Kim Session21 ACEF2008

download Kim Session21 ACEF2008

of 23

Transcript of Kim Session21 ACEF2008

  • 8/14/2019 Kim Session21 ACEF2008

    1/23

    1

    JUNE 2008JUNE 2008

    ASIA CLEAN ENERGY FORUMSIA CLEAN ENERGY FORUM

  • 8/14/2019 Kim Session21 ACEF2008

    2/23

    2

  • 8/14/2019 Kim Session21 ACEF2008

    3/23

    3

  • 8/14/2019 Kim Session21 ACEF2008

    4/234

    KOREAs Financial Support SystemKOREAs Financial Support System

    Fund established in 1980 Loan

    : long term, low rate of interest loans for investing in

    energy efficiency & conservation facilities

    Tax incentives: 10% tax deduction (income tax or corporation tax) for

    investments of energy efficiency & conservation facilities

    Managed by MKE(government) and operated by KEMCO

  • 8/14/2019 Kim Session21 ACEF2008

    5/235

    Projects of LoanProjects of Loan

    Rational use of energy

    Establishment of cogeneration facilities for industry or building,

    installation of energy efficiency & conservation facilities andESCO projects etc.

    Integrated Energy Supply

    District Heating, Community Energy System, Industrial ComplexCHP (Combined Heat and Power System)

    Dissemination of New & Renewable energy

    Installation of equipment using alternative energy such as solar-

    heat, solar-light and bio-energy etc.

  • 8/14/2019 Kim Session21 ACEF2008

    6/236

    Loan Scale in 2008Loan Scale in 2008

    CategoryBudget

    (million USD)

    Rational Use of Energy 480

    Integrated Energy Supply 100

    Dissemination of New & Renewable energy 130

    Total 710

    (1 USD 1,000 won)

    Rate of interest : 3.25~6% (variable)

    Repayment period : 4~15years (according to facilities or project)

  • 8/14/2019 Kim Session21 ACEF2008

    7/23

    7

    to apply to recommend

    toapplyfortheloan

    togivetheloan lend

    agreem

    ent to

    notify

    Applicant KEMCO

    BANK

    Loan ProcedureLoan Procedure

  • 8/14/2019 Kim Session21 ACEF2008

    8/23

    8

  • 8/14/2019 Kim Session21 ACEF2008

    9/23

    9

    ESCO System in KOREAESCO System in KOREA

    System is in operation since 1992 ESCO should be registered before applying for a loan 156 ESCOs have registered as of 2007

    But, Active ESCOs are about 30~40

    Energy Performance Contracting model is almost theShared Savings model (about 98%)

  • 8/14/2019 Kim Session21 ACEF2008

    10/23

    10

    Shared savings model(ESCO: Fund raising and profit sharing)

    Guaranteed savings model(ESCO: energy performance guarantee / Energy user: Fund raising)

    Two main models for EPCTwo main models for EPC

    ESCO Energy user

    ESCO Energy user

    fund raise

    fund raise

  • 8/14/2019 Kim Session21 ACEF2008

    11/23

    11

    ESCOInvestment in facility

    Energy user

    sharing of cost savings

    Financial support Policy improvement

    Advertisement Market expansion

    MKE & KEMCO

    System of supporting ESCOSystem of supporting ESCO

    MKE : Ministry of Knowledge EconomyKEMCO : Korea Energy Management Corporation

  • 8/14/2019 Kim Session21 ACEF2008

    12/23

    12

    Class 1(plant) Class 2(building) Class 1 2 Total

    18 companies 47 companies 91 companies 156 companies

    N

    o.ofESCOs

    Number of registered ESCOsNumber of registered ESCOs

    1 5 9

    1 6 3 1 6 31 5 9

    1 6 61 5 8 1 5 6

    4 5 76 9

    1 6

    2 8

    5 5

    1 0 3

    0

    2 0

    4 0

    6 0

    8 0

    1 0 0

    1 2 0

    1 4 0

    1 6 0

    1 8 0

    ' 9 2 ' 9 3 ' 9 4 ' 9 5 ' 9 6 ' 9 7 ' 9 8 ' 9 9 ' 0 0 ' 0 1 ' 0 2 ' 0 3 ' 0 4 ' 0 5 ' 0 6 ' 0 7

  • 8/14/2019 Kim Session21 ACEF2008

    13/23

  • 8/14/2019 Kim Session21 ACEF2008

    14/23

    14

    ESCOFund(MUSD)

    No.ofProject

    s

    Investment by facility (9307)Investment by facility (9307)

    115

    35

    118 122

    81

    621

    274 276

    81239

    1,771

    139245 244 173

    13 530

    50

    100

    150

    200

    250

    300

    Lightin

    g

    Coge

    neratio

    n

    Boile

    r

    P

    roce

    ssImprov

    emen

    t

    Heat

    Recove

    ry

    Heating

    /Coolin

    g

    Power

    Runnin

    g

    Others

    -

    400

    800

    1,200

    1,600

    2,000

    ESCO Fund(million USD)

    No. of Projects

  • 8/14/2019 Kim Session21 ACEF2008

    15/23

    15

    Waste Heat Recovery System

    - Heat Recovery Boiler

    - Mechanical(Thermal) Vapor Recompressor

    - Heat exchanger for heating or cooling

    Co-Generation (Steam + Electricity)

    Process Improvement

    - Naphtha Cracking Heater Coil replacement- Ejector type replacement (Steam EG)

    Examples of energy conservation in Industry

  • 8/14/2019 Kim Session21 ACEF2008

    16/23

    16

    Ice thermal storage system Lighting System Co-generation system (Apartment) Heat recovery system (AHU, Steam) Building automation control unit Variable Voltage Variable Frequency

    Examples of energy conservation in Building

  • 8/14/2019 Kim Session21 ACEF2008

    17/23

    17

    Energy Saving Performance (9307)Energy Saving Performance (9307)

    Savings(MUSD

    )

    th

    ousandtoe

    36

    77

    15

    78

    32

    9

    110

    37

    284

    148

    113 108

    22

    291

    3919

    0

    20

    40

    60

    80

    100

    120

    Lighting

    Coge

    neration

    Boiler

    Proc

    essI

    mprov

    emen

    Heat

    Recovery

    Heating

    /Coolin

    Power

    Others

    0

    50

    100

    150

    200

    250

    300

    350Savings(million USD)

    thousand toe

  • 8/14/2019 Kim Session21 ACEF2008

    18/23

    18

    Operating Fund (1998)- Fund for small & medium sized ESCOs

    Credit loan system (1998)- Getting a credit loan from bank

    Factoring system (1999) Guaranteed savings contract model (2004) Excellent ESCO (2006)

    - accreditation program to superior ESCO

    Policies for supporting ESCOs

  • 8/14/2019 Kim Session21 ACEF2008

    19/23

    19

  • 8/14/2019 Kim Session21 ACEF2008

    20/23

  • 8/14/2019 Kim Session21 ACEF2008

    21/23

    21

    Financial support to 108 groups of energysaving facilities

    Hard to estimate the effect of energy savings

    Group Major Facilities

    IntegratedEnergy Supply

    District Heating & Cooling, Community Energy System,Combined Heat & Power for industrial complex

    Energy efficientfacilities

    furnace, kiln, dyeing machine, drying machine, pulper,MVR, TVR, accumulator, air handling unit, Cogeneration,building automation control unit , heat recovery boiler,

    heat exchanger etc.

    Certified highefficientproducts

    Induction motor, pump, gas boiler, UPS, transformer,fluorescent lamp & ballast, inverter, vending machine,

    fan, blower, LED traffic light etc.

  • 8/14/2019 Kim Session21 ACEF2008

    22/23

    22

    Result of Korean Governments strong will toenergy saving

    Economic structure in Korea

  • 8/14/2019 Kim Session21 ACEF2008

    23/23

    23

    for more informatione-mail : [email protected] or

    [email protected]

    Thank you

    mailto:[email protected]:[email protected]:[email protected]:[email protected]