Bevlogenheid maakt inzetbaar én gezond (Marjolein Janssen en Simone Lexmond)
Marjolein de lange manchester report think bike workshop
-
Upload
dutchembassy -
Category
Documents
-
view
419 -
download
2
Transcript of Marjolein de lange manchester report think bike workshop
![Page 1: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/1.jpg)
Love Cycling, go Dutch Workshop Report about design workshop Manchester Marjolein de Lange – Dutch Cycling Embassy
![Page 2: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/2.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 2 20 November 2012
![Page 3: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/3.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 3 20 November 2012
Situation Roundabout Chester Road
![Page 4: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/4.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 4 20 November 2012
Situation Roundabout Chester Road
![Page 5: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/5.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 5 20 November 2012
Problems Roundabout Chester Road Waiting time / many stops Not continuous Sharp and narrow curves No facilities on northern side (also for pedestrians) Dangerous crossings End of two way bike path incomprehensible Some cyclists don’t use the facilities
However …
![Page 6: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/6.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 6 20 November 2012
Problems Roundabout Chester Road
![Page 7: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/7.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 7 20 November 2012
Solutions Roundabout Chester Road
1 End of two way bike path 2 Toucanise and move crossing 3 More width for cyclists esp. in curves and at crossings 4 Better connections to neighbourhoods
![Page 8: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/8.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 8 20 November 2012
Solutions Roundabout Chester Road
1 End of two way bike path + 20 m/h zone entrance 2 Clear give way situation: Elevated crossings side roads 3 Optional use of northern sidewalk
![Page 9: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/9.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 9 20 November 2012
Situation Wilmslow Road
“Curry mile”
![Page 10: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/10.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 10 20 November 2012
Situation Wilmslow Road
![Page 11: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/11.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 11 20 November 2012
Problems Wilmslow Road
Too many cars Many busses Too many functions Unpleasant cycling (Double) parking Potholes; bike lanes damaged by busses
![Page 12: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/12.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 12 20 November 2012
Problems Wilmslow Road
![Page 13: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/13.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 13 20 November 2012
Considerations Wilmslow Road
Make choices! Important bicycle route Backbone for bus network Pleasant climate for shops and restaurants Conclusion: Separate bicycle facilities Reduce space for cars
Opportunity: in line with scheme for Oxford Road Alternating one way for cars
More space for pedestrians, shops and terraces
![Page 14: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/14.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 14 20 November 2012
Parking space can be used more profitable: Terrace Walking Residing Meeting Commercial … Create alternatives: Parking and loading in side streets
Arguments for removing parking space
![Page 15: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/15.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 15 20 November 2012
Cross section
Continuous template profile Minimum profile: 14.70 m Minimum available: 18 m Extra width at bus stops and others
![Page 16: Marjolein de lange manchester report think bike workshop](https://reader031.fdocuments.net/reader031/viewer/2022020307/55996ef11a28ab81368b4706/html5/thumbnails/16.jpg)
Love Cycling, go Dutch Report about Design Workshop Manchester
Page 16 20 November 2012
Discussion
Short term technical improvements at Chester Road Longer term roundabout Chester Road is too big Back to human scale / city scale Continuation of bicycle facilities is needed
Wilmslow Road needs clear choices Long term vision and wider perspective Courage to withstand resistance Potentially good example