KTH == IEC 61850 for Substation Automation 2013-04-12

download KTH == IEC 61850 for Substation Automation 2013-04-12

of 105

Transcript of KTH == IEC 61850 for Substation Automation 2013-04-12

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    1/105

    1

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    2/105

    2

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    3/105

    3

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    4/105

    4

    Megger - Substation overview

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    5/105

    5

    170 product groups, 2600 products

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    6/105

    6

    MEGGER Insulation testers, fibre optic testingMULTI-AMP Circuit breaker test testsBIDDLE High voltage test sets

    AVO Multimeters,Training, softwareDUCTER Ohm metersFOSTER Oil test setsSTATES Terminal blocks

    METROSONICS Critical systems monitoringPROGRAMMA Relay/ Circuit Breaker/ Battery TestingPAX DIAGNOSTIC Transformer, Insulation Products

    Megger Brand Names

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    7/105

    7

    IEC 61850 STANDARD IN SUBSTATION AUTOMATION

    Main purpose of the standard is to achieve interoperability amongdifferent devices from different vendors within the same substation.

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    8/105

    8

    IEC 61850 STANDARD IN SUBSTATION AUTOMATION

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    9/105

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    10/105

    10

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    11/105

    11

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    12/105

    12

    THE POWER SUBSTATIONIn a substation there are Primary Equipments:

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    13/105

    13

    THE POWER SUBSTATION

    The Primary equipments in the Substation need

    to be controlled . The word CONTROL in a substation has nothing to do with ProcessControl , where the word CONTROL is usually associated to feedbacksystems :

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    14/105

    14

    THE POWER SUBSTATION

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    15/105

    15

    THE POWER SUBSTATIONBusbar change. Load is on Busbar 2

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    16/105

    16

    THE POWER SUBSTATIONBusbar change. Connecting Busbar 1 to Busbar 2

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    17/105

    17

    THE POWER SUBSTATIONBusbar change: Connecting the Feeders to Busbar 1

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    18/105

    18

    THE POWER SUBSTATIONBusbar change: Disconnecting feeders from Busbar 2

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    19/105

    19

    THE POWER SUBSTATIONBusbar change: Disconecting Busbar 2 from the system

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    20/105

    20

    THE POWER SUBSTATIONBusbar change. Busbar 1 in service

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    21/105

    21

    THE POWER SUBSTATION

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    22/105

    22

    THE POWER SUBSTATIONOne very simple interlocking:Earthing Switch and Disconnector

    I can OPEN / CLOSE the Disconnector ONLY if the EarthingSwitch is OPEN.If the Earthing Switch is CLOSED I cannot operate theDisconnector.

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    23/105

    23

    THE POWER SUBSTATIONEARTHING SWITCH CLOSED

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    24/105

    24

    THE POWER SUBSTATIONEARTHING SWITCH OPEN

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    25/105

    25

    THE INTERLOCKING SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    26/105

    26

    A Local Action (open/close) may require:THE INTERLOCKING SYSTEM

    Remote information (from different bays)Local information (from the same bay)

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    27/105

    27

    OC G S S

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    28/105

    28

    THE INTERLOCKING SYSTEM

    THE INTERLOCKING SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    29/105

    29

    THE INTERLOCKING SYSTEM

    THE IEC 61850 INTERLOCKING SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    30/105

    30

    THE IEC 61850 INTERLOCKING SYSTEM

    CONTROL / INTERLOCKING in an IEC 61850 substation

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    31/105

    31

    CONTROL / INTERLOCKING in an IEC 61850 substation

    IEC 61850 Standard

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    32/105

    32

    IEC 61850 Standard

    THE POWER SUBSTATION

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    33/105

    33

    THE POWER SUBSTATIONIn a substation there are Primary Equipments..

    THE POWER SUBSTATION

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    34/105

    34

    THE POWER SUBSTATION that must be protected.

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    35/105

    THE PROTECTION RELAYS

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    36/105

    36

    THE PROTECTION RELAYS

    THE PROTECTION RELAYS

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    37/105

    37

    THE PROTECTION RELAYS

    The circuit breaker opens and interrupts the fault current. The relaysees no fault conditions anymore and it resets. Circuit breaker remains open, the fault has been cleared.

    THE PROTECTION SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    38/105

    38

    THE PROTECTION SYSTEM

    THE PROTECTION SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    39/105

    39

    THE PROTECTION SYSTEM

    Radial Feeders: No communication

    THE PROTECTION SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    40/105

    40

    THE PROTECTION SYSTEM

    Radial Feeders: No communication

    THE PROTECTION SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    41/105

    41

    THE PROTECTION SYSTEM

    Radial Feeders: No communication

    THE PROTECTION SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    42/105

    42

    THE PROTECTION SYSTEM

    Radial Feeders: No communication

    THE PROTECTION SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    43/105

    43

    THE PROTECTION SYSTEM

    Radial Feeders: Communication

    THE PROTECTION SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    44/105

    44

    THE PROTECTION SYSTEM

    Radial Feeders: Communication

    THE PROTECTION SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    45/105

    45

    THE PROTECTION SYSTEM

    Radial Feeders: Communication

    THE PROTECTION SYSTEM

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    46/105

    46

    THE PROTECTION SYSTEM

    Radial Feeders: Communication

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    47/105

    GOOSE communication for PROTECTION and CONTROL

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    48/105

    48

    GOOSE = Generic Object Oriented S ystem Event.Is an unacknowledged multicast message that is repeated with a certainstrategy allowing the supervision of the Horizontal Communication.

    GOOSE communication for PROTECTION and CONTROL

    GOOSE or Contact (Conventional) ?

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    49/105

    49

    GOOSE or Contact (Conventional) ?

    GOOSE or Contact (Conventional) ?

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    50/105

    50

    GOOS o Co tact (Co ve t o a ) ?

    GOOSE or Contact (Conventional) ?

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    51/105

    51

    ( )

    GOOSE or Contact (Conventional) ?

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    52/105

    52

    ( )

    IEC 61850 Standard

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    53/105

    53

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    54/105

    BEFORE standardisation : REPORTING TO SCADA / RTU

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    55/105

    55

    Proprietary communication protocols were / are still available.Handling correctly all protocols was and is still a challenge

    BEFORE: PROTOCOL CONVERTERS / IMPLEMENTATIONS

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    56/105

    56

    IEC 61850 APPLICATION: REPORTING TO SCADA / RTU

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    57/105

    57

    IEDs from different vendors can exchange and use information over acommon communications media. No need to have protocol converters.Reporting: Vertical Communication .

    IEC 61850 APPLICATION: SCADA/RTU COMMUNICATION

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    58/105

    58

    The communication between SCADA / RTU and the IEDsis defined in the IEC 61850 standard (MMS / FTP).

    Data exchanged can be:

    Control (operating primary objects) Log Reporting of events Disturbance Files Upload

    IEC 61850 Standard

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    59/105

    59

    IEC 61850: NETWORK TOPOLOGY

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    60/105

    60

    The data traffic runs on Ethernet, 100 Mbit/s.

    This means that in the IEC 61850 substation there are Ethernet switches.

    Protection and Control signals aredependent on the correctfunctionality of the communicationsystem, which has in the Ethernetswitches one of its most importantfactors.

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    61/105

    IEC 61850 Standard

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    62/105

    62

    IEC 61850: The SCL language

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    63/105

    63

    IEDs and Substations are described through XML files.The IEC 61850 language used in the XML files is calledSCL language.

    SCL: Substation Configuration Language.

    IEC 61850: The SCL language (IED Modelling)

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    64/105

    64

    IEC 61850: The SCL language (IED modelling)

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    65/105

    65

    Bay A Bay Unit (IED)

    PTRC (Trip, Operate)

    IEC 61850: The SCL language (IED modelling)

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    66/105

    66

    Bay Unit (IED)

    PTRC (Trip, Operate)

    SCLBay A

    IEC 61850: The SCL language (IED modelling)

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    67/105

    67

    Bay Unit (IED)

    PTRC (Trip, Operate)

    SCLBay A

    IEC 61850: The SCL language (IED modelling)

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    68/105

    68

    Bay Unit (IED)

    PTRC (Trip, Operate)SCL

    Bay A

    IEC 61850: The SCL language (IED modelling)

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    69/105

    69

    SCLSCLIt is possible to structurethe Logical Nodes, andgroup them under differentLogical Devices.The rules of this structureare described in the XMLfile.

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    70/105

    IEC 61850: Different SCL files

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    71/105

    71

    Depending on the information they carry, there are different types of SCL files:

    ICD (IED Capability Description)

    CID (Configured IED Description)SCD (Substation Configuration Description)

    SSD (System Specification Description)

    IID (Instantiated IED Description)SED (System Exchange Description)

    IEC 61850 Standard

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    72/105

    72

    IEC 61850: Engineering Process

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    73/105

    73

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    74/105

    IEC 61850: Engineering Process

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    75/105

    75

    There are software tools that can extract engineering information from theSCD file and represent them in a comfortable way to the user:

    IEC 61850: Engineering Process

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    76/105

    76

    REPORTING Vertical Communication

    All the IEC 61850 devices (IEDs) describe themselves withhelp of the SCL language.

    SCL information from all IEDs are integrated into theIEC 61850 Engineering Tool.

    IEC 61850: Engineering Process

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    77/105

    77

    The SCADA system isalso IEC 61850compliant, and it can readthe SCD filesunderstanding how thesubstation looks like,which IEDs are presentand which informationthey send to the SCADAsystem .

    SCADA / RTU Vertical Communication

    IEC 61850: Engineering Process

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    78/105

    78

    GOOSE Horizontal Communication

    In the SCL file there is written which IED talks to which IED.

    The standard messages among IEDs in the same substation are calledGOOSE messages (Generic Object Oriented Substation Event).GOOSE messages can contain protection application information (TRIP,Block etc.) .

    IEC 61850: Engineering Process

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    79/105

    79

    The IEC 61850 Engineering Tool

    One IEC 61850 Engineering Tool is in principle a software that handlesSCL files.

    The initial SCL files are provided by the IED vendor software tools, and theyare called ICD files (IED Capability Description).

    The ICD files are imported in the IEC 61850 Engineering TOOL andGOOSE Reporting information are added for each IED, creating the socalled SCD file (Substation Configuration Description).

    The SCD file is then exported from the Engineering Tool. IED vendor toolswill import that file and will download in the IEDs the IEC 61850 informationthat are written in the SCD files.

    IEC 61850:E i i P

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    80/105

    80

    Engineering Process

    IEC 61850: Engineering Tools

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    81/105

    81

    Documentation

    The SCD file describes thesubstation in IEC 61850 language(SCL).The IEC 61850 tool is able toelaborate such information and toshow it in human readable format,like a PDF file.

    IEC 61850: Engineering Tools

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    82/105

    82

    IEC 61850 Standard

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    83/105

    83

    PROCESS BUS

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    84/105

    84

    Sampled Values(SV)9-2

    Merging Units(MU)

    IEC 61850-9-2NCIT

    PROCESSBUS

    FULLY IEC 61850 SUBSTATION

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    85/105

    85

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    86/105

    Replacement of BO cards

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    87/105

    87

    GOOSE OUT

    Replacement of BI cards

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    88/105

    88

    GOOSE OUT

    GOOSE IN

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    89/105

    89

    GOOSE OUT

    GOOSE IN

    THE IEC 61850-8-1 IED

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    90/105

    90

    GOOSE IN GOOSE OUT

    IEC 61850-8-1 Station Bus

    Replacement of analog cards + A/D conversion

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    91/105

    91

    GOOSE IN GOOSE OUT

    IEC 61850-8-1 Station Bus

    SAMPLED VALUES (SV)

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    92/105

    92

    GOOSE IN GOOSE OUT

    IEC 61850-8-1 Station Bus

    SAMPLED VALUES

    THE FULLY IEC 61850 COMPLIANT IED

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    93/105

    93

    GOOSE IN GOOSE OUT

    IEC 61850-8-1 Station Bus

    SAMPLED VALUES

    IEC 61850-9-2Process Bus

    WHERE ARE THE SAMPLED VALUES COMING FROM?E

    S

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    94/105

    94

    S A M P L E D V A L U E

    Merging Units

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    95/105

    95

    Merging Units

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    96/105

    96

    IEC 61850 Standard

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    97/105

    97

    IEC 61850 Standard

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    98/105

    98

    IEC 61850: TESTING

    H d t t ll f thi ?

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    99/105

    99

    How do we test all of this?

    How do we test the Network Topology (Switches)?

    How do we test the Vertical Communication to SCADA?(IEC 61850-8-1, MMS, Reporting)

    How do we test Interlockings?(IEC 61850-8-1 GOOSE)

    How do we test Protection Schemes?(IEC 61850-8-1 GOOSE and IEC 61850-9-2 SV)

    IEC 61850: TESTING

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    100/105

    100

    Information about IEC 61850KTH: Kungliga Tekniska Hgskolan

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    101/105

    101

    g g g

    University courses on IEC 61850for SA (Substation Automation)

    Information about IEC 61850Tissues (Technical Issues) database

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    102/105

    102

    ( )

    www.tissues.iec61850.comIEC 61850 standard is a dynamic standard !. You must follow it!

    IEC 61850 Blog www.blog.iec61850.comInformation about IEC 61850

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    103/105

    103

    g

    Information on new IEC 61850documents

    Information on IEC 61850 events

    Information on new instruments andtechniques on the IEC 61850

    g

    Competent and fast up to date blog on IEC 61850

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    104/105

    Megger http://www.megger.comInformation om IEC 61850

  • 7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12

    105/105

    gg p ggIEC 61850 test equipment, tools and litterature