Mat Su Career & Technical High School - Site Plan • Floor Plan • Design Concepts ......
Transcript of Mat Su Career & Technical High School - Site Plan • Floor Plan • Design Concepts ......
Mat-Su Career & Technical High School
BDC Meeting # 5Mat Su Career & Technical High School
Matanuska Susitna Borough
Mat Su School District
McCool Carlson Green Architects
Mat-Su Career & Technical High School
Agenda
• Process Overview• Space Program• Site Plan• Floor Plan• Design Concepts• Next Steps
Mat-Su Career & Technical High School
BDC Schedule
• July 17: Kickoff• August 12-14: Workshop• September 4: Concept Refinement• September 5-12: Focus Groups• October 8: Schematic Design• November: School Board/Assembly • March 2014: Bidding• July 2015: Occupancy
Mat-Su Career & Technical High School
SITE CONTEXT
Mat-Su Career & Technical High School
1st Floor
Mat-Su Career & Technical High School
2nd Floor
Mat-Su Career & Technical High School
RELATIONSHIP TO BUISINESS & INDUSTRY
Mat-Su Career & Technical High School
ADAPTABLE CORE
Overhead Door provides access for large equipment and displays
Operable Walls create multiple
configuration opportunities
Each Pathway has a Portal facing the
MPR/Partners Room
Auxiliary dining area for Culinary Arts training
Large Assembly
Fitness & Large
Seminar
Fitness, Classrooms &
Informal Learning
Mat-Su Career & Technical High School
FLEXIBLE INSTRUCTION PROTOTYPE
• Individual Work Areas
• Small Group Work/Conference room
• Large Group Work Area/Classroom
• Teaching Team Office
• Storage
• Technical Reference Library
• 2,600 sf per Pathway
Mat-Su Career & Technical High School
PATHWAY ANATOMY
Mat-Su Career & Technical High School
LEARNING SIGNATURE
changing, adapting, connecting inviting, welcoming, responding
Mat-Su Career & Technical High School
Discussion – Future Trends• Technology
• Mobile devices• Distance Learning• Information vs. understanding• Teachers as coaches
• Diversity• Personalization• Languages• Teaching teams
• Global Economy• Literacy• Creativity• Collaboration• Integrated learning / inquiry based
• Brain Research• Learning Pyramid• Multi sensory learning• Active Learners• Learning styles
Mat-Su Career & Technical High School
Workshop 1
Mat-Su Career & Technical High School
Workshop 2
Mat-Su Career & Technical High School
Workshop 3
Mat-Su Career & Technical High School
Space Programming Input
• Aviation• Human Services• Hydraulics/Diesel Power• Process Technology
Mat-Su Career & Technical High School
Site Design
Mat-Su Career & Technical High School
Exterior Massing
Mat-Su Career & Technical High School
Area Comparison8/30/2013
Quantity Size Totals Dept Totals Path Totals Net Area VarianceNatural Resources Pathway
Classroom 1 800 800 793 (7) Science Labs 2 1,200 2,400 2,345 (55) Science Prep 1 400 400 393 (7) Natural Resources Lab 1 1,200 1,200 1,173 (27)
4,800 4,704 (96) Flexible Instructional Space
Flex Area 1 1,674 1,674 1,174 (500) Group InstructionSmall Group Work Areas/ConferenceTeacher Team Office Storage
1,674 1,174 (500) Natural Resources Pathway Total 6,474 5,878 (596)
Transportation PathwayAviation Lab 1 2,100 2,100 2,119 19 Process Technology Lab 1 1,000 1,000 1,079 79 Diesel Power Generation Lab 1 1,000 1,000 1,079 79 Classroom 1 800 800 793 (7) Storage 3 300 900 450 (450)
5,800 5,520 (280) Flexible Instructional Space
Flex Area 1 1,674 1,674 1,175 (499) Group InstructionSmall Group Work Areas/ConferenceTeacher Team Office Storage
1,674 1,175 (499) Transportation Pathway Total 7,474 6,695 (779)
Human Services PathwayLaw Enforcement Classroom 1 1,000 1,000 999 (1) Classroom 1 800 800 805 5 Education Classroom 1 1,000 1,000 999 (1)
2,800 2,803 3 Flexible Instructional Space
Flex Area 1 1,674 1,674 1,202 (472) Group InstructionSmall Group Work Areas/ConferenceTeacher Team Office Storage
1,674 1,202 (472) Human Services Pathway 4,474 4,005 (469)
Media / Testing Center - Media Center 1 3,300 3,300 3,353 53 Testing Center 1 800 800 818 18 Library Office/Workroom 1 250 250 227 (23) Library Storage 1 300 300 284 (16)
4,650 4,682 32 Media / Testing Center Total 4,650 4,682 32
Net Program Area 23,072 21,260 (1,812) Service, Mechanical, Structural, Circulation & Toilets (SMSCT) 10,316 11,676 1,360 Total Gross Building Area 33,388 32,936 Maximum Gross Building Area Allowed 33,060 33,060 Gross Area Variance 328 (124) Grossing Factor 45% 55%
Programmed Space 9/4/13 Plan
Mat-Su Career & Technical High School
First Floor Plan
Mat-Su Career & Technical High School
Second Floor Plan
Mat-Su Career & Technical High School
Media/Echange Center
Mat-Su Career & Technical High School
Flex/Testing Adaptations
Mat-Su Career & Technical High School
Next Steps
• Focus Groups• Engineering Systems• Maintenance Input• Schematic Submittal 10/8/13• Schematic Review Meetings