Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ......

13
1 Leviathan Mine January 2016 Annual Technical Summary Meeting Lahontan Water Board

Transcript of Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ......

Page 1: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

1

Leviathan Mine January 2016 Annual Technical Summary Meeting

Lahontan Water Board

Page 2: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

2

Tasks in 2015:

•Summer Pond Water Treatment

•Flow and Stage Monitoring

•Routine Maintenance

•RevegetationStudy Completed

Page 3: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

3

Lahontan Water Board Pond Water Treatment Plant

Utility Water TanksLime Slurry Tank

Influent Line

R-1

FF-1

R-2

FF-2CL-2

Polymer Feed LineTreated Effluent Lineto Pit Clarifier

Page 4: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

4

• Approximately 156 tons of sludge were hauled off site for disposal in July 2015.• Sludge generated during the treatment of 0.8 million gallons of AMD in 2014.

2015 Pit Clarifier Sludge Removal and Disposal

Page 5: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

5

• Assembly of pond water treatment plant• Discharge of treated AMD to the Pit Clarifier began on July 15, 2015• Discharge of treated AMD to Leviathan Creek began on July 21, 2015

2015 Summer PondWater Treatment Startup

Page 6: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

6

•2.5 million gallons of AMD treated and discharged•Influent pH range 2.35 to 2.77 SU•Influent average TDS 5,910 mg/L•Field and lab data show USEPA discharge criteria met except for an occasional exceedance of total recoverable selenium

• 35.3 tons lime (dry weight)• 1,100 gallons diesel• 105 gallons gasoline• 280 pounds of polymer• 3,341 mg lime / liter AMD

2015 Summer Pond Water Treatment

Page 7: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

7

Sludge generated is contained in the pit clarifier

Approximately 212 - 255 tons of sludge generated during the 2015 season will be hauled off site for disposal in 2016.

Page 8: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

8

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Millions of G

allons

Year

AMD Neutralized by Treatment Year

Spring Treatment

Summer Treatment

Approximately 100 Million Gallons of AMD have been treated since 1999

Page 9: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

9

Maximum capacity is available for AMD storage entering the 2015/16 winter

Ponds 2 North and 2 South essentially dry due to pond water treatment

Page 10: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

10

Flow and stage monitoring

• 15 locations during the 2015 water year

Page 11: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

11

2015 Routine Maintenance

• Removed accumulated sediment from 14,000 linear feet of storm water conveyance ditches and from the Flow Control Structure

• Repaired perimeter fence

• Performed drainage work above flow control structure and installed BMPs in and around the Pit access road

• Coordinated with El Dorado County Department of Agriculture to spray invasive Tall Whitetop and Dyer’s Woad

Page 12: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

12

• 2 Year Revegetation Study Completed by UC Davis

• Final Report available at: http://www.waterboards.ca.gov/lahontan/water_issues/projects/leviathan_project/index.shtml

Revegetation Study

Page 13: Leviathan Mine January 2016 Annual Technical Summary ... · Leviathan Mine January 2016 ... Lahontan Water Board. 2 Tasks in 2015: •Summer Pond Water Treatment •Flow and Stage

13

Questions?