Mark Ackerman U.S. EPA, Region 5 April 5, 2013

22
Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Transcript of Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Page 1: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Mark AckermanU.S. EPA, Region 5April 5, 2013

Page 2: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Overview Overview of the CWA and the NPDES Program Need for General Permit and Beneficial Impact General Permit ILG62‐What is it? Permit Mechanics Technical and Economic Feasibility

2

Page 3: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Clean Water Act Goals By 1985…

3

Page 4: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Clean Water Act Goals Cntd.

4

Page 5: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

TBELs and WQBELs CWA Section 301 (b)(2)(A)

“Elimination of pollutant discharges to waters of the U.S.” … “if such elimination is technologically and economically  achievable”

CWA Section 302(a) Whenever discharges of pollutants…with the application of effluent limitations required under section 301(b)(2) interfere with the attainment of maintenance of water quality, that water quality effluent limits shall be established to attain or maintain the water quality

5

Page 6: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

NPDES Program Section 402 of the CWA authorizes EPA to issue an National Pollutant Discharge Elimination System (NPDES) permit to any person discharging any pollutant or combination of pollutants from a point source into waters of the United States 

NPDES Permits Restrict the types and amounts of pollutants

Accomplished by requiring dischargers to meet Technology Based Effluent Limitations; or

Water Quality Based Effluent Limitations

6

Page 7: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Overview Overview of the CWA and the NPDES Program Need for General Permit and Beneficial Impact General Permit ILG62‐What is it? Permit Mechanics Technical and Economic Feasibility

7

Page 8: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Public Health and Water Resource Impacts “A Waterborne outbreak of Norwalk‐Like Virus among Snowmobilers” Published in Journal of Infectious Diseases, volume 187, 2003

Undersized onsite septic system contaminated the water supply

Highlights the importance of proper design and maintenance for onsite wastewater treatment systems

8

Page 9: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Installation Statistics

0%

10%

20%

30%

40%

50%

60%

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

1996

1998

2000

2002

2004

2006

2008

2010

Total Systems Installed

Surface DischargingSystemsPercentage of Total

9

Page 10: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Overview Overview of the CWA and the NPDES Program Need for General Permit and Beneficial Impact General Permit ILG62‐What is it? Permit Mechanics Technical and Economic Feasibility

10

Page 11: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

ILG62‐What is it? NPDES General Permit that covers new and replacement surface discharging systems

Eligibility requirements: Receive and process domestic sewage only, Flow through the system is 1500 gallons per  day or less, Connection to sewer is 200 feet from the property or greater, and

All alternatives to a surface discharging system are technically or economically infeasible.

11

Page 12: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

You’re Not Eligible If… Lots created 6‐months after the effective date of the permit

Already covered by a different NPDES permit Discharges to 303(d) listed waters Discharges mixed with material other than domestic sewage

Discharges from more than one home, or other structure

A sewer connection is within 200 feet of your property

12

Page 13: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Effluent LimitsDischarges to WOUS Discharges to Lakes, Ponds, 

or Impoundments Max. Daily Limits in mg/L

BOD5 or COD (45 or 55) TSS or Turbidity (45 or 15 

NTU) Dissolved Oxygen  (4.0 

minimum) Fecal Coliform  (400 

CFU/100 mL) Total Resid. Chlorine (0.038) pH (6.0‐9.0 Std. Units) Oil, Odor, Color, Floating 

Debris (None Detectable)

Max. Daily Limits in mg/L BOD5 (20) TSS (24)

Fecal Coliform (400 CFR/100 mL)

Total  Resid. Chlorine (0.038) pH (6.0‐9.0 Std. Units) Oil, Odor, Color, Floating 

Debris (None Detectable)

13

Page 14: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Overview Overview of the CWA and the NPDES Program Need for General Permit and Beneficial Impact General Permit ILG62‐What is it? Permit Mechanics Technical and Economic Feasibility

14

Page 15: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Permit Mechanics‐HomeownerTech. Feasibility 

AnalysisCan your site support a zero discharge system?

Economic AnalysisEvaluate least expensive zero 

discharge system.

Install the least expensive zero 

discharge system or;

Apply for an individual NPDES permit from the state of Illinois

Submit an NOI

15

Yes No

Eligible

Not Eligible Not Eligible

Page 16: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Permit Mechanics‐Business or Government

16

Tech. Feasibility Analysis

Can your site support a zero discharge system?

Install the least expensive zero 

discharge system or;

Apply for an individual NPDES permit from the 

state of IllinoisSubmit an NOI

NoYes

Page 17: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Overview Overview of the CWA and the NPDES Program Need for General Permit and Beneficial Impact General Permit ILG62‐What is it? Permit Mechanics Technical and Economic Feasibility

17

Page 18: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Technical Feasibility

Soil Investigation

Site Evaluation

Technical Feasibility Analysis

18

Page 19: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Economic Feasibility• $ Least expensive zero discharge system

• Corresponding O&M $

Annualized Cost over 30 

years

• AGI year 1• AGI year 2• AGI year 3

Average AGI

19

Page 20: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Economic Eligibility Criteria IF annualized cost over 30 years > 2% of average AGI

Eligible for coverage Submit an NOI

IF annualized cost over 30 years < 2% of average AGI Not eligible for coverage Install zero discharge system; or Apply for an individual NPDES permit

20

Page 21: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Example‐Economic Feasibility Given:

Total system cost (purchase & installation) $7,500 Corresponding annual O&M cost =  $350‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

The annualized cost over 30 years = $895/yr ($75/month) Find corresponding AGI such that:

Annualized cost = 2% * AGI $895 = 2% * AGI AGI = $44,750/year 

21

Page 22: Mark Ackerman U.S. EPA, Region 5 April 5, 2013

Photo References http://www.militarymentalhe

alth.org/blog/2012/03/fishing‐is‐more‐than‐just‐a‐relaxing‐pastime‐it‐can‐help‐with‐ptsd‐symptoms/

http://rowerunning.co.uk/2008/04/why‐some‐dont‐like‐open‐water‐swimming/

http://chenected.aiche.org/plant‐operations/water‐industrial‐discharge‐permits/

22