Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study...

11
Page 1 of 11 and temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elements results may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltage DISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculated significantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values. Actual site conditions may vary. T: 416-741-2673 TF: 1-844-741-2673 [email protected] Premise LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1 For: Project: Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc.

Transcript of Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study...

Page 1: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 1 of 11and temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elementsresults may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltageDISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculated

significantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.

Actual site conditions may vary.

T: 416-741-2673 TF: 1-844-741-2673 [email protected] LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1

For:

Project:

Lighting Calculation StudyÉtude Photométrique

Your ProjectYour Company

Prepared By: Premise LED Inc.

Page 2: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 2 of 11

DISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculated

significantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.and temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elementsresults may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltage

Actual site conditions may vary.

Premise LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1T: 416-741-2673 TF: 1-844-741-2673 [email protected] Project:

For:

Calc. points at 2.5' above floor

Your ProjectYour Company

Prepared By: Premise LED Inc.

Reflectances:50/50/20

Mounting Height:22'

Located as requested

55.54

Luminaire ScheduleSymbol Qty Label Description

Calculation SummaryLabel CalcType

Arrangement LLF

Units Avg Max Min Avg/Min

221 LHB2-1705-2-W18610 Premise 170w 347V LED linear Highbay SINGLE 0.900

Max/MinCalcPts_1 Illuminance Fc 56.93 133.3 2.4 23.72

Page 3: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 3 of 11and temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elementssignificantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.

results may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltageDISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculated

Actual site conditions may vary.

Premise LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1T: 416-741-2673 TF: 1-844-741-2673 [email protected] Project: Your Project

For: Your CompanyPrepared By: Premise LED Inc.

74.7 88.4 92.9 75.5 4.8

89.0 108.0 120.0 120.0 110.9 93.7 81.7 69.8 50.0 60.8 42.6 59.6 60.9 59.3 61.5 59.7 48.4 57.8 48.5 58.7 55.4 57.7 61.6 58.3 53.4 57.0 52.9 55.5 49.4 53.1 45.3 44.0

97.3 117.2 132.0 133.3 119.8 97.3 51.1 52.7 51.3 55.2 58.7 48.0 51.4 46.2 51.3 59.3 51.0 51.7 47.9

100.3 117.0 129.1 124.8 95.8 48.3 56.6 44.9 54.9 55.9 43.5 54.5 43.6 53.9 45.3 54.7 44.7 47.4

100.4 112.4 122.5 106.4 62.0 52.3 57.7 50.1 53.2 56.8 48.4 54.2 48.6 54.0 50.6 55.2 50.1 47.5

98.8 109.9 119.1 103.7 58.8 54.5 58.8 53.1 55.6 58.0 52.1 53.9 52.2 53.7 54.6 55.3 54.0 50.4

95.7 106.4 115.2 102.9 59.4 54.6 59.8 54.9 55.2 59.0 53.8 53.2 54.6 51.8 56.9 53.9 56.6 50.9

90.2 102.1 113.2 103.5 55.8 50.8 58.0 53.9 53.6 57.4 51.3 51.8 55.2 49.0 55.9 50.5 55.3 49.0

82.1 92.9 107.9 101.1 55.6 47.8 60.5 53.2 52.7 58.6 50.0 49.3 54.9 44.6 56.8 46.2 55.6 46.0

76.0 87.2 99.0 94.4 66.2 63.4 62.3 63.8 61.0 55.0 52.9 64.8 54.6 48.3 53.0 44.6 51.5 41.0

72.2 82.4 94.9 98.5 68.6 73.1 60.8 70.9 68.2 68.3 63.9 68.8 69.4 79.5 53.7 67.4 57.4 67.1 75.4 76.7 81.5 67.0 63.5 61.0 56.4 56.7 49.7 53.4 48.3 47.9 36.3 46.2

70.9 80.9 92.1 88.9 74.4 46.9 71.6 69.2 67.7 36.5 37.3 4.2

69.7 81.4 90.3 85.5 74.6 46.3 60.1 57.2 52.0 54.7 86.4 73.8 51.9 51.8 52.3 52.0 78.6 67.2 39.2 43.7 47.6 42.9 40.9 41.4 43.4 43.9 46.1 48.8 33.3 44.0 51.7 55.8 59.5 62.4 63.6 63.7 63.4 62.6 61.1 57.9 53.2 45.6 4.8

66.7 78.7 87.1 83.2 80.8 47.9 20.5 21.8 17.7 21.4 85.1 25.9 21.8 20.8 18.6 17.5 83.3 80.1 47.3 34.2 46.9 43.7 44.4 45.3 46.6 45.9 41.8 50.5 30.3 51.1 60.3 64.9 68.8 72.1 73.0 72.9 72.4 71.2 69.5 65.9 60.5 51.9 5.5

62.1 75.3 83.8 84.2 84.0 75.8 65.6 59.6 55.9 53.2 51.4 52.3 85.9 68.0 51.0 50.3 49.6 46.6 79.9 74.4 82.0 32.9 29.7 30.3 42.5 40.0 36.4 35.7 35.2 35.2 35.7 49.6 49.5 64.7 70.0 73.8 77.0 77.6 76.6 75.4 73.8 71.8 68.0 62.3 53.3 5.7

59.7 72.1 81.6 82.1 80.7 69.2 64.6 50.9 19.4 13.5 11.1 13.2 75.4 24.5 11.1 11.6 12.5 13.9 74.8 67.8 27.3 8.6 12.8 9.2 8.5 8.0 7.7 7.1 13.2 48.0 67.5 72.4 76.3 78.9 78.8 75.8 73.6 71.7 68.9 65.1 59.7 50.8 5.6

61.0 73.6 82.7 83.5 80.9 52.2 50.9 50.2 49.2 50.0 87.0 75.8 51.1 50.7 51.9 49.8 80.8 75.7 38.9 41.5 48.0 43.8 39.5 40.8 42.1 42.6 41.3 51.3 67.5 71.8 74.9 77.2 72.2 69.5 66.0 62.7 59.8 56.2 51.2 43.3 5.1

62.6 74.8 83.0 78.4 67.0 31.9 20.1 16.1 11.4 14.1 83.9 58.1 45.7 45.1 43.8 42.3 95.1 91.4 97.0 50.8 41.6 11.9 13.0 10.1 9.8 9.5 8.9 8.5 6.9 48.4 66.5 69.9 72.3 73.8 64.4 59.8 55.2 49.1 46.8 43.9 39.4 33.6 4.9

62.8 75.1 83.2 79.6 67.5 41.7 36.4 42.6 50.8 51.7 46.6 51.2 88.3 76.0 49.3 50.2 51.3 53.8 86.1 79.0 40.4 55.1 41.9 40.6 38.9 38.6 38.5 36.6 38.6 50.5 65.8 68.3 69.9 70.8

58.8 69.7 78.2 73.9 65.1 49.0 38.5 38.4 16.3 16.9 14.5 15.7 92.7 20.6 13.7 12.5 14.1 14.6 81.2 69.9 35.3 9.1 18.7 13.2 11.3 10.1 9.3 8.7 12.7 51.9 64.7 66.4 66.5 64.0

55.3 66.0 76.6 77.1 72.9 47.5 61.0 52.7 49.3 52.6 96.7 82.8 50.9 51.0 50.4 50.1 91.2 82.8 30.3 40.6 48.5 40.9 37.2 35.9 35.5 32.0 47.7 51.1 64.2 65.3 65.4 63.1

54.6 63.6 74.6 74.1 76.0 59.4 59.1 49.0 93.5 87.6 85.1 93.1 55.9 50.2 41.8 42.2 39.7 37.9 38.7 39.6 38.8 34.9 50.6 63.9 65.1 64.1 62.9

55.7 64.7 72.4 69.7 72.2 59.4 56.4 71.1 78.3 80.4 91.0 122.8 104.4 86.0 84.1 80.9 79.6 95.6 78.6 58.1 48.4 71.4 67.3 64.5 64.0 66.7 63.3 55.1 59.8 63.5 64.5 64.6 62.8

56.6 62.8 70.9 68.6 78.9 63.5 66.0 69.0 75.5 74.7 74.8 119.4 53.2 81.2 78.4 76.8 72.3 93.5 83.2 52.3 10.0 12.5 9.0 9.1 8.7 8.4 8.1 10.9 68.6 63.4 64.3 64.5 63.2

57.5 64.2 64.9 54.5 64.8 50.9 53.9 49.1 52.7 46.1 52.6 93.8 54.2 56.8 52.7 52.0 53.7 86.7 57.9 91.8 52.4 53.0 54.4 49.6 51.4 55.0 50.6 50.5 46.9 41.9 57.2 62.7 63.7 63.7 62.4

58.6 63.1 59.6 48.4 61.3 60.2 62.3 60.3 78.9 60.5 61.4 93.8 58.8 61.3 60.0 58.9 53.9 56.9 62.2 63.3 63.4 62.2

61.5 64.8 64.5 50.9 55.3 37.9 51.5 41.6 60.8 35.6 50.6 67.1 40.3 50.7 40.1 48.5 36.4 52.5 62.3 63.4 63.3 62.2

64.3 69.6 70.5 56.4 52.3 46.6 54.4 47.2 60.1 43.9 53.2 60.5 43.1 54.1 45.3 53.8 42.7 50.8 61.7 62.8 62.7 61.6

65.9 69.7 71.9 58.6 53.2 50.7 59.0 50.1 58.5 51.2 56.9 59.2 50.1 55.6 54.1 53.8 50.5 52.7 61.4 62.5 62.6 61.6

66.5 69.4 71.5 57.9 54.1 51.6 58.2 51.9 57.6 51.8 57.5 58.1 51.1 56.4 54.9 55.0 51.0 53.5 61.1 62.1 62.0 61.0

66.7 70.1 71.5 57.7 54.6 51.4 57.7 50.4 57.9 50.7 57.1 58.4 50.5 57.1 54.1 55.5 50.4 53.3 59.9 60.9 60.9 60.0

65.1 68.9 71.0 57.6 52.7 48.6 57.0 48.0 56.7 48.2 56.1 57.3 47.8 56.8 51.6 55.4 47.8 51.8 58.7 59.8 59.8 58.9

60.6 63.4 67.2 55.0 49.9 43.7 56.4 43.5 55.3 43.3 55.0 55.9 47.6 56.6 46.8 54.9 43.3 48.6 56.3 57.2 57.1 56.2

58.2 61.2 64.7 48.6 52.0 48.7 53.4 35.9 52.6 35.8 51.5 53.0 47.6 53.8 49.4 51.5 50.7 49.7 52.6 53.5 53.6 52.5

51.5 54.6 55.4 50.8 55.6 53.8 42.1 56.1 47.1 59.3 42.3 58.1 55.6 59.5 55.4 58.6 55.3 58.9 54.0 59.4 56.0 58.1 54.3 59.5 53.7 58.1 52.6 57.3 57.7 54.2 48.0 46.3 18.9 47.6 48.4 48.3 47.4

42.3 45.1 43.3 36.0 24.6 2.4 37.1 35.0 19.4 6.7 39.4 40.3 40.3 39.1 4.9

Page 4: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 4 of 11and temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elements

DISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculatedresults may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltage

significantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.

Actual site conditions may vary.

Premise LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1T: 416-741-2673 TF: 1-844-741-2673 [email protected] Project:

For:Your Project

Your CompanyPrepared By: Premise LED Inc.

56.4 71.1 78.3 80.4 91.0 122.8 104.4 86.0 84.1 80.9 79.6 95.6 78.6 58.1 48.4 71.4 67.3 64.5 64.0 66.7 63.3 55.1 59.8

66.0 69.0 75.5 74.7 74.8 119.4 53.2 81.2 78.4 76.8 72.3 93.5 83.2 52.3 10.0 12.5 9.0 9.1 8.7 8.4 8.1 10.9 68.6

53.9 49.1 52.7 46.1 52.6 93.8 54.2 56.8 52.7 52.0 53.7 86.7 57.9 91.8 52.4 53.0 54.4 49.6 51.4 55.0 50.6 50.5 46.9 41.9 57.2

60.2 62.3 60.3 78.9 60.5 61.4 93.8 58.8 61.3 60.0 58.9 53.9 56.9

37.9 51.5 41.6 60.8 35.6 50.6 67.1 40.3 50.7 40.1 48.5 36.4 52.5

46.6 54.4 47.2 60.1 43.9 53.2 60.5 43.1 54.1 45.3 53.8 42.7 50.8

50.7 59.0 50.1 58.5 51.2 56.9 59.2 50.1 55.6 54.1 53.8 50.5 52.7

51.6 58.2 51.9 57.6 51.8 57.5 58.1 51.1 56.4 54.9 55.0 51.0 53.5

51.4 57.7 50.4 57.9 50.7 57.1 58.4 50.5 57.1 54.1 55.5 50.4 53.3

48.6 57.0 48.0 56.7 48.2 56.1 57.3 47.8 56.8 51.6 55.4 47.8 51.8

43.7 56.4 43.5 55.3 43.3 55.0 55.9 47.6 56.6 46.8 54.9 43.3 48.6

48.7 53.4 35.9 52.6 35.8 51.5 53.0 47.6 53.8 49.4 51.5 50.7 49.7

56.1 47.1 59.3 42.3 58.1 55.6 59.5 55.4 58.6 55.3 58.9 54.0 59.4 56.0 58.1 54.3 59.5 53.7 58.1 52.6 57.3 57.7 54.2 48.0 46.3 18.9

2.4 37.1 35.0 19.4

Page 5: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 5 of 11significantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.

DISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculatedresults may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltageand temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elements

Actual site conditions may vary.

Premise LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1T: 416-741-2673 TF: 1-844-741-2673 [email protected] Project: Your Project

For: Your CompanyPrepared By: Premise LED Inc.

90.2 102.1 113.2 103.5 55.8 50.8 58.0 53.9 53.6 57.4 51.3 51.8 55.2 49.0 55.9

82.1 92.9 107.9 101.1 55.6 47.8 60.5 53.2 52.7 58.6 50.0 49.3 54.9 44.6 56.8

76.0 87.2 99.0 94.4 66.2 63.4 62.3 63.8 61.0 55.0 52.9 64.8 54.6 48.3 53.0

72.2 82.4 94.9 98.5 68.6 73.1 60.8 70.9 68.2 68.3 63.9 68.8 69.4 79.5 53.7 67.4 57.4 67.1 75.4 76.7 81.5 67.0 63.5 61.0 56.4 56.7

70.9 80.9 92.1 88.9 74.4 46.9 71.6 69.2 67.7 36.5

69.7 81.4 90.3 85.5 74.6 46.3 60.1 57.2 52.0 54.7 86.4 73.8 51.9 51.8 52.3 52.0 78.6 67.2 39.2 43.7 47.6 42.9

66.7 78.7 87.1 83.2 80.8 47.9 20.5 21.8 17.7 21.4 85.1 25.9 21.8 20.8 18.6 17.5 83.3 80.1 47.3 34.2 46.9 43.7

62.1 75.3 83.8 84.2 84.0 75.8 65.6 59.6 55.9 53.2 51.4 52.3 85.9 68.0 51.0 50.3 49.6 46.6 79.9 74.4 82.0 32.9 29.7 30.3 42.5 40.0

59.7 72.1 81.6 82.1 80.7 69.2 64.6 50.9 19.4 13.5 11.1 13.2 75.4 24.5 11.1 11.6 12.5 13.9 74.8 67.8 27.3 8.6 12.8 9.2

61.0 73.6 82.7 83.5 80.9 52.2 50.9 50.2 49.2 50.0 87.0 75.8 51.1 50.7 51.9 49.8 80.8 75.7 38.9 41.5 48.0 43.8

62.6 74.8 83.0 78.4 67.0 31.9 20.1 16.1 11.4 14.1 83.9 58.1 45.7 45.1 43.8 42.3 95.1 91.4 97.0 50.8 41.6 11.9 13.0 10.1

62.8 75.1 83.2 79.6 67.5 41.7 36.4 42.6 50.8 51.7 46.6 51.2 88.3 76.0 49.3 50.2 51.3 53.8 86.1 79.0 40.4 55.1 41.9 40.6

58.8 69.7 78.2 73.9 65.1 49.0 38.5 38.4 16.3 16.9 14.5 15.7 92.7 20.6 13.7 12.5 14.1 14.6 81.2 69.9 35.3 9.1 18.7 13.2

55.3 66.0 76.6 77.1 72.9 47.5 61.0 52.7 49.3 52.6 96.7 82.8 50.9 51.0 50.4 50.1 91.2 82.8 30.3 40.6 48.5 40.9

54.6 63.6 74.6 74.1 76.0 59.4 59.1 49.0 93.5 87.6 85.1 93.1 55.9 50.2 41.8 42.2 39.7

55.7 64.7 72.4 69.7 72.2 59.4 56.4 71.1 78.3 80.4 91.0 122.8 104.4 86.0 84.1 80.9 79.6 95.6 78.6 58.1 48.4 71.4 67.3

56.6 62.8 70.9 68.6 78.9 63.5 66.0 69.0 75.5 74.7 74.8 119.4 53.2 81.2 78.4 76.8 72.3 93.5 83.2 52.3 10.0 12.5 9.0

57.5 64.2 64.9 54.5 64.8 50.9 53.9 49.1 52.7 46.1 52.6 93.8 54.2 56.8 52.7 52.0 53.7 86.7 57.9 91.8 52.4 53.0 54.4 49.6 51.4

Page 6: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 6 of 11results may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltageDISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculated

significantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.and temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elements

Actual site conditions may vary.

Premise LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1T: 416-741-2673 TF: 1-844-741-2673 [email protected] Project: Your Project

For: Your CompanyPrepared By: Premise LED Inc.

49.3 54.9 44.6 56.8 46.2 55.6 46.0

64.8 54.6 48.3 53.0 44.6 51.5 41.0

75.4 76.7 81.5 67.0 63.5 61.0 56.4 56.7 49.7 53.4 48.3 47.9 36.3 46.2

69.2 67.7 36.5 37.3

78.6 67.2 39.2 43.7 47.6 42.9 40.9 41.4 43.4 43.9 46.1 48.8 33.3 44.0 51.7 55.8 59.5 62.4 63.6 63.7 63.4 62.6 61.1 57.9 53.2

83.3 80.1 47.3 34.2 46.9 43.7 44.4 45.3 46.6 45.9 41.8 50.5 30.3 51.1 60.3 64.9 68.8 72.1 73.0 72.9 72.4 71.2 69.5 65.9 60.5

79.9 74.4 82.0 32.9 29.7 30.3 42.5 40.0 36.4 35.7 35.2 35.2 35.7 49.6 49.5 64.7 70.0 73.8 77.0 77.6 76.6 75.4 73.8 71.8 68.0 62.3

74.8 67.8 27.3 8.6 12.8 9.2 8.5 8.0 7.7 7.1 13.2 48.0 67.5 72.4 76.3 78.9 78.8 75.8 73.6 71.7 68.9 65.1 59.7

80.8 75.7 38.9 41.5 48.0 43.8 39.5 40.8 42.1 42.6 41.3 51.3 67.5 71.8 74.9 77.2 72.2 69.5 66.0 62.7 59.8 56.2 51.2

95.1 91.4 97.0 50.8 41.6 11.9 13.0 10.1 9.8 9.5 8.9 8.5 6.9 48.4 66.5 69.9 72.3 73.8 64.4 59.8 55.2 49.1 46.8 43.9 39.4

86.1 79.0 40.4 55.1 41.9 40.6 38.9 38.6 38.5 36.6 38.6 50.5 65.8 68.3 69.9 70.8

81.2 69.9 35.3 9.1 18.7 13.2 11.3 10.1 9.3 8.7 12.7 51.9 64.7 66.4 66.5 64.0

91.2 82.8 30.3 40.6 48.5 40.9 37.2 35.9 35.5 32.0 47.7 51.1 64.2 65.3 65.4 63.1

87.6 85.1 93.1 55.9 50.2 41.8 42.2 39.7 37.9 38.7 39.6 38.8 34.9 50.6 63.9 65.1 64.1 62.9

95.6 78.6 58.1 48.4 71.4 67.3 64.5 64.0 66.7 63.3 55.1 59.8 63.5 64.5 64.6 62.8

93.5 83.2 52.3 10.0 12.5 9.0 9.1 8.7 8.4 8.1 10.9 68.6 63.4 64.3 64.5 63.2

86.7 57.9 91.8 52.4 53.0 54.4 49.6 51.4 55.0 50.6 50.5 46.9 41.9 57.2 62.7 63.7 63.7 62.4

Page 7: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 7 of 11

DISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculated

and temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elementssignificantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.

results may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltage

Actual site conditions may vary.

Premise LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1T: 416-741-2673 TF: 1-844-741-2673 [email protected] Project: Your Project

For: Your CompanyPrepared By: Premise LED Inc.

74.7 88.4 92.9 75.5 4.8

89.0 108.0 120.0 120.0 110.9 93.7 81.7 69.8 50.0 60.8 42.6 59.6 60.9 59.3 61.5 59.7 48.4 57.8 48.5 58.7 55.4 57.7 61.6 58.3 53.4 57.0 52.9 55.5 49.4 53.1 45.3 44.0

97.3 117.2 132.0 133.3 119.8 97.3 51.1 52.7 51.3 55.2 58.7 48.0 51.4 46.2 51.3 59.3 51.0 51.7 47.9

100.3 117.0 129.1 124.8 95.8 48.3 56.6 44.9 54.9 55.9 43.5 54.5 43.6 53.9 45.3 54.7 44.7 47.4

100.4 112.4 122.5 106.4 62.0 52.3 57.7 50.1 53.2 56.8 48.4 54.2 48.6 54.0 50.6 55.2 50.1 47.5

98.8 109.9 119.1 103.7 58.8 54.5 58.8 53.1 55.6 58.0 52.1 53.9 52.2 53.7 54.6 55.3 54.0 50.4

95.7 106.4 115.2 102.9 59.4 54.6 59.8 54.9 55.2 59.0 53.8 53.2 54.6 51.8 56.9 53.9 56.6 50.9

90.2 102.1 113.2 103.5 55.8 50.8 58.0 53.9 53.6 57.4 51.3 51.8 55.2 49.0 55.9 50.5 55.3 49.0

82.1 92.9 107.9 101.1 55.6 47.8 60.5 53.2 52.7 58.6 50.0 49.3 54.9 44.6 56.8 46.2 55.6 46.0

76.0 87.2 99.0 94.4 66.2 63.4 62.3 63.8 61.0 55.0 52.9 64.8 54.6 48.3 53.0 44.6 51.5 41.0

72.2 82.4 94.9 98.5 68.6 73.1 60.8 70.9 68.2 68.3 63.9 68.8 69.4 79.5 53.7 67.4 57.4 67.1 75.4 76.7 81.5 67.0 63.5 61.0 56.4 56.7 49.7 53.4 48.3 47.9 36.3 46.2

70.9 80.9 92.1 88.9 74.4 46.9 71.6 69.2 67.7 36.5 37.3

69.7 81.4 90.3 85.5 74.6 46.3 60.1 57.2 52.0 54.7 86.4 73.8 51.9 51.8 52.3 52.0 78.6 67.2 39.2 43.7 47.6 42.9 40.9 41.4 43.4 43.9 46.1 48.8 33.3

66.7 78.7 87.1 83.2 80.8 47.9 20.5 21.8 17.7 21.4 85.1 25.9 21.8 20.8 18.6 17.5 83.3 80.1 47.3 34.2 46.9 43.7 44.4 45.3 46.6 45.9 41.8 50.5 30.3

62.1 75.3 83.8 84.2 84.0 75.8 65.6 59.6 55.9 53.2 51.4 52.3 85.9 68.0 51.0 50.3 49.6 46.6 79.9 74.4 82.0 32.9 29.7 30.3 42.5 40.0 36.4 35.7 35.2 35.2 35.7 49.6

59.7 72.1 81.6 82.1 80.7 69.2 64.6 50.9 19.4 13.5 11.1 13.2 75.4 24.5 11.1 11.6 12.5 13.9 74.8 67.8 27.3 8.6 12.8 9.2 8.5 8.0 7.7 7.1 13.2 48.0

61.0 73.6 82.7 83.5 80.9 52.2 50.9 50.2 49.2 50.0 87.0 75.8 51.1 50.7 51.9 49.8 80.8 75.7 38.9 41.5 48.0 43.8 39.5 40.8 42.1 42.6 41.3 51.3

Page 8: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 8 of 11results may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltageand temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elementssignificantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.

DISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculated

Actual site conditions may vary.

Premise LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1T: 416-741-2673 TF: 1-844-741-2673 [email protected] Project:

For:Your Project

Your CompanyPrepared By: Premise LED Inc.

4.2

33.3 44.0 51.7 55.8 59.5 62.4 63.6 63.7 63.4 62.6 61.1 57.9 53.2 45.6 4.8

30.3 51.1 60.3 64.9 68.8 72.1 73.0 72.9 72.4 71.2 69.5 65.9 60.5 51.9 5.5

49.5 64.7 70.0 73.8 77.0 77.6 76.6 75.4 73.8 71.8 68.0 62.3 53.3 5.7

67.5 72.4 76.3 78.9 78.8 75.8 73.6 71.7 68.9 65.1 59.7 50.8 5.6

67.5 71.8 74.9 77.2 72.2 69.5 66.0 62.7 59.8 56.2 51.2 43.3 5.1

66.5 69.9 72.3 73.8 64.4 59.8 55.2 49.1 46.8 43.9 39.4 33.6 4.9

65.8 68.3 69.9 70.8

64.7 66.4 66.5 64.0

64.2 65.3 65.4 63.1

63.9 65.1 64.1 62.9

63.5 64.5 64.6 62.8

63.4 64.3 64.5 63.2

62.7 63.7 63.7 62.4

62.2 63.3 63.4 62.2

62.3 63.4 63.3 62.2

61.7 62.8 62.7 61.6

61.4 62.5 62.6 61.6

61.1 62.1 62.0 61.0

59.9 60.9 60.9 60.0

58.7 59.8 59.8 58.9

56.3 57.2 57.1 56.2

52.6 53.5 53.6 52.5

18.9 47.6 48.4 48.3 47.4

19.4 6.7 39.4 40.3 40.3 39.1 4.9

Page 9: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 9 of 11

DISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculatedresults may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltageand temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elementssignificantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.

Actual site conditions may vary.

T: 416-741-2673 TF: 1-844-741-2673 [email protected] LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1

Project:

For:Your Project

Your CompanyPrepared By: Premise LED Inc.

Page 10: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 10 of 11results may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltageDISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculated

significantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.and temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elements

Actual site conditions may vary.

Premise LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1T: 416-741-2673 TF: 1-844-741-2673 [email protected] Project:

For:Your Project

Your CompanyPrepared By: Premise LED Inc.

Page 11: Lighting Calculation Study Étude Photométrique · 2019. 6. 28. · Lighting Calculation Study Étude Photométrique Your Project Your Company Prepared By: Premise LED Inc. Page

Page 11 of 11

DISCLAIMER : Calculations have been performed according to IESNA & CIE standards and good practice. Some differences between measured values and calculatedresults may occur due to tolerances in calculation methods, testing procedures, component performance, measurement techniques, and field conditions such as voltageand temperature variations. Input data used to generate the attached calculations such as room dimensions, reflectance's, furniture and architectural elementssignificantly affect the lighting calculations. If the real environment conditions do notmatch the input data, differences will occur between measured value and calculated values.

Actual site conditions may vary.

Premise LED Inc. 80-86 Carrier Drive, Toronto, ON. M9W 5R1T: 416-741-2673 TF: 1-844-741-2673 [email protected] Project: Your Project

For: Your CompanyPrepared By: Premise LED Inc.