Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

21
Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434

Transcript of Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Page 1: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Lecture 4Title: The Scope

Management Plan

By: Mr Hashem AlaidarosMIS 434

Page 2: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Main TopicsScope Management:

PlanningDefinitionWork Breakdown SystemVerificationControl

Page 3: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

What is Project Scope Management?

Scope refers to all the work involved in creating the products of the project and the processes used to create them.

A deliverable is a product produced as part of a project, such as hardware or software, planning documents, or meeting minutes.

Project scope management includes the processes involved in defining and controlling what is or is not included in a project.

Page 4: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Scope Planning

Scope Definitio

n

CreateWBS

Scope Verificati

on

ScopeControl

Documents how the team will define and develop the project’s scope and WBS, as well as processes for verifying and controlling the project and product deliverables.

Builds upon the preliminary project scope statement to define all the project and product deliverables, including the processes and criteria for acceptance.

A project planning tool that that decomposes or subdivides and organizes the project’s scope into a deliverable-orientated hierarchy.

A formalized acceptance from the appropriate stakeholders that the defined project scope is complete

A defined process for managing changes to project and product scope and the impact of those changes to the project’s schedule and budget.

ScopeManageme

ntPlan

DetailedProjectScope

WorkBreakdownStructure

ScopeVerificatio

nChecklist

ScopeChange ControlProcess

Scope Management Processes

Page 5: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Scope Management Process

Description

Scope Planning The development of a scope management plan that defines the project’s scope and how it will be verified and controlled throughout the project.

Scope Definition A detailed scope statement that defines what work will and will not be part of the project and will serve as a basis for all future project decisions

Create Work Breakdown Structure (WBS)

The decomposition or dividing of the major project deliverables into smaller and more manageable components.

Scope Verification Confirmation and formal acceptance that the project’s scope is accurate, complete, and supports the project’s MOV.

Scope Change Control Ensuring that controls are in place to manage proposed scope changes once the project’s scope is set. These procedures must be communicated to all project stakeholders.

Page 6: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

1. Scope Planning

Initiating process to begin defining and documenting the project work (i.e., deliverables) needed to achieve the project’s value Extra work that will not help the project achieve it’s value

will only needlessly increase the project’s schedule and budget

This process begins at a high level and will become more detailed as the project progresses and more information becomes available

Attempts to answer the question: What is and what is not to be delivered by this project? Makes the project sponsor’s needs and expectations explicit

Tools: Scope Boundary Scope Statement

Page 7: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

“Failure to define what is part of the project, as well as what is not, may result in work being performed that was unnecessary to create the product

of the project and thus lead to both schedule and budget overruns.”

-         Olde Curmudgeon, 1994

(an anonymously written column in PM Network Magazine)

Page 8: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Example Scope Statement

1. Develop a proactive electronic commerce banking strategy that identifies the processes, products and services to be delivered through the World Wide Web.

2. Develop an application system that supports all of the processes, products, and services identified in the electronic commerce strategy.

3. The application system must integrate with the bank’s existing enterprise resource planning system.

Out of Scope

1. Technology and organizational assessment of the current environment

2. Customer resource management and data mining components

Page 9: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

2. Project Scope Definition

The scope boundary and scope statement provide a useful first step

The project’s scope must now be defined in more detail in terms of specific deliverables that provide a basis for developing the project’s work breakdown structure (WBS)

Example Tools:Context Level Data Flow Diagram (Structured

Systems Analysis and Design)Use Case Diagram (Object Oriented Systems

Analysis and Design)

Page 10: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Context Level Data Flow Diagram

Page 11: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Use CaseDiagram

Page 12: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

3. Creating the Work Breakdown Structure (WBS)

A WBS is a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project.

A WBS is a foundation document that provides the basis for planning and managing project schedules, costs, resources, and changes.

Decomposition is subdividing project deliverables into smaller pieces.

Page 13: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Developing the WBS

A work package is developed for each of the phases and deliverables defined in the Deliverable Structure Chart (DSC)

Page 14: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.
Page 15: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.
Page 16: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.
Page 17: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

4. Project Scope Verification

Measurable Organizational Value (MOV) Has the project’s MOV been clearly defined

and agreed upon? Deliverables

Are the deliverables tangible and verifiable? Do they support the project’s MOV?

Quality Standards Milestones

Significant events that mark the acceptance of a deliverable

Review and AcceptanceFormal Signoff

Page 18: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

5. Scope Change Control

Concerned with managing changes to the project’s scope and to ensure that these changes are beneficial when they occur

Mitigates:Scope Creep

Tools/Procedures:Scope Change Request Form

Scope Schedule

Budget

Page 19: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Example of a Scope Change Request Form

Page 20: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Example of a Scope Change Request Log

Page 21: Lecture 4 Title: The Scope Management Plan By: Mr Hashem Alaidaros MIS 434.

Benefits of Scope Control

Keeps the project manager in control of the project. Authorized changes to the project’s scope are

reflected in changes to the project’s schedule and budget.

Allows the project team to stay focused and on track They do not have to perform unnecessary

work.