Manual: Distribution Substation Manual (DSM) Section 3: Substation Arrangements Standard Number: HPC-5DA-07-0003-2012
DM# 3666729 Page 2 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
Document Control
Author Name: Viswa Easwaran
Position: Standards Engineer
Document Owner
(May also be the Process Owner)
Name: Justin Murphy
Position: Manager Asset & Works
Approved By * Name: Justin Murphy
Position: Manager Asset & Works
Date Created/Last Updated July 2013
Review Frequency ** 3 yearly
Next Review Date ** July 2016
* Shall be the Process Owner and is the person assigned authority and responsibility for managing the whole process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business results.
** Frequency period is dependent upon circumstances– maximum is 5 years from last issue, review, or revision whichever is the latest. If left blank, the default shall be 1 year unless otherwise specified.
Revision Control
Revision Date Description
0 12/07/2013 Original Issue Document
STAKEHOLDERS The following positions shall be consulted if an update or review is required:
Manager Assets & Works
Manager Engineering Services
Manager Engineering Systems Planning
DM# 3666729 Page 3 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
TABLE OF CONTENTS
1 PURPOSE .................................................................................................... 4
2 SCOPE ......................................................................................................... 4
3 CONTENTS .................................................................................................. 5 3.1 Index of Drawings ................................................................................................. 5
4 REFERENCE DOCUMENT .......................................................................... 6
5 REVISION INFORMATION .......................................................................... 7
DM# 3666729 Page 4 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
1 PURPOSE
This Standard specifies the arrangements for Land, Equipment and Clearances in relation to Substations used on Horizon Power Distribution networks.
This Standard supersedes the Western Power Document (record DMS# 4122965] previously in use by Horizon Power since disaggregation.
2 SCOPE
This Standard covers the following range of equipment:
District Substations – Non Fire Rated which is defined in the Distribution Design Manual Vol 3 sections 12.1, 12.2 and 14;
District Substations – Fire Rated which is defined in the Distribution Design Manual Vol 3 sections 12.1, 12.2 and 14;
Sole Use Substations – Non Fire Rated which is defined in the Distribution Design Manual Vol 3 sections 12.1, 12.3 and 14;
Sole Use Substations – Fire Rated which is defined in the Distribution Design Manual Vol 3 sections 12.1, 12.3 and 14;
Customer Owned Substations which is defined in the Distribution Design Manual Vol 3 sections 12.1, 12.4 and 14.
50 kVA / 63 kVA District Substation; and
MV Switchgear Substation.
DM# 3666729 Page 5 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
3 CONTENTS
3.1 Index of Drawings
Drawing Number Drawing Title
District Substations – Non Fire Rated
DSM-3-01 Up To 630 kVA (MPS) - Without MV Switchgear
DSM-3-02 Up To 630 kVA / 33 kV (MPS) - With MV Switchgear
DSM-3-03 Up To 1000 kVA (Non MPS & MPS) - Without MV Switchgear
DSM-3-04 Up To 1000 kVA (Non MPS) - With MV Switchgear
DSM-3-05 Up To 2000 kVA (Non MPS) - Without MV Switchgear
DSM-3-06 Up To 2000 kVA (Non MPS) - With MV Switchgear
District Substations – Fire Rated
DSM-3-07 Up To 1000 kVA (Non MPS) - Without MV Switchgear
DSM-3-08 Up To 1000 kVA (Non MPS) - With MV Switchgear
DSM-3-09 Up To 2000 kVA (Non MPS) - Without MV Switchgear
DSM-3-10 Up To 2000 kVA (Non MPS) - With MV Switchgear
Sole Use Substations – Non Fire Rated
DSM-3-11 Drawing Number Not Used
DSM-3-12 Drawing Number Not Used
DSM-3-13 Up To 1000 kVA (Non MPS) - Without MV Switchgear
DSM-3-14 Up To 1000 kVA (Non MPS) - With MV Switchgear
DSM-3-15 Up To 2000 kVA (Non MPS) - Without MV Switchgear
DSM-3-16 Up To 2000 kVA (Non MPS) - With MV Switchgear
Sole Use Substations – Fire Rated
DSM-3-17 Up To 1000 kVA (Non MPS) - Without MV Switchgear
DSM-3-18 Up To 1000 kVA (Non MPS) - With MV Switchgear
DSM-3-19 Up To 2000 kVA (Non MPS) - Without MV Switchgear
DSM-3-20 Up To 2000 kVA (Non MPS) - With MV Switchgear
DSM-3-21 Up To 4000 kVA (Non MPS) - With MV Switchgear
Customer Owned Substations
DSM-3-22A MV Indoor Ground Mounted Schneider Switchgear
DSM-3-22B MV Indoor Ground Mounted Schneider Switchgear
DSM-3-23 MV Outdoor Ground Mounted Switchgear
DSM-3-24 MV Outdoor Overhead Switchgear – MV Installation
50 kVA / 63 kVA District Substations
DSM-3-25 50 kVA Non MPS, Non Fire Rated - Without MV Switchgear
DSM-3-26 63 kVA Non MPS, Non Fire Rated - Without MV Switchgear
HV Switchgear Substation
DSM-3-27 Extensible Schneider Switchgear – Outdoor Ground Mounted Kiosk
DM# 3666729 Page 6 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
4 REFERENCE DOCUMENT
The following Reference Documents have been used to prepare this Standard:
Doc Ref. Document Title Record No DM#
Publisher
AS 2067 - 2008
Substations & high voltage installations SAI Global
AS/NZS 3000 – 2007
Wiring Rules SAI Global
AS 3008 Cables for Alternating Voltages up to and Including 0.6/1 kV
SAI Global
Distribution Substation Manual - Section 3 Substation Arrangements
4122965 (Superseded)
Horizon Power
HPC-5DC-07-0003-2012
Distribution Design Manual: Volume 3 3467976 Horizon Power
HPC-5DA-07-0001-2012
Distribution Substation Manual – Sect 1
Customer Supply Arrangements
3405766 Horizon Power
HPC-5DA-07-0002-2012
Distribution Substation Manual – Sect 2
Medium Voltage Network Arrangements
3405802 Horizon Power
HPC-5DA-07-0004-2012
Distribution Substation Manual – Sect 4
Equipment Installation guide
3407067 Horizon Power
HPC-5DA-07-0005-2012
Distribution Substation Manual – Sect 5
Substation Fire Protection
3246313 Horizon Power
HPC-5DA-07-0006-2012
Distribution Substation Manual – Sect 6
Miscellaneous
3403088 Horizon Power
HPC-5DA-07-0009-2012
Distribution Substation Manual – Sect 9
Environmental Requirements
3403081 Horizon Power
HPC-9DJ-23-0001-2012
Substation Installation Requirements TBA Horizon Power
Western Australian Distribution Connections Manual (WADCM)
Regional Power & Electricity Networks Corporation
Western Australian Electrical Requirements
Office of Energy safety
DM# 3666729 Page 7 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
5 REVISION INFORMATION
(Informative) Horizon Power has endeavoured to provide standards of the highest quality and would appreciate notification if any errors are found or even queries raised.
Each Standard makes use of its own comment sheet which is maintained throughout the life of the standard, which lists all comments made by stakeholders regarding the standard.
A comment sheet found in DM:3497272, can be used to record any errors or queries found in or pertaining to this standard, which can then be addressed whenever the standard gets reviewed.
Date Rev No. Notes
12/07/2013 0 Original Issue
DM# 3666729 Page 8 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 9 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 10 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 11 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 12 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 13 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 14 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 15 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 16 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 17 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 18 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 19 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 20 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 21 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 22 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 23 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 24 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 25 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 26 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 27 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 28 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 29 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 30 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 31 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 32 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 33 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 34 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 35 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 36 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 37 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 38 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 39 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 40 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 41 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 42 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 43 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 44 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 45 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 46 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 47 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 48 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 49 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 50 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 51 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 52 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 53 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 54 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 55 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 56 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 57 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 58 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 59 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 60 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 61 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 62 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 63 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 64 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 65 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 66 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 67 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 68 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 69 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 70 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 71 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 72 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 73 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 74 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 75 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 76 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 77 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 78 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 79 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 80 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 81 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 82 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 83 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 84 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012
Uncontrolled document when printed. Printed copy expires one week from print date. Refer to Document No. for current version.
DM# 3666729 Page 85 of 85 Print Date 12/07/2013 © Horizon Power Corporation – Document Number: HPC-5DA-07-0003-2012