Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7...

19

Transcript of Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7...

Page 1: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8
Page 2: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

Mailing list:

1 Chief Engineer (LD), MSETCL, Kalwa. Fax-022-27601769/65

2 CE (W), MSEGCL, 3rd floor, Prakash gad, Mumbai.

3 CE, SLDC, GETCO, Gotri, Vadodara, Fax.No. 0265-2352019/2356469.

4 Chief Engineer (Gen), GSECL, H.O. Baroda. Fax-0265-5512129/2344537

5 Chief Engineer (LD), MPPTCL, Jabalpur, Fax - 0761- 2664343 / 2970119.

6 ED (Engg.) MPPGCL, Jabalpur Fax- 0761-2660063

7 Chief Engineer (LD), CSPTCL, Raipur. Fax-0771 - 2574174

8 EE (T), CSPGCL- Fax.No. 07789-226227

9 D.G.M. (O.S.) , N.T.P.C., Mumbai, Fax- 28216692

10 DGM, NTPC WR – II, Raipur, Fax: 0771 - 2544550

11 D.G.M. (EM), KSTPS, NTPC, Korba Fax 07759-233088 (Tele fax: 232440) /237462

12 DGM (EMD), VSTPS, NTPC, Vindhyachal Fax-07805-247713 /247711

13 DGM (EM-I), NTPC, SIPAT Fax-07752-246506 (Tele fax: 246691)

14 AGM (O&M), KGPP, Adityanagar, Surat Fax 0261-2861428/2861433

15 Sr. Supdt. (EM), Gandhar, NTPC Fax-02642-87402 / 87450

16 DGM (O.S.), WRLDC, Mumbai Fax-28235434

17 DGM, WRTS-I, PGCIL, Nagpur, Fax- 0712- 2631051 / 641366

18 AGM, WRTS-II, PGCIL, Baroda Fax-0265-2480952 (Tele fax: 2487542)

19 AGM, O&M, WRTS – III, PGCIL, Raipur. Fax: 0771 - 2970450

20 SME (E), TAPS-3&4,Tarapur Fax 02525-282001/282073

21 Maintenance Superintendant, TAPS –1 & 2, Tarapur.Fax- 02525-282121

22 SME(E), NPCIL , Kakrapara Fax 02626-234266

23 GM (Maint.). TORRENT Power., Ahmedabad.Fax-079-27506679

24 AGM (QAIT), TPC, Trombay. Fax –022-66687088

25 Asst. VP, Dahanu TPS Fax- 952528-222576 / 222039

26 GM (O & M), Reliance Infrastructure Limited, Mumbai Fax-30094488

27 GM (Electrical), JPL, Raigarh, Fax. No. 7767-281995, 281993.

28 AGM (OS), NSPCL, New Delhi . Fax.No.011 26717381/26717363/26717366

29 Vice President, APL, Ahmedabad 079-25557176

30 GM, RGPPL, Anjanwel, Guhagar, Ratnagiri, Fax.No. 02359 241071

31 GM, JSW Energy Ltd., Jindal Mansion, Mumbai- Fax.No.022 23526400

32 GM, CGPL, Mundra Fax.No. 02838 661188

Copy to

1. MD, CSPGCL, Danganiya, Raipur, Fax.No. 0771-2262741.

2. MD, GSECL, race course, Vadodara, Fax.No. 0265-2344734.

3. MD, MPPGCL, Rampur, Jabalpur, Fax.No. 0761-2665661.

4. CMD, MSPGCL, Bandra(E), Mumbai, Fax.No. 022-26471060/26581400.

5. Director(HR), NTPC Ltd., NTPC Bhawan, New Delhi, Fax.No. 011-24368417.

6. Director(Finanace), NPCIL, Urja Bhawan, Mumbai, Fax.No. 022-25993332.

7. GM, POSOCO, WRLDC, Andheri(E), Mumbai, Fax.No. 022-28202630.

8. COO&ED, Tata Power Company Ltd., Mumbai, Fax.No. 022-66657966.

9. MD, Rantnagiri Gas &power Pvt Ltd., Noida, Fax.No.0120-4148911/13/14.

10. CED, NHDC Ltd., Shyamala Hills, Bhopal, Fax.No. 0755-4030003.

Page 3: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

11. ED, Torrent power Generation Ltd., Surat, Fax.No.02621-661151.

12. COO, Adani Power Ltd., Ahmedabad, Gujarat, Fax.No. 079-25557176.

13. MD, Dhariwal Infrastructure Ltd., Kolkata, Fax.No. 033-22256003.

14. Director & CEO, JSW Energy Ltd., New Delhi, Fax.No. 011-48178740.

15. CEO, Jindal Power Ltd., Gurgaon, Haryana, Fax.No. 0124-26739151.

16. ED & CEO, Costal Gujarat Power Ltd., Gujarat, Fax.No. 02838-661181.

17. Sr.vice President(o), Rattan India Power Ltd., Gurgaon, Haryana, Fax.No. 0124-6695868.

Page 4: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

Minutes for the meeting on PSS Tuning held on 03.01.2017 Page 1

Minutes for the meeting of PSS Tuning

A meeting was held on 03.01.2017 at WRPC, Mumbai on PSS tuning with Excitation

Engineers of various entities in WR to discuss the status of PSS covered in WR PSS Tuning

Project, Status of PSS for all other remaining Generators in WR and tuning of all the generating

units whose capacity is greater than 50MW as per IEGC. The list of participants is enclosed at

Annexure – I.

SE (Protection & Studies), WRPC welcomed Dr. A. M. Kulkarni from IIT-B and all

the participants of meeting and briefed the members about the PSS tuning. A brief video was

presented on the PSS tuning activity carried out in WR wherein PSS tuning of 23 units was

taken up for which IIT-B was consultant. WRPC having a successful background in many

aspects of PSS tuning further exercise can be taken up for tuning PSS in remaining

generating units. Thereafter agenda items were taken up for discussion.

Item No 1: Status of PSS covered in WR PSS Tuning Project

As decided by WREB/WRPC in 114th WREB meeting, field tuning of PSS on

generators was done by a group comprising IIT-B as consultant, BHEL and utility excitation

groups. In all 23 units PSS were tuned. The status of these projects as of now was discussed

and updated as follows.

Sl.

No

Name of the

Generating

Station

Details of

Generating

Units

Capacity of

each Unit in

MW

Type of Excitation

System

Present STATUS

1. NTPC- Korba Units 2 & 3 210 Adaptive DVR Changed to DVR & PSS is Active

2. Wanakbori Units 4 & 5 210 Static AVR Changed to DVR & PSS is Active

3. Nasik Units 3 & 5 210 Static AVR Changed to DVR & PSS is Active

4. Dahanu, RPL 2 units 250 Brushless AVR Changed to DVR & PSS is Active

5. Korba West Units 1, 3 & 4 210 Static AVR Changed to DVR & PSS Not

Enabled

6. Satpura Units 8&9 210 Static AVR Changed to DVR & PSS is Active

7. NTPC- Korba Units 4,5 & 6 500 Brushless AVR Changed to DVR & PSS is Active

8. Parli, MSEB 3 units 210 Static AVR Changed to DVR & PSS is Active

9. SGTPS, MP 4 units 210 Static AVR Units 1 &2 Changed to DVR &

PSS is Active.

Units 3 & 4 are with AVR & PSS

is Disabled.

Total: 23 Units

Page 5: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

Minutes for the meeting on PSS Tuning held on 03.01.2017 Page 2

Item No 2: Status of PSS for all other remaining Generators in WR:

It was proposed to taken up the exercise of PSS tuning in WR, for which following

information was sought from ISGS, State Generating Companies, IPP’s connected to CTU,

and IPP’s connected to State having generating unit capacity more than 50 MW.

Unit No, Rated Capacity, Type of Excitation System, whether PSS provided or not,

whether PSS tuned or not, and manufacturer of excitation system. The data furnish by the

entities is enclosed at Annexure-2.

Item No 3: Proposal for Tuning:

SE (Protection & Studies), WRPC informed that,

i. As per IEGC Generators have to tune PSS. CTU/RPC can check the settings.

ii. Tuning of PSS is recommended to enhance stability. WR can utilize the

earlier experience and take up PSS tuning activity once again. However as

compared to earlier phase, knowledge of frequency response and theoretical

aspects must be spread to generators so that they can also participate in the

exercise. Training is also necessary. Further since PSS tuning helps in

enhancing Grid stability expenditure can be taken under PSDF.

After discussion following was agreed;

1) All the State owned Generating Companies would prepare a DPR for getting

the PSS tuned by the OEM of their generating units. This DPR would be put

up to the appraisal Committee for funding through PSDF with the

recommendation of WRPC.

2) The private generating companies shall get the PSS tuned from the

manufacturer at their own cost.

3) A detailed guideline on the adoption of the PSS settings and testing the PSS

would be prepared by WRPC in consultation with IIT-B and the same may

be referred by the generating companies during adopting PSS settings.

4) A training program on the PSS tanning activity shall be organized by IIT-B

for all the stake holders. The fees of the training program shall be borne by

the individual organization.

5) Software for checking the performance of PSS, analytically, would be

Page 6: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

Minutes for the meeting on PSS Tuning held on 03.01.2017 Page 3

developed by IIT-B after discussing the requirements with WRPC. The copies

of the software then could be shared with the generating companies.

6) Simulation software for exciter/PSS control system simulation shall be

developed by IIT-B, which shall be made available to all the generating

companies of WR for checking/simulating the frequency response of the PSS

tuned system, so that they can select the settings.

7) After carrying out the tuning of PSS, the parameters/constants set by the

generating companies shall be communicated to WRPC for its verification.

This would be verified by WRPC through the software developed by IIT-B at

5) above.

8) The cost of the software’s at 5 & 6 be funded through WRPC fund.

Page 7: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8
Page 8: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8
Page 9: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8
Page 10: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8
Page 11: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

SerialNo.

Station Name Unit No.Rated

CapacityType of excitation

systemAVR/DVR

PSSprovided

PSSenabled

Manufacturer ofexcitation system

1 CGPL Mundra Unit - 10 830 MW Static excitation DVR Yes Yes Toshiba Japan2 CGPL Mundra Unit - 20 830 MW Static excitation DVR Yes Yes Toshiba Japan3 CGPL Mundra Unit - 30 830 MW Static excitation DVR Yes Yes Toshiba Japan4 CGPL Mundra Unit - 40 830 MW Static excitation DVR Yes Yes Toshiba Japan5 CGPL Mundra Unit - 50 830 MW Static excitation DVR Yes Yes Toshiba Japan

6Tata

Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000

7Tata

Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080

8Tata

Power,Trombay Unit-8 250 MW Brushless DVR Yes Yes BHEL, DVR

9Tata

Power,Trombay Unit -7A 120 MW Static excitation DVR Yes Yes GE, Semipol

10Tata

Power,Trombay Unit -7B 60 MW Brushless DVR Yes Yes ABB, Unitrol 6080

11 Tata Power, Bhira BPSU 150 MW Static excitation DVR Yes Yes ABB Unitrol 6080

Information Regarding Excitation System At SGTPS Birsinghpur.

1 SGTPS BRS I 210 MW Static DAVR YES YES BHEL2 SGTPS BRS II 210 MW Static DAVR YES YES BHEL3 SGTPS BRS III 210 MW Static AVR YES No BHEL4 SGTPS BRS IV 210 MW Static AVR YES No BHEL5 SGTPS BRS V 500MW Brushless DAVR YES YES BHEL

KSK

Sr No Station Name Unit No's Rated CapacityType of ExitationSystem AVR/DVR

PSSprovidedYES/NO

PSSEnabledYES/NO

Manufacturer ofExitation system

1 KMPCL 1 600 MW Static AVR AVR YES YES ABB (Unitrol5000)2 KMPCL 2 600 MW Static AVR AVR YES YES ABB (Unitrol5000)

STPS, SARANIS.No. Station Name Unit No. Rated capacity Type of Excitation

systemAVR/DVR PSS

Provided(Yes / No)

PSSEnabled

(Yes / No)

Manufacturer ofExcitation system

Details of AVR of Tata Power in Western Region

SL NO. Station Name Unit No. Rated CapacityType of Excitation

System AVR/DVRPSS

providedPSS

EnabledManufacturer ofExcitation system

Page 12: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

1 SATPURA 6 235MVA Static ExitationSystem

DVR Yes Yes BHEL

2 SATPURA 7 247MVA Static ExitationSystem

DVR Yes Yes BHEL

3 SATPURA 8 247MVA Static ExitationSystem

DVR Yes Yes BHEL

4 SATPURA 9 247MVA Static ExitationSystem

DVR Yes Yes BHEL

5 SATPURA 10 294 MVA Brushless Exitationsystem

DVR Yes Yes BHEL

6 SATPURA 11 294 MVA Brushless Exitationsystem

DVR Yes Yes BHEL

Sr.No.

Station Name Unit No Rated capacityType of excitation

systemAVR /DVR

PSSProvided Yes / No

PSSEnabledYES / NO

Manufaturer ofExcitation System.

1 1 330 MW2 2 330 MW3 3 330 MW4 4 330 MW5 5 660 MW6 6 660 MW7 7 660 MW8 8 660 MW9 9 660 MW

Sr.No.

Station Name Unit No Rated capacityType of excitation

systemAVR /DVR

PSSProvided Yes / No

PSSEnabledYES / NO

Manufaturer ofExcitation System.

1 Adani Power Tiroda 1,2,3,4&5 5*660 MW STATIC DVR YES YES ABB -UNITROL 5000

Sl.No. Station Name Unit No

RatedCapapcity

Type of excitationsystem AVR/DVR

PSSProvidedYes/No

PSSEnabledYes/No

Manufacturer ofExcitation System

1 222 MW- GTG Static Exciation SEE Yes Yes BHEL, EDN2 129 Mw STG Rotary (Brushless)ExciatationDAVR Yes Yes BHEL, EDN3 222 MW- GTG Static Exciation SEE Yes Yes BHEL, EDN4 129 Mw STG Rotary (Brushless)ExciatationDAVR Yes Yes BHEL, EDN

YESABB -

UNITROL 5000

PSS details for GPPC, Pipavav

GPPC, 2 X 351MW1

2

Detail of Excitaion system at Adani Power Ltd. Mundra - Gujarat

Adani PowerMundra

Brushless DVR YES YES

Beijing Jisi ElectricCo., Ltd.

GEC make modelGEC 321

Static DVR YES

Gandhinagar Thermal Power station 210 MW x 3 Units

Detail of Excitaion system at Adani Power Ltd. Mundra - Gujarat

Page 13: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

2 Gandhinagar T.P.S Unit-4 210 MWStatic Excitation

SystemAVR Yes No

3 Gandhinagar T.P.S Unit-5 210 MWStatic Excitation

SystemAVR Yes NO

Information Regarding the Status of PSS of MSPGCL Units as on 30/12/2016

2 Thermal PowerStation, Nashik

Eklahare4 210 MW

Static ExcitationSystem

DAVR Yes YesM/S Andritz

Hydro Pvt. Ltd.Bhopal

3 Thermal PowerStation, Nashik

Eklahare5 210 MW

Static ExcitationSystem

DAVR Yes YesM/S Andritz

Hydro Pvt. Ltd.Bhopal

4 Thermal Power

Station, ParliVaijnath

3 210 MWStatic Excitation

SystemDAVR Yes Yes M/s BHEL

5 Thermal Power

Station, ParliVaijnath

4 210 MWStatic Excitation

SystemDAVR Yes Yes M/s BHEL

6 Thermal Power

Station, ParliVaijnath

5 210 MWStatic Excitation

SystemDAVR Yes Yes M/s BHEL

7 Thermal Power

Station, ParliVaijnath

6 250 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

8 Thermal Power

Station, ParliVaijnath

7 250 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

9 Thermal Power

Station, ParliVaijnath

8 250 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

10 Thermal Power

Station,Khaperkheda

1 210 MWStatic Excitation

SystemDAVR Yes Yes M/s BHEL

11 Thermal Power

Station,Khaperkheda

2 210 MWStatic Excitation

SystemAVR Yes NO M/s BHEL

12 Thermal Power

Station,Khaperkheda

3 210 MWStatic Excitation

SystemDAVR Yes Yes M/s BHEL

SL NO.

Station Name Unit No. Rated CapacityType of Excitation

System AVR/DVRPSS

providedPSS

EnabledManufacturer ofExcitation system

PSSEnabled

Manufacturer ofExcitation systemStation Name Unit No. Rated Capacity

Type of ExcitationSystem AVR/DVR

PSSprovided

SL NO.

Page 14: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

13 Thermal Power

Station,Khaperkheda

4 210 MWStatic Excitation

SystemDAVR Yes Yes M/s BHEL

14 Thermal Power

Station,Khaperkheda

5 500 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

15 Thermal PowerStation, Paras

3 250 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

16 Thermal PowerStation, Paras

4 250 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

17 Thermal Power

Station,Chandrapur

3 210 MWStatic Excitation

SystemDAVR Yes Yes M/s BHEL

18 Thermal Power

Station,Chandrapur

4 210 MWStatic Excitation

SystemAVR Yes NO M/s BHEL

19 Thermal Power

Station,Chandrapur

5 500 MWStatic Excitation

SystemAVR Yes NO M/s BHEL

20 Thermal Power

Station,Chandrapur

6 500 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

21 Thermal Power

Station,Chandrapur

7 500 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

22 Thermal Power

Station,Chandrapur

8 500 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

23 Thermal Power

Station,Chandrapur

9 500 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

24 Thermal PowerStation,Koradi

5 200 MWStatic Excitation

System,DAVR Yes Yes

M/S AndritzHydro Pvt. Ltd.

Bhopal

25 Thermal PowerStation,Koradi

Under R&M6 228 MW

Static ExcitationSystem,

DAVR M/s BHEL

26 Thermal PowerStation,Koradi

7 210 MWStatic Excitation

System,DAVR Yes Yes

M/S AndritzHydro Pvt. Ltd.

Bhopal

Page 15: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

27 Thermal PowerStation,Koradi

8 660 MWStatic Excitation

System,DAVR Yes Yes

MITSUBISHIELECTRIC

CORPORATION.MEC600 model

28 Thermal PowerStation,Koradi

9 660 MWStatic Excitation

System,DAVR Yes Yes

MITSUBISHIELECTRIC

CORPORATION.MEC600 model

29 Thermal PowerStation,Koradi

10 660 MWStatic Excitation

System,DAVR Yes Yes

MITSUBISHIELECTRIC

CORPORATION.MEC600 model

30 Thermal Power

Station, Bhusawal2 210 MW

Static ExcitationSystem,

DAVR Yes Yes M/S ABB

31 Thermal Power

Station, Bhusawal3 210 MW

Static ExcitationSystem,

DAVR Yes Yes M/s BHEL

32 Thermal Power

Station, Bhusawal4 500 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

33 Thermal Power

Station, Bhusawal5 500 MW

Static ExcitationSystem, with

Brushlessexcitation

DAVR Yes Yes M/s BHEL

34Hydro PowerStation KGSC

Stage 41 250 MW

Static ExcitationSystem,

DAVR Yes Yes M/S GEC Alsthom

35Hydro PowerStation KGSC

Stage 42 250 MW

Static ExcitationSystem,

DAVR Yes Yes M/S GEC Alsthom

36Hydro PowerStation KGSC

Stage 43 250 MW

Static ExcitationSystem,

DAVR Yes Yes M/S GEC Alsthom

37Hydro PowerStation KGSC

Stage 44 250 MW

Static ExcitationSystem,

DAVR Yes Yes M/S GEC Alsthom

Sr.No.

Power Station UnitRated

Capacity

Type ofexcitation system

PSS Status

GSECL POWER STATIONS – PSS STATUS

Page 16: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

Static AVR /DVR

1 210 MW2 210 MW3 210 MW4 210 MW5 210 MW6 210 MW7 210 MW3 200 MW4 200 MW5 210 MW6 500 MW3 210 MW4 210 MW5 210 MW1 120 MW DAVR Yes Yes BHEL2 120 MW Static AVR No No BHEL3 250 MW4 250 MW1 70 MW DAVR Yes No BHEL2 70 MW BHEL

3 70 MWABBDOLMEL

4 75 MW DAVR Yes Yes BHEL6 UGBPS 2 374 MW DAVR Yes Yes ALSTOM

GTG1 67.85STG1 38.77GTG2 72.51STG2 39.94

1 200 MW2 200 MW3 200 MW4 200 MW5 200 MW6 200 MW

1 50 MW2 50 MW3 50 MW4 50 MW5 50 MW1 75 MW2 75 MW3 75 MW

Manufacturer ofExcitation System

1 Wanakbori DAVR Yes Yes BHEL

Sr.No.

Power Station UnitRated

Capacity

Type ofexcitation system PSS

ProvidedYes/No

PSSEnabledYes/No

2 UkaiAVR No No SIEMENS

DAVR Yes Yes BHEL

4 SikkaDAVR Yes Yes BHEL

3 Gandhinagar Static AVR Yes No BHEL

5 KLTPS Static AVR No No

7 DGBPS DAVR Yes Yes

10 Ukai-Hydro AVR No No BHEL

9 SSNNL-CHPH

Static AVR Yes No BHEL

DAVR Yes Yes BHEL

BHEL

8 SSNNL-RBPH DAVR Yes Yes TOSHIBA

Page 17: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

4 75 MW1 60 MW2 60 MW3 60 MW4 60 MW

REMARKS:

1 Sikka TPSUnit No.1, 3, 4

BHEL is beingasked foronlinesetting.

2 KLTPSUnit No.1

BHEL is beingasked for PSScommissioning and onlinesetting.

3 Kadana HydroUnit No.1, 2, 3,4

BHEL is beingasked foronlinesetting.

1

VidharbhaIndustries power

Ltd 2 2*300MW Brushless AVR AVR yes yes ABB (UNITROL-F)

2

DhariwalInfrastructure Ltd. ,Chandrapur(Maharashtra)

1 & 2 2x300 MW Static ExcitationUnitrol5000

yes No ABB

3Maruti Clean Coalpower ltd 1 300MW Static AVR DVR

yes NoBeijing Jisi Electricco. Ltd

4 1 105MW Static DVR yes No BHEL5 2 105MW Static DVR yes No BHEL6 3 105MW Static DVR yes No BHEL7 Dahanu TPS 1 250MW Brushless DAVR yes yes BHEL8 Dahanu TPS 2 250MW Brushless DAVR yes yes BHEL

9

Lanco AmarkantakPower Limited,Patadi, Korba (C.G.)

1 & 2 2x300 MWStatic Excitation

SystemUnitrol5000

Yes No ABB

10

Hindustan PowerProjects Pvt.Ltd.(Formely knownas MBPower),Anuppur(M.P.)

1 & 2 2x600 MWStatic Excitation

SystemUnitrol5000

Yes No ABB

11 SSHEP-RBPH 1 200MW Static AVR YES YES TOSHIBA

SL NO. Station Name Unit No. Rated CapacityType of Excitation

System AVR/DVRPSS

providedPSS

EnabledManufacturer ofExcitation system

11 Kadana Hydro DAVR Yes No BHEL

10 Ukai-Hydro AVR No No BHEL

Tons Hydel Powerstation

Page 18: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

12 SSHEP-RBPH 2 200MW Static AVR YES YES TOSHIBA13 SSHEP-RBPH 3 200MW Static AVR YES YES TOSHIBA14 SSHEP-RBPH 4 200MW Static AVR YES YES TOSHIBA15 SSHEP-RBPH 5 200MW Static AVR YES YES TOSHIBA16 SSHEP-RBPH 6 200MW Static AVR YES YES TOSHIBA17 CCPP, GSEGL 2 222.43MW STATIC DVR YES yes BHEL

18Rattan India PowerLtd

1,2,3,4,&5 270 MW Brushless DAVR

yes yesBHEL

19 Jindal Power Ltd 1,2,3 & 4 4*250MW Brushless DVR yes yes BHEL20 Jindal Power Ltd 1,2,3 & 4 4*600MW Brushless DVR yes yes BHEL21 DB Power 1&2 2*600MW Brushless DAVR yes yes BHEL22 DGEN 51 400MW static DVR yes yes Siemens23 DGEN 52 400MW static DVR yes yes Siemens24 DGEN 53 400MW static DVR yes yes Siemens

Sl.No.

Station Name Unit No's RatedCapacity

Type of ExcitationSystem

AVR /DVR

PSSprovidedYes / No

PSSEnabledYes / No

Manufacturer ofExcitation System

1 1 210 MW Exciter with Brush DVR Yes Yes Electrosila+ABB

2 2 210 MW Exciter with Brush DVR Yes Yes Electrosila+BHEL

3 3 210 MW Exciter with Brush DVR Yes Yes Electrosila+ABB

4 4 210 MW Exciter with Brush DVR Yes Yes Electrosila+BHEL

5 5 210 MW Exciter with Brush DVR Yes Yes Electrosila+BHEL

6 6 210 MW Static DVR Yes Yes Siemens7 7 500 MW Brushless with

PMGDVR Yes Yes BHEL+ABB

8 8 500 MW Brushless withPMG

DVR Yes Yes BHEL+ABB

9 9 500 MW Brushless withPMG

DVR Yes Yes BHEL

10 10 500 MW Brushless withPMG

DVR Yes Yes BHEL

11 11 500 MW Brushless withPMG

DVR Yes Yes BHEL

12 12 500 MW Brushless withPMG

DVR Yes Yes BHEL

13 13 500 MW Brushless withPMG

DVR Yes Yes BHEL

14 1 200 MW Static DVR Yes Yes ABB15 2 200 MW Static DVR Yes Yes BHEL16 3 200 MW Static DVR Yes Yes BHEL17 4 500 MW Brushless with

PMGDVR Yes Yes BHEL+ABB

18 5 500 MW Brushless withPMG

DVR Yes Yes BHEL+ABB

Vindhyachal

Korba

PSS data for NTPC Stations

Page 19: Mailing list - wrpc.gov.in · Power,Trombay Unit-5 500 MW Brushless DVR Yes Yes ABB, UNITROL-5000 7 Tata Power,Trombay Unit-6 500 MW Brushless DVR Yes Yes ABB, UNITROL-6080 8

19 6 500 MW Brushless withPMG

DVR Yes Yes BHEL+ABB

20 7 500 MW Brushless withPMG

DVR Yes Yes BHEL

21 1 660 MW Brushless withPMG

DVR Yes Yes Electrosila

22 2 660 MW Brushless withPMG

DVR Yes Yes Electrosila

23 3 660 MW Brushless withPMG

DVR Yes Yes Electrosila

24 4 500 MW Brushless withPMG

DVR Yes Yes BHEL

25 5 500 MW Brushless withPMG

DVR Yes Yes BHEL

26 GT1 144.3 MW Static DVR Yes Yes Andritz27 GT2 144.3 MW Static DVR Yes Yes Andritz28 GT3 144.3 MW Static DVR Yes Yes Andritz29 STG 224.49 MW Static DVR Yes Yes Andritz30 GT1 106 MW Brushless DVR Yes Yes ABB31 GT2 106 MW Brushless DVR Yes Yes ABB32 STG1 116.1 MW Brushless DVR Yes Yes ABB33 GT3 106 MW Brushless AVR Yes Yes Alstom34 GT4 106 MW Brushless AVR Yes Yes Alstom35 STG2 116.1 MW Brushless AVR Yes Yes Alstom36 1 500 MW Brushless with

PMGDVR Yes Yes BHEL

37 2 500 MW Brushless withPMG

DVR Yes Yes BHEL

38 3 660 MW Brushless withPMG

DVR Yes Yes BHEL

Korba

Sipat

Ghadhar GPS

Kawas

Mouda