Transcript of Manufacturing planning control
-
7/23/2019 Manufacturing planning control
1/59
5-1
Agenda (CH 5)- P 152
-
7/23/2019 Manufacturing planning control
2/59
5-2
Manufacturing Planning
and Control MPC 6thEdition
Chapter 5
Rememer!!!!!!
-
7/23/2019 Manufacturing planning control
3/59
5-3
Ma"ter Production
#cheduling
An effecti$e Ma"ter Production #chedule(MP#) pro$ide" a"i" for ma%ing good u"e of &
manufacturing re"ource"' ma%ing cu"tomer deli$er promi"e"'
re"ol$ing trade-off" eteen "ale" and'
manufacturing* and attaining the firm+" "trategic o,ecti$e"' a"
reflected in the #ale" and peration" plan.
-
7/23/2019 Manufacturing planning control
4/59
5-4
Ma"ter Production #cheduling
and the Manufacturing
Planning and Control #"tem
/he MP# i" a "tatement of the "pecific
product" that ma%e up manufacturing output /he MP# i" a tran"lation of the "ale" and
operation" plan into producile product" ith
their timing and 0uantitie" determined /he MP# "ho" hen product" ill e
a$ailale in the future
-
7/23/2019 Manufacturing planning control
5/59
5-5
MP# and the u"ine""
En$ironment (p 15)
In a make-to-stock compan' the MP# i" a
"tatement of ho much of each end item to e
produced and hen it ill e a$ailale In a make-to-order (or engineer-to-order)
firm' the MP# i" u"uall defined a" the "pecific
end item(") that ma%e up an actual cu"tomer
order
In an assemble-to-order firm' the large
numer of po""ile product comination" i"
repre"ented ith a planning ill of material"
-
7/23/2019 Manufacturing planning control
6/59
5-6
Attriute" of the Ma"ter
Production #chedule
/he MP# i" a "tatement of production' not of demand
/he MP# i" not a foreca"t /he MP# con"ider" factor" "uch a" capacit con"traint"'
co"t" of production' re"ource limitation"' and the "ale" and
operation" plan
/he MP# i" "tated in term" of product "pecification"3u"uallpart numer" hich ha$e "pecific ill" of material" (M)
4n a""emle-to-order en$ironment"' the MP# ma e "tated
in term" of an a$erage final product
-
7/23/2019 Manufacturing planning control
7/595-7
MP# and 7uture utput (p 158)
#tatement of the Planned output
#pecifie" product"9 product option"
/ime of completion Ho product ill e "upplied to meet
future demand
:ifferent from foreca"t& Account"capacit planning' co"t of production'
re"ource
-
7/23/2019 Manufacturing planning control
8/595-8
Ma"ter Production
#cheduling ;in%age"
/he MP# i" the dri$er of all detailed
manufacturing acti$itie" need to meet output
o,ecti$e" /he MP# i" the a"i" for %e inter-functional
trade-off"
Production and "ale" 7inancial udget" "hould e integrated ith
MP# acti$itie"
-
7/23/2019 Manufacturing planning control
9/595-9
MP# in the MPC #"tem-fig
5.1 pg 155
Re"ource
planning
#ale" and operation"
planning
:emand
management
Ma"ter production"cheduling
:etailed material
planning
Ent
erpri"eRe"ourc
ePlanning(ERP
)#"tem
Front End
Engine
Rough-cut capacit
planning
-
7/23/2019 Manufacturing planning control
10/595-10
PoerPoint pre"entation toaccompan Hei 2?? Prentice Hall' 4nc.' @pper #addleRi$er' .B. ?=55-1?
Engineering :raing" -#ho :imen"ion"'
/olerance"' etc. (not in teDt)
-
7/23/2019 Manufacturing planning control
11/59
5-11
A""eml :raingA""eml :raing
#ho" eDploded#ho" eDploded$ie of product$ie of product
:etail" relati$e:etail" relati$elocation" to "holocation" to "hoho to a""emleho to a""emlethe productthe product
7igure 5.11 (a)7igure 5.11 (a)
-
7/23/2019 Manufacturing planning control
12/59
5-12
PoerPoint pre"entation toaccompan Hei 2?? Prentice Hall' 4nc.' @pper #addleRi$er' .B. ?=55-12
Bill of MaterialP/N:1??? Name:ic(cleP/N Desc Qty Unitse!el
1??1 Handlear" 1 Each 11??2 7rameA""( 1 Each 11??8 heel" 2 Each 21?? 7rame 1 Each 2
Bill of MaterialP/N:1??? Name:ic(cleP/N Desc Qty Unitse!el1??1 Handlear" 1 Each 11??2 7rameA""( 1 Each 11??8 heel" 2 Each 21?? 7rame 1 Each 2
> 1FF5 Corel Corp.
ill of Material EDample (not in teDt)
N i ) Bill f M i lN t i ) t Bill f M t i l
-
7/23/2019 Manufacturing planning control
13/59
5-13
PoerPoint pre"entation toaccompan Hei 2?? Prentice Hall' 4nc.' @pper #addleRi$er' .B. ?=55-18
ill of Material for a Panel eldment Hard Roc% CafG+" Hic%or
acon Chee"eurger
umer :e"cription t
:e"cription t
"#$-%& Panel 'eldm(t 1 un
Hamurger Patt
Cheddar Chee"eacon
nion"
Hic%or #auce
urger #et
;ettuce
/omato
Red nion Pic%le
7rench 7rie"
#ea"oned #alt
11-inch Plate
HRC 7lag
1
o
-
7/23/2019 Manufacturing planning control
14/59
5-14
Part" grouped into familie" ith
"imilar characteri"tic"
Coding ""tem de"crie" proce""ingand ph"ical characteri"tic"
Part familie" can e produced
in dedicated manufacturing cell"
Jroup /echnologJroup /echnolog
-
7/23/2019 Manufacturing planning control
15/59
5-15
Jroup /echnolog #chemeJroup /echnolog #cheme
7igure 5.1?7igure 5.1?
(a) @ngrouped Part"() Jrouped Clindrical Part" (familie" of part")
Jroo$ed #lotted /hreaded :rilled Machined
-
7/23/2019 Manufacturing planning control
16/59
5-16
1. 4mpro$ed de"ign
2. Reduced ra material and purcha"e"
8. #implified production planning and control. 4mpro$ed laout' routing' and machine
loading
5.
Reduced tooling "etup time' or%-in-proce""' and production time
Jroup /echnolog enefit"Jroup /echnolog enefit"
-
7/23/2019 Manufacturing planning control
17/59
5-17
Cla""
Prepare a ill-of-material for a ham and chee"e "andich' "pecif uantit andle$el".
-
7/23/2019 Manufacturing planning control
18/59
5-18
PoerPoint pre"entation to
accompan Hei 2?? Prentice Hall' 4nc.' @pper #addle
Ri$er' .B. ?=55-1
Practice Prolem" (ne po""ile Kan"er)
read 2 "lice"
Ham 1 "lice
#i"" Chee"e 1 "lice
;ettuce 1926 head of lettuceMu"tard 2 tea"poon
Pic%le reli"h 1 tea"poon
Paper plate 1
Paper nap%in 1
-
7/23/2019 Manufacturing planning control
19/59
5-19
Ma"ter Production #cheduling
Proce"" and /echni0ue"
-
7/23/2019 Manufacturing planning control
20/59
5-20
:etermine "uppl and demand relation"hip"
o$er time (time-pha"ed record)- p15=
eginning alance (could e alance from
t-1' or if it i" fir"t period (on hand)L MP#-
7oreca"t
Chec% if polic i" met alance if not relea"e
order to MP#.
MP#&
#trateg to meet demand ;e$el ' cha"e'etc .
;ot "i
-
7/23/2019 Manufacturing planning control
21/59
5-21
PA calculation" (refer to
page 15=
First .eriod (on hand in$entor 4 t-1)' to 7tif le"" N and alance
for PA.' if no launch MP# at "pecified period and realance.
For ot/er .eriods:
eginning alance from t-1LMP#- O7oreca"t
O i" it le"" than "pecified amountQ4f e" alance a"& Leginning alance (could e alance from t-
1' or if it i" fir"t period on hand)L MP# -7Q4f no launch MP# at "pecified period and realance.
-
7/23/2019 Manufacturing planning control
22/59
5-22
#ummar of 7igure"
7ig 5.2- MP# relea"e "cheduled lot "i
-
7/23/2019 Manufacturing planning control
23/59
5-23
7ig 5.2 ("pecified MP#-Pg 15=
pat& lot "i
-
7/23/2019 Manufacturing planning control
24/59
5-24
/ime-Pha"ed Record (p 15=).fig 5.2 A mean" of gathering and di"plaing critical "cheduling information
(7oreca"t' a$ailale "toc%' production "chedule)-K "ee page 15=
n hand
Period
1 2 8 5
7oreca"t 5 5 1? 15
Pro,ected a$ailale alance 2? 25
O52?1?-------25
8?
O5251?-------8?
82
O8?1?-------82
82 2=
Master .rod,ction sc/ed,le 0e!el1 &$ &$ &$ &$ &$
-
7/23/2019 Manufacturing planning control
25/59
5-25
7ig 5.2 ("pecified MP#-Pg. 15=
pat& lot "i
-
7/23/2019 Manufacturing planning control
26/59
5-26
MP# Proce""3ith ;ot #i
-
7/23/2019 Manufacturing planning control
27/59
5-27
Ccle #toc%
ote& 4n 7igure 5.8' if e did not produce anther atch in period 8'
in$entor ould drop to to unit" and ould e elo our "afet "toc%
le$el.
e therefore "chedule a lot of 8? unit" to e produced in period 8 to
repleni"h in$entor.
Manufacturing u"ing a lot "i
-
7/23/2019 Manufacturing planning control
28/59
5-28
Re$i"ing the MP#-fig5.
fig 5.5 page 15F
5.
Period 2 3 6 plan (onhand)
Period
2 8 5 6
7oreca"t 2? 2? 2? 15 2?
Pro,ected
a$ailale alance
1? O2?
PA1?O2?MP#8?1?
8?
1?
1? 25
5
Ma"ter production "chedule 8? 8? 8?
;ot "i
-
7/23/2019 Manufacturing planning control
29/59
5-29
After 74J 5.5 Modification
ue"tion"
/he re$i"ion "hon in 7igure 5.5 "ol$e" the prolem of pro,ected negati$e a$ailale in-
$entor ut put" in clear focu" the 0ue"tion of fea"iilit.
ue"tion"&
:oe" the compan ha$e thecapacit to immediatel produce a atch that a" originall
"cheduled for period 8
Can the compan produce atche" in to con"ecuti$e period" in the future 4" material
a$ailale to meet the re0uirement" of thi" "chedule
7urthermore' high co"t" are tpicall a""ociated ith ma%ing production change".
/he ma"ter production "chedule "hould e uffered fromo$erreaction' ith change" made onlhen e""ential.
-
7/23/2019 Manufacturing planning control
30/59
5-30
P6-pg 1=1-Calculate PA and
MP# gi$en . ;ot "i
-
7/23/2019 Manufacturing planning control
31/59
5-31
PA calculation" (refer to
page 15=
First .eriod (on hand in$entor 4 t-1)' to 7tif le"" N and alance
for PA.' if no launch MP# at "pecified period and realance.
For ot/er .eriods:
eginning alance from t-1LMP#- O7oreca"t
r O i" it le"" than "pecified amount 4f prolem
"pecifie" (##)etc.Q4f e" alance a"& Leginning alance (could e alance from t-1' or if it i" fir"t period on hand)L MP# -7
Q4f no launch MP# at "pecified period and realance.
-
7/23/2019 Manufacturing planning control
32/59
5-32
A/P Concept
7or man product"' cu"tomer" do not eDpect immediate
deli$er' ut place order" for future deli$er.
/he deli$er date (promi"e date) i" negotiated through a
ccle of order promi"ing' the cu"tomer either a"%" henthe order can e "hipped or "peciTe" a de"ired "hipment
date.
4f the compan ha" a ac%log of order" for future
"hipment"' the order promi"ing ta"% i" to determine henthe "hipment can e made. rder promi"ing can e
coordinated ith production "chedule" u"ing a concept
%non a" a$ailale-to-promi"e (A/P).
-
7/23/2019 Manufacturing planning control
33/59
5-33
A$ailale-to-Promi"e
hen immediate deli$er i" not eDpected (or
i" not po""ile due to "toc%out")' a promi"ed
deli$er date mu"t e e"tali"hed /he order promi"ing ta"% i" to determine
hen the "hipment can e made
A$ailale-to-promi"e (A/P) procedure"coordinate order promi"ing ith production
"chedule"
-
7/23/2019 Manufacturing planning control
34/59
5-34
PA-Calculation" hen
order" oo%ed- p 1?
-
7/23/2019 Manufacturing planning control
35/59
5-35
P 16? ("ee neDt "lide)
5.6 & :i"crete A/P
5.= & Cumulati$e A/P
-
7/23/2019 Manufacturing planning control
36/59
5-36
P16?Ucalculate e$er period
in Hori
-
7/23/2019 Manufacturing planning control
37/59
5-37
PA-Pg 16?
:i"crete A/P& Prior alance.
7or p1& on hand
MP# -O#um (all ordersin period" till neDt MP#
7or other period"
MP#
-O#um (all ordersin period" till neDt MP#KKKKKKKnote& for other period" than fir"t calculation doe" not include Prior alance' ote a"ed on order" not
foreca"t an more
-
7/23/2019 Manufacturing planning control
38/59
5-38
A$ailale-to-Promi"e ;ogic3
:i"crete (p 16?)-fig 5.6
:i"crete A/P treat" each period independentl
Period
n hand 1 2 8 5
7oreca"t 5 5 1? 15
rder" 5 8 2 ? ?
Pro,ected a$ailale alance 2? 15 1? 82 22 =
A$ailale-to-promi"e 12 2
Ma"ter production "chedule 8?
;ot "i
-
7/23/2019 Manufacturing planning control
39/59
5-39
Cumulati$e A/P-
ote "u"e0uent i" a"ed on MP# occurrence&
2. A/P calculation" (cumulati$e logic).
7or the Tr"t period'
A/P L n-hand L MP# - #um of the order" until theneDt MP#.
7or each period hen a "u"e0uent MP# occur"'A/P Pre$iou" A/P L MP# - #um of the order until
the neDt MP#.
-
7/23/2019 Manufacturing planning control
40/59
5-40
P6-pg 1=1-Calculate PA and
MP# gi$en . ;ot "i
-
7/23/2019 Manufacturing planning control
41/59
5-41
A$ailale-to-Promi"e ;ogic3
Cumulati$e (p 16?)
5.= Cumulati$e A/P carrie" A/P unit" forard
Period
n hand 1 2 8 5
7oreca"t 5 5 1? 15
rder" 5 8 2 ? ?
Pro,ected a$ailale alance 2? 15 1? 82 22 =
A$ailale-to-promi"e 12 KMP#occur"
?
Ma"ter production "chedule 8?
;ot "i
-
7/23/2019 Manufacturing planning control
42/59
5-42
Cumulati$e A/P-
ote "u"e0uent i" a"ed on MP# occurrence&
2. A/P calculation" (cumulati$e logic).
7or the Tr"t period'
A/P L n hand L MP# - #um of the order" until theneDt MP#.
7or each period KKKhen a "u"e0uent MP# occur"'A/P Pre$iou" A/P(hen la"t time calculated) L
MP# - #um of the order until the neDt MP#.
-
7/23/2019 Manufacturing planning control
43/59
5-43
A/P3Con"uming the
7oreca"t (p 161)
4n the A/P calculation' demand i" con"idered to
e the maDimum of foreca"t and actual cu"tomer
order"/hi" i" a con"er$ati$e approach
A""ume" that e ill e$entuall "ell at lea"t the
foreca"t 0uantit
Ad,u"t" for period" here demand eDceed" the
foreca"t
P 161 i th f t d
-
7/23/2019 Manufacturing planning control
44/59
5-44
Page 161& con"uming thru foreca"t a"ed on
con"er$ati$e approach& ne order"
Can e accept "ee fig 5. neDt "lide 5 oder" in
period 1 deli$ered.e order" in Period 2 a"&
-
7/23/2019 Manufacturing planning control
45/59
5-45
ithout
doing anthing
-
7/23/2019 Manufacturing planning control
46/59
5-46
ote& A/P di"crete $". Cumulati$e
#ee note" page" 161S162 Another atch WP5
:i"crete A/P&
-
7/23/2019 Manufacturing planning control
47/59
5-47
MP# in A""emle-to-rder
En$ironment" ( P168)
4n an a""emle-to-order (A/) en$ironment' the
po""ile comination" of end item" can e huge
#pecific end item ill" of material" (M) arereplaced ith a planning ill of material"' hich
repre"ent" the potential product comination"
ne tpe of planning M i" the s,.er bill'
hich de"crie" the u"age of option" and
component" that ma%e up the a!erageproduct.
-
7/23/2019 Manufacturing planning control
48/59
5-48
Panning in A""emle to rder
(p168) MP# can not e a"ed on end item.&u"ed modular option comination to ma%e end item
-
7/23/2019 Manufacturing planning control
49/59
5-49
#uper ill of Material"
Part" u"ed in
allconfiguration"
are li"ted ith
u"age
proailit of
1.?
Mutuall eDclu"i$e
option "et" are li"tedtogether' ith a u"age
proailit for each
option
#afet("toc
%a"or"
$ariation"
inactualm
iD
-
7/23/2019 Manufacturing planning control
50/59
5-50
A$ailale-to-Promi"e ;ogic
ith Planning M
Common Part"
A$ailale
Jear
A$ailale
/alor
A$ailale
oo% order
/r 1 period
later
o
o
o
Xe"
Xe"
Xe"
Are the common
part" on the M
a$ailale
4" the re0ue"ted
gear option
a$ailale
4" the re0ue"ted
/alor optiona$ailale
-
7/23/2019 Manufacturing planning control
51/59
5-51
/o-;e$el Ma"ter
Production #chedule" hen a planning M i" u"ed' a final a""eml "chedule
(7A#) i" often u"ed
#tate" the "et of end product" to e uilt o$er a time period
/o-le$el MP# coordinate" component production and the7A#
Component production i" controlled aggregate
production plan in the 7A#
7inal a""eml i" controlled the 7A#
Either di"crete or cumulati$e A/P logic can appl
-
7/23/2019 Manufacturing planning control
52/59
5-52
#uper ill P 16=
-
7/23/2019 Manufacturing planning control
53/59
5-53
:i"crete A/P ith a /o-;e$el
Ma"ter Production #chedule
-Hor"epoer /iller" (Aggregate) Period
n hand 1 2 8 5
Production Plan 1?? 1?? 1?? 1?? 1??rder" 1?? =2 5 ? ?
Pro,ected a$ailale alance ? ? ? ? ? ?
A$ailale-to-promi"e ? 2 6 1?? 1??
Ma"ter production "chedule 1?? 1?? 1?? 1?? 1??
#afet "toc% ?
/alor rand -HP /iller" (7A#) Period
n hand 1 2 8 5
7oreca"t for model (?Y of total) ? ? ? ? ?
rder" 2 8= 28 ? ?
Pro,ected a$ailale alance 1?
A$ailale-to-promi"e 2? ?
Ma"ter production "chedule ? ? ?
;ot "i
-
7/23/2019 Manufacturing planning control
54/59
5-54
#uper ill& A/P Cumulati$e(p16)
-
7/23/2019 Manufacturing planning control
55/59
5-55
Ma"ter Production #chedule
#tailit
A "tale MP# tran"late" to "tale
component "chedule"
#tailit allo" impro$ed plant performance EDce""i$e MP# change" can lead to
reduced producti$it
7ailure to change the MP# can lead toreduced cu"tomer "er$ice and increa"ed
in$entor (failure to react)
-
7/23/2019 Manufacturing planning control
56/59
5-56
7ree
-
7/23/2019 Manufacturing planning control
57/59
5-57
Managing the Ma"ter
Production #chedule
/o e controlled' the MP# mu"t e reali"tic
People "hould onl e held accountale for
attainale performance le$el" #tailit and uffering are important
/he MP# mu"t not e o$er"tated
#um of the MP# "hould e0ual theproduction plan
-
7/23/2019 Manufacturing planning control
58/59
5-58
Principle"
/he MP# unit "hould reflect the u"ine""
en$ironment and the compan+" cho"en approach.
4f a common ERP dataa"e i" implemented' the
MP# function "hould u"e that data. Regardle"" of the firm+" en$ironment' effecti$e
"cheduling i" facilitated common ""tem"' time-
pha"ed proce""ing' and MP# techni0ue". Cu"tomer order proce""ing "hould e clo"el lin%ed
to MP#.
-
7/23/2019 Manufacturing planning control
59/59
Principle"
A/P information "hould e deri$ed from the
MP# and pro$ided to the "ale" department.
An 7A# "hould e u"ed to con$ert theanticipated uild "chedule into the final uild
"chedule.
/he ma"ter production "cheduler "hould
en"ure that the "um of the part" (the MP#) i"
e0ual to the hole (the operation" plan).