LIMITED FUNDING OF EVENTS USING IOTA
STATIONS
PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING
LAS VEGAS NVOCTOBER 20, 201210/18/12 version
1
![Page 2: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/2.jpg)
SWRI GOALS AND EXPECTATIONS• OBTAIN THE MAXIMUM NUMBER OF VIDEO
CHORDS SPREAD ACROSS THE ENTIRE ASTEROID AND BEYOND WITH THE EXPENDITURE OF FEWEST AMOUNT OF DOLLARS.
• ONLY VIDEO STATION CHORDS TO BE FUNDED.• CONTINUING WITH SWRI COLLABORATION
FROM 2011 (ANTIOPE), SWRI SEEKS TO FUND ADDITIONAL EFFORTS TO ACQUIRE HIGH QUALITY OCCULTATION DATA
• FURTHER PROGRESS MADE ON METHODOLOGY TO PRIORITIZE FUNDABLE EVENTS. SWRI WANTS TO MORE AGGRESSIVELY PURSUE FUNDING NEXT YEAR.
2
![Page 3: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/3.jpg)
CANDIDATE EXPENSES FOR FUNDS ALLOCATION
• TRANSPORTATION COULD BE BY CAR, TRAIN (OR AIR)
• LODGING• MEALS (not covered due to potential
accounting issues with observer/SWRI)• SHIPPING (might be covered)
3
![Page 4: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/4.jpg)
• DECISIONS ON SUPPORT MADE 2 MONTHS BEFORE ON DOMESTIC TRAVEL, 3 MONTHS FOR FOREIGN TRAVEL
• APPLICATION TEMPLATE BEING CONSTRUCTED (MAY BE ONLINE)
4
![Page 5: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/5.jpg)
ALLOCATION OF FUNDS• SWRI WILL DECIDE WHICH OBSERVER(S) GETS
FUNDED• IF FEWER DOLLARS THAN OBSERVERS, SWRI WILL
MAKE THE FINAL DETERMINATION• IOTA OFFICERS NOTIFY PROSPECTIVE OBSERVERS• OBSERVER(S) NEED TO MAKE A COMMITMENT
ONCE NOTIFIED. IF THE CONTACTED OBSERVER REFUSES, THE NEXT OBSERVER IN SEQUENCE WILL BE NOTIFIED.
• FUNDING LEVELS / METHODS FOR OBSERVER SELECTION WILL EVOLVE
5
![Page 6: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/6.jpg)
KNOWN RISKS TO RECEIVING FUNDING
• WEATHER/UNEXPECTED FACTORS COULD CAUSE EVENT CANCELLATION
• EXPENSES MAY NOT BE REIMBURSED IF OBSERVER MAKES UNREASONABLE DECISIONS OR IS NOT SET UP IN PROPER TIME
• OBSERVERS USE OWN FUNDS INITIALLY• REIMBURSEMENT OCCURS AFTER THE EVENT• RECEIPTS FOR EVERYTHING ARE MANDATORY!
6
![Page 7: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/7.jpg)
OBSERVER CONSIDERATION• OBSERVER(S) WILL HAVE TO MAKE PRUDENT
DECISION ON WHETHER TO START TRAVEL PRIOR TO THE EVENT
• IF WEATHER PROBABILITIES FOR SUCCESS ARE DEEEMED LOW, TRAVEL SHOULD BE ABORTED
• FAILURE TO EXERCISE GOOD JUDGMENT MAY RESULT IN NO REIMBURSEMENT. IN THAT EVENT OBSERVER MUST AGREE TO COVER OWN EXPENSES.
7
![Page 8: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/8.jpg)
MAIN OBJECTIVES
• PRIORITIZE ASTEROID TARGETS THAT ARE OF MOST SIGNIFICANCE TO THE PROFESSIONAL COMMUNITY (SWRI and others)
• EVENTS WHERE THE MOST RESOURCES CAN BE BROUGHT TO BEAR FOR THE LEAST COST YIELDING MAXIMUM POTENTIAL RESULTS WITH LEAST OVERALL RISK
8
![Page 9: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/9.jpg)
PROCESS-1• SCREEN 788 EVENTS FROM END OF 2012 TO
END OF 2013• FILTER FOR THOSE WHERE MINOR PLANET
SHAPE MODELS HAVE ALREADY BEEN DEVELOPED
• FILTER FOR THOSE WHICH HAVE KNOWN SATELLITES
• FILTER FOR THOSE WHICH HAVE EXISTING LIGHT CURVE, ADAPTIVE OPTICS, OCCULTATION DATA
9
![Page 10: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/10.jpg)
PROCESS-2
• FILTER FOR POTENTIAL FUTURE OBSERVATIONS AT A RESOLVABLE SIZE/MAGNITUDE
10
![Page 11: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/11.jpg)
EVENT FILTER CRITERIA FOR PRIORITY (not in order) FOR MASS DEPLOYS
• MAGNITUDE DROP• MAGNITUDE OF STAR• PATH ERROR• MOON PHASE/ELONGATION• GEOGRAPHIC ACCESS• PROXIMITY TO SUNSET/SUNRISE TO ALLOW
FOR MULTISTATION SETUP• OVERALL ODDS OF SUCCESS FOR A MULTI
STATION EXPEDITION11
![Page 12: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/12.jpg)
• VALUE TO SCIENCE (MODELING EFFORTS)• WEATHER IMPACT• DURATION• PRESENCE OF DOUBLE STAR OR PROPER
MOTION ISSUES• ELEVATION OF STAR • POSITION OF STAR WITH RESPECT TO
DEPRESSED SUN ELEVATION AZIMUTH AND ELONGATION
• EVENT ON A WEEKEND!
12
![Page 13: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/13.jpg)
OBSERVER FUNDING FACTORS
• PROXIMITY OF OBSERVER TO EVENT PATH DICTATES AMOUNT POTENTIAL FUNDING
• NUMBER OF STATIONS THE OBSERVER CAN EFFECTIVELY MUSTER
• ABILITY OF OBSERVER TO HAVE/EXECUTE(D) MULTISTATION DEPLOY
• FINANCIAL NEED FOR FUNDS BY OBSERVER(S)• PROVEN TRACK RECORD
13
![Page 14: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/14.jpg)
14
#STATIONS
![Page 15: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/15.jpg)
IOTA MULTI-STATION RESOURCES (10/22/2012)
T.Redding - 4 to 8 S.Conard – 2 E.Iverson -5T.George - 3 R.Nugent - 3T.Swift - 2 P.Maley – 8 to 10R.Venable -6 S.Messner(b) - 3T.Campbell(a) – 4 B.Sandy (b) - 2S.Degenhardt – 11 C.Ellington(b) - 2 D.Dunham – 12 S.Preston - 3(a) Restricted to Florida(b) Equipment not for air transport
15
![Page 16: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/16.jpg)
KNOWN CONCERNS
• NOT CLEAR HOW MANY OBSERVERS COULD TRAVEL WITH ALL EQUIPMENT ON AIRCRAFT
• SOME MULTI-STATION OWNERS HAVE NOT YET DEPLOYED SUCCESSFULLY
• MOST EVENTS MUST BE EXCLUDED FROM MASS DEPLOYS DUE TO BEING IN THE 10.5-12 MAGNITUDE RANGE unless enough maxi telescopes can be obtained
16
![Page 17: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/17.jpg)
ASTEROIDS WITH LOWEST PRIORITY
• THOSE WHICH HAVE LITTLE EXISTING PAST LIGHT CURVE, ADAPTIVE OPTICS & OCCULTATION DATA
• THOSE WHICH HAVE NO KNOWN SATELLITES• THOSE FOR WHICH LITTLE RESOURCES CAN BE
BROUGHT TO BEAR• THOSE FOR WHICH TRAVEL / OPERATIONAL
COSTS WOULD BE EXCESSIVE
17
![Page 18: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/18.jpg)
SwRI SCIENCE PRIORITY LISTwithout filtering for best events
18
![Page 19: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/19.jpg)
PROVISIONAL SWRI PRIORITY LISTWITH FILTERING FOR BEST EVENTS
19
0-3 rating
![Page 20: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/20.jpg)
20
![Page 21: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/21.jpg)
21
![Page 22: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/22.jpg)
22
![Page 23: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/23.jpg)
23
![Page 24: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/24.jpg)
24
![Page 25: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/25.jpg)
25
![Page 26: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/26.jpg)
26
![Page 27: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/27.jpg)
27
![Page 28: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/28.jpg)
28
![Page 29: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/29.jpg)
29
![Page 30: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/30.jpg)
30
![Page 31: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/31.jpg)
31
![Page 32: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/32.jpg)
BUIE EDUCATIONAL OCCULTATION NETWORK COORDINATION
• TRACKS OF FUNDED OCCULTATIONS MAY BENEFIT FROM BUIE NETWORK LOCATIONS
• NETWORK IS FIXED WITH LARGE APERTURE INSTRUMENTS
• IOTA ROLE IS TBD. SEE BUIE PRESENTATION!• EFFORT IS SEPARATE FROM SWRI MOBILE
STATION FUNDING
32
![Page 33: LIMITED FUNDING OF EVENTS USING IOTA STATIONS PAUL D. MALEY (IOTA), BILL MERLINE AND BRIAN ENKE (SwRI) IOTA ANNUAL MEETING LAS VEGAS NV OCTOBER 20, 2012.](https://reader035.fdocuments.net/reader035/viewer/2022062618/55146b605503462d4e8b5da8/html5/thumbnails/33.jpg)
PROPOSED FUNDING LEVELS (TBD)• DOMESTIC TRIP AVERAGE ESTIMATED COST $600 =
AIR, HOTEL, CAR
FOREIGN TRIP AVERAGE ESTIMATED COST $1900 = AIR, HOTEL, CAR
SWRI SUPPORT COULD BE UP TO 40 SINGLE OBSERVER DOMESTIC EXPEDITIONS + SEVERAL FOREIGN EXPEDITIONS OVER 2012-2014 (TBD)