March 30th, 2011 - Japanese Government Action Items and Material Request List

download March 30th, 2011 - Japanese Government Action Items and Material Request List

of 8

Transcript of March 30th, 2011 - Japanese Government Action Items and Material Request List

  • 7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List

    1/8

    From:

    Sent:To:Subject:

    Blount, To m

    Wednesday, March 30, .2011 1:32 PMLIAO1 Hoc; LIA08 Hoc; UA06 HocRE: Revised Consortium Call Spreadsheet

    (b)(5)

    Tnx,Tom

    From: LIA01 HocSent: Wednesday, March 30 , 2011 12:51 PMTo: LJA08 Hoc; LIA06 Hoc; Blount, TomSubject: Revised Consortium Call Spreadsheet

    Se e attached.

    1 13c,--//3

  • 7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List

    2/8

    **DRAFT'*JapaneseGovernmentAction Itemsand MaterialRequestList

    Item Coordinating CurrentStatusand OpenActionItemDescription Agency/POC Expectedtiming Closed Comments

    Due Date:3/30/11. NeedgovernmentStatus:Supplychain:4- decisionon how6 eletectorsfrom thesewillbeSONGs,variousradiacs shipped.CDRandairsamplers (about Jared Eastapallet)fromSTPready PACOM

    Radiationmonitors, survey meters,friskersrequestedbyGoJ (Mr. toship;20 handandfoot committedtoHosono)(radiacs)andTEPCoKeisukeTakenaka (hand andfoot) monitorsfromBruce checkinginto

    1monitors.SenttoTwo locations. INPO (800lbsapiece) Opengov'ttransport.

    2GammaCamera- Infohas beensentto INPOPOCin apan INPO ClosedRequesthasbeencanceledbyGovtof

    3HydraulicHoses(300-500meters) INPO Japan Closed

    DueDate:3/29/11. GoJto establishSupplychain:Materials need.sourced;to beobtained Communicatedto

    commercially, themthat theyInformationsentto GoJ arepayersbyAnti C's,respirators,materials.From Mr.Hosono(GoJ) INPO throughAlHochevar OpenHochevar.

    DueDate:4/2/11.ISTdevelopingspecs. Oneproposalcompleteand ISTtodevelop

    Commercialheatexchangersystem that canbeusedtocoola beingsourcedthrough otherdesignspec4 pentfuelpoolwithdebrisin t. romMr.Hosono(GoJ). INPO MattGooder. Openoptions.

    Tools/methodsformovingdamagedfuel,pluscontactsofthosewith DueDate:3/30/11.IST5 xperienceatTMI-2andChernobyl.FromMr.Hosono(GoJ). INPO isWorking Open6Shieldingforindividualroomsandforthe facilityin eneral INPO I 1 _-_

    6:15PM9/18/2011 Page1 JapaneseGovernmentActionItems and Material RequestUst(tobe consideredduringConsortiumCalls) **DRAFT**

  • 7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List

    3/8

    **DRAFT**JapaneseGovernmentAction Itemsand MaterialRequestList

    Item Coordinating CurrentStatusand Open# ActionItemDescription Agency/POCExpectedtiming cmd Comments

    Obtaincontactinformationforindustrypersonnelwithexperienceinhandlinganddisposalofopen pools/trenchesofhighdoserate DueDate:3/30/11.

    7 >100R/hr)water.RcvdMar29fromAlHochevarfromMr.Hosono INPO WorkingwithIST..WestinghouseworkingontheUAVrequest andcoordinatingwith

    8TexasA&M xpert INPOSAMGTechnicalDocument guidancehasbeensentto

    INPOcontactinapanandis eingupdated(Rev1)andwillbediscussedat

    1100 hrscalltoday;willincludeinjectionrateandbestassessmentto plantconditions;(needtoconfirmthatINPOhas

    -9 _INFOreceived)

    10GEHis ollowingup ontheNitrogenpurgeissue INPO .......This actionhas beenclosedout(Confirmhow

    11GoJrequestforshielding INPO andbywhom?) ClosedDueDate:3/30/11.Ongoingproject;comments thatshiftfocusare received

    during1100statuscall31292

    13

    ClarifyforRSTthe indicationsthatcanbe usedtoassessRPVintegrityandlocation ofcore,(RSTrequest)

    Listalternative flowpathsthatcan be usedforpurging, givenaccessibilitychallenges.(RSTrequest)

    INPO Open

    Due Date:3/30/11.GEtoprovide3/29list,

    INPOprovidingtechnicalINPO review Open

    6:15PM9/18/2011 Page2 JapaneseGovernmentActionItems and Material RequestList(tobe considered duringConsortiumCalls) **DRAFT**

  • 7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List

    4/8

    **DRAFT**JapaneseGovernment ActionItemsand MaterialRequestList

    Item Coordinating CurrentStatusand Open# ActionRemDescription Agency/POC Expectedtiming Cosd Comments

    DueDate:3/30/11.

    Technical:Ongoingproject;commentsthatshiftfocusare received

    ConfirmRSTrecommendationthatRPVinjection can bemaximizedonce during 1100statuscall14containmenthasbeenpurgedandvented,(RST INPO 3/29 Open

    Therehasbeena equestfromGoJdirectlytoPacificNorthwestLabsfortechnicalassistancewithwaterdecontamination and TomMichenerstorage issues(thisrequestis otbeingcoordinatedthroughthe PNNL- DOENRC.Forfurtherinformationpleasecontact thePNNLPoint of LaboratoriesinContacts) WA

    509-375-2162

    WayneJohnson,

    DivisionDirectorPNNL-DOE

    LaboratoriesinWA

    509-372-479112 1

    Water BargesPerJ4 the bargeshave

    beenoutfittedandtestedand are10hrsfromtheNPPsiteand should

    13 J4/PACOM arriveWeds.NeedETA

    6:15PM9/18/2011 Page3 JapaneseGovernmentActionItems andMaterialRequestUst(tobeconsideredduring ConsortiumCalls) **DRAFT**

  • 7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List

    5/8

    **DRAFT'*JapaneseGovernmentAction Itemsand MaterialRequestList

    Item Coordinating CurrentStatusand Open# ActionItemDescription AgencylPOC Expectedtiming Cosed Comments

    Requestsformilitaryairtransport J4/PACOMPACOMis nvolvedinthereviewandapproval Firstchoiceofallrequestsfor shouldbemilitaryairifttoJapan. commercialRequestsshouldinclude carrierfortimelyweightand dimensions delivery;shouldofthe cargo limitrequeststo

    materielthatisdifficult forcommercial

    14 _carriers to deliveConductof aerialsurvey(forAMSmeasurements)(sharingofthe DOEwithNNSANRCwithNARACdataanditsanalysis) andNARACconductedaplausible

    support doseassessmentwhichwillbeforwardedtoJapanaftergoingthroughthe approval

    15 chain

    Useofradiationmonitoringdeviceson theground(mobileand DOEwith16stationarytype) industrysupport

    Conductofthesimulationbytheradiationdiffusionmodel DOE& RC17(comparisonwiththeSPEEDIsimulationbytheJapanside) PMT

    Useofthegermaniumsemiconductordetectors(formeasuringthe18extentto whichwaterandfoodsareexposedtoradiation) DOE

    6:15 PM9/18/2011 Page4 JapaneseGovernmentActionItemsand Material RequestList (tobe consideredduring ConsortiumCalls) **DRAFT"

  • 7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List

    6/8

    **DRAFT**JapaneseGovernmentAction ItemsandMaterialRequestList

    Item Coordinating CurrentStatusand OpenActionItemDescription Agency/POC Expectedtiming close Comments

    Useofroboticdevices(formonitoring) DOE;DOD;

    INPO INPOdiscussedinconferencecalltheyareinontactwithDr RobinMurphy,TexasA&M,aDisasterAssessmentExpertin oboticsandhas

    19 offeredherservices

    DOE; DOD;20 Useofroboticdevices(forrubbleremoval) INPO Seeabove21Useofthedata(image,level ofradiation)obtainedbyUAVs DOE;DOD

    Useofunmannedhelicopter(K-MAX) J4??

    A ockheedMartinasset($25Mcost).WillnotbeshippeduntilSeniorDefense Leadsagreetodoso. Discussionongoingat thePentagonbetween attorneysand

    comptrollers.If equestapproved,preparationsbeingmadetoshipthis

    22 resourceviamilitary air23 FreshwatersupplypumpsfromBechtel INPO?? Firsttrainin apan

    Radsurveymeters;individualdosimeters,radioactivemeasuringinstruments,masksfor iodineadsorption,andseparationmaterials

    24(quantityspecificationtobediscussedlater) INPO25Protectivebodyarmor ??

    6:15PM9/18/2011 Page5 JapaneseGovernmentActionItemsand Material RequestList(tobe considered duringConsortiumCalls) **DRAFT**

  • 7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List

    7/8

  • 7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List

    8/8

    .... ...... .

    **DRAFT**JapaneseGovernmentActionItemsand MaterialRequestList

    Item Coordinating CurrentStatusand open# ActionItemDescription Agency/POCExpectedtiming Closed Comments

    NRC FromCabinet

    Office CrisisJapanaskedforNRCexpertiseontemporaryshieldingoptions, to Managementdeterminewhetherthe NPPPlantbuildingsare strong enoughto TeamMeeting

    33 holdupunderadditionalpressure notes,3/28/11Requestforthefollowing:2100units- RadSurveyMeters2500units- PersonalDosimetery5100units- iodine shieldingmasks

    34 DOE Needstatusupdate35

    36

    6:15PM9/18/2011 Page7 Japanese GovernmentActionItemsandMaterialRequest Lst(tobe consideredduring ConsortiumCails)**DRAFT**