3696.0895.2589.78

92.3193.2794.4490.66879695.0594.8990.73

PIR Summary Narrative

Page 7: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Winchester VA PO EXFC First Class Mail Service Performance from TIM

Transportation Changes:The approved AMP projected an annual transportation cost of $26,140. The Final PIRprojects an annual savings of $665,293 due to modification of HCR routes and otherinitiatives at Dulles VA P&DC. The Final PIR also references changes to HCR routesthat were not associated with the AMP, but were initially identified as affected HCRroutes on the original AMP proposal. The changes are as follows:

22910:The original service to Winchester on part A, was eliminated with the AMP. The newmileage associated with part A is the result of the addition of service previouslyperformed on HCR 22936. HCR 22936 was canceled and the service was shifted toHCR 22910.

Staffing Impacts:Based upon the four full quarters of data following AMP implementation, the annualizedFunction 1 work hour savings is $1,513,494 compared to the proposed $1,320,548. EASwork hour savings amount to $329,833 compared to the proposed $104,498. Craftpersonnel changes are summarized from the staffing comparison for complement as ofthe end of Quarter 1 FY 2011 versus Pre AMP. There was a reduction of 12 craft and 7EAS employees.

The staffing impacts and management to craft ratios are summarized below.

, Craft. FTR+PTR+PTF+Ct'l8Usis

1 Craft ., F1 + F4 at losing; F1 onfy at Gaining

PIR Summary Narrative

Page 8: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

1 Craft;: FTR+PTR+PTF+Cuuals

The USPS has not had to lay-off any employees from the Winchester VA PO to achievecurrent complement levels and has aggressively worked with the impacted employeesfor placement in career positions within the identified area of consideration inaccordance with the Worker Adjustment and Retraining Notification Act (WARN).

Maintenance Impacts:The AMP projected net annual maintenance savings of $185,043 with the consolidationof the operations. This savings was attributed to the Winchester VA PO losing 1 AFCS,2 CSSCS, and 1 micro mark and the associated labor and non-personnel costs. As ofDecember 31,2010, Winchester's AFCS is not in use and has been relocated. OneDSCS and one DIOSS were relocated to the Dulles VA P&DC and the costs associatedwith the equipment relocation amounted to $18,244.

The AMP study represented the consolidation of operations and the PIR reflects allcurrent operational changes during the review period.

Space Impacts and One Time Facility Costs:The AMP projected $26,880 one time costs. The Final PIR identifies $18,244 for asavings of $8,636.

Other Concurrent Initiatives:

The Final PIR accessed an actual cost of $1,693,546 for Maintenance associated withthe additional FSS machines.

The AMP proposal to move originating and destinating Winchester VA PO volume to theDulles VAP&DC projected a first year savings of $1,583,944. The Final PostImplementation Review after implementation savings as $1,080,569. Additionally, theoriginating Dulles mail processing was AMPed into Merrifield VA P&DC and 3 new FSSmachines were added at the Dulles VA P&DC within the first PIR period. The 3additional FSS machines were not included in the initial study. FSS work hours wereaccessed at $2,711,966. The Final PIR accessed an actual cost of $1 ,693,546 forMaintenance as well in association with the 3 additional FSS machines.

PIR Summary Narrative

Page 9: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Service Performance and Customer Satisfaction MeasurementLast Saved: May 16, 2011

PIRType:Implementation Date:

Final PIR01/01/10

Losing Facility: -:Wi-:-:-:-ln~C;.:.he::.;S:..:t:=,er::-P;..O=-:- _District: Northern Virginia

After AMP

Gaining Facility: ..;;D;,..:;u;.;,;lIe~s;;..P;..&~D:;;.C.::.,--:-- _District: Northern Virginia

022009

032010

012011

042010

Fiscal Quarter

022010

(15) Notes: _

After AMP

_.!l3_2_oo_9__-+ ~::....---+---..::7~--___1, ",,9.<l.2<JQ1l__ ,+ -=-:,.;::. 1-__......::.:::,.:::.___-l

01 20::.:1~0_-I- .....;~:._ ..I- .:.::.:.:._____l

,--+-,------,-+--1--------1--,-,---,--+--,----«-'--1---

• Customer Satisfaction Measurement (CSM) became Customer Experience Measurement(CEM) in 2010 Data reflects most recentiy completed quarter available in CEM,

01 Overall Satisfaction (Overall Expertence)

04a Satisfaction with Receiving (Expertence with receiving)

08a Satisfaction with Sanding (Expertence with sending)

012a Satisfaction with most frequently VIsited PO (Expertence with most frequently Vlslled PO)

018a Satisfaction with most recent contact WIth USPS (Experience WIth most recent contact WIth USPS)

019 Likaly to recommend the USPS

iQuestion # Residential Top I SmlMed Bus Top Two

Two Box I BoxQ1 --'833% -T 81,0%

Q<4a 87,1% 83,2%

PIR Service Performance and Customer Satisfaction Measurement

Page 10: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Wo

rkho

ur

Co

sts-

Com

bin&<!

Fa

cilities

LastS

aw<

l:M

Ilrch1,2011

PIR

Typo":

.":Oota,,in:;:a:;I:,..:;;"R;-;_==.."......-==""="':;;,F"...;;oP",

(11

­ .........'OOii'OOi'01070i'0013T0i10

15

/01

50307030'04470«OOOTOOOom

m079T0191OOi1OO"1"1OTi'1O12071'24131Ti3'1169/8~

16

0/1

80

181S/185

21

0/2

10

21'2T212'23572'3526172f12637i93~~~2m

IC

ombined

Fa

cilities

I

Type

ofD

istribu

tion

Co

nso

lida

ted

:C

Og

&D

est

Function

1~L../IV

"1G$42...26~U1

3.1

!5f0

$4

3.,a~~~

..~~l:e

-'-

Fu

nctio

n4

Date

Range

ofO

.ta:JM

.l:l1-2010to

--lQ.

$"'U

Hl

1-25.-493531

~$564$101\

o.c-31..zo10"

$33.791$0

$143.407$0$

12

tl37

0$0$0

$0$0$0$4.056.093$

0$

0$

0$0o$0

$1

,01

7.6

58

$0

$0$0$17.04.289$280.140$

73

26

37

$169,036$50,390

$274$33,486

$112,657$

10

0.6

04

$896

98

$75"To

$4

4371

$8

2.9

98

$62,se9$0$0

$3

54~

$0

$2

72

ae$0

$0

PIR

Vvtlf1f1lour

Co

sts-

Co

mb

ine

dF

aciW

es

Page 11: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

1')

0..,"

"""

Num

I>«>

--;a:;oT~

7Q

83

-'1091i092T0931

09

4i0951

09

6'0

97

1098/0

99

11

09

/11

1!

11

2/1

14

Ti17IrntiU

/12

5Ti261

12

81

13

21

1.0

,141~-

--1

-'4

-'-

11

44

J146

/20

81

20

9i2T10

29

12

30

/23

11232/2

33

12

:)4

12

6'

126312641

28

31

:)40

i46a/5

30

/53

81

5<

9IS

MIsa

21563Isa

4I56S7590/6

18

T6281

62

9'6

30

/67

7/7

75

17

93

/a

91

du

18

92

1895T8981

89

91

00

9T035/0

84

/08

71

08

81

11

51

1sa

11

57

1158/1

59

7321/3

24

13

26

1$

'

AnnualW

Of'tlhourC

osts

FJn

aI_

$9

89

$233,879$

«075

2K

66

5$

49

86

7$

61

,81

9$«04$255$9

$49,078$32,631$54,261so$0$

52

01

4$275

$7

57

55$0

$32,967254,004

$1,240,952$70,908

$2,346,917$32

.•16$2,020

$299348

$96,639$

23

1.9

1$538.150

$1

5<

$576.786$1,939,535

'40

8,5

19

$1,695,688$

64

17

25

$365,09"$91TO

O4~

«$«04$01,069

$0$1.204,803

$2

n801

$31.9227

90

58

$108,025$

13

,15

9$0$14.923$0

$5,244$

80

28

0$756

180$

2,5

30so

$2

1,0

33

$106,787$0$1,095$

1,4

29

$1

14$0$0

$«17

~$97

$805$

0$9,157

$819,687S

84

74

$265,248$10,725

$$36136

$1

10

42

8$0$0$0so$0$0$0$0$0$0

PIR

VV

orkhourC

ostS

·C

om

bln

ed

Facffitjes

Page 12: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

{1

0..

_

~

Am

/Ad

To

Ws

AnnulilFH

PV

okame

"'-"".....

PIR

uaITP

tiO

fNA

TPH

VoM

neA

nn

ualW

orthours

-

o0""0"0"0o"0"0"00"o2:oo0""0"0"0

10:

.....PIR

-'13

.....PIR

-......."'"

$0

$0$0

$0

$0

$0

$0

$0$0$0

$0so$0

$0

$0so$0

$0

$0

$0

$0

$0

$0$0$0$0

$0$0$0$0so$0$0

$0

$0

$0$0$0$0

$0$0$0

$0

$0$0

$0

$0

$0$0

$0$0$0$0

$0$0$0$0$0

$0

$0

$0$0

$0$0$0

(27)N

OT

ES

:~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~=

~~V"'~~~W,W_~

PIR

Workhour

Costs

~C

ombined

Fadfltles

Page 13: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

P1RT

ype':.;;~;cin"':"'I::-;~c.;~R"_==-:::~-:-an="""=.'=e<l:;-c"'=F1=""PIR.

(1)

losin

gFacility:..:.W

i"n"'ch=e."te"'r..:.P-"O'-_

Type

ofD

i.trtbu

tlon

Conoolidotod:

on

g&

Des,

Wo

rkho

urC

osts

-L

osin

gF

acility

Lastsav.d

:M

arch1,2011

Fu

netion

4.

DateRa~

ofD

ata:J.

.-o

14

01

0to

-...

$0

0ec;..31-2010

.,.FlnaaPiR

$0$0$0$0$0sosoS

I21.836$0so$0$0S5.763$

0$

0$0sososo$0so$0$0$0$0fIN

IA$0so$0$0$0$0soso$

0

$0so$0so$0$0$0so$0so280.140so$0sosoS

3H

86

112.657$100,604S89.615so$0sososososo

PIR

lMlr1d1ourC

o.!>•

Lo.ing

Page 14: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

,.F

ina

lAR

$0$0$0

#NJA

#NIA

PIR

Wo

rkh

OU

fCosts

~Losing

Page 15: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

PIRT

yp

e':"i;!;,.<:ina=..I'::::i~R,,'R.-:""'""'"==~=.......

=<

:,::c.."""=F""'=PIR

(1)

Gain

ing

Faelllty:.=Du=Iles=P--'&

"DC:.::..

_

Ty

pe

of

DIstribution

Co

nso

lldal*

d:

Ong

&D

esl

Wo

rkho

urC

osts

-G

ain

ing

Fa

cilityL•.t

Sn

ed

:M

an::tl1,

2011

Fu

nctio

n1

11I--.<

i...12

$42..2f1

)$-3,....W

.n$$J.&

1

Oa"

Range

of

Data:

J.-n.o

1-1010to

DK

-31

-10

10

Fln

alPiR

$165.938$0«>.989$~

$100.688$68O

,3n$160,485$195.757$816.8ll3$0

13

.4"

$512$

n9

.02

8$0$102.007$124.716$262224

$2.794.060

$1.379$99.628

$2.059.158$242.878$0$0$0

$33.791$0$143.407$0$129.370$0$0

$ii$0$0

$4.056.093$0$0$0$0$0$0$1.017.658$0$0$0

$174.289$0$732,637$169.036

$50.390$274$

0$0$0$83$75$0

$44.371$82.998$62.889$0$0

PIR

Wor1<hour

Costs

-G

aining

Page 16: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

(1)

--$

#,1

19

$l,1

2M

93

$4,531$5.006

$564$106

f6"'J81$6,85<)

$132,731$128.954

$79,316$124,075soso

$207,503$2,179.881

$552.892$314,931$73~

$289$1,659soiii'

$10,769$0$1,094,683

$78,941)$73,427

$231),983$11,498

$120$28,600$0

$3,548$68,454

$942.496$3,779

$236$55,113

$433.395so$1.267

$31,092$10,193$49,634

fina

lPI"

$3~

$1,410,'26$0$27,289$0so

$989$233,879$

«.0

75

$28,685$49,687$61.819

$404$255$9

$49,078$32,631$54,261$0$0$52,014

$275$75,755so$32,967

$254,064$1,240,952

$70.908$2,346.917

$3

2,"6

$2,020$299.348

$96,639$231..91$538,150

$154$576.786

$1.939,535$408,519

$1,695,688$641,725$365,094$917,064

$22.198$

$.0

4$

0$1,069

$0

$1,204,803$277.801

$31,922$79.058

$108,025$13,159so$14,923

$0$

52

«$80,280

$756.180$2,530

so$21.033

$106.787$0$1,095

~$114$0$0$417

$3,990$97

$605so$9,157

$819,687$8,474

$265,248$10,725

PIRW

orkhourC

osts~

Gaining

Page 17: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

(1)

...........A

nalP

fR

$636,136$

11

0,4

28$0$0$0$0$0$0

$0$0

$0$0$0$0$0$0$0$0$0$0

$0$0$0$0$0$0$0$0$0$

0$0$0$0$0$0$

0$0$0$0$0$0$

0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$

0$

0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0

PIR

\t'VorkhourC

osts·G

aining

Page 18: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

:;;

:e

'"EE~

Jl~

S"1I

~

0

~

.c:1!'

~

~

•'"

'"

a:

Page 19: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

..<.L8%

$0$

0

jS-2&

2,t187}

$33,743,948

An

alP1R

(>0)

FlnM

PIll.....P

ropoH

d

..__

_$0_

$34,020,&34

Pe«

enl

€d\~iQ

195

3,059

,........

(2<)

Rn

.tP't~

....P

To

po

s.-d

17,2''<.

"A

nn

ualW

Of"tilo

u....

An

ltUaI

PT

od

uclh

1ty

---F

lnaiP

iR_.....

Prn

po

o"

°N

oC

alc

°N

oC

alc

°--

1M,an

2."4

FIn"""

2,4

37

"",95

0

(U,752,.221)

833.6&9,765

·2,7o/i.

Fin

alP

lR

"',5",7"1

1.:W

..

UI,421,9t2

""'.....A

nn

ua

lF

HP

Vo

fum

e

V~

An

nu

al

fHP

Vo

eum

e

(17

)I

(1&)

FIrMII~...."".AMiP'

FtroafPlJt

....Pro

po

...t

Un

its

Perte(lt

Ch

ang

eA

ruillyab

(27)N

OT

ES

:=================================-=-_

============================-:,>

(:·:.if::i!i<:~~j>:'~'e;;fif,

PIR

Worl<hour

Costs

~G

aining

Page 20: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

IO

ther

Wo

rkho

ur

Mo

veA

nalysis

I12131110

to01101/10

Date

Ra

ng

eo

fData:

Dulles

P&

DC

Gaining

Facility:

LOSing

FacilitY"_V

Wlch

este

rP

O

397~5

$1

07

2---$

0$0

39

745$434,838

$4

35

78

03

6750

$1

93

12

8$

0$196

36

750$

38

07

37

0$

38

96

79

837

753$80

120$

0$

10

43

037

753$

89

96

32

$899632

21354

$44968

$4

49

68

$1

96

321

35

4$0

$0

45355

$354

58

$3

54

58

$5

17

20

45355

$0$

02

5~21

$1

,82

64

85

$1

82

64

85

$1

88

54

09

25

421$0

$0

89515

$1

31

1$

13

11

$1968

9515

$4,094$

40

94

48~

$8

70

04

$8

70

04

$106050

48~

$0

$0

79550

$99546

$99546

$7

51

07

9550

$1

01

99

14

$1

01

99

14

48558

$276~71

$276,471$199

3424

8558

$0

$0

~5

588$386

31$386

231$353

8274

55

68

$0

$0

57

589$592

$592$0

57

569$

0$

048

58

3$

53

34

$5

33

4$

048

583$

0$

048

60S$92

$92$

22

48

486

08

$0

$0

216

13

$3

01

0$

30

10

$2

97

621

61

3$

0$0

$0

48

631$19

$19$802

48631

$0

$0$

048

67

8$

25

22

$2

52

2$

048

678$

0$0

$0

29

709$

55

56

$5

55

6$

26

29

709$

0$0

$0

21722

$1

26

30

$1

26

30

$1

98

621

722$0

$0$

02

2727

$1

51

55

79

$15

15

57

9$

18

35

64

622

727$

0$0

$0

21728

$1

06

3,8

95

$1

06

38

95

$8

69

19

821

728$

0$0

$0

27

731$

34

14

8$

34

14

8$33

4652

7731

$0

$0$

02

3737

$1

73

8$1,738

$9192

3737

$0

$0

$0

48H

l$188

$188$117

1264

8741

$0

$0

$0

487~2

$5

94

56

$59,~56

$4

95

55

487

42

$0

$0$

02

6743

$873$873

$2

04

52

6743

$0

$0$

03

8747

$1956

18

$1

95

61

8$203

6513

8747

$1

94

17

19

$1

94

17

19

$2

09

65

56

48756

$1664

28

$166~28

$7

31

85

44

8756

$0

$0$

048

794$

48

34

1$

48

34

1$26

6714

8794

$0

$0$0

46986

$4,786$

47

86

$0

46986

$0

$0

$0

89

510$394

$39450

03

581$858,292

$858292

$481«

502

582$54

529$54

529$

03

96

16

$1

05

54

$1

05

54

$6

00

331

61

7$67

$67$442

39

62

4$

67

36

2$

67

36

2$

52

30

161

642$167

$167$

13

35

63

653$3,341

$3

341$79,027

79

660$

25

34

$2

53

4$

30

78

88

26

65

$8

68

80

$86880

$0

83

66

6$58

283$58

283$

00

86

88

$2

25

33

$2

25

33

$0

35

67

6$102

60

6$

10

26

06

$63,49831

67

9$109

90

3$109

90

3$195

7913

96

80

$416$416

$22179

69

7$

6349

$6,349$

03

4765

$1

,02

09

29

$1

02

09

29

$9

78

97

83

4766

$634551

$634,551$

75

25

23

825

70

$0

57591

$59,0933

96

34

$2050

36

73

$3,118

PIR

Other

WorkhourC

osts

Page 21: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation
Page 22: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

30

759$192

684$263.512

$1

65

39

18

0671

$7

16

38

$7

16

38

$02

0705

$0$0

$04

0706

$0$0

$088

477$0

$0$0

35624

$433$433

$03

0679

$7

47

92

$7

47

92

$57,61510

698$

64

40

05

$644005

$5

65

89

210

699$

37

81

65

$3

78

16

5$790

90810

700$

13

47

81

3$1~7

813$

1,0

39

97

410

701$712

$712$0

01922

$1

09

11

6$

10

91

16

$80397

10927

$4

29

66

3$<429

663$496

8503

5933

$9

88

39

$9

88

39

$99599

35951

$832566

$8

32

56

6$

71

16

75

35952

$2,809$2,809

$0

PIR

Oth

erW

or1<hO<JrC

osts

Page 23: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Totals

13,6468

,.00

9,294$551,951

$376,624$401,164

Totals

69,82591,576

65,667$4,163,255

$4,254,063$4,006,300

PIR

Oth

er

Wo

rkho

ur

Co

sts

Page 24: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Totals

21,64422,895

16.484$741.487

$781,468$602,704'

ID

istributionto

Other

PIR

Worksheet

TabsI

7••1

':_._.-

0p1.617,679,

7~(31)

Ops

765,766

(34

)

PIR

Oth

er

WorlthourC

o.ts

Page 25: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Trm.sD

Of'tJdkln

0M

Mn

tenarlla

0,Su'

ooo

TotalA

d'

$0$0

$0

$0$0

$0$0$0

$0$0$0

I'Jop

oM

dA

nnual

-oooooo

PropoMdA

nnualW

_co

a($)

$0

$0

$0

$0$0

$0$0

$0

$0$0$0

$0$0

$0o

PIR

Oth

erW

o/1(hourC

osts

Page 26: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Staffing - CraftLast Saved: May 16, 2011

PIR Type: Final PIR

Craft Positions

Function 1 - ClerkFunction 4 - ClerkFunction 1 - Mail HandlerFunction 4 - Mail HandlerFunction 3A - Vehicle ServiceFunction 38 - MaintenanceFunctions 67-69 - Lmtd/RehablWCOther Functions

Total

Data Extraction Date: 01/11/11

ChangeAnalysis

PositionsPercent

o19o4o3o

5480

Gaining Facility: Dulles P&DC

Craft Positions

Function 1 - ClerkFunction 1 - Mail HandlerFunction 3A - Vehicle ServiceFunction 38 - MaintenanceFunctions 67-69 - Lmtd/RehablWCOther Functions

Total

Data Extraction Date: 07111110

~#--_._-----~-----------~, (23) , (24) ,

! Final PIR vs Pre AMP ! Final PIR vs Proposed !Total Craft Position Loss:L :: l J:2.. J

(Above numbers are carried forward to the Executive Summary)

Final PIR

30919024

108

22

654

Variances Total On-Rolls(21) (22)

Change Final P1R 'IS Final P1R vsAnalysis Pre AMP Proposed

Positions 35 19

Percent 5.5% 2.9%

PIR Staffing - Craft

Page 27: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Staffing - PCES/EASLast Saved: May 16, 2011

PIR Type: Final PIR

Losing Facility: Winchester POData Extnoctlon Date, 7/11/2010

Li

23456789101112131415161718192021222324252627282930313233343536373839404142434445

464746495051525354555657585960

PCES/EAS Positions(1)

Position Title

POSTMASTERSUPV CUSTOMER SERVICESSUPV DISTRIBUTION OPERATIONS

Totals

(2)

Level

EAS-22EAS-17EAS-17

Anance #

(6) (7)

Final pjR

1 13 20 0

0000000000000000000000000000000000000000000000000000000003

(15) (16)

Chango FIMI PlR \1'$ Final PtR vaAnaIys" PreAMP Proposed

Positiom

P• ..-

PIR Staffing - P ES/EAS

Page 28: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

On-Rolls

Flnaf PtR VI Final PlR VI.... AMP PropoMd

Gaining Faclllty:.::D:.:u~lle=s.:..P=&:::DC::::.-::-c:-,...,.,.,..,.... _Datil Extr1lcllon Datil: 711112010

PCES/EAS Positions(19)

Li Position Title1 MGR PROCESSINGIDISTRIBUTION

2 MGR DISTRIBUTION OPERATIONS3 MGR MAINTENANCE4 MGR IN-PLANT SUPPORT5 MAINTENANCE ENGINEERING SPECIALIST6 MGR MAINTENANCE OPERATIONS7 MGR MAINTENANCE OPERATIONS SUPPT

8 NETWORKS SPECIALIST9 OPERATIONS SUPPORT SPECIALIST10 OPERATIONS SUPPORT SPECIALIST11 SUPV DISTRIBUTION OPERATIONS12 SUPV MAINTENANCE OPERATIONS13 SUPV TRANSPORTATION OPERATIONS14 SECRETARY (FLD)

15161718192021222324252627

28293031

3233343536373839404142434445464748495051525354555657585960

Totals

Anance 1#

4

o

2231663

(25)

F"a1PIR

o3o

o

o2

17

oooooooooooooooooooooooooooo

Position:a

r¥-¥-¥-¥-¥-¥-¥-¥-¥-r¥-¥-¥-¥-¥-¥-¥-,,-¥-¥-¥-¥-¥----,; Total PCES/EASj (37) j (38) jj Position Loss; 7 j 8 ;~__¥_¥_¥_¥_¥_¥_¥_¥~¥_¥_¥_¥_¥ ¥_i_¥_¥_¥_¥_¥_¥_~

(Above numbera are eaffied forwurd to the ExtJCl.Jfitle Summary)

PIR Staffing - PCES/EAS

Page 29: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Tra

nsp

orta

tion

-P

VS

LastS

aved:M

ay16,

2011

Dec-31-2010

Final

PIR

-to

-

PIR

Typ

e:_

_...:...::.:...:.:::....:..-:.:....:...._

_

Date

Range

of

Data:

Jan

-01

-20

10

Ga

inin

gF

acility:

Dulles

P&

DC

Fin

an

ceN

um

be

r:

(2)I

(3)I

(4)(5)

(7)(8)

(9)(10)

Variance

Variance

Variance

Variance

FinalP

IRF

inalPIR

vsF

inalPIR

vsP

rop

ose

dP

IRF

inalPIR

vsF

inalPIR

vsP

reA

MP

ProD

osedP

reAM

PP

rosed

PV

SO

wn

ed

Eq

uip

me

nt

,""

PV

SO

wn

ed

Eu

iS

evenTon

Trucks0

Seven

TonTrucks

0E

levenTon

TrucksI

0E

levenTon

Trucks0

Single

Axle

Tractors0

Sin

IeA

xleTractors

0

TandemA

xleTractors

,0

TandemA

xleTractors

0

Spotters

'--

0S

potters0

PV

ST

ran

spo

rtatio

nN

umberofS

chedulesTotalA

nnualMileage

To

talM

ilea

ge

Co

sts$

[)$

0SO

soT

ota

lM

ilea

ge

$0I

I$0

I$0

PV

SL

ea

ses

PV

SL

ea

ses

TotalVehides

Leased0

0TotalV

ehidesLeased

To

tal

Le

ase

Co

sts$

0$0

$0$0

To

tal

Le

ase

Co

sts$0

PV

SW

ork

ho

ur

Co

sts

~:~I

sol$

01

LDC

31617,

679,764)

$86,263

LOC

34(765,

766)$76,022

To

talW

ork

ho

ur

Co

sts$162,285

$0

$0

(11)T

ota

lF

ina

lPIR

vs

Pre

AM

PT

ran

spo

rtatio

n-P

VS

Sa

ving

s:$162,285

(This

numberadded

tothe

Executive

Su

mm

ary

(12)T

ota

lFin

alP

IRvs

Pro

po

sed

Tra

nsp

orta

tion

-PV

SS

avin

gs:

$162,285(This

numberadded

tothe

Executive

Su

mm

ary)

(13)N

ote

s:_

PIR

Transportation

-P

VS

Page 30: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Tran

spo

rtation

-H

eR

LastSaved:

March

1,2

01

1

#DIV

/O!

#DIV

lO!

#DIV

lO!

#DIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

lO!

#DIV

lO!

#DIV

/O!

#DIV

/O!

#DIV

lO!

#DIV

lO!

#DIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

lO!

#DIV

lO!

#DIV

lO!

(10)

FinalP

IRA

nn

ua

lC

ostIM

ile

$1.93$1.86$1.88$2.40$5.70$1.37$1.87

PIR

Type:

Fin

al

PIR

(9)

PrO

PO

Sed

An

nu

al

Co

st/Mile

$1.70

CT

for

Ou

tbo

un

dD

ock:

(7)

FinalP

IRA

nn

ua

lC

ost

(6)

Pro

po

sed

An

nu

al

Co

st

oo o o oo oo ooo ooo oo oo o

Lo

sing

Fa

cility:_Wi_I_n_ch_e_s_te_r_P_O_

Typ

eo

fDistrib

utio

nC

on

solid

ate

d:

Orig

&D

est

Data

of

HC

RD

ataF

ile:July

20

10

(1)

An

nu

al

Mileage

226902263922632

226A4

2263022611

226A3

Ro

ute

#

22910(A

)

PIR

Transportation

He

R-

Losing

Page 31: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

oooooooooooooT

ot

ooooooooooooo1,295,531

1,462,932$2,553,420

Va

rian

ces

To

talA

nn

ua

lCo

sts

#DIV

/O!

#DIV

/OI

#DIV

/O!

#DIV

/O!

#DIV

/Ol

#DIV

/O!

#DIV

/Ol

#DIV

/Ol

#DIV

/O!

#DIV

/O!

#DIV

/Ol

#DIV

/O!

#DIV

/Ol

Ch

an

ge

An

alysis

Do

llars

Pe

rcen

t

(11)

Fin

alP

IRvs

Pre

AM

P

PIR

Transportation

He

R-

Losing

Page 32: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Tra

nsp

orta

tion

-H

eR

LastS

aved:M

arch1,2011

#D

IV

#DIV

/O!

#DIV

/O!

#OIV

/O!

#DIV

/O!

#DIV

/O'

#DIV

/O!

#DIV

/O!

#DIV

/O!

#OIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

/O!

#OIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

/O!

#D1V

/O!

#DIV

/O'

#DIV

/OI

#DIV

/O!

#DIV

/O!

#OIV

/O!

#DIV

/O!

#DIV

/O'

#OIV

/O!

#DIV

/OI

(10)

FinalP

IRA

nn

ua

lC

ost/Mile

PIR

Type:

Orig

&D

est

#OIV

/O!

PIR

Transportation

He

R-

Gaining

$1.14$1.85

(9)

Pro

po

sed

An

nu

al

Co

st/Mile

CE

Tfo

rO

GP

:------

CT

for

Ou

tbo

un

dD

ock:

(7)

FinalP

IRA

nn

ua

lC

ost

$71,206$129,534

(6)

Pro

po

sed

An

nu

alC

ost

CE

Tfo

rIn

bo

un

dD

ock:

CE

Tfo

rC

an

cella

tion

s:

I

oo o oo oo o ooo oo ooo oo o o o oo oo o o o oo

38,490

113,387

o o ooo o oo ooo oooo oooo o o oo o ooooo o

Ga

inin

gF

acility:

.:D:..:u:..:.:."e~s=-:..-P&.::.=-=DC_

Type

ofD

istribu

tion

Consolidated:

Orig

&D

est

Date

ofH

CR

Data

File:

July2010

(1)

An

nu

al

Mileage

25410

20

1X

X

Route

#

Page 33: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

(11)

Ch

an

ge

An

alysis

IFln

alP

IRvs

Pre

AM

#DIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

/O!

#DIV

/O!

$200,740

86.5%$64,158

Va

rian

ces

To

talA

nn

ua

lCo

sts

Do

llars

Pe

rcen

t

106,272

ooo oo o o

151,877

o o oo oooTo

tal

(13)T

ota

lF

ina

lPIR

vsP

reA

MP

Tra

nsp

orta

tlon

-HC

RS

avin

gs:

(fromlosing

andgaining

facilities)($827,578)

(14)T

ota

lF

ina

lPIR

vsP

rop

ose

dT

ran

spo

rtatio

n-H

CR

Sa

ving

s:(from

losingand

gainingfacilities)

($853,718)

(15)T

ota

lF

ina

lPIR

vsP

reA

MP

Tra

nsp

orta

tion

(PV

S&

HC

R):

($665,293)(T

hisnum

bercarriedforw

ardto

theE

xecutiveS

umm

ary)

(16)T

ota

lF

ina

lPIR

vsP

rop

ose

dT

ran

spo

rtatio

n(P

VS

&H

CR

):(T

hisnum

bercarried

forward

tothe

Executive

Sum

mary)

($691,433)

PIR

Transportation

He

R-

Gaining

Page 34: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

MP

EIn

vento

ryLastS

aved:M

ay16,

2011

Data

Extra

ction

Date:

01/11/11P

IRT

ype:F

inalPIR

Date

Ra

ng

eo

fData:

Jan-01-2010-

to-

Dec-31-2010

Lo

sing

Fa

cility:y.Jinchester

PO

Ga

inin

gF

acility:

Dulles

P&

DC

(2)I

(3)I

II

.'·~.I

(5)I

(6)1;'1

(7)(8)

(9).

.P

roposedF

inal PIR

Variance

InF

ma

lPIR

Pro

po

sed

Fm

alP

IRR

elocationR

elocationC

tsE

au

ipm

en

tE

qu

ipm

en

tC

ostsC

osts

osA

FC

S0

0A

FC

S.

40

$0

$0

AF

SM

1000

0A

FS

M1

00

33

$0

$0

AF

SM

-Ai

00

AF

SM

-Ai

00

$0

$0

AF

SM

AT

HS

00

AF

SM

AT

HS

00

$0

$

AF

SM

-AT

HS

/Ai

00

AF

SM

-AT

HS

/Ai

00

$0

AP

PS

00

AP

PS

01

$0

$0

$0

ClO

SS

00

ClO

SS

.2

0$

0$

0$0

CS

BC

S0

0C

SB

CS

00

$0

$0

$0

DB

CS

00

DB

CS

172

0$

13

,44

0$9,122

($4,318}

DB

CS

-oSS

00

DB

CS

-oS

S0

0$

0$

0$0

DIO

SS

00

DIO

SS

54

$1

3,4

40

$9

,12

2($4,318)

FSS

00

FS

S.,

..

44

$0

$0

$0

SP

BS

.0

0S

PB

SI

/0

0$

0$

0$0

UF

SM

00

UF

SM

00

$0

$0

$0

FCI

MIC

RO

MA

RKII

00

FCI

MIC

RO

MA

RK

00

$0

$0

$0

RO

BO

TG

AN

TR

Y0

0R

OB

OT

GA

NT

RY

I.,0

0$

0$

0$0

HS

TS

IH

SU

S0

0H

ST

SI

HS

US

00

$0

$0

$0

LCT

SI

LCU

S0

0LC

TS

ILC

US

.1

11

$0

$0

LIPS

00

LIPS

00

0$

0$

0

ML

OC

R-IS

S'

00

ML

OC

R-IS

.I'l

'0

0$

0$

0

MP

BC

S-O

SS

00

MP

BC

S-o

SS

00

0$

0$

0

TA

BB

ER

.0

0T

AB

BE

R0

0$

0$

0

..,

..

.4

SA

MP

RC

SI

"1

Ile

a---

!!

•!

II

.m

-II

1.1

1$

26

,88

0L.£;244.,:>

(10)N

otes:C

arriedto

Space

Evaluation

an

dO

the

rC

osts.

PIR

MP

EInventory

Page 35: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Main

tenan

ceLast

saved

May

16,2011

PIR

Type":;..F.::,in;.::a::...';..PI"-R'--

_Jan-01-2010

Dec-31-2010

Lo

sing

Fa

cility:W

inchesterP

O-------------------

Date

Range

ofD

ata:

Ga

inin

gF

acility:

Dulles

P&

DC

-----------------------

Parts

an

dS

up

plie

s

45

52

46

1.896.367

455,246

1,993,971

1,611,0951,155,849

$

$8,980,349

$10,876,716

~(8)

(9)(10)

Va

rian

ceV

ariance

Pro

po

pd

Fln

alP

IRF

ina

lP

IRto

Fln

alP

1Rto

CCISISC

osts

Pre

AM

PP

reP

rse

d

$3,896,798

$5,200,948

1,393,577$

LlO

4.150

$899,632

$980,785

81.153$

81.153

$1,941,719

$2,096,556

154,837$

154,837

----

$514,112

$514,324

1.154$

213

---

$572,240

$473,008

(91996)$

t~:'9J32}

---

$7,824,500

$9,265,621

1,538,725$

1,441,121

Wo

rkho

urA

ctivity

Maintenance

Stockroom

andS

u

Grand

Total

Pa

rtsa

nd

Su

pp

lies

FM

ain

ten

an

ceT

rain

ing

$

EM

ain

ten

an

ceO

pe

ratio

ns

$S

up

po

rt

EB

uild

ing

Eq

uip

me

nt

$

EB

Uild

ing

Se

rvices

$(C

ustodialC

leaning)

EM

allP

roce

ssing

Eg

ulp

me

nt

$

(3)(4)

(5)V

aria

nce

Va

rian

ceF

ina

lP

IRF

ina

lPIR

toF

lna

lPIR

toC

osts

Pre

AM

PP

rop

ose

d

$196

(19

2,9

32

)$

19

6

o$

10,430(B

9.691)$

10

,43

0

195,618$

203,6518,033

$8,033

o$

0(1,072)

$0

o$

57

0(7

,75

7)

$5

70

195,618$

214,847(263,419)

$19,229

159,542$

123,535(36,O

07}$

(36

,00

7)

O~0

00

365,160$

338,382(299,426)

$(16.778)

~2)

Pro

po

sad

Co

sts

$$$ $ $$ $

$G

randT

otal

Maintenance

Stockroom

andS

Wo

rkho

urA

ctivity

EM

ain

ten

an

ceO

pe

ratio

ns

Su

pp

ort

$

EM

ain

ten

an

ce$

Tra

inin

g

EB

Uild

ing

Eq

uip

me

nt

$

~B

Uild

ing

Se

rvices

$(C

uslod/81C

loanmg)

EM

allPro

cessin

gE

gu

lpm

en

t$

(11)F

ina

lPIR

vsP

reA

MP

-M

ain

ten

an

ceS

aVings:

(12)F

ina

lPIR

vsP

rop

ose

d-

Ma

inte

na

nce

Sa

ving

s:

$1,694,546

$1,879,588(T

he

sen

um

be

rscarried

forw

ard

toth

eE

xecutiveS

um

ma

ry)

(These

nu

mb

ers

carriedforw

ardto

the

Executive

Su

mm

ary)

(13)N

ote

s:-===============================

~Bta

inP

IRcokuM

.Sis

annualizedfor

First

PIR

PIR

Maintenance

Page 36: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Distrib

utio

nC

ha

ng

es

LastS

aved:M

ay

16,2011

Ide

ntify

the

da

teo

fthe

Po

stalB

ulle

tinth

atco

nta

ine

dD

MM

lab

elin

glistre

vision

s.

PIR

Type:

FinalP

IR

Date

Range

of

Data:

Jan-01-2010-

to--

Dec-31-2010

Lo

sing

Fa

cility:

....:Wi~ln..:.c:..:.he.:..s:.:t..:.er:...P:...O..::-_

Type

ofD

istribu

tion

Co

nso

lida

ted

:O

rig&

Dest

Place

a"X

"n

extto

the

DM

Mla

be

ling

Iist(s)re

vised

asre

sulto

fthe

ap

pro

ved

AM

P.

Was

the

Se

rviceS

tan

da

rdD

irecto

ryu

pd

ate

dfo

rth

ea

pp

rove

dA

MP

?

(3)Yes.

January1

,20

10

(1)D

MM

lOO

1D

MM

lO11

XD

MM

lOO

2X

DM

Ml2

01

XD

MM

lOO

3D

MM

l60

1

DM

MlO

O4

DM

Ml6

02

XD

MM

lOO

5D

MM

l60

3

DM

MLO

O6

DM

Ml6

04

DM

MlO

O?

DM

Ml6

05

DM

MLO

O8

DM

Ml6

06

DM

MLO

O9

DM

Ml6

0?

DM

MLO

WD

MM

l80

1

(2)F

ebruary11,

2010P

osta

lBu

lletin

22278

(4)D

rop

Sh

ipm

en

tsfo

rD

estin

atio

nE

ntry

Disco

un

ts

FA

ST

Ap

po

intm

en

tSu

mm

ary

Re

po

rtN

AS

SF

acility

Nam

eT

ota

lN

o-S

ho

wLate

Arriva

lo

en

Clo

sed

Un

schd

Mo

nth

LosinQI

GaininQ

Fa

cilitvC

odeS

chd

Co

un

t%

Co

un

t%

Co

un

t%

Co

un

t%

Co

un

t

Ma

y'10

Lo

sing

Fa

cility229

Winchester

PO

47136

7.64%176

37.37%0

0.00%435

92.36%3

Jun

'10

Lo

sing

Fa

cility229

Winchester

PO

45337

8.17%182

40.18%0

0.00%416

91.83%3

Ma

y'10

Ga

inin

gF

acility

230D

ullesP

&D

C736

12216.58%

27337.09%

00.00%

61483.42%

17

Jun

'10

Ga

inin

gF

acility

230D

ullesP

&D

C745

10914.63%

28838.66%

00.00%

63685.37%

6

(5)N

otes:-=============

PIR

Distribution

Changes

Page 37: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Cu

stom

erS

erviceIssu

esLastsaved:

May

16,2011

Lo

sing

Fa

cility:..:.Wt..:.;;.:nch.::::.:.:e:.:sc:.:te:.:.r..:.P--=O'--_

5-D

lgltZ

IPC

ode:22601

Data

Extra

ction

Date:-::0'71/~1==8/"'1""1------

1.C

olle

ction

Po

ints

Nu

mb

er

picke

du

pb

efo

re1

p.m.

Nu

mb

er

picke

du

pb

etw

ee

n1

-5p.m

.

Nu

mb

er

picke

du

pa

fter

5p.m

.

To

talN

um

be

ro

fC

olle

ction

Po

ints

PIR

on.·Fri.

o

Sat.

oo

Sat.

o

2.H

owm

an

ycollltC

tlonboxes

arecu

rren

tlydesignated

for

"loca

lde

livery"?

Il)-J

3.H

ow

ma

ny

"loca

lde

livery"

bo

xes

we

rere

mo

ved

as

are

sult

ofA

MP

?I

OJ

9:00I

16:00

9:00I

16:00

9:00I

16:00

N/A

IN

/A

9·.00I

16:00

9:00I

16:00

FinalP

IRS

tartI

End

9:00I

16:00

9:00I

16:00

9:00I

16:00

9:00I

16:00

NJA

IN

JA

9:00I

16:00

Start

IE

nd

6.B

usin

ess

(Bu

lk)M

allA

ccep

tan

ceH

ou

rs

Proposed

33.9%

66.2%

59.8%

55.3%

Percent

9:00I

18:00II,I

9:00I

18:00

9:00I

18:00II,I

9:00I

18:00

9:00I

18:001:1

9:00I

18:00

9:00I

18:001:1

9:00I

18:00

90

0I

1800JI

9.001~

~,~

Start

IE

ndIii

Start

IE

nd

s.R

etailUn

itInsid

eL

osin

gF

acility

(WIn

do

wse

rviceT

ime

s)

"'--""p'""ropo--sed"""'"---'I"'wl---F

"'I-nal""""P1""R

""'--'j

4.

De

livery

Pe

rfon

na

nce

Re

po

rt

%C

arrie

rsre

turn

ing

be

fore

5p.m

.

7.

Can

custo

mers

ob

tainIilo

calp

ostm

arkin

accord

ance

with

app

licable

po

liciesin

the

Po

stalOp

enrtJo

ns

Ma

nu

al?

Yes

8.N

otes:Ga

inin

gF

acility:

-=D~u::::lle:::s~P--.:&~D~C:::.-_

9.W

ha

tpo

stma

rkIs

prin

ted

on

colle

ction

ma

ll?

'It~1;:;:JE0.~~Th\\"xi~~iis

PIR

Cu

stom

er

Se

rviceIssu

es

Page 38: May 17, 2011 American Postal Workers Union (APWU), AFL-CIO ... · Dulles VAP&DC projected a first year savings of$1,583,944. The Final Post Implementation Review after implementation

Space Evaluation and Other Costslast Saved: May 16. 2011

Losing Faclllty:...:Wi...:.;:.;ln"'c:..;.he::.;s""te::.;r:...;P'-O"'- _

1. Affected Facility

Date: 0::.;5::;./.:;16::;./..:.11.:.-__

Facility Name: Winchester POStreet Address: 340 N Pleasant Valley RoadCity. State ZIP: Winchester VA

2. One-TIme Costs

Enter anyone-time costs:__...:$0::..__

3. Savings Information

Space Savings ($): .;::$0.;;...__

4. Did you u1mze the acquired space as planned? Explain.

5. Notes:

$0 $0(These numbers shown below under One-TIme Costs section.)

$0 $0(These numbers eanied forward to the Executive Summary)

Employee Relocation Costs

Mail Processing Equipment Relocation Costs(from MPE Inventory)

Facility Costs(from above)

$26,880

$0

$18,244

$0

($8.636)

$0

Total One-Time Costs $26,880 $18,244 ($8636)PIR costs carried forward to Executive Summary)

Range of Report

Losing Facility: ...:Wi..:.;I'-'nch=:;e:.;:s"'te:.:.r..:.;P...::O'-- _

FY 2008

Gaining Facility: ..:D:.:u:::;lIe::;:s:..;P....::&::;:D:..;C:o.- _

FY 2009