Elisa Rapisarda, CERN, PH Division
-
Upload
gertrude-wilkinson -
Category
Documents
-
view
226 -
download
8
description
Transcript of Elisa Rapisarda, CERN, PH Division
CERN ISOLDEThe Isotopes Separator Online DEviceElisa Rapisarda, CERN, PH Division
The Nuclear Chart
82
50
20
126
50
28 82
2028
8
8
stableb+ decayb- decaya decayp decayfissionpredictedClosed Shells
atoms: noble gasnuclei: magic numbers
system
periodic
2820
50
126
82
50
2820
8
8
Production of Radioactive Ion beams
• Nuclear Reaction: proton (1.4 GeV) + 238U (1012 atomen per seconde)• Purification:
• Separation in mass number (A)• Separation in proton numbers/ element (Z): lasers
• Transport of the ion beam (sometimes 1 atom per second) to the measurement setup
• Acceleration in order to induce a new Nuclear Reaction
ISOLDE @ CERN• It all starts with a bottle of hydrogen …
ISOLDE @ CERN… followed by the LINAC2 …
ISOLDE @ CERN … and the 4 rings of the PSBooster
ISOLDE targetsService Robots
ISOLDE targetIn position
ISOLDE targetProton on target or on the neutron converter
Research with Radioactive Beams Why?
Biology
v
Quark
s, lep
tone
n <10
-19 cm
Hadronen <10-13 cm
Kernen <10-12 cm
Gevangen atomen 10 -8 cm
10-3
cm G
emer
kte
cel
Kanalisatie 10 -7 cm102 cm
Gen
eesk
unde
106 cm AMS in het klimaat 1011 cm De zon
10 18 cm Supernova
10 22 cm Sterrenstelsels
0=>1028 cm
Oerknal
Particle physics(standaard model)
Nuclear Physics
atomic Physics
Medicine
Climate
Energy
Astrophysics
cosmology
Solid State Physics
Existence of the elements
Laser spectroscopieCollaps - CRIS
HIE-ISOLDE-acceleration (REX)
MINIBALL
WITCH: fundamental interaction
Solid State Research
MEDICIS
CERN ISOLDE Isotope Separator On-Line DEvice
IDS: Decay study
b-spectroscopy: Previuos Experimental Setup
Annular Si Si
pure 30 keV Tl beam from RILIS+ISOLDEIntensity = 104 pps
C-foils20 mg/cm2
Si detectors
SiAnnular Si
ff
ff
a
30 keV beam from ISOLDE
C-foil
Ge detector #1
Windmill Chamber
Courtesy of T.E.Cocolios
Possible Projects
AUTOCAD technical drawing of the new beam line and the experimental area
Beam optical simulations of the latest part of the beam line(Switchyard + three quadrupoles) (MADX and Simion software)
Ongoing work in coming months: Install detectors frame (hands on)
Install an automatic Refill system of Liquid Nitrogen for the Germanium detectors (hands on)
Test Germanium detectors (set up a simple 1-channel data acquition system)
Commission Tape station and ancillary detectors (hands on)
Team: you will join a small group of 3 to 5 persons (locally 2 Senior Post-Doc, 1 PhD student)
goal: be ready for first decay experiment end July 2014
• Installation of the apparatus started in Feb 2014• Beam line modification is going on;