Application and development prospects of double-reheat coal-fired power units Kyle Nicol CCC/255 August 2015 © IEA Clean Coal Centre

Transcript of Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power...

Page 1: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Application and development prospects of double-reheat

coal-fired power units

Kyle Nicol

CCC/255

August 2015

© IEA Clean Coal Centre

Page 2: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 1

Application and development prospects of double-reheat coal-fired power units Author: Kyle Nicol

IEACCC Ref: CCC/255

ISBN: 978-92-9029-577-8

Copyright: © IEA Clean Coal Centre

Published Date: August 2015

IEA Clean Coal Centre 14 Northfields London SW18 1DD United Kingdom

Telephone: +44(0)20 8877 6280

www.iea-coal.org

Page 3: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 2

Preface This report has been produced by IEA Clean Coal Centre and is based on a survey and analysis of published literature, and on information gathered in discussions with interested organisations and individuals. Their assistance is gratefully acknowledged. It should be understood that the views expressed in this report are our own, and are not necessarily shared by those who supplied the information, nor by our member countries.

IEA Clean Coal Centre is an organisation set up under the auspices of the International Energy Agency (IEA) which was itself founded in 1974 by member countries of the Organisation for Economic Co-operation and Development (OECD). The purpose of the IEA is to explore means by which countries interested in minimising their dependence on imported oil can co-operate. In the field of Research, Development and Demonstration over fifty individual projects have been established in partnership between member countries of the IEA.

IEA Clean Coal Centre began in 1975 and has contracting parties and sponsors from: Australia, Austria, China, the European Commission, Germany, India, Italy, Japan, New Zealand, Poland, Russia, South Africa, Thailand, the UK and the USA. The Service provides information and assessments on all aspects of coal from supply and transport, through markets and end-use technologies, to environmental issues and waste utilisation.

Neither IEA Clean Coal Centre nor any of its employees nor any supporting country or organisation, nor any employee or contractor of IEA Clean Coal Centre, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product or process disclosed, or represents that its use would not infringe privately-owned rights.

Page 4: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 3

Abstract Most pulverised coal combustion (PCC) plants employ single-reheat cycles. However, double-reheat

cycles can significantly improve the electrical efficiency of PCC plants. Surprisingly, no double-reheat

units have been commissioned since the 1990s. However, with rising primary energy costs, more

stringent emission limits and advances in thermal power engineering, double-reheat cycles are being

considered to minimise the cost of electricity, reduce emissions and prolong valuable coal supplies,

especially in China. This report reviews, analyses and assesses the application and development

prospects of coal-fired double-reheat units.

Page 5: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 4

Acknowledgments Felix Brooks Independent Consultant (UK)

Frank Drinhaus Added Values (Denmark)

Jianxiong Mao Tsingua University (China)

Luyao Zhou North China Electric Power University (China)

Rohan Fernando Independent Consultant (UK)

Shiwang Fan Shanghai Turbine Works (China)

Sonal Patel POWER magazine (USA)

Yasuhiro Yamauchi NEDO (Japan)

Zheng Yunzhe Electric Power and Planning Engineering Institute (EPPEI) (China)

Page 6: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 5

Acronyms and abbreviations ASME American Society of Mechanical Engineers AUSC advanced ultra-supercritical BEST back pressure extraction turbine BFP boiler water feed pump CHP combined heat and power CCGT combined cycle gas turbine CCHPLA cross compound at high/low position arrangement CCS carbon capture and storage CPI consumer price index EPC engineering, procurement and construction EVAP evaporators FEED front end engineering design FSDP full-scale demonstration plant HHV higher heating value HP high pressure IDC interest during construction IP intermediate pressure LCOE levelised cost of electricity LHV lower heating value LP low pressure 0&M operation and maintenance P&ID piping and instrumentation diagram PCC pulverised coal combustion PFD process flow diagram R&D research and development SCR selective catalytic reduction USC ultra-supercritical VHP very high pressure

Page 7: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 6

Contents Preface 2 Abstract 3 Acknowledgments 4 Acronyms and abbreviations 5 Contents 6 List of Figures 9 List of Tables 10 1 Introduction 11 2 Electrical efficiency 12

2.1 Maximum steam temperature and pressure 12 2.2 Steam reheating 13

2.2.1 Single circuit 14 2.2.2 Single-reheat 14 2.2.3 Double-reheat 15

2.3 Auxiliary load and components 16 3 Status of double-reheat units in Germany 18

3.1 Hüls 1 18 3.2 Gaisburg 4 18 3.3 Ratingen 1 18 3.4 Wedel 3 18 3.5 Franken II 1 and 2 18 3.6 Grosskraftwerk Mannheim 4 18 3.7 Grosskraftwerk Mannheim 7 19 3.8 Sandreuth 1, 2 and 3 19 3.9 Analysis 19

4 Status of double-reheat units in the USA 21 4.1 Philo 6 21

4.1.1 Engineering challenges 21 4.1.2 Performance 22 4.1.3 Historic Mechanical Engineering Landmark 22

4.2 Eddystone 1 23 4.2.1 Engineering 23 4.2.2 Start-up 24 4.2.3 Performance 24

4.3 Dean H Mitchell 5 and 7 25 4.4 Breed 1 25 4.5 Philip Sporn 5 25 4.6 Eddystone 2 26 4.7 Tanners Creek 4 26 4.8 Cardinal 1 and 2 26 4.9 Chalk Point 1 and 2 26 4.10 Hudson 1 26 4.11 Herbert A Wagner 3 26 4.12 Haynes 5 and 6 27 4.13 Hudson 2 27 4.14 Muskingum River 5 27 4.15 Canal 1 27 4.16 Big Sandy 2 27 4.17 Brayton Point 3 28 4.18 Four Corners 4 and 5 28 4.19 Genoa 1 28

Page 8: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 7

4.20 Marshall 3 and 4 28 4.21 Mitchell 1 and 2 28 4.22 John E Amos 1 and 2 29 4.23 Gibbons Creek 1 29 4.24 Hugo 1 29 4.25 Analysis 29

5 Status of double-reheat units in Italy 33 5.1 La Spezia 3 33 5.2 La Spezia 4 33 5.3 Analysis 33

6 Status of double-reheat units in Japan 34 6.1 Himeji Daini 4 34 6.2 Kainan 1 and 2 34 6.3 Takasago Kansai 1 and 2 34 6.4 Himeji Daini 5 and 6 34 6.5 Kainan 3 and 4 34 6.6 Tanagawa Daini 1 and 2 35 6.7 Kawagoe 1 and 2 35 6.8 Analysis 35

7 Status of double-reheat units in Denmark 38 7.1 Skærbæk 3 38 7.2 Nordjylland 3 38

7.2.1 Boiler 38 7.2.2 Turbine 39 7.2.3 High temperature materials 40 7.2.4 Sea-water cooling 40 7.2.5 LP blade erosion 41 7.2.6 Technical performance 41 7.2.7 Industrial symbiosis 42 7.2.8 Process economics 42

7.3 Analysis 43 8 Evaluation of all built double-reheat units 44

8.1 Technical performance 44 8.2 Boiler and turbine manufacturers 46 8.3 Construction time 46 8.4 Process economics 46

8.4.1 Capital costs 47 8.4.2 Fuel, operation and maintenance costs 49

8.5 The decline of double-reheat units 50 9 Development prospects for double-reheat units 51

9.1 Turbine and steam cycle 51 9.1.1 Siemens 51 9.1.2 Master Cycle 52 9.1.3 Shanghai Turbine Works 55 9.1.4 Echelon Cycle 56 9.1.5 North China Electric Power University 56

9.2 Boiler-turbine configuration 59 9.2.1 Compact design boiler 59 9.2.2 Partially underground tower type boiler 59 9.2.3 Cross compound at high/low position arrangement 60

10 Double-reheat units proposed and under construction 62 10.1 Europe 62 10.2 China 62

10.2.1 Guodian Taizhou 1 and 2 62 10.2.2 Waigaoqiao number 3 unit 9 63 10.2.3 Laiwu 6 and 7 65

Page 9: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 8

10.2.4 Huaneng Anyuan 3 and 4 65 10.2.5 Yuedian Huilai 1 and 2 65 10.2.6 Guohua Beihai 1 and 2 65 10.2.7 Guodian Bengbu 1 and 2 65 10.2.8 Analysis 66

11 Advanced ultra-supercritical double-reheat units 68 11.1 AUSC technology 68 11.2 AUSC research and development programmes 68 11.3 Proposals for AUSC double-reheat systems 69

11.3.1 Europe 69 11.3.2 USA 71 11.3.3 Japan 71 11.3.4 China 72 11.3.5 Siemens 72

11.4 Process economics 73 11.5 All units 74

12 Conclusions 75 13 References 77

Page 10: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 9

List of Figures Figure 1 Net efficiency (LHV) with main steam temperature 13 Figure 2 Steam cycle in drum-type boiler 14 Figure 3 Steam cycle in once-through single-reheat supercritical boiler 15 Figure 4 PFD of a standard double-reheat steam cycle 15 Figure 5 Relationship between steam temperature and electrical efficiency 16 Figure 6 Efficiency and unit size of double-reheat units in Germany 20 Figure 7 PFD of the world’s first double-reheat cycle at Philo unit 6 22 Figure 8 PFD of the double-reheat cycle at Eddystone unit 1 24 Figure 9 Efficiency and unit size of the double-reheat units in the USA 32 Figure 10 Efficiency and unit size of hard coal-fired double-reheat units in Japan 36 Figure 11 Cross-section of boiler at Nordjylland PCC plant unit 3 39 Figure 12 PFD of the double-reheat steam cycle at Nordjylland unit 3 40 Figure 13 Impact of condenser pressure on net efficiency 41 Figure 14 Efficiency and unit size of double-reheat units globally with commissioning year 44 Figure 15 Normalised operating efficiencies of supercritical case study plants compared with elsewhere 46 Figure 16 Overnight capital cost with unit size 48 Figure 17 Overnight capital cost versus superheat steam temperature 49 Figure 18 Overnight capital cost with normalised efficiency 49 Figure 19 Calculated generating cost contributions for coal-fired power plant in the OECD and

Non-OECD countries 50 Figure 20 Schematic of Siemens 1000 MWe tandem-compound double-reheat turbine 51 Figure 21 Schematic of Siemens advanced double-reheat turbine 52 Figure 22 PFD of the Master Cycle 53 Figure 23 Cross-sectional diagram of a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat turbine with an Echelon Cycle by Shanghai Turbine Works 56 Figure 25 PFD of an outer steam cooler 57 Figure 26 PFD of double-reheat cycle with outer steam coolers 58 Figure 27 PFD of double-reheat cycle with a regenerative turbine 58 Figure 28 Cross-section of partially underground tower type boiler 60 Figure 29 Cross-compound at high/low position arrangement (CCHPLA) technology 61 Figure 30 PFD of a 1000 MWe double-reheat cycle by Shanghai Turbine Works 63 Figure 31 PFD of the Siemens 1350 MWe turbine 64 Figure 32 3D model of the Siemens 1350 MWe turbine 65 Figure 33 Gantt chart comparing the AUSC material research programme timelines 69 Figure 34 Piping layout of Master Cycle boiler by Burmeister and Wain Energy 70 Figure 35 Flow diagram of a Japanese double-reheat AUSC PCC plant 72 Figure 36 Progression of steam cycle efficiency in Siemens turbines 73 Figure 37 Efficiency and unit size of all double-reheat units, operating, decommissioned,

under construction and planned 74

Page 11: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 10

List of Tables Table 1 List of double-reheat units in Germany 19 Table 2 List of double-reheat units in the USA 30 Table 3 List of double-reheat units in Japan 35 Table 4 Performance data from Nordjylland unit 3 42 Table 5 List of coal-fired double-reheat units under construction in China 67

Page 12: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Introduction

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 11

1 Introduction Pulverised coal combustion (PCC) power plant dominate the power industry and will continue to do so

for the foreseeable future. Increasing PCC plant electrical efficiency lowers coal use, resulting in reduced

fuel costs, and helps to sustain valuable coal resources. A higher electrical efficiency also reduces the

amount of flue gas to be treated in the flue gas cleaning systems, and lowers taxes or fines related to

emissions of carbon dioxide. A higher electrical efficiency also favours the economic viability of carbon

capture and storage (CCS).

From the 1880s to the 1950s, PCC power plant operated at subcritical steam conditions and employed a

single circuit of steam through a boiler and turbine. In the early 1950s, there was rapid growth in the

average unit size of PCC units and a single steam reheat loop was introduced. This single-reheat steam

cycle takes steam exiting the highest pressure module in the steam turbine and reheats it in the boiler

before entering the second highest pressure module in the turbine. Single-reheat increases electrical

efficiency by a few percentage points by increasing the average temperature of the steam across the

turbine. The single-reheat steam cycle became the standard steam cycle design for PCC units.

Single-reheat cycles require additional boiler and turbine components, which increases capital

expenditure. However, the additional costs are paid for with savings on fuel costs.

In the late 1950s, a second reheat loop was established. This double-reheat steam cycle takes steam

exiting the second highest pressure module in the steam turbine and reheats it in the boiler before

entering the third highest pressure module in the turbine. Double-reheat increases electrical efficiency

over single-reheat by one to two percentage points. Again, the additional steam reheat loop increases the

capital costs, which is paid for with fuel savings.

Sixty coal, oil- and gas-fired double-reheat units have been built globally, 37 of which are coal fired. This

number is small compared to the roughly 8700 built coal-fired units globally. Despite the fact that the

world’s most efficient coal-fired power unit, Nordjylland unit 3 commissioned in 1998 in Denmark,

employs a double-reheat cycle, less than 0.5% of the global coal fleet uses double-reheat technology.

Chapter 2 of this report explains how double-reheat cycles increase the efficiency of coal-fired power

plant. Chapters 3 to 7 review and analyse the technical and economic performance of operational and

decommissioned coal-, oil- and gas-fired double-reheat units in Germany, the USA, Italy, Japan and

Denmark, respectively. Chapter 8 evaluates the use of double-reheat units globally and presents

development trends. Chapter 9 reviews the recent technical developments and advances in turbines,

boiler configuration and steam cycles for double-reheat units. Chapter 10 evaluates the double-reheat

units that are currently in planning and under construction. Finally, Chapter 11 reviews the research and

development (R&D) programmes for advanced ultra-supercritical (AUSC) coal-fired power plant with the

prospect for double-reheat steam cycles.

Page 13: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Electrical efficiency

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 12

2 Electrical efficiency PCC plant transfer heat energy from the boiler to the turbine via the steam cycle. The steam cycle, which

is a type of heat engine, operates broadly under the thermodynamic principle of a Carnot cycle, but in a

modified form known as the Rankine cycle when water is used as the working fluid. The steam cycle can

be made more efficient by reducing losses. For a unit operating with a superheat steam temperature of

600°C, efficiency losses in the steam cycle account for around 10% points of electrical efficiency. The

steam cycle can be made more efficient by: employing regenerative feedwater preheating; combustion air

preheating; raising the maximum steam temperature; reducing the turbine exit temperature; and steam

reheating. Henderson (2004) presents a report titled ‘Understanding coal-fired power plant cycles’ for

further reading.

2.1 Maximum steam temperature and pressure

Steam cycle efficiency is proportional to the equation (TMAX–TMIN)/TMAX, where TMAX is the main

superheater steam temperature and TMIN is the turbine exit temperature (both measured in Kelvin).

Therefore, to increase the steam cycle efficiency the superheater steam temperature must be increased

and the turbine exit temperature decreased.

The main superheater temperature is limited by materials that can operate in these components at these

temperatures for a practical length of time without failure. Increasing both the superheater and reheater

temperatures by 20°C equates to an increase of roughly 1% point in net efficiency (National Coal Council,

2007). Significant gains in electrical efficiency can be made by increasing the superheated steam

temperature up to approximately 900°C. Nicol (2013, 2014) explains the historic increase in superheat

temperature with steels and the current research into nickel alloys.

The turbine exit temperature is determined by the temperature of the cooling fluid, which can be river

water (directly or using cooling towers), sea water or ambient air. In Europe, a PCC plant with sea water

cooling has 1.5–2% points higher efficiency than an equivalent plant using river-water cooling (VGB,

2012). The turbine exit temperature is constrained geographically.

For single reheat cycles, improvements in steam cycle efficiency by increasing the superheat steam

pressure are less useful than increasing superheat steam temperature. Increasing superheat steam

temperature from 600°C to 700°C results in efficiency rise of 2.2% points, whereas increasing the

pressure from 25MPa to 35MPa results in an efficiency rise of 0.8% points (Mao, 2012). However, Kjaer

and Drinhaus (2010a) show that the thermodynamic gain by increasing main steam pressure of

double-reheat cycles is more than twice the gain of the single reheat cycles.

Generally, the electrical efficiency differences between individual plants may vary due to process

differences, such as coal calorific value, auxiliary load, number of reheats and temperature of condenser

cooling medium. It is important that the basis on which efficiency is calculated is clearly stated and

consistent: for example, which heating value for the fuel is used. Efficiency measured on a higher heating

Page 14: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Electrical efficiency

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 13

value (HHV) basis can be nearly 2% points lower than calculated on a LHV basis for bituminous coals and

6% points lower for many lignite coals (Henderson, 2015). The Association of German Engineers have

developed a standard, known as VDI3986 ‘Determination of efficiencies of conventional power stations’,

which provides a method of calculating the electrical efficiency of thermal power plants so they are

comparable internationally (Drinhaus, 2015).

Electrical efficiency can also be represented by heat rate, which is the amount of heat consumed in the

boiler to produce 1 kWh of electricity. Heat rate is expressed as kJ/kWh and is related to electrical

efficiency by dividing the heat rate by 3600.

Figure 1 shows a plot of net electrical efficiency (LHV) with main steam temperature for operating and

planned PCC units. These units are all seawater cooled, fire the same type of coal, but vary in steam

pressure and temperature, final feedwater temperature, the water/steam cycle design and components

used at the time of construction. The black line shows that the efficiency of operational PCC units

increases with rising steam temperature. The blue line shows the maximum efficiency increase with

rising steam temperatures of the steam cycle, assuming no auxiliary load and ideal components (no

losses) (Kjaer and Drinhaus, 2010a).

Figure 1 Net efficiency (LHV) with main steam temperature (Kjaer and Drinhaus, 2010a)

2.2 Steam reheating

Adding reheat steam loops increases the efficiency by increasing the average upper temperature of the

steam cycle. Single-reheat steam cycles are common, double-reheat steam cycles rare, and a third reheat

steam loop is impractical.

Page 15: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Electrical efficiency

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 14

2.2.1 Single circuit

Until the late 1950s, PCC units employed a single circuit of water/steam in the steam cycle. The heat

exchangers in the boiler consist of an economiser, waterwall and superheater. The steam cycle in drum-

type boilers is shown in Figure 2. Water is pumped through the economiser into the steam drum. From

the steam drum water is either pumped (forced circulation) or flows due to density differences (natural

circulation) through the water walls, where the water boils. The water/steam mixture re-enters into the

steam drum. Steam from the steam drum then passes to the primary and secondary superheater in the

boilers. PCC unit design varies and some boilers may simply employ one superheater pass.

Figure 2 Steam cycle in drum-type boiler (Henderson, 2004)

2.2.2 Single-reheat

A single steam reheat loop was established in the early 1950s. The extra steam loop takes steam from the

high pressure (HP) module and reheats it in the boiler before returning it to the intermediate pressure

(IP) turbine module. Simultaneously, developments in high temperature materials allowed boilers to

operate with supercritical steam conditions, which led to once-through steam cycles. The steam cycle in a

once-through supercritical boiler is shown in Figure 3. During start-up and low load operation, before the

once through operation point, a levelling vessel and separators, placed after the waterwall, perform a

similar role to the steam drum in the no-reheat cycle.

Page 16: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Electrical efficiency

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 15

Figure 3 Steam cycle in once-through single-reheat supercritical boiler (Henderson, 2004)

Single-reheat increases electrical efficiency by a few percentage points. Single-reheat cycles require an

additional reheater in the boiler, two extra high temperature steam pipes, from the turbine to the boiler,

and a modified steam turbine. This increases capital expenditure, but the additional costs are quickly paid

for with decreased operational expenditures.

2.2.3 Double-reheat

A double-reheat steam cycle was introduced with the early supercritical boilers in the late 1950s. The

double-reheat cycle adds another steam reheat loop to the single-reheat, which can require an additional

turbine module. This increases electrical efficiency by 1–2% points. Figure 4 shows a process flow

diagram of a modern double-reheat PCC unit (Xu and others, 2015; Li and others, 2014).

Figure 4 PFD of a standard double-reheat steam cycle (Xu and others, 2015; Li and others, 2014)

Page 17: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Electrical efficiency

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 16

Figure 5 is a plot of superheater steam temperature (°C) and carbon dioxide emissions (gCO2/kWh) with

efficiency. The green line shows that efficiency increases with superheat steam temperature and the

orange line shows that CO2 emissions decrease with increasing superheater temperatures and efficiency.

State-of-the-art PCC plant are also shown on this figure with the associated steam conditions in the

following format: superheater steam temperature (°C) / reheat temperature (°C) / second reheat

temperature (°C) / superheater pressure (MPa); for example 600°C /620°C /620°C /31 MPa. Throughout

this report the steam conditions will be presented in this format and all efficiencies are net electrical, on a

lower heating value basis for coal, unless stated otherwise.

Figure 5 illustrates the efficiency gain of double-reheat technology combined with cold sea water cooling

found at Nordjylland 3 ultra-supercritical (USC) PCC plant, compared to other higher temperature single-

reheat PCC plant. For modern PCC units operating at ultra-supercritical (USC) steam conditions, reheated

steam has significantly lower pressure than superheat steam, at around 5–8 MPa, depending on the HP

design and numbers of reheats, and slightly higher temperature, typically by 10–20°C.

Figure 5 Relationship between steam temperature and electrical efficiency (Nicol, 2013)

2.3 Auxiliary load and components

Electrical efficiency is lost to the auxiliary load and internal losses. The auxiliary load is the power

required by electrical devices to operate the PCC plant. Significant auxiliary loads include the coal

pulverising mills, motor driven boiler feed water pumps (BFP), forced and induced draught fans,

particulate control devices and pumps in flue gas desulphurisation units. Internal losses are heat losses

due to friction in moving components, such as motor driven BFPs, forced and induced draught fans, the

electricity generator and turbine bearings. For a unit operating with superheat steam temperature at

600°C, efficiency losses to the auxiliary load and component inefficiencies equate to around 10% points of

electrical efficiency (MPS, 2008). Electrical and mechanical improvements in components have reached a

Page 18: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Electrical efficiency

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 17

point of diminishing returns, and component losses can no longer be significantly reduced. However,

components need cooling and this heat can be used in the water/steam cycle to raise electrical efficiency

by approximately 0.1% point.

Page 19: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Germany

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 18

3 Status of double-reheat units in Germany Chapters 3 reviews and analyses the technical and economic performance of operational and

decommissioned double-reheat units in Germany. The technical aspects include the process design, start-

up mode, reliability, availability, control mode, and the effect of parameters such as reheat steam

temperature and any technical difficulties.

3.1 Hüls 1

The first supercritical coal-fired double-reheat unit in the world, Hüls unit 1, was commissioned in 1956

in Hüls AG chemical factory, located in Marl (Germany). The 104 MWe unit had the following steam

conditions 600°C/560°C /510°C /30 MPa, the primary reheat pressure was 10.7 MPa, and the heat rate

was 2080 kcal/kWh (8709 kJ/kWh) (Meier, 2015).

3.2 Gaisburg 4

Gaisburg unit 4 was a gas-fired double-reheat unit commissioned in 1958 and now decommissioned. It

was owned by ENBW Energie Baden-Wurttemberg. Siemens manufactured the boiler and turbine. The

100 MWe unit had subcritical steam conditions of 540°C/540°C/520°C/17.8 MPa (Platts, 2014).

3.3 Ratingen 1

Ratingen unit 1 was a coal-fired double-reheat unit commissioned in 1962. It was owned by Durr Werke

Ag. The 103 MWe unit had supercritical steam conditions of 525°C/535°C/535°C/25.5 MPa (Bertilsson

and Scarlin, 1990).

3.4 Wedel 3

Wedel unit 3 was a coal-fired double-reheat unit commissioned in 1963 and now decommissioned. It was

owned by ENBW Energie Baden-Wurttemberg. Siemens manufactured the boiler and Durr manufactured

the turbine. The 155 MWe unit had supercritical steam conditions of 540°C/540°C/520°C/24.6 MPa

(Platts, 2014).

3.5 Franken II 1 and 2

Franken II units 1 and 2 were coal-fired double-reheat units commissioned in 1966 and 1967 respectively

and now both decommissioned. They were owned by E.On Bayern. Siemens manufactured the boiler and

turbine for unit 1. Siemens manufactured the boiler for unit 2 and MAN manufactured the turbine. The

two 206 MWe units had steam flow rates of 151.2 t/h each, steam conditions of 530°C/540°C/540°C/24.5

MPa and reached a net efficiency of 39.4% (LHV) (Platts, 2014).

3.6 Grosskraftwerk Mannheim 4

Grosskraftwerk Mannheim unit 4 is a supercritical, hard coal-fired double-reheat unit commissioned in

1970. Deutsche Babcock Anlagen manufactured the boiler and ABB Power Generation manufactured the

Page 20: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Germany

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 19

turbine. The supercritical 220 MWe unit has steam conditions of 530°C/540°C/530°C/25 MPa and

reaches an assumed net electrical efficiency of 39.4% (LHV) (IEA CCC, 2012).

3.7 Grosskraftwerk Mannheim 7

Grosskraftwerk Mannheim unit 7 is a supercritical, hard coal-fired double-reheat unit commissioned in

1982-4. EVT Energie- und Verfahrenstechnik manufactured the boiler and ABB Power Generation

manufactured the turbine. The supercritical, 475 MWe unit has steam conditions of

530°C/540°C/530°C/25.6 MPa and reaches an assumed net electrical efficiency of 39.6% (LHV) (IEA CCC,

2012; Bertilsson and Scarlin, 1990).

3.8 Sandreuth 1, 2 and 3

Sandreuth consists of three gas-fired units each of 25 MWe commissioned in 1982. EVT Energie- und

Verfahrenstechnik manufactured the boilers and ABB Power Generation manufactured the turbines. The

steam conditions are 535°C/360°C/400°C/12 MPa and the units reach an assumed net electrical

efficiency of 28.1% (IEA CCC, 2012).

3.9 Analysis

Germany was the first country to employ double-reheat steam cycle technology. In the 26 years from

1956 to 1982, eleven double-reheat units were commissioned. These units are made up of six hard

coal-fired and four gas-fired units, amounting to 1.64 GWe. Table 1 lists the eleven double-reheat units

built in Germany, with details of year commissioned, primary fuel, size (MWe), steam conditions

(°C/°C/°C/MPa) and electrical efficiency, most of which are assumed values), in chronological order of

year commissioned.

Table 1 List of double-reheat units in Germany

Unit Commissioned Primary fuel Size (MWe) Steam Conditions (°C/°C/°C/MPa) Efficiency (%)

Hüls 1 1954 Hard coal 100 600/560/510/30

Gaisburg 4 1958 Gas 100 540/540/520/17.8

Ratingen 1 1962 Hard coal 103 525/535/535/25.5

Wedel 3 1963 Hard coal 155 540/540/520/24.6

Franken II 1 1966 Hard coal 206 530/540/540/24.5 39.4

Franken II 2 1967 Hard coal 206 530/540/540/24.5 39.4

Mannheim 4 1970 Hard coal 220 530/540/530/25 39.4

Mannheim 7 1982 Hard coal 475 530/540/530/25 39.6

Sandreuth 1 1982 Gas 25 535/360/400/12 28.1

Sandreuth 2 1982 Gas 25 535/360/400/12 28.1

Sandreuth 3 1982 Gas 25 535/360/400/12 28.1

Hüls unit 1 had the highest superheat and reheat temperature and superheat pressure at 600°C, 560°C,

510°C and 30 MPa respectively. The following five coal-fired units settled on

530°C/540°C/530°C/25 MPa over the next 26 years. The steam conditions were decreased because of

Page 21: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Germany

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 20

inexperience with austenitic steels at high supercritical steam conditions; this unit de-rate was not

unrelated to the number of reheats. Metallurgists initially thought austenitic steels could be used for

thick-section components at superheat temperatures up to 650°C. Siemens manufactured four boilers

and three turbines, EVT Energie- und Verfahrenstechnik manufactured four boilers and ABB Power

Generation manufactured four turbines (Platts, 2014; IEA CCC, 2012).

Figure 6 shows a graph of the electrical efficiency and unit size with year commissioned for hard

coal-fired units. The unit size increased from 100 to 475 MWe, and the electrical efficiency almost

reached 40% (Platts, 2014; IEA CCC, 2012).

Figure 6 Efficiency and unit size of double-reheat units in Germany (Platts, 2014; IEA CCC, 2012)

A double-reheat cycle has not been built in Germany since 1982. At the time this was because of the

additional costs coupled with difficulties in mid-range load operation found with early double-reheat

units in Germany (VGB 1995)

Page 22: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 21

4 Status of double-reheat units in the USA Chapter 4 reviews and analyses the technical and economic performance of operational and

decommissioned double-reheat units in the USA.

4.1 Philo 6

Philo unit 6 was the first supercritical double-reheat unit commissioned in 1957 in south-eastern Ohio.

Owned by American Electric Power (AEP), the 120 MWe unit operated at the following steam conditions

621°C/565°C/538°C/31 MPa, and reached 40% electrical efficiency. The boiler was manufactured by

Babcock & Wilcox and General Electric manufactured the turbine. The cost of building the unit was $20.3

million in 1957 (170 $/kW), which was 20% more than the estimated cost of a conventional subcritical

unit of the same capability. Philo unit 6 was mothballed in 1975, decommissioned in 1979 and

demolished in 1983, after 103,110 operating hours. The unit was demolished because it was uneconomic

to upgrade the plant to comply with the requirements of the Clean Air Act (Weitzel, 2012a; ASME, 2003a).

4.1.1 Engineering challenges

Philo unit 6 was a prototype to prove supercritical technology, hence its small size at half the size of the

largest unit at the time; future units were scaled up. Coincidently, Philo unit 6 was built on the former site

of Philo unit 1 which was the first unit to employ single-heat (ASME, 2003a).

The superheat pressure of 31 MPa was impressive as the highest before that in the USA was 17 MPa;

although Hüls unit 1 reached 30 MPa in 1956. To reach supercritical steam conditions with double-reheat,

Philo unit 6 employed advanced materials; a new boiler design (or technically a steam generator, as the

water does not boil with supercritical cycles); advanced water treatment (filtering, de-mineralisation and

chemical treatment); high pressure water boiler feed pumps (BFP), which pumped 85 kg/s of water at

37.9 MPa; configuration of the steam bypass systems; and a new method of reliable and automated

process control. Figure 7 shows a process flow diagram (PFD) of the double-reheat cycle (ASME, 2003a).

Superheated steam from the boiler first enters the high pressure (HP) module of the single shaft turbine

and flows towards the front of the turbine. The steam exits the HP module and passes through a

secondary heat exchanger in the boiler, known as the primary reheater, and then passes through the first

stage of the intermediate pressure (IP1) turbine, again flowing towards the front. The steam exits the IP1

module and is sent through the secondary reheater in the boiler before passing through the second stage

of the intermediate pressure (IP2) module, but this time flowing towards the back and exiting to a

crossover pipe into the low pressure (LP) module, half flowing forwards and half flowing backward

(ASME, 2003a).

Page 23: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 22

Figure 7 PFD of the world’s first double-reheat cycle at Philo unit 6 (ASME, 2003a)

Interestingly, the engineers at Philo unit 6 used extrapolated measurements of steam properties (from

data up to only 4.1 MPa) from 1936. The American Society of Mechanical Engineers (ASME) published up-

to-date works in 1963 (ASME, 2003a).

4.1.2 Performance

After one year of operation, an engineer from Babcock & Wilcox said “No real difficulties were encountered

during the initial start-up and the few troubles which have shown up subsequently are minor compared with

those which ordinarily might be expected in a major engineering development of this type” (ASME, 2003a).

One problem was encountered when copper deposits were found in the boiler and turbine. This copper

had been carried over by the water/steam from copper components. A new chemical cleaning procedure

prevented further copper deposition and future supercritical steam cycle components avoided the use of

copper (ASME, 2003a).

4.1.3 Historic Mechanical Engineering Landmark

On the 7th August 2003, Philo unit 6 was designated as a Historic Mechanical Engineering Landmark by

the American Society of Mechanical Engineers on the 50th anniversary of its construction. Philo unit 6

pioneered engineering innovations that vastly improved power plant generating efficiency, and

subsequently generated unprecedented levels of power from coal efficiently. The advanced engineering

employed at Philo unit 6 has been used in other PCC plants. The ASME said that ‘Breaking the critical

steam barrier presented many engineering challenges analogous to those surmounted in breaking the sound

barrier’ (ASME, 2003a).

Page 24: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 23

4.2 Eddystone 1

Eddystone unit 1 was commissioned in 1959 in Pennsylvania. Unit 1 was owned by Philadelphia Electric

Company, later PECO, and then Exelon. Eddystone 1 was designed and built by an entirely different team

to those who built Philo 6. The thermodynamic calculations for Eddystone 1 were calculated with manual

methods and more accurate steam properties than used in Philo 6. After Eddystone 1, computer

programmes soon took over this task. Eddystone unit 1 was decommissioned in 2011, after 52 years of

service (Sourcewatch, 2015).

4.2.1 Engineering

ABB Combustion Engineering manufactured the two pass boiler, which avoided the necessity for spray

de-superheating and provided constant reheat temperature at most load levels.

The cross-compound turbine, manufactured by Westinghouse Electric, was rated at 325 MWe and had

design ultra-supercritical (USC) steam conditions of 649°C/565°C/565°C/34.5 MPa. The 3600 rpm shaft

contained the very high pressure turbine (VHP) and high pressure turbine (HP) modules and the

1800rpm shaft contained the double-flow IP module and two-single flow low pressure (LP) modules,

which had 44 inch (1.12 m) last row blades.

Nine stages of feedwater preheating raised the temperature of the condensate to 293°C. There was a

condensate pump and three BFP (LP, IP and HP). The LP and IP-BFP were driven by constant electrical

motors, whereas the HP-BFP had a non-condensing variable speed turbine and its exhaust was used in a

stage of feedwater preheating.

To maximise steam cycle efficiency, the following items were optimised: the pressure level of each water

heater; the use of drain cooler and heater de-superheater zones; the location of heater drains; advanced

water treatment; and the disposition of pump and turbine shaft-seal drains. The lowest pressure steam

bleed was used to temper combustion air and in a low-level economiser to heat condensate, and thus

lower the stack temperature to about 93°C (which was later removed due to excessive fouling). The final

design heat rate was 8778 kJ/net kWh. Figure 8 shows a PFD of the double-reheat cycle at Eddystone unit

1 (ASME, 2003b).

Page 25: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 24

Figure 8 PFD of the double-reheat cycle at Eddystone unit 1 (ASME, 2003b)

Eddystone was one of the first PCC plants to use austenitic steels to reach such high steam conditions. The

main steam piping, inner shell of the 3600 rpm turbine, the four nozzle chambers and the valve bodies for

the governing and stop valves (and discharge pipes) were made of austenitic stainless steel (12–18% Cr,

mostly Type 316) (ASME, 2003b).

4.2.2 Start-up

To start-up the double-reheat unit, a minimum of 30% of the design water/steam flow was required to

flow through the boiler at a throttle pressure of 24 kPa (3.500 psig). The turbine was by-passed until the

steam reached a certain temperature, at which point the throttle and hot-reheat inlet control valves were

partially opened. The gradual increase in steam flow to the turbine occurred in conjunction with an

increase in generator excitation to increase electrical output. The control valves were fully open at 260

MW and a throttle pressure of 24 MPa. This start-up procedure required advanced integrated controls

which simultaneously operated the boiler, turbine and bypass systems. Load was further increased by

increasing the operating pressure from 24 MPa to 34.5 MPa. This is known as sliding pressure operation;

it reduces pumping power and eliminates throttling on the control valves, thus increasing electrical

efficiency (ASME, 2003b).

The bypass system used at Eddystone unit 1 has since been improved. New double-reheat units use

superimposing circulation, which by-pass much less steam, lose less energy and have far fewer valves, 19

compared to 152 at Eddystone unit 1. Additionally, by-passed steam can be used in the feedwater

preheaters (ASME, 2003b).

4.2.3 Performance

In 1962, operating with 649°C superheated steam, the unit availability was 82.6% and its average load

was 331 MW. The design heat rate was 8683 kJ/kWh (8230 Btu/kWh), however the best measured heat

Page 26: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 25

rate was approximately 9000 kJ/kWh (8530 Btu/kWh) (ASME, 2003b). The unit has an assumed net

electrical efficiency of 39.4% (IEA CCC, 2012).

In the 1960s, several instances of rotor vibration occurred due to seal rubbing on the 3600 rpm turbine.

This damage to the nested seals at the shaft ends resulted in steam leaks. A different material was used

for the inner modules, as well as replacing nested seals with conventional spring backed labyrinth seals

and reducing the superheat steam temperature from 649°C to 621°C. Soon after, excessive fireside

corrosion of the superheater and reheater surfaces reduced the superheat steam temperature to 610°C

and 33 MPa (ASME, 2003b).

In the 1970s and 1980s, performance further deteriorated with the use of lower quality coals and

additional air pollution control systems. During a start-up in 1993, the VHP module overheated which

caused some of the rotating blades to fail. The unit was de-rated to 230 MW until 1995 when a new 3600

rpm rotor was installed. The boiler stop valves cracked during operation; this was solved with a new

valve using different materials (ASME, 2003b).

The ultra-pure feedwater caused leaching of alloying elements from the steam side of high temperature

materials. Copper oxide deposits were found on the turbine blades. Further deposits were prevented with

a condensate polishing filter, fitted to the end of the LP heater, and substituting copper tube heaters with

ones made of steel (ASME, 2003b).

4.3 Dean H Mitchell 5 and 7

Dean H Mitchell units 5 and 7 are two hard coal-fired double-reheat units commissioned in 1959 in

Indiana. ABB Combustion Engineering and General Electric manufactured the boiler and turbine

respectively. The 138 MWe subcritical units have steam conditions of 541°C/341°C/541°C/12 MPa and

reach 27% efficiency (Platts, 2014; IEACCC, 2012).

4.4 Breed 1

Breed unit 1 was a coal-fired double-reheat unit commissioned in 1960 and is now decommissioned.

Unit 1 was owned by Indiana Michigan Power Company. Babcock & Wilcox manufactured the boiler,

General Electric manufactured the turbine. The 485.6 MWe supercritical unit had the following steam

conditions 565°C/565°C/565°C/24 MPa and reached 39% electrical efficiency (type CC6F26) (Platts,

2014).

4.5 Philip Sporn 5

Philip Sporn 5 was a coal-fired double-reheat unit commissioned in 1960 and decommissioned in 2010. It

was owned by Appalachian Power Company. Babcock & Wilcox manufactured the boiler and General

Electric manufactured the turbine (CC6F26). The 485.6 MWe supercritical unit had the following steam

conditions 565°C/565°C/565°C/24.1 MPa (Sourcewatch, 2015; Platts, 2014; IEACCC, 2012).

Page 27: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 26

4.6 Eddystone 2

Eddystone unit 2 was a hard coal-fired double-reheat unit commissioned in 1961 in Pennsylvania. Unit 2

was owned by Philadelphia Electric Company, later PECO, and then Exelon. ABB Combustion Engineering

manufactured the boiler and General Electric manufactured the turbine. The 339 MWe supercritical unit

had the following steam conditions 565°C/565°C/565°C/24.1 MPa and an electrical efficiency of 39.4%

(IEACCC, 2012). Eddystone unit 2 was decommissioned in 2011 (Sourcewatch, 2015).

4.7 Tanners Creek 4

Tanners Creek unit 4 is a hard coal-fired double-reheat unit in Lawrenceburg. The unit is owned by

Indiana Michigan Power and was commissioned in 1964. Babcock & Wilcox and General Electric

manufactured the boiler and turbine (model CC4F38), respectively. The 580 MWe supercritical unit has

steam conditions of 538°C/552°C/565°C/24 MPa and reaches an assumed net electrical efficiency of 39%.

The unit will be decommissioned in 2015 (Sourcewatch, 2015; Platts, 2014; IEA CCC, 2012).

4.8 Cardinal 1 and 2

Cardinal units 1 and 2 are two hard coal-fired double-reheat units commissioned in 1964 in Brilliant

(Ohio). They are owned by Cardinal Operating. Babcock & Wilcox and General Electric manufactured the

boiler and turbine (model TC6F30) respectively. The two 600 MWe supercritical units have steam

conditions of 538°C/551°C/567°C/26 MPa and assumed net electrical efficiencies of 39% and 38.4%,

respectively (Platts, 2014; IEA CCC, 2012).

4.9 Chalk Point 1 and 2

Chalk Point units 1 and 2 are two hard coal-fired double-reheat units commissioned in 1964 in

Aquascutum (Maryland). They are owned by NRG Energy. Babcock & Wilcox and General Electric

manufactured the boiler and turbine (model CC4F30) respectively. The two 364 MWe supercritical units

have steam conditions of 538°C/552°C/565°C/24 MPa and reach an assumed net electrical efficiency of

39% and 38.4%, respectively. Both units will be decommissioned in 2017 (Sourcewatch, 2015; Platts,

2014; IEA CCC, 2012).

4.10 Hudson 1

Hudson 1 is a gas-fired double-reheat unit commissioned in 1964 in Jersey City (New Jersey) and is

owned by PSEG Fossil. Babcock & Wilcox manufactured the boiler and Westinghouse Electric

manufactured the turbine (model TC4F28). The 455 MWe unit has steam conditions of

538°C/552°C/565°C/24 MPa and reaches an assumed net electrical efficiency of 38.4% (Platts, 2014; IEA

CCC, 2012).

4.11 Herbert A Wagner 3

Herbert A Wagner unit 3 is a hard coal-fired double-reheat unit. Commissioned in 1966 in Baltimore

(Maryland), the unit is owned by Raven Power Holdings. Babcock & Wilcox and Westinghouse Electric

Page 28: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 27

manufactured the boiler and turbine (model CC2F40) respectively. The 539 MWe supercritical unit has

steam conditions of 538°C/538°C/538°C/24 MPa and reaches an assumed net electrical efficiency of

38.4% (Platts, 2014; IEA CCC, 2012).

4.12 Haynes 5 and 6

Haynes 5 and 6 were gas-fired double-reheat units commissioned in 1966 and 1967, respectively, and

decommissioned recently. They were owned by Los Angeles Department of Water and Power. Babcock &

Wilcox manufactured the boilers and General Electric manufactured the turbine (CC1F52). The 343 MWe

supercritical units had the following steam conditions 552°C/565°C/565°C/14.7 MPa (Platts, 2014).

4.13 Hudson 2

Hudson 2 is a hard coal-fired double-reheat unit commissioned in 1968 in Jersey City (New Jersey) and is

owned by PSEG Fossil. Foster Wheeler manufactured the boiler and Westinghouse Electric manufactured

the turbine (model TC6F28). The 623 MWe unit has steam conditions of 538°C/552°C/565°C/24 MPa

and reaches an assumed net electrical efficiency of 38.4% (Platts, 2014; IEA CCC, 2012).

4.14 Muskingum River 5

Muskingum River unit 5 is a hard coal-fired double-reheat unit commissioned in 1968 in Beverly (Ohio).

The unit is owned by AEP Generation Resources. Babcock & Wilcox and General Electric manufactured

the boiler and turbine (model TC6F30) respectively. The 615 MWe supercritical unit has steam

conditions of 538°C/552°C/565°C/24 MPa and reaches an assumed net electrical efficiency of 38.4%

(Platts, 2014; IEA CCC, 2012). Unit 5 will stop firing coal in 2015 (Sourcewatch, 2015).

4.15 Canal 1

Canal 1 is an oil-fired double-reheat unit owned by NRG Energy. Commissioned in 1968, it is rated 585

MWe and has steam conditions of 538°C/538°C/538°C/24.1 MPa. Babcock & Wilcox manufactured the

boiler and Westinghouse Electric manufactured the turbine (TC4F31) and generator (Platts, 2014).

4.16 Big Sandy 2

Big Sandy unit 2 is a hard coal-fired double-reheat unit. Commissioned in 1969 in Kentucky, the unit is

owned by Kentucky Power. Foster Wheeler and General Electric manufactured the boiler and turbine

(model TC4F33.5) respectively. The 816 MWe supercritical unit has steam conditions

538°C/552°C/565°C/24 MPa and reaches an assumed net electrical efficiency of 38.4% (Platts, 2014; IEA

CCC, 2012). The unit will stop burning coal in 2015 (Sourcewatch, 2015).

Up until 1969, cross-compound turbines were used in double-reheat units. This was because thermal

expansion limited the number of modules on tandem compound turbines. By 1969, a tandem-compound

double-reheat turbine was commissioned. This turbine combined the HP module (538°C and 24.1 MPa)

and the primary reheat IP1 module (552°C) in a single opposed flow casing. The secondary reheat IP2

Page 29: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 28

module (552°C) had a double-flow arrangement and there were three double-flow LP modules. The

design was successful and provided excellent reliability and performance (MPS, 1999).

4.17 Brayton Point 3

Brayton Point unit 3 is a hard coal-fired double-reheat unit commissioned in 1969 in Massachusetts. The

unit is owned by Energy Capital Partners. Babcock & Wilcox and Westinghouse Electric manufactured the

boiler and turbine (model TC6F28) respectively. The 643 MWe supercritical unit has steam conditions of

538°C/552°C/565°C/24 MPa and an assumed net electrical efficiency of 31.4% (Platts, 2014; IEA CCC,

2012). Unit 3 will be decommissioned as of May 2017 (Sourcewatch, 2015).

4.18 Four Corners 4 and 5

Four Corners units 4 and 5 are two hard coal-fired double-reheat units in Fruitland (Idaho). They were

commissioned in 1969 and 1970, respectively. They are owned by Arizona Public Services. Babcock &

Wilcox and General Electric manufactured the boilers and turbines (model CC2F52) respectively. The 818

MWe supercritical units have steam conditions of 538°C/538°C/540°C/26 MPa. Unit 4 reaches 32%

efficiency and unit 5 reaches an assumed net electrical efficiency of 33% (Platts, 2014; IEA CCC, 2012).

4.19 Genoa 1

Genoa unit 1 is a hard coal-fired double-reheat unit in Genoa (Wisconsin). Commissioned in 1969, the

unit is owned by Dairyland Power. ABB Combustion Engineering and Westinghouse Electric

manufactured the boiler and turbine (model TC4F28) respectively. The 379 MWe supercritical unit has

steam conditions of 538°C/538°C/538°C/24 MPa and reaches an assumed net electrical efficiency of

31.05% (Platts, 2014; IEA CCC, 2012).

4.20 Marshall 3 and 4

Marshall units 3 and 4 are two hard coal-fired double-reheat units in Terrell (North Carolina),

commissioned in 1969 and 1971 respectively. They are both owned by Duke Energy Carolinas. ABB

Combustion Engineering and General Electric manufactured the boiler and turbine (model TC4F33.5)

respectively. The 650 MWe supercritical units have steam conditions of 538°C/538°C/538°C/24 MPa.

Unit 3 reaches 31.65% and unit 4 reaches an assumed net electrical efficiency of 32.65% (Platts, 2014;

IEA CCC, 2012).

4.21 Mitchell 1 and 2

Mitchell units 1 and 2 are two hard coal-fired double-reheat units in Moundsville (West Virginia),

commissioned in 1971. They are both owned by Ohio Power. Foster Wheeler and Westinghouse Electric

manufactured the boiler and turbine (model TC4F33.5) respectively. The 800 MWe units have steam

conditions of 538°C/552°C/565°C/24 MPa and reach an assumed net electrical efficiency of 39.4% (Platts,

2014; IEA CCC, 2012).

Page 30: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 29

4.22 John E Amos 1 and 2

John E Amos units 1 and 2 were commissioned in 1971 and 1972 respectively, in Saint Albans (West

Virginia). They are both owned by Appalachian Power. Foster Wheeler and General Electric

manufactured the boiler and turbine (model TC4F33.5) respectively. The 816.3 MWe units have steam

conditions of 538°C/552°C/565°C/24 MPa and reach an assumed net electrical efficiency of 39.4% (Platts,

2014; IEA CCC, 2012).

4.23 Gibbons Creek 1

Gibbons Creek double-reheat unit 1 was commissioned in 1982 in Carlos (Texas). The unit fires lignite

coal and is owned by Texas Muni Power Agency. ABB Combustion Engineering and General Electric

manufactured the lignite-fired boiler and turbine (model TC2F33.5), respectively. The 480 MWe unit has

steam conditions of 538°C/538°C/540°C/16.5 MPa and reaches an assumed net electrical efficiency of

33% (Platts, 2014; IEA CCC, 2012).

4.24 Hugo 1

Hugo double-reheat unit 1 was commissioned in 1982. Babcock & Wilcox and Westinghouse Electric

manufactured the boiler and turbine respectively. The 418 MWe unit has steam conditions of

542°C/542°C/343°C/17 MPa and reaches an assumed net electrical efficiency of 33% (IEA CCC, 2012).

4.25 Analysis

From the late 1940s to the mid-1980s, the total capacity of PCC plant in the USA increased from a few

GWe to around 300 GWe. Power plant designers calculated that the more fuel efficient supercritical

double-reheat units were more economical over the plant lifetime than subcritical boilers – such units

started coming online in the late 1950s. From the 1950s to the 1970s, the market for PCC technology was

dominated by North American companies, such as Babcock & Wilcox and General Electric (Yeh and Rubin,

2007).

Table 2 lists the double-reheat units built in the USA, with details of year commissioned, primary fuel, size

(MWe), steam conditions (°C/°C/°C/MPa) and electrical efficiency (%) (most of which are assumed

values), in chronological order of year commissioned.

Page 31: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 30

Table 2 List of double-reheat units in the USA

Unit Commissioned Primary Fuel

Size (MWe)

Steam Conditions (°C/°C/°C/MPa)

Electrical Efficiency (%)

Philo 6 1957 Hard coal 120 621/565/538/31 40

Eddystone 1 1959 Hard coal 325 649/565/565/34.5, later 610/565/565/33 39.4

Dean H Mitchell 5 1959 Hard coal 138 541/341/541/12 27

Dean H Mitchell 7 1959 Hard coal 138 541/341/541/12 27

Breed 1 1960 Hard coal 486 565/565/565/24 39

Philip Sporn 5 1960 Hard coal 486 565/565/565/24

Eddystone 2 1961 Hard coal 339 565/565/565/24 39.4

Hudson 1 1964 Gas 455 538/552/565/24 38.4

Tanner Creek 4 1964 Hard coal 580 538/552/565/24 39

Cardinal 1 1964 Hard coal 600 538/551/567/26 39

Cardinal 2 1964 Hard coal 600 538/551/567/26 38.4

Chalk Point 1 1964 Hard coal 364 538/552/565/24 39

Chalk Point 2 1964 Hard coal 364 538/552/565/24 38.4

Herbert A Wagner 3 1966 Hard coal 539 538/538/538/24 38.4

Haynes 6 1967 Gas 343 552/565/565/14.7

Hudson 2 1968 Hard coal 623 538/552/565/24 38.4

Muskingum River 5 1968 Hard coal 615 538/552/565/24 38.4

Canal 1 1968 Oil 585 538/538/538/24.1

Haynes 5 1969 Gas 343 552/565/565/14.7

Brayton Point 3 1969 Hard coal 643 538/552/565/24 31.4

Big Sandy 2 1969 Hard coal 816 538/552/565/24 38.4

Four Corners 4 1969 Hard coal 818 538/538/540/26 32

Four Corners 5 1969 Hard coal 818 538/538/540/26 33

Genoa 1 1969 Hard coal 379 538/538/538/24 31.05

Marshall 3 1969 Hard coal 650 538/538/538/24 31.65

Marshall 4 1971 Hard coal 650 538/538/538/24 32.65

Mitchell 1 1971 Hard coal 800 538/552/565/24 39.4

Mitchell 2 1971 Hard coal 800 538/552/565/24 39.4

John E Amos 1 1971 Hard coal 816.3 538/552/565/24 39.4

John E Amos 2 1972 Hard coal 816.3 538/552/565/24 39.4

Hugo 1 1982 Hard coal 418 542/542/343/17 33

Gibbons Creek 1 1982 Lignite 480 538/538/540/16.5 33

In the 25 years from 1957 to 1982, 32 double-reheat units were commissioned in the USA amounting to

approximately 17 GWe. Of these units, 27 are hard coal-fired, three are gas-fired, and there is one oil-fired

and one lignite-fired unit. Babcock & Wilcox manufactured 18 boilers, Foster Wheeler manufactured six

boilers and ABB Combustion Engineering manufactured eight boilers. Westinghouse Electric

manufactured ten turbines and General Electric manufactured 22 turbines (Platts, 2014; IEA CCC, 2012).

Page 32: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 31

For the hard coal-fired, supercritical units the steam conditions, listed in Table 2, varied greatly. This was

due to inexperience with the use of austenitic steels at supercritical steam conditions. The superheat

steam conditions were initially set high at 649°C and 34.5 MPa for Eddystone 1 and 621°C and 31 MPa for

Philo 6. Eddystone 1 had to de-rate its superheat steam to 610°C and 33 MPa due to problems with rotor

vibration and fireside corrosion. The next three units commissioned in 1960 and 1961 had superheat

steam at 565°C and 24 MPa. Further problems with austenitic materials were encountered in the 1960s

and early 1970s. Problems included creep and fatigue cracking of austenitic steel boiler tubes and

extensive steamside oxidation caused severe wear in the boiler tubes and the turbine nozzle. As a result,

the availability of these plants dropped and the maintenance costs increased significantly. Such problems

were entirely due to moving to ultra-supercritical (USC) steam conditions with early austenitic materials,

and nothing to do with the number of reheaters in the steam cycle. The only solution to these problems, at

the time, was to de-rate the boiler and lower the steam conditions (Yeh and Rubin, 2007). The next

eighteen units had superheat steam at 538°C and 24 MPa, except for three units which had a higher

superheat pressure of 26 MPa. For all units the primary and secondary reheat temperatures were in the

range 538–565°C (Platts, 2014; IEA CCC, 2012).

As the number of double-reheat units in the USA increased, the cost of building such units dropped from

170 $/kW to 100 $/kW in the mid-1960s, and the reliability increased. However, in the 1970s the cost of

building PCC plant increased, largely because of the requirements for air pollution control and cooling

towers (ASME, 2003a). Weitzel (2012) says that the double-reheat cycle with the early supercritical units

in the USA increased efficiency by 1.5–2% points above single-reheat units.

Figure 9 shows a graph of the electrical efficiency and unit size with year commissioned for double-reheat

units on the USA. This graph shows the increase in unit size with year commissioned, from 120 MWe to

816.3 MWe. The electrical efficiency ranged from 27% to 40%. The graph shows that the efficiency

decreases slightly with time, but this is because the trend is skewed by the small and inefficient units of

subcritical Hugo 1 and lignite-fired Gibbons Creek 1 (Platts, 2014; IEA CCC, 2012).

Page 33: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in the USA

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 32

Figure 9 Efficiency and unit size of the double-reheat units in the USA (Platts, 2014; IEA CCC, 2012)

Since the 1970s, until recently, no supercritical coal-fired units were built in the USA because of a

decreased electricity demand and an increasingly privatised electricity industry. One supercritical unit

was commissioned in the USA in 2007 (Yeh and Rubin, 2007). Since operating at reasonable steam

conditions 538°C/538–565°C/538–565°C/24 MPa for austenitic steels, the operational record of the

double-reheat units in the USA has been excellent with operating lifetime greater than 50 years (Kjaer

and Drinhaus, 2010a).

Interestingly, in the 1980s the Electric Power Research Institute (EPRI) in the USA investigated double-

reheat turbines to operate at supercritical steam conditions of 593°C/593°C/593°C/31 MPa. However, no

such plants have been built in the USA. This has been attributed to the privatisation of power plants, not

favouring long-term investments (MPS, 2002; MPS, 1999).

Eleven of the 27 double-reheat units have been decommissioned, or will be soon (Sourcewatch, 2015).

Some units will switch to firing gas or biomass due to more stringent emission regulations set by the

Environmental Protection Agency, an abundance of low cost shale gas and a decreased electricity demand.

Page 34: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Italy

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 33

5 Status of double-reheat units in Italy Chapter 5 reviews the technical and economic performance of operational and decommissioned

double-reheat units in Italy.

5.1 La Spezia 3

La Spezia unit 3 in Italy was a supercritical 600 MWe natural gas-fired double-reheat unit commissioned

in 1967 and recently decommissioned. It was owned by ENEL. Franco Tosi Industriale manufactured the

turbine (CC4F33) and Babcock & Wilcox manufactured the boiler. The unit has a steam flow of 517 t/h

with the following steam conditions 542°C/552°C/566°C/24.6 MPa. The unit reaches 38.4% electrical

efficiency (Platts, 2014; IEA CCC, 2012).

5.2 La Spezia 4

La Spezia unit 4 in Italy is a supercritical 600 MWe bituminous coal-fired double-reheat unit

commissioned in 1968 in Italy. It is owned by ENEL. Franco Tosi Industriale manufactured the turbine

(CC4F33) and Babcock & Wilcox manufactured the boiler. The unit has a steam flow of 517 t/h with the

following steam conditions 542°C/552°C/566°C/24.6 MPa and reaches an assumed net electrical

efficiency of 38.4% (Platts, 2014; IEA CCC, 2012).

5.3 Analysis

Only two double-reheat units were built in Italy, one coal and one gas-fired, in the last 60s. Franco Tosi

Industriale manufactured the double-reheat turbines in Italy, whereas Babcock & Wilcox manufactured

both boilers.

Page 35: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Japan

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 34

6 Status of double-reheat units in Japan Chapter 6 reviews and analyses the technical and economic performance of operational and

decommissioned double-reheat units in Japan.

6.1 Himeji Daini 4

Himeji Daini 4 was a liquefied natural gas-fired double-reheat owned by Kansai Electric Power. The unit

was commissioned in 1968 and is now decommissioned. ABB Combustion Engineering manufactured the

boiler and Westinghouse Electric manufactured the turbine (type TC4F28.5). The 450 MWe supercritical

unit had 333 t/h of steam flow with the following steam conditions 538°C/552°C/556°C/24.1 MPa (Platts,

2014).

6.2 Kainan 1 and 2

Kainan units 1 and 2 are two oil-fired double-reheat units in Japan owned by Kansai Electric Power.

Commissioned in 1970, the units are rated 450 MWe each and have steam conditions of

538°C/552°C/566°C/24.1 MPa. Babcock-Hitachi manufactured the boilers and Toshiba manufactured the

turbines and generators (Platts, 2014).

6.3 Takasago Kansai 1 and 2

Takasago Kansai units 1 and 2 were two oil-fired double-reheat units owned by Kansai Electric Power.

The units were commissioned in 1971 and are both now decommissioned. Mitsubishi Heavy Industries

manufactured the boilers and turbines (type TC4F28.5). The 450 MWe supercritical units had 348 t/h of

steam flow with the following steam conditions 538°C/552°C/556°C/24.1 MPa (Platts, 2014).

6.4 Himeji Daini 5 and 6

Himeji Daini units 5 and 6 are two liquefied natural gas-fired double-reheat units owned by Kansai

Electric Power. The unit was commissioned in 1973. Mitsubishi Heavy Industries manufactured the boiler

and turbine (type TC4F31) for unit 5. Ishikawajima-Harima Heavy Industries manufactured the boiler

and Hitachi manufactured the turbine (type TC4F33.5) for unit 6. The 600 MWe supercritical units had

449 t/h of steam flow with the following steam conditions 538°C/552°C/556°C/24.1 MPa (Platts, 2014).

6.5 Kainan 3 and 4

Kainan units 3 and 4 are two oil-fired double-reheat units in Japan owned by Kansai Electric Power.

Commissioned in 1974 and 1973, respectively, the supercritical units are rated 600 MWe each, have a

maximum steam flow rate of 466 t/h and steam conditions of 538°C/552°C/566°C/24.1 MPa. For unit 3,

Mitsubishi Heavy Industries manufactured the boiler and turbine (TC4F31); Melco manufactured the

generator. For unit 4, Babcock-Hitachi manufactured the boiler and Toshiba manufactured the turbine

(TC4F30) and generator (Platts, 2014).

Page 36: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Japan

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 35

6.6 Tanagawa Daini 1 and 2

Tanagawa Daini units 1 and 2 were two 600 MWe oil-fired double-reheat units operated by the Kansai

Power Company. They are now decommissioned (Yamauchi, 2015).

6.7 Kawagoe 1 and 2

Kawagoe units 1 and 2 are two liquefied natural gas-fired double-reheat units in Japan owned by Chubu

Electric Power. Commissioned in 1989 and 1990, respectively, the supercritical units are rated 700 MWe

each, have a maximum steam flow rate of 542 t/h and steam conditions of 565°C/565°C/565°C/31 MPa.

Mitsubishi Heavy Industries manufactured the boilers and Toshiba manufactured the tandem-compound

turbine-generators (model TC4F31). The units have sliding pressure operation (Platts, 2014).

The tandem-compound turbine was chosen over a cross-compound type due to a commercial

compromise. The cross-compound turbine would have conferred an additional 0.6% points in net

electrical efficiency (LHV). Kawagoe unit 1 is designed for load following operation, which involves daily

start-up/shut-down and rapid reaction to changing demand. Kawagoe unit 1 reaches 45% net electrical

efficiency (LHV). At full-load the unit has a net electrical efficiency of 46.8% (LHV) with an auxiliary load

of 2.8% points. The design engineers estimated that if the unit was coal fired the full-load efficiency

would be 44.9% (LHV), due to the auxiliary loads of coal delivery and pulverisation, and flue gas

denitrification and desulphurisation (Iwanaga and others, 1990; Ishiki and others, 1990).

6.8 Analysis

Table 3 lists the thirteen oil- and gas-fired double-reheat units built in Japan, with details of year

commissioned, primary fuel, size (MWe), steam conditions (°C/°C/°C/MPa) and electrical efficiency

(%)(most of which are assumed values), in chronological order of year commissioned.

Table 3 List of double-reheat units in Japan

Unit Commissioned Primary Fuel Size (MWe) Steam Conditions (°C/°C/°C/MPa) Efficiency (%)

Himeji Daini 4 1968 Gas 450 538/552/556/24.1

Kainan 1 1970 Oil 450 538/552/566/24.1

Kainan 2 1970 Oil 450 538/552/566/24.1

Takasago Kansai 1 1971 Oil 450 538/552/556/24.1

Takasago Kansai 2 1971 Oil 450 538/552/556/24.1

Kainan 3 1973 Oil 600 538/552/566/24.1

Himeji Daini 5 1973 Gas 600 538/552/556/24.1

Himeji Daini 6 1973 Gas 600 538/552/556/24.1

Kainan 4 1974 Oil 600 538/552/566/24.1

Tanagawa Daini 1 Oil 600

Tanagawa Daini 2 Oil 600

Kawagoe 1 1989 Gas 700 565/565/565/31 45

Kawagoe 2 1990 Gas 700 565/565/565/31 45

Page 37: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Japan

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 36

Of the eleven double-reheat units, amounting to 7.2 GWe, built in Japan between 1968 and 1990, five are

gas-fired and six are oil-fired. Interestingly, the first double-reheat unit in Japan commissioned in 1968

used a boiler manufactured by ABB Combustion Engineering and turbine from Westinghouse Electric,

which shows the dominance of the North American companies at the time. Mitsubishi Heavy Industries

manufactured six boilers and four turbines. Babcock-Hitachi manufactured three boilers and

Ishikawajima-Harima Heavy Industries manufactured one boiler. Toshiba manufactured five turbines and

Hitachi manufactured one turbine.

The steam conditions began modestly, compared to practice in the USA. As shown on Table 3, the first

nine units operated at 538°C/552°C/556–566°C/24.1 MPa, and Kawagoe units 1 and 2 increased the

steam parameters to 565°C/565°C/565°C/31 MPa. Figure 10 shows a graph of the electrical efficiency

and unit size with year commissioned for double-reheat units in Japan. Unit size gradually increased from

450 to 700 MWe (Platts, 2014; IEA CCC, 2012).

Figure 10 Efficiency and unit size of hard coal-fired double-reheat units in Japan (Platts, 2014; IEA CCC, 2012)

The gas-fired units at Kawagoe could reach an impressive net electrical efficiency of 46.8% (LHV) and be

operated in load-following mode. However, firing gas in boilers is now redundant as combined cycle gas

turbines (CCGT) can reach net electrical efficiencies of 60% (LHV).

Coal-fired double-reheat units have not been built in Japan because they have not been economically

favourable. The cost of electricity has been lower from oil- and gas-fired double-reheat units and

coal-fired single-reheat units (Yamauchi, 2015).

For turbines rated over 900 MWe spinning at 3600 rpm and power grids operating at 60 Hz, such as

those in Japan, a tandem-compound arrangement would cause excessively high centrifugal forces on the

last stages of the LP turbine blades. The solution was to have a cross-compound arrangement, with the LP

modules on a secondary low-speed (1800 rpm) train. Titanium based alloys now allow last stage LP

Page 38: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Japan

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 37

module blades to spin at 3600 rpm, with larger annular exit areas, which allow tandem-compound

arrangement (MPS, 2010).

Page 39: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Denmark

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 38

7 Status of double-reheat units in Denmark Chapter 7 reviews and analyses the technical and economic performance of the operational double-reheat

units in Denmark.

7.1 Skærbæk 3

In Denmark, Skærbæk unit 3 is a natural gas-fired double-reheat unit commissioned in 1997. It can also

fire light fuel oil (LFO). This unit generates 392 MWe of power and 447 MWth for a district heating

system, making the unit 93% energy efficient. At the time of commissioning, Skærbæk unit 3 set the

world record for natural gas-fired plants with a total efficiency of 49% in 100% power generation mode

(Dong Energy, 2015). The boiler was manufactured by Burmeister & Wain Energy A/S and GEC-Alstom

manufactured the turbine. The unit has a steam flow of 972 t/h and steam conditions of

580°C/580°C/580°C/29 MPa (Poulsen and Bendixen, 2006).

7.2 Nordjylland 3

Nordjylland unit 3, rated 415 MWe, was commissioned in Northern Jutland, close to Aalborg, in Denmark

in 1998. The decision to build unit 3 was made in 1992, making the design plus construction time six

years (MPS, 1998).

7.2.1 Boiler

FLS miljø and Burmeister & Wain Energi designed the boiler shown in Figure 11. Aalborg Industries,

Burmeister & Wain Energi (BWE) and Vølund Energy constructed the boiler. Internationally-traded

bituminous coals (25.2 MJ/kg LHV or 26.4 MJ/kg HHV) are fired normally, but the unit can also fire heavy

fuel oil (HFO). The boiler is a once-through USC Benson tower boiler (12.25 m2 by 70 m) with tangential

corner firing; with a spiral wound evaporator, sliding pressure operation and double reheaters. The

16 BWE 4 attached flame (AF) burners can fire coal and oil. Staged combustion is employed to lower NOx

emissions. The over burner air (OBA) system and the flue gas recirculation (FGR) together control the

reheater outlet temperatures. A screen and the first stage of the superheater are used to protect the HP

and reheater 1 final superheaters from the combustion chamber (MPS, 1998).

Page 40: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Denmark

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 39

Figure 11 Cross-section of boiler at Nordjylland PCC plant unit 3 (Jensen, 2000)

7.2.2 Turbine

The tandem-compound, double-reheat impulse turbine, was manufactured by GEC-Alstom. The turbine

has the following steam conditions, 582°C/580°C/580°C/29 MPa, with a steam flow of 972 t/h. The

generator generates 415 MWe at 3000 rpm (Poulsen and Bendixen, 2006). The turbine is made up of a

single-flow VHP; a combined HP (7.4 MPa) and IP0 (1.9 MPa) modules in opposed flow arrangement; a

double-flow IP1/2 (0.7 MPa) module; and two asymmetrical double-flow LP modules, with 860 mm last

row blades. Each of the VHP, HP and IP steam inlets are controlled by two stop and control valve

assemblies (combined in same valve chest) (Kjaer, 2003; MPS, 1998).

The unit can run in two modes, power only mode and combined heat and power (CHP) mode, which heats

a district heating system. Ten steam bleeds are taken from the turbine, at various pressures, for the

condensate/feedwater preheating. The feedwater can be preheated to 300°C. This includes two steam

bleeds (A3/H1 and A4/H2), on the double-flow IP module, to serve the condensing heat exchangers for

the district heating grid. The condensate is pumped through seven stages of low pressure feedwater

heaters to the de-aerator unit, which converts the condensate to feedwater and acts as an eighth low

pressure heater. From the de-aerator, the two variable speed electric boiler feed pumps (BFP) force the

feedwater through two high pressure feedwater heaters and one feedwater de-superheater, which are

heated with steam originating from two bleeds. Feedwater preheaters are characterised by condensing

the steam whereas feedwater de-superheaters are characterised by cooling the steam. The turbine has

sliding pressure operation to optimise efficiency at low loads, to a minimum output of 20% (IEA, 2007;

Page 41: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Denmark

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 40

Kjaer, 1993). Due to high amounts of intermittent power generation from renewable energy on the

Danish grid, Nordjylland unit 3 cycles from 20% load to base load on a daily basis.

There is heat recovery on the components, such as fans and pumps, which heat the building, combustion

air and provide the initial stage of condensate preheating (MPS, 1998). Figure 12 shows a PFD of the

double-reheat steam cycle at Nordjylland unit 3 (Kjaer, 2003; MPS, 1998).

Figure 12 PFD of the double-reheat steam cycle at Nordjylland unit 3 (IEA, 2007; Kjaer, 2003)

7.2.3 High temperature materials

New materials allowed a significant increase in superheat steam conditions to 582°C and 29 MPa.

Austenitic steel HTP347FG (SA213-TP347H) was used for the final superheater and martensitic steel P91

(X10CrMoVNb9-1) was used for the high pressure headers and pipework. The small unit size and the use

of double-reheat cycle reduced the steam flow by 10%, which kept the size of the pressure parts small

enough to manufacture. Flue gas recirculation, advanced water treatment and soot blowers were used to

ensure the T11 water wall tubes did not overheat (IEA, 2007; MPS, 1998).

7.2.4 Sea-water cooling

The coastal area of Denmark has access to the North Sea, which can provide sea water cooling at an

average of 10°C, reaching a minimum of 0°C, which creates an average condenser pressure of just 2.3 kPa

(IEA, 2007). A low condenser pressure causes a high volumetric flow in the LP module, which increases

power generation and thus efficiency. Figure 13 shows the relationship between net electrical efficiency

(%, LHV), for steam conditions at 580°C/580°C/580°C/28.5 MPa, with increasing condenser pressure,

when moving from sea water cooling to wet cooling towers and finally dry cooling tower (Kjaer, 1993).

This figure shows that sea water cooling increases net electrical efficiency (LHV) by 1% compared to wet

cooling towers.

Page 42: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Denmark

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 41

Figure 13 Impact of condenser pressure on net efficiency (Kjaer, 1993)

7.2.5 LP blade erosion

Some single-reheat cycles have low condenser pressures which give rise to relatively high moisture

concentrations (wetness) in the low pressure turbine. This moisture can cause serious erosive damage,

particularly to the LP turbine blades. Low condenser pressures can be found with low temperature

cooling air or sea-water cooling, superheated steam temperature above 605°C and units with optimised

cold ends (serial condensers or cooling towers with optimised design) (Drinhaus, 2015).

However, double-reheating increases the exhaust steam enthalpy, which reduces the steam wetness in

the LP exhaust and results in less erosion in the LP turbine. Double-reheat was found to give a maximum

exhaust moisture content of 8%, compared with 15% for the single-reheat, found during the cold winter.

LP blade erosion has not been a problem at Nordjylland unit 3 (Kjaer, 1993; IEA, 2007; Morrison, 2011).

Additionally, as the moisture content is so low, the steam extracted for feedwater preheating can be

increased to an optimum level without causing LP blade erosion (Kjaer and Drinhaus, 2010).

7.2.6 Technical performance

Nordjylland unit 3 reaches 47% net electrical efficiency (LHV) in power only mode, and is currently

(Dec 2014) the world’s most efficient PCC unit (Morrison, 2011; Poulsen and Bendixen, 2006; Vattenfall,

2014). The combination of low temperature sea water cooling (10°C), high superheat steam (580°C) and

double-reheat substantially reduce losses to the Carnotisation Gap in the Rankine cycle used in PCC

plants, making the cycle more thermodynamically efficient (Poulsen and Bendixen, 2006). Compared to

Esjberg unit 3, a single-reheat supercritical PCC plant in Denmark operating with superheat steam at

560°C and 25 MPa, Nordjylland unit 3 increases net electrical efficiency by 1% point by going to

ultra-supercritical (USC) conditions and by 0.9% point by having double-reheat as opposed to

Page 43: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Denmark

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 42

single-reheat (Kjaer, 1990). In 2005, Nordjylland unit 3 achieved the performance results, shown in

Table 4, for power only mode and combined heat and power (CHP) mode (Poulsen and Bendixen, 2006).

Table 4 Performance data from Nordjylland unit 3 (Poulsen and Bendixen, 2006)

Performance aspect Power only mode (100% load, condensing mode with 10°C cooling water)

Combined heat and power mode (100% load, back pressure mode, 4°C cooling water)

Availability 98% 98%

Generator output 411 MWe 339.5 MWe

Auxiliary power consumption, total 26 MWe 26.5 MWe

Auxiliary power consumption of denitrification and desulphurisation systems 3 MWe 3 MWe

Electrical output to grid (400 kV) 385 MWe 313 MWe

District heating output 0 MJ/s 422 MJ/s

Turbo generator heat rate (based on generator output) 6736.6 kJ/kWh 8150.3 KJ/kWh

Boiler efficiency 94.2% 94.2%

Power plant heat rate (based on generator output)

7151.4 kJ/kWh 8652.1 kJ/kWh

Gross calorific value of coal 26 MJ/kg 26 MJ/kg

Specific coal consumption (based on generator output) 275 g/kWh 148 g/kWh

Specific coal consumption (400 kV to grid) 293 g/kWh 154 g/kWh

Thermal efficiency (400 kV to grid) 47.2 % 90%

Emissions Regulations met Regulations met

At 415 MWe, almost half that of the largest German and Japanese units at the time, such high efficiency

demonstrates that increasing unit size is not necessarily accompanied by increased electrical efficiency.

However, around 400 MWe is about the smallest worthwhile size to gain high efficiency with a USC unit

(Henderson, 2015).

7.2.7 Industrial symbiosis

Nordjylland PCC plant is part of the industrial symbiosis network in Denmark. The bottom ash, fly ash and

gypsum from the units are sold to the construction industry, and the waste heat is used in a district

heating scheme – there is minimal waste. This symbiosis minimises environmental damage and lowers

costs.

7.2.8 Process economics

At the time, the double-reheat option cost DM 20 million more than the single-reheat option. Assuming an

imported coal price of 73 $/t, the cost benefit of the secondary reheat loop was said to be 'in the lower

region of the break-even price' (Kjaer, 1993).

Initially, ELSAM owned the Nordjylland unit 3. Since then, DONG Energy bought ELSAM. DONG Energy

said that the contracting strategy was owner design with multi-contract procurement. Vattenfall have

now bought the plant from DONG Energy. In 2007, the IEA were unable to obtain economic information

Page 44: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Status of double-reheat units in Denmark

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 43

from the plant operators due to commercial sensitivity. Siemens said that a similar 800 MWe USC unit

would cost around 1500 US$/kW, which excludes owner’s costs and interest during construction (IDC). In

2007, Nordjylland unit 3 had been economically worthwhile, especially as coal prices had increased and a

price was developed for carbon dioxide (IEA, 2007).

7.3 Analysis

In Denmark, there is high public pressure and strong governmental demands for environmentally

friendly heat and power generation. Denmark has low indigenous fossil fuel reserves and is a net energy

importer. Uncertainties regarding the cost and security of natural gas supplies led Denmark to focus on

coal and biomass. After extensive investigation into coal and biomass conversion technologies, the

technology employed at Nordjylland unit 3 was calculated to have the highest efficiency and lowest

lifecycle cost (MPS, 1999). The technology choice here is site specific. The availability of low temperature

sea water cooling favours the double-reheat steam Rankine cycle, in terms of higher efficiency and low

erosion. Nordjylland unit 3 is currently (March 2015) the most efficient and one of the cleanest PCC

plants in the world.

Drinhaus (2015) states that there is no difference in maintenance costs or reliability between the

double-reheat units of Skærbæk unit 3 and Nordjylland unit 3 with equivalent single-reheat units

operating with 560°C superheat steam; the historic performance statistics are similar. During the first

years of operation, there were issues with the distributed control system, the thermo-wells and

emergency stop valves, which have since been resolved. The engineers of such units have since developed

the Master Cycle, a modified double-reheat cycle that could be used to further improve performance of

new build double-reheat plants, which is looked at in detail in Chapter 9.

Page 45: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Evaluation of all built double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 44

8 Evaluation of all built double-reheat units From 1956 to 1998, 60 double-reheat units were built globally, 11 in Germany, 32 in the USA, 2 in

Denmark, 13 in Japan, and 2 in Italy; amounting to 27.9 GWe. As there are roughly 8700 operational and

decommissioned coal-fired units globally, coal-fired double-reheat units account for less than 0.5% of the

total fleet.

For coal-fired units, 7 were built in Germany, 28 in the USA, one in Denmark and one in Italy; a total of 37

units. For gas-fired units, 4 were built in Germany, 3 in the USA, one in Denmark, 5 in Japan, and one in

Italy; a total of 14 units. For oil-fired double-reheat units, one was built in the USA and 8 in Japan; a total

of 9 units. Most of these units were built in Germany, the USA and Japan in the 1960s and 1970s.

Unfortunately, there is only a small amount of published literature on double-reheat plant, and the

majority of this is not available online. This is largely because the majority of the units are 40–60 years

old and a significant proportion of the units have been decommissioned.

8.1 Technical performance

Figure 14 shows the gradual increase in unit efficiency and unit size with time. For coal-fired

double-reheat units, the electrical efficiency increased from 27% to 47% (LHV) and the unit size

increased from 100 to 818 MWe. The steam conditions settled on 580°C/580°C/580°C/29 MPa in the

1990s, despite starting at much higher numbers in the 1950s, such as 649°C/565°C/565°C/34.5 MPa.

Figure 14 Efficiency and unit size of double-reheat units globally with commissioning year

Numerous engineers have calculated the electrical efficiency increase with double-reheat cycles

compared to a single reheat cycle. This figure ranges from 0.8% points to 2% points. The range is due to

Page 46: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Evaluation of all built double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 45

different reference conditions and technologies used at certain units, and of course method of calculation

used:

• 0.8% points, Siemens (MPS, 2010);

• 0.9% points, Dong Energy (Kjaer, 1990);

• 1.4% points (LHV), National Coal Council (2007);

• 1.5% points, Poulsen and Bendixen (2006);

• 1.5% points, Drinhaus (2015): The efficiency difference, at VDE3986 conditions, are 46.7% for a

single-reheat (597°C/605°C/28.8 MPa) and 48.3% for a double-reheat

(592°C/605°C/605°C/31.1MPa);

• 1.9% points, Chew (2003). Moving from 560/560/25 to 560/560/560/25;

• 2.0% points, Scheffknecht and others (2003).

It is important to note here that such efficiency increases with double-reheat units are valid throughout

the load range.

The start-up mode evolved from 100% steam bypass to just a small percentage of bypass combined with

sliding pressure operation. Unit reliability and availability were initially poor, due to inexperience with

austenitic steels. Since operating at reasonable steam conditions of

530-540°C/538-565°C/530-565°C/24–25 MPa from the mid-1960s onwards and moving to USC steam

conditions in the 1990s, double-reheat units have performance records (availability, reliability, cyclic

operation) and O&M costs equivalent to those of single-reheat units.

Figure 15 shows net electrical efficiencies (HHV) for some supercritical PCC plant and an approximate

value for subcritical plant, firing both black coal and brown coal (lignite). As the efficiency of PCC plant is

affected by factors such as location (which affects condenser pressure), coal quality and emission controls,

the efficiencies on this figure have been normalised so that comparisons can be made. This figure clearly

shows that Nordjylland unit 3 is the most efficient PPC plant, even without the efficiency bonuses of sea

water cooling and district heating (IEA, 2007; IEA and others, 2010)

Page 47: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Evaluation of all built double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 46

Figure 15 Normalised operating efficiencies of supercritical case study plants compared with elsewhere (IEA, 2007)

8.2 Boiler and turbine manufacturers

In the 1970s, four boilers and one turbine were manufactured by companies in the USA for double-reheat

units in Italy and Japan and the international company, GEC-Alstom, manufactured the turbines for the

two double-reheat units in Denmark. However, the other 113 boilers and turbines (94%) were

commissioned in the country of manufacture.

The dominant boiler manufacturers were: EVT Energie- und Verfahrenstechnik in Germany; Babcock &

Wilcox, Foster Wheeler and ABB Combustion Engineering in the USA; Mitsubishi Heavy Industries and

Babcock-Hitachi in Japan; and Burmeister & Wain Energy in Denmark. The dominant turbine

manufacturers were: Siemens and ABB Power Generation in Germany; General Electric and

Westinghouse Electric in the USA; Mitsubishi Heavy Industries and Toshiba in Japan.

8.3 Construction time

Construction times vary considerably depending on site constraints. The construction time for single-

reheat PCC plants ranges from 30 to 66 months. Nordjylland unit 3 took 48 months to build. This suggests

that longer construction times are not an issue with double-reheat PCC plant (IEA, 2007; IEA and others,

2010).

8.4 Process economics

Additional capital expenditure is required for the second reheat steam loop, but this is eventually paid for

with decreased operational expenditures. The coal fuel prices will decide the payback period – generally

coal prices increase over time. The trading price of carbon dioxide, or a carbon tax, should be considered

in process economics for new double-reheat units, as it is likely that such mechanisms will become

established in the next few decades in order to restrict carbon dioxide emissions.

Page 48: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Evaluation of all built double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 47

Due to private ownership of the units, and associated commercial sensitivity, specific process economic

data for double-reheat units are generally not available. Even so, process economics are date and location

specific. For a new unit, the process economics must be calculated with process modelling and simulation

software, such as ASPEN Plus or EBSILON Professional, using as much correct information as practical to

obtain accurate costs.

A key message to take from the wave and clusters of double-reheat units in Germany, the USA, Japan, Italy

and more recently Denmark, is that the process economics of double-reheat units were more favourable

than single-reheat units at the time. This will have been due to a combination of low labour costs, which

reduces capital costs, and/or high energy prices. Additionally, strong governmental and public forces for

environmentally friendly and sustainable energy generation largely favoured double-reheat technology in

Denmark.

In 2007 the IEA Clean Coal Centre conducted a major techno-economic analysis of fossil fuel-fired power

generation, which included Nordjylland unit 3. These following sub-sections summarise the findings of

the report published by the IEA in 2007 (IEA, 2007).

8.4.1 Capital costs

Approximations for the Engineering, Procurement and Construction (EPC) costs were obtained for the

selected PPC plant shown in Figure 16. However, these were in different currencies and for different base

years. These capital costs were normalised to allow for comparison. These normalisation methods

include inflating the cost according to the consumer price index (CPI) rate of inflation and assuming that

the interest incurred during construction was 13% of the EPC cost, which gave the overnight capital costs.

The owner’s costs (cost of land, clearance, initial catalysts and chemicals, start-up costs, spares, fees and

working capital) were not included for the plant. However, it was uncertain whether the capital costs

given for Younghung and Suratgarh included owner’s costs of interest during construction (IDC), so only

IDC was added.

This economic analysis contained unquantifiable components – economic, technical and geographical.

Economic components, such as currency fluctuations and project financing structure, were not included

and would affect these EPC figures. Purchasing power parities (PPP) could be used for a more accurate

comparison, but significant data from all parties would be required at the same time for a complete

analysis.

The technical components are unit size and plant design. Unit size affects capital costs. Generally, larger

units experience economies of scale and therefore lower capital costs. The steam cycle and emission

control systems differ with each plant. More detailed information on capital costs is required to quantify

costs for such technologies.

Prevailing market conditions at the time play a significant factor. In countries where new units are

frequently built, competition is high and work is plentiful, which introduces economies of scale in

engineering and in materials procurement, and the costs decrease. The opposite happens to capital costs

Page 49: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Evaluation of all built double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 48

in countries where new units are rarely built. Furthermore, plant location affects costs for raw materials.

To conclude, these figures should be used as an indication for comparison only – none of these figures are

absolute.

Figure 16 compares overnight specific capital cost (US$/kWso) versus unit size (MWe). The name

Denmark was used instead of Nordjylland unit 3 as the capital costs for Nordjylland unit 3 could not be

obtained; values from a front end engineering design (FEED) study for a similar unit in Denmark were

obtained. This figure shows that the newer units in Germany and Denmark have higher overnight capital

costs. However, these higher figures are likely to reflect increases in the costs of resources and labour

over that time period in the OECD, which are not reflected accurately by CPI. This concept is reinforced by

the fact that newer units have considerably higher overnight capital costs at >2000 US$/kWso in the

OECD.

Figure 16 Overnight capital cost with unit size (IEA, 2007)

In 2007, an 800 MWe USC double-reheat unit would cost around 1500 US$/kW, which excludes owner’s

costs and interest during construction (IDC).

Figure 17 is a plot of adjusted plant costs for a common plant size versus main steam temperature (°C).

To draw this graph, the overnight costs of all plant were adjusted to a unit size of 1000 MWe, with an

exponential scaling factor of 0.8. Despite the approximate nature of this economic analysis, this graph

showed a correlation between the overnight capital cost and superheat steam temperature. This was as

expected as higher steam temperatures require higher cost materials.

Page 50: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Evaluation of all built double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 49

Figure 17 Overnight capital cost versus superheat steam temperature (IEA, 2007)

Figure 18 is a plot of adjusted specific overnight capital cost for a common plant size with normalised net

electrical efficiency (%, HHV). As expected, higher efficiencies incur higher capital costs.

Figure 18 Overnight capital cost with normalised efficiency (IEA, 2007)

8.4.2 Fuel, operation and maintenance costs

Operation and maintenance (O&M) costs, excluding fuel, are the smallest contributor to total plant cost,

generally in the range 10–20%. Operating costs include manpower, rates (land taxes), insurance and raw

materials (such as limestone, cooling water, boiler feedwater make-up and chemicals). However, in some

areas revenue is made from sales of by-products (such as bottom ash, fly ash, gypsum and sulphuric acid).

Page 51: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Evaluation of all built double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 50

As a proportion of total plant expenditure, fuel usually represents 30–40% for new coal plants. Present

coal costs can be accurately estimated and are similar for the OECD and non-OECD. In 2007, this was

1.5-2.5 US$/GJ (LHV); or 37.5–62.5 US$/t for 25 GJ/t (LHV). However, predicting future coal costs is

difficult.

Fuel and O&M costs could only be obtained from two of the eight PCC plant selected, and even those were

not complete operating costs and contained some apparently spurious values. These costs had to be

based on an amalgamation of IEA Clean Coal Centre knowledge and the data collected.

Levelised generating costs were calculated in the IEA study and are shown on Figure 19, together with

the contributions from the main cost elements (overnight capital costs were amortised over 25 years

using a real discount rate of 10%). Typically, capital costs contribute around half of total generating costs

for coal-fired power plants, and these figures corroberate this. The LCOE is the overall cost of generating

electricity which can then be used to compare electricity costs between different units. No carbon tax or

carbon trading scheme was included in this study.

Figure 19 Calculated generating cost contributions for coal-fired power plant in the OECD and Non-OECD countries (IEA, 2007)

8.5 The decline of double-reheat units

Double-reheat cycles fell out of favour in the late 1970s for three reasons. Firstly, nuclear power was

introduced for base-load power generation. Secondly, oil prices reduced. Finally, there was a view that

the increased capital expenditure and complexity were not economically or technically justified. Gas-fired

double-reheat cycles were made redundant with the introduction of combined cycle gas turbine (CCGT)

in the late 1990s. Despite this, double-reheat cycles have proved economically favourable in countries

with low indigenous energy reserves. The world’s most efficient PCC unit, Nordjylland unit 3 in Denmark,

employs a double-reheat cycle and was commissioned in 1998.

Page 52: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 51

9 Development prospects for double-reheat units This Chapter reviews and analyses the recent technical developments and advances in turbines, boiler

configuration and steam cycles for double-reheat units.

9.1 Turbine and steam cycle

Double-reheat turbines are made by Alstom, Doosan Heavy Industries, General Electric, Hitachi,

Mitsubishi Heavy Industries, Siemens, Shanghai Turbine Works and Toshiba. Developing a design for

double-reheat takes decades. Doosan Heavy Industries in Korea manufacture turbines based on a licence

from General Electric. Shanghai Turbine Works manufacture turbines based on foreign licences, such as

Siemens in Germany. The following sub-sections review the latest developments in turbine and steam

cycle technology.

9.1.1 Siemens

Siemens manufacture turbines for use with gas, coal and nuclear power plant which range from 0.3 to

1900 MWe. For large-scale, coal-fired power generation, Siemens manufacture the SST-5000 and

SST-6000, which supply 750 MWe and 1200 MWe respectively. Figure 20 shows a 1000 MWe

tandem-compound single-train double-reheat turbine, with three LP modules (Quinkertz, 2014).

Figure 20 Schematic of Siemens 1000 MWe tandem-compound double-reheat turbine (Quinkertz, 2014)

Siemens are working on an advanced single-train, double-reheat design, shown in Figure 21, which

employs increased steam conditions, advanced sealing, an optimised cold end and steam cycle (Quinkertz,

2014).

Page 53: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 52

Figure 21 Schematic of Siemens advanced double-reheat turbine (Quinkertz, 2014)

9.1.2 Master Cycle

As superheat steam conditions increase, some of the turbine bleeds for feedwater preheating become too

hot (>300°C). This is known as the ‘superheat problem’, and it is more detrimental to double-reheat

cycles than single-reheat cycles. However, the superheat problem would also be significant on

single-reheat AUSC units operating superheated steam over 700°.

You will find the superheat problem also on single reheat units, if AUSC temperatures in the range of

700°C are used. In order to exploit the bleed in an optimum way, topping de-superheaters are needed,

which are costly.

DONG Energy have devised and patented a modified double-reheat cycle, called the Master Cycle which

solves the superheat problem and modifies the steam cycle to increase electrical efficiency and decrease

capital costs (Kjaer and Drinhaus, 2010a,b; MPS, 2008).

Steam cycle

The Master Cycle moves the IP turbine bleeds to an additional small turbine, known as the tuning turbine,

or T turbine. The T turbine is fed by steam from the first cold reheat steam line. The steam flow through

the reheater tubing in the boiler, the associated piping and IP module, is reduced by the amount of bleed

steam shifted to the T turbine, which is approximately 15–30%. Essentially, the Master Cycle moves the

heat uptake from the two reheaters to the furnace walls and superheaters. This means significant size

reductions in reheater tubing and piping, and the IP turbine.

As the bleed temperatures are not as high from the T turbine lower cost steels for the bleed tubing, as

well as the stop and check valves, can be used; thus reducing capital costs. Therefore, the Master Cycle

significantly reduces the capital costs of double-reheat cycles by reducing the need for high temperature

material. The final feedwater can still reach an optimum 330°C with preheating, without compromising

the performance of large state-of-the-art single-line rotating air preheaters.

Page 54: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 53

Figure 22 shows a PFD of the Master Cycle. The components in the green box are altered from a

conventional double-reheat cycle (Kjaer and Drinhaus, 2010a,b).

Figure 22 PFD of the Master Cycle (Kjaer and Drinhaus, 2010a,b)

Boiler feedwater pump

In modern supercritical PCC plant, the boiler feedwater pumps (BFP) are driven with condensing

turbines or electric motors. The condensing turbines take a steam bleed from the main turbine. Electric

motors require an auxiliary load of 20 MWe. Most units have three BFPs driven by condensing turbines,

each sized to supply 50% of the maximum feedwater flow rate, and one BFP driven by motors for start-up

(MPS, 2010).

The mechanical output from a T turbine could drive a BFP, as the T turbine is similar in size to a

condensing turbine used to drive BFPs. A variable speed ‘balancing’ motor can be used to guarantee the

correct speed of the BFP at high loads; at low loads this balancing motor can be used as a generator. For a

900 MWe USC Master Cycle, the balancing motor is sized at 4-5 MWe.

As the steam exiting the T turbine ends in the IP heater, the complicated condenser and cooling water

systems with conventional condensing turbine driven BFP, and the associated building structure, are

avoided. This configuration is already operational in Avedøre unit 1.

The T turbine could be used with its own generator, but this is unfavourable for a number of

thermodynamic and practical reasons (Kjaer and Drinhaus, 2010a,b; MPS, 2008).

Page 55: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 54

Boiler configuration

As the IP bleeds are moved to the tuning turbine, there is 15–30% less steam flow in the reheat piping.

This reduces the amount of reheater tubing in the boiler by 6%, thus decreasing capital costs of the boiler.

Figure 23 shows a side view of a Master Cycle USC boiler. From bottom to top the order is as follows:

furnace screen, which includes the primary superheater (SH1); final superheater (SH3); final primary

reheater (RH1.2); final secondary reheater (RH2.2); secondary superheater (SH2); first section of

secondary reheater (RH2.1); first section of the primary reheater (RH1.1); final section of the economiser;

selective catalytic reduction (SCR); first section of the economiser; and finally the rotating air preheater

(Kjaer and Drinhaus, 2010a,b).

Figure 23 Cross-sectional diagram of a USC Master Cycle boiler (Kjaer and Drinhaus, 2010)

Performance improvement

Relative to a conventional single reheat cycle, the Master Cycle increases the heat rate of the steam cycle

by 3–4%, which equates to an increase of net electrical efficiency by 1–2% points (MPS, 2008; IEA, 2007).

The paper by Kjaer and Drinhaus (2010a) details the thermodynamic gain from a Master Cycle compared

to a single-reheat cycle and a conventional double-reheat cycle, and how the optimum steam temperature

and pressures, and final feedwater temperatures are calculated. For a 900 MWe USC unit, they calculated

48.5% net efficiency (LHV) for the Master Cycle unit, 48.45% for a conventional double-reheat cycle and

47.05% for the single-reheat cycle. The Master Cycle has 1.45% points more efficiency than the

single-reheat. Although the Master Cycle only has 0.05% points more efficiency than the conventional

Page 56: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 55

double-reheat cycle, the superheat problem is avoided and the capital costs are decreased. The Master

Cycle does not affect the flexibility of the double-reheat unit.

DONG Energy have calculated that a finely tuned sea-water cooled Master Cycle could reach 49%

efficiency. Further process improvements gained by employing best available technologies (BAT) could

further increase such efficiency to >50%. The efficiency improvements given by the Master Cycle remain

the same for inland located plant with air-cooled condensers (Kjaer and Drinhaus, 2010a,b). Ploumen and

others (2011) found that the Master Cycle on a single-reheat unit could increase the electrical efficiency

of the unit by 0.4% points.

The Master Cycle is based on well-proven technology and has similar elements to the double-reheat units

in the USA, such as Eddystone units 1 and 2 and Philo unit 6 which have excellent operational records

(Kjaer and Drinhaus, 2010a,b; MPS, 2008).

Process economics

In 2010, Kjaer and Drinhaus compared the capital cost of a conventional single-reheat cycle to a

double-reheat Master Cycle on an 800 MWe unit. The Master Cycle gives an extra 35–40 MW for the same

coal input. The Master Cycle requires an additional capital expenditure of around €40–45 million and has

a specific investment cost of 1150–1250 €/kW. Compared to the conventional single-reheat cycle, the

lower fuel costs and reduced carbon dioxide emissions with the Master Cycle are estimated to save a

minimum of €180 million in a typical power plant lifetime (Kjaer and Drinhaus, 2010b; Kjaer and

Drinhaus, 2010a).

The IEA (2007) showed that a double-reheat 800 MWe USC unit would cost around 1500 US$/kW

compared to a single-reheat unit cost of 1200 US$/kW, which excludes owner’s costs and interest during

construction (IDC). Assuming an exchange rate of 1 US$ = 0.95 €, the Master Cycle reduces specific

investment costs of a double-reheat unit by 12–19%. The specific investment cost of a Master Cycle is also

comparable to a single-reheat at 1137 €/kW.

Further modification

The Master Cycle was further improved in 2011, through working with Flowserve (USA) and their

experience with Philo unit 6. Improvements include: design of the HP preheater; integration of the final

feedwater pump; LP heater bi-condensate pumps for each heater; serial condenser coupling; and boiler

cold end optimisation. Drinhaus (2015) says that net electrical efficiencies of over 50% (LHV) can be

achieved with an USC Master Cycle.

9.1.3 Shanghai Turbine Works

Shanghai Turbine Works manufacture a 660 MWe and a 1000 MWe double-reheat turbine which operate

with ultra-supercritical superheat steam at 600°C and 25–35 MPa, and a reheat at 600–620°C. These

turbines can reach a plant efficiency of 48% (LHV), with a net coal consumption of roughly 267 g/kWh

and associated carbon dioxide emissions of roughly 730 kg/kWh. In September 2014, forty-three

1000 MWe single-reheat and twenty-nine 660 MWe single-reheat turbines were put into operation (Yang

Page 57: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 56

and other, 2014). Additionally, Shanghai Turbine Works have devised a strategy to convert single-reheat

units into a cross-compound double-reheat by adding an ultra-high pressure module; this strategy can

also raise the steam conditions. Shanghai Turbine Works manufacture turbines based on foreign licences

(MPS, 2010).

9.1.4 Echelon Cycle

Shanghai Turbine Works have developed the Echelon Cycle, which is a method of regenerative preheating,

which reduces the amount of high-cost materials and capital costs, for single and double-reheat turbines.

The Echelon cycle uses an additional smaller turbine called the back pressure extraction turbine (BEST),

which takes some steam from the exhaust of the HP or VHP module to drive the boiler feedwater pump,

as well as supply steam for regenerative feedwater preheating. The Echelon Cycle reduces the amount of

expensive high temperature materials used in regenerative preheating. Figure 24 shows a PFD of a

double-reheat turbine with an Echelon Cycle. Shanghai Turbine Works plan to demonstrate their Echelon

cycle in 2017 (Yang and others, 2014).

Figure 24 PFD of a double-reheat turbine with an Echelon Cycle by Shanghai Turbine Works (Yang and others, 2014)

9.1.5 North China Electric Power University

Researchers at the National Thermal Power Engineering and Technology Research Center of the North

China Electric Power University in Beijing (China) have conducted numerous studies on coal-fired

double-reheat cycles.

Outer steam coolers and regenerative turbine (2015)

Xu and others (2015) present two schemes that more efficiently utilise the superheated steam bleeds on a

USC double-reheat turbine. A techno-economic analysis for both schemes under full and half-load was

conducted. The EBSILON Professional power plant simulation software is used to model the

Page 58: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 57

thermodynamic cycles involved. Half-load is assessed because the superheated steam bleed temperature

remains constant in sliding pressure units, which means that the superheat problem has more of an effect

on unit performance at lower loads.

The results are compared to a reference 1000 MWe double-reheat unit with the following steam

conditions 600/610/610/30 and eight stages of steam bleeds, which reaches 46.83% electrical efficiency,

as shown in Chapter 2. The reference double-reheat unit has the superheat problem with steam bleeds 2

and 5, which are both first stage IP module bleeds. Bleeds 2 and 5 can reach 562.6°C and 521.7°C,

respectively.

The first method is to employ outer steam coolers, as shown on Figure 25. Outer steam coolers use an

additional heat exchanger to heat high temperature feedwater before heating low temperature feedwater.

This means that the superheated steam bleed is cooled by up to 100°C before heating the low

temperature feedwater, which uses the heat more efficiently.

Outer steam coolers are known as feedwater de-superheaters in Europe (or less frequently a topping

de-superheater), they are well known and lots of units employ them.

Figure 25 PFD of an outer steam cooler (Xu and others, 2015)

Outer steam coolers would be required on steam bleeds 2 and 5, shown in Figure 26, which is the same

configuration as work by Li and others (2014). At full-load, the steam coolers increase electrical efficiency

by 0.16% points to 46.99%, or increase the heat transfer rate by 26.2 kJ/kWh, compared to the reference

double-reheat unit. At half-load, the increase in electrical efficiency rises to 0.19% points. Assuming a coal

price of 4.09 US$/GJ LHV, the total investment for two outer steam coolers is US$2.10 million and the net

annual revenue is US$0.29 million. The payback period is therefore 7.2 years for the additional outer

steam coolers over the reference double-reheat plant.

Page 59: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 58

Figure 26 PFD of double-reheat cycle with outer steam coolers (Xu and others, 2015)

The second method is to employ a regenerative turbine, shown in Figure 27. This method is similar to the

Master Cycle discussed earlier in this Chapter. At full-load, the regenerative turbine increases electrical

efficiency by 0.67% points to 47.5%, and increases the heat transfer rate by 106.80 kJ/kWh, compared to

the reference double-reheat unit. At half-load, the increase in electrical efficiency rises to 0.79% points to

47.62%. Assuming a coal price of 4.09 US$/GJ LHV, the total investment for regenerative turbine is

US$6 million and the net annual revenue is US$1.59 million. The payback period is therefore 3.8 years for

the additional outer steam coolers and regenerative over the reference double-reheat plant.

The regenerative turbine scheme has O&M costs and capital costs that are approximately three times

those of the outer steam coolers. However, the higher efficiency increase offsets these costs and the

regenerative turbine scheme has almost half the payback period.

Figure 27 PFD of double-reheat cycle with a regenerative turbine (Xu and others, 2015)

Page 60: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 59

Outer steam coolers (2014)

Li and others (2014) present a similar investigation. A single-reheat unit, with steam conditions of

600°C/600°C/26.25 MPa with 44.78% electrical efficiency is used as a base case.

Case 1 is a double-reheat unit with eight stages of steam extraction for increased feedwater preheating.

This would have 46.5% electrical efficiency. Case 2 is a double-reheat unit with ten stages of steam

extraction. This would have 46.83% electrical efficiency. Case 3 is a double-reheat unit with ten stages of

steam extraction, coupled with two outer steam coolers. Case 3 increases the electrical efficiency of the

base case by 2.21% points to 46.99%. The total plant investment is increased by US$45.6 million to

US$745.6 million. The annual fuel costs decrease by US$7.74 million to US$157.08 million. The O&M costs

increase by US$0.82 million to US$29.82 million. Finally, the LCOE decreases by 0.05 US$/MWh to 55.89

US$/MWh (Li and others, 2014).

9.2 Boiler-turbine configuration

Boilers are made by Foster Wheeler, Babcock & Wilcox, Alstom, Siemens, Shanghai Boiler Works, Harbin

Boilers, Rafako and others. Single-reheat PCC plant have 150 metres of pipework between the boiler and

the steam turbine, manufactured from high cost materials. Double-reheat plant can have 450 metres of

such pipework. The pipework cost accounts for about 3% of the capital costs with conventional single -

reheat units (Jeffs, 2000). Therefore, alternative boiler-turbine configurations could reduce the length of

the pipework and thus dramatically reduce capital costs.

9.2.1 Compact design boiler

Siemens developed the compact design boiler to shorten steam pipework. This Benson-type boiler uses

horizontal firing and raises the turbine plinth, to reduce the amount of expensive high temperature

pipework by up to 80%. For a 550 MW unit, the compact design boiler is 31 metres tall, a two-pass boiler

is 63 metres tall and a tower boiler is 91 metres tall (Jeffs, 2000). This concept has not yet been

demonstrated for a coal-fired boiler. However, a subcritical compact design boiler was installed as a heat

recovery steam generator (HRSG) at the Cottam Development Centre test facility in the UK (MPS, 2010).

Another arrangement is to have the boiler and turbine inline (MPS, 2008).

9.2.2 Partially underground tower type boiler

Xu and others (2014) at the National Thermal Power Engineering and Technology Research Center of the

North China Electric Power University in Beijing (China) propose a novel partially underground tower

type boiler design to decrease capital costs of double-reheat units.

This configuration, shown in Figure 28, reduces boiler height by 70 m and steam piping length by 160 m.

Compared to a typical 1000 MWe double-reheat design, the submerged boiler increases electrical

efficiency by 0.1% point (or increases the heat transfer rate by 18.3 kJ/kWh). The high efficiency and

lower investment cost lower the cost of electricity (COE) by 0.60 US$/MWh. Further investigations found

that the economics of the partially underground boiler become more favourable with increasing coal

Page 61: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 60

prices and high capital costs, especially for potential AUSC double-reheat units which employ high cost

nickel alloys.

Figure 28 Cross-section of partially underground tower type boiler (Xu and others, 2014)

9.2.3 Cross compound at high/low position arrangement

The plant engineers at Waigaoqiao No 3 PCC plant have designed a turbine configuration which decreases

the length of the pipework. This re-design is known as the cross compound at high/low position

arrangement (CCHLPA). In this arrangement the turbine is split into two trains. The first train, which

consists of the VHP, HP and one IP modules, is mounted at the same level as the outlets of the boiler

steam headers, which is around 80–85 metres above ground level. The second train, which consists of the

two IP modules and the LP modules, remains roughly 17 m above ground level in the conventional

turbine house. Additionally, shorter pipework reduces the pressure drop and temperature loss of steam

from the boiler, which slightly increases efficiency. Figure 29 shows a basic schematic of the

cross-compound at high/low position arrangement (CCHPLA) technology (Feng, 2014a; Mao, 2012).

Page 62: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Development prospects for double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 61

Figure 29 Cross-compound at high/low position arrangement (CCHPLA) technology (Mao, 2012)

Page 63: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Double-reheat units proposed and under construction

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 62

10 Double-reheat units proposed and under construction This Chapter reviews, analyses and evaluated the double-reheat units that are currently in planning and

under construction.

10.1 Europe

DONG Energy conducted a preliminary FEED study for a third double-reheat unit in Denmark, in a series

of ‘Convoy’ units, following positive experience with Skærbæk unit 3 and Nordjylland unit 3.

The study involved Alstom, Siemens, Toshiba, Hitachi Power Europe and MAN Turbo. The following

steam cycle configurations were assessed, single-reheat, conventional double-reheat and the Master Cycle.

The Master Cycle employed a 800 MWe Siemens turbine with the following temperature

590°C/604°C/604°C (Quinkertz, 2014). In 2007, Siemens estimated that an 800 MWe double-reheat USC

unit would cost around 1500 US$/kW, which excludes owner’s costs and interest during construction

(IDC) (IEA, 2007).

However, in 2010 DONG Energy announced that, in order to significantly reduce its carbon footprint, they

would not invest in new coal-fired power plants (Drinhaus, 2015).

10.2 China

The following sub-sections analyse the double-reheat units under construction in China and the last

sub-section evaluates these units.

10.2.1 Guodian Taizhou 1 and 2

Guodian Taizhou units 1 and 2 are two hard coal-fired double-reheat units under construction and

planned to be commissioned in August 2015 (Fan, 2015). Guodian Taizhou PCC plant is made up of two

1000 MWe, double-reheat, USC units, operating at 600°C/610°C/610°C/31 MPa, calculated to reach up to

47.94% efficiency (LHV). Coal consumption is predicted to be 256.2 g/kWh, which is 14 g/kWh lower

than an equivalent single-reheat unit, saving 151.8 thousand tonnes of coal annually. The payback period

of the incremental capital cost of the double-reheat cycle, compared to single-reheat cycle, is just 6.25

years, which is economically justified considering a plant life of 25 years+. Guodian Taizhou will be the

largest double-reheat plant and most efficient coal-fired power plant in the world (China Guodian

Corporation, 2015; Yang and other, 2014; Sun and others, 2012; Shanghai Electric, 2012).

Turbine

Guodian Taizhou unit 1 will employ Shanghai turbine Works first double-reheat 1000 MWe turbine. This

turbines operates at 600°C/620°C/620°C/29 MPa, but can handle up to 35 MPa superheat pressure. The

turbine is made up of a single-flow VHP module, double-flow HP module, double-flow extra-large IP

modules, and two double-flow LP modules with 1146 mm last row blades. Extra-large IP modules are

required due to the increased volume of steam flow with the superheated steam at 35 MPa. It has a single

shaft with five casings, four exhausts and spans 36.7 metres. There are ten stages of re-generative

Page 64: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Double-reheat units proposed and under construction

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 63

feedwater heating and it has tandem-compound configuration. The turbine uses 9–12% chromium

martensitic steels, such as CB2 for cast components and FB2 for forged components (rotor, valve and

module casings). Start-up methods have been devised for ultra-high, high and medium pressure starts

(Yang and other, 2014). Figure 30 shows a PFD of the 1000 MWe double-reheat turbine (Yang and other,

2014).

Figure 30 PFD of a 1000 MWe double-reheat cycle by Shanghai Turbine Works (Yang and others, 2014)

10.2.2 Waigaoqiao number 3 unit 9

The Shenneng Group Co Ltd, owners of Waigaoqiao No 3 power plant, have made a number of process

improvement and plant innovations which will be highlighted in this sub-section.

Waigaoqiao No 3 power plant consists of two 1000 MW USC units, , known as units 7 and 8, with steam

parameters 605°C/603°C/28 MPa, constructed by Shanghai Boiler Works, and two 1000 MW Siemens

designed turbines, manufactured by Shanghai Turbine Works. These units were designed, constructed

and commissioned in just over three years, from 2005 to March-June 2008, at a cost of 8.5 billion Yuan

RMB (1.2 billion US$). During the project construction, the engineers carried out a large number of

optimisations and technological innovations in all aspects of project design, equipment selection,

construction, commissioning, start-up and operation. Units 7 and 8 at Waigaoqiao No 3 power plant now

operate with higher efficiency and lower emissions than originally designed. The average net electrical

efficiency, from January to August 2014, was 44.35% (LHV) and the average load is 78%, which equates

to 276.82 g/kWh. For the same time period the average NOx, SO2 and particulate emissions were 16.61,

32.96 and 9.92 mg/m3 respectively – all well within the regulated limits of 100, 50 and 20. In 2013 the

plant, at full-load, reached 46.7% net efficiency, with only 2% auxiliary load (Feng, 2014b).

The next major efficiency improvement at Waigaoqiao will be a new build, known as unit 9. This unit will

use a double-reheat cycle with the CCHLPA unit configuration as explained in Chapter 3 and incorporate

Page 65: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Double-reheat units proposed and under construction

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 64

the efficiency improvements made at unit 7 and 8. It has been independently verified by Siemens, Alstom

and Chinese local manufacturers to reach around 48.9% net electrical efficiency (LHV), which equates to

roughly 251 g/kWh (Feng, 2014a; Quinkertz, 2014; Mao, 2012). The owners of Shanghai Waigaoqiao No 3

have permission from the Chinese Government and the Chinese National Energy Administration to build

unit 9. Construction will start in 2015, operation is expected in 2017 and the payback period is expected

to be less than five years (Feng, 2014b).

Calculations have shown that if Waigaoqiao No 3 unit 9 was built on the Danish coast with access to

cooling water at an average of 10°C then the plant could reach 51% net electrical efficiency (LHV).

Additionally, if advanced ultra-supercritical (AUSC) technology were used with steam parameters of

700°C/720°C/720°C/35 MPa then 52% net electrical efficiency (LHV), or 236 g/kWh could be reached in

Shanghai, or an incredible 54% net electrical efficiency (LHV) if located in Denmark (Feng, 2014b).

The turbine, designed by Siemens, is a cross-compound type with double-reheat operating at the

following USC steam parameters 600°C/620°C/610°C/30 MPa. The primary-reheat pressure is 9.17 MPa

and the secondary-reheat pressure is 2.25 MPa. The rated steam flow rate is 3229 t/h and the maximum

steam flow is 3426 t/h. The average cooling water temperature is 19°C. This turbine generates 1350 MWe

and a schematic and 3D model, showing the first and second trains, are shown in Figures 31 and 32

(Quinkertz, 2014).

Figure 31 PFD of the Siemens 1350 MWe turbine (Quinkertz, 2014)

Page 66: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Double-reheat units proposed and under construction

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 65

Figure 32 3D model of the Siemens 1350 MWe turbine (Quinkertz, 2014)

10.2.3 Laiwu 6 and 7

Laiwu units 6 and 7 are two hard coal-fired double-reheat units under construction and should be

commissioned in mid-2015 (Yamauchi, 2015). They are owned by Huaneng Shandong Power. Harbin

Boiler Company is building the boiler and Shanghai Turbine Works are building the turbine. They are

both 1000 MWe USC units with the following steam conditions 600°C/620°C/620°C/31 MPa (Platts,

2014).

10.2.4 Huaneng Anyuan 3 and 4

Huaneng Anyuan units 3 and 4 are two hard coal-fired double-reheat units under construction and should

be commissioned in mid-2015. They are owned by Huaneng Power International. Dongfang are building

the boiler and turbine. They are both 660 MWe USC units with the following steam conditions

600°C/620°C/620°C/31 MPa (Platts, 2014).

10.2.5 Yuedian Huilai 1 and 2

Yuedian Huilai units 1 and 2 are two hard coal-fired double-reheat units under construction and should

be commissioned in mid-2015. Shanghai Turbine Works are building the turbine. They are both 1000

MWe USC units with the following steam conditions 600°C/620°C/620°C/31 MPa (Fan, 2014; Yang and

others, 2014).

10.2.6 Guohua Beihai 1 and 2

Guohua Beihai units 1 and 2 are two hard coal-fired double-reheat units under construction (as of 2014)

and will be commissioned in 2015. Shanghai Turbine Works are building the turbine. They are both

1000 MWe USC units with the following steam conditions 600°C/620°C/620°C/31 MPa (Fan, 2014; Yang

and others, 2014).

10.2.7 Guodian Bengbu 1 and 2

Guodian Bengbu units 1 and 2 are two hard coal-fired double-reheat units under construction and should

be commissioned in mid-2015. Shanghai Turbine Works are building the turbine. They are both 660 MWe

Page 67: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Double-reheat units proposed and under construction

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 66

USC units with the following steam conditions 600°C/620°C/620°C/31 MPa (Fan, 2014; Yang and others,

2014).

10.2.8 Analysis

In 2012, PCC plant in China accounted for 80% of installed power generation capacity and coal-fired

power plant accounted for approximately half of China’s total carbon dioxide (CO2) emissions. From 2012

to 2020, 400 GWe of new coal-fired power generation will be required, which equates to roughly 50%

additional capacity.

However, China currently has serious problems with air pollution; an example of this is that visibility in

Beijing can be reduced to 2 km. Therefore, the Chinese Government has enforced lower emission

standards for coal-fired power plant, of 5 mg/Nm3 PM, 35 mg/Nm3 SO2 and 50 mg/Nm3 NOx and a limit

for mercury. Additionally, new build coal-fired power plant have been banned on the east coast of China,

except for Waigaoqiao No 3 unit 9. Increasing PCC plant efficiency is therefore an effective way to comply

with the increasingly stringent emission limits and to prolong valuable coal resources. The efficiency of

China’s coal fleet has significantly increased from extensive R&D and deployment of upgrades and

efficiency improvements, the demolition of old small subcritical units and the construction of new large

USC units. The average coal consumption is now 321 g/kWh, down from 380 g/kWh ten years ago, which

is the third lowest in the world after Japan and Germany, both at 290 g/kWh. Additionally, close to a third

of the coal-fired fleet is fitted with CHP. Further improvements in efficiency will be met with larger units,

double-reheat and higher steam parameters.

With relatively high coal prices coupled with low labour costs, double-reheat USC units are seen as an

economically favourable, technically feasible and more environmentally friendly means of coal-fired

power generation. Double-reheat technology was identified as a key R&D project for China’s ‘Twelfth

Five-year Plan (2011-2015)’ (Xu and other, 2015; Li and others, 2014).

Thirteen units are currently under construction in China, amounting to 11 GWe, and twelve units should

be commissioned this year. Table 5 lists the hard coal-fired double-reheat units under construction in

China, with details of year commissioned, primary fuel, size (MWe), steam conditions (°C/°C/°C/MPa)

and electrical efficiency (%), in chronological order of year commissioned. By late 2015, the two new

units at Guodian Taizhou should be the largest and most efficient coal-fired double-reheat in the world, at

1000 MWe each reaching 47.94% electrical efficiency (LHV). Further advances in plant configuration and

steam cycle are planned to be demonstrated in 2017.

Page 68: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Double-reheat units proposed and under construction

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 67

Table 5 List of coal-fired double-reheat units under construction in China

Unit Planned commissioning Year

Primary Fuel Size (MWe) Steam Conditions (°C/°C/°C/MPa)

Electrical efficiency (%)

Laiwu 6 2015 Hard coal 1000 600/620/620/31

Laiwu 7 2015 Hard coal 1000 600/620/620/31

Huaneng Anyuan 3 2015 Hard coal 660 600/620/620/31

Huaneng Anyuan 4 2015 Hard coal 660 600/620/620/31

Yuedian Huilai 1 2015 Hard coal 1000 600/620/620/31

Yuedian Huilai 2 2015 Hard coal 1000 600/620/620/31

Guohua Beihai 1 2015 Hard coal 660 600/620/620/31

Guohua Beihai 2 2015 Hard coal 660 600/620/620/31

Guodian Bengbu 1 2015 Hard coal 660 600/620/620/31

Guodian Bengbu 2 2015 Hard coal 660 600/620/620/31

Guodian Taizhou 1 2015 Hard coal 1000 600/610/610/31 47.94

Guodian Taizhou 2 2015 Hard coal 1000 600/610/610/31 47.94

Waigaoqiao 9 2017 Hard coal 1000 600/620/610/30 48.92

Page 69: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Advanced ultra-supercritical double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 68

11 Advanced ultra-supercritical double-reheat units This Chapter explains the concept of advanced ultra-supercritical (AUSC) technology, reviews the

research and development (R&D) programmes globally with the prospects for combination with double-

reheat cycles.

11.1 AUSC technology

The steel barrier presently lies at 620°C. Current research aims to use nickel alloys to reach 700°C

superheated steam, known as AUSC or 700°C technology, with a corresponding net electrical efficiency

greater than 50% (LHV). Double-reheat cycles combined with AUSC steam conditions could provide

lucrative gains in electrical efficiency. When operating with 700°C superheat steam, double-reheat cycles

would increase the efficiency over single-reheat cycles by +0.7% points (Weitzel, 2012) and +2% points

(HHV) (Viswanathan, 2010).

The pressures in AUSC turbines are higher those in USC turbines; the secondary hot reheat pipe would

have a pressure of around 2.1 MPa. Therefore, controlling the temperature/pressure differential between

the HP, IP1 and IP2 modules is complex and restricts the turbine operating range. The benefit of

increased efficiency must be weighed against higher capital costs and restricted operating range. It is

likely that the first AUSC units will employ single-reheat and once significant operational experience has

been gained then double-reheat could be employed if justified (Weitzel, 2012).

11.2 AUSC research and development programmes

The EU, USA, Japan, India and China all have material R&D programmes for 700°C technology.

Nicol (2013) has reviewed the developments and status of these major material research programmes.

The material research programmes consist of the following three main stages, which can overlap each

other by a few years depending on technical readiness and funding availability:

• Stage 1: Small-scale laboratory tests (8–13 years);

• Stage 2: Large-scale components test facility (CTF):

• Part A: Design and build (4–5 years);

• Part B: Operate and evaluate (3–5 years);

• Stage 3: Full-scale demonstration plant (FSDP) (500–1000 MWe):

• Part A: Design and build (4–6 years);

• Part B: Operate and evaluate (6 years).

Figure 33 shows a Gantt chart of the material research programmes. Assuming successful operation of a

full-scale demonstration plant, commercial 700°C AUSC PCC power plant could be operation in 2031,

given favourable economics. Progress has been slower than expected, which has led to increased demand

for 650°C steels.

Page 70: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Advanced ultra-supercritical double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 69

Figure 33 Gantt chart comparing the AUSC material research programme timelines (Nicol, 2013)

Compared to ferritic and martensitic steels, nickel alloys have a high coefficient of thermal expansion and

low thermal conductivity. This means that nickel alloys are slow to react to temperature change, and

expand and contract at rates which could result in cracking. Therefore, AUSC technology would be best

suited to base-load operation.

11.3 Proposals for AUSC double-reheat systems

The AUSC R&D programmes in Europe, the USA, Japan and China include plans for a full-scale

demonstration plant (FSDP). A smaller unit size of approximately 500–600 MWe has been chosen in all

programmes to minimise financial risk to investors. This section reviews how the AUSC R&D programmes

are incorporating double-reheat technology.

11.3.1 Europe

The European AUSC R&D programme conducted a detailed FEED study to determine the technical and

economic feasibility of a 500 MWe demonstration AUSC PCC unit fired with bituminous coal. The FEED

study, called the North Rhine-Westphalia Power Plant at 700°C (NRWPP700), began in October 2006 and

ended in 2008. The study was completed by a consortium of twenty power plant operators and

component suppliers involved in the European AUSC R&D programme; the study was co-ordinated by the

VGB. Over 70% of the funding came from the consortium and the remainder from regional funds from

Brussels via the government of North Rhine-Westphalia.

On the boiler side, three tower boiler concepts from Alstom, Hitachi Power Europe, Burmeister and Wain

Energy were assessed. Alstom designed a high pressure (36.4 MPa) single-reheat boiler and Hitachi

Power Europe designed an intermediate pressure (26.4 MPa) single-reheat boiler.

The single-pass tower boiler from Burmeister and Wain Energy was a design for the Master Cycle

concept, with the following steam conditions 702–705°C/720°C/720°C/36.4 MPa (at boiler outlet). The

Page 71: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Advanced ultra-supercritical double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 70

primary reheat pressure is 7.5–11.2 MPa and the secondary reheat pressure is 2.5–2.7 MPa. The

advantages of this design are lower use of expensive nickel alloys, through smaller primary and

secondary reheaters with the Master cycle, and a relatively compact boiler with the tower arrangement.

Additionally, tower boilers are easier to operate than two-pass boilers. Preliminary thermodynamic

calculations estimated the boiler efficiency at around 95%, which led to a net unit efficiency of 50.18%

(LHV).

Figure 34 shows the piping layout of the Master Cycle boiler by Burmeister and Wain Energy. The

membrane walls are planned as evaporators (EVAP). The reheater is split into three parts. SH1 and SH2

are arranged in counter flow to the flue gas, SH3 in co-current flow. The reheater (RH) is divided into a

first and a second reheater group. RH1 and RH2 are combined with each other in their arrangement. The

reheat temperatures are kept to 720°C, up to 100% load, with the use of excess air and injection coolers.

Economiser 1 (ECO1) is arranged in counter flow to the flue gas. The second economiser (ECO2) is

planned with an up-flow parallel to the flue gas flow. This arrangement minimises the risk of evaporation

in the second economiser. The economiser was split that way so that in part load operation the

temperature can be controlled for the downstream nitrogen oxide catalyst, or selective catalytic

reduction (SCR). Thus, a relatively high temperature before the SCR must be accepted in full load.

Figure 34 Piping layout of Master Cycle boiler by Burmeister and Wain Energy (VGB, 2012)

Although the Master Cycle concept boiler and the high pressure single-reheat boiler by Hitachi Power

Europe had similar technical and economic viability, the Master Cycle boiler was rejected because the

main turbine, and tuning turbine, could not be built with the standardised modular unit assembly system

Page 72: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Advanced ultra-supercritical double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 71

of the turbine manufacturers. The components would have to be newly developed, which increases the

capital expenditure.

It was decided to opt for the high pressure single-reheat boiler with steam parameters of

705°C/720°C/36.5 MPa reaching 49.8% net electrical efficiency (LHV). In 2012, the capital cost for this

demonstration unit was €1.7 billion, or >3000 €/kW. In comparison, a modern supercritical PCC plant

built in the developed world in 2012 would cost <1200 €/kW (VGB, 2012). It was estimated that a

1100 MWe commercial version of a high pressure single-reheat boiler could reach 50.2% net electrical

efficiency (LHV) on coastal sites. The Master Cycle could improve such efficiency by 1–2% points;

therefore a Master Cycle AUSC unit could reach 52.2% net electrical efficiency (LHV) on coastal sites

(MPS, 2008; IEA, 2007). In 2010, the FSDP was postponed due to technical problems (such as cracking of

thick-section components) (Nicol, 2013).

11.3.2 USA

There have been no specific proposals for double-reheat AUSC PCC plant in the USA. However, Babcock &

Wilcox have modified the design for an existing USC tower boiler, with technology from two-pass boilers,

to create an AUSC tower boiler with improved reheat control and shorter pipework, which could be used

with double-reheat systems. Babcock & Wilcox are working with turbine manufacturer Toshiba on

alternative boiler-turbine configurations to minimise piping length (Nicol, 2013).

11.3.3 Japan

The Japanese programme has generated sufficient information to create a P&ID for a double-reheat AUSC

PCC plant, shown in Figure 35, with a detailed list of candidate materials for critical components. There

are plans in Japan to build a 600 MW FSDP from 2017 to 2021. The Japanese FSDP has the following

steam parameters 700°C/720°C/720°C/35 MPa, reaching 46–50% electrical efficiency (net, LHV).

Operation and feedback would be from 2021 to 2026 (Nicol, 2013).

Page 73: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Advanced ultra-supercritical double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 72

Figure 35 Flow diagram of a Japanese double-reheat AUSC PCC plant (Fukuda, 2012a)

11.3.4 China

In China, double-reheat AUSC technology is under investigation, but not for the FSDP (Nicol, 2013). Such

plant would employ the CCHLPA technology, as described earlier, to minimise the amount of pipework.

AUSC double-reheat units with steam parameters of 700°C/720°C/720°C/35 MPa could reach 52% net

electrical efficiency (LHV), or 236 g/kWh, in Shanghai (Feng, 2014b).

11.3.5 Siemens

Figure 36 shows historic and projected steam cycle efficiencies for single and double-reheat turbines for

USC and AUSC steam conditions (Quinkertz, 2014). Siemens say that their current double-reheat turbines

can reach 48.8% net electrical efficiency (LHV), which should be demonstrated at Waigaoqiao No 3 unit 9

in 2017. Applying AUSC technology to Waigaoqiao No 3 unit 9 would allow such efficiency to reach 52%.

This figure shows the potential for AUSC to reach 54%.

Page 74: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Advanced ultra-supercritical double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 73

Figure 36 Progression of steam cycle efficiency in Siemens turbines (Quinkertz, 2014)

11.4 Process economics

The economic viability of AUSC technology depends on the efficiency of such units, coal price, carbon tax

and the capital cost. The capital cost is high for AUSC technology, as nickel alloys are expensive, due to

high use of elements such as nickel, cobalt and molybdenum, and a unique manufacturing supply chain.

Although the capital cost is greater, the fuel costs are reduced with the increased electrical efficiency. The

superheater temperature of 700°C was chosen in the 1990s, as nickel alloys are technically capable of

operating at this temperature and the resulting electrical efficiency of roughly 50% was thought to make

such technology economically viable.

Mao (2012) presents the costs of USC and AUSC technology. He shows that, on a per tonne basis, Inconel

615 (473,000 US$/tonne) is 43 times more expensive than P91 (11,041 US$/tonne) and eight times more

expensive than P92 (11,041 US$/tonne). Mao (2012) shows that in China, the capital cost for two

1000 MWe 600°C USC units with single-reheat is RMB 8 billion (US$1.27 billion), in which the superheat

and reheat piping cost was 400 million RMB (US$ 63 million); accounting for 15% of total cost. However,

for two 1000 MWe 700°C AUSC units with double-reheat, the cost for boiler tubing alone would be at

least RMB 2.5 billion (US$380 million). In this case, the projected increase in electrical efficiency with

AUSC technology is not considered sufficient to compensate for the high cost of nickel alloys, which

renders AUSC technology economically unfavourable.

Gierschner and others (2012) say that components manufactured from nickel alloys are at least ten times

more expensive than ferritic steel and five times more expensive than martensitic steel. Wheeldon and

Shingledecker (2013) say that nickel alloys are anywhere from five to fifty times more expensive than

steels used in USC technology. Due to the considerable cost of nickel alloys, new 650°C steels are in

development to reduce the amount of nickel alloys used in AUSC plant, see Nicol (2014) for more

information. As shown above, the costs estimates for AUSC technology vary widely and can only be

confirmed with a commercial-scale demonstration unit.

Page 75: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Advanced ultra-supercritical double-reheat units

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 74

11.5 All units

Figure 37 shows a scatter graph of the efficiency and unit size of all double-reheat units, operating,

decommissioned, under construction and planned. For coal-fired double-reheat units, the electrical

efficiency increased from 27% to 47.94% (net, LHV) in early 2015 and the unit size has increased from

100 to 1000 MWe.

Figure 37 Efficiency and unit size of all double-reheat units, operating, decommissioned, under construction and planned (Platts, 2014; IEA CCC, 2012)

Page 76: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Conclusions

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 75

12 Conclusions Double-reheat units emerged with the introduction of supercritical units in the 1950s. Most double-

reheat units were built around the 1960s and 1970s in Germany, the USA and Japan. Double-reheat

technology peaked with Nordjylland unit 3, reaching ultra-supercritical (USC) steam conditions of

582°C/580°C/580°C/29 MPa, setting a world record in electrical efficiency at 47.2% (net, LHV) in 1998.

No other double-reheat units were built in the 16 years to 2015. As of July 2015, a total of 60 double-

reheat units were built globally; amounting to 27.9 GWe. Of these units, 37 are coal-fired, amounting to

17.7 GWe, making up less than 0.5% of the total global fleet of pulverised coal combustion (PCC) power

units. Over 94% of the boilers and turbines were manufactured in the country they were installed in. The

boiler and turbine companies in the USA exported components overseas.

Initially, double-reheat units suffered from operational problems, high maintenance costs and low

availability associated with the use of new austenitic steels (at the time) at ultra-supercritical steam

conditions with superheat steam up to 649°C and 34.5 MPa. Such operational problems were unrelated to

the number of reheats and were resolved by de-rating the superheat steam to 565°C and 25 MPa, or

lower. Since then, the technical performance of double-reheat units has been comparable to single-reheat

units. Compared to single-reheat units, double-reheat units increase electrical efficiency increase by 0.8 to

2% points (net, LHV), and the operational and maintenance (O&M) costs are similar. Therefore,

double-reheat technology can be considered as proven with low technical and economic risks.

Double-reheat units fell out of favour in the 1970s largely due to the introduction of nuclear power,

combined cycle gas turbines, and persistently low oil prices. The majority of existing double-reheat units

will be decommissioned over the next few years, largely due to end of life and the introduction of more

stringent emission regulations. Double-reheat units have had a lifetimes of up to 53 years long.

Rapid growth in the Chinese economy and its increased demand for electricity has led to the planned

commissioning of 10 GWe of USC double-reheat units in 2015 alone. Double-reheat technology was

identified as a key R&D project for China’s ‘Twelfth Five-year Plan (2011-2015)’. As of May 2015, Guodian

Taizhou power plant has two double-reheat units with USC steam conditions of

600°C/620°C/620°C/29 MPa, which are the largest double-reheat units in the world at 1000 MWe each

and set a new world record in electrical efficiency at 47.94% (net, LHV). This means that from 1959 to

2015, for coal-fired double-reheat units, the electrical efficiency increased from 27% to 47.94% (net,

LHV) and the unit size has increased from 100 MWe to 1000 MWe.

The plant engineers at DONG Energy, who designed the double-reheat units in Denmark, devised and

patented the Master Cycle in 2010. The Master Cycle modifies the steam cycle by adding a small turbine

module, separate to the main turbine, which replaces a boiler feed pump (BFP) and reduces the size and

amount of high temperature components. Compared to a conventional double-reheat cycle, calculations

for the Master Cycle show an increase in electrical efficiency of 0.5% and a reduction in overnight specific

investment costs (€/kW) over a conventional double-reheat cycle of 12–19%, which brings the costs

Page 77: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

Conclusions

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 76

equivalent to those of a single-reheat cycle. Since 2010, the Echelon Cycle proposed by Shanghai Turbine

Works and the Regenerative Turbine proposed by the North China Electric Power University, use similar

concepts to the Master Cycle. The Regenerative Turbine could result in net electrical efficiencies of

48.94–49.94% with a payback period for the unit at just under four years. Shanghai Turbine Works plan

to demonstrate their Echelon cycle in 2017.

Improved plant configuration to reduce the length of pipework can increase unit efficiency and reduce

capital costs. For example, cross compound at high/low position arrangement (CCHLPA), mounts the

higher pressure steam turbine modules at the same level as the boiler steam header outlets, which

reduces steam pipework lengths. Waigaoqiao No 3 unit 9 plans to be the first unit to use CCHLPA, along

with other process improvements. It is expected to be commissioned in 2017 and should reach 48.92%

net electrical efficiency (LHV) in Shanghai. With access to cooling water at an average of 10°C, this figure

is estimated to be 51%.

Advanced ultra-supercritical (AUSC) technology, which uses nickel alloy components to achieve higher

steam temperatures, is projected to become commercial in the early 2030s. A 600 MWe demonstration

unit, using double-reheat at steam conditions 700°C/720°C/720°C/35 MPa achieving up to 50% net

electrical efficiency (LHV), should be operational in Japan in 2021. From 2031, commercial AUSC

double-reheat units are expected to reach 54% net electrical efficiency (LHV).

Double-reheat technology is a proven technology for high efficiency and low emissions (HELE) power

generation. When designing a new a pulverised coal fired power plant, the decision to opt for double or

single-reheat is based on an economic trade-off between capital cost and fuel cost. The forecasted fuel

costs will determine the payback period. Normally, fuel costs increase in the long-term. The capital,

operational and maintenance costs are largely related to the labour costs, and the costs of concrete and

steel. Generally, such costs in developed countries are double those in developing countries. When

double-reheat units were built in Europe, the USA and Japan in the 1960s and 1970s, such costs would

have been lower, thus favouring the process economics of double-reheat plant. Additionally, rising

concern of climate change is leading to costs associated with emitting carbon dioxide, such as a carbon

trading price or carbon tax. These costs should be accounted for, as they favour double over single-reheat.

Due to a combination of low labour costs, high fuel prices and increased demand for electricity, double-

reheat units may be favoured in developing countries such as China and those in South-east Asia.

Presently in China, low labour costs and high fuel costs result in a payback period for the incremental

capital costs of a double-reheat cycle, over a single-reheat cycle, of just 6.25 years. In the developed

countries, new build coal-fired power plant are scarce due to high capital costs, low electricity demand,

stringent emission regulations, public opposition against coal power, the need for carbon capture and

storage (CCS) and rising electricity generation from renewable sources.

Page 78: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

References

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 77

13 References ASME (2003a) Philo 6 Steam - Electric Generating Unit, American Society of Mechanical Engineers; 17 pp (Aug 2003). Available from https://www.asme.org/getmedia/d0aaf3f6-e9b5-4408-8a21-02ac803eb6fc/228-Philo-6-Steam-Electric-Generating-Unit.aspx (accessed Jan 2015)

ASME (2003b) Eddystone station, 325 MW generating unit 1, American Society of Mechanical Engineers; 24 pp (2003). Available from https://www.asme.org/getmedia/97605bd2-720a-47c9-a031-80047ae8deec/226-Eddystone-Station-Unit.aspx (accessed Jan 2015)

Bertilsson J E, Scarlin B (1990) Design requirements and materials for advanced steam turbines. Presented at: High Temperature Materials for Power Engineering, Liège, Belgium, 24-27 Sep 1990.

Breeze P (2012) Pushing the steam cycle boundaries, Power Engineering International; 20 (4); 16-20 (Apr 2012)

Chew P E (2003) PF-fired supercritical power plant. Proceedings of the Institution of Mechanical Engineers; Journal of Power and Energy; 217(A); special issue paper; pp35-43 (2003)

China Guodian Corporation (2015) Information from website. Available from: http://www.cgdc.com.cn/sbdgdxl/52170.jhtml (accessed Mar 2015)

Dong Energy (2015) Skærbæk power station - where we operate. Available from: http://www.dongenergy.com/en/business-activities/thermal-power/where-we-operate (accessed Feb 2015)

Drinhaus F (2015) Vejle, Denmark, Added Values, private communication (Jan-June 2015)

Fan S (2014) Shanghai, China, Shanghai Turbine Works, private communication (Aug 2015)

Feng W (2014a) The research on design and technology of new high efficient supercritical unit. Presentation given at: 2nd IEA Clean Coal Centre workshop on advanced ultrasupercritical coal-fired power plants, Rome, Italy, 14-15 Oct 2014. Available from: http://ausc.coalconferences.org/ibis/ausc.coalconferences/home 24 pp (Oct 2014)

Feng W (2014b) Shanghai, China, Shanghai Waigaoqiao No 3, private communication (Sep 2014)

Fukuda M (2012a) Advanced USC technology development in Japan. Paper presented at: 1st IEA Clean Coal Centre workshop on advanced ultrasupercritical coal-fired power plants, Vienna, Austria, 19-20 Sep 2012. Available from: http://ausc.coalconferences.org/ibis/ausc.coalconferences/home 15 pp (2012)

Gierschner G, Ullrich C, Tschaffon H (2012) Latest developments for the flexible high efficient power plant of the future. Paper presented at: Advanced ultrasupercritical coal-fired power plants, Vienna, Austria, 19-20 Sep 2012. Available from: http://ausc.coalconferences.org/ibis/ausc.coalconferences/home 21 pp (2012)

Henderson C (2004) Understanding coal-fired power plant cycles. CCC/91, London, UK, IEA Clean Coal Centre, 47 pp (Oct 2004)

Henderson C (2015) IEA Clean Coal Centre; London, UK, private communication (March 2015)

IEA (2007) Fossil fuel-fired power generation – case studies of recently constructed coal- and gas-fired power plants. Paris, France, OECD/IEA, 178pp (2007)

IEA CCC (2012) Coal power database. London, UK, IEA Clean Coal Centre (2012)

IEA, NEA, OECD (2010) Projected costs of generating electricity. Paris, France, OECD/IEA, 218pp (2010)

Ishiki Y, Toyoda T, Kurihara I (1990) Design and operating performance of 700 MW LNG-fired ultra supercritical pressure steam generators for Kawagoe units 1 and 2. In: Steam plant for the 1990s, London, UK, 4-6 Apr 1990. London, UK, Mechanical Engineering Publications Ltd, pp 39-52 (May 1990)

Page 79: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

References

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 78

Iwanaga K, Ishiki Y, Mimuro H, Ohji A (1990) General planning and construction of the 700 MW unit with advanced steam conditions. In: Steam plant for the I990s, London, UK, 4-6 Apr 1990. London, UK, Mechanical Engineering Publications Ltd, pp 25-30 (May 1990)

Jeffs (2000) Cottam: a pointer to Siemens’ gas turbine future. Turbo-machinery International; 41(3); 20-22 (Jun 2000)

Jensen V (2000) Experience gained from commissioning a new 411 MW coal-fired plant with advanced steam condition. VGB PowerTech; 05; 54-59 (May 2000)

Kjaer S (1990) Pulverized coal fired power stations with advanced water-steam cycle. VGB Kraftwerkstechnik; 70 (3); 201-208 (Mar 1990)

Kjaer S (1993) The future 400 MW ELSAM units in Aalborg and Skærbæk, Denmark. VGB Kraftwerkstechnik - English Issue; 73(11); 803-810 (Nov 1993)

Kjaer S (2003) Review of supercritical power plant technology. Presented at Canadian CCT Roadmap meeting, Calgary, Canada; pp20-21 (March, 2003)

Kjaer S, Drinhaus F (2010a) A modified double reheat cycle. Paper presented at: American Society of Mechanical Engineers (ASME) 2010 Power Conference, Chicago, Illinois, USA, 13-15 Jul 2010; 10 pp (Jul 2012)

Kjaer S, Drinhaus F (2010b) A modified double reheat cycle. Energy-Tech Magazine; 5 pp (Dec 2010). Available from http://www.energy-tech.com/article.cfm?id=28884 (accessed Nov 2014)

Li Y, Zhou L, Xu G, Fang Y, Zhao S and Yang Y (2014) Thermodynamic analysis and optimisation of a double reheat system in an ultra-supercritical power plant. In: Energy - The International Journal. Vol 74, pp 202-214 (Jun 2014)

Mao J, Feng W (2012) Ways to further improve efficiency for ultra-supercritical coal-fired power plants in China. Paper presented at: 1st IEA Clean Coal Centre workshop on advanced ultra-supercritical coal-fired power plants, Vienna, Austria, 19-20 Sep 2012. Available from: http://ausc.coalconferences.org/ibis/ausc.coalconferences/home 9 pp (2012)

Meier H-J (2015) Germany VGB, private communication (Jan 2015)

MPS (1998) Advanced technology for Nordjyllandsværket Unit 3. Modern Power Systems (May 1998) Available at: http://www.modernpowersystems.com/features/featureadvanced-technology-for-nordjyllandsv-rket-unit-3/ (accessed Dec 2014)

MPS (1999) Ultra-supercritical CHP: getting more competitive. Modern Power Systems (Jan 1999) Available at: http://www.modernpowersystems.com/features/featureultra-supercritical-chp-getting-more-competitive/ (accessed Dec 2014)

MPS (2002) Tangjin 5 and 6: Korea's first ultrasupercritical units. Modern Power Systems (Oct 2002) Available at: http://www.modernpowersystems.com/features/featuretangjin-5-and-6-korea-s-first-ultrasupercritical-units/ (accessed Dec 2014)

MPS (2008) AD700 innovations pave the way for 53 per cent efficiency. Modern Power Systems; 28 (11); 15-20 (Nov 2008)

MPS (2010) Supercritical-pressure power plants: a progress report. Modern Power Systems (Jul 2010) Available at: http://www.modernpowersystems.com/news/newsad-700-on-the-carnot-track/ (accessed Dec 2014)

Morrison G (2011) The energy balance as the 21st century unfolds and the role of coal. Presentation at: European Power Generation Strategy Summit, Prague, Czech Republic, 29 Nov 2011; 50 pp (2011)

National Coal Council (2007) Technologies to reduce or capture and store carbon dioxide. Washington, DC, USA, 178 pp (Jun 2007)

Page 80: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

References

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 79

Nicol K (2013) Status of advanced ultra-supercritical pulverised coal technology. CCC/229, London, UK, IEA Clean Coal Centre, 57 pp (Dec 2013)

Nicol K (2014) High temperature steels in pulverised coal technology. CCC/234, London, UK, IEA Clean Coal Centre, 72 pp (June 2014)

Ploumen P, Stienstra G, Kamphuis H (2011) Reduction of CO2 emissions of coal fired power plants by optimizing steam water cycle. In: Energy Procedia. Vol 4, pp2074–2081 (2011). Available from: http://www.sciencedirect.com/science/article/pii/S1876610211002876 (accessed Feb 2015)

Poulsen H F, Bendixen K E (2006) Advantages of ultrasupercritical technology in power generation. Milan, Italy, STF, 8 pp (Jun 2006)

Platts (2014) World Electric Power Plants Database (December update). New York, USA, Platts, The McGraw-Hill Companies Inc, CD-ROM (Dec 2014)

Scheffknecht G, Palkes M, Weissinger G, Seeber J, Banas J M, Kessel W (2003) Clean coal combustion for India: circulating fluid bed and advanced supercritical technologies. In: Power-Gen India and Central Asia exhibition and conference, 14-16 Jan 2003. PennWell Corporation, Upshire, Essex, UK, pp 1-39 (2003)

Shanghai Electric (2012) Shanghai Electric signed the first domestic equipment contract of manufacturing 1000 MW ultra-supercritical coal-fired power generation double reheat units. Press release. Shanghai, China, Shanghai Electric, 1 pp. Available from: http://www.shanghai-electric.com/Lists/NewsEn/AllItems.aspx (24 September 2012)

Sourcewatch (2015) Existing U.S. Coal Plants. Available from: http://www.sourcewatch.org/index.php/Existing_U.S._Coal_Plants (accessed Jan 2015)

Sun R, Cui Z, Tao Y (2012) Development of 700C USC coal-fired power generation technology in China. Paper presented at: Advanced ultrasupercritical coal-fired power plants, Vienna, Austria, 19-20 Sep 2012. Available from: http://ausc.coalconferences.org/ibis/ausc.coalconferences/home 10 pp (2012)

Quinkertz R (2014) Siemens evolution of large USC turbines. Presentation given at: 2nd IEA Clean Coal Centre workshop on advanced ultrasupercritical coal-fired power plants, Rome, Italy, 14-15 Oct 2014. Available from: http://ausc.coalconferences.org/ibis/ausc.coalconferences/home 20 pp (Oct 2014)

Vattenfall (2014) Nordjyllandsvaerket, Vattenfall website. Available from http://powerplants.vattenfall.com/powerplant/nordjyllandsvaerket (Dec 2014)

VGB (2012) Pre-engineering study "NRW Power Plant 700C" NRWPP700. Berlin, Germany, VGB PowerTech; 112 pp (Jan 2012)

VGB (2013) Power plant technologies. Available from www.vgb.org/en/research_fossil (Apr, 2013)

Weitzel PS (2012a) Design Features of Advanced Ultrasupercritical Plants, Part I. POWER (Apr 2012). Available from: http://www.powermag.com/design-features-of-advanced-ultrasupercritical-plants-part-i/ (accessed Dec 2014)

Weitzel PS (2012b) Design Features of Advanced Ultrasupercritical Plants, Part II. POWER (May 2012). Available from http://www.powermag.com/design-features-of-advanced-ultrasupercritical-plants-part-ii/ (accessed Dec 2014)

Viswanathan R, Shingledecker J, Pugert R (2010) Evaluating Materials Technology for Advanced Ultrasupercritical Coal-Fired Plants. POWER (Jan 2010). Available from: http://www.powermag.com/evaluating-materials-technology-for-advanced-ultrasupercritical-coal-fired-plants/?printmode=1 (accessed Dec 2014)

Page 81: Kyle Nicol - United States Energy Association and... · prospects of double-reheat coal-fired power units . Kyle Nicol . ... a USC Master Cycle boiler 54 Figure 24 PFD of a double-reheat

References

IEA Clean Coal Centre – Application and development prospects of double-reheat coal-fired power units 80

Wheeldon J M, Shingledecker J P (2013) Materials for boilers operating under supercritical steam conditions. In Ultra-supercritical coal power plants: Materials, technologies and optimisation. Woodhead Publishing Limited, pp 10-25 (2013)

Wright I G, Maziasz P J, Ellis F V, Gibbons T B, Woodford D A (2005) Materials issues for turbines for operation in ultra-supercritical steam .In: Proceedings of the 19th annual conference on fossil energy materials, Knoxville, TN, USA. Oak Ridge National Laboratory, 13 pp (May 2005)

Xu G, Xu C, Yang Y, Fang Y, Zhou L, Yang Z (2014) Thermodynamic and economic analysis of a partially-underground tower-type boiler de sign for advanced double reheat power plants. In: Applied Thermal Engineering. Vol 78, pp 565–575 (Dec 2014).

Xu G, Zhou L, Zhao S, Liang F, Xu C, Yang Y (2015) Optimum superheat utilization of extraction steam in double reheat ultra-supercritical power plants. In: Energy Procedia. Vol 61, pp 1356–1359 (Jan 2015). Available from http://www.sciencedirect.com/science/article/pii/S0306261915000331 (accessed Feb 2015)

Yang , Yang J, Peng Z, Fan S (2014) Research progress Of 700C HUSC power plant. Paper presented at: 2nd IEA Clean Coal Centre workshop on advanced ultrasupercritical coal-fired power plants, Rome, Italy, 14-15 Oct 2014. Available from: http://ausc.coalconferences.org/ibis/ausc.coalconferences/home 10 pp (Nov 2014)

Yamauchi Y (2015) Japan, NEDO private communication (Feb 2015)

Yeh S, Rubin E S (2007) A centurial history of technological change and learning curves for pulverised coal-fired utility boilers. In: Energy - The International Journal. Vol 32, pp 1996-2005 (Nov 2007)