Page 1 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
M/490 Smartgrid Mandate Status
UCA CIMug Meeting
London, 16.05.2012
Eric Lambert
Page 2 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Agenda
• Smartgrid context
• M/490 Mandate
• Sustainable Process Working Group
• Reference Architecture Working Group
• Information Security Working Group
• Smart Grid Coordination Group work
• Towards a First set of Standards for SG
• Conclusion
Page 3 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
TC8
Page 4 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
European Smartgrid context
OpenNode,
Grid4EU,
Finseny…
Page 5 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Mandate M/490 Smart Grid
Mandate Scope
Smart Grid
Coordination
Group(former JWG)
EC
Reference
Group
Process
Team
Security
Team
First Set of
Standards
Team
Architecture
Team
Steering
Committee
Further
Tasks
• Report 2.0
• Liaisons
• Promotion
New joint WGs
Existing WGs
• NIST
• JISC
• China
• Etc.
TC LevelTC Level
SGSG--CG LevelCG Level
EC LevelEC Level
New joint WGs
Existing WGs
New joint WGs
Existing WGs
New joint WGs
Existing WGs
M/441
M/468
coordination
Organisation
SG-CG participants are from
industry/user organizations,
commission and standardizations
organizations
Scope: coordination of activities,
no standards are developed.
Expected results till 2012
First Set of Standards
Sustainable Processes
Reference Architecture
Security
Mandate focus is on processes, models
and functions, not on single standards.
Page 6 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Scope of work
Sustainable Processes
today's main focus: set up a use cases management
Organization
39 members (active 12-13) + Observers: 8 Industry, 14 Telecom/ETSI, 10 Utility, 5 R&D, 1 SDO
(attendance: 10-13)
6 x F2F, 8 Conference calls, 1 open workshop with stakeholders
Deliverables and Milestones
1 March 2012
Draft report
Use Case Management Repository
End of 2012
Final Report
Use Case Management Process
Sustainable Process working group
Page 7 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Milestone Plan
“Processes
Use Case
Management”
Inform about
Methodology
Comments Draft
Report
Stakeholder
meeting Start
UC collection
First Analysis
Collection of Use
Cases (> 450)
Draft Report to
EU Commission
05 07 09 11 02 06 12 10 06 08 10 12 01 03 04 05 07 08 09 11
2011 2012
Draft Report
Workshop(s)
to Generic
Use Cases
Time Table of the WG SP
May 21st : DR/DSM workshop
May 31st: EV workshop
Use Case Template
Based on IEC PAS 62559,
Basis for the Use Case collection
Actor List Based on IEC System Actors + ENTSO-ebIX-EFET Role Model
Page 8 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Use Cases – Interrelation Between Domain and
IT Experts
UML-Graphics
Domain Expert IT Expert
System Engineer
Template as
form or check list
UML (Unified Modeling Language) for the technology neutral description of interactions and actors
Page 9 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
TC 13
TC 8 TC 22
TC 57
TC 82
TC 88 TC YZ
TC XY „TC 8“, „TC 57“, „TC 22“ -> IEC
Why is standardization interested in the use case approach?
Page 10 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Smart Grid – Collaboration of Technical Committees
TC 13
TC 8 TC 22
TC 57
TC 82
TC 88 TC YZ
TC XY
New processes for
complex, cross cutting
systems? e.g. collaborative
description of use cases
Web 2.0?
Page 11 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
IEC TC8 AHWG4 Domain Core Teams Use cases definition
Leading Team
Page 12 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
The Reference Architecture is responsible for
Setup, organization and work plan on Ref. Architecture
Selection of existing input to the work
Definition of scope for Reference Architecture
Incl. nature and usage of documents
Organization
89 members to date (58% Power Industry, 42% ICT)
9 Face-to-face meetings; average 26 participants ()
Deliverables and Milestones
Delivery of interim report on 02/03/12 (after 9 months)
Publication of TR at end of 2012
Reference Architecture working group
Page 13 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Status of the Work
Achievements
Development of Architecture Model
Agreed scope of Conceptual Model
Limited differences with NIST CM (SGIP and NIST informed)
Use Cases provided by Sustainable Processes WG
Generic uses cases used for Comm. Arch. Analysis
Draft report v1.0 distributed for comments
Draft Communication Architecture viewpoint
Page 14 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Requirements for a Smart Grids architecture framework
Able to represent
system aspects of smart grids in comprehensive, consistent and understandable manner
interoperability aspects
Able to locate gaps in standardization
Able to cope with
moving targets (in regulation) and
evolutionary implementation of smart grids
Reuse existing foundational concepts and work
Independent from technology and solutions
Page 15 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Smart Grids Architecture Model: based on existing frameworks & contributions
Generation
Transmission
Distribution
DER
Customer
Premise
Process
Field
Station
Operation
Enterprise
Market
Domains
Zones
Component Layer
Communication Layer
Information Layer
Function Layer
Protocol
Protocol
Data Model
Data Model
Outline of Usecase
Subfunctions
Business Layer
Business Objectives
Polit. / Regulat.. Framework
NIST/EU Conceptual Model Business Architecture Models
GWAC
Interoperability Stack
Reference Architecture for
Power System
Information Exchange SGAM
CEN/CENELEC/ETSI
Standards
EU Smart Grid Projects
EU EG and JWG contributions
Page 16 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
SGAM: the Smart Grid Plane
Generation
Transmission
Distribution
DER
Customer
Process
Field
Station
Operation
Enterprise
Market
Domains
Zones
(Home, Building,
Industry, EV, Mobility)
Power System
Primary Equipment
Information Management
Page 17 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
SGAM: inspired by GWAC Stack
System A
Business Context
Semantic Understanding
Network Interoperability
Syntactic Interoperability
Basic Connectivity
Business Procedures
Business Objectives
Economic / Regulatory Policy
Function
System B
Business Layer
Function Layer
Information Layer
Communication Layer
Component Layer
Page 18 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
SGAM
Generation
Transmission
Distribution
DER
Customer
Premise
Process
Field
Station
Operation
Enterprise
Market
Domains
Zones
Component Layer
Communication Layer
Information Layer
Function Layer
Protocol
Protocol
Data Model
Data Model
Outline of Usecase
Subfunctions
Business Layer
Business Objectives
Polit. / Regulat.. Framework
Interoperability
Dimension
Example Use Case
UC: DMS System controls reactive power of DER unit
Business Service: Voltage control in distribution system
Service: RTU Data-acquisition
Service: Voltage/Var control
Service: Control/Supervision of DER
Service: Audit of control actions
Precondition:
Data-acquisition is running
Feeder electric models are current
Sequence of events:
RTU sends measurement to DMS
Voltage/Var-Control is triggered by event
Voltage/Var-Control calculates control value
Voltage/Var-Control sends control value to DMS
DMS sends controlable setpoint to DER
DER receives setpoint and acknowledges
DER adjusts reactive power injection
DMS posts DER control action to audit of control actions
CRM system obtains audit actions
Use Case Mapping on SGAM
Page 21 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Component Layer
Generation Transmission Distribution Customer PremiseDER
Process
Field
Station
Operation
Enterprise
Market
HV MV LV
G H
RTUDER
Controller
HMI HES
DMS
Computer
Gateway
CRM
Computer
HAN
Controller
Data
Concentrator
Page 22 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Business Layer / Function Layer
Generation Transmission Distribution Customer PremiseDER
Process
Field
Station
Operation
Enterprise
Market
HV MV LV
G H
RTUDER
Controller
HMI HES
DMS
Computer
Gateway
CRM
Computer
HAN
Controller
Data
Concentrator
Business objectives
Business processes
Economic and regulatory
constraints
Generation Transmission Distribution Customer PremiseDER
Process
Field
Station
Operation
Enterprise
Market
HV MV LV
G H
RTUDER
Controller
HMI HES
DMS
Computer
Gateway
CRM
Computer
HAN
Controller
Data
Concentrator
Business Service
„Voltage Control in
Distribution System
RTU
Supervision
DER
Control &
Supervision
Voltage/Var
Control
Audit
Page 23 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Information Layer
Generation Transmission Distribution Customer PremiseDER
Process
Field
Station
Operation
Enterprise
Market
HV MV LV
G H
RTUDER
Controller
HMI HES
DMS
Computer
Gateway
CRM
Computer
HAN
Controller
Data
Concentrator
RTUSupervision
DER
Control &
Supervision
Voltage/Var
Control
Audit
Measurement Control
Value
Ackn
CTRL ACTAckn
Generation Transmission Distribution Customer PremiseDER
Process
Field
Station
Operation
Enterprise
Market
HV MV LV
G H
RTUDER
Controller
HMI HES
DMS
Computer
Gateway
CRM
Computer
HAN
Controller
Data
Concentrator
IEC
61850-7
-420
IEC
61
85
0-7
-4
CIM
IEC 61968-4
Message View Canonical Data Model View
Message Payloads will use standardized semantic models (CIM, 61850, COSEM, …)
Page 24 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Communication Layer
Generation Transmission Distribution Customer PremiseDER
Process
Field
Station
Operation
Enterprise
Market
HV MV LV
G H
RTUDER
Controller
HMI HES
DMS
Computer
Gateway
CRM
Computer
HAN
Controller
Data
Concentrator
IEC 61968-100
ESB IEC 61968-100
IEC 61850-8-1
GPRS
IEC 61850-8-1
IEEE 1901.1
IEC 61850-8-1
ADSL
Page 25 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
SGIS working group
Page 26 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Scope of Information Security WG
Page 27 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Existing Security standards
Page 28 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
SGIS – security levels
Page 29 CEN/CENELEC/ETSI Smart Grid Co-ordination Group © CEN-CENELEC-ETSI 2012
1. What standards can be used in Europe today
for the implementation of Smart Grids?
Mandate – SG-CG work
Use
Cases
Generation
Transmission
Distribution
DER
Customer
Premise
Process
Field
Station
Operation
Enterprise
Market
Domains
Zones
Component Layer
Communication Layer
Information Layer
Function Layer
ProtocolProtocol
Data Model
Data Model
Outline of Usecase
Subfunctions
Business Layer
Inte
rop
era
bilit
y
WG-SP
Generic Use Cases
EG1 Report
6 High level services
2. Step Map UCs to SGAM
1. Step Map Use Cases
to EG 1 Report
Identify generic
Use Cases
WG-RA
Architecture Model
3. Step Locate standards
usage
4. Step Identify common
standards WG-FSS
First set of standards
Source
Expected outcome
Result • Set of existing standards
ready for implementation
• >80% of all “necessary”
standards expected in
this category (inline with main finding of JWG report)
Existing
Standards
CEN, CLC,
ETSI WG-RA
Architecture Model
t.b.d t.b.d
t.b.d
t.b.d
Target date
End 2012
Time Horizon First set of standards
Ready by end 2012
Page 30 CEN/CENELEC/ETSI Smart Grid Co-ordination Group © CEN-CENELEC-ETSI 2012
2. How can we solve the already identified gaps?
Mandate – SG-CG work
WG-FSS
Prioritization
JWG Report
2. Step Perform Gap Analysis
1. Step Prioritize
Gaps from JWG
report
WG-FSS
Gap Analysis
3. Step Develop
Methodology
4. Step Identify common
standards WG-FSS
Workprogram
Source
Accomplished outcome (31.11.11 – to be iterated)
Result • Work program for SDOs
to fill gaps
• <20% of all “necessary”
standards expected in
this category (inline with main finding of JWG report)
WG-FSS
Dashboard
31.07.2011
Time Horizon Work program finished
Review every 3 month
Page 31 CEN/CENELEC/ETSI Smart Grid Co-ordination Group © CEN-CENELEC-ETSI 2012
3. How can we in future systematically identify
additional gaps??
Mandate – SG-CG work
Use
Cases
Generation
Transmission
Distribution
DER
Customer
Premise
Process
Field
Station
Operation
Enterprise
Market
Domains
Zones
Component Layer
Communication Layer
Information Layer
Function Layer
ProtocolProtocol
Data Model
Data Model
Outline of Usecase
Subfunctions
Business Layer
Inte
rop
era
bilit
y
Generic Use Cases
Repository
Further findings:
R&D, Pilots, Implementation
2. Step Map UCs to SGAM
1. Step Identify New Generic
Use Cases from findings
3. Step Locate
requirements for
standards
4. Step Identify new
gaps NEW Gap List
(follow process 2. from here)
Source
Expected outcome
Result • Identification of “new
gaps”
• Systematically investigate
need for new
standardization according
to the new process
established by SG-CG
t.b.d
Target date
from 2013
SGAM
SGAM
Generation Transmission Distribution Customer PremiseDER
Process
Field
Station
Operation
Enterprise
Market
HV MV LV
G H
RTUDER
Controller
HMI HES
DMS
Computer
Gateway
CRM
Computer
HAN
Controller
Data
Concentrator
IEC
61850-7
-420
IEC
61
85
0-7
-4
CIM
IEC 61968-4
GAP
Time Horizon Process set end 2012
Iteration ongoing from
2013
Generation
Transmission
Distribution
DER
Customer
Process
Field
Station
Operation
Enterprise
Market
Domains
Zones
Coverage by semantic standards
Page 32
(Home, Building,
Industry, EV, Mobility)
(Hierarchy)
KNX, BacNet,
Echonet,
Profibus,
OpenADR, SEP, …
Generation
Transmission
Distribution
DER
Customer
Process
Field
Station
Operation
Enterprise
Market
Domains
Zones
TC57 covers the supply side of Smart Grid
Page 33
(Home, Building,
Industry, EV, Mobility)
(Hierarchy)
Page 34 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Conclusion • M/490 reinforces IEC Good Working Practices
• IEC 62559 UC Template
• Use cases Role models
• Use Cases web 2.0 Tool to coordinate TCs
• SG Architecture Models
• SG Information Security Standards
• FSS for European SG and Standard Gaps
• Challenges to come :
• IEC Generic Use Cases
• International coordination between IEC TC
• Standard Harmonization
• UML models for any semantic model
• European SG demonstrator projects coordination with IEC
Page 35 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012
Thanks to M490 convenors & contributors
Thanks for your attention
Questions ?