Transcript of M. Dracos 1 Status of the Target Tracker (M. Dracos) Nagoya, 08/03/2011 M. Dracos.
M. Dracos
1
Status of theStatus of theTarget TrackerTarget Tracker
(M. Dracos)(M. Dracos)
Nagoya, 08/03/2011 M. Dracos
M. Dracos
2
During last TT interventionDuring last TT intervention(2-9 Dec. 2010)(2-9 Dec. 2010)
•Light leaks: 23 horizontal and 16 vertical cured
Right Left
More and more difficult to scotch the light leaks, during one year they become big…
Nagoya, 08/03/2011 M. Dracos
M. Dracos
3
PMT statusPMT status
PMT replaced in Dec. and now in Strasbourg for studies
trig
ger
rate
(H
z)
Not light tight!
PA2583 PA940
PA2496PA1971 PA4086
Nagoya, 08/03/2011 M. Dracos
M. Dracos
4
PMT statusPMT statustr
igge
r ra
te (
Hz)
More than 10 PMTs suffer from this problem affecting the channels on the 3 external sides (under discussion with Hamamatsu).
Apparently, the problem comes from an electrode running only on the 3 sides and emitting more and more electons…
Nagoya, 08/03/2011 M. Dracos
M. DracosOthersOthers
• front end cards• 4 replaced• limited spares• 200 spare chips found in Bern !
• Camerops and mezzanines• 2 camerops replaced• 2 mezzanines replaced
• Problems with the basket (essential for this work)• Thanks to Mario and Mengucci, the problem has been
attenuated using a faraona.
Nagoya, 08/03/2011 M. Dracos 5
M. Dracos
6
Interaction with BMSInteraction with BMS
The BMS has "touched" the TT at many places on several walls⇒All the TT walls have been readjusted
Nagoya, 08/03/2011 M. Dracos
M. Dracos
7
SummarySummary• 39 light leaks cured,
• 2 camerops+mezzanines and 4 front end cards replaced
• spare chips found!
• More than 10 PMTs under observation (discussions with Hamamatsu),
• next intervention: end of the year
• Obviously, only one intervention at the end of the running period is not enough.