March 2011
Opening session: the Spanish TSO experience on renewable integration
Dirección de Operación
Contents
Spanish TSO presentation
Overview of the Spanish electric sector
Current regulatory framework of Spanish renewable units
Challenges
RED ELÉCTRICA DE ESPAÑAWho is Red Eléctrica?
Red Eléctrica de España (REE) is the Spanish transmission system operator (TSO)
REE is operating the mainland system and the island systems
REE was the first company in the world dedicated exclusively to power transmission and the operation of electrical systems.
RED ELÉCTRICA DE ESPAÑA
FREE-FLOAT
80%
Operates the system to guarantee the power supply.
Since 2006 also in the extra-peninsular systems
Designs, builds and maintains the transmission network.
Since 2007 as exclusive transmission company
Red Eléctrica de España (REE): Mission and principles.
SEPI: Spanish Stated Owned Holding Company
SEPI 20 %
SHARE CAPITAL (Aprox.):
4
Transmission GridMain magnitudes (SPPS)
Closure 2010
Lines400 kV [km ct] 18,576
220 kV [km ct] 17,221
Subst.Transformers 400/X kV [MVA] 69,059
220 & 400 kV [nº bays] > 3,500
It has proved fundamental for the fast and secure implementation of electricity market and integration of RES
RED ELÉCTRICA DE ESPAÑA
Spanish transmission system
Lines and cables Total 400kV 220kV Total 400kV 220kVNew ones [km] 12656 7488 5168 4465 3504 961Refitting [km] 8308 3850 4458 1730
Substations Total 400kV 220kV Total 400kV 220kVNew bays 3476 1163 2313New substations 399 106 293 39 20 19Extension of substations 405 76 329 59 18 41
Transformers Total 400 / 220 kV 400 / 132 kV Total 400 / 220 kV 400 / 132 kVAdditional capacity [MVA] 68540 52450 16090 5305 3500 1805
Reactances and Capacitors[MVAR] 3900 11002800
Whole planned infrastructureSpecific infrastructure planned to
integrate RES
220kV400kVTotal
Lines and cables Total 400kV 220kV Total 400kV 220kVNew ones [km] 12656 7488 5168 4465 3504 961Refitting [km] 8308 3850 4458 1730
Substations Total 400kV 220kV Total 400kV 220kVNew bays 3476 1163 2313New substations 399 106 293 39 20 19Extension of substations 405 76 329 59 18 41
Transformers Total 400 / 220 kV 400 / 132 kV Total 400 / 220 kV 400 / 132 kV
Additional capacity [MVA] 68540 52450 16090 5305 3500 1805
Reactances and Capacitors[MVAR] 3900 11002800
Whole planned infrastructureSpecific infrastructure
planned to integrate RES
220kV400kVTotal
REE: Spanish Transmission System Operator. 34000 km of lines and 60000 MW of transforming capacity. Spanish peak demands 45 GW and off-peak demands of 19-25 GW. Planned reinforcements 2009-2016, partly due to RES integration:
Highlighted lines correspond to planned lines from 2008-2016.
RED ELÉCTRICA DE ESPAÑASpanish inteconnection capacity
Limited interconnection capacity with France, security link with the European Interconnected system. In practice almost an “electrical
island”.
PO ES = 1,5%
FR ES =1,5%
Potencia Inst. ESPAÑA = 94 604 MW
MA ES = 0,6%
UE 10%05
101520253035404550Interconnection capacity compared to installed capacity
RED ELÉCTRICA DE ESPAÑA
7
Spanish energy context
The 20/20/20 European Strategy is the key driver of the Spanish energy model change
20 / 20 / 20 Strategy
The development of renewable energy
sources and the reduction in consumption
imply a reduction in GHG emissions.
Renewable energy integration into the
electric grid produces an improvement in
the system efficiency.
RED ELÉCTRICA DE ESPAÑA
Installed capacity January 2011Technology MW %
Hydro-power 16 657 17.5
Nuclear 7 .455 7.8
Coal 10.789 11.3
Fuel-Gas 1 849 1.9
Combined cycles 24.641 25.9
Total (ordinary regime) 61.391 64.3
Wind power generation 19976 20.9
Solar PV 3.634 3.8
Solar CSP 630 0.7
Biomass 684 0.7
Special regime hydro 1 965 2.1
Cogeneration 5 946 6.2
Waste treatment 1 204 1.3
Total (special regime) 33.791 35.7
Total 95.430
Hydro17,5%
Nuclear7,8%
Coal11,3%
Fuel-Gas1,9%
Combined cycle25,8%
Wind20,9%
Solar PV3,8%
Solar CSP0,7%
Mini-hydro2,1%
Biomass0,7%
Cogeneration6,2%
Waste Treat.1,3%
RED ELÉCTRICA DE ESPAÑA
260.230 GWh = 189.071 Net Ordinary Regime + 90.513 Net Special Regime
-4.412 Hydro-pump storage -8.338 International exchanges
Demand supply 2010
Special Regulation RegimeRenewable:
Minihydro
Biomass
Wind
Industrial waste
Urban waste
Solar
Non Renewable:
Cogeneration
Coal
Fuel - Gas oil
Refinery gas
Natural gas
Hydro-power14,0%
Nuclear21,6%
Coal7,6%
Fuel-Gas0,6%
Combined cycle23,0%
Wind15,6%
CHP and other RES
12,8%
Solar2,4%
Small Hydro2,40%
RED ELÉCTRICA DE ESPAÑAPresent wind power capacity and evolution
Renewable Energies’ Plan for Spain (August 2005): ~20,000 MW by the year 2010.
Official Network Planning for 2016 contemplates ~29,000 MW.
Renewable Energies Plan for Spain 2010-2020 ~38,000 MW.
10
183 428798
1.5252.298
3.4424.927
6.138
8.304
9.653
11.099
13.908
15.873
18.390
19.976
0
2.000
4.000
6.000
8.000
10.000
12.000
14.000
16.000
18.000
20.000
22.000
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
MW
Installed Wind power generation evolution 1996-2010
Installed Wind Capacity January 2011
kW/km2
RED ELÉCTRICA DE ESPAÑA
11
- Development of Spain-France Interconnection with a new 2 x 1000 MW DC underground line
-1st step for objective of 4.000 MW of commercial capacity-Necessary for building the IEM-Fundamental for RES integration in Spain -(& Portugal)
Development of the Spain-France Interconnection: A priority
500-
600
170
0-28
00
1200
-140
0 26
00-3
000
Spain –and Portugal- form a peninsula, also electrically, with weak electrical interconnections with the rest of European Union.
RED ELÉCTRICA DE ESPAÑA
Rights To deliver energy to the grid through the distribution company or to sell it
in the market receiving regulated retribution (regulated tariff or premium)
Priority of access to the grids.
To deliver all the produced energy
Duties To deliver energy in suitable conditions which doesn’t cause disruptions
in the system.
To be adhered to a generation control center. (Power Plants > 10 MW). This control center will be the intermediary and speaker with the System Operator
To carry out the rule about avoiding the problem of tension holes1. It’s a condition to receive the regulated tariff or premium.
Current regulation: RD 661/2007. Rights and Duties
(1) Operation Procedure 12.3. This is a problem which occurred with the old wind machines.
RED ELÉCTRICA DE ESPAÑA
Possibilities
To deliver the energy to transmission or distribution network with a regulated tariff (c€kWh)
To sell the energy in the market: Retribution= Market price + premium
Regulated tariff
Fixed amount of money for all periods for each type of energy
Hydroelectric, biomass, biogas: they could have hourly discrimination.
Market : Retribution= Reference Price + Premium
Cup and Floor are established for the total amount of price+ premium
Premium is variable: Total amount to receive > Cup and > Floor.
Power Plants >50MW must go the market
Economic Regime in current regulation: RD 661/2007
RED ELÉCTRICA DE ESPAÑA
0
20
40
60
80
100
120
140
0 10 20 30 40 50 60 70 80 90 100 110 120
(€/M
Wh
)
Marginal Market Price (€/MWh)
Wind Market Price (€/MWh) Wind Bonus (€/MWh) Fixed tariff price
Market integration of wind energy
Possibility of accessing the daily wholesale market and updating the schedules in the intra-day markets according to new production forecasts.
As for any type of generation, agents are penalized for their deviations and pay for the balancing energy needed to counteract their deviation.
Reserve bands are calculated by the TSO and paid by the final consumers.
14
RED ELÉCTRICA DE ESPAÑA
For renewable energy there is a retribution table for the first 25 year and other for after.
After 25 years
For photovoltaic it isn’t possible to go to the market, there is only tariffs:
RD 661/2007. Economic Regime
c€/kWh Superior Inferior
Wind Onshore 7.8183 3.1273 9.0692 7.6098Wind Offshore 9.0004 16.9494
Regulated Tariff
Reference Premium
Limits
c€/kWhWind Onshore 6.5341Wind Offshore
Regulated Tariff
<100 kW 47.0181100 kW-10 MW 44.575110-50 MW 24.5311
Fotovoltaic c€/kWh
RED ELÉCTRICA DE ESPAÑA
Recently, National regulation oriented to control of generation to be connected per year,
securing economic and technical sustainability
RD1578/2008 for Solar FV, extending RD661 objectives with quotas of 500-400 MW per year with progressive reduction of tariffs
emphasis on roof plants over floor plants
RDL6/2009 for the rest of SRG, establishing quotas per year for plants to be commissioned (upto ≈ 2,5 GW Solar Thermal in 2013; upto ≈ 23 GW WP in 2012), demonstrating some pre-requisites:
Access and connection authorization issued by REE or distribution company
Administrative authorization for power plants > 100 kW
License for Commissioning
Deposit of a bank guarantee (for wind: 20€/kW; for Solar Thermal: 100€/kW)
Financial resources at least for 50% of the total
Purchase -or contract- at least for 50% of the equipment
Authorisation for gas access and water supply (when applicable)
Recent modifications of regulation for SRG
RED ELÉCTRICA DE ESPAÑA
Installed power: It will be updated every year The Register of Pre-establishment of retribution is created to enter all of the
requested power plants.
A quota of installed power is established for the first year and it will be updated. First year:
Facades: 267 MW
Floor : 133 MW
Retribution:
Photovoltaic updatings. RD 1578/2008
c€/kWhType I <20 kW 34 <100 kW 47.0181
>20 kW 32 100 kW-10 MW 44.5751Type II All 32 10-50 MW 24.5311
RD 1578/2008 RD 661/2007
RED ELÉCTRICA DE ESPAÑA
R.D 2366/1994, establishes a new regulation for special regime R.D 2366/1994, establishes a new regulation for special regime
R.D. 2818/1998, adequates special regime regulation to new Act 54/97, of electric power system
R.D. 2818/1998, adequates special regime regulation to new Act 54/97, of electric power system
R.D. 841/2002, regulates and incentives special regime participation in generation market
R.D. 841/2002, regulates and incentives special regime participation in generation market
1994
2002
2004
1998
1980
Development of Special Regime Regulation
2007
2008
Act 82/1980, determines, for the first time, distributors obligation of purchasing renewable energy at a regulated price forAct 82/1980, determines, for the first time, distributors obligation of purchasing renewable energy at a regulated price for
R.D. 436/2004, merges all the existing regulationa and defines a new economical framework for special regimen
R.D. 436/2004, merges all the existing regulationa and defines a new economical framework for special regimen
R.D. 661/2007, updates economical and legal framework for special regime generation, including installed power goals
R.D. 661/2007, updates economical and legal framework for special regime generation, including installed power goals
R.D.1578/2008, modifies, reducing incentives and increasing requirementts, fotovoltaic energy regulation
R.D.1578/2008, modifies, reducing incentives and increasing requirementts, fotovoltaic energy regulation
R.D.6/2009, creates a special registration mechanism in order to reach the objectives of installed power in an efficient way
R.D.6/2009, creates a special registration mechanism in order to reach the objectives of installed power in an efficient way 2009
RED ELÉCTRICA DE ESPAÑA
Payment of Technical Services
Units which deviate from their programs
Deficits and surpluses are paid by final demand proportionally to metered energy (excepting pumping units and exports)
UPWARD UPWARD
UNBALANCESUNBALANCES
(less consumption,
more generation)
Receive DMPReceive minimum of:•DMP•Average price of DOWNWARD energy used (SR + TR + DM)
DOWNWARD DOWNWARD
UMBALANCESUMBALANCES
(more consumption,
less generation)
Pay DMPPay Maximum of: • DMP• Average price of UPWARD energy used (SR + TR + DM)
IN FAVOUR OF THE IN FAVOUR OF THE SYSTEMSYSTEM IN OPOSSITION TO THE SYSTEMIN OPOSSITION TO THE SYSTEM
TECHNICAL TECHNICAL CONSTRAINTSCONSTRAINTS
SECONDARY SECONDARY RESERVERESERVE
Final demand depending on the metered energy
(excepting pumping units and exports)
SECONDARY SECONDARY ENERGYENERGY
TERTIARY TERTIARY ENERGYENERGY
DEVIATION DEVIATION MANAGEMENTMANAGEMENT
RED ELÉCTRICA DE ESPAÑA
Influence of solar photovoltaic in system operation 2% of the total energy demand in 2009. Present installed capacity: 3 392 MW. Reduced observability by the SO. Must be solved. Behavior in summer in accordance to demand requirements. In winter, peak demand is in the evening. No contribution. Connection to Transmission/Distribution: 2/98%
YEARSOLAR PV PRODUCTION
(GWh)
2005 40
2006 103
2007 466
2008 2 477
2009 5 347
Source CNE
RED ELÉCTRICA DE ESPAÑAIntegration of solar thermoelectric in system operation
Present installed capacity 481 MW. In the short term: increase of 500 MW per year. Two technologies: parabolic trough and tower. Connection to Transmission/Distribution: 63/37%
Year 2007: first commercial solar thermoelectric plant installed (PS-10) Installed capacity: 11 MW (as a part of the
Solucar project with expected 300 MW en 2013).
Generated energy in 2009 : 125 GWh. Planning 2010-2012: 500 MW per year of new installed capacity. Positive correlation with demand in summer. In winter molten salt storage and hybridation with natural gas allow production
during the daily load peaks becoming mostly manageable generation.
Planta PS-10
21
RED ELÉCTRICA DE ESPAÑA
Legal framework (I)
Definition of Special Regime Law 54/1997
Article 27: Special regime of electricity generation
Electricity generation activities shall be regarded as generation under the special regime system in the following cases whenever they are carried out from installations whose installed power is no greater than 50 MW:
Cogeneration or other forms of electricity generation associated with non-electricity operations, provided they involve high efficiency output
Whenever non-consumable renewable energies, biomass or biofuels of any type are used as primary energy, provided their holder does not engage in generation activities under the ordinary system
Whenever non-renewable waste is used as primary energy
22
RED ELÉCTRICA DE ESPAÑA
Legal framework (II)
Royal Decree 661/2007 Legal and economic framework for Special Regime production which
includes: Type of installations that can be considered as Special Regime
Procedure to include plants in the Special Regime Register
Rights and obligations of the Special Regime producers
Priority of dispatch over conventional generation
Market integration. Two options:
Regulated rate: Constant feed-in tariff per MWh produced
Selling the electricity on the electricity production market: price established in the day-ahead and intraday organised market (OMEL) or the price that has been freely negotiated by the owner or the installation representative (bilateral contract), complemented by a premium dependent on the technology of the installation.
Economic framework
Requirements to participate in the system adjustment services
Cost of deviations
23
RED ELÉCTRICA DE ESPAÑA
Art 24.1.a: Sell trough distributor or transport grid
Feed-in tariff
For some technologies (CHP, mini-hydro, biomass…) depends on the periods they generate.
Reactive energy supplement
If P>=10MW units may receive instructions from the OS
High efficiency supplement (for CHP)
Supplement for voltage dip ride through capabilities (maximum period 5 years, until 31/12/2013) For wind only.
Art 24.1.b: Sell in the electricity energy production market
Price of the organized market
Premium:
For renewable energies: With upper and lower limits for the sum of the reference market price an the reference premium
For non renewables: Fixed premium
Reactive energy supplement
If P>=10MW may receive instructions from the operator of the system.
High efficiency supplement (for CHP)
Supplement for voltage dip ride through capabilities (maximum period 5 years, until 31/12/2013) For wind only.
Economic Framework (I)
24
RED ELÉCTRICA DE ESPAÑA
Art 24.1.a: Sell through distributor or transport grid
Directly or through a representative or trader
Cost of deviations
If have the duty to have hourly measuring equipment: As established in PO 14.4
If not: exempt
Participation in the system adjustment services
Mandatory ones: Such as “Technical constraint management”Technical constraint management”
Art 24.1.b: Sell in the electricity energy production market
Directly or through a representative or trader
Cost of deviations
As established in PO 14.4
Participation in the system adjustment services
Mandatory ones: Such as “Technical constraint management”Technical constraint management”
Manageable installations may participate in optional services (subject to prior authorization by the administration and technical authorization by the SO)
Economic framework (II)
25
RED ELÉCTRICA DE ESPAÑA
Challenges
The current high penetration of RES must be significantly increased due to ambitious national objectives (2020: 20% of Efinal ≈ 40% Eelectric)
• Market/Regulatory changes
• TSO management of new RES connections
(queues mangement) and tests for more
dispatchable resources
•Technical Requirements (voltage dips, freq.
regulation, voltage control, …)
Technical challenges motivated by particular features of new generation:
Location far from load and sometimes grid
Vulnerability to incidents(voltage dips)
Primary energy: Lack of firmness and control
* Power installed Dec 2010** NAP for 2020 submitted to EC in June10
(Under review)
38.000 MW** 8.367 MW** 5.079 MW**
19.975 MW* > 3.500 MW* 630 MW*