8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
1/14
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
2/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
Construction Approval
Lifting
Devices
Is testingrequired
before firstuse?
If yes, whattesting
method?
Re-Test Frequency andMethod (Load, NDT,Visual Inspection)
RegulatoryCode or
Standard
Pad eyes
Wall, hull, floor, beam, etcmount type pad eyes only
(Excluding CCU Pad Eyes)
Yes
Proof test to 1.5times the SWL,
visual inspectionand pre and post
NDT by a QualifiedInspector
Prior to each use - Visual inspectionby a qualified individual
1 Year- visual certification by aQualified Inspector to the degreedeemed necessary by the QualifiedInspector
5 Year - Proof load test to 1.5 times
the SWL or rated design, visualinspection,
5 YearNDT- performed at thediscretion of Qualified Inspector(Required if no record on fil e)
Deficient Padeyes lockou t (LOTO)
ASME, OSHA,AWS D1.1
Wire Rope Slings
and
Stingers
Yes
Proof load test to 2times the SWL andvisual inspection by
a qualifiedinspector
Prior to each use - Visual inspectionby a qualified individual
1 Year(from in servi ce date)Replace or conduct an annual 3rdparty proof load test to 2 times theSWL and visual inspection by aqualified inspector.
ASME, API RP2D, OSHA, BP
Nylon Slings / Pallet Straps
(Synthetic Slings)
Yes
Proof Load testedby Manufacturer
visual inspection by
a qualifiedinspector
Prior to each use - Visual inspectionby a qualified individual
1 Year (from in service date)-Discard and replace nylon / syntheticslings.
Heavy soiled/oiled/UV damaged/cut ortorn slings to be discardedimmediately.
ASME, OSHA,API RP 2D, BP
Shackles
Yes
Proof load test to 2times the SWL andvisual inspection by
a qualifiedinspector
Prior to each use - Visual inspectionby a qualified individual
1 year - Visual recertificationinspection by a qualified inspector
API RP 2D,ASME, OSHA, BP
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
3/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
Spreader Bars Yes
Proof load test to 2times the SWL,
visual inspectionand NDT by
qualified person.
Prior to each use - Visual inspection
by a qualified individual
1 Year- visual certification by aQualified Inspector to the degreedeemed necessary by the QualifiedInspector
5 Year Proof load test to 2 times theSWL, Visual inspection and NDT byQualified Inspector
ASME, OSHA
Cargo Carrying Unit (CCU)
Portable Offshore Units
Baskets, skids, skid mountedequipment, cabins, boxes,
pallet types, reels and skidmounted types, tanks all types.
ISO type lifting PointsProhibited
NOTE: EXCLUDESPERSONNEL BASKETS
(X-904)
Yes
Visual inspectionprior to each use.
Proof Load test to 2
times max grossweight, NDTinspection
conducted byqualified person.
Prior to each use - Visual inspectionby a qualified individual
12 months Visual inspection by aQualified Inspector and NDT required
5 Year Proof load test to 2 times theMGW (maximum gross weight), Visualinspection and NDT by QualifiedInspector
Aft er modi fication o r repair Proofload test to 2 times the MGW(maximum gross weight), Visualinspection and NDT by QualifiedInspector
ASME, DNV, BP
Trolleys Yes
Proof load test to125 % of SWL,
visual inspectionand NDT by a
Qualified Inspector
Prior to each use - Visual inspectionby a qualified individual
1 Year- visual certification by aQualified Inspector to the degree
deemed necessary by the QualifiedInspector
5 Year- Proof load testing to 125 % ofthe SWL, visual inspection
NDT- performed at the discretion ofQualified Inspector
5 Year Integrity Check- Discardolder equipment to ensureadequate safety factors aremaintained
API RP 2D,ASME,
OSHA,OGP
Monorails Yes
Proof load test to125 % of SWL,
visual inspectionand NDT by a
Qualified Inspector
Prior to each use - Visual inspection
by a qualified individual1 Year- visual certification by aQualified Inspector to the degreedeemed necessary by the QualifiedInspector
5 Year- Proof load test to 125 % ofthe SWL, visual inspection
NDT- performed at the discretion ofQualified Inspector
API RP 2D,ASME, OSHA
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
4/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
Chain Fall / Hoist Yes
Proof load test to125 % of SWL,
visual inspectionby a Qualified
Inspector
Prior to each use - Visual inspection
by a qualified individual andconsultation of operating manual forproper configuration.
1 Year- Proof load tested to 125 % ofthe SWL and visual inspection by aQualified Inspector
5 Year Integrity Check- Discardolder equipment to ensureadequate safety factors aremaintained
ASME, OSHA, BP
Eye Bolts with ThreadedRods
No Inspected byManufacturer
Prior to each use visual inspection byqualified person. 1 year inspecti on.
See guide for inspection in ASMEB30.26-2.8.4
ANSI / ASMEB30.26-2010
Master Links, all type Ringsand Swivels
Yes
By Manufacturer.
And by RiggingSupply Company
Prior to each use - Visual inspectionby a qualified individual
1 year inspection and tested whenattached to sling rigging set prooftested to 2 times rated load. (same asslings)
ASME B30.26-4
BP
Rigging Blocks all Types NO
Inspection byqualified person
Prior to each use - Visual inspectionby a qualified individual
In service date:Annual Inspectionand certification by qualified inspector.Proof tested 1.5 times rated capacity.
Review ASME B30.26-5.8.4 forremoval from service.
ASME B30.26-5
BP
Tripods & A-Frames Yes
Proof load test to125 percent ofSWL, visual
inspection andNDT by a Qualified
Inspector
Prior to each use - Visual inspectionby a qualified individual
1 Year- visual certification by aQualified Inspector to the degreedeemed necessary by the QualifiedInspector
5 Year- Proof load testing to 125percent of the SWL, visual inspectionand NDT by a Qualified Inspector
ASME
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
Note: Any lifting & rigging equipment that is found to be defective should be tagged out ofservice immediately and properly discarded or repaired.
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
5/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
PADEYE INSPECTION CRITERIA
Inspection Criteria
Damage
Corrosion
Cracks
Bending or twisting
Ensure there are no jagged or flame cut eyes
Correct and legible tag information
Most Common Causes of Damage
Damage due to misuse1. Deformation due to overload or improper lifting
Effects of the environment1. Severe corrosion, Pitting or metal loss, Abrasions from side loading,
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
Holes are not with inindust ry standards. Padeye hole ID must be 6 to10% larger than the ODshackle in OD size.
Appl icable Standards
ASME
OSHA AWS D1.1
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
6/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
WIREROPESLING
INSPECTION
CRITERIA
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
7/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
NYLON SLING INSPECTION CRITERIA
SHACKLE INSPECTION CRITERIA
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
8/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
SHACKLE INSPECTION CRITERIA
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
9/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
SPREADER BAR INSPECTION
Inspection Criteria
Damage
Corrosion
Smooth boreholes (pad eyes)
Cracks
Security of weld / bolts
Wear
Deformation
Correct and legible tag information
Most Common Causes of Damage Damage due to misuse
2. Bent or broken pad eyes or supports3. Deformation due to overload or improper lifting
Effects of the environment1. Severe corrosion2. Pitting or metal loss
Appl icable Standards
ASME
OSHA
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
10/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
CARGO CARRYING UNIT INSPECTION CRITERIA
Appl icable Standards
BP
DNV 2.7-1
ASME B30.20
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
11/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
TROLLEY BEAM INSPECTION CRITERIA
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
12/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
MONORAIL INSPECTION CRITERIA
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
13/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
CHAINFALL / HOIST INSPECTION CRITERIA
Inspection Criteria
Damage
Corrosion
Cracks
Chain condition
Sheave or pinion wear
Hook deformation
Correct and legible tag information
Most Common Causes of Damage
Damage due to misuse1. Deformation due to overload or improper lifting
Effects of the environment1. Severe corrosion2. Pitting or metal loss
Appl icable Standards
ASME
OSHA
BP
Uncontrolled Document. Valid Only at the Time of Printing. Print Date: 10/31/2012
-
8/10/2019 Lifting Gear Inspection & Maintenance (1).pdf
14/14
BP GoM RPU Lif ting Gear Inspection and MaintenanceRequirementsDocument Number: CD # UPS-US-SW-GOM-HSE-DOC-00175-2
Control Tier 2 GoM HSSE Doc owner: Jake Reidenbach - GoM Regional Lifting Technical Authority Revision Date: 06/19/201
A-FRAME INSPECTION CRITERIA
Inspection Criteria
Damage
Corrosion
Cracks
Sheave or pinion wear
Loose or missing bolts, nuts or rivets
Operation of limiting devices (if installed)
Correct and legible tag information
Most Common Causes of Damage
Damage due to misuse1. Deformation due to overload or improper lifting
Effects of the environment1. Severe corrosion2. Pitting or metal loss
Appl icable Standards
ASME