Long Span Building Construction

28
AHMAD ARIF BIN ZULKIFLE AMIN A12DP0027 ASNIZA BINTI MD YUNUS A12DP0109 RICHMOND OLYMPIC OVAL, BRITISH-COLUMBIA, CANADA

Transcript of Long Span Building Construction

AHMAD ARIF BIN ZULKIFLE AMIN A12DP0027

ASNIZA BINTI MD YUNUS A12DP0109

RICHMOND OLYMPIC OVAL, BRITISH-COLUMBIA, CANADA

PROJECT DATAClient

City of Richmond

Architect

Cannon Design, Toronto

Structural Engineer

Glotman Simpson, Vancouver

Roof Structural Engineer (Wood Wave© Structural Panel)

Fast+Epp Partners, Vancouver

Electrical & Mechanical Engineer

Stantec Consulting, Vancouver

Landscape Architect

Phillips Farevaag Smallenberg, Vancouver

Project Management

MHPM Project Managers Inc.

Construction Manager

Dominion Fairmile Construction Ltd.

Building Renderings

Cannon Design

Developer Design Builder

Woodwave StructureCraft Builders Inc

BACKGROUND

KEY PLAN

British Columbia, Canada

BACKGROUND

LOCATION PLAN

Located on the bank of the Fraser River Delta, and enjoys spectacular views to the

North Shore Mountains Richmond

BACKGROUND

SITE PLAN

6111 River Road, Richmond, British Columbia, Canada (49°10′29″N 123°9′5″W)

Capacity: 8 000

DESIGN INSPIRATION

• Design concept: Flow, Flight and Fusion

• Approach: City Meets Nature

• Elements of curved and linear forms were taken

from the nearby Fraser River and the wild birds (the

heron) that inhabit its estuary. . Architecturally, the

curving roof recalls a heron’s wing. The roofline of

the Oval also mirrors the outline of the stylized

heron that is the centrepiece of the city’s logo

Heron symbolise

‘The graceful & elegant’

Logo of City of Richmond

3D Model Richmond Olympic Oval

DESIGN

ROOF PLAN

DESIGN

SECOND FLOOR PLAN

Second Floor Spaces

LEGEND:

1 fitness equipment

area

2 core fitness

3 meeting room

4 tenant

5 support

6 multipurpose room

7 tenant

8 speed-skating oval

9 support

DESIGN

FIRST FLOOR PLAN

First Floor Spaces

LEGEND:

1 fitness equipment

area

2 core fitness

3 meeting room

4 upper lobby

5 support

6 multipurpose room

7 tenant

8 200 m running track

9 eight-court

basketball

10 two international ice

sheets

DESIGN

GROUNDFLOOR PLAN

Ground Floor Spaces

LEGEND:

1 refrigeration mech room

2 mechanical room

3 tenant

4 paddling centre

5 sport medicine

6 tenant

7 change rooms

8 administration

9 team rooms

10 executive locker rooms

11 lobby

12 tenant

13 child minding

14 multipurpose room

15 meeting rooms

16 multipurpose meeting

rooms

17 tenant

18 tenant

19 loading/receiving

20 parking spaces

DESIGN

EAST ELEVATION

NORTH ELEVATION

DESIGN

LOBBY SECTION

SECTION A-A’

1.6 metres

100 metres

STRUCTURES CONSTRUCTION

Building Structure Diagram (330-foot glulam and steel bracing support that spring from the

massive concrete buttresses and stretch across the vaulted six-acre space every 47 feet)

Concrete Buttress

Glulam Roof

Beam Arch

Glulam Round

V-Post

Glulam Round

Frame Support

STRUCTURES CONSTRUCTION

Glulam Roof Beam Arch

Glulam Round Frame Support

Glulam Round V-Post

Concrete Buttress

Pile Caps

Concrete Slab

Vee-Shape Wood Panel Structure

The two lower floors of the building are cast-in-place concrete. Extending through the floors

are massive, inclined concrete buttressessit sit on pile caps that distribute buttress loading to

pile resistance from which the great arched roof springs.

Wood wave panel

Wave Panel Perspective View

End Plates – Transfer compresion timber arch to Steel Tension Rod

Steel Tansion Rod - Hold arch shape after the panel has been pressed

Plywood Bulkhead - Hold vee-shaped in place & transfer shear load

Plywood Pattern – Create rigid panel

Wood wave panel

Spruce, Pine, Fir (SPF) 2x4 dimension lumberWoodWave panel - tension rods; sprinkler, wood strand

pattern and form

Panel Vees loaded with fibrous insulation WoodWave panel bolted in place to a pair of

glulam arches

Wood wave panel

The Vee-shapes of the panel structure create internal voids for concealing the sprinkler piping, while allowing the

sprinkler heads to protrude into the space below

Top down roof view of an arch prior to sheathing sprinkler system main lines, electrical conduits, ventilation system

ducting, strut connection detail, WoodWave panel to arch connection detail, glulam arch steel forming and bracing

elements

Wood wave panel

Services between V-Shapes wood panel V-shapes Wood panel close up

Panel Vee with sprinkler line

positioned, lined with fabric

and plywood gussets drilled for

services

Panel Vees - staged prior to

assembly

Panel Vee with plywood

gusset positioned and

glued

gLulam round-v-post

gLulam round-v-post

Glulam Round Post use bolt and nut to

joint with metal sheet plate then have

been welded to steel frame

gLulam round-v-post

gLulam round-v-post

Glulam Round Post use bolt and nut to joint with metal sheet plate to

concrete buttress

GLULAM ROOF BEAM ARCH

GLULAM ROOF BEAM ARCH

C- Jointing Construction using bolt & nut

system

B- Roof Structure-Steel strut bracing

secured the wooden arch roof beam

panels at the top whole steel frame at the

bottom

A- Jointing Construction to Wall Facade

A B

C

material

WoodWave Panels

Exterior:

CBR Products: Broda Clarity Wood – Stone

Acrylic Finish (WS)

Applied over;

CBR Products: Broda Clarity Masonry –

Concrete Acrylic Sealer (MC)

Applied over;

PeneTreat Wood preservative

Glulam Beams

Interior:

Target - EMTECH® U9300: Ext.

polycarbonate water based urethane top coat

material

Yellow Cedar Posts

Exterior:

Target - EMTECH® U9300: Exterior

polycarbonate water based urethane top coat

Applied over;

Target - EMTECH® 8800 Universal Waterborne

Sealer

materialArchitectural Millwork

A number of wood based cabinets, counters,

displays and a variety of screening panels

have been created

through the business and special usage areas

of the facility.

Wood doors, moldings and trims have also

been used to accent the building.

Some of the wood incorporated into the

finishing details originated from the trees

harvested on the site prior to construction.

Gymnasium Floor

Surface:

Robbins Bio Channel Classic 31,000 square

feet of

Maple lumber – 25/32 in. x 1 1/2 in. wide,

2nd and better XL Maple MFMA-FJ

Substrate includes:

997 sheets of 4 ft x 8 ft x 3/4 in. plywood -

Exterior grade;

Standard D Fir CSP

System includes:

Low VOC sealer and finish

references-http://www.cannondesign.com/projects/project-catalog/richmond-olympic-oval/

-http://www.archdaily.com/49705/winter-olympics-2010-vancouver-skating-richmond-olympic-oval-cannon-design/

-http://www.designbuild-network.com/projects/richmondolympicoval/

-http://en.wikipedia.org/wiki/Richmond_Olympic_Oval

-ACEC (Association of Consulting Engineering Companies) - CCE (Canadian Consulting Engineers) 2010 Award

Announcement Reduced.pdf-Winner

-CRSI (Concrete Reinforcing Steel Institute) 2010 Design Award Announcement web size.pdf-Winner

-RAIC (Royal Architectural Institute of Canada) Awards-Innovation Architecture (Science).pdf-Winner

-Richmond Olympic Oval Case Study.pdf

-Architecture Over Ice: Cannon Creates a Skating Venue of Olympic Proportions.pdf

-Eco-structure Olympic Hero.pdf

-Oval and Above: As part of the 2010 Winter Olympics, this innovative speed-skating facility will eventually be part of a

thriving new community on the banks of the Fraser River.pdf