Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal...

22
© LANCO Group, All Rights Reserved © LANCO Group, All Rights Reserved Lanco Infratech Ltd Investor Presenta>on POWER EPC INFRASTRUCTURE SOLAR NATURAL RESOURCES

Transcript of Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal...

Page 1: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved © LANCO Group, All Rights Reserved

Lanco Infratech Ltd 

 Investor Presenta>on 

POWER EPC  INFRASTRUCTURE SOLAR  NATURAL RESOURCES 

Page 2: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

Agenda 

2

1   Company Overview 

3   Industry Overview 

4   Power Business 

5   EPC Business 

7   Natural Resource Business 

8   Infrastructure Business 

9   Property Development Business 

10 Experienced Management Team 

6   Solar Business 

2   Financials 

Page 3: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

1. Mission, Vision and Values  

Mission: Development of Society through Leadership, Entrepreneurship, Ownership

 

Vision: Most Admired Integrated Infrastructure Enterprise

Values: Integrity

Humility & Respect

Achievement Drive Accountability

Continuous Learning

Teamwork Organization before Self

3 Positive Attitude

Page 4: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

1. India’s largest Integrated Power Developer 

4

Infrastructure Property Development 

Subsidiaries / Affiliates

Lanco Power  Natural Resources Solar 

Lanco Infratech Limited (LITL) 

•  Listed Holdco of the group •  Promoters Holding ~ 68% •  Adj. Net Worth US $443 mn (including Minority) 

•  All businesses of the group are under LITL  •  Power projects of 8,086 MW in 12 states of India (3,450MW* under opera>on & 4,636 under construc>on) 

* 732 MW ge^ng ready for opera>ons 

EPC  Construc>on 

Thermal  Hydro  Roads Lanco Hills EPC 

GeneraSon 

Manufacturing 

All Coal and Gas based SPVs 

All Hydro based SPVs 

      Assumed US$ / INR = 60  

•  Devihalli •  Hosekote 

•  Griffin •  Tasra 

Coal 

Page 5: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

2. Financials – P&L 

Cash Profit: PAT + Depreciation + Profit Eliminated

Adj. PAT= Reported PAT + Profit Eliminated

* Revenue : Before intersegment revenue elimination

5

Note: 1.  Assumed US$ / INR =60 2.  Mn indicate million 

US$ Mn 

Revenue  EBITDA 

Adj. Profit  Cash profit 

 2,567    2,549  

 1,813  

 1,228  

 ‐    

 500  

 1,000  

 1,500  

 2,000  

 2,500  

 3,000  

FY12  FY13  FY14  9MFY15 

 308  

 442  

 279   254  

 ‐    

 50  

 100  

 150  

 200  

 250  

 300  

 350  

 400  

 450  

 500  

FY12  FY13  FY14  9MFY15 

 114  

 ‐178  

 ‐381  

 ‐241  

 ‐500  

 ‐400  

 ‐300  

 ‐200  

 ‐100  

 ‐    

 100  

 200  

FY12  FY13  FY14  9MFY15 

 230  

 39  

 ‐124  

 ‐28  

 ‐150  

 ‐100  

 ‐50  

 ‐    

 50  

 100  

 150  

 200  

 250  

FY12  FY13  FY14  9MFY15 

Page 6: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

2. Financials – Balance Sheet 

* Fixed Assets : Gross Block + CWIP

6 Note: 1.  Assumed US$ / INR = 60 2.  * As per AS‐21 / AS‐28 

US$ Mn 

Cash & Cash Equivalents 

Key  Balance Sheet Figures (as on Dec 31, 2014) Net Worth (including Minority Interest)  192 Add: Profit Eliminated (as per AS 21)  251 Adjusted Net Worth  443 Gross Debt (of company, subsidiaries & associates)  6,329 

Gross debt of projects under opera>on  2,955 Gross debt of projects under construc>on  3,374 

Cash and Cash Equivalent (including subsidiaries and associates)  90 Net Debt  6,239 Net Debt / Gross Adjusted Net Worth  14.10 

Above debt figures excludes acquisition debt of Griffin and working capital loans of Power companies

Fixed Assets 

 5,901  

 6,439  

 6,782   6,890  

 5,400  

 5,600  

 5,800  

 6,000  

 6,200  

 6,400  

 6,600  

 6,800  

 7,000  

FY12  FY13  FY14  9MFY15 

 235  

 97    101   90  

 ‐    

 50  

 100  

 150  

 200  

 250  

FY12  FY13  FY14  9MFY15 

Page 7: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

3. Industry Overview      a) Strong Push to Drive Infrastructure Growth 

7

XII Plan spending (FY13-FY18)

Source: World Bank Data 2010, (http://data.worldbank.org/indicator/EG.USE.ELEC.KH.PC)

Expenditure on Infrastructure is required to keep growth momentum of Indian economy

XII Five Year Plan expected target ~88 GW (as per draft document).

Per capita consumption of electricity

Total - US$1,126bn

Installed Power Capacity Growth (GW)

Source: Planning commission (XIIth five year Draft plan) (INR/USD:50)

105  108  113  118  124  132  143  148  159  174 200 

288 

 100

 150

 200 250

 300

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2017e

616

2944

0

500

1000

1500

2000

2500

3000

3500

India China

In BRIC countries, India’s per capita consumption lowest. China’s per capita consumption of power is 4.8x of India.

In order to achieve 8% growth, India should attain atleast 7% growth in total power sector.

300

64

194189

104

25

101

51 40

1830

12 -

50

100

150

200

250

300

350

Central State Private

Page 8: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

Per Capita Consumption Growth (Units)

3. Industry Overview     b)Power Scenario in India 

Source: CEA

8

Source: CEA

Growing share of Private players Capacity Addition targets in the 12th Plan (MW)

Per capita consumption of electricity ~ growing at brisk pace

Recent Policy Ini-a-ves:  

1.  State  Electricity  Boards  (SEBS)  Financial Restructuring Package   

2.  Ini>a>ve  by  Government  of  India  to  allow  pass‐through  of  addi>onal  cost  of  imported  coal supplied under FSA 

3.  Modifica>on  to  Case  II  standard  bidding documents  

591 613 632 672 717 735 779 819 

879 

2004 2005 2006 2007 2008 2009 2010 2011 2012 

Type  FY13  FY14  % Change 

Thermal  761  792  4 

Hydro  114  135  18 

Nuclear  33  34  4 

Bhutan Import  5  6  17 

All India  912  966  6 

Source: CEA

Electricity Generation during April 2013 to March 2014 (BUs)

Type/Sector  Central  State  Private  Total 

Thermal  14878  13922  43540  72340 

Hydro  6004  1608  3285  10897 

Nuclear  5300  0  0  5300 

Total  26182  15530  46825  88537 

The 12th plan targets a capacity addition of 88,537 MW with 53% of the capacity being added by the private sector

Page 9: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

4. Lanco Power Business ‐ Project Status Update 

9

Plant Fuel Capacity (MW) Oeake Anpara Coal 1,200 PPA Kondapalli I Gas 368 PPA Kondapalli II Gas 366 Short Term Kondapalli III*  Gas  732  Short Term Amarkantak I Coal 300 PPA Amarkantak II Coal 300 PPA Tanjore Gas 120 PPA Other Renewable Wind, Solar, Hydro 64 PPA Total 3,450

* kondapalli III (732 MW) is getting ready for operations.

Power Projects under OperaSon 

Plant Fuel Financial closure  Capacity (MW)

oeake EsSmated compleSon

Lanco Ularanchal  Hydro Y 76 Short Term FY 17

Teesta Hydro Y 500 PPA FY 17

Amarkantak III & IV Coal Y 1,320   Part PPA FY 17

Vidarbha Coal Y 1,320 Part PPA FY 17

Babandh Coal (Partly Cap>ve) Y 1,320 Part PPA FY 17

Solar Solar Y 100 PPA FY 17 

Total 4,636

Power Projects under ConstrucSon 

46% 52% 

2% Fuel Diversification

Gas  Coal  Renewables including Hydro 

Page 10: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

4. Power Business      Presence Across Value Chain De‐risking the Business 

Fuel (Coal mining) EPC Generation and O&M Trading

•  Griff in coal, Coll ie region in Western Austral ia, currently produces 4 MTPA with resources of 1.2 bn

•  Selected as MDO by SAIL for Tasra Open C a s t m i n e w i t h geological reserves of approximately 250 mn tons in Jharkhand. Includes development of a captive power plant as well.

•  Completed projects with capacity of 4,732 MW

•  4,636 MW projects under construction

•  St rong eng inee r i ng capability

•  O v e r 1 0 y e a r s o f experience in design and development of Power Projects

•  Handles global suppliers selection and sourcing of diverse materials like high-pressure fabricated e q u i p m e n t , s k i d s , i n s t r u m e n t a t i o n & electrical systems

•  Operating capacity of 3,450MW*

•  Kondapalli III (732 MW) is getting ready for operations.

•  4,636 MW projects under construction.

•  One of largest private sector player in Indian power trading market

•  Traded 333 mn units in quarter ended Dec 31, 2014

Transmission and Distribution

•  St ra tegy i n c l udes possible expansion into transmission and distribution

Integrated presence across value chain capturing value addition across the businesses

10

Type   MW 

Thermal & Gas  3,386 

Renewable (Hydro, Solar, Wind) 

64 

TOTAL  3.450 

* 732 MW ge^ng ready for opera>ons 

Page 11: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

5. EPC Business: In‐house exper>se enhances margins 

11

Construction

Executing a wide range of projects spanning Thermal Power Plants, Hydro Power Plants, Highways, Airports, Industrial Structures, Transmission and Distribution, Chimneys and Cooling Towers, Water Infrastructure and Heavy Civil Structures.

EPC

EPC order book of USD 4.91 billion as on Dec’14 Major EPC / Construction order executed

Kondapalli 1,214 MW Udupi 1,200 MW Anpara 1,200 MW Amarkantak (I & II) 600 MW Tanjore Power 120 MW

Budhil 70 MW External orders under execution EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical Ennore Thermal Power Project (1*660MW)

EPC

Construction

Order Book (USD Mn) 

Revenue (USD Mn) 

 5,117  

 4,383    4,363  

 4,910  

 3,600  

 4,000  

 4,400  

 4,800  

 5,200  

FY12  FY13  FY14  9MFY15 

 1,445  

 724  

 376   189  

 ‐    

 400  

 800  

 1,200  

 1,600  

FY12  FY13  FY14  9MFY15 

Page 12: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

6. Solar Scenario 

12 

  Addition of capacities:   2009 – 7.2 GW   2010 – 16.6 GW

  Price decreases that have brought PV close to grid parity in several countries have encouraged new investors

  Expected Growth in the market 3.3-4.8x of current capacity by 2015

Source: EPIA – Global Market Outlook for PV Until 2015

Glo

bal S

cena

rio

Indi

an P

ersp

ectiv

e

Source: MNRE - Renewable Energy in India: Progress, Vision and Strategy

  Under the MNRE policy:   New grid projects through NVVN   Small grid projects through IREDA   Off-grid solar

  MNRE - Phase I   Batch I 620 MW   Batch II 350 MW

  Gujarat 365 MW   Rajasthan 200 MW

  RPO requirement

Page 13: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

6. Solar Business:  Fully Integrated Strategy enables lowest Rs/kWh 

13 

EPC   Project Development  Integrated 

Manufacturing 

Target in 4 Yrs        

500 MW/PA 

Aim to be a Global player, as a developer and a third party EPC player. Current Solar EPC Order Book USD $ 468mn (included in EPC order book) Current Solar farm development portfolio – 141 MW (Operating 41 MW and Under Construction 100 MW)

400 MW/PA  250 MW/PA 

Target in 3 Yrs        

Manufacturing- Phase I

Capex US$ 180 Mm

Debt: Equity 70:30

Capacity- Phase I

Polysilicon 1250 MT

Wafer 80 MW

Module Line 50 MW

Policy Capacity (MW) Tariff- Rs/Unit Project Cost

(USD mm) PPA Duration

(Yrs)

Solar PV Farm

Gujarat Policy 35 Rs 15 for 12 yrs, Rs 5 for next 13 Yrs 89 25

JNNSM 5 11.5 14 25

RPSSGP 1 16.5 2.4 25 Solar Thermal Farm JNNSM 100 10.5 311 25

Foray into manufacturing to support internal requirements and reduce margin volatility, through the cycle

Page 14: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

7. Natural Resources (Coal):  

  Around 70% of demand from Power Sector 

  Uncertainty in domes>c supply 

  Expected Import of coal by 2017 > 150 MT 

  Increasing compe>>on for overseas assets 

  Limited opera>onal assets 

 

DomesSc supply falls short of demand  Securing coal: a need; an opportunity 

14

431 

457 

493 

533 

533 

540 

575 

795 464 

504 

549 

582 

625 

640  773  98

0 200 400 600 800 1000 1200 

FY07  FY08  FY09  FY10  FY11  FY12 Prov 

FY13 BE FY17 BE 

Produc>on  Demand (inld middlings) 

Source: Planning Commission (XII Plan draft document)

Tasra Open Cast Project (SAIL) 

•  Selected as Mine Developer and Operator (MDO) by Steel Authority of  India  (SAIL)  for Tasra Open Cast Project and development of associated cap>ve power project. 

•  Located in Jharia coalfield of Dhanbad (Jharkhand) having geological reserves of approximately 250 million tons  

•  Se^ng up of coal washery and opera>on of power plant of    200‐300  MW  capacity  based  on  the  secondary products arising from the proposed Tasra Washery.   

 

Griffin Coal 

Largest  opera>onal  thermal  coal  mines  in  Western  Australia, with Resource base of 1.2 bn Tonne 

Strategic loca>on – Bunbury port <100 km from mine 

Good connec>vity of rail and port.  

Current producSon :‐ capacity of 4 mtpa of coal.  

Expansion : Plans to ramp up produc>on  to a max of 18 MTPA by FY 18 

Page 15: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

8. Infrastructure Business:       Leveraging Construc>on Exper>se to Build Infrastructure 

15

Lanco has moved into selective infrastructure projects to leverage its EPC experience

Awarded two NaSonal highway projects in Karnataka 

c. 81 km stretch connec>ng Bangalore – Hoskote – Mudbagal 

c. 82 km stretch connec>ng Neelamangla – Devihalli  

Concession periods of 20 years and 25 years respec>vely during which toll will be collected 

Capex of USD $ 308 mn  

Grant from NHAI USD $ 60 mn 

COD of Devihalli alained on June 25th 2012 and toll collec>on started 

COD of Hoskote alained on December 19th 2013 and toll collec>on started  

Also built jetty at Mangalore port for Udupi Power Plant

Page 16: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

9. Property Development Business 

16

Lanco Hills is the group’s foray into property development, located in Hyderabad, spread over 100 acres and comprises residential space, office space and IT SEZ

Lanco Hills

Residential •  Towers under Phase I are ready for occupation, 97% units sold out, 63% occupied •  In addition to high rise towers, 56 Villas will also be constructed

Office space •  IT tower - 0.59 mn sqft ready for occupation, lease deed signed for 80,000 sqft. •  SEZ : 0.06 mn sqft incubation space – leased out to IT companies

Property Development is restricted to Hyderabad only

Page 17: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

10. Experienced Management Team 

17 

L. Madhusudhan Rao 

Execu&ve Chairman 

 

G. Bhaskara Rao Execu&ve Vice Chairman 

L Sridhar Vice Chairman 

G. Venkatesh Babu Managing Director 

P. Abraham Director 

LANCO Board  

U.K. Kohli Director 

Finance  Power 

Lanco Group Senior Management Team 

    T. Adi Babu     T N Subramanian 

   P. Panduranga Rao    K. Raja Gopal 

ConstrucSon & EPC 

  S. C. Manocha 

Solar 

  Rajkumar Roy  

S. C. Manocha Director 

R. Krishnamoorthy Director 

Page 18: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

Pan India Presence 

18

Chitradurga

Tanjore power

Amarkantak – I & II Amarkantak – III & IV

Kondapalli I & II Kondapalli III

Teesta

Lanco Uttaranchal

Anpara

Babandh

Lanco Hills

Plants under construction

Plants under operation

Plants under construction

Plants under operation

Plants under construction

Plants under operation

Property development

Road development

Vamshi

Vamshi Industrial

81 km Bangalore – Hoskote – Mudbagal 82 km Neelamangla – Devihalli

Coal Based

Hydro

Gas

Wind

Registered office

Corporate Office

Hyderabad

Gurgaon

Coal mine

Vidarbha

Plants under operation

Solar

Solar Power Plants Manufacturing at Rajnandgaon- Chattisgarh

Gujarat Solar

Rajasthan Solar

Tasra mine

Page 19: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

We care for the world we live in 

Lanco Foundation

•  Member of the UN Global Compact

•  Operating in 11 Indian States at 13 locations

•  Covering 140 villages & 200,000 population beneficiaries

•  we have a number of initiatives in place that help us to make a difference…

•  Focused work in the areas of:

  Disability

  Education

  Safe Drinking water

  Mobile Health Services

  Support of traditional arts & crafts

19 

Page 20: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

Recent Awards 

  Lanco Amarkantak wins “Greentech Safety Award 2013” in Gold category in Thermal Power sector

  Lanco Anpara wins “PowerLine Award” for the Best Thermal Project

  Lanco Amarkantak wins “Golden Peacock Occupational Health & Safety Award” for the Year 2013

  Lanco Solar Wins “IESA Award For Most Innovative Product” for 2012

  Lanco Kondapalli Wins “Golden Peacock Environment Management Award for corporate Social responsibility” for 2012

  8th Construction World- Annual Award for “Fastest Growing Construction Company”

  Tanjore Power received TERI Corporate Award for “ Environmental Excellence and Corporate Social Responsibility”

  Tanjore Power received GreenTech silver award in Power sector for “Safety Management”

  IKU II received IEEMA award for “Excellence in Fast Track Commissioning of Small Hydro Projects”

  Lanco Infratech Ltd received PRSI Golden Jubilee Award for the “Most Impressive Public Relations Initiatives”

20 

Page 21: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

Disclaimer  

                   No representa>on or warranty, express or  implied,  is made as  to, and no reliance should be placed on,  the  fairness, accuracy, completeness or correctness of the informa>on or opinions contained in this presenta>on. Such informa>on and opinions are in all events not current arer the date of this presenta>on. Certain statements made in this presenta>on may not be based on historical informa>on or facts and may be "forward looking statements" based on the currently held beliefs and assump>ons of the management of the Company, which are expressed in good faith and in their opinion reasonable, including  those  rela>ng  to  the  Company's  general  business  plans  and  strategy,  its  future  financial  condi>on  and  growth prospects and future developments in its industry and its compe>>ve and regulatory environment.  

           Forward‐looking statements involve known and unknown risks, uncertain>es and other factors, which may cause the actual 

results, financial condi>on, performance or achievements of the Company or industry results to differ materially from the results,  financial  condi>on,  performance  or  achievements  expressed  or  implied  by  such  forward‐looking  statements, including future changes or developments in the Company's business, its compe>>ve environment and poli>cal, economic, legal  and  social  condi>ons.  Further,  past  performance  is  not  necessarily  indica>ve  of  future  results.  Given  these  risks, uncertain>es and other factors, viewers of this presenta>on are cau>oned not to place undue reliance on these forward‐looking  statements.  The  Company  disclaims  any  obliga>on  to  update  these  forward‐looking  statements  to  reflect  future events or developments. 

                   This presenta>on is for general informa>on purposes only, without regard to any specific objec>ves, financial situa>ons or 

informa>onal needs of  any par>cular person.  This presenta>on does not  cons>tute an offer or  invita>on  to purchase or subscribe for any securi>es of the Company by any person in any jurisdic>on, including India and the United States. No part of it should form the basis of or be relied upon in connec>on with any investment decision or any contract or commitment to purchase or subscribe for any securi>es. The Company may alter, modify or otherwise change in any manner the content of  this  presenta>on,  without  obliga>on  to  no>fy  any  person  of  such  change  or  changes.  This  presenta>on may  not  be copied or disseminated in any manner. 

21

Page 22: Lanco Infratech Ltd · EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq EPC of Supercritical

© LANCO Group, All Rights Reserved 

22

Thank You