Lamding - Project Profile
Transcript of Lamding - Project Profile
-
8/14/2019 Lamding - Project Profile
1/19
A
PROJECT REPORT
FOR
INTEGRATED HANDLOOM DEVELOPMENT
SCHEME
LAMDING CHERAPUR CLUSTER,
KAKCHING SUB-DIVISION,
THOUBAL DISTRICT, MANIPUR
SUBMITTED BY
DEPARTMENT OF COMMERCE & INDUSTRIES,
GOVERNMENT OF MANIPUR
---------
-
8/14/2019 Lamding - Project Profile
2/19
2
LAMDING CHERAPUR CLUSTER
I N D E X
S.No. Particulars Page Nos.
1. Diagnostic Study Report 1 to 7
2. Action Plan 8 & 9
3. Annexure-A-I Selection of Implementing
Agency and Selection of Cluster for Diagnostic
Study
10 to 12
4. Geographical Locations of the Cluster (MAP) 13 A & B
5. Annexure-A-2- Basic Survey of Cluster 14 to 45
6. Annexure-A-3-Diagnostic Study report and
Action Plan for Cluster Development
46 to 49
7. Financial Outlay 50 & 51
8. Year-wise break up 3 years (Physical and
Financial)
52 & 53
-
8/14/2019 Lamding - Project Profile
3/19
3
DIAGNOSTIC STUDY FOR
LAMDING CHERAPUR CLUSTER OF THOUBAL DISTRICT
UNDER INTEGRATED HANDLOOM DEVELOPMENT SCHEME
1. Introduction:
The Cluster approach for a holistic development of micro, small and medium enterprises is
being attempted all over the world particularly in the developing countries including India
on a wider scale. The Development of identified handloom clusters in the second phase of
the implementation of Integrated Handloom Cluster Development Programme in the
country. Towards that end, a Diagnostic study has been conducted on by The Department
of Commerce & Industries, Govt. of Manipur covering Lamding Cherapur Handlooms
Cluster in Thoubal District under Integrated Handloom Development Scheme.
The Primary aim of the Diagnostic study is to identify what ails in the cluster. Thedetailed objectives of the cluster are detailed below.
To understand the current socio economic profile of the cluster To evaluate the current status of Handloom Cluster in terms of the product variety,
yarn availability, the number of functional or non-functional looms, role of support
organization and prevailing infrastructure facilities.
To highlight the constrains faced by the cluster and suggest some action plans forfuture.
In order to fulfill the above mentioned objectives the primary survey in the cluster has
been conducted as well as diagnostic study by the Department of Commerce &
Industries, Govt. of Manipur, for understanding of the cluster is based on analyzing thevalue chain that exists in the cluster. It includes the suppliers of raw material (backward
linkage), the Weavers (Producers), the traders/Exporters (Forward linkage), and support
institutions/ organizations. The support institutions are the Government bodies and
social organization which held the various activities of the entire value chain.
Generally, that support organizations include the National Handloom Development
Corporation (NHDC) Ltd., Weavers Service Centre, National Institution of Fashion and
Technology (NIFT), the Weavers Cooperative Societies and master weavers.
A meeting of prominent weavers, Master Weavers, Prominent weaving
community leaders, staff of the Cooperative Societies of cluster has been conducted
and held various discussions regarding availability of raw materials, production
capacity, product diversification, marketing, infrastructure facilities and the problems
being faced by them are noted below.
Types of product manufactured Raw material procurement Traditional preparatory work Dyeing and design facilities Use of t traditional looms Product market structure Competitive analysis Lack of working capital and availability of Finance.
-
8/14/2019 Lamding - Project Profile
4/19
4
2. Background of the Cluster:
Ministry of Textiles, Govt. of India have sanctioned 05 No. of clusters in Manipur. The first
phase for the year 2005-06 was implemented through IIE, Guwahati and another 04 Nos. of
clusters in 2nd
phase for the year 2006-07 have also been sanctioned.
Evaluation of the Cluster:
Lamding Cherapur is 44 Km. away from Imphal under Kakching Sub-Division of Thoubal
Revenue District. There is population of more than 8500 having about 1150 weaver
households in the cluster of which about 300 weavers households are affiliated to the
Cooperative Society and remaining weavers are outside the cooperative folds. There are
about 250 independent Weavers, 70 shed weavers, 400 wage weavers and 20 master
weavers. Of the total 750 looms in the cluster 40 % are working and 60% are idle. In the
cluster, female weavers are 98% and engaged in the occupation of the weaving industry inthe major way even though their contribution is either paid or poorly paid for the ancillary
activities if performed by her outside the family weaving.
The members of the weavers Cooperative Societies are accustomed to weave cotton
and acrylic varieties, like, bed sheet, lungies, towels, mosquito nets, etc. Due to deteriorated
financial position of the Society member are not getting regular work from the Society
consequently a large number of weavers have diverted to the master weavers.
The cluster covers the adjoining villages, lanes, areas, where handloom weaving
activities is the main occupation of the womenfolk.
Major Players in the Cluster
In this cluster the Master Weavers are playing major role in providing employment to
70% to 80% of the weavers in the cluster. They are supplying raw material in the shape
of warps. The weavers are simply put it on the loom and weaving and return the
finished goods, by taking their wages. There are problems of raw materials, dyeing,
common facilities etc. As such the weavers in the cluster are not doing their job
successfully.
The Officer on Special Duty (Handloom), Deputy Director of Handlooms,
General Manager with his Project Manager (Handloom) and Secretaries of the Societiesare the in-charge of the Cluster for implementation of the Scheme.
Current Scenario of Cluster:
Particulars Lamding Cherapur Cluster
Total looms 750
Looms covered under Cooperative fold 300
Looms covered under outside cooperative fold 450
Type of loomsa) Loin Looms 400
b) Throw Shuttle Frame Looms 220
c) Fly Shuttle Frame Looms 130
-
8/14/2019 Lamding - Project Profile
5/19
5
Types of product manufactured : 40 No. of Women Weavers : 1150 No. of Society : 03 No. of Societies working : 03 Turnover of the area : Rs.1750 lakhs Outstanding loan : Nil Products :Shawls, Mekhla, Bed sheets, Ladies wear,
muffler, etc.
Wage Rage : Rs. 46 to Rs. 52/- Present loan amount : Nil Cash credit limit Rs. 110.0 lakh CC renewal for the year 2007-08 : Rs.105.00 lakhs
The annual turnover of the cluster is Rs.1750 lakhs and the last 5 years turnover is as
detailed below:-
1. 2002-03 Rs.1,050.00 lakhs
2. 2003-04 Rs.1,100.00 lakhs
3. 2004-05 Rs.1,300.00 lakhs
4. 2005-06 Rs.1,500.00 lakhs5. 2006-07 Rs.1,750.00 lakhs
Socio-economic profile:
In this cluster the entire weaving activity is totally dominated by backward classes. The
98% of the weavers are BPL families. There is no un-employment in the industry. But
due to social and economic changes the youngsters are not being attracted for weaving
profession but opting for other professions.
3. Main Handloom Products:
Major products of the cluster are cotton and acrylic products f Shawls, Bed sheets,
lungies, muffler, dress materials, mekhla (phanek) and school bags. The entire stocks of
the weavers are being marketed through societies and individual sales depots which
are 28 showrooms in Ema Market and in other small towns and master weavers. There
are no professional dyers in the cluster and the raw material is being supplied by the
Departmental Raw Material and master weavers after grey yarn is dyed and sized.
4. Powerlooms in the Cluster:
There are no power looms in the cluster.
-
8/14/2019 Lamding - Project Profile
6/19
6
5. Handloom Mark:
As the Government has introduced the Handloom mark scheme with a view to provide
collective identity to the handloom woven products and distinguish them from power
loom and mill products. All the societies and producers are being registered with the
Textile Committee, Ministry of Textiles for supply of Handloom Mark Labels.
6. Economic conditions of the weavers in the cluster:
The earning of the weavers families are average. Many welfare schemes are being
implemented by Govt. of Manipur as well as Govt. of India and as such the weavers
families are self sufficient and having proper security for their livelihood. The
following schemes have also been implemented as advantageous for the weavers.
a) Integrated Handloom Villages Development Schemeb) Project Package Schemec)
Health Package Schemed) Mahatma Gandhi Bunkar Bima Yojana
e) Housing cum-work shed schemef) Thrift fund com saving security schemeg) Deen Dayal Hathkargha Protsahan Yojanah) PMRY (Prime Minister Rojgar Yojana)
7. SWOT Analysis:
The Strengths, Weaknesses, Opportunities and Threats (SWOT) analysis has
been done keeping in mind the historical background, geographical, social, and
economic and Industrial related core issues and conditions existing in the cluster.
Strengths:
Market, Product Development and Technology
There is good potential in the domestic market for all the products There is good demand for tribal shawls products in all over India and abroad Local consumption is high Societies and individual weavers have many sales outlets in and outside States. Possibility of creating new product range beside the existing to explore the market Ample scope for product diversification by developing new designs. Having good handloom concentration Availability of skilled weavers Marketing /development Assistance is provided by Govt.
Weakness
Market, Product Development and Technology
No local adequate market No local raw material supplies No collective efforts related to marketing Internal competition for marketing of goods leads to differentiation in prices Dependence on few products No regular work for weavers
-
8/14/2019 Lamding - Project Profile
7/19
-
8/14/2019 Lamding - Project Profile
8/19
8
ACTION PLAN FOR IMPLEMENTATION OF THE CLUSTER DEVELOPMENT
APPROACH IN LAMDING CHERAPUR
------
I. Trust Building:
The following action, are to be implemented fro trust building among the weavers.
Exposures visit to successful clusters Conducting workshops at regular intervals Workshop on networking strategy has to be conducted Workshop on quality appraisal of woven fabrics has to be conducted
II. Quality Awareness:
Quality of the products are not up to the export standards because of less attention being paid
by the weavers and master weavers as they do not have technically qualified personal for
quality checking for their final products,. They are to be educated properly to improve thequality of their products. Therefore, it is proposed to arrange quality awareness campaign on
frequent intervals.
III Raw Material:
A Raw Material centre for supply of different counts of Yarn as required by the Weavers is
proposed for supply of yarn at the cluster head quarters under the scheme.
IV Common Facility Centre:
Infrastructure proposed for establishing a sizing and warping units ion the cluster head quartersfor preparation of pre-looms processing.
V. Dyeing:
There are no facilities for testing of dyeing fastness of the dyed materials. In many of the dye
houses they are not doing the yarn scouring which lead to uneven dyeing. They are using hard
water for dyeing which also causes uneven dyeing. The Dye houses needs to be modernized
with scouring and water softening plants.
VI. Design Development:
The services of the Weavers Service Centre will be taken for the development of new designs
And training of designers is need to create innovative designs as per the market requirement.
VII. Loom and Accessories:
All the weavers are having traditional pit looms. They require Jacquard, dobbies and
accessories top weave new designs and improved their productivity.
VIII Marketing:
The weavers in the cluster are not having any systematic marketing strategy. It needs initiationof efforts to organize market promotion for cluster products through domestics market.
Therefore, it is propose to initiate actions as under:
-
8/14/2019 Lamding - Project Profile
9/19
9
Market survey is to be carried out for development of colour designs quality Geographical identification brand has to be registered Manipuri Handloom Establishment of market consortia Buyers and Sellers meets and also specialized retailers meets have to be conducted
at regular intervals
Training in value addition to the traditional saris has to be conducted Use if information technology
IX Finance:
The Lamding Cherapur Cluster is suffering due to lack of working capital. It is therefore the
members of the society have started working under Master Weavers and hence margin money
is proposed for their requirement.
Signature of the President/Secretary/Chief Executives
(Name & Designation)
Countersigned.
Director In/Charge of Handlooms
-
8/14/2019 Lamding - Project Profile
10/19
-
8/14/2019 Lamding - Project Profile
11/19
11
4 Status of the weavers in the
cluster
Status Existing
Independent 250
With Master Weavers 300
With Primary Cooperatives 300
With Handloom Apex/GroupWith Self Help Goups 250
With NGOs 50
With exporters
Others
Total 1150
5. Present economic
status of the cluster
as compared to 5
years back
(a)Economic level of
the weaver
Economy of the weavers is improving
slightly from Rs.46/- to 52/- per day.
(b) Product
diversification
Traditional patterns have been diversified
for fashion clothing.
(c) Infrastructure
faculties
Road connectivity between inter-villages
have been improved with PMSY, which
have easier for movability around the
area.
(d) Sales Turnover The sales turnover has improved from Rs.
1,050.00 lakh to Rs.1750.00 lakh from
2002-03 to 2006-07.
6. SWOT analysis of
the Cluster
Analysis in brief separately on the strength, weakness,
opportunities and threats.
a) Strengths a) There is good potential in the domestic market for thetraditional items and other products
b) There is good demand for tribal shawls products in all overIndia and abroad
c) Local consumption is highd) Societies have many sales outlets in State and neighbouring
States.
e) Possibility of creating new product range beside the existingrange to explore the market
f) Ample scope for product diversification by developing newdesigns through skilled artisans
g) Having good handloom concentrationh) Availability of skilled weaversi) Marketing /development Assistance is provided by Govt.
b) Weakness a) No local marketb) No local raw material supplies. 3. No collective efforts
related to marketing
c) Internal competition for marketing of goods leads todifferentiation in prices
d) Though efforts were made for new design development, butit is only individual basis
-
8/14/2019 Lamding - Project Profile
12/19
-
8/14/2019 Lamding - Project Profile
13/19
13
Certified that:
1. The proposal for release ofRs. 93.93 lakh has been recommended by the State LevelProject Committee in its meeting held on 07-01-2008. For Baseline Survey and
Diagnostic Study. The minutes of the meting arte encloses.
2. There is no reason to believe that these organizations are involved in corrupt practice.3. Consolidated UC for earlier releases for the year nil has been sent vide State
Governments Letter No. nil dated nil is enclosed. It is also certified that no U.C. in
respect of the above grantee organization is pending.
4. Certified that the above particulars are correct.5. Certified that no complain(s) in respect of the above mentioned agency have been
received in the State in respect of disbursement of assistance released by the GOI and
State in the past.
Signature of the President/Secretary/Chief Executives
(Name & Designation)
Countersigned.
Director In/Charge of Handlooms
-
8/14/2019 Lamding - Project Profile
14/19
14
CLUSTER APPROACH
Annexure-A-3
DIAGNOSTIC STUDY REPORT AND ACTION PLAN FOR LAMDING CHERAPUR
CLUSTER DEVELOPMENT
-----------
Sl.
No.
Parameters
1. Name of the
Cluster/Ward Village
Lamding Cherapur under Kakching Sub-Division of Thoubal
District
Profile of the Cluster
2. Geographical location
of the cluster
Lamding Cherapur 44 Km. east of Imphal under Kakching Sub-
Division of Thoubal District. 4391 sq. km., 24o
59 North and 93o
30 East.
3. Number of
handlooms
750
4. Type of handlooms in
the pocket
Loin Looms, throw shuttle and fly shuttle frame looms
5. Infrastructure
available
Weavers have their indigenous loom and managed in their
residential verandah.
6. Present skills of the
weavers
Capable of weaving various intricate traditional designs.
7. Number of handloom
weavers
8. Status of the weavers Existing Proposed to be covered
A) Number of Primary Weavers Coop. Societies 03B) Number of Weavers in Cooperative fold. 300
C) Number of Master Weavers 20
D) Number of weavers with Master Weavers 300
E) Number of NGOs working in handlooms 05
F) Number of weavers with NGOs 50
G) Number of SHGs working in Handlooms 25
H) Number of weavers with SHGs 250
I) Number of traders 12
9. Turnover of the pocket (Rs. in crore) Present Turnover Anticipated turn over
a) Domestic 20.25 32.50
b) Exports 4.05 20.00
Total 24.20 52.50
10. Average earning of the weaver per day (In
Rs.)
49/-
106/-
11. Main handloom products of the pocket Shawls, Bed sheets, lungies, muffler, dress
materials, mekhla (phanek), and scholl bags
12. Number of Powerlooms in the pocket - Nil -
13. Whether handlooms of the pocket face
competition with Powerlooms
- No.-
Status of Pocket 5 years back
14. Economic condition ofthe pocket in relation
to the position 5 years
back from now
(a)Economiclevel of the
weaver
Economy of the weavers is improving slightlyfrom Rs.46/- to 52/- per day.
(b) Product Traditional patterns have been diversified for
-
8/14/2019 Lamding - Project Profile
15/19
15
diversification fashion clothing.
(c) Infrastructure
faculties
Road connectivity between inter-villages have
been improved with PMSY, which have easier
for movability around the area.
(d) Sales
Turnover
The sales turnover has improved from Rs.
1,050.00 lakh to Rs.1750.00 lakh from 2002-03 to 2006-07.
SWOT ANALYSIS
15. a) Strength a) There is good potential in the domestic market for thetraditional items and other products
b) There is good demand for tribal shawls products in all overIndia and abroad
c) Local consumption is highd) Societies have many sales outlets in State and neighbouring
States.
e) Possibility of creating new product range beside the existingrange to explore the market
f) Ample scope for product diversification by developing newdesigns through skilled artisans
g) Having good handloom concentrationh) Availability of skilled weaversi) Marketing /development Assistance is provided by Govt.
b) Weakness a) No local marketb) No local raw material supplies. 3. No collective efforts related
to marketing
c) Internal competition for marketing of goods leads todifferentiation in prices
d) Though efforts were made for new design development, but itis only individual basis
e) Dependence on few productsf) No regular work for weaversg) Low productivityh) No exposure to information Technologyi) Low education level and poor economic condition of weavers
j) Absence of weavers associationk) No availability of sizing locallyl) Inferior quality of dyeingm)Lack lf publicityn) There is no application of information technology modern
management techniques for marketing the product design etc.
o) Credit facilities from financial institutionsc) Opportunities a) Brand Building for traditional saris and other products
b) Scope for reduction in cost dyeing by modernizationc) High demand to handloom productsd) Availability of skilled weaverse) A common raw material Bank for Yarn, dyes and chemicals,
silk yarn zari may be provided for quality up gradationf) Scope for increasing working looms.g) Introduction of various welfare scheme
d) Threats a) Competition from Mill made productsb) Ensuing globalization
-
8/14/2019 Lamding - Project Profile
16/19
-
8/14/2019 Lamding - Project Profile
17/19
17
19. Project
Cost
Sl.
No
.
Name of the component Amount (Rs. In lakh weaverto be
coveredGOI State/
IA
Benef
iciaryTotal
1. Base line Survey, Diagnostic
study, Formation of SHGs
- - - - -
2. Consortium building 0.50 0.503. Raw Material 3.00 3.00
4. Skill up gradation 20
a) Training of Weavers 3.00 3.00
b) Training of Dyeing 1.00 1.00
c) Management Training 0.50 0.50
5. Design Development & Product
Diversification
a) Purchase of CATD 2.70 0.30 3.00
b) Engaging Designers 5.40 0.60 6.00
c) Paper design, sample,
assembling.
15.00 15.0
6. Infrastructure/CFC
a) Common Facility Centre 4.50 0.50 5.00
b) Dye House 1.80 0.20 2.00
7. Publicity & marketing
a) Advertising, Brochure,
Catalogue for 3 years
0.45
0.05
0.50
b) Exhibitions/Fairs for 3 years 5.40 0.60 6.00
c) Buyers-Sellers meets 3 years 2.70 0.30 3.00
d) Market Survey/Intelligence 1.00 1.00
e) Awareness and Exposure visit 3years 3.00 3.00
f) Development & Hosting of website 0.50 0.50
8. Project Management Cost
9. Basic Input
a) Margin Money 4.20 1.20 0.6 6.00 100
b) New looms 4.928 1.408 0.704 7.04 88
c) Dobby 2.80 0.80 0.4 4.00 100
d) Jacquard 2.10 0.60 0.3 3.00 50
f) Accessories 1.498 0.428 0.214 2.14 107
10. Construction of Workshed 8.75 8.75 35
Sub-total 9.726 21.986 2.218 83.93 500
11. Civil amenities
a) Approach roads 5 5
b) Education 2 2
d) Drinking water facility 1 1
e) Crche centre(Child Day care
Centre) for children of the
weaver
1 1
f) Primary education for children
of the weaver
1 1
Sub-total 10 10
Grand total 69.726 21.986 2.218 93.93
-
8/14/2019 Lamding - Project Profile
18/19
18
20 Propose
d Action
Plan for
the
cluster
Year-wise action plan highlighting the physical and financial targets for 3 years
along with a brief project report should be enclosed.
1. The beneficiary has not availed of any similar assistance under any other scheme of theState or the Central Government
2. The Implementing Agency is functioning3. There is no reason to believe that these organizations are involved in corrupt practice.4. Consolidated UC for earlier releases in respect of the grantee organization under IHDS
has been sent vide State Governments letter No Nil dated Nil is enclosed. It is also
certified that no U.C. in respect of the above grantee organization is pending under
IHDS.
5. Certified that the above particulars are correct and are verifiable from Books ofaccounts of the grantee agency.
6. Certified that no complaint(s) in respect of the above mentioned agency have beenreceived in the State in respect of disbursement of assistance released by the GOI andState in the past.
7. Certified that the Implementing agency(s) has obtained necessary approval from theBanks/financial institutions for credit linkages, wherever required.
8. Certified that the Implementing Agency has furnished the requisite details in the9. Performa A-2 (Baseline Survey of Cluster), enumerating, interalia, the names of the
individual weavers, components required and the assistance required thereof etc. and is
verifiable from records.
10.The proposal has been recommended by the State Level Project Committee in itsmeeting held on 07-01-2008.The minutes of the meting are enclosed.
(Signature)
President/Secretary of Organization
Countersigned.
Director In-charge of Handlooms & Textiles.
-
8/14/2019 Lamding - Project Profile
19/19
19
YEAR-WISE FINANCIAL OUTLAY BREAK UP FOR UTILIZATION OF THEFUNDS LAMDING CHERAPUR CLUSTER
-------DISTRICT: THOUBAL
(Rupees in lakh)
Sl.No Name of the Component 2007-08 2008-09 2009-10 TOTALPHY FIN PHY FIN PHY FIN PHY FIN
1. Base line Survey, Diagnostic
study, Formation of SHGs
2. Consortium building 1 0.5 1 0.5
3. Raw Material 1 1 1 1 1 3
4. Skill up gradation 0 0
a) Training of Weavers 10 1.5 5 0.75 5 0.75 20 3
b) Training of Dyeing 20 1 20 1
c) Management Training 20 0.5 20 0.5
5. Design Development & Product
Diversification
0 0
a) Purchase of CATD 1 3 1 3
b) Engaging Designers 1 2 1 2 1 2 3 6
c) Design Paper, sample, assembly 5 5 5 15
6. Infrastructure/CFC 0 0
a) Common Facility centre 1 5 1 5
b) Dye House 1 2 1 2
7. Publicity & marketing 0 0
a) Advertising, Brochure,
Catalogue for 3 years
1 0.5 1 0.5
b) Exhibitions/Fairs for 3 years 1 2 1 2 1 2 3 6c) Buyers-Sellers meets for 3 years 1 1 1 1 1 1 3 3
d) Market Survey/Intelligence 1 1 1 1
e) Awareness and Exposure visit 3 yrs 1 1 1 1 1 1 3 3
f) Development & Hosting of website 1 0.5 1 0.5
8. Project Management Cost 0 0
9. Basic Input 0 0
a) Margin Money 30 1.8 40 2.4 30 1.8 100 6
b) New looms 40 3.2 24 1.92 24 1.92 88 7.04
c) Dobby 50 2 25 1 25 1 100 4
d) Jacquard 20 1.2 15 0.9 15 0.9 50 3
e) Accessories 53 1.06 27 0.54 27 0.54 107 2.14
10. Construction of Workshed 15 3.75 10 2.5 10 2.5 35 8.75
Sub-total 270 40.51 150 22.01 140 21.4 560 83.93
11. Civil amenities
a) Approach roads 1 4 1 1 2 5
b) Education 1 2 1 2
d) Drinking water facility 1 1 1 1
e) Crche centre(Child Day care
Centre) for children of the weaver
1 1 1 1
f) Primary education for children
of the weaver
1 1 1 1
Sub-total 5 9 1 2 110
Grand total 275 49.51 151 24.01 140 21.41 561 93.93