Kopeopeo Canal Remediation Project Community Liaison Group Meeting Tuesday 16 May 2017 1

Transcript of Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer •...

Page 1: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Kopeopeo Canal Remediation ProjectCommunity Liaison Group MeetingTuesday 16 May 2017

1

Page 2: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Meeting agenda topics

• Welcome & introduction – John Pullar

• Communications update – Abby Tozer

• Trial compound skip bin removal

• Project update – Brendon Love

• Health, Safety and Monitoring – Des McLeary

• Light lunch

• Independent Monitor – Andrew Kohlrusch and Matt James

• Other business

2

Page 3: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Communications

• What’s new

• Website www.boprc.govt.nz/kopeopeo

• Newsletter

• Flyers

• Communication and Engagement Plan (CEP)

• Recent media

3

Page 4: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Communication Plan Update

Physical Works stage

• Comments have been received from CLG members and incorporated

• Preparing draft for CLG approval

Key changes

• Updated members

• Acknowledgement for need for more immediate communications during physical works

4

Page 5: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Recent mediaWhakatāne Beacon

5

Page 6: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Trial compound skip bin removal

20th April 2017

6

22th April 2017

Page 7: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Lessons Learnt

Trial compound skip bin removal

• Decision-making around variation to consented activities should involve Independent Monitor (IM) and Compliance Officer (CO) in future.

• Timely response to complaints and feeding information back to Complainant required (phone call, text, email, in person).

• There is a need to improve the complaint distribution process so that complaints are referred to more than one person.

• Variation to trial and consent may be warranted.

7

Page 8: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Project update

• Canal performance during floods

• Preliminary activities

• Activities proposed for May-June

• Project Schedule

• Monthly report dashboard

8

Overview

Page 9: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Canal performance in flood Cyclone Debbie • Greater than on in 100 year event (i.e. an overdesign event)

• Kopeopeo Canal filled close to capacity (still freeboard with no overflow)

• Water flows limited due to high levels in Whakatāne and RangitaikiRivers – gates remain closed and pumps operate

• Sampling and analysis completed along canal and at flood pump station

9

Page 10: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Canal water levelsApril 2017 Flood Event

10

Page 11: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Surface water quality

11

Flood conditions – 8 April

Page 12: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Preliminary activitiesManagement plans completed

Final plans and design details for CS1

Traffic Management Plan

Asset Management Plan and peer review certificate

Erosion and Sediment Control Plan

Environmental Monitoring and Validation Plan

Health and Safety Management Plan

Management plans outstanding• Dredge Management Plan – draft under review

• Flood Management Plan – draft under review

12

Page 13: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Activities planned for May-June

• Earthworks for CS1 construction

• Ongoing dust monitoring

• Construct erosion and sediment controls

• Topsoil removal and stockpiling

• Importing quarry rock foundation material

• Pipeline route planning

• Eel removal trial

• Finalise flood control structure design

13

Page 14: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Traffic Management

Fill for CS1

(4 weeks)

14

Page 15: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Project Schedule

15

• Containment Site 1 construction underway

• Pipeline established late-June

• Control structures in canal late-June

• CS1 open day (early July)

• Dredging starts – mid-July

High Level

Page 16: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Monthly Report Dashboard

16

Page 17: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Independent Monitor

Comments on Traffic Management Plan (TMP)

• All contact numbers of staff who may work on this project should be listed

• It is not clear how speed restrictions will be enforced – communication is essential and should be clear

• Exit and entry to the site will be from the same point

• Communication between trucks coming onto or off the site and the controllers.

• The configuration of SH30 may require earlier warnings to motorists.

17

Page 18: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Independent MonitorComments on Environment Monitoring and Validation Plan (EMVP)

• Generally covers key elements, but should be stand alone

• Better linkage to conditions of consent, trigger levels and monitoring

• All proposed monitoring points should be shown

• Corrective actions should be listed

• Key people and responsibilities should be listed

• Sediment validation sampling procedures require more explanation

18

Page 19: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Independent Monitor

Comments on trial bin removal

• Communication breakdown – community notification should be established

• Some rectification, but covering still warranted

• Needs a plan of how to remove the bags

19

Page 20: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Kopeopeo Canal Dioxin Remediation Project

Healing the Rift

Beneficial Outcomes through Open Community Engagement

Brendon Love, HAIL Environmental

Andrew Kohlrusch, GHD Australia

Insert own company logo here

20

Page 21: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Other Business

21

• Next Meeting: Tuesday 20th June

Page 22: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

Additional Information

22

Page 23: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

23

Page 24: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

24

Page 25: Kopeopeo Canal Remediation Project · 5/16/2017  · • Communications update –Abby Tozer • Trial compound skip bin removal • Project update –Brendon Love ... Final plans

25