Main Control System (MCS) System Designca.hkie.org.hk/Upload/Doc/4a48e470-809c-464c-a05d-66d...MTR...
Transcript of Main Control System (MCS) System Designca.hkie.org.hk/Upload/Doc/4a48e470-809c-464c-a05d-66d...MTR...
2012/3/9 Page 1MTR Corporation
Innovative Design in Decision Support
System for Railway
Main Control System (MCS) System Design
K.M. TsangSenior Engineer-Control, MTRCL
2012/3/9 Page 2MTR Corporation
Decision Support System
Complex station and track environments
Complicated railway electrical and mechanical systems
Railway rules and procedures
Communication with the relevant internal and external parties
Timely and proper handling of incident and service recovery
Need for Decision Support System (DSS)
2012/3/9 Page 3MTR Corporation
Decision Support System
Acquire critical equipment status
Provide key information on user friendly HMI
Recommend a course of actions
Assist in making decision
Minimise human error
Decision Support System (DSS)
Target Users:
Station Operators
OCC Operators
2012/3/9 Page 4MTR Corporation
Evolution of DSS in MTR
1993
Tseung Kwan O Line Main Control System
20032002
First Trial at Yau Ma Tei Station
Urban Line Station Management System
2000 2007 2014
DSS for selection of tunnel ECS mode (developed by OCC staff using HTML)
Main Control Systemof West Island Line / South Island Line etc….
West Rail Line Main Control System
DSS Enhancement after Tai Lam Tunnel incident
Present
2012/3/9 Page 5MTR Corporation
DSS in Urban Line Station Management System
2012/3/9 Page 6MTR Corporation
DSS in Tseung Kwan O Line Main Control System
2012/3/9 Page 7MTR Corporation
DSS in West Rail Line Main Control System
2012/3/9 Page 8MTR Corporation
Increasing Demand for DSS
Deep station
Long adit
Lift assisted evacuation
Intelligent signage
Long tunnel with cross passage door
Huge station for XRL
Challenges for future railway lines
2012/3/9 Page 9MTR Corporation
Current DSS Design – Generic Screen Framework
Overview Panel Station/tunnel overview with
necessary real-time info
Overview Panel
Information/Resource Panel
DSS Tool Panel
Information/Resource Panel Video clip showing station/
track view Geographic information system Emergency contacts and
telephone directories Schematic diagrams of major
E&M systems Emergency resource list etc.
DSS Tool Panel Procedural check list tool What-if analysis DSS tool Station evacuation DSS tool
2012/3/9 Page 10MTR Corporation
Current Design – DSS Main Screen
Information / Resource
TrackView
StationView GIS
Tel.Dir.
Sys.Sch.
BIM
Retrieve Customise
Emer.Res.
Track ViewStation ViewTunnel ViewBIMGISEmergency PlanEmergency Tel. Dir.
DSS Tools
What-ifAnalysis
StationEvacuation
TunnelEvacuation
Fan AreaSmoke Extract. Check List
2012/3/9 Page 11MTR Corporation
Current Design - Information/Resource Panel (1)
Track View Station View
2D View 3D View
2012/3/9 Page 12MTR Corporation
Current Design - Information/Resource Panel (2)
Emergency Telephone Directory ICCS Schematic
Emergency Resources
地面庫2個30米鋼卷尺13
地面庫3個8磅手錘12
地面庫2把潘得羅爾扣件搬手11
地面庫3\5把375mm\450mm 活搬手10
地面庫3個扁口管擰子9
地面庫2個六角管擰子8
地面庫4把道釘錘7
地面庫3根翻軌器6
地面庫3根橇棍5
地面庫1台起道機4
地下庫1把三軌檢查尺3
地下庫1把支距尺2
地下庫2把軌距檢查尺1
存放位置總數單位規格名稱序號
2012/3/9 Page 13MTR Corporation
Current Design - What-If Analysis DSS Tool
What if
Preview
E-Mode 1
E-Mode 21
E-Mode 40
E-Mode 48
E-Mode 51
E-Mode 79
E-Mode 101
2012/3/9 Page 14MTR Corporation
Current Design - Station Evacuation DSS Tool
AB
C
D E
FG
I
H
Fire Zone Alarm
A B C D F G IHDetected
Confirmed
Route Blocked
ENT.A
ENT.B
ENT.C
Plat.1
Conc.Up
Plat.2
Conc.Dn
CONFIRME
Recommendations
Preview Execute
Actions Confidence
80%E-Mode 1
1
E-Mode 8 60%
1
2012/3/9 Page 15MTR Corporation
DSS for Forthcoming New Railway Lines/Extensions
West Island Line
South Island Line
Kwun Tong Line Extension
Shatin to Central Link(East West Line)
Express Rail Link
Shatin to Central Link(North South Line)
2014 Q2
2014 Q3
2015 Q1
2015 Q3
2017
2020
2012/3/9 Page 16MTR Corporation
THANK YOU
2012/3/9 Page 17MTR Corporation
Entrance C1Pok Fu Lam Road
Entrance B1Whitty Street
Entrance B2Hill Road
To Entrance C2Belcher’s Street
Entrance AHKU
Hong Kong University Station – 3D View
70m deep
340m long
Moving Walkway
Passenger Adit
4 High Capacity Lifts
8 High Capacity Lifts
2012/3/9 Page 18MTR Corporation
Hong Kong University Station – Section View
70m
150 m
C1
B2
2012/3/9 Page 19MTR Corporation
Lift Assisted Evacuation
Fire at Station Box Fire at Adit
2012/3/9 Page 20MTR Corporation
Intelligent Signage – Example for Platform Fire
2012/3/9 Page 21MTR Corporation
Intelligent Signage – Example for Adit Fire
2012/3/9 Page 22MTR Corporation
XRL - West Kowloon Station