London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel...

25
Confidential. Not to be copied, distributed, or reproduced without prior approval. © 2017 Baker Hughes, a GE company, LLC - All rights reserved. London Petrophysical Society Well Integrity, Surveillance & Well Intervention Advances 10 th January 2019 Peter Hill. Global Products Director January 21, 2019

Transcript of London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel...

Page 1: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval. © 2017 Baker Hughes, a GE company, LLC - All rights reserved.

London Petrophysical Society

Well Integrity, Surveillance & Well Intervention Advances

10th January 2019

Peter Hill. Global Products DirectorJanuary 21, 2019

Page 2: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

BHGE’s Perception of Industry Imperatives

Oil and Gas Operating Companies work in a market constrained by, at best, revenue uncertainty and, currently, low product prices.

They are under financial constraints to maximise cash flow and return on capital like rarely before.

FID approvals for new, multi-decade developments remain hard to justify; placing the onus on preserving production and well integrity for existing assets.

These assets also must be decommissioned at the absolute minimum cost consistent with industry and regulatory standards.

This situation requires existing assets’ life cycles (reservoirs as well as well infrastructure) to be optimised and every Dollar of both CAPEX and OPEX spent

wisely through data-driven decisions and planning.

Page 3: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

BHGE’s Response

January 21, 2019 3

Well Integrity Production Logging SlicklineThe widest measurements portfolio in the industry. Providing answers to your cement uncertainties utilizing three different measurements. With the ability to identify tubulars & casing conditions up to 5 barriers.

Tubing & Casing Cutters Reservoir monitoring DeploymentThe BHGE tubing and casing cutting arsenal is the biggest in the industry. The Mechanical Pipe Cutter (MPC) along with the Downhole Electric Cutting Tool (DECT) provides the flexibility to have clean cuts from 2 7/8” tubulars to 7 5/8” casings.

We have listened to our clients’ concerns regarding issues associated with the current available production logging platforms. BHGE utilized the Industry recognized MAPS to build our future production logging Platform Accuphase®

The RPM® Platform address a broad scope of reservoir evaluation and management applications, including reservoir saturation and produced fluids monitoring, formation evaluation, production profiling, workover and well abandonment evaluation, borehole diagnostics, location of bypassed oil, gas detection and quantification, and identification of water production.

SondeTrax® is our new wireline tractor used in the deployment & retrieval of the wireline tools. Higher efficiencies & tandem tractoring options.

Whether it is an intervention job with Slickline or a SRO is required for PLT, BHGE offers a wide range of modularity and options to satisfy our clients’ needs.

Page 4: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Wireline CH New Technology

January 21, 2019 4

AccuPhase®

Building on success of MAPSFlow Rate & Fluid IDCompact & Robust6 x Optical Sensors for Gas ID6 x Micro Spinners for flow rate6 x Resistivity Sensors for Fluid ID

65US Patents GRANTED

Sondetrax® Tractor2.75” to 9.2” ID PipeSurface FeedbackPrecision Controlled, Bi-Directional Electro mechanical drive train23 Operations;

No lost timeWell Integrity & Prod. Logging2.7/8” Select Fire Perf (6m)3.5” Explosive CuttersDECT Mechanical Cutter

DECT Extreme® & MPC Incision®

2.7/8” to 7.5/8” RangeUp to 1.12” Wall ThicknessNon-explosive, non-chemical precision cuts.Surface FeedbackTension & CompressionControl linesInconel Packer MandrelsHi-alloy MaterialsHWDP & Heavy Muds

Multiple Casing Well Integrity Research

Integrity eXplorer®

Evaluate light-weight cement (as low as 7 ppg)Operate in gas-filled boreholesReal-time answer productMicroannulus Identification3 truly independent cement evaluations, simultaneouslyCombinable with OH services

Winner: World Oil Award for INTeX for "Best Well Integrity" Technology

Through-TubingMulti Barrier Corrosion MonitoringSimultaneous Cement & casing EvaluationBHGE/Industry collaboration

Page 5: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Well Surveillance & Performance

Page 6: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

AccuPhase®

January 21, 2019 6

• Resistance sensors for Hydrocarbon

detection

• Optical sensors for Gas detection

• Micro Spinners for flow

measurement

• Independent deployment arms

allow individual diameter restriction

• Multiple PAI’s can be run in the

same tool string

• Fully compatible with all Sondex

Ultrawire tools

• Toolstring length (including

centralisers) 12.3ft (3.75m)

SpecificationTemperature 177 Deg C

Pressure 15,000 psi

Tool Diameter 2.125” (54mm)

Tool Length 81.6” (2073mm)

Max Operating Diameter 9”

Top connection Sondex Female

Bottom Connection Sondex Male

Deployment Arms 6 (independent)

Sensors 6 x Micro Spinners6 x Resistance Probes6 x Optical Probes

Page 7: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

AccuPhase®

January 21, 2019 7

Field-trial locations

• Shorter toolstring enabling safer operations

• Possible multiple tools combination for a better borehole coverage

• Log data is improved through robust, co-located sensors on the arms and the new optical sensor for gas detection

• Independent deployment arms increase cross-sectional coverage and tolerance to decentralizationty

• Improved sensor distribution and more precise borehole coverage increasescalculation reliability

Gas array optical sensors

Depending on the refractive index of the fluid medium, light either refracts into the medium (liquid), or reflects back (gas).

Page 8: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Well Integrity

Page 9: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Well Integrity Portfolio

Cement Evaluation

• Radial Bond tool (RBT)

• Segmented Bond tool (SBT)

• Integrity eXplorer (INTeX)

• Ultrasonic Isolation eXplorer (ULTeX)

• Multi-Finger Imaging Caliper (MIT)

• Simultaneous Cement & Casing Evaluation –SBT + MIT + MTT

• High Resolution Vertilog (HRVRT)

• Multi-Casing Thickness tool (MID)

Casing Inspection

Long-Term Developments

• Multi-Casing Thru-Tubing Cement evaluation for P&A

• Predictive Well Integrity Management

Page 10: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

January 21, 2019 10

INTeX®

• Pad Mounted transducer design • Deployable in highly deviated boreholes

• Each pad has a SHEAR transceiver

• Measurement made in the same horizontal plane

• Variable density Log tool (VDL) provides bond with formation

Integrity eXplorer Specifications

Make up Length 19’ 11 ¼ ”

Minimum Casing Size O.D: 4.5 in, I.D: 3.92 in

Maximum Casing Size O.D 16 in, I.D: 15.5 in

Maximum tool diameter 3 5/8” closed, 17” open

Maximum logging speed 30 ft/min

Maximum pressure 20,000 psi

Maximum temperature 350˚ F

Page 11: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

INTeX Bond – Processed Deliverable

• Features and benefits• Cement mechanical properties

• Shear Modulus

• Young’s Modulus

• Bulk Modulus

• Solid-Liquid-Gas-Microannulus Delineation• Provides percentage annular fluid and microannulus map

• Filtered VDL waveform data• Eliminates ambiguity caused by casing arrivals

Page 12: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

January 21, 2019 12

INTeX Deliverables

Field Deliverable Mechanical Properties GLS-Microannulus

Page 13: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

ULTeX®

January 21, 2019 13

Challenge Solution

Simultaneous Cement & Casing Evaluation Yes

Casing Sizes 5 in to 13-3/8 in

Borehole fluid weights Up to 1.6 g/cc

Maximum operating temperature 350 DegF

Maximum operating pressure 20,000 PSI

Maximum tool diameter 3-5/8 in

Azimuthal resolution 6 degrees

Vertical Resolution 1.5 in

Casing Thickness Range 0.2 in – 0.6 in

Logging Speed (recommended) 10 ft./min

*Provisional specifications, subject to change.

Currently there are active engineering tests ongoing to qualify the service to be ran in higher mud weights and different casing types, casing thickness ranges and cement types and cement weights.

Cement Evaluation Casing Inspection

Currently on Restricted Release

Page 14: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

BHGE Cement Evaluation Capabilities

Page 15: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Multi-casing Thickness Tool - MID

• Includes three defect detectors and comprises a long probe sensor, medium probe sensor, short probe sensor, temperature sensor and gamma ray probe.

Measurement range: Tool is capable of measuring four barriers quantitatively and 5th barrier presence/ absence

Max diameter of the investigated pipes 20 in

Minimum diameter of the investigated pipes 2 3/8 in (2.05 in without centralizers)

Maximum thickness of a single pipe 0.63 in

Maximum total thickness of four barriers 2 in

The absolute error of measurement of pipe wall thickness:

for the first barrier ±0.5 mm/ ±0.02 in

for the second barrier ±0.7 mm/ ±0.028 in

for the third barrier ± 0.15 x barrier thickness

for the fourth barrier ± 0.2 x barrier thickness

The minimum length of a defect "crack" type along the tubular axis:

in survey of a single pipe 1/12 of the perimeter

in survey of the second pipe 1/4 of the perimeter

in survey of the third pipe 1/3 of the perimeter

in survey of the fourth pipe 1/2 of the perimeter

The minimum length of a defect "crack" of "transverse crack" type:

in survey of a single pipe 1/7 of the perimeter

Number of coils 3 (short, medium, long)

Measurement mode Real time

Additional sensors:

Temperature sensor resolution 0.01ºC

Pressure sensor 30-1000 API

Gamma ray range of the intensity measurement, muR/hr 3-100

Page 16: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

MID - Applications

January 21, 2019 17

• Allows for time lapse monitoring of electrochemical corrosion over time and its propagation thru multiple tubulars

• Quantitative evaluation of the first barrier and indication of any electrochemical corrosion building up in the outer casings

• Evaluation of well barrier without pulling out the tubing, can be run thru-tubing with PCE under operating conditions

• Determines quantitative thickness up to four tubulars separately

Page 17: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Multi-Barrier Cement Evaluation Technology

• Neutron Modality – Cement defect (volumetric analysis)

• Gamma / X-Ray Modality –Casing defect

• Pulse EM – Casing Defect not affected by decentralization

• Ultrasonic modality –Eccentering and Bond information

• Data fusion – Comprehensive Isolation answer

Page 18: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Predictive Corrosion Management

January 21, 2019 19

Page 19: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Well Intervention

Page 20: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

BHGE Mechanical Cutting Arsenal

January 21, 2019 21

Drillpipe selection guide

DECT & MPC specifications

Parameter Mechanical Pipe Cutter(MPC)

Downhole Electric Cutting Tool(DECT)

Tool OD Max (in) 2.125 2.52 3.25 2.6875 2.6875 3.25 3.625 4.7

Max Pipe cut OD (in) 4 4.5 7 5 5.6 6 7 7.625

Max Thickness (in) 0.5 0.68 0.75 0.75 1.1 1 0.875 0.875

Industry leading with a combined

range covering2-7/8in to 7-5/8 in and up to 1.1

in Wall Thickness

Page 21: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

Mechanical Cutters: MPC and DECT

January 21, 2019 22

Combined Range Covers 2-7/8” to 7-5/8” and up to 1.1” Wall Thickness

MPC and DECT Overview:

• Extreme range:

• MPC: 30,000 psi*, 200 DegC rated

• DECT Extreme: 3.5”-5.5” HWDP (up to 1.1” Wall Thickness)

• Both tools cut in tension and compression

• Flexible Applications:

• Ability to cut Control Lines, Inconel Packer Mandrels, Hi-Alloy Materials, HWDP

• Different Cutting Strategies enable tailored programs to be developed for specific applications

Page 22: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

January 21, 2019 23

MPC InCision Precision Slot Cutting

Tubing centralized in casing

Tubing laying against casing

Non-Ballistic Tubing Punch

minimizes hazards and rig

downtime

Page 23: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

MPC InCision

January 21, 2019 24

Precise Downhole Circulation using proven MPC design

Applications: Opening cutting in tubulars with continuous control for: • Cement squeeze

• Restored circulation

• Asphaltenes and scale clean-up

GoM Case Study:• Objective: Provide 37 clean precise slot cuts in 3.5” concentric

tubing without damaging adjacent tubular

• Result: Production flow increase was achieved before the screens were cleaned

• Increased flow extended the life of the completion and saved recompleting the well

Page 24: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity

Confidential. Not to be copied, distributed, or reproduced without prior approval.

BHGE’s Response

January 21, 2019 25

Well Integrity Production Logging SlicklineThe widest measurements portfolio in the industry. Providing answers to your cement uncertainties utilizing three different measurements. With the ability to identify tubulars & casing conditions up to 5 barriers.

Tubing & Casing Cutters Reservoir monitoring DeploymentThe BHGE tubing and casing cutting arsenal is the biggest in the industry. The Mechanical Pipe Cutter (MPC) along with the Downhole Electric Cutting Tool (DECT) provides the flexibility to have clean cuts starting 2 7/8” tubulars up to 7 5/8” casings.

We have listened to our clients’ concerns regarding issues associated with the current available production logging platforms. BHGE utilized the Industry recognized MAPS to build our future production logging Platform Accuphase®

The RPM Platformaddress a broad scope of reservoir evaluation and management applications, including reservoir saturation and produced fluids monitoring, formation evaluation, production profiling, workover and well abandonment evaluation, borehole diagnostics, location of bypassed oil, gas detection and quantification, and identification of water production.

SondeTrax® is our new wireline tractor used in the deployment & retrieval of the wireline tools. Higher efficiencies & tandem tractoring options.

Whether it is an intervention job with Slickline or a SRO is required for PLT, BHGE offers a wide range of modularity and options to satisfy our clients’ needs.

Page 25: London Petrophysical Society Well Integrity, Surveillance & Well … · 2019. 8. 25. · Inconel Packer Mandrels Hi-alloy Materials HWDP & Heavy Muds Multiple Casing Well Integrity