Kolkata November 2012

Transcript of Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... ·...

Page 1: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

KolkataKolkata

November 2012

Page 2: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

PROPOSAL INFORMATION

Page 3: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Summary of Current Plant Configuration

Unit Facility/ Capacity

Coke Oven 0.5 mtpa each of heat recovery type with Vertical &

Horizontal Configuration

Sinter plant 2 x 105 m2

Pellet Plant 1.2 mtpa grate-Rotary kiln configuration

Blast Furnace 2 x 1050 m3 and 1 x 350 m3

Steel Melt Shop 600t mixer, 2 x 60t BOF, 2 x 5 strand Billet CasterSteel Melt Shop 600t mixer, 2 x 60t BOF, 2 x 5 strand Billet Caster

Rolling Mills Rebar mill of 0.85 mtpa and Wire Rod Mill of 0.6 mtpa

DI pipe plant 0.33 mtpa capacity

Oxygen Plant 24,000 nm3/Hr capacity

Power Plant 2 x 60 MW and steam driven blowers for Blast Furnace

Other plant/ Auxiliary 800 TPD lime plant, 150 TPD Dolo plant, Main receiving

sub-station, Raw water system and all utility services

Page 4: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Plant Configuration – Comparison of Change

Name Unit 2.2

mtpa

2.51

mtpa

Remarks

Sinter Plant MTPA 2.62 2.98 • Increase by 0.36 mtpa by increasing productivity from

1.5 to 1.7 t/m2/h

Pellet Plant MTPA 1.2 1.2 • No Change

Coke Oven Plant MTPA 1.0 1.0 • No Change, balance requirement to be met from open

market

Blast Furnace MTPA 2.20 2. 51 • Increase by 0.31 mtpa by increasing productivity from

2.55 to 2.85 t/m3 in 1,050 m3 blast furnace and 2.69

to 3.31 t/m3 in 350 m3 mini blast furnace

4

to 3.31 t/m3 in 350 m3 mini blast furnace

DI Pipe MTPA 0.33 0.33 • No Change

Basic Oxygen

FurnaceMTPA 1.66 1.87 • Increase by 0.21 mtpa by reducing average tap-to-tap

cycle time of converter from 40 to 28 min.

Billet Caster Strand 2 X 5 2 X 5 • No Change

Calcining Plant TPD 800 800 • No Change

Dolomite Plant TPD 150 150 • No Change

Wire Rod Mill MTPA 0.5 0.6 • Increase by 0.1 mtpa

Bar Mill MTPA 0.7 0.85 • Increase by 0.15 mtpa

Oxygen Plant M3/Hr 24,000 24,000 • No Change

Power Plant MW 120 120 • No Change

Page 5: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Product MixProduct Revised

Capacity

(MTPA)

Wire Rods 0.60

TMT Bars 0.85TMT Bars 0.85

DI Pipe 0.33

Commercial Billets 0.33

Pig Iron 0.40

Total 2.51

Page 6: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Revised Cost of Project

Rs/Crs

For Capacity

Enhancement

from 2.20

For Additional

Expenditure for

Infrastructure/

Other Facilities &

Particulars 2.20 MTPA

MTPA to 2.51

MTPA (*)

Efficiency

Improvement (*)

Total for

2.51 MTPA

Project Cost 7262 1236 1064 9562

• Revised cost vetted by Lenders' Independent Engineer M/s R. Singh &

Associates and MECON

• Revised Cost Appraised by State Bank of India also

Page 7: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

(Figs in Rs/Crs ) 2.2 mtpa (Budgeted)2.5 mtpa (Revised

proposed)

Equity 1,815 2,227

Senior Debt 4,793 4,745

Securitization Loan - 2,200

Means of Financing

7

Sub Debt 654 390

Total 7,262 9,562

Part of the Securitization Loan is being utilized to repay a portion of

the Senior and Subordinated debt

Page 8: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Equity Structure (As on 26-10-12)

Name of the Shareholders No. of Shares

%

Shareholding

PROMOTER 866,750,000 39.64

NON-PROMOTER:

FOREIGN COMPANIES 563,638,937 25.78

BODIES CORPORATES 354,527,804 16.21

RESIDENT INDIVIDUALS/HUF/IFI/OTHERS 203,685,934 9.31RESIDENT INDIVIDUALS/HUF/IFI/OTHERS 203,685,934 9.31

FOREIGN INSTITUTIONAL INVESTORS/

FCB 141,024,337 6.45

MUTUAL FUNDS/TRUSTS/VENTURE

CAPITAL 50,340,913 2.30

BANKS 1,427,859 0.07

NON RESIDENT INDIANS 2,456,340 0.11

DIRECTORS AND RELATIVES 2,882,899 0.13

Total 2,186,735,023 100.00

Page 9: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SITE PROGRESS

Page 10: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

FACILITIES COMPLETED

� Facilities Under Operation:

• Vertical Coke Oven

• 350 m3 Blast Furnace

• Pig Casting Machine

• Sinter Plant

• Rebar Mill• Rebar Mill

• Water Supply System

• 220 KV Sub-Station & 33 KV Distribution

• Soft Water and DM Water Plant

• Air Compressor Station

• Blast Furnace Gas Holder

Page 11: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

FACILITIES COMPLETED (Contd)

� Facilities which are under trial/testing:

• Steel Melt Shop

• 1050 Cum Blast Furnace No.2

• Lime Calcination & Dolo Plant

• Oxygen Plant• Oxygen Plant

• Pulverized Coal Injection System

• River Side Pump House

� DI Pipe Plant was also operational

Page 12: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

PRESENT PROGRESS STATUS

� STRUCTURE SUPPLY 95%

� Construction activities of all units are in progress.

� Project execution activities in sequential manner, i.e. Civil,

Structural work, equipment supplies & erection.

� Progress of project achieved up to October 2012 -

� STRUCTURE SUPPLY 95%

� EQUIPMENT SUPPLY 90%

� CIVIL WORK 95%

� STRUCTURE ERECTION 89%

� EQUIPMENT ERECTION 71%

� OVERALL PROGRESS 86%

Page 13: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

BIRD’S EYE VIEW OF

THE PLANT

Page 14: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Satellite image of the Plant

Page 15: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities
Page 16: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Blast Furnace Area : Overview

Page 17: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Blast Furnace #3 production of hot metal

Page 18: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Hot metal pouring to ladle for transfer

Page 19: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Pig Casting Machine

Page 20: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Pig iron Yard

Page 21: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Pig iron Yard

Page 22: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

TESTING AND TRIAL RUNS IN PROGRESS

1050m3 BLAST FURNACE #2

Page 23: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

1050 CUM BLAST FURNACE CAST HOUSE

Page 24: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

BLAST FURNACE PLC PANEL

Page 25: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Hot Metal Railway Track

From Blast FurnaceFrom Blast Furnace

Page 26: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities
Page 27: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT MACHINE BUILDING

Page 28: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT ESP

Page 29: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT CONVEYOR SYSTEM

Page 30: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT MATERIAL PROPORTIONING BUNKERS

Page 31: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT FLUE GAS CONNECTING SYSTEM

Page 32: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT 4500 KW FAN

Page 33: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT PUMP HOUSE CONTROL PANEL

Page 34: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT FEED AREA

Page 35: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT FURNACE AREA

Page 36: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT UNDER OPERATION

Page 37: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

SINTER PLANT UNDER OPERATION

Page 38: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities
Page 39: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Coke Oven Area : Under Operation

Page 40: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Coal Tower

Page 41: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Coke Oven Chimney

Page 42: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Waste Heat Recovery Boiler

Page 43: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Coke Oven Quenching Car

Page 44: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Battery of Coke Oven

Page 45: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Coke Oven Wharf

Page 46: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Production of Coke

Page 47: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities
Page 48: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Centrifugal Casting Machine

Page 49: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

DI pipe Production

Page 50: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

DI pipe Production

Page 51: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

DI pipe Production

Page 52: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Main Control Building - DI pipe Plant

Page 53: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities
Page 54: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

TESTING AND TRIAL RUNS IN PROGRESS

Steel Making Shop Area : Overview

Page 55: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

CONVERTER : UNDER TESTING

Page 56: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

STEEL MAKING SHOP CONVERTER

Page 57: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

STEEL MAKING SHOP CONVERTER (TILTED)

Page 58: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

STEEL MAKING SHOP – CASTER TURRET

Page 59: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

STEEL MAKING SHOP – CASTER TURRET

Page 60: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

HOT METAL MIXER & RAIL TRACK

Page 61: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

CASTER DUMMY BAR ZONE : READY

Page 62: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

BILLET CASTER : READY

Page 63: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities
Page 64: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Rolling Mill Area

Page 65: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

INSIDE VIEW OF BAR MILL

Page 66: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

REHEATING FURNACE - BAR MILL

Page 67: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

BAR MILL OPERATION

Page 68: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

BAR MILL OPERATION

Page 69: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

BAR MILL OPERATION

Page 70: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Cooling Bed of Bar Mill

Page 71: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

BAR PRODUCT STORAGE

Page 72: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

BAR PRODUCT STORAGE

Page 73: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities
Page 74: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

TESTING AND TRIAL RUNS IN PROGRESS

Oxygen Plant Area : Overview

Page 75: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

COLD BOX COLUMN : UNDER TRIAL

Page 76: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

VAPOURISERS & COOLERS

Page 77: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Oxygen Plant Cooling Towers & Pump House

Page 78: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities
Page 79: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

OVERVIEW OF THE COMPLEX

Page 80: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Lime Plant - Pre-Heater and Rotary Kin

Page 81: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

LIME PLANT : FINISHING WORK

Page 82: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

TESTING AND TRIAL RUNS IN PROGRESS

LIME PLANT : ROTARY KILN

Page 83: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

TESTING AND TRIAL RUNS IN PROGRESS

DOLO PLANT : UNDER TRIAL & FINISHING

Page 84: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

DOLO PLANT :VERTICAL KILN

Page 85: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities
Page 86: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Waste Heat Waste Heat

Recovery Boiler

(WHRB)

Page 87: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Power Plant & Control room Building

Power Plant

Page 88: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Turbo Generator

Page 89: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Coal Fired Boilers (CFBC)

Page 90: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Air Compressor Station

Page 91: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Water Treatment plant

Page 92: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Blast Furnace gas

HolderHolder

Page 93: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

220 KV SUB-STATION

Page 94: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Intake Channel to Pump House

Page 95: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Electrical Yard at Pump House Complex

Page 96: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Pumps in River Head Pump House

Page 97: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities

Electrical room in River Head Pump House

Page 98: Kolkata November 2012 - CCPITaaa.ccpit.org/Category7/Asset/2012/Dec/21/onlineeditimages/file... · Enhancement from 2.20 For Additional Expenditure for Infrastructure/ Other Facilities