MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR &...

47
MALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. 320 77 TH Street Galveston, TX 77554 Office: (409) 7403314 Fax: (409) 7218 www.malinshiprepair.com

Transcript of MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR &...

Page 1: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

MALIN INTERNATIONAL SHIP 

REPAIR & DRYDOCK, INC. 

 

320 77TH Street  

Galveston, TX 77554 

Office: (409) 740‐3314 

Fax: (409) 7218 

www.malinshiprepair.com 

Page 2: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication
Page 3: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Pier 41 Facilities 

 

MISR’s main yard located in Galveston, TX is easily accessible via land and water and 

offers a variety of amenities and services in a secure environment suitable for any 

marine application.   The facilities at Pier 41 include a 5,300 square foot covered 

fabrication area, over 2,600 feet of available berthing space to 36 feet deep, 8 acres of 

lay‐down area as well as private on‐site office space available for customer utilization.   

Utilities conveniently located throughout the yard include freshwater, electrical, and 

compressed air connections.   

 

 

Page 4: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

CERTIFICATIONS/CONTRACTS 

 

 

 

 

 

 

 

     Contract GS‐21F‐0148W 

 

 

Page 5: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

 

 

        PROJECTS 

 

 

 

 

 

 

 

 

 

 

 

 

Page 6: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

US Government Contracts 

 

Agency:  US Coast Guard  POC: Kyle Kagami  

Telephone No: 409‐766‐5690  Vessel: USCGC Harry Claiborne 

Period of Performance: 03/09/09‐03/20/09 

 

Description of Work:  

Install a new inclined ladder  

Remove existing vertical ladder from 02 to 03 level 

Install one (1) new aluminum inclined ladder 

Remove sections of rail on 03 level in way of new inclined ladder 

Install vertical stanchions to support free ends of rails 

Perform non‐destructive testing (NDT) on all new welds 

 

 

Page 7: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

 

Agency:  US Coast Guard  POC: Albie D. Evans 

Telephone No: 757‐628‐4665  Vessel: USCGC Harry Claiborne 

Period of Performance: 03/09/09‐03/20/09 

 

Description of Work:  

Complete all welding and covering of cutter’s seabay system 

Removed and replaced port and starboard Sea Chest vent lines and valves 

Provided underwater videotaping of repair 

 

 

Agency:  Maritime Administration  POC: Janice Marshall  

Telephone No: 202‐366‐1744  Vessel: M/V “Barbara Lois” 

Period of Performance: 07/02/09‐08/14/09 

Description of Work:  

Crop out, renew, and install a stern bulwark 

Fender system on the bulwark 

Fender system installed on the stern hull 

Replace six (6) ballast vents on the stern of the vessel 

 

Page 8: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

Commercial Marine Repair 

 

Agency:  Well Ops – A Helix Company  POC: Richard Scott  

Telephone No: 281‐848‐6559  Vessel: Drilling Rig: Q‐4000 

Period of Performance: 10/08/09‐11/04/09 

   

 

Description of Work:  

Replacement of two propulsion pods 

Approximately 100 feet of 3” pipe 

renewals 

Mud pump piping renewals 

Added gusset plates and stiffeners in 

the moon pool  

Double pads and pipe stanchions on 

the MPT tower 

 

 

Page 9: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  REM Offshore  POC: Arild Skram  

Telephone No: +47 7008 08 95  Vessel: REM FORZA 

Period of Performance: 12/15/09‐12/22/09 

      

Description of Work: 

Removal and installation of hull inserts 

above summer load waterline utilizing 

½”, 3/8” ABS plate and ½” X 6” flat bar.  

Renew brackets connected between 

tank top plate and side shell plate 

between frames in ballast water tank.   

Ultrasonic, dye, and vacuum box testing 

of welds approved by DNV.   

Repaired dented hull insert 

Change vessel’s main crane rams 

 

 

 

Page 10: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  Canyon Offshore – A Helix Company  POC: Danny Cook 

Telephone No: 713‐996‐4020  Vessel: Northern Canyon 

Period of Performance: 4/10/09‐4/15/09 

   

 

Description of Work:  

Assisted in the installation of trencher sub‐frame  

Gussets, extension beam supports, and grating  

Fabrication of access stairway to trencher platform 

Removal of pads   Installation of level wind and winch, and  

Construction of frame for HPO unit  Removed and reinstalled satellite dome   Crane to haul container from stern of vessel 

Installed aft port side and forward starboard wing walls into place 

Sea fastened equipment. 

 

 

 

 

Page 11: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  CGG Veritas  POC: Lenny Stanley 

Telephone No: 835‐351‐8491  Vessel: CCG LAURENTIAN 

Period of Performance: 11/26/07‐12/3/07 

    

 

Description of Work:  

Installed replacement starboard ships service diesel generator  

Measurements performed to ensure the adequate coupling size 

Machined coupling to fit the replacement generator and engine 

Cut 5 x 5 opening in vessel side shell and through the tank bulkhead into the engine room to installed generator 

Renewed side shell using 7/16” ABS plate in accordance with the owner’s direction  

 

 

 

 

 

 

Page 12: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  Western Geco  POC: Lawrence Howard  

Telephone No: 832‐868‐7172  Vessel:M/V STONES RIVER 

Period of Performance: 7/28/08‐8/15/08 

      

 

Description of Work:  

Removed Containers and equipment  Cut container foundations loose from deck 

Added angles and flat bar to secure deck boards   

Removed wire and wireways   Cut down port and starboard exhaust 

stacks 

Installed rope guard after fabrication    Reinstalled stainless steel bulwark  

Welded and prepped for paint  Removed fuel from tanks and stored in 

order to perform hot work repairs 

Fuel pumped back into tanks after hot work was completed

 

 

 

Page 13: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

Agency:  PGS Geophysical  POC: Hans‐Peter Waldner  

Telephone No: 281‐509‐8376  Vessel: M/V Ramform Valiant 

Period of Performance: 10/14/09‐10/20/09 

   

Description of Work: 

Removal and installation of both 

starboard and port side thrusters 

Fabrication of antenna platform and 

installation  

Removal of twisted anchor chain from 

locker 

Renewal and fabrication of cooling pipe 

and fittings  

Repair of cracks and adding of stiffeners 

in ballast tank bulkhead 

 

 

 

 

Page 14: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  Martin Midstream   POC: Dwain Bankston 

Telephone No: 281‐842‐3911  Vessel:M/V PONCIANA 

Period of Performance: 2/19/2007‐4/24/2007 

 

Description of Work: 

Removed existing condenser and 

refrigeration system 

Fabrication of Cargo Piping Spools 

Installed new cargo piping and exchangers 

 

 

 

 

 

 

 

Page 15: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

Marine Repair 

 

Agency:  Columbia University Lamont‐Doherty     Earth Observatory 

POC: Richard Beaudoin 

Telephone No: 212‐854‐2331  Vessel:M/V MARCUS G. LANGSETH 

Period of Performance: 3/16/2007‐ 9/02/2007 

 

Description of Work: 

Removal and installation of gun rails 

All star hydraulic work and welding 

Repair of overhead in seismic lab 

High seas net (Dome GPS) installation 

 

 

 

 

 

Page 16: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  Edison Chouest  POC: Willie Danos  

Telephone No: 985‐601‐4128 EXT: 51615  Vessel: M/V C‐LEGEND 

Period of Performance: 04/2009 

 

Description of Work: 

Performed work on ballast tank 

Repaired cracked 8 ¾” ID x 14 ¾” OD 

ballast pipe (overboard discharge line)  

Installed double plate 

Re‐welded both sides of bulkhead  

 

Agency:  Edison Chouest  POC: Willie Danos  

Telephone No: 985‐601‐4128 EXT: 51615  Vessel: M/V GECO PEGASUS 

Period of Performance: 11/2009 

  

Description of Work: 

Executed pipe work on CO2 system  

Removal and installation of an 8 ft piece of 

½ in galvanized pipe 

Original piping was cut in half and 

removed 

New piping was cut and threaded in (2) 

sections, then reinstalled with a ½ in union 

 

 

 

Page 17: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

Agency:  Interocean American Shipping  POC: Odd Helgas  

Telephone No: 609‐502‐3732  Vessel: M/V HONOR 

Period of Performance: 05/2008 

    

Description of Work: 

Removal of lagging and framing from 

around base to access boiler  

Repair cracks in lining  

Reinstallation of lagging and framing  

Repairs were also completed on the deck 

lift  

All star hydraulics were removed and 

repaired 

Removed and repaired clutch slave 

cylinder for one of the deck lift trucks 

 

 

 

 

 

 

 

 

 

Page 18: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

Commercial Outside Machine/Fabrication 

 

Agency:  Crowley Maritime  POC: Carly Remm  

Telephone No: 904‐727‐2131  Vessel: M/V ATB RESOLVE 

Period of Performance: 01/15/10‐01/16/10 

  

 

Description of Work:  

Removal of motor to pump couplings,  

Drilling of locking set screws and 

setting of mechanical seals  

Reinstallation of couplings 

Repaired and tested fire suppression 

system 

Removed, disassembled, and 

reassembled system’s pneumatic 

actuators 

 Removed and installed new cooler 

from the starboard side aft engine 

room overhead  

Machining of aluminum engine covers 

and in‐shop fabrication of new vacuum 

tank. 

 

 

 

 

 

Page 19: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  Crowley Maritime  POC: Trent Skladany  

Telephone No: 904‐727‐2448  Vessel: Tug Integrity/Barge 650‐4 

Period of Performance: 07/19/09‐07/23/09 

Description of Work:  

Removed heat exchanger  

Fabricated heat blankets 

Reinstalled new heat exchanger 

Fabricated new insulation blankets at 

MISR shop 

Fabricated and installed copper nickel 

spool pieces and supply and return 

lines. 

 

 

 

 

 

 

 

 

 

 

 

 

Page 20: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

Agency:  Edison Chouest  POC: Willie Danos   

Telephone No: 985‐601‐4128 EXT: 51615  Vessel:M/V GECO PEGASUS 

Period of Performance: December 2009 

 

Description of Work: 

CO2 Pipework 

removal and installation of  8 ft piece of ½ 

in galvanized pipe 

cut and threaded new piping in (2) sections

Installed ½ in union 

 

 

 

 

 

 

Page 21: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

Agency:  Odfjell  POC: Rune Fanebust 

Telephone No: +47 55 27 44 58  Vessel: M/V BOW PRIMA 

Period of Performance: October 2008 

 

Description of Work: 

Stern Tube Bearing Renewal 

Controllable Pitch Propeller Repair 

Tail Shaft Load Testing 

 

 

 

 

 

 

 

 

Page 22: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Commercial Inside Machine/Fabrication 

Agency:  Edison Chouest  POC: Willie Danos  

Telephone No: 985‐601‐4128 EXT: 51615  Vessel: M/V C‐PIONEER 

Period of Performance:  

  

Description of Work: 

Designed drilling fixture to allow the 

drilling and tapping of a stripped out bolt‐

hole in stainless steel aft shaft coupling   

Fabricated fixture and drilled and tapped 

for larger 30mm bolts 

machined opening in dog bones to 

accommodate 30mm bolt 

installed dog bone on shaft coupling 

applied specified torque to coupling bolts 

 

Agency:  Secunda Marine Services  POC: 

Telephone No: 902‐463‐7678  Vessel: M/V BOLD ENDURANCE 

Period of Performance: 8/18/08 

  

Description of Work: 

 Reconditioning of engine  

Installation of new liner kits, rods, and 

main bearings 

 Engine resealed with new gaskets and o‐

rings 

Installation of oil pump, W‐water pump 

and F‐water pumps 

Page 23: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  Gulf Sulphur Services  POC:  

Telephone No: 409‐765‐1206  Vessel: Turbine Sulfur Pump 

Period of Performance: December 2009 

 

Description of Work: 

Exterior Sandblasting of Turbine Pump 

Bushing and seal Inspection 

Fabrication of stainless steel pump shaft 

Installed piping heat shield 

 

 

 

 

 

 

 

 

Page 24: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  Odfjell  POC: Jan Magnus Hestdal   

Telephone No: +47 55 27 45 42  Vessel:M/V BOW SPRING 

Period of Performance: July 2008 

 

Description of Work: 

 

Cylinder head resurfacing 

 

 

 

Agency:  Secunda Marine Services  POC:  

Telephone No: 902‐463‐7678  Vessel:M/V BOLD ENDURANCE 

Period of Performance: 8/18/08 

 

Description of Work:

Fabricated (2) Stainless Steel Pump Shafts 

(14 3/16 Long X 2.883 OD with 3” Long X 

2.360 OD step and flanged end with 3 1/2” 

holes drilled 120 degrees apart) 

Phenolic Bushing Fabrication 

Drilling and tapping of broken bolts 

 

 

 

Page 25: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Seabulk Tankers, Inc.  POC: Harvey J. Mott 

Telephone No: 954‐627‐5259  Vessel: Seabulk Trader 

Period of Performance: October 2009 

 

Description of Work: 

Pressure Vacuum Valve Repair 

Flame Screen Installation 

PV Valve Repacking 

 

 

Commercial Crane 

 

Agency:  Canyon Offshore – A Helix Company  POC: Danny Cook 

Telephone No: 713‐996‐4020  Vessel: Northern Canyon 

Period of Performance: 4/10/09‐4/15/09 

   

 

Description of Work:  

Removed the launch and recovery system from vessel’s back deck 

Reinstall level wind and trencher winch 

Set containers on the ship’s deck that could not be reached by the vessel’s crane 

 

 

 

 

Page 26: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Boa Marine Services  POC: Tim Redland 

Telephone No: 832‐466‐4250  Vessel: M/V BOA SUB C 

Period of Performance: 2/5/2010 ‐  

 

 

Description of Work:  

Mounted a 500 ton spool of wench cable to a shore‐side spooling apparatus  

Utilized both 650 ton and 500 ton cranes in tandem  

 

 

 

 

 

 

 

 

 

 

 

 

Page 27: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Con‐Dive  POC: Kevin Bernard 

Telephone No: 713‐591‐0556  Vessel:  

Period of Performance: 7/20/08‐7/26/08 

 

Description of Work: 

Utilized 750 Ton shore crane to unload/load 

100 Ton ship crane components 

Fabricated 6 x 16 Lifting frame  

Hoisted components and reel from dockside 

to barge deck 

 

 

 

 

 

 

 

 

 

Page 28: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  PGS Geophysical  POC: Hans‐Peter Waldner 

Telephone No: 281‐509‐8376  Vessel: M/V RAM FORM VALIANT 

Period of Performance: 10/14/09‐10/20/2009 

 

 

Description of Work: 

 

Starboard and Port Side Thruster Removal/ 

Installation 

Utilization of 500 Ton Crane 

 

 

 

 

 

 

 

Page 29: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  TTS Marine  POC: Torsten Paas 

Telephone No: +1 954 493 6405  Vessel:M/V CAP ORTEGAL 

Period of Performance: 2/8/09‐2/11/09 

 

Description of Work: 

Crane Boom repair 

Fabricated Boom Jig Fixture 

Alignment Plate installation 

Fabricated transition pieces and center 

brace 

Ultrasonic weld testing 

Replaced (4) Pad eyes and (2) Sheaves 

Applied Primer and Paint 

 

 

 

 

 

 

 

 

 

 

Page 30: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

Agency:  Well Ops‐ A Helix Company  POC: Richard Patton 

Telephone No: 281‐848‐6559  Vessel: Drilling Rig: Q‐4000 

Period of Performance: 10/08/09‐11/04/09 

 

 

Description of Work: 

Heavy lift of Propulsion Pods 

Placed Pods shore‐side on prefabricated 

cradles 

 

 

 

 

 

 

Page 31: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Dockendale Shipping Company, LTD.  POC: D’sa J. Eddy 

E‐mail: [email protected]  Vessel:M/V DS VANGUARD 

Period of Performance: 4/12/2009‐4/17/2009 

 

 

Description of Work: 

Crane Pedestal Removal 

 Slewing Bearing Replacement 

Jib Bearing replacement 

Load Testing 

 

 

 

 

 

 

Page 32: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Clipper Elite Carriers S.A.  POC: Niels Giltrup 

Telephone No: 713‐953‐2242  Vessel:M/V CARRIBEAN CARRIER 

Period of Performance: March 2008 

 

 

Description of Work: 

Removed/Reinstalled Crane Jib 

Removed damaged sections of jib 

Fabricated new jib sections 

Ultrasonic weld testing 

Crane and Jib load testing 

Re‐spooled Crane Cable 

 

 

 

 

 

 

 

 

 

 

 

Page 33: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Texas Department of Transportation  POC:  

Telephone No:   Vessel:  

Period of Performance: 11/17/2008  

  

 

Description of Work:  

Assisted the Texas Department of Transportation 

incident response and recovery services  up righting of overturned vehicles  removal of large obstructions from 

roadways   removal of boats from the Galveston 

Causeway   

 

 

 

 

 

 

 

 

Page 34: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Western Geco  POC: Keith Graham   

Telephone No: 713‐689‐6589  Vessel: Geco Pegasus 

Period of Performance: 2009‐Present 

 

Description of Work: 

Provide crane service 

Trash Removal  

Load Vessel Supplies 

 

 

 

 

 

 

 

 

 

 

Page 35: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Fabrication 

 

Agency:  Dow Chemical  POC:  

Telephone No:   Project: Stainless Steel Pressure Vessel 

Period of Performance:  

  Description of Work: 

Fabricated  stainless  steel  pressure 

vessel to the customer’s specs, within 

the required timeline. 

 

 

 

 

 

 

 

Page 36: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Tool Inc.  POC:  Cathy Busbey 

Telephone No:   Project: Mud Production Tanks 

Period of Performance: September 2010 

 

Description of Work: 

Constructed (3) mud production 

tanks. 

Utilized plate‐ roll to fabricate tank 

walls. 

Welded and pressure tested vessels 

to customers standards. 

 

 

 

 

 

 

 

 

 

Page 37: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

Agency:  Schlumberger Technology Corporation  POC: Rod Shampine   

Telephone No: 281-285-8479  Vessel:  

Period of Performance: March 2009 

 

Description of Work: 

Fabricated Pressure Vessel 

Repaired and Modified existing Pressure 

Vessels 

 

 

 

 

 

 

 

 

 

 

 

Page 38: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Boa Marine Services  POC: Tim Redland   

Telephone No: 832‐466‐4250  Vessel:M/V BOA SUB C 

Period of Performance: 2/6/2010‐2/16/2010 

 

 

Description of Work: 

Fabricated Spooling Tower Support Skid 

Attached skid to Spooling Towers 

 

 

 

 

 

 

 

 

 

 

Page 39: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

Agency:  Odfjell Management AS  POC: Jan Magnus Hestdal   

Telephone No: +47 55 27 45 42  Vessel:M/V BOW ATLANTIC 

Period of Performance: June 2009 

 

Description of Work: 

Fabricated Engine Room Vent Silencer 

using 1/8” carbon steel plate rolled into 

52.5” OD 

Installed 2” of sound insulation 

Sandblasted and coated 1/8” galvanized 

perforated metal with zinc primer 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 40: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Helix  POC: Richard Patton 

Telephone No: 281‐848‐6559  Vessel:  

Period of Performance: December 2007 

 

 

Description of Work: 

Fabricated 30 Ton 33’ X 33’ Carousel Base at 

MISR yard 

 

 

 

 

 

 

 

Page 41: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Coatings 

 

Agency:  Helix Energy Solutions  POC: Richard Patton 

Telephone No: No: 281‐848‐6559  Vessel: Q‐4000 

Period of Performance: 10/15/10‐ 10/25/10 

 

 

Description of Work: 

Coated 18” 90 degree pipe with flame sprayed 

coating to extend overboard discharge piping 

life. 

 

 

 

 

 

 

Page 42: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  Schlumberger Technology Corporation  POC: Rod Shampine   

Telephone No: 281-285-8479  Vessel:  

Period of Performance: March 2009 

 

Description of Work: 

Applied Powder‐Coating to Pressure Vessel 

 

 

 

 

 

 

Page 43: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  American Cargo Transport Corp.  POC:  

Telephone No: 206‐243‐1800  Vessel:M/V AMERICAN TRADER 

Period of Performance: May 2009 

Description of Work: 

Sandblasted (2) 11’ x 26’ and 11’ x 40’ 

cargo ramp doors 

Applied (3) Coat Paint System (Bar‐Rust 

235, Catha Coat 302, T‐10 Thinner) 

 

 

Agency:  Western Geco  POC: Lawrence Howard   

Telephone No: 832‐868‐7172  Vessel:M/V STONES RIVER 

Period of Performance: 7/28/08‐8/15/08 

 

 

Description of Work: 

Prepping and painting in way of deck 

boards wireways 

Applied bulwark coating 

 

 

 

 

Page 44: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  Helix  POC: Richard Patton 

Telephone No: 281‐848‐6559  Vessel:  

Period of Performance: December 2007 

 

Description of Work: 

Sandblasting 

Applied 3 part epoxy coating to carousel 

base 

 

 

 

 

 

 

 

 

Page 45: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

 

 

Agency:  Lott Ship Agency  POC: Bill Lott 

Telephone No: 251‐433‐1621  Vessel:M/V ACERGY POLAR QUEEN 

Period of Performance: May 2009 

 

Description of Work: 

Hydro‐blasted original paint from heli‐deck 

Cleaned Prepped and laid out area to be 

painted 

Applied multiple paint coatings to heli‐

deck; approved by ship’s inspector 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 46: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

  

Agency:  ID Wallem  POC: 

Telephone No:   Vessel: OBELIX BULKER 

Period of Performance: 6/10/2011‐6/29/2011 

 

Description of Work: 

Removed twisted rudder stock 

Fabricated 10’ x 18’ x 20’ cofferdam 

Installed cofferdam and inspected rudder 

for damage 

Machined new key way in rudder stock 

Reinstalled rudder stock 

Removed, aligned, and reinstalled steering 

gear 

 

 

 

 

 

Page 47: MALIN INTERNATIONAL SHIP REPAIR DRYDOCK, INC. · PDF fileMALIN INTERNATIONAL SHIP REPAIR & DRYDOCK, INC. ... lay‐down area as well as private on‐site office space ... Fabrication

Agency:  Superior Energy  POC: Nick Mayon 

Telephone No: 337‐364‐9704  Vessel: DB Superior Performance 

Period of Performance:  Dec. 2010 

 

Description of Work: 

De‐rig of SAT system 

Disposed of vessel waste 

Removal of fairleads, cow‐catchers, and 

tender work 

Provided logistics support 

Installed equipment to make vessel ready 

for Panama Canal passage