Page 1: KWU TUNG HONG KONG€¦ · KWU TUNG HONG KONG. 44 Henderson Land Development Company Limited Annual Report 2019 Status of property developments with anticipated completion during

E D E N M A N O R

K W U T U N G H O N G K O N G

Page 2: KWU TUNG HONG KONG€¦ · KWU TUNG HONG KONG. 44 Henderson Land Development Company Limited Annual Report 2019 Status of property developments with anticipated completion during

44 Henderson Land Development Company LimitedAnnual Report 2019

Status of property developments with anticipated completion during the period to the end of 2022

Review of Operations – Business in Hong Kong

Progress of Major Development Projects

206-212 Johnston Road, Wanchai, Hong Kong (artist’s impression)

206-212 Johnston Road, Wanchai (100% owned)

Site area 4,328 square feetGross floor area 64,923 square feetExpected completion Fourth quarter of 2020

This office redevelopment project boasts a strategic location right at the heart of Wanchai with an MTR station and the Hong Kong Convention and Exhibition Centre in the vicinity. Façade installation works are in progress.

Reach Summit – Sereno Verde Phase 5, Yuen Long, Hong Kong (artist’s impression)

Reach Summit – Sereno Verde Phase 599A Tai Tong Road, Yuen Long (79.03% owned)

Site area 48,933 square feetGross floor area 171,266 square feetResidential units 504Expected completion Second quarter of 2020

This project has two residential towers of 25 storeys containing 504 units of small-to-medium size, supported by comprehensive clubhouse facilities. Superstructure works for the project are progressing well.

Page 3: KWU TUNG HONG KONG€¦ · KWU TUNG HONG KONG. 44 Henderson Land Development Company Limited Annual Report 2019 Status of property developments with anticipated completion during

45Henderson Land Development Company LimitedAnnual Report 2019

Review of Operations – Business in Hong Kong • Progress of Major Development Projects

The Addition, Cheung Sha Wan, Hong Kong (artist’s impression)

The Addition342-356 Un Chau Street, Cheung Sha Wan (100% owned)

Site area 9,157 square feetGross floor area 79,903 square feetResidential units 200Expected completion First quarter of 2021

Located close to Cheung Sha Wan MTR station, “The Addition” enjoys easy access to every part of the city. With many prestigious schools and amenities just steps way, this 28-storey development is complemented by a residents’ clubhouse and some ground-level retail shops, providing a convenient living environment. Construction of the superstructure work has been progressing well. It was launched for presales in April 2019 with a satisfactory market response.

Page 4: KWU TUNG HONG KONG€¦ · KWU TUNG HONG KONG. 44 Henderson Land Development Company Limited Annual Report 2019 Status of property developments with anticipated completion during

46 Henderson Land Development Company LimitedAnnual Report 2019

Review of Operations – Business in Hong Kong • Progress of Major Development Projects

The Vantage, Hung Hom, Hong Kong (artist’s impression)

The Vantage63 Ma Tau Wai Road, Hung Hom (100% owned)

Site area 23,031 square feetGross floor area 207,257 square feetResidential units 551Expected completion First quarter of 2021

Located close to Ho Man Tin MTR station, “The Vantage” is a 29-storey residential-cum-commercial development. With an array of highly sought-after schools and amenities (such as Hoi Sham Park and Ko Shan Theatre) nearby, this development in the thriving district of Hung Hom is poised to meet the discerning tastes of urban dwellers. The exclusive rooftop residents’ clubhouse, “Club Cruiser”, is an example of the Group’s meticulous design planning for residents, serving the needs of both introverts and extroverts. Superstructure works are in progress and upon completion, it will allow upper floor residences to enjoy panoramic views of Victoria Harbour and the verdant greenery of Ho Man Tin. It was launched for presales in March 2019 with a positive response.

Page 5: KWU TUNG HONG KONG€¦ · KWU TUNG HONG KONG. 44 Henderson Land Development Company Limited Annual Report 2019 Status of property developments with anticipated completion during

47Henderson Land Development Company LimitedAnnual Report 2019

Review of Operations – Business in Hong Kong • Progress of Major Development Projects

TIMBER HOUSE74 Waterloo Road, Ho Man Tin (49% owned)

Site area 11,256 square feetGross floor area 94,973 square feetResidential units 240Expected completion First quarter of 2021

“TIMBER HOUSE” which is a 27-storey residential-cum-commercial development in Ho Man Tin, was well received when it was launched for presales in May 2019.

2 Tak Shing Street, Tsim Sha Tsui, Hong Kong (artist’s impression)

2 Tak Shing Street, Tsim Sha Tsui(100% owned)

Site area 10,614 square feetGross floor area 89,553 square feetResidential units 172Expected completion First quarter of 2021

Located close to Jordan MTR station and the Express Rail Link West Kowloon Station, the site is being developed into a premium residential-cum-commercial tower. The vibrant Tsim Sha Tsui shopping hub and scenic Kowloon Park are both within walking distance, offering unrivalled living convenience to its residents.

Page 6: KWU TUNG HONG KONG€¦ · KWU TUNG HONG KONG. 44 Henderson Land Development Company Limited Annual Report 2019 Status of property developments with anticipated completion during

48 Henderson Land Development Company LimitedAnnual Report 2019

Review of Operations – Business in Hong Kong • Progress of Major Development Projects

The Richmond62C Robinson Road, Mid-Levels West (100% owned)

Site area 3,851 square feetGross floor area 33,678 square feetResidential units 90Expected completion Third quarter of 2021

Located in the highly sought-after Mid-Levels West area, “The Richmond” is a 28-storey residential-cum-commercial property. Work has proceeded to the superstructure stage.

The Richmond, Mid-Levels West, Hong Kong (artist’s impression)

1-19 Chung Ching Street, Sai Ying Pun, Hong Kong (artist’s impression)

1-19 Chung Ching Street, Sai Ying Pun (100% owned)

Site area 7,858 square feetGross floor area 90,102 square feetResidential units 264Expected completion Third quarter of 2021

This project is located at “ARTLANE”, a unique mural precinct, with Sai Ying Pun MTR station in its vicinity. Upon completion, its stylish architecture and advanced clubhouse facilities will set a new benchmark for premium residential-cum-commercial development in this revitalised community. Superstructure works are in progress.

Page 7: KWU TUNG HONG KONG€¦ · KWU TUNG HONG KONG. 44 Henderson Land Development Company Limited Annual Report 2019 Status of property developments with anticipated completion during

49Henderson Land Development Company LimitedAnnual Report 2019

Review of Operations – Business in Hong Kong • Progress of Major Development Projects

38 Fuk Chak Street, Mong Kok(100% owned)

Site area 20,114 square feetGross floor area 180,926 square feetResidential units 488Expected completion Third quarter of 2021

Located next to the Group’s “Eltanin • Square Mile” and “Cetus • Square Mile” with the Olympic MTR station in its proximity, this commercial-cum-residential development is surrounded by a vibrant neighbourhood with various amenities and shopping arcades. Construction has proceeded to the superstructure stage.

38 Fuk Chak Street, Mong Kok, Hong Kong (artist’s impression)

4A-4P Seymour Road, Mid-Levels(65% owned)

Site area 52,466 square feetGross floor area 472,185 square feetResidential units 172Expected completion Second quarter of 2022

Situated at a prestigious Mid-Levels location, the site will be developed into a premier residential development, featuring spacious units and a unique modern façade design. The superstructure works will commence soon.

4A-4P Seymour Road, Mid-Levels, Hong Kong (artist’s impression)

Page 8: KWU TUNG HONG KONG€¦ · KWU TUNG HONG KONG. 44 Henderson Land Development Company Limited Annual Report 2019 Status of property developments with anticipated completion during

50 Henderson Land Development Company LimitedAnnual Report 2019

Review of Operations – Business in Hong Kong • Progress of Major Development Projects

Tuen Mun Town Lot No. 547 Castle Peak Road, Castle Peak Bay, Area 48, Tuen Mun (16.41% owned)

Site area 165,765 square feetGross floor area 663,062 square feetResidential units 1,782Expected completion Second quarter of 2022

The construction of Hong Kong Ferry’s 50%/50% equity joint venture project with Empire Group located at Castle Peak Road – Castle Peak Bay, Area 48, Tuen Mun, New Territories (Tuen Mun Town Lot No. 547), has made good progress. The foundation works have been completed and the superstructure works have commenced. The project is expected to be completed by phases in 2022. The project under construction consists of six residential towers providing about 1,782 units with sea or landscape views. The gross floor area of the project is about 663,062 square feet.

Tuen Mun Town Lot No. 547, Tuen Mun, Hong Kong (artist’s impression)

Fanling Sheung Shui Town Lot No. 262, Fanling North

(100% owned)

Site area 174,236 square feetGross floor area 612,477 square feetResidential units 1,723Expected completion Second quarter of 2022 (Phases 1 and 2) Third quarter of 2022 (Phase 3)

Surrounded by lush greenery in a tranquil environment, the site will be developed in three phases into a residential development. Foundation works for the project are progressing well.

Fanling Sheung Shui Town Lot No. 262, Fanling North, Hong Kong (artist’s impression)

Page 9: KWU TUNG HONG KONG€¦ · KWU TUNG HONG KONG. 44 Henderson Land Development Company Limited Annual Report 2019 Status of property developments with anticipated completion during

51Henderson Land Development Company LimitedAnnual Report 2019

Review of Operations – Business in Hong Kong • Progress of Major Development Projects

73-73E Caine Road, Mid-Levels(100% owned)

Site area 6,781 square feetGross floor area 64,063 square feetResidential units 160Expected completion Fourth quarter of 2022

Located in the upmarket residential neighbourhood of Mid-Levels with easy reach to the SOHO dining hub, this residential-cum-commercial property offers residents both tranquility and convenient access to modern amenities. Demolition works of the existing building are in progress.

73-73E Caine Road, Mid-Levels, Hong Kong (artist’s impression)

Page 10: KWU TUNG HONG KONG€¦ · KWU TUNG HONG KONG. 44 Henderson Land Development Company Limited Annual Report 2019 Status of property developments with anticipated completion during

14 27

1041

40

8

2332 37

363435 20

3331

30

4

3839

43 542 45

44

15

17

2952

531913

5554

7 2821

483

46

47

16 18 6

51

4950

2

1

9

1211

22

2425 26

56

Tuen Mun

Sheung Shui

Tai Po

Shatin

Ma On ShanSai Kung

TsingYi

Quarry Bay

Tsuen Wan

FanlingLok Ma Chau

Yuen Long

Tseung Kwan O

Tung Chung

Lantau Island

Airport

New Territories

Kowloon

Hong Kong IslandMTRTung Chung Cable CarLight RailRoute 3Cross Harbour Tunnel

Existing Line

Guangzhou – Shenzhen – Hong Kong Express Rail Link

Shatin to Central LinkNetwork Extensions In Progress

Unsold units from the major development projects o�ered for sale 1 Eden Manor 2 Double Cove – Phases 1-5 3 Cetus • Square Mile 4 Wellesley 5 NOVUM EAST 6 The Addition 7 The Vantage 8 NOVUM WEST 9 Green Lodge 10 South Walk • Aura 11 Reach Summit – Sereno Verde Phase 5 12 The Reach 13 Seven Victory Avenue 14 H • Bonaire 15 PARKER33 16 Global Gateway Tower 17 E-Trade Plaza 18 The Globe 19 Mega Cube

Newly-acquired Urban Redevelopment Projects – with 80% to 100% ownership secured 31 4A-4P Seymour Road, Mid-Levels 32 73-73E Caine Road, Mid-Levels 33 1-4 Ladder Street Terrace, Mid-Levels 34 94-100 Robinson Road, Mid-Levels 35 88 Robinson Road, Mid-Levels 36 105 Robinson Road, Mid-Levels 37 33-47A Elgin Street, Mid-Levels 38 206-212 Johnston Road, Wanchai 39 13-21 Wood Road and

22-30 Wing Cheung Street, Wanchai 40 83-95 Shek Pai Wan Road and

2 Tin Wan Street, Aberdeen 41 4-6 Tin Wan Street, Aberdeen 42 9-13 Sun Chun Street, Tai Hang 43 17-25 Sun Chun Street, Tai Hang 44 2 Tai Cheong Street, Quarry Bay 45 983-987A King’s Road and 16-22

and 24-94 Pan Hoi Street, Quarry Bay 46 2 Tak Shing Street, Tsim Sha Tsui 47 16 Kimberley Road, Tsim Sha Tsui 48 Various projects spanning, Ka Shin Street,

Kok Cheung Street, Pok Man Street,Man On Street and Tai Kok Tsui Road, Tai Kok Tsui

49 456-466 Sai Yeung Choi Street North and 50-56A Wong Chuk Street, Sham Shui Po

50 1-27 Berwick Street, 202-220 Nam Cheong Street and1-14 Yiu Tung Street, Shek Kip Mei

51 11-19 Wing Lung Street, Cheung Sha Wan 52 Various projects spanning Gillies Avenue

South, Baker Street, Whampoa Street and Bulkeley Street, Hung Hom

53 68A-76B To Kwa Wan Road,58-76 Lok Shan Road, 14-20 Ha Heung Road, 1-7 Lai Wa Street and 1-9 and 2-8 Mei Wa Street, To Kwa Wan

54 67-83 Fuk Lo Tsun Road, Kowloon City 55 4-22 Nam Kok Road, Kowloon City 56 3 Mei Sun Lane, Tai Po

Projects pending sale in 2020 20 The Richmond 21 38 Fuk Chak Street, Mong Kok 22 Lot No. 1752 in DD No. 122 Tong Yan San

Tsuen, Yuen Long 23 1-19 Chung Ching Street, Sai Ying Pun 24 Phase 1, Tuen Mun Town Lot No. 547

(Castle Peak Road, Castle Peak Bay, Area 48, Tuen Mun)

25 Phase 2, Tuen Mun Town Lot No. 547 (Castle Peak Road, Castle Peak Bay, Area 48, Tuen Mun)

26 Phase 3, Tuen Mun Town Lot No. 547 (Castle Peak Road, Castle Peak Bay, Area 48, Tuen Mun)

27 65-71 Main Street, Ap Lei Chau 28 Phase 1, New Kowloon Inland Lot

No. 6565, Kai Tak

Existing Urban Redevelopment Projects 29 Yau Tong Bay 30 29A Lugard Road, The Peak

52 53Henderson Land Development Company LimitedAnnual Report 2019

Henderson Land Development Company LimitedAnnual Report 2019

Review of Operations – Business in Hong Kong

Location of Various Categories of Development Projects