Transcript of March 30th, 2011 - Japanese Government Action Items and Material Request List
-
7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List
1/8
From:
Sent:To:Subject:
Blount, To m
Wednesday, March 30, .2011 1:32 PMLIAO1 Hoc; LIA08 Hoc; UA06 HocRE: Revised Consortium Call Spreadsheet
(b)(5)
Tnx,Tom
From: LIA01 HocSent: Wednesday, March 30 , 2011 12:51 PMTo: LJA08 Hoc; LIA06 Hoc; Blount, TomSubject: Revised Consortium Call Spreadsheet
Se e attached.
1 13c,--//3
-
7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List
2/8
**DRAFT'*JapaneseGovernmentAction Itemsand MaterialRequestList
Item Coordinating CurrentStatusand OpenActionItemDescription Agency/POC Expectedtiming Closed Comments
Due Date:3/30/11. NeedgovernmentStatus:Supplychain:4- decisionon how6 eletectorsfrom thesewillbeSONGs,variousradiacs shipped.CDRandairsamplers (about Jared Eastapallet)fromSTPready PACOM
Radiationmonitors, survey meters,friskersrequestedbyGoJ (Mr. toship;20 handandfoot committedtoHosono)(radiacs)andTEPCoKeisukeTakenaka (hand andfoot) monitorsfromBruce checkinginto
1monitors.SenttoTwo locations. INPO (800lbsapiece) Opengov'ttransport.
2GammaCamera- Infohas beensentto INPOPOCin apan INPO ClosedRequesthasbeencanceledbyGovtof
3HydraulicHoses(300-500meters) INPO Japan Closed
DueDate:3/29/11. GoJto establishSupplychain:Materials need.sourced;to beobtained Communicatedto
commercially, themthat theyInformationsentto GoJ arepayersbyAnti C's,respirators,materials.From Mr.Hosono(GoJ) INPO throughAlHochevar OpenHochevar.
DueDate:4/2/11.ISTdevelopingspecs. Oneproposalcompleteand ISTtodevelop
Commercialheatexchangersystem that canbeusedtocoola beingsourcedthrough otherdesignspec4 pentfuelpoolwithdebrisin t. romMr.Hosono(GoJ). INPO MattGooder. Openoptions.
Tools/methodsformovingdamagedfuel,pluscontactsofthosewith DueDate:3/30/11.IST5 xperienceatTMI-2andChernobyl.FromMr.Hosono(GoJ). INPO isWorking Open6Shieldingforindividualroomsandforthe facilityin eneral INPO I 1 _-_
6:15PM9/18/2011 Page1 JapaneseGovernmentActionItems and Material RequestUst(tobe consideredduringConsortiumCalls) **DRAFT**
-
7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List
3/8
**DRAFT**JapaneseGovernmentAction Itemsand MaterialRequestList
Item Coordinating CurrentStatusand Open# ActionItemDescription Agency/POCExpectedtiming cmd Comments
Obtaincontactinformationforindustrypersonnelwithexperienceinhandlinganddisposalofopen pools/trenchesofhighdoserate DueDate:3/30/11.
7 >100R/hr)water.RcvdMar29fromAlHochevarfromMr.Hosono INPO WorkingwithIST..WestinghouseworkingontheUAVrequest andcoordinatingwith
8TexasA&M xpert INPOSAMGTechnicalDocument guidancehasbeensentto
INPOcontactinapanandis eingupdated(Rev1)andwillbediscussedat
1100 hrscalltoday;willincludeinjectionrateandbestassessmentto plantconditions;(needtoconfirmthatINPOhas
-9 _INFOreceived)
10GEHis ollowingup ontheNitrogenpurgeissue INPO .......This actionhas beenclosedout(Confirmhow
11GoJrequestforshielding INPO andbywhom?) ClosedDueDate:3/30/11.Ongoingproject;comments thatshiftfocusare received
during1100statuscall31292
13
ClarifyforRSTthe indicationsthatcanbe usedtoassessRPVintegrityandlocation ofcore,(RSTrequest)
Listalternative flowpathsthatcan be usedforpurging, givenaccessibilitychallenges.(RSTrequest)
INPO Open
Due Date:3/30/11.GEtoprovide3/29list,
INPOprovidingtechnicalINPO review Open
6:15PM9/18/2011 Page2 JapaneseGovernmentActionItems and Material RequestList(tobe considered duringConsortiumCalls) **DRAFT**
-
7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List
4/8
**DRAFT**JapaneseGovernment ActionItemsand MaterialRequestList
Item Coordinating CurrentStatusand Open# ActionRemDescription Agency/POC Expectedtiming Cosd Comments
DueDate:3/30/11.
Technical:Ongoingproject;commentsthatshiftfocusare received
ConfirmRSTrecommendationthatRPVinjection can bemaximizedonce during 1100statuscall14containmenthasbeenpurgedandvented,(RST INPO 3/29 Open
Therehasbeena equestfromGoJdirectlytoPacificNorthwestLabsfortechnicalassistancewithwaterdecontamination and TomMichenerstorage issues(thisrequestis otbeingcoordinatedthroughthe PNNL- DOENRC.Forfurtherinformationpleasecontact thePNNLPoint of LaboratoriesinContacts) WA
509-375-2162
WayneJohnson,
DivisionDirectorPNNL-DOE
LaboratoriesinWA
509-372-479112 1
Water BargesPerJ4 the bargeshave
beenoutfittedandtestedand are10hrsfromtheNPPsiteand should
13 J4/PACOM arriveWeds.NeedETA
6:15PM9/18/2011 Page3 JapaneseGovernmentActionItems andMaterialRequestUst(tobeconsideredduring ConsortiumCalls) **DRAFT**
-
7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List
5/8
**DRAFT'*JapaneseGovernmentAction Itemsand MaterialRequestList
Item Coordinating CurrentStatusand Open# ActionItemDescription AgencylPOC Expectedtiming Cosed Comments
Requestsformilitaryairtransport J4/PACOMPACOMis nvolvedinthereviewandapproval Firstchoiceofallrequestsfor shouldbemilitaryairifttoJapan. commercialRequestsshouldinclude carrierfortimelyweightand dimensions delivery;shouldofthe cargo limitrequeststo
materielthatisdifficult forcommercial
14 _carriers to deliveConductof aerialsurvey(forAMSmeasurements)(sharingofthe DOEwithNNSANRCwithNARACdataanditsanalysis) andNARACconductedaplausible
support doseassessmentwhichwillbeforwardedtoJapanaftergoingthroughthe approval
15 chain
Useofradiationmonitoringdeviceson theground(mobileand DOEwith16stationarytype) industrysupport
Conductofthesimulationbytheradiationdiffusionmodel DOE& RC17(comparisonwiththeSPEEDIsimulationbytheJapanside) PMT
Useofthegermaniumsemiconductordetectors(formeasuringthe18extentto whichwaterandfoodsareexposedtoradiation) DOE
6:15 PM9/18/2011 Page4 JapaneseGovernmentActionItemsand Material RequestList (tobe consideredduring ConsortiumCalls) **DRAFT"
-
7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List
6/8
**DRAFT**JapaneseGovernmentAction ItemsandMaterialRequestList
Item Coordinating CurrentStatusand OpenActionItemDescription Agency/POC Expectedtiming close Comments
Useofroboticdevices(formonitoring) DOE;DOD;
INPO INPOdiscussedinconferencecalltheyareinontactwithDr RobinMurphy,TexasA&M,aDisasterAssessmentExpertin oboticsandhas
19 offeredherservices
DOE; DOD;20 Useofroboticdevices(forrubbleremoval) INPO Seeabove21Useofthedata(image,level ofradiation)obtainedbyUAVs DOE;DOD
Useofunmannedhelicopter(K-MAX) J4??
A ockheedMartinasset($25Mcost).WillnotbeshippeduntilSeniorDefense Leadsagreetodoso. Discussionongoingat thePentagonbetween attorneysand
comptrollers.If equestapproved,preparationsbeingmadetoshipthis
22 resourceviamilitary air23 FreshwatersupplypumpsfromBechtel INPO?? Firsttrainin apan
Radsurveymeters;individualdosimeters,radioactivemeasuringinstruments,masksfor iodineadsorption,andseparationmaterials
24(quantityspecificationtobediscussedlater) INPO25Protectivebodyarmor ??
6:15PM9/18/2011 Page5 JapaneseGovernmentActionItemsand Material RequestList(tobe considered duringConsortiumCalls) **DRAFT**
-
7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List
7/8
-
7/28/2019 March 30th, 2011 - Japanese Government Action Items and Material Request List
8/8
.... ...... .
**DRAFT**JapaneseGovernmentActionItemsand MaterialRequestList
Item Coordinating CurrentStatusand open# ActionItemDescription Agency/POCExpectedtiming Closed Comments
NRC FromCabinet
Office CrisisJapanaskedforNRCexpertiseontemporaryshieldingoptions, to Managementdeterminewhetherthe NPPPlantbuildingsare strong enoughto TeamMeeting
33 holdupunderadditionalpressure notes,3/28/11Requestforthefollowing:2100units- RadSurveyMeters2500units- PersonalDosimetery5100units- iodine shieldingmasks
34 DOE Needstatusupdate35
36
6:15PM9/18/2011 Page7 Japanese GovernmentActionItemsandMaterialRequest Lst(tobe consideredduring ConsortiumCails)**DRAFT**