List of PS Division Notes 2001 - CERN...EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION...
Transcript of List of PS Division Notes 2001 - CERN...EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION...
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE
CERN - PS DIVISION
PS/DR/Note 2002-001 (Info)
22 January 2002
List of PS Division Notes 2001
Accelerators and Experimental Areas 4l
PS/ AE/NotE?,2001-001 NuFact-061
PS/ AE/Note2qo1-002
PS/ AE/Note 2001-003 (MD)
PS/ AE/Nofe2001-004 AD Note 060
PS/ AE/Note2001-005 (Min.)
PS/ AE/Note2001-006 'j NF Note 075
PS/ AE/Note2001-007 CTF3 Note 022
PS/ AE/Note2001-008
CLIC Note 496
PS/ AE/Note2001-009
PS/ AE/Note2001-010
CLIC Note 498
PS/ AE/Note2001-011
PS/ AE/Note2001-012
Transfer Line Between the Proton Driver Accumulator and Compressor Rings for the CERN Neutrino Factory M. Giovannozzi, M. Martini
Varying the Path Length of Charged Particles Using Wiggler Modules B. Autin, M. Giovannozzi, M. Martini, Ph. Royer
Study of a new PSB-PS Transfer line Optics with Improved Dispersion Matching by means of tum-by-turn Beam Profile Acquisitions M. Benedikt, Ch. Carli, Ch. Dutriat, M. Giovannozzi, A. Jansson, M. Martini, U. Raich, K. Schindl
Orbit Measurement and Correction for the Antiproton Decelerator (AD) N. Madsen
Minutes of PIL Meeting No. 1, 16th February 2001 N. Madsen
A Layout for a Muon Cooling Experiment at the CERN-PS: the Primary Proton Beam R. Cappi, M. Giovannozzi
RF Power Testing of the two RF Deflectors for the Preliminary Phase of the New CLIC Test Facility (CTF3) R. Corsini, G. Rossat, P. Royer
Accelerator Aspects of a Potential CLIC-1 Collider D. Schulte, F. Zimmermann
Results from First Experiment to Measure Lead Ion Induced Desorption at Linac3 N. Madsen
A 30 GHz Beam Driven High Gradient. Single Cell Cavity Test C. Achard, H.H. Braun, S. Dobert, L. GroeninK, I. Wilson, W. Wuensch
LIL Lattice Parameters, LIL Energy gains, LIL Temperature versus RF Frequency, EPA Circumference and EPA Isochronicity Measurements R. Corsini, B. Dupuy, A. Ferrari, L. Rinolfi, T. Risselada, P. Royer, F. Tecker
Injection of the Lead Ion Beam for LHC into the PS M. Martini
1
PS/ AE/Note2001-013
PS/ AE/Note2001-014 CTF3 Note 034
PS/ AE/Note2001-015 (Tech.)
PS/ AE/Note2001-016 (MD) CTF3 Note 037
PS/ AB/Note 2001-017
PS/BO/Note 2001-012
PS/ AB/Note 2001-018
PS/ AB/Note 2001-019
PS/ AE/Note2001-020 CTF3 Note 040
Antiproton Decelerator AD-Note-060
PS/ AE/Note 2001-004
Beam Diagnostics Group PS/ BD/Note2001-001 (Tech.);
PS/ BD IN ote 2001-002
PS/ BD IN ote 2001-003
PS/ BD IN ote 2001-004
PS/ BD/Note2001-005 (Tech.)
PS/ BD/Note 2001-006
22/01/2002
Magnets and Power Supplies Nomenclature for the Preliminary Phase of CTF3 L. Rinolfi, Ph. Royer
CTF3 Preliminary Phase Commissioning. Report on First Week, 17-21 September 2001 R. Corsini, B. Dupuy, L. Rinolfi, P. Royer, F. Tecker
Solenoid Mangets MS464 for the CTF3 Injector H.H. Braun
CTF3 Preliminary Phase Commissioning- Report on Second Week, 8-12 October 2001 0. Coiro, R. Corsini, B. Dupuy, F. Marcellini, L. Rinolfi, P. Royer, A. Stella, F. Tecker
Measurement of Optical and Beam Parameters in the Transfer Line towards the Decelerating RFQ C. Bal, M. Giovannozzi, V. Prieto, U. Raich
·Emittance Exchange by Crossing a Coupling Resonance - A Method for Precise Measurements of the Horizontal Emittance Applied to the PSB C. Carli, G. Cyvoct
Reflection on the Different Lead Ion Injection Variants S. Maury
CTF3 Preliminary Phase Commissioning Report on Third Week, 29 October-2 November 2001 R. Corsini, B. Dupuy, L. Rinolfi_, P. Royer (Ed.), F. Tecker (CERN), A. Ferrari, Uppsala University, M. Belli, C. Milardi, A. Stecchi, INFN-LNF, Frascati
Orbit Measurement and Correction for the Antiproton Decelerator (AD) N. Madsen
Aspects Timing et Interconnexions Hardware dans le Contexte de la Mesure d'Intensite des Faisceaux dans les Lignes d'Ejection et de Transfert du PSB J.-D. Schnell
Calibration of Transfer Line Beam Current Transformers (BCT's) C. Carter
Calibration of TRA468; TOF Transformer C. Carter
Low-Level Software for the Pentek 6510 DRS, in application to the new AD beam measurement system M. E. Anf{oletta
Purchase of a Fast Digitiser System for Beam Studies V. Chohan
Procedures a suivre pour la maintenance des detecteurs de pertes de !'ensemble PS V. Prieto
2
PS/ BD/Note2001-007
PS/ BD/Note 2001-008
PS/ BD/Note 2001-009
PS/ BD/Note2001-010
PS/ BD/Note2001-011 (Tech.)
PS/ BD/Note 2001-012
PS/ AE/Note 2001-017
PS/ BD/Note2001-013
PS/OP /Note 2001-011
PS/BD/Note2001-014 (Tech.)
PS/ BD/Note 2001-015
PS/ BD/Note2001-016 (Tech.)
PS/ BD/Note 2001-017
PS/ BD IN ote 2001-018
CLIC Test Facility 3
CTF3-Note-018 (Tech.)
PS/ AE/Note 2001-011
CTF3-Note-019 (Tech.)
CTF3-Note-020 (Tech.)
CTF3-Note-021 (Tech.)
CTF3-Note-022 (Tech.)
PS/ AE Note 2001-007
22/01/2002
Beam Profile Monitoring using Gas Scintillation in the Booster Machine E. Bravin, R. Maccaferri, M. Plum
Beam Loss Monitors used in Counting Mode. Some Elementary Issues. J. Bosser
Experimental Tests of a Spare Electron Gun for the Antiproton Decelerator (AD) Electron Cooler C. Dimopoulou
MultiWire Proportional Chambers: a Comparative Measurement of a Newly Developed and the Existing Electronics R. Maccaferri, G. Molinari
Un Transformateur semi-lent pour LEIR F. Lenardon, P. Odier, S. Tirard
Measurement of Optical and Beam Parameters in the Transfer Line Towards the Decelerating RFQ C. Bal, M. Giovannozzi, V. Prieto, U. Raich
Test of a Dispersion Sweep Correction System by using a Centroid in the DIRAC Beam Line ]. Bosser, G. Molinari, ]-M. Nonf{laton, V. Prieto, R. Steerenberf{
Beam Intensity Measurements in the LHC V. Chohan
Laser Wire Scanner: Basic Process and Perspectives for the CTF's and CLIC Machines. T. Lefevre
Beam Diagnostics Implications for LEIR V. Chohan
LEIR Electron Cooler Conceptual Study J. Bosser, G. Tranquille
Specifications of the LEIR Electron-Cooler Magnetic Components J. Bosser, V. Prieto, G. Tranquille
LIL Lattice Parameters, LIL Energy Gains, LIL Temperature Versus RF Frequency, EPA Circumference and EPA Isochronicity Measurements R. Corsini, B. Dupuy, A. Ferrari, L. Rinolfi, T. Risselada, P. Royer, F. Tecker
Thermal Analysis of OTR Screens for CTF3 E. Bravin
Production of a High-Average Current Electron Beam with CsTe Photocathodes E. Chevallay, G. Suberlucq, H. Trautner
Proposal for CTF3 Timing System J.-C. Bau, J.-M. Bouche, J.H. Lewis,]. Serrano, J.P.H. Sladen
RF Power Testing of the two RF Deflectors for the Preliminary Phase of the New CLIC Test Facility (CTF3) R. Corsini, G. Rossat, P. Royer
3
CTF3-Note-023 (Tech.)
CTF3-Note- 024 (Tech.)
CTF3-Note-025 (Tech.)
CTF3-Note- 026 (Tech.)
CTF3-Note-027 (Tech.)
PS/PO/Note 2001-032 (Tech.)
CTF3-Note- 028 (Spec.)
CTF3-Note-029 (Min.)
CTF3-Note-030 (Tech.)
CTF3-Note-031 (Tech.)
PS/ AE Note 2001-013
CTF3-Note-032 (Tech.)
PS/PO/Note 2001-052 (Tech.)
CTF3-Note- 033 (Tech.)
PS/ AE/Note 2001-015 (Tech.)
CTF3-Note-034 (Tech.)
PS/ AE Note 2001-014
CTF3-Note-035 (Spec.)
PS/PO/Note 2001-050 (Spec.)
CTF3-Note-036 (Min.)
CTF3-Note-037
PS/ AE/Note 2001-016 (MD)
CTF3-Note-038
Driving Beam Delay Loop Design for CTF3 F. Sannibale
Combiner Ring Lattice C. Biscari
The RF Deflectors for CTF3 D. Alesini, R. Boni, A. Gallo, F. Marcellini
22/01/2002
Energy Spread and Energy Losses in CTF3 Combiner Ring A. GhiKO, M. Zobov
Visit to Thales Electron Devices (formerly Thomson Tubes Electronique) on Tuesday 26th June 2001 T. Fowler, G. McMonaKle
Specifications for the CTF3 Gun H. Braun, G. Geschonke, L. Rinolfi
Report of the Meeting for CLIC Photo-Injector Study, 28 June 2001 S. Hutchins
Notes of a Visit to TMD Technologies Ltd. on 2nd August 2001 G. McMonaKle, P. Pearce
Magnets and Power Supplies Nomenclature for the Preliminary Phase of CTF3 L. Rinolfi, P. Royer
The Effect of Different Resistor Values on the CTF3 Sub-harmonic Klystron Pulser Simulation Circuit Performance L. Shen
Solenoid Magnets MS 464 for the CTF3 Injector H. Braun
CTF3 Preliminary Phase Commissioning- Report on First Week, 17-21 September 2001 R. Corsini, B. Dupuy, L. Rinolfi, P. Royer, F. Tecker
Specification for the Supply of a 1.5 GHz Broadband Klystron or Other RF Power Source for the CLIC Test Facility (CTF3) G. McMonaKle, P. Pearce
Report on the Photo-injector Workshop, CERN, 24-25th September 2001 Summarized by S. Hutchins
CTF3 Preliminary Phase Commissioning. Report on Second Week, 8-12 October 2001 R. Corsini, B. Dupuy, L. Rinolfi, P. Royer (Ed.), F. Tecker (CERN) 0. Coiro, F. Marcellini, A. Stella (INFN-LNF, Frascati)
Visit to Thales Electron Devices for Klystron Reception (Upgrade of TH2100 Ser. No. 040, 37 MW to 45 MW) on 9th November 2001 G. McMonaKle
4
CTF3-Note- 039
CERN/PS/ 2001-072 (RF)
CTF3-Note-040
PS/ AE Note 2001-020
CTF3-Note-041
22/01/2002
CTF3 Design Report. Preliminary Phase D. Allard, B. Bartholome, J.P. Bertuzzi, R. Bonzano, R. Bossart, H. Braun, E. Bravin, J. Borburgh, /. Buttkus, E. Chazarenc, V. Chohan, /./. Cloye, R. Corsini, G. Coudert, M. Damiani, S. Deghaye, J.P. Delahafe, F. Di Maio, T. Dobers, P. Dubie/, B. Dupuy, L.Durieu, A. Ferrari, G. Geschonke, . Hansen, H. Hellgren, M. Hourican, M. Lamidon, T. Lefevre, J.H. Lewis,/. Lindroos, E. Manner, G. McMonagle, /. Monteiro, /. Mourier, P. Odier, T. Otto, P. Pearce, R. Pittin, M. Poehler, J-P. Potier, U. Raich, M. Rettig, L. Rinolfi, T. Risselada, R. Riva, G. Rossat, P. Royer, L. Sermeus, K. Setas, G. Simonet, /.P.H. Sladen, L. Saby, L. Tanner, F. Tecker, J.C. Thomi, I. Wilson, G. Yvon - CERN, M. Bernard, G. Bienvenu, R. Chaput (LURE),/. Le Duff, T. Garvey, B. Mouton - LAL
CTF3 Preliminary Phase Commissioning. Report on Third Week, 29 October - 2 November 2001 R. Corsini, B. Dupuy, L. Rinolfi, P. Royer (Ed.), F. Tecker (CERN) A. Ferrari (Uppsala University), M. Belli, C. Milardi, A. Stecchi, (Frascati)
Prototype "froid" WCM CTF3 : quelques resultats
/.Durand
Compact Linear Collider Study CLIC-Note-468
PS/RF/Note 2001-002
CLIC-Note-469
CERN/PS 2001-002 (AE)
CLIC-Note-470
CLIC-Note-471
CLIC-Note-472
CLIC-Note-473
CERN/PS 2001-008 (AE} 1,,
CLIC-Note-474
LC-PHSM- 2001-072-CLIC
CLIC-Note-475
CERN /PS 2001-009 (AE)
CLIC-Note-476
CERN-SL- 2001-010 AP
CLIC-Note-477
CERN-SL- 2001-012 AP
CLIC-Note-478
CERN /PS 2001-018 (PO)
CLIC-Note-479
CERN /PS 2001-022 (PO)
Cooling and Vibration in the CLIC Main Accelerating Structure W. Schnell
Machine-Detector Interface at CLIC D. Schulte
Beam Dynamics for the CTF3 Preliminary Phase R. Corsini, A. Ferrari, L. Rinolfi, T. Risselada, P. Royer, F. Tecker
CTF3 : Design of Driving Beam Combiner Ring C. Biscari, R. Corsini, T.E. D'Amico, A. Ghigo, L. Groening, G. Gui~rd, F. Marcellini, C. Sanelli, F. Sannibale, M. Serio, F. SKamma, G. Vi~ola, M. Zobov,
Studies on the RF Deflectors for CTF3 A. Gallo, D. Alesini, F. Marcellini, R. Corsini, D. Schulte, I. Syratchev,
Achievements and Future Plans of CLIC Test Facilities R.H. Braun for the CLIC Study Team
Physics Signatures at CLIC M. BattaKlia
High-power Testing of 30 GHz Accelerating Structures at the CLIC Test Facility (CTF II) H.H. Braun, S. Doebert, L. GroeninK, I. Wilson, W. Wuensch, F. Zhou
Final-Focus Schemes for CLIC at 3 TeV H. Burkhardt, T. Risselada, F. Schmidt (CERN), H.-/. Schreiber (DESY), F. Zimmermann,
Heat Deposition by Transient Beam Passage in Spoilers B. Jeanneret
Klystron-Modulators for the 3 TeV CLIC Scheme - an Overview P. Pearce
Design Proposal for a Compact, Solid-State, Low-Power Klystron-Pulser for CTF3 P. Pearce
5
CLIC-Note-480
CERN /PS 2001-027 (AE)
CLIC-Note-481
CERN /PS 2000-039 (RF)
CLIC-Note-482
CERN /PS 2001-028 (AE)
CLIC-Note-483
CERN/PS 2001-029 (AE)
CLIC-Note-484
CERN/PS 2001-038 (AE),
CLIC-Note-485
CERN/PS 2001-030 (AE)
CLIC-Note-486
CERN/PS 2001-032 (AE)
CLIC-Note-487
CERN /PS 2001-033 (PP)
CLIC-Note-488
CERN/PS 2001-031 (RF)
CLIC-Note-489
CERN /PS 2001-045 (RF)
CLIC-Note-490
CERN /PS 2001-046 (RF)
CLIC-Note-491
CLIC-Note-492
CERN/SL 2001-034
CLIC-Note-493
CERN/SL 2001-036
CLIC-Note-494
CERN SL 2001-038
CLIC-Note-495
CERN/SL 2001-045 (AP)
CLIC-Note-496
CERN /SL 2001-049 (AP),
22/01/2002
Recent Experiments on the Effect of Coherent Synchrotron Radiation on the Electron Beam Effect of CTF II M. Borland, H.H. Braun, S. Doebert, L. Groeninf(, A. Kabel
Slotted Iris Structure Studies E. Jensen, I. Syratchev, W. Wuensch
Simulation Package based on PLACET E. D'Amico, G. Guif(nard, N. Leros, D. Schulte
Dynamic Effects in the Main Linac of CLIC N. Leros, D. Schulte
The Crossing Angle in CLIC D. Schulte, F. Zimmermann
An Overview of the New CLIC Test Facility (CTF3) R. Corsini for the CTF3 Study Team
Beam Dynamics for the Preliminary Phase of the New CLIC Test Facility (CTF3) R. Corsini, A. Ferrari, L. Rinolfi, T. Risselada, P. Royer, F. Tecker
The Photoinjector Option for CLIC: Past Experiments and Future Developments E. Bente, H.H. Braun, E. Chevallay, S. Hutchins, P. Legros, G. Suberlucq, H. Trautner, I.N. Ross
Network Representation of Multi-Cell Accelerating Structures J. V. Raf(Uin
Status of CLIC High Gradient Studies H. Braun, S. Doebert, L. Groeninf(, I. Wilson, W. Wuensch
Time Domain Simulations of the CLIC PETS (Power Extraction and Transfer Structure with GdfidL W. Bruns, I. Syratchev
High Power Test of a 30 GHz Planar Accelerator H.H. Braun, S. Doebert, H. Henke, W. Wuensch, D. Yu
Failure Modes in CLIC D. Schulte, F. Zimmermann
Overview of the CLIC Collimation Design R. Assmann, H. Burkhadt, S. Fartoukh, J.B. Jeanneret, J. Pancin, S. Redaelli, T. Risselada, H.J. Schreiber, F. Zimmermann
Damping Rings for CUC J. Jowett, H. Owen, T. Risselada, F. Zimmermann
The CLIC Study of Magnet Stability an Time Dependent Luminosity by Performance M. Aleksa, R. Assmann, W. Coosemans, G. Guignard, N. Leros, M. Mayoud, S. Redaelli, F. RUf(f(iero, S. Russenschuck, D. Schulte, I. Wilson, F. Zimmermann
Accelerator Aspects of a Potential CLIC-1 Collider D. Schulte, F. Zimmermann
6
CUC-Note-497
CUC-Note-498
PS/ AE Note 2001-010
CUC-Note-499
CERN /PS 2001-057 (AE)
CUC-Note-500
CERN/PS 2001-062 (AE)
CUC-Note-501
CERN SL- 2001-064 (AP)
CUC-Note-502
CERN/PS 2001-074 (AE)
Controls Group PS/ CO/Note2001-001 (Min.)
PS/ CO/Note2001-002 (Min.)
PS/ CO/Note2001-003 (Min.)
PS/ CO/Note2001-004 (Tech.)
PS/ CO/Note2001-005 (Tech.)
PS/ CO/Note2001-006 (Min.)
PS/ CO/Note2001-007 (Tech.)
PS/ CO/Note2001-008 (Min.)
PS/ CO/Note2001-009 (Tech.)
PS/ CO/Note2001-010 (Min.)
PS/ CO/Note2001-011 (Min.)
PS/ CO/Note2001-012 (Min.)
22/01/2002
A Report of the Activities of the CLIC Study Team for the Year 2000 Compiled by I. Wilson for the CUC Study Team
A 30 GHz Beam Driven High Gradient Single Cell Cavity Test C. Achard, H. H. Braun, S. Dobert, L. Groeninx, I. Wilson, W. Wuensch
Progress on the CUC Linear Collider Study G. Guixnard for the CUC Study Team
Higgs Physics with a yy Collider Based on CUC 1 D. Asner, H. Burkhardt, A. De Roeck, J. Ellis, J. Gronberg, S. Heinemeyer, M.Schmitt, D. Schulte, M. Velasco, F. Zimmermann
Polarization Issues at CUC R. W. Assmann, F. Zimmermann
Update of the Status of Machine Detector Interface Studies for CUC D. Schulte
Compte Rendu de la Reunion C02 du 16.03.2001 M. Pace
Compte rendu de la Reunion C02 du 16.03.2001 M. Pace
Compte rendu de la Reunion C02 du 06.04.2001 M. Pace
Details of CTF3 Central Timing J.-C. Bau, J.-M. Bouche, I Lewis, J. Sladen, J. Serrano
Counters you can count on: the Rejuvenation of the TG8's Programmable Logic J. Serrano
Compte rendu de la reunion C02 du 04.05.2001 M. Gourber-Pace
The B Counter Piggyback. An 18-bit-up-down Counter to Keep Track of the Magnetic Field in the PS J. Serrano
Compte rendu de la reunion C02 du 01.06.2001 M. Gourber-Pace
ISOLDE FEC Study - Final Report. A Study to upgrade the ISOLDE Controls Front-end O.C. Jonsson, F. Locci, G. Mornacchi
Compt~ Rendu de la Reunion C02 du 24.08.2001 M. Gourber-Pace
Compte Rendu de la Reunion C02 du 21.09.2001 M. Gourber-Pace
Compte rendu de la reunion du 02.10.2001 sur l'Environnement Java M. Gourber-Pace
7
PS/ CO/ Note 2001-013 (Min.)
PS/ CO/Note2001-014 (Tech.)
Compte Rendu de la Reunion C02 du 07.12.2001 M. Gourber-Pace
22/01/2002
The CTF3 Delay Card. An 8-channel VME module to delay TTL pulses in 200 ps steps P. Fernier, J. Serrano
Divisional Resources Group PS/ DR/Note2001-001 (Info.)
PS/ DR/Note2001-002 (Min.)
PS/ DR/Note 2001-003 (Min.)
PS/ DR/Note2001-004 (Min.)
PS/ DR/Note 2001-005 (Min.)
PS/ DR/Note 2001-006 (Min.)
PS/ DR/Note2001-007 (Min.)
PS/ DR/Note2001-008 (Min.)
PS/ DR/Note2001-009 (Min.)
PS/ DR/Note 2001-010 (Min.)
PS/ DR/Note2001-011 (Min.),,
Tech. Mtg 118
PS/ DR/Note2001-012 (Min.)
PS/DR/Note2001-013 (Min.)
PS/ DR/Note2001-014 (Min.)
PS/ DR/Note 2001-015 (Min.)
PS/ DR/Note 2001-016
SPL-DI/KHK bd 946
PS Division Notes 2000 Edited by S.L. Neboux
Summary of the PS Management Board Meeting held on 15.01.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 22.01.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 29.01.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 05.02.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 12.02.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 19.02.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 26.02.2001 S.L. Neboux
Compte-rendu de la reunion du PS Management Board du 05.03.2001 T. Kehrer
Summary of the PS Management Board Meeting on 12.03.2001 S.L. Neboux
Minutes of the PS Technical Meeting No. 118 held on 28.03.2001 ]. Boillot
Summary of the PS Management Board Meeting on 19.03.2001 S.L. Neboux
Summary of the PS Management Board Meeting on 26.03.2001 S.L. Neboux
Minutes of the PS Administrative Meeting held on 21.03.2001. Exercise MOAS pour les filieres III a VII. J. Boillot
Summary of the PS Management Board Meeting held on 02.04.2001 S.L. Neboux
Definition du modele "Equipe de Support" pour l'appui industriel dans la division PS. GrouP.e de travail ASC (Analysis of Service Contracts), PS & SPL J. Bozllot, B. Denis, J. Gruber, A. Krusche, F. Perriollat
8
PS/ DR/Note2001-017 (Spec.)
PS/ DR/Note2001-018 (Min.)
PS/ DR/Note2001-019 (Min.)
Tech. Mtg 119
PS/ DR/Note2001-020 (Min.)
PS/ DR/Note2001-021 (Min.)
PS/ DR/Note2001-022 (Min.)
PS/ DR/Note2001-023 (Min.)
PS/ DR/Note2001-024 (Min.) Tech. Mtg 120
PS/ DR/Note2001-025 (Min.)
PS/ DR/Note2001-026 (Min.)
PS/ DR/Note2001-027 (Min.)
PS/ DR/Note 2001-028 (Min.)
PS/ DR/Note2001-029 (Min.)\
PS/ DR/Note2001-030 (Min.)
PS/ DR/Note 2001-031 (Min.)
PS/ DR/Note2001-032 (Min.)
PS/ DR/ Note 2001-033 (Min.)
PS/ DR/Note2001-034 (Min.)
PS/ DR/Note2001-035 (Min.)
PS/ DR/Note 2001-036 (Min.)
22/01/2002
Cahier des Charges - Structure de Management de l'appui industriel (contrats S072 et S073) dans la division PS pour la periode du ler avril 2001 au 31 decembre 2001 Grour.e de travail ASC (Analysis of Service Contracts), PS & SPL /. Boillot, B. Denis, /. Gruber, A. Krusche, F. Perriollat
Summary of the PS Management Board Meeting held on 09.04.2001 S.L. Neboux
Minutes of PS Technical Meeting No. 119 held on 04.04.2001 B. W. Allardyce
Summary of the PS Management Board Meeting held on 23.04.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 30.04.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 07.05.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 14.05.2001 S.L. Neboux
Minutes of PS Technical Meeting No. 120 held on 09.05.2001 B. W. Allardyce
Summary of the PS Management Board Meeting held on 28.05.2001 S.L. Neboux
Summary Notes of the 3rd NLC-MAC Meeting, (SLAC: 16 - 18.05.2001) J.P. Delahaye
Summary of the PS Management Board Meeting held on 11.06.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 18.06.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 25.06.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 25.06.2001 K. Schindl
Summary of the PS Management Board Meeting held on 09.07.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 16.07.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 23.07.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 30.07.2001 S.L. Neboux
Summary of the PS Management Board held on 06.08.2001 T. Kehrer
Summary of the PS Management Board held on 13.08.2001 S.L. Neboux
9
PS/ DR/ Note 2001-037 (Min.)
PS/ DR/Note 2001-038 (Min.)
PS/ DR/Note 2001-039 (Min.)
PS/ DR/Note 2001-040 (Min.)
PS/ DR/Note 2001-041 (Min.)
PS/ DR/Note 2001-042 (Min.)
PS/ DR/Note2001-043 (Min.)
Tech. Mtg 121
PS/ DR/Note2001-044 (Min.)
PS/ DR/Note 2001-045 (Min.) Tech. Mtg 122
PS/ DR/Note2001-046 (Min.)
PS/ DR/Note2001-047
PS I DR/Note 2001-048 (Min.)
PS/ DR/Note2001-049 (Min.)
Tech. Mtg 123
PS/ DR/Note2001-050 (Min.)i,
PS/ DR/Note 2001-051 (Min.)
PS/ DR/Note2001-052 (Min.)
PS/ DR/Note2001-053 (Min.)
Tech. Mtg 124
PS/ DR/Note2001-054
PS/ DR/Note2001-055 (Min.)
PS/ DR/Note 2001-056
PS/ DR/Note2001-057 (Tech.)
22/01/2002
Summary of the PS Management Board Meeting held on 20.08.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 27.08.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 03.09.2001 T. Kehrer
Summary of the PS Management Board Meeting held on 10.09.2001 T. Kehrer
Summary of the PS Management Board Meeting held on 17.09.2001 T. Kehrer
Summary of the PS Management Board Meeting held on 24.09.2001 T. Kehrer
Minutes of PS Technical Meeting No. 121 held on 29th August 2001 B. W. Allardyce
Summary 'of the PS Management Board Meeting held on 01.10.2001 S.L. Neboux
Minutes of PS Technical Meeting No. 122 held on 26th September 2001 B. W. Allardyce
Summary of the PS Management Board Meeting held on 08.10.2001 S.L. Neboux
Long Term Consolidation Programme for the PS Complex J. Gruber
Summary of the PS Management Board Meeting held on 15.10.2001 S.L. Neboux
Minutes of PS Technical Meeting No. 123 held on 10th October 2001 B. W. Allardyce
Summary of the PS Management Board Meeting held on 22.10.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 29.10.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 05.11.2001 S.L. Neboux
Minutes of PS Technical Meeting No. 124 held on 31st October 2001 B. W. Allardyce
PS Manpower Plan J. Boillot, J.P. Delahaye and F. Perriollat for the PS Mana:zement Board
Summary of the PS Management Board Meeting held on 12.11.2001 S.L. Neboux
Capital Value of PS Equipment B. W. Allardyce
Confidential J.P. Delahaye, K. Hubner, C. Wyss
10
PS/ DR/Note2001-058 (Min.)
PS/ DR/Note2001-059 (Info.)
PS/ DR/Note 2001-060 (Min.)
PS/DR/Note2001-061 (Min.)
PS/ DR/Note2001-062 (Min.)
PS/ DR/Note2001-063 (Min.)
PS/ DR/Note2001-064 (Spec.)
PS/ DR/Note 2001-065 (Spec.)
Neutrino Factory NF-Note-053
NF-Note-054
NF-Note-055
NF-Note-056
NF-Note- 057
NF-Note-058
NF-Note-059
NF-Note-060
NF-Note-061
NF-Note-062
22/01/2002
Summary of the PS Management Board Meeting held on 19.11.2001 S.L. Neboux
General Information on the PS Division Edited by ]. Boillot (for the PS Mana~ement Board)
Summary of the PS Management Board Meeting held on 26.11.2001 C. Galmant
Summary of the PS Management Board Meeting held on 03.12.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 10.12.2001 S.L. Neboux
Summary of the PS Management Board Meeting held on 17.12.2001 S.L. Neboux
Definition du modele "Equipe de Proximite" pour l'appui industriel dans la Division PS: Approche utilisee pendant le premier semestre 2002 F. Perriollat et al.
Cahier des charges pour activites au forfait F. Perriollat et al
Neutrino Fluxes from a Conventional Neutrino Beam using CERN SPL A. Blonde[, M. Done~a, S.Gilardoni
Focusing in Recirculating Muon Accelerators E. Keil
Installation and Use of Simple Mathematica Packages for Recirculating Linear Muon Accelerator and Storage Ring Designs E. Keil
Electron Cloud at the CERN Muon Storage Ring F. Zimmermann
An Alternative Beam Trajectory Through the 2.2 Ge V Linac Beam Chopper Reduces the Power Requirements by a Factor 4 M. Paoluzzi
Triplet Focusing for Recirculating Linear Muon Accelerators E. Keil
Muon Front-End without Cooling K. Hanke
Neutrino Oscillations at the SPL Super Beam M. Mezzetto (INFN Padova, Italy)
Transfer Line Between the Proton Driver Accumulator and Compressor Rings for the CERN Neutrino Factory M. Giovannozzi, M. Martini
Revised Beam Dynamics and Layout for the Superconducting Section of the SPL F. Geri~k
11
NF-Note-063
NF-Note-064
NF-Note-065
NF-Note-066
NF-Note-067
NF-Note-068
NF-Note-069
NF-Note-070
NF-Note-071
NF-Note-072
NF-Note-073
NF-Note-074
NF-Note-075
NF-Note-076
NF-Note-077
NF-Note-078
NF-Note-079
NF-Note-080
22/01/2002
Neutrino Factory Plans at CERN A. Riche (for the CERN Neutrino FactonJ Study Group)
Simulation of the SPL SC RF System with Beam using SPLinac J. Tiickmantel
A Stationary Target for the CERN-Neutrino Factory P. Sievers
Considerations on Low Frequency High Gradient Cavities for Muon Capture and Cooling B. Spataro, F. Tazzioli
Focusing in Recirculating Muon Accelerators E. Keil
A CdTe Detector for Muon Transverse Profile Measurements M. Placidi, E. Rossa, H. Schmick/er
Varying the Path Length of Charged Particles Using Wiggler Modules B. Autin, M. Giovannozzi, M. Martini, Ph. Royer
Simulation of Target Particles Emission for Neutrino Factory Using FLUKA J.F. Amand
Beam-Loading Compensation in the Recirculating Linacs of the CERN Neutrino Factory F. Zimmermann
The Effect of Phase Slippage in Multicell Cavities on Longitudinal Beam Dynamics F. GeriJ?k
Solenoidal Channels Linear Dynamics G. Franchetti
Current Activities for a Neutrino Factory at CERN R. Garoby
A Layout for a Muon Cooling Experiment at the CERN-PS: the Primary Proton Beam R. Cappi, M. Giovannozzi
Beam Loading Compensation Schemes for the Muon Recirculating Linacs of the CERN Neutrino Factory M. Ferrario, V. Fusco, M. MiJ?liorati
Proposal for a Four Hom Capture Scheme S. Gilardoni, K. Hanke et A. Perrin
Study of (Anti-)Neutrino Fluxes from a Hom Neutrino Beam using 2.2 GeVProtons M. DoneJ?a
A First Study of a Scintillating Fibre Detector for a Muon Ionisation Cooling Experiment P. Gruber, E. Mcki~ney
Technical Results of the Hom Study for the Nufact J.M. Mau~ain, S. RanJ?od, F. Voelker
12
NF-Note- 081
NF-Note-082
NF-Note- 083
NF-Note-084
NF-Note-085
NF-Note-086
NF-Note-087
NF-Note- 088
NF-Note-089
NF-Note- 090
NF-Note-091
NF-Note-092
NF-Note- 093
NF-Note- 094
NF-Note-095
NF-Note-096
NF-Note-097
NF-Note-098
NF-Note- 099
22/01/2002
Nufact Prototype Hom Installation and Measurements, J.M. MauKain, S. RanKod, F. Voelker
Control Instabilities in a Pulsed Multi-Cavity RF System With Vector Sum Feedback J. Tilckmantel
Status of Studies for a Muon Cooling Experiment K. Hanke
Design of the Superconducting Section of the SPL LINAC at CERN F. GeriKk, M. Vretenar
Beam Dynamics of Non-Equipartitioned Beams in the Case of the SPL Project at CERN F. GeriKk
Review and Comparison of Solenoid and Hom Capture System S. Gilardoni
Cavity Design for the CERN Muon Cooling Channel R. Garoby and F. GeriKk
Preliminary shielding Calculations for a 2 GeV Superconducting Proton Linac S. AKosteo, M. Silari
Status of European Studies for a Neutrino Factory at CERN R. Garoby
Beam Dynamics Study of a Cooling Experiment Based on 88 MHz CERN Cooling Channel K. Hanke, E.-S. Kim
Conducting Targets for Pion production B. Autin, S. Gilardoni, P. Sievers
Simulation of the Pion Decay Channel of a Neutrino Factory E.B. Holzer
Ionisation Cooling in FFAG's H. SchOnauer
A Stationary Target for the CERN-Neutrino-Factory P. Sievers
Superbeam Studies at CERN A. Blondel, J. Burguet-Castell, D. Casper, M. Donega, S. Gilardoni, J.J. Gomez Cadenas, P. Hernandez, M. Mezzetto
A Novel Concept for ave Neutrino Factory P. Zucchelli
Muon Emittance and Pion Decay B. Autin
Longitudinal Capture of Muons using Bunch Compression B. Autin, K. BonKardt, J. Pasternak, A. Verdier
Summary of WG3 E. Keil
13
NF-Note-100
NF-Note-101
NF-Note-102
NF-Note-103
NF-Note-104
Operation Group PS/ OP /Note 2001-001 (Tech.)
PS/ OP/Note2001-002 (Tech.)
PS I OP IN ote 2001-003
PS I OP IN ote 2001-004 (Spec.)
PS/ OP/Note2001-005 (Min.)
PS/ OP/Note2001-006 (Info.)
PS/ OP/Note 2001-007 (Tech.)
PS/ OP/Note 2001-008
PS/RF/Note 2001-010
PS/ OP/Note 2001-009
PS/ OP/Note2001-010
PS/ OP/Note 2001-011
PS/BO/Note 2001-013
PS/ OP/Note 2001-012
Multiple Beam Injection B. Autin, A. Verdier
European R&D for Neutrino Factory B. Autin
22/01/2002
Geant4 Simulation of Phase Rotation for Neutrino Factory S. Ciani, S. Gilardoni, V.M. Grichine
The Study of a European Neutrino Factory at CERN B. Autin et al.
RLA Design: RF Optics A. Verdier
Aimants PS. Controle de l'Etat des Sertissages Intemes de 22 PFW. Mesures Effectuees Pendant le Grand Arret 2000/2001 J. Ottaviani
Aimants PS. Controle des Circuits Auxiliaires des P.F.W. (Arret Machine 2000/2001) J. Ottaviani
Operation Statistics of the PS Accelerator Complex for 2000 D. Dagan
Technical specifications ISOLDE Resonant Ionisation Laser Ion Source Operation and maintenance services B. Denis, M. Lindroos
Compte Rendu de "Briefing" du 16 mars 2001 D. Gueu!{non
Rota 2001 PS Complex E. Ovalle, A. Solera
Les Chames de 5ecurite du Complexe PS J. Ottaviani
A Pedestrian Guide to Online Phase Space Tomography in the CERN PS Complex S. Hancock, J.-L. Sanchez Alvarez
First Conclusions of the Losses Management Working Group J. Borburgh, R. Brown, M. Chanel, R. Cappi, V. Vohan, D. Cornuet, D. Forkel, M. Gourfier-Pace, S. Hancock, J. Hansen, C. Hill, D. Manglunki (editor), L.Rinolfi, H. SchOnauer, M. Thivent.
Etude pour une Nouvelle Zone "inflecteur" D. Gueu!{non
Test of a Dispersion Sweep Correction System by using a Centroid in the DIRAC Beam Line ]. Bosser, G. Molinari, J.M. Nonglaton, V. Prieto, R. Steerenberg
Results of Two Weeks PS Slow Extraction at 20 GeV /c for the East Area R. Steerenberg
14
Particle Production Group PSI PP/Note2001-001
PS/ PP/Note2001-002
PS/ PP/Note2001-003
PS/ PP/Note2001-004
Power Group PS/ PO/Note2001-001 (Min.)
PS/ PO/Note2001-002 (Tech.)
PS/ PO/Note 2001-003 (Tech.)
PS/ PO/Note 2001-004 (Tech.)
PS/ PO/Note2001-005 (Tech.)
PS/ PO/Note 2001-006 (Min.)
PS/ PO/Note2001-007 (Info.)
PS/ PO/Note2001-008 (Min.)
PS/ PO/Note2001-009 (Tech.)
PS/ PO/ Note 2001-010 (Proc.)
PS/ PO/Note2001-0ll (Proc.)
22/01/2002
X-ray Measurements at the CERN Laser Ion Source 0. Camut, P. Fournier, S. Heising, D. Kuchler, H. Kugler, N. Lisi , B. Pincott, R. Scrivers, K. Makarov, A. Stepanov, G. Volkov, V. Zaitsev
Proposal for Optical Elements for the Laser Ion Source (LIS) P. LeKfOS
Extraction Geometry for the Future LIS Plasma R. Scrivens
Comparison of the Beam Dynamic Solutions for Low Energy Beam Transport Systems for a Laser Ion Source at CERN K. Hanke, S. Heisinf{, R Scrivens
Les Alimentations de la Zone ISOLDE. Compte rendu de la reunion Isolde-P03 du 17.01.2001 J.-P. Royer
Suivi des Interventions sur les Equipements PS/PO. Troisieme Analyse (Semaines 38 a 51 - 2000) J.-P. Royer
Statistiques et Evolution des Interventions sur les Equipements du Groupe PO durant l'an 2000 J.-P. Royer
A Novel Four-Quadrant AC to DC Converter for Accelerator Magnets: Current Source Rectifier and Full-Bridge Inverter R. de la Calle, J.-M. Espi, J. B. Ejea, R. Garcia Gil, F. VOlker
Voltage Source Matrix Converter R. de la Calle, J.B. Ejea, J.-M. Espi, R. Garcia Gil,
Visit Notes to TMD Technology Lted., U.K. P. Pearce
Listes d'Appel du Groupe PS/PO en 2001 J. Borburgh, J. Buttkus, T. Fowler, J. Gruber, K.-D. Metzmacher, P. Pearce, J.-P. Royer, H. Ullrich
Les Alimentations de la Zone ISOLDE. Compte rendu de la reunion lsolde-P04 du 07.03.2001 J.-P. Royer
Intervention sur les alirnentations auxiliaires defectueuses des differents septa utilises dans les machines AD, Booster, EPA et PS T. Masson
Procedure d'Enclenchement et de Declenchement de l'Alimentation Principale du PS A Levrier
Consignes d'Operation et de Securite des Alimentations Pulsees des Dipoles d'Ejection et de Transfert du Booster J.-M. Cravero
15
PS/ PO/Note2001-012 (Spec.)
PS/ PO/Note2001-013 (Min.)
PS/ PO/Note 2001-014 (Min.)
PS/ PO/Note2001-015 (Proc.)
PS/ PO/Note 2001-016 (Tech.)
PS/ PO/Note 2001-017 (Proc.)
PS/ PO/Note 2001-018 (Min.)
PS/ PO/ Note 2001-019 (Proc.)
PS/ PO/Note2001-020 (Proc.)
PS/ PO/ Note 2001-021 (Min.)
PS/ PO/ Note 2001-022 (Min.)
PS/ PO/Note2001-023 (Min.)
PS I PO IN ote 2001-024 (Min.)\
PS/ PO/Note2001-025 (Tech.)
PS/ PO/Note2001-026 (Min.)
PS/ PO/Note2001-027 (Min.)
PS/ PO/Note 2001-028 (Min.)
PS/ PO/Note2001-029 (MD)
PS/ PO/Note2001-030 (Min.)
22/01/2002
Specification for the supply of 2 S-band 100 MW vacuum dry RF loads P. Pearce
Operation Piquet PO 2001-01. Compte Rendu de la Reunion du 2.04.2001 ].-P. Royer
Operation Piquet PO 2001-02. Compte Rendu de la Reunion du 9.04.2001 J.-P. Royer
Arret et Consignation des Equipements PS /PO de la Zone Experimentale deAD J.-L. Blanc
New Possibilities to Program PS/PO G64 Controllers E. Aldaz Carroll
Presentation sommaire des alimentations du batiment 366 (A.D.) G. Deroma
Analyse des Demandes de Travaux au Bureau de Dessin et a l'Atelier dy; )) Cablage Electronique P02. Compte Rendu de la Reunion du 11 avril 200T · J.-P. Royer
Arret et Consignation des Equipements PS/PO du PSB et ligne d'ISOLDE (BTY) J.-M. Cravero, H. Fiebixer, F. Gendre, M. Georxes, J. Lahaye, G. Simonet
Deconsignation et Redemarrage des Equipements PS/PO du PSB et d'ISOLDE J.-M. Cravero, H. Fiebixer, F. Gendre, M. Georxes, ]. Lahaye, G. Simonet
Operation Piquet PO 2001-03. Compte Rendu de la Reunion du 17.04.2001 J.-P. Royer
Operation Piquet PO 2001-04. Compte Rendu de la Reunion du 23.04.2001 J.-P. Royer
Operation Piquet PO 2001-05. Compte Rendu de la Reunion du 30.04.2001 J.-P. Royer
Operation Piquet PO 2001-06. Compte Rendu de la Reunion du 07.05.200_ ].-P. Royer
Inspection and Testing of BNL (AGS) Dipole Coils at Sigmaphi M. Hourican
Operation Piquet PO 2001-07. Compte Rendu de la Reunion du 14.05.2001 J.-P. Royer
Operation Piquet PO 2001-08. Compte Rendu de la Reunion du 21.05.2001 J.-P. Royer
Operation Piquet PO 2001-09. Compte Rendu de la Reunion du 28.05.2001 J.-P. Royer
Resultats du MD du 23.05.2001 G. Simonet
Operation Piquets PO 2001-10 & 11. Compte Rendu de la Reunion du 11.06.2001 J.-P. Royer
16
PS/ PO/ Note 2001-031 (Tech.)
PS/ PO/Note2001-032 (Tech.)
CTF3 Note 027
PS/ PO/Note 2001-033 (Min.)
PS/ PO/Note2001-034 (Min.)
PS/ PO/Note2001-035
PS/ PO/Note 2001-036 (Tech.)
PS/ PO/Note 2001-037 (Min.)
PS/ PO/Note 2001-038 (Min.)
PS/ PO/Note2001-039 (Min.)
PS/ PO/Note2001-040 (Min.)
PS/ PO/Note 2001-041 (Min.)
PS/ PO/Note 2001-042 (Min.)
PS/ PO/Note2001-043 (Proc.)
PS/ PO/Note2001-044 (Min.)
PS/ PO/ Note 2001-045 (Min.)
PS/ PO/ Note 2001-046 (Tech.)
PS/ PO/ Note 2001-047 (Min.)
PS/ PO/Note 2001-048 (Tech.)
CTF3 Note 030 (Min.)
22/01/2002
A 250 kW Four Quadrant Switch Mode Converter for the 1.4 GeV PS Booster Beam Transfer Lines at CERN S. Dewan , R. Holmes, K. Reini:zer, F. Volker, ]. Zenx
Visit to Thales Electron Devices (formerly Thomson Tubes Electronique) on 26.06.2001 T. Fowler, G. McMonaxle
Operation Piquet PO 2001-12. Compte Rendu de la Reunion du 18.06.2001 J.-P. Royer
Les Alimentations de la Zone ISOLDE. Compte rendu de la reunion ISOLDE-P05 du 20.06.2001 J.-P. Royer
Review of the Stockholm School of Economics (SSE) Proposal -Knowledge Management at CERN P. Pearce
Suivi des Interventions sur les Equipements PS/PO. Premiere Analyse en 2001 (semaines 13 a 24 - 2001) E. Durieu-Thiry, J.-P. Royer
Operation Piquet PO 2001-13. Compte Rendu de la Reunion du 25.06.2001 J.-P. Royer
Operation Piquet PO 2001-14. Compte Rendu de la Reunion du 02.07.2001 J.-P. Royer
Operation Piquet PO 2001-15. Compte Rendu de la Reunion du 09.07.2001 j.-P. Royer
Operation Piquet PO 2001-16. Compte Rendu de la Reunion du 16.07.2001 J.-P. Royer
Operation Piquet PO 2001-17. Compte Rendu de la Reunion du 23.07.2001 J.-P. Royer
Operation Piquet PO 2001-18. Compte Rendu de la Reunion du 30.07.2001 H. Ullrich
Procedure d'Enclenchement et de Declenchement de l'Alimentation de l'Aimant Principal PS fonctionnant avec le Transformateur 13 m VA raccorde au Reseau 18 kV A. Levrier
Operation Piquet PO 2001-19. Compte Rendu de la Reunion du 06.08.2001 J. Buttkus
Operation Piquet PO 2001-20. Compte Rendu de la Reunion du 13.08.2001 j.-P. Royer
Magnetic Measurement System using ADC card and Lab View Application E. Armen:zou
Operation Piquet PO 2001-21. Compte Rendu de la Reunion du 20.08.2001 j.-P. Royer
Notes on a visit to TMD Technologies Ltd on 2nd August 2001 G. McMona:zle, P. Pearce
17
PS/ PO/Note2001-049 (Min.)
PS/ PO/Note2001-050 (Spec.)
CTF3 Note 035 (Spec.)
PS/ PO/Note2001-051 (Min.)
PS/ PO/Note2001-052 (Tech.)
CTF3 Note 032
PS/ PO/Note2001-053 (Min.)
PS/ PO/Note2001-054 (Min.)
PS/ PO/Note2001-055 (Min.)
PS/ PO/Note2001-056 (Min.)
PS/ PO/Note2001-057 (Tech.)
PS/ PO/Note2001-058 (Tech.)
PS/ PO/Note2001-059 (Min.)
PS/ PO/Note2001-060 (Min.)
PS/ PO/Note2001-061 (Min.)\
PS/ PO/Note2001-062 (Min.)
PS/ PO/Note2001-063 (Min.)
PS/ PO/Note 2001-064 (Min.)
PS/ PO/Note2001-065 (Min.)
CTF3 Note 038 (Min.)
PS/ PO/Note2001-066 (Min.)
PS/ PO/Note2001-067 (Min.)
22/01/2002
Operation Piquet PO 2001-22. Compte Rendu de la Reunion du 27.08.2001 J.-P. Royer
Specification for the Supply of a 1.5 GHz Broadband Klystron or other RF Power Source for the CLIC Test Facility (CTF3) G. McMonaf(le, P. Pearce
Les Alimentations de la Zone ISOLDE. Compte Rendu de la Reunion du 05.09.2001 J.-P. Royer
The Effect of Different Resistor Values on the CTF3 Sub-harmonic Klystron Pulser Simulation Circuit Li Shen
Operation Piquet PO 2001-23. Compte Rendu de la Reunion du 03.09.2001 J.-P. Royer
Operation Piquet PO 2001-24. Compte Rendu de la Reunion du 10.09.2001 J.-P. Royer
Operation Piquet PO 2001-25. Compte Rendu de la Reunion du 17.09.2001 J.-P. Royer
Operation Piquet PO 2001-26. Compte Rendu de la Reunion du 24.09.2001 J.-P. Royer
The PS Ejection Kicker KFA71-79 Performance for LHC K.D. Metzmacher, L. Sermeus
Suivi Des Interventions Sur Les Equipements PS/PO- Deuxieme Analyse En 2001 (Semaines 25 a 36 - 2001) E. Durieu-Thiry, J.-P. Royer
Operation Piquet PO 2001-27. Compte Rendu de la Reunion du 01.10.2001 J. Buttkus
Operation Piquet PO 2001-28. Compte Rendu de la Reunion du 08.10.2001 J.-P. Royer
Operation Piquet PO 2001-29. Compte Rendu de la Reunion du 15.10.200 J.-P. Royer
Operation Piquet PO 2001-30. Compte Rendu de la Reunion du 22.10.2001 J.-P. Royer
Operation Piquet PO 2001-31. Compte Rendu de la Reunion du 29.10.2001 J.-P. Royer
Operation Piquet PO 2001-32. Compte Rendu de la Reunion du 05.11.2001 J.-P. Royer
Visit to Thales Electronic Devices for Klystron Reception on 09.11.2001 G. McMonaf(le
Operation Piquet PO 2001-33. Compte Rendu de la Reunion du 12.11.2001 J.-P. Royer
Operation Piquet PO 2001-34. Compte Rendu de la Reunion du 19.11.2001 J.-P. Royer
18
PS/ PO/Note 2001-068 (Tech.)
PS/ PO/Note2001-069 (Tech.)
PS/ PO/Note2001-070 (Tech.)
PS/ PO/Note2001-071 (Min.)
PS/ PO/Note2001-072 (Min.)
PS/ PO/Note 2001-073 (Tech.)
Radio-Frequency Group PS/ RF/Note2001-001 (Spec.)
PS/ RF IN ote 2001-002
CLIC Note 468
PS/ RP /Note 2001-003
NF Note 062
PS/ RF/Note2001-004
PS/ RF IN ote 2001-005
PS/ RF/Note 2001-006
PS/ RF/Note2001-007
PS/ RF/Note2001-008 (Tech.)
PS/ RF/Note2001-009
NF Note 2001-072
PS/ RF /Note 2001-010
PS/OP /Note 2001-008
PS/ RF /Note 2001-011
22/01/2002
High Tension Control System for the On-line Isotope Separators -ISOLDE (with compact PCI front end controller) T. Fowler, ]. Schipper
Safety Instructions for AD Kicker Systems ]. Schipper
Tasking Development Tools Guide for PS/PO E. Aldaz Carroll
Les alimentations de la Zone ISOLDE Compte Rendu de la Reunion ISOLDE-P0-7 du 28.11.2001 ].-P. Royer
Operation Piquet PO 2001-35 & 36. Comptes Rendus des Reunions des 19.11et3.12.2001 ].-P. Royer
Simple Programming Guidelines for C LANGUAGE E. Aldaz-Carroll
Technical Specification for RF Pulse Amplifier 3 GHz/300 W R. Bossart
Cooling and Vibration in the CLIC Main Accelerating Structure W. Schnell
Revised Beam Dynamics and Layout for the Superconducting Section of the SPL F. GeriKk
PSB Beam Control Technical Guide A. Blas
3 kW, 0.1-35 MHz Pulsed Amplifier PS-RF/HC3289 M. Paoluzzi
Proposed 13.3 - 20 MHz RF Systems for Bunch-Splitting Operation in the PS for LHC A. Krusche, M. Morvillo
PSB Phase Pick-Up Pre-Amplifier Modifications for 2001 A. Findlay
Tableau des Travaux a realiser sur les Beam Controls au PS lors du shut-down 2000-2001 J.-L. Val/et
The Effect of Phase Slippage in Multicell Cavities on Longitudinal Beam Dynamics F. GeriKk
A Pedestrian Guide to Online Phase Space Tomography in the CERN PS Complex S. Hancock, ].-L. Sanchez Alvarez
Talks on Linacs presented by A. Rohlev (LNL) during the week 13-17 · August2001
19
PS/ RF/Note2001-012
PS/ RF/Note2001-013
PS/ RF/Note2001-014
NF Note 2001-087
PS/RF/Note2001-015 (MD)
PS/ RF/Note 2001-016
PS/ RF/Note 2001-017
PS/ RF IN ote 2001-018
Distribution
B.W. Allardyce J. Boillot J.P. Delahaye K. Schindl PS Group Leaders PS Project Leaders PS Secretaries
22/01/2002
Measurement of the Longitudinal Coupling Impedance, for the PS Electrostatic Septum 23 F. Caspers, A. Mostacci
Updating the BTFM of the PSB A. Blas
Cavity Design for the CERN Muon Cooling Channel R. Garoby, F. Gerigk
Test of a New Acceleration Scheme for Indium Ions in the PS-Booster M. Benedikt, A. Blas, G. Cyvoct, J-P. Terrier
Hollow Bunches in the PSB. Request for resources and possible planning A. Blas
Proposal for a 3 MeV H- Test Facility in the PS South Hall K. Bongardt, F. Caspers, R. Garoby, 0. Kuchler, A.M. Lombardi, A. Mostacci, M. Pao1uzzi, U. Ratch, M. Vretenar (Editor)
High Intensity Proton Beams at CERN and the SPL Project - Resources, External Contributions and Milestones R. Garoby
Edited by Susan L. Neboux
20