Lab ReportsYM-211

Practical No: 2 to 12

Submitted To:

Sir M. Zubair Sb.

Submitted by:

Kashif Ali Khan07-NTU-072Semester 4th

Section: BNATIONAL TEXTILE

UNIVERSITY

FAISALABADPractical No: 2

Page 2: Lab Reports Spinning(221)

Title: Determination of count of lap and sliver.

OBJECTIVES:To become familer with the method of numbering of lap and sliver in english

system of numbering.

MATERIAL USED:Sample of lap and sliver.

APPARATUS:

Wooden template.

Wrapping drum.

Wrapping reel.

PROCEDURE:

Sliver:

1. First of all , the sample of sliver was taken.

2. With the help of wrapping drum, 6 yards of sliver was measured.

3. The circumference of the wrapping drum was one yard, 6 yards was measured by revolving the wrapping drum 6 times.

4. With the help of weighing balance, the weight of measured length of sliver was calculated.

5. That weight was measured in pounds.

6. Then, number of yards per pound was calculated.

7. Then, count of sliver was calculated by dividing it by 840.

Lap:

1. The sample of lap was taken.

2. With the help of wooden template, one yard of sample lap was measured.

3. Then, with the help of weighing balance the weight of measured length was calculated.

4. Then, number of yards per pound were calculated.

5. Then, the count was calculated by dividing it by 840.OBSERVATION AND CALCULATIONS FOR SLIVER:

TYPE OF STANDARD WEIGHT NUMBER OF COUNT BY VERIFICATION

2

Page 3: Lab Reports Spinning(221)

MATERIAL LENGTH OF MATERIAL

/STANDARD LENGTH

YARDS PER POUND

DEFINATION OF COUNT BY FORMULA

SLIVER 6 YARDS 8217 OUNCE 1116.83 0.1390 0.1390

- 6 YARDS

- 6 YARDS

OBSERVATION AND CALCULATIONS:

TYPE OF MATERIAL

STANDARD LENGTH OF MATERIAL

WEIGHT /STANDARD

LENGTH

NUMBER OF YARDS PER

POUND

COUNT BY DEFINATION

VERIFICATION BY FORMULA

LAP 1 YARD 12.25 0.0816 0.000097 0.000097

- 1 YARD

- 1 YARD

PRECAUTIONS:

1. Drum should be properly adjusted.

2. It should complete one revolution for 1 yard.

3. The lap or sliver should not be entangled.

4. Sample should be weighted properly.

5. Template plate should be adjusted properly.

6. The sample should be taken according to the boundaries of template plate.

7. It should be weighted properly.

Practical No: 3

3

MEAN

MEAN

Page 4: Lab Reports Spinning(221)

Title: Determination of count of roving and yarn.

OBJECTIVES:

To become familer with the method of numbering of roving and yarn in english system of numbering.

MATERIAL USED:Sample of roving and yarn.

APPARATUS:

Wrapping drum.

Rappeing reel.

PROCEDURE:

ROVING:

1. First of all, the sample of roving was taken.

2. With the help of wrapping drum, 15 yards were measured.

3. Circumference of the wrapping drum was one yard by revolving it 15 times we get 15 yards.

4. With the help of weighing balance, the weight of measured length of roving was calculated in pounds.

5. Then, number of yards per pound was calculated.

6. Then, the count of roving was calculated.

YARN:

1. The sample of yarn was taken.

2. With the help of rappeing reel, 120 yards were measured.

3. With the help of weighing balance, the weight of measured length was calculated in pounds.

4. Then, number of yards per pound were calculated.

5. Then, count of yarn was calculated.OBSERVATION AND CALCULATIONS(Roving):

4

Page 5: Lab Reports Spinning(221)

TYPE OF MATERIAL

STANDARD LENGTH OF MATERIAL

WEIGTH /STANDARD

LENGTH(OUNS)

NO. OF YARDS PER

POUND

COUNT BY DEFINATION

VERIFICATION BY FORMULA

ROVING 15 YARDS 9.13 150 0.892 0.892

- 15 YARDS

- 15 YARDS

OBSERVATION AND CALCULATIONS (Yarn):

TYPE OF MATERIAL

STANDARD LENGTH OF MATERIAL

WEIGHT /STANDARD

LENGTH(OUNS)

NO. OF YARDS PER

POUND

COUNT BY DEFINATION

VERIFICATION BY FORMULA

YARN 120 YARDS 3.28 17142.85 20.40 20.40

- 120 YARDS

- 120 YARDS

PRECAUTIONS:

1. Drum should be properly adjusted.

2. It should complete one revolution for 1 yard.

3. The roving or yarn should not be entangled.

4. Sample should be weighted properly.

5. Rappeing reel plate should be adjusted properly.

6. 120 yards by rappeing reel should be measured properly.

7. It should be weighted properly.

5

MEAN

MEAN

Page 6: Lab Reports Spinning(221)

Practical No: 4

Title: Inspection of waste extracted by different machines of

spinning department.

NAME OF MACHINES:

1. BLOW ROOM MACHINES:

Purcupin opener. Exiflow machine. Step cleaner machine. Kishner bitter waste. Scutcher machine.

2. CARD MACHINE:

Taker in waste. Cylinder under casing waste. Flate strip waste. Goffer waste.

3. DRAWING FRAME MACHINE.

4. ROVING FRAME MACHINE.

5. RING FRAME MACHINE.

6. WINDING MACHINE.

6

Page 7: Lab Reports Spinning(221)

Practical No: 5

Title: Calculate the different drafts and draft

count of carding machine

OBJECTIVES:

1. Fiber to fiber opening.

2. Cleaning.

3. Mixing from fiber to fiber.

4. Produce sliver.

EQUIPMENTS AND MATERIAL:

Drafting machine.

Lap roll.

METHODS OF DRAFTING:

Dispersion drafting method:

Material disperse on roller of machine and drafting in that condition.

Roller drafting method:

Material feed in regular pattern and drafting happened. Bale remains in regular pattern during process.

DRAFT: Increase in length per unit weight is called draft.

OR Decrease in weight per unit length is called draft.

PROCEDURE:

1. First of all, the material was fed on drafting machine which was given.

2. Then, the draft between lap roller and feed roller was calculated (tension draft).

3. For calculating the tension draft, the RPM of feed roller and lap roller and diameter of feed and lap roller was calculated and put the values in the following formula.

7

Page 8: Lab Reports Spinning(221)

TENSION DRAFT = surface speed of feed roller/surface speed of lap roller.

D1 = RPM of feed roller * П * diameter of feed roller RPM of lap roller * П * diameter of lap roller

For measuring the RPM of feed and lap roller tecometer was used.

Then, draft between feed roller and doffer was calculated (main draft).

For calculating the main draft, the RPM of doffer and feed roller and diameter of doffer and feed roller was calculated and put the values in the following formula.

MAIN DRAFT = surface speed of doffer/surface speed of feed roller.

RPM of doffer * П * diameter of doffer D2 = RPM of feed roller * П * diameter of feed roller

Then, the draft between doffer and calender roller was calculated (tension draft).

For calculating the tension draft, RPM of calender roller and doffer and diameter of calender roller and doffer was calculated and put the values in the following formula.

TENSION DRAFT = surface speed of calender roller/surface speed of doffer.

RPM of calender roller * П * diameter of calender roller D3 = RPM of doffer * П * diameter of doffer

Then, the draft between calender roller and coiler calender was calculated.

For calculating that draft, RPM of coiler calender roller and calender roller and diameter of coiler calender roller and calender roller was calculated and put the values in the following formula.

D4 = surface speed of coiler calender roller/surface speed of calender roller.

RPM of coiler calender roller * П * diameter of coiler calender roller = RPM of calender roller * П * diameter of calender roller

Then, total draft of carding machine was calculated by the formula

TOTAL DRAFT = surface speed of coiler calender roller/surface speed of lap roller

8

Page 9: Lab Reports Spinning(221)

Then, DCP was calculated.

Then, D.C was calculated by multiplying draft with DCP.

OBSERVATIONS AND CALCULATIONS: RPM of feed roller * П * diameter of feed roller Tension draft = D1 = RPM of lap roller * П * diameter of lap roller

D1 =

D1 =

RPM of doffer * П * diameter of doffer Main draft = D2 = RPM of feed roller * П * diameter of feed roller

D2 =

RPM of calender roller * П * diameter of calender roller Tension draft = D3 = RPM of doffer * П * diameter of doffer

D3 =

RPM of coiler calender roller * П * diameter of coiler calender roller D4 = RPM of calender roller * П * diameter of calender roller

D4 =

Total draft = surface speed of coiler calender roller/surface speed of lap roller

=

DCP =

9

Page 10: Lab Reports Spinning(221)

D.C = draft * DCP.

Practical No: 6

Title: To calculate the cleaning efficiency of

scutcher machine.OBJECTIVES:

To understand the method of determine the cleaning efficiency of cleaning machine of blow room.

EQUIPMENTS:

1. scutcher machine.

2. Shirley analyzer.

3. Feeding material of scutcher machine.

4. Lap material.

5. Weight balance.

PROCEDURE:1. 100 gram sample of feeding material of scutcher machine was selected.

2. The sample material for scutcher machine was taken from 20 – 30 places of feeding material for true representation.

3. Then, the sample was fed in Shirley analyzer and completed the standard method of the machine.

4. Then, trash T5 was collected from trash tray.

5. With the help of weighing balance, the weight of trash was calculated.

6. Then, 100 gram sample was taken from lap role from 20 – 30 places of the lap role for true representation.

7. Then, material was fed in Shirley analyzer and completed the standard method of machine.

8. With the help of weighing balance, the weight of trash was calculated.

10

Page 11: Lab Reports Spinning(221)

9. Cleaning efficiency of scutcher machine was calculated by the following formula.

10. ( trash in feeding material – trash in lap/weight of trash in feeding material) * 100.

11. Cleaning efficiency of a cleaning machine was calculated by the following formula:

(trash in feeding material – trash in delivered material/trash in feeding material) * 100.

OBSERVATION AND CALCULATIONS:

[(4.5 – 4.0)/4.5] * 100

= (0.5/4.5) * 100 = 11.11

PRECAUTIONS:

The sample should be weighted correctly.

The machine should be used carefully.

All trash should be collected in tray.

The value of T5 should be taken every time.

11

Page 12: Lab Reports Spinning(221)

Practical No: 7

Title: To calculate the different drafts and draft

constant on 3 by 3 drafting system drawing frame machine (roller drafting).

OBJECTIVES:

5. Doubling.

6. Increase the uniformity of sliver.

7. Mixing and blending of fibers.

8. Drafting.

9. Straighting of fibers.

10. Make the fibers parallel.

11. Decrease the weight per yard of the material.

EQUIPMENTS AND MATERIAL:

3. Drawing frame machine and slivers.

DRAFT:

Increase in length per unit weight is called draft.

OR

Decrease in weight per unit length is called draft.

PROCEDURE:

First of all, the given material was fed on drawing frame machine.

12

Page 13: Lab Reports Spinning(221)

Then, the draft between assisting roller and back roller was calculated (tension draft).

For calculating the tension draft, the RPM of back draft roller and assisting roller and diameter of back drafting roller and assisting roller was calculated and put the values in the following formula.

TENSION DRAFT = D1 = surface speed of back drafting roller/surface speed of assisting roller.

RPM of back draft roller * П * diameter of back draft roller D1 = RPM of assisting roller * П * diameter of assisting roller

Then, draft between back drafting roller and middle drafting roller was calculated (break draft).

For calculating the break draft, RPM of middle drafting roller and back drafting roller and diameter of middle and back drafting roller was calculated and put the values in the following formula.

BREAK DRAFT = surface speed of middle drafting roller/surface speed of back drafting roller

RPM of middle drafting roller * П * diameter of middle drafting roller D2 = RPM of back drafting roller * П * diameter of back drafting roller

Then, the draft between middle drafting roller and front drafting roller was calculated (main draft).

For calculating the main draft, RPM of front and middle drafting roller and diameter of front and middle drafting roller was calculated and put the values in the following formula.

MAIN DRAFT = surface speed of front drafting roller/surface speed of middle drafting roller

RPM of front drafting roller * П * diameter of front drafting roller D3 = RPM of middle drafting roller * П * diameter of middle drafting roller

Then, the draft between front drafting roller and calender roller was calculated (front tension draft).

For calculating the front tension draft, RPM of calender and front drafting roller

13

Page 14: Lab Reports Spinning(221)

and diameter of calender and front drafting roller was calculated and put the values in the following formula.

FRONT TENSION DRAFT = surface speed of calender roller/surface speed of front drafting roller.

RPM of calender roller * П * diameter of calender roller D4 = RPM of front drafting roller * П * diameter of front drafting roller

Then, total draft of drafting system machine was calculated.

Then, total draft of drawing frame was calculated.

Then, DCP was calculated.

Then, D.C was calculated by multiplying total draft with DCP.

OBSERVATIONS AND CALCULATIONS:

DRAFT BETWEEN ASSISTING ROLLER AND BACK DRAFFTING ROLLER:

RPM of back draft roller * П * diameter of back draft roller D1 = RPM of assisting roller * П * diameter of assisting roller

D1 =

D1=

DRAFT BETWEEN BACK DRAFTING ROLLER AND MIDDLE DRAFTING ROLLER:

RPM of middle drafting roller * П * diameter of middle drafting roller D2 = RPM of back drafting roller * П * diameter of back drafting roller

D2 =

14

Page 15: Lab Reports Spinning(221)

D2 =

DRAFT BETWEEN MIDDLE DRAFTING ROLLER AND FRONT DRAFTING ROLLER:

RPM of front drafting roller * П * diameter of front drafting roller D3 = RPM of middle drafting roller * П * diameter of middle drafting roller

D3 =

DRAFT BETWEEN FRONT DRAFTING ROLLER AND CALENDER ROLLER:

RPM calender roller * П * diameter of calender roller D4 = RPM front drafting roller * П * diameter of front drafting roller

D4 =

RPM of front drafting roller * П * diameter of front drafting rollerTotal draft of drafting roller = RPM of back drafting roller * П * diameter of back drafting roller =

Total draft of drawing frame = surface speed of calender roller/surface speed of assisting roller

= D1 * D2 * D3 * D4

=

Draft constant = total draft * DCP.

15

Page 16: Lab Reports Spinning(221)

Practical No: 8

Title: Investigation of various twist insertion

methods on ring spinning frame.

OBJECTIVES:

1. To become familier with the principle of twisting on ring spinning frame.

2. To calculate the TPI and TPM on ring frame by direct measurement using tachometer.

3. To understand the role of TCP on ring spinning frame.

EQUIPMENTS, TOOLS AND MATERIAL:

1. RING SPINNING FRAMES:

MR-3 ring frame.

Howaring frame.

RY-5 spinning frame.

Tachometer.

Calliper.

Measuring tape.

Sample of yarn.

16

Page 17: Lab Reports Spinning(221)

PROCEDURE:FOR RING FRAME:

With the help of calliper and measuring tape, the diameter of front drafting roller of ring frame was calculated.

With the help of tachometer, the RPM of front drafting roller and spindle was observed.

Then, TPI on ring frame was calculated by the following formula: spindle RPMTPI on ring frame = front roller delivery inch/min.

OR

spindle RPMTPI = RPM of front roller * П * diameter of front roller.

FOR RING FRAME:

Name of machine =

NO. OF OBS. SPINDLE RPM (FLYER RPM)

FRONT ROLLER RPM

FRONT ROLLER DIAMETER

(INCH)

TPI

1

2

3

4

MEAN =

Name of machine =

17

Page 18: Lab Reports Spinning(221)

NO. OF OBS. SPINDLE RPM (FLYER RPM)

FRONT ROLLER RPM

FRONT ROLLER DIAMETER

(INCH)

TPI

1

2

3

4

MEAN =

Practical No: 9

Title: Investigation of various twist insertion

methods on roving frame.

OBJECTIVES:

1. To become familier with the principle of twisting on roving frame.

4. To calculate the TPI and TPM on roving frame by direct measurement using tachometer.

5. To understand the role of TCP on roving frame.

EQUIPMENTS, TOOLS AND MATERIAL:

1. ROVING FRAME:

MS-2-speed frame.

FL-16 roving frame.

Tachometer.

Calliper.

Measuring tape.

Sample of yarn.

18

Page 19: Lab Reports Spinning(221)

PROCEDURE:

FOR ROVING FRAME:

With the help of calliper and measuring tape the diameter of front drafting roller was calculated.

With the help of tachometer the RPM of front drafting roller and spindle or flyer was observed.

Then, TPI was calculated by the following formula: flyer RPMTPI on roving frame = front roller delivery inch/min.

OR

flyer RPMTPI = RPM of front roller * П * diameter of front roller.

OBSERVATIONS AND CALCULATIONS:

FOR ROVING FRAME:

Name of machine =

NO. OF OBS. SPINDLE RPM(FLYER RPM)

FRONT ROLLER RPM

FRONT ROLLER DIAMETER(INCH)

TPI

1

2

3

4

19

Page 20: Lab Reports Spinning(221)

MEAN =

Practical No: 10

Title: Calculation of twist on ring spinning frame

by drawing twist gearing sketches of the machines.

OBJECTIVES: To understand the method to draw the twist gearing sketch of the ring spinning

frame.

To understand the identification of TCP on ring frame.

To understand the calculations of TPI by gearing sketch of the machines.

EQUIPMENTS, TOOLS AND MATERIAL:

Ring spinning frame.

White chalk.

Measure tape.

PROCEDURE:

FOR RING FRAME:

Draw the twist gearing sketch of ring spinning frame by showing the drive from front drafting roller to spindle.

Measured the diameter of front drafting roller.

20

Page 21: Lab Reports Spinning(221)

Counted the no. of teeth of gears present in the twist gearing sketch of ring spinning frame.

Calculated the TPI by the formula:

spindle RPMTPI on ring frame = front roller RPM * П * diameter of front roller

supposed the front roller RPM was one and calculated the rpm of spindle through twist gearing sketch of ring frame and calculated the TPI and twist constant of ring frame.

OBSERVATIONS AND CALCULATIONS:TWIST GEARING SKETCH OF MR-3 RING FRAME:

A

F E B

SPINDLE TAPE

D C

G

SPINDLE WHARVE

diameter of tin roller 1TPI = 1 * A/C * D/E * F/G * * diameter of spindle wharves П * diameter of front roller

21

BACK DRAFTING ROLLER

MIDDLE DRAFTING ROLLER

FRONT DRAFTING ROLLER

Page 22: Lab Reports Spinning(221)

=

=

=

Practical No: 11

Title: Calculation of twist on roving frame by

drawing twist gearing sketches of the machines.

OBJECTIVES: To understand the method to draw the twist gearing sketch of the roving frame.

To understand the identification of TCP on roving.

To understand the calculations of TPI by gearing sketch of the machines.

EQUIPMENTS, TOOLS AND MATERIAL:

Roving frame.

White chalk.

Measure tape.

PROCEDURE:

FOR ROVING FRAME:

Draw the twist gearing sketch of roving frame, showing the drive from front drafting roller to flyer.

22

Page 23: Lab Reports Spinning(221)

The diameter of front drafting roller was measured.

The no. of teeth of different gears present in twist gearing sketch was counted.

Then, TPI was calculated by the following formula:o flyer RPM

TPI = front roller RPM * П * diameter of front roller

ratio of rotary speed (flyer and front roller) = П * diameter of front rollerSupposed the front roller rpm as one and calculated the rpm of flyer through twist gearing sketch of roving frame and calculated the TPI at roving frame and calculated the twist constant by multiplying the no. of teeth of TCP with TPI.

OBSERVATIONS AND CALCULATIONS:

TWIST GEARING SKETCH OF M.S-2 SPEED FRAME (ROVING FRAME):

A FLYER

B

SPINDLE

C

K D J I E

F H

23

BACK DRAFTING ROLLER

MIDDLE DRAFTING ROLLER

FRONT DRAFTING ROLLER

Page 24: Lab Reports Spinning(221)

G

RPM of flyerTPI = RPM of front roller * П * diameter of front roller

Suppose when front roller rotates one revolution through gearing sketch we can calculate the rotation of flyer as: = 1 * A/B * B/C * C/D * E/F * F/G * H/I * J/K. = 1 * A/D * E/G * H/I * J/K.

1 * A/D * E/G * H/I * J/K TPI = 1 * П * diameter of front roller

A

B

C K J L D TCP E

F FLYER G

I H

24

BACK DRAFTING ROLLER

3rd DRAFTING ROLLER

2nd DRAFTING ROLLER

FRONT DRAFTING ROLLER

Page 25: Lab Reports Spinning(221)

Suppose front roller RPM = 1

then flyer rpm through gearing sketch :

= 1 *A/D * E/F * G/H * I/J * K/L

1 *A/D * E/F * G/H * I/J * K/L TPI = 1 * П * DIAMETER OF FRONT ROLLER

Practical No: 12

Title: Determination of inputs and outputs of

spinning machines.

BLOW ROOM

Input output

CARDING MACHINE

Input output

DRAWING MACHINE

Input output

GINNED COTTON LAP SHEETPROCES

S

25

CARDED SLIVER CANSPROCES

S

LAP SHEET

DRAWN SLIVERCARDED SLIVERSPROCES

S

Page 26: Lab Reports Spinning(221)

SLIVER LAP MACHINE

Input output

COMBING MACHINE

Input output

DRAWING MACHINE 2

Input output

ROVING MACHINE

Input output

RING SPINNING MACHINE

Input output

26

NARRROW LAP SHEET

COMBED SLIVER CANS

NARROW LAP SHEET

DRAWN SLIVERS

COMBED SLIVER CANS

ROVING PACKAGES

DESIRED YARN BOBINS

DRAWN SLIVER CANS

ROVING PACKAGES

DRAWN SLIVER CANS

PROCESS

PROCESS

PROCESS

PROCESS

PROCESS

Page 27: Lab Reports Spinning(221)

WINDING MACHINE

Input output

27

WINDING PACKAGES

YARN BOBINS PROCESS