KolkataKolkata
November 2012
PROPOSAL INFORMATION
Summary of Current Plant Configuration
Unit Facility/ Capacity
Coke Oven 0.5 mtpa each of heat recovery type with Vertical &
Horizontal Configuration
Sinter plant 2 x 105 m2
Pellet Plant 1.2 mtpa grate-Rotary kiln configuration
Blast Furnace 2 x 1050 m3 and 1 x 350 m3
Steel Melt Shop 600t mixer, 2 x 60t BOF, 2 x 5 strand Billet CasterSteel Melt Shop 600t mixer, 2 x 60t BOF, 2 x 5 strand Billet Caster
Rolling Mills Rebar mill of 0.85 mtpa and Wire Rod Mill of 0.6 mtpa
DI pipe plant 0.33 mtpa capacity
Oxygen Plant 24,000 nm3/Hr capacity
Power Plant 2 x 60 MW and steam driven blowers for Blast Furnace
Other plant/ Auxiliary 800 TPD lime plant, 150 TPD Dolo plant, Main receiving
sub-station, Raw water system and all utility services
Plant Configuration – Comparison of Change
Name Unit 2.2
mtpa
2.51
mtpa
Remarks
Sinter Plant MTPA 2.62 2.98 • Increase by 0.36 mtpa by increasing productivity from
1.5 to 1.7 t/m2/h
Pellet Plant MTPA 1.2 1.2 • No Change
Coke Oven Plant MTPA 1.0 1.0 • No Change, balance requirement to be met from open
market
Blast Furnace MTPA 2.20 2. 51 • Increase by 0.31 mtpa by increasing productivity from
2.55 to 2.85 t/m3 in 1,050 m3 blast furnace and 2.69
to 3.31 t/m3 in 350 m3 mini blast furnace
4
to 3.31 t/m3 in 350 m3 mini blast furnace
DI Pipe MTPA 0.33 0.33 • No Change
Basic Oxygen
FurnaceMTPA 1.66 1.87 • Increase by 0.21 mtpa by reducing average tap-to-tap
cycle time of converter from 40 to 28 min.
Billet Caster Strand 2 X 5 2 X 5 • No Change
Calcining Plant TPD 800 800 • No Change
Dolomite Plant TPD 150 150 • No Change
Wire Rod Mill MTPA 0.5 0.6 • Increase by 0.1 mtpa
Bar Mill MTPA 0.7 0.85 • Increase by 0.15 mtpa
Oxygen Plant M3/Hr 24,000 24,000 • No Change
Power Plant MW 120 120 • No Change
Product MixProduct Revised
Capacity
(MTPA)
Wire Rods 0.60
TMT Bars 0.85TMT Bars 0.85
DI Pipe 0.33
Commercial Billets 0.33
Pig Iron 0.40
Total 2.51
Revised Cost of Project
Rs/Crs
For Capacity
Enhancement
from 2.20
For Additional
Expenditure for
Infrastructure/
Other Facilities &
Particulars 2.20 MTPA
MTPA to 2.51
MTPA (*)
Efficiency
Improvement (*)
Total for
2.51 MTPA
Project Cost 7262 1236 1064 9562
• Revised cost vetted by Lenders' Independent Engineer M/s R. Singh &
Associates and MECON
• Revised Cost Appraised by State Bank of India also
(Figs in Rs/Crs ) 2.2 mtpa (Budgeted)2.5 mtpa (Revised
proposed)
Equity 1,815 2,227
Senior Debt 4,793 4,745
Securitization Loan - 2,200
Means of Financing
7
Sub Debt 654 390
Total 7,262 9,562
Part of the Securitization Loan is being utilized to repay a portion of
the Senior and Subordinated debt
Equity Structure (As on 26-10-12)
Name of the Shareholders No. of Shares
%
Shareholding
PROMOTER 866,750,000 39.64
NON-PROMOTER:
FOREIGN COMPANIES 563,638,937 25.78
BODIES CORPORATES 354,527,804 16.21
RESIDENT INDIVIDUALS/HUF/IFI/OTHERS 203,685,934 9.31RESIDENT INDIVIDUALS/HUF/IFI/OTHERS 203,685,934 9.31
FOREIGN INSTITUTIONAL INVESTORS/
FCB 141,024,337 6.45
MUTUAL FUNDS/TRUSTS/VENTURE
CAPITAL 50,340,913 2.30
BANKS 1,427,859 0.07
NON RESIDENT INDIANS 2,456,340 0.11
DIRECTORS AND RELATIVES 2,882,899 0.13
Total 2,186,735,023 100.00
SITE PROGRESS
FACILITIES COMPLETED
� Facilities Under Operation:
• Vertical Coke Oven
• 350 m3 Blast Furnace
• Pig Casting Machine
• Sinter Plant
• Rebar Mill• Rebar Mill
• Water Supply System
• 220 KV Sub-Station & 33 KV Distribution
• Soft Water and DM Water Plant
• Air Compressor Station
• Blast Furnace Gas Holder
FACILITIES COMPLETED (Contd)
� Facilities which are under trial/testing:
• Steel Melt Shop
• 1050 Cum Blast Furnace No.2
• Lime Calcination & Dolo Plant
• Oxygen Plant• Oxygen Plant
• Pulverized Coal Injection System
• River Side Pump House
� DI Pipe Plant was also operational
PRESENT PROGRESS STATUS
� STRUCTURE SUPPLY 95%
� Construction activities of all units are in progress.
� Project execution activities in sequential manner, i.e. Civil,
Structural work, equipment supplies & erection.
� Progress of project achieved up to October 2012 -
� STRUCTURE SUPPLY 95%
� EQUIPMENT SUPPLY 90%
� CIVIL WORK 95%
� STRUCTURE ERECTION 89%
� EQUIPMENT ERECTION 71%
� OVERALL PROGRESS 86%
BIRD’S EYE VIEW OF
THE PLANT
Satellite image of the Plant
Blast Furnace Area : Overview
Blast Furnace #3 production of hot metal
Hot metal pouring to ladle for transfer
Pig Casting Machine
Pig iron Yard
Pig iron Yard
TESTING AND TRIAL RUNS IN PROGRESS
1050m3 BLAST FURNACE #2
1050 CUM BLAST FURNACE CAST HOUSE
BLAST FURNACE PLC PANEL
Hot Metal Railway Track
From Blast FurnaceFrom Blast Furnace
SINTER PLANT MACHINE BUILDING
SINTER PLANT ESP
SINTER PLANT CONVEYOR SYSTEM
SINTER PLANT MATERIAL PROPORTIONING BUNKERS
SINTER PLANT FLUE GAS CONNECTING SYSTEM
SINTER PLANT 4500 KW FAN
SINTER PLANT PUMP HOUSE CONTROL PANEL
SINTER PLANT FEED AREA
SINTER PLANT FURNACE AREA
SINTER PLANT UNDER OPERATION
SINTER PLANT UNDER OPERATION
Coke Oven Area : Under Operation
Coal Tower
Coke Oven Chimney
Waste Heat Recovery Boiler
Coke Oven Quenching Car
Battery of Coke Oven
Coke Oven Wharf
Production of Coke
Centrifugal Casting Machine
DI pipe Production
DI pipe Production
DI pipe Production
Main Control Building - DI pipe Plant
TESTING AND TRIAL RUNS IN PROGRESS
Steel Making Shop Area : Overview
CONVERTER : UNDER TESTING
STEEL MAKING SHOP CONVERTER
STEEL MAKING SHOP CONVERTER (TILTED)
STEEL MAKING SHOP – CASTER TURRET
STEEL MAKING SHOP – CASTER TURRET
HOT METAL MIXER & RAIL TRACK
CASTER DUMMY BAR ZONE : READY
BILLET CASTER : READY
Rolling Mill Area
INSIDE VIEW OF BAR MILL
REHEATING FURNACE - BAR MILL
BAR MILL OPERATION
BAR MILL OPERATION
BAR MILL OPERATION
Cooling Bed of Bar Mill
BAR PRODUCT STORAGE
BAR PRODUCT STORAGE
TESTING AND TRIAL RUNS IN PROGRESS
Oxygen Plant Area : Overview
COLD BOX COLUMN : UNDER TRIAL
VAPOURISERS & COOLERS
Oxygen Plant Cooling Towers & Pump House
OVERVIEW OF THE COMPLEX
Lime Plant - Pre-Heater and Rotary Kin
LIME PLANT : FINISHING WORK
TESTING AND TRIAL RUNS IN PROGRESS
LIME PLANT : ROTARY KILN
TESTING AND TRIAL RUNS IN PROGRESS
DOLO PLANT : UNDER TRIAL & FINISHING
DOLO PLANT :VERTICAL KILN
Waste Heat Waste Heat
Recovery Boiler
(WHRB)
Power Plant & Control room Building
Power Plant
Turbo Generator
Coal Fired Boilers (CFBC)
Air Compressor Station
Water Treatment plant
Blast Furnace gas
HolderHolder
220 KV SUB-STATION
Intake Channel to Pump House
Electrical Yard at Pump House Complex
Pumps in River Head Pump House
Electrical room in River Head Pump House