SLB Well Integrity final

26
Well B14 / Operator X Mediterranean Sea / Operator X Well B14 Schlumberger Well Integrity Team Mohamed El-Sadek Ahmed El-Gamal Moustafa Rakha 1

Transcript of SLB Well Integrity final

Page 1: SLB Well Integrity final

Well B14 / Operator X

Mediterranean Sea / Operator XWell B14

Schlumberger Well Integrity Team

Mohamed El-SadekAhmed El-GamalMoustafa Rakha

1

Page 2: SLB Well Integrity final

Well B14 / Operator X

Agenda

B14 Project Introduction

Client Objectives

Challenges

Work Flow

Conclusion& Recommendations

2

Page 3: SLB Well Integrity final

Well B14 / Operator X

Introduction

- Location: Mediterranean Sea, Egypt

- Well Name : B14

- Operator: X

- Well B14 was drilled with several drilling problems

A14 B14Well A 14 Well B14

Gas Cap at 3702 ft. The well plan was based on Well A14

Reservoir X P = 1300 psia

Reservoir Y P = 2500 psia

Water level at 5000 ft.

3

Page 4: SLB Well Integrity final

Well B14 / Operator X

Intermediate Casing 9 5/8’’

Total mud losses reported No open hole logs Liner was run with no

centralizers Cemented with 11.5 ppg

lead and 15.8 ppg tail

- Well Sktech

X

Y

B14 Well Schematic

2800 ft.

3702 ft.

1700 ft.

Gas Cap

5000 ft. Water

Liner Casing 7’’

Introduction

Drilled with 16 ppg OBM containing barite

Cemented with 15.8 ppg Existing Fractures

4

Page 5: SLB Well Integrity final

Well B14 / Operator X

A. Cement evaluation for to the entire zone of interest to ensure:

1. Zonal isolation between reservoirs Y and X

2. Hydraulic isolation from water zone and gas cap

Client Objectives

B. Completion system design to support production using choke size

44/64 with flowing pressure 800 to 900 psi and sand production.

C. Plug and abandonment plan

5

Page 6: SLB Well Integrity final

Well B14 / Operator X

Fractures in intermediate section

Absence OH logs

Liner ran without centralizers

No Cement Execution Report

Challenges

- Well Sktech

X

Y

Well Schematic

2800 ft.

5000 ft.

6

Page 7: SLB Well Integrity final

Well B14 / Operator X

Work Flow

Data gathering Planning Execution

Results &

recommendations

7

Page 8: SLB Well Integrity final

Well B14 / Operator X

TT= 15µs/cm

Zcement=

Zcement = 2.33 Mrayl

Planning phase

8

Page 9: SLB Well Integrity final

Well B14 / Operator X

2.3

USIT limitation

9

Page 10: SLB Well Integrity final

Well B14 / Operator X

Isolation Scanner

10

Page 11: SLB Well Integrity final

Well B14 / Operator X

Liquid

Light weight cement

SLG Map

11

Page 12: SLB Well Integrity final

Well B14 / Operator X

Identifying barite and solid accumulations

Differentiate between light weight cement & liquid

Assess hydraulic isolation

Third interface echoes “TIEs”

Other Applications

12

Page 13: SLB Well Integrity final

Well B14 / Operator X

Log header

13

Page 14: SLB Well Integrity final

Well B14 / Operator X

Execution phase

Gas cap

Water level

Perf X

Perf Y

14

Page 15: SLB Well Integrity final

Well B14 / Operator X

Gas cap- PerfX

15

Page 16: SLB Well Integrity final

Well B14 / Operator X

SLG Map

No Perforation at X

16

Page 17: SLB Well Integrity final

Well B14 / Operator X

X-Perf Y- Water zone

17

Page 18: SLB Well Integrity final

Well B14 / Operator X

SLG Map

Perforate at zone Y

18

Page 19: SLB Well Integrity final

Well B14 / Operator X

Completion program

• Single completion • Quantum PerfPac• Chock size

19

Page 20: SLB Well Integrity final

Well B14 / Operator X

Plug& Abandonment

What if the well is dry?

- Well Sktech

X

Y

Well Schematic

1700 ft.

2800 ft. Depth selection criteria:

1. Good centricity 2. Free pipe

B14 Well Schematic

Where to cut and retrieve?

Cut across the dual casing

20

Page 21: SLB Well Integrity final

Well B14 / Operator X

Example of a bad point to cut the 9 5/8’’ casing

At depth 156 ft. - Cement presence- Contact points

Plug& Abandonment

Depth Selection

21

Page 22: SLB Well Integrity final

Well B14 / Operator X

At interval 910 ft. to 960 ft.- Solid presence

Plug& Abandonment

Depth Selection

22

Page 23: SLB Well Integrity final

Well B14 / Operator X

At interval 410 ft. to 435 - No solid presence- Good centralization

Plug& Abandonment

Depth Selection

Looks good !

Recommended Depths: 415 ft. / 420 / 425 ft. / 430 ft.

23

Page 24: SLB Well Integrity final

Well B14 / Operator X

1. No hydraulic isolation between gas cap and perforation X

2. Good hydraulic isolation between formation Y and both water zone and

formation X

3. Single completion and Quantum Perf Pac System

4. Recommended depths for P&A operastion are 415 ft. / 420 /

425 ft. / 430 ft.

Conclusion

24

Page 25: SLB Well Integrity final

Well B14 / Operator X

1. Consulting our Geomechanics team to investigate wellbore

stability issues.

2. Acquiring OH logs, and Imaging tools for fracture analysis and

correct cement calculations.

3. Centralizers are recommended in deviated wells for a good

cement job.

Recommendations

25

Page 26: SLB Well Integrity final

Well B14 / Operator X

Thank youAny questions?

26