LV Distribution Networks CharacteristicsFor Power Electronics Devices

Peter Lang

Page 2: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

Agenda

• Describing distribution networks

• Describe our original functional specification

• Some measurements

• Lessons learned

2

Page 3: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

UK Power Networks

3

Measure% of

industry

Meter points 8.2 m 28%

Population served 20 m 30%

New connections 130,768 35%

Distributed

generation connected7.6 GW 25%

ED1 totex allowance

(2012/13 prices)£6,029 m 25%

Energy distributed 84.8 TWh 28%

Peak demand 16 GW N/A

Service area 29,250 km2 12%

Underground network 139,000 km 29%

Overhead network 46,500 km 15%

Customer density 44 per km N/A

Page 4: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

4

400 kV and

275 kV

400 kV/275 kV > 132 kV

132 kV 33 kV11 kV

33 kV

Industrial

Supplies

11 kV Industrial &

Commercial

Supplies

LV Supplies to

domestic

& small commercial

400 V/230 VSecondary

Substation

Primary

Substation

33 kV > 11 kV 11 kV > LV

Grid

Substation

132 kV > 33 kV

Grid Supply

Points

EHV HV LV

The UK Electricity Supply Chain

~2000M

W

2MW 5kW 4kW

Distribution

Network

Operator

Page 5: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

5

LV Distribution board

Page 6: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

6

FUN-LV Trial Objectives

• To demonstrate that power electronics in the form of a soft open point can deliver capacity sharing between secondary substations.

• To demonstrate other functions such as voltage and reactive power support, phase unbalance and power factor improvement.

• Understand the reliability of power electronics connected to a distribution network.

Page 7: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

7

Electricity Distribution in the 21st Century

Why Smart Grid?

• UK has an ageing Transmission & Distribution network• De-carbonisation of transport set to increase our demand for Electricity• Energy Supply is changing, becoming less controllable• Energy Efficiency driving a proliferation of non-linear loads

Why Consider Power Electronics?

Multi-Function solutions are possible to deliver numerous benefits and maximise the capacity of our existing assets

Page 8: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

8

Our original functional specification

Characteristic Value

Low voltage connection 230 V +10% and -6% phase to neutral

Neutral connection Solidly earthed

Number of phases Three phases typically unbalanced

Maximum short circuit fault level 46 kA for 0.5 seconds, 35.1kA for 3 seconds

Target fault clearance time 350 ms

Power factor Between 0.7 lagging, unity and 0.7 leading power factor.

Altitude Below 1000 m

Frequency 49.5 to 50.5 Hz

Emergency condition limits 47.5 to 52 Hz for one minute

Audible Noise 56 dB(A) at 3 m. Measured as per IEC 60076-10:2005

Total Harmonic Distortion (THD) THD levels measured on the LV network are compliant

with ER G5/4-1

Page 9: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

9

LV busbar voltages

Page 10: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

Transformer Demands

10

Page 11: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

Voltage disturbance ride through

11

Page 12: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

12

Audible Noise (pavement SOP)

Background levels (SOP off) About 5 metres from SOP

Average sound level - 62dBA/72dBC

PE switching

Page 13: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

13

Audible Noise (Inside substation)

Unit switched off inside substation Unit switched On

100Hz from transformer

PE switching

Average sound level 72dBA/88dBC

Page 14: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

14

EMC and EMF

Radiated emissions Cannon Place EMF measurements Cannon Place

Page 15: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

15

Example of EMC results

Red SOP onGreen SOP off

Page 16: LV Distribution Networks Characteristics For Power · PDF fileSubstation Primary Substation 33 kV > 11 kV 11 kV > LV Grid 132 kV > 33 kV Grid Supply Points EHV HV LV The UK Electricity

Summary of lessons

• Size

• Noise – Close to residential areas.

• Ventilation - avoid hot air loops.

• Security – street furniture

• Site access – crane required

• Other street furniture challenges