KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

293
SUPPLIER DATA DOCUMENT TITLE  FORM NR.: SOFTWARE: FILE NR. COMPANY STD. NR. KE01-A1-000-MT-I-LS-0004-000 CHKD BY APPRD BY O.KH SV P01 17/09/2006 ISSUED FOR COMPANY REVIEW M.K REV. DATE DESCRIPTION OF REVISION PREPD BY CONTRACTOR DATA: N/A SUB- PROJECT  Onshore Plant - 1st Phase SUPERSEDES NR N/A SUPERSEDED BY NR N/A N/A SCALE N/A CONTRACTOR DOC. NR. Instrument Loop Diagr ams for Package Units 500, 520, 530 and 620 SHEET NR 1 OF 293 DOCUMENT NUMBER KE01-A1-500-MT-I-HL-0001-000 DEPT ___________ COMPANY  Ag ip KCO  ASSET Kashagan KE01-00-000-AK-A-PS-0001-000 PROJECT ASSET MANAGEMENT SYSTEM INTERFACE LIST KE01-A1-000-MT-I- LS-0005-000 ITEM NUMBERING AND CODING SYSTEMS PROCEDURAL STANDARD PROCESS CONTROL PANEL SCHEMATIC WIRING DIAGRAM FOR WATER TREATMENT PLANT INSTRUMENT NUMBERING AND LOOP TEMPLATES FUNCTIONAL SPECIFICATION KE01-A1-000-MT-I-HH-0011-000 KE01-00-000-KD-I-SF-0002-000 PROJECT DOC. NR. P & ID FOR TECHNICAL WATER PRE - TREATMENT PACKAGE 500, P & ID FOR DEMIN TREATMENT PACKAGE 530, P & ID FOR RAW WATER PUMPS 520, P & ID FOR pH NEUTRALIZATION PACKAGE 620, P & ID FOR POTABLE WATER TREATMENT PACKAGE 530, P & ID FOR ELECTRODEIONIZATION PACKA KE01-A1-500-MT-R-HP-0007-000, KE01-A1-530-MT-R-HP-0009-000, KE01-A1-520-MT-R-HP-0022-000, KE01-A1-620-MT-R-HP-0011-000, KE01-A1-530-MT-R-HP-0008-000, KE01-A1-530-MT-R-HP-0010-000. COMPANY STANDARD NUMBER REFERENCE DOCUMENT PROJECT PROGRAMMABLE LOGIC CONTROLLER /DISTRIBUTION CONTROL SYSTEM SERIAL COMMUNICATION LINK INTERFACE LIST

Transcript of KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 1/293

SUPPLIER DATA DOCUMENT TITLE

 FORM NR.: SOFTWARE: FILE NR. COMPANY STD. NR.

KE01-A1-000-MT-I-LS-0004-000

CHKD BY APPRD BY

O.KH SVP01 17/09/2006 ISSUED FOR COMPANY REVIEW M.K

REV. DATE DESCRIPTION OF REVISIONPREPD

BY

CONTRACTOR DATA: N/ASUB-

PROJECT   Onshore Plant - 1st Phase

SUPERSEDES NR

N/A

SUPERSEDED BY NR

N/AN/A

SCALE

N/A

CONTRACTOR DOC. NR.

Instrument Loop Diagrams for Package Units 500, 520, 530 and 620

SHEET NR

1 OF 293

DOCUMENT NUMBER

KE01-A1-500-MT-I-HL-0001-000

DEPT ___________

COMPANY  Agip KCO

 ASSET Kashagan

KE01-00-000-AK-A-PS-0001-000

PROJECT ASSET MANAGEMENT SYSTEM INTERFACE LIST KE01-A1-000-MT-I -LS-0005-000

ITEM NUMBERING AND CODING SYSTEMS PROCEDURAL STANDARD

PROCESS CONTROL PANEL SCHEMATIC WIRING DIAGRAM FOR WATER

TREATMENT PLANT

INSTRUMENT NUMBERING AND LOOP TEMPLATES FUNCTIONAL

SPECIFICATION

KE01-A1-000-MT-I-HH-0011-000

KE01-00-000-KD-I-SF-0002-000

PROJECT DOC. NR.

P & ID FOR TECHNICAL WATER PRE - TREATMENT PACKAGE 500, P & ID

FOR DEMIN TREATMENT PACKAGE 530, P & ID FOR RAW WATER PUMPS

520, P & ID FOR pH NEUTRALIZATION PACKAGE 620, P & ID FOR

POTABLE WATER TREATMENT PACKAGE 530, P & ID FORELECTRODEIONIZATION PACKA

KE01-A1-500-MT-R-HP-0007-000,

KE01-A1-530-MT-R-HP-0009-000,

KE01-A1-520-MT-R-HP-0022-000,

KE01-A1-620-MT-R-HP-0011-000,

KE01-A1-530-MT-R-HP-0008-000,

KE01-A1-530-MT-R-HP-0010-000.

COMPANY STANDARD NUMBER REFERENCE DOCUMENT

PROJECT PROGRAMMABLE LOGIC CONTROLLER /DISTRIBUTION

CONTROL SYSTEM SERIAL COMMUNICATION LINK INTERFACE LIST

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 2/293

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 3/293

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 4/293

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 5/293

SHEETS INDEX AND REVISION

SHEETS REVISION SHEET REVISION

SHEET DESCRIPTION OF REVISION REVISION SHEET DESCRIPTION OF REVISION REVISION

229 ISSUED FOR COMPANY REVIEW P01 267 ISSUED FOR COMPANY REVIEW P01

230 ISSUED FOR COMPANY REVIEW P01 268 ISSUED FOR COMPANY REVIEW P01

231 ISSUED FOR COMPANY REVIEW P01 269 ISSUED FOR COMPANY REVIEW P01

232 ISSUED FOR COMPANY REVIEW P01 270 ISSUED FOR COMPANY REVIEW P01

233 ISSUED FOR COMPANY REVIEW P01 271 ISSUED FOR COMPANY REVIEW P01

234 ISSUED FOR COMPANY REVIEW P01 272 ISSUED FOR COMPANY REVIEW P01

235 ISSUED FOR COMPANY REVIEW P01 273 ISSUED FOR COMPANY REVIEW P01

236 ISSUED FOR COMPANY REVIEW P01 274 ISSUED FOR COMPANY REVIEW P01

237 ISSUED FOR COMPANY REVIEW P01 275 ISSUED FOR COMPANY REVIEW P01

238 ISSUED FOR COMPANY REVIEW P01 276 ISSUED FOR COMPANY REVIEW P01

239 ISSUED FOR COMPANY REVIEW P01 277 ISSUED FOR COMPANY REVIEW P01240 ISSUED FOR COMPANY REVIEW P01 278 ISSUED FOR COMPANY REVIEW P01

241 ISSUED FOR COMPANY REVIEW P01 279 ISSUED FOR COMPANY REVIEW P01

242 ISSUED FOR COMPANY REVIEW P01 280 ISSUED FOR COMPANY REVIEW P01

243 ISSUED FOR COMPANY REVIEW P01 281 ISSUED FOR COMPANY REVIEW P01

244 ISSUED FOR COMPANY REVIEW P01 282 ISSUED FOR COMPANY REVIEW P01

245 ISSUED FOR COMPANY REVIEW P01 283 ISSUED FOR COMPANY REVIEW P01

246 ISSUED FOR COMPANY REVIEW P01

247 ISSUED FOR COMPANY REVIEW P01

248 ISSUED FOR COMPANY REVIEW P01

249 ISSUED FOR COMPANY REVIEW P01

250 ISSUED FOR COMPANY REVIEW P01

251 ISSUED FOR COMPANY REVIEW P01

252 ISSUED FOR COMPANY REVIEW P01

253 ISSUED FOR COMPANY REVIEW P01254 ISSUED FOR COMPANY REVIEW P01

255 ISSUED FOR COMPANY REVIEW P01

256 ISSUED FOR COMPANY REVIEW P01

257 ISSUED FOR COMPANY REVIEW P01

258 ISSUED FOR COMPANY REVIEW P01

259 ISSUED FOR COMPANY REVIEW P01

260 ISSUED FOR COMPANY REVIEW P01

261 ISSUED FOR COMPANY REVIEW P01

262 ISSUED FOR COMPANY REVIEW P01

263 ISSUED FOR COMPANY REVIEW P01

264 ISSUED FOR COMPANY REVIEW P01

265 ISSUED FOR COMPANY REVIEW P01

266 ISSUED FOR COMPANY REVIEW P01

SUPPLIER DATA  ASSET Kashagan DOCUMENT NUMBER

CONTRACTOR NAME KE01-A1-500-MT-I-HL-0001-000

SUB PROJECT

CONTRACTOR DATA DOCUMENT TITLE

CONTRACTOR DOC.NR

N/A FORM NR.: SOFTWARE: FILE NR. COMPANY STD. NR.

Instrument Lo op Diagrams for Package Units 500, 520, 530 and 620

Onshore Plant - 1st Phase

N/A

METITO OVER SEAS LTD17/09/06

REV.

P01

SHEET NR

5 OF 293

DATE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 6/293

6 OF

5000-JT-00001-PAN

TB1

X:20

5000-JT-00001-PAN -6 +5 -4 +3 -2 +1

 A1-5000-FT-100-TB1-3+   + 3- TB 1- A1 -5 00 0- FT -1 00 A 1- 50 00 -F T- 10 0- 00 5+ + 00 5- A1 -5 00 0- FT -1 00 A 1- 50 00 -F T- 10 0- 03 B+

+5-A1-5000-FT-100 A1-5000-FT-100-12+

 A1-5000-FT-100-TB1-4-   - 4- TB 1- A1 -5 00 0- FT -1 00 A 1- 50 00 -F T- 10 0- 00 6- - 00 6- A1 -5 00 0- FT -1 00 A 1- 50 00 -F T- 10 0- 03 C-

-6-A1-5000-FT-100 A1-5000-FT-100-14-

SCL

 

H

L

5000-FCV-100 5000-JT-00001-PAN

TB1

5000-JT-00001-PAN 1 2 +3 -4 +5 -6

 A1-5000-FY-100-TB1-5+ +5-TB1-A1-5000-FY-100 A1-5000-FY-100-001+ +001-A1-5000-FY-100 A1-FY-5000-100-1+

 A1-5000-FY-100-TB1-6+ -6-TB1-A1-5000-FY-100 A1-5000-FY-100-002- -002-A1-5000-FY-100 A1-5000-FY-100-2- 01B-A1-5000-FY-100 A1-5300-FY-100-1

01C-A1-5000-FY-100 A1-5300-FY-100-5

SCL

5000

FIC

100

5000

FIC

100

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

9

10

005

REACTIVE CLARIFIER TZ-001 IN FLOW

WATER TREATMENT PLANT

3

RACK-3, SLOT-1

INSTRUMENT

FIELD

PACKAGE

+

 A1-5000-FT-100

12

14

03A

03B

2

-

5 +

03C

   A   1  -   5   0   0   0  -   F   T  -   1   0   0

611

13

6

006

7

8

4

5

1756-IF16K

1

iRTN5

IN4

IN5

iRTN4

-

FI-1

SHEET 293

PLC MODULETERMINALSJBDCS (BY OTHERS)

PROCESS CONTROL ROOM

3 ALT0

5

   A   1  -   5   0   0   0  -   F   Y  -   1   0   0

RTN0

To AMS System

2 01B

1756-OF6CIK

RACK-3, SLOT-9

1 OUT0

5000

FIC

100

I/P

 A1-5000-FT-100LOOP NO.:

01C

001

002 -

+ 1 01A

REV. NO.

DOC. NO.

LOOP SERVICE:

+

-

FI-12

4

5

6

7

5000

FIC

100

CE CE

CE

CE   CE CE

CE

 A1-5000-FT-100 A1-5000-JP-00001

5000

FAH

100

5000

FAL

100

5000

FTA

100

CE   CE

 A1-5000-JP-00001

CE   CE

CE CE

CE

 A1-5000-FY-100

5000

FAH

100

5000

FAL

100

5000

FTA

100

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 7/293

7 OF

-6 +5 -4 +3 -2 +1 X:20

5000-JT-00001-PAN

TB1 5000-JT-00001-PAN   +1-A1-5000-AT-100 A1-5000-AT-100-2+

 A1-5000-AT-100-TB1-1+   +1-TB1-A1 -5 00 0-AT -1 00 A1 -5 00 0-AT -1 00 -0 07 + +00 7-A1 -5 00 0-AT -1 00 A1-50 00 -AT-10 0-01 B+

 A1-5000-AT-100-TB1-2-   -2-TB1-A1-5000-AT-100 A1-5000-AT-100-008- -008-A1-5000-AT-100 A1-5000-AT-100-01C- -2-A1-5000-AT-100 A1-5000-AT-100-4-

SCL

H H

JT X1-24VDC

+

-

X2-0VDC

 

Note:

Instrument cable power supply cable tag number and ferruling is still under hold for this analyzer and shall be indicated

accordingly in next revision of this drawing.

   A   1  -   5   0   0   0  -   A   T  -   1   0   0

IN0

293

PLC MODULE

WATER TREATMENT PLANT

DCS (BY OTHERS)PROCESS CONTROL ROOM

SHEET

FI-1

JB

IN1

1756-IF16K

TERMINALS

RACK-3, SLOT-1

01A+

-

iRTN1

iRTN0

5000

FIC

1

 A1-5000-AT-100

1

8

2

4

6

7

REACTIVE CLARIFIER TZ001 IN TURB.

1

2

3

2

4

01B

01C

LOOP NO.: A1-5000-AT-100

+

-

LOOP SERVICE:

+

-

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

REV. NO.

DOC. NO.

PACKAGE

+

3

100

INSTRUMENT

FIELD

-

007

008

100

FIC

50

50

100

5000

FIC

9

10

5

5000

5000

 AI

100

CE CE   CECE   CE CE   CE

 A1-5000-AT-100 A1-5000-JP-00001

5000 AAH

100

5000

 ATA

100

5000

 AI

100

5000 AAH

100

5000

 ATA

100

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 8/293

OF

  5000-JT-00012-PDN

TB1

  5000-JT-00012-PDN A1-5000-XS-300-TB1-3+   +3 -T B1 -A 1- 50 00 -XS -3 00 A 1- 500 0- XS- 30 0- 86 3+ +8 63 -A1 -5 00 0- XS -3 00 A1 -5 00 0- XS -3 00- 00 9+

NC

 A1-5000-XS-300-TB1-4-   - 4- TB1 -A 1- 50 00 -XS -3 00 A1 -5 00 0- XS- 30 0- 86 4- - 86 4- A1 -5 00 0- XS -3 00 A1 -5 00 0- XS -3 00- 01 0-

SCL

Hard wired to

ESD by others

1

2

3 863  009

DI-ESD-001

864

LOOP NO.: A1-50 00-XS-300 LOOP SERVICE: REACTIVE.CLARIF.TQ SW.FOR SCRAPER

4010

TERMINALS

 A1-5000-XS-300

PROJECT K ASHA GA N DEVELOPMENT EXPERIMENTAL PROGRA M

JBINSTRUMENT

PACKAGE

P01

8

KE01-A1-500-MT-I-HL-0001-000

TERMINALSESD (BY OTHERS)

 AGIP KAZA KHSTAN NORTH CASPIA N OPERATING COMPANY

293

PROCESS CONTROL ROOM

SHEETWATER TREATMENT PLANT

DOC. NO.

REV. NO.

CLIENT

FIELD

CE CECE   CE

 A1-5000-XS-300 A1-5000-JP-00002

CE

5000

XAHH

300

ESD

System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 9/293

OF

  5000-JT-00012-PDN

TB1 5000-JT-00012-PDN A1-5000-LS-200-TB1-1+   +1 -TB 1- A1 -5 00 0- LS -2 00 A 1- 500 0- LS- 20 0- 86 1+ +8 61 -A1 -5 00 0- LS- 20 0 A1 -5 00 0- LS -2 00 -0 01 +

NC

 A1-5000-LS-200-TB1-2-   - 2- TB 1- A1 -5 00 0- LS -2 00 A1 -5 00 0- LS- 20 0- 86 2- - 86 2- A1 -5 00 0- LS -2 00 A1 -5 00 0- LS -2 00 -0 02 -

SCL

9

ESD (BY OTHERS)

 AGIP KAZA KHSTAN NORTH CASPIA N OPERATING COMPANYCLIENT

FIELD

293

PROCESS CONTROL ROOM

SHEETPACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

P01

 A1-5000-LS-200

PROJECT K ASHA GA N DEVELOPMENT EXPERIMENTAL PROGRA M

JB

DI-ESD-001

INSTRUMENT TERMINALS

862

LOOP NO.: A1-5000-LS-200 LOOP SERVICE: CLARI.WTR.BREAK. TNK TA-002 LS

4

002

Hard wired to

ESD by others

1

2

3

861  001

REV. NO.

DOC. NO.

LALL

200

5000

TERMINALS

CE CECE   CE

 A1-5000-LS-200 A1-5000-JP-00002

CE

5000

LALL

200

ESD

System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 10/293

10 OF

FI-15000-JT-00002-PAN 1756-IF16K

TB1 5000-JT-00002-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-1

 A1-5000-LT-100-TB1-1+   + 1- TB 1- A1 -5 00 0- LT -1 00 A 1- 50 00 -L T- 10 0- 11 + + 11 -A 1- 50 00 -L T- 10 0 A 1- 50 00 -L T- 10 0- 07 A+

+13-A1-5000-LT-100 A1-5000-LT-100-30+

 A1-5000-LT-100-TB1-2-   - 2- TB 1- A1 -5 00 0- LT -1 00 A 1- 50 00 -L T- 10 0- 12 - - 12 -A 1- 50 00 -L T- 10 0 A 1- 50 00 -L T- 10 0- 07 B-

-14-A1-5000-LT-100 A1-5000-LT-100-32-

SCL

H H

L L

5000

5000

FIC

100

5000

31

iRTN1229

30

iRTN13

32 IN13

4

3

07A

07B

1

2

LOOP NO.: A1-5000-LT-100

INSTRUMENT

FIELD

CLARI.WTR.BREAK. TNK TA-002 LVL

 A1-5000-LT-100

+

-

PLC MODULE

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

IN12

DCS (BY OTHERS)PROCESS CONTROL ROOM

011

012

   A   1  -   5   0   0   0  -   L   T  -   1   0   0

PACKAGE WATER TREATMENT PLANT

14

+

-07C

13

TERMINALSJB

LOOP SERVICE:

FIC

100

5000

FIC

100

FIC

100

CE CE

CE

CE   CE   CE

CE

 A1-5000-LT-100 A1-5000-JP-00003

5000

LAH

100

5000

LAL

100

5000

LTA

100

5000

LIC

100

5000

LIC

100

5000

LAH

100

5000

LAL

100

5000

LTA

100

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 11/293

11 OF

24V DC SUPPLY

- +

18 18

 A1-5000-JY-100 5000-JT-00003-PDN

TB2 5000-JT-00003-PDN

BL   A1-5000-JY-100-TB2-1+   +1-TB2-A1-5000-JY-100 A1-5000-JY-100-1501+

WT   A1-5000-JY-100-TB2-2-   - 2- TB 2- A1 -5 00 0- JY -1 00 A 1- 50 00 -J Y- 10 0- 15 02 - - 15 02 -A 1- 50 00 -J Y- 10 0 A 1- 50 00 -J Y- 10 0- 1

SCL 18A- 18A+

24V DC SUPPLY

+ -

1 1

 A1-5000-HZSH-100 5000-JT-00003-PDN

TB1 5000-JT-00003-PDN

BL   A1-5000-HZSH-100-TB1-1+   +1-TB1-A1-5000-HZSH-100 A1-5000-HZSH-100-701+

WT   A1-5000-HZSH-100-TB1-2-   - 2-TB1-A1 -5 00 0-HZ SH-1 00 A1-50 00 -HZSH-10 0-70 2- - 70 2-A1 -5 00 0-HZ SH-1 00 A1-50 00 -HZSH-10 0-1

SCL

1A+ 1A-

24V DC SUPPLY

+ -

5000-JT-00003-PDN 1 1

TB1

 A1-5000-HZSL-100

5000-JT-00003-PDN

BL   A1-5000-HZSL-100-TB1-3+   +3-TB1-A1-5000-HZSL-100 A1-5000-HZSL-100-703+

WT   A1-5000-HZSL-100-TB1-4-   - 4-TB1-A1 -5 00 0-HZ SL -1 00 A1-50 00 -HZSL-10 0-70 4- - 70 4-A1 -5 00 0-HZ SL -1 00 A1-50 00 -HZSL-10 0-3

SCL

1A+ 1A-

5000

XA

100

2

100

5000

XA

100

5000

JY

100

5000

HIC

100

100

5000

HSAL

100

 A1-5000-JY-100

2

1

+DC-0

OUT-0

 A1-5000-JP-00005

S

   A   1  -   5   0   0   0  -   J   Y  -   1   0

 A1-5000-HZSH-100   A1-5000-JP-00004

RACK-1, SLOT-6

1+   1501

NO

100

2 702

-   2 1502

C   1 701

1

3

 A1-5000-JP-00004

3 703

SHEET 293

PLC MODULE

5000

JY

100

5000

JY

1756-OB16DK

TERMINALS

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

 A1-5000-HZSL-100

C

NO   3 IN-14 704

1756-IB161K

RACK-0, SLOT-1

LOOP NO.: A1-5000-X-100

INSTRUMENT

FIELD

LOOP SERVICE: CLARI .WTR.BRAK.TNK TA-002 IN VLV

3

5

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   0   0   0  -   H   Z   S   H  -   1   0   0

   A   1  -   5   0   0   0  -   H   Z   S   L  -   1   0   0

WATER TREATMENT PLANT

ZSH

ZSL

5000

HSAH

1756-IB161K

RACK-0, SLOT-1

5000

HSAH

4 G ND- 1

IN-0

GND-02

100

5000

HSAL

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE  CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 12/293

12 OF

24V DC SUPPLY

- +

5000-JT-00003-PDN 18 18

TB2

 A1-5000-JY-101

5000-JT-00003-PDN

BL   A1-5000-JY-101-TB2-3+   +3-TB2-A1-5000-JY-101 A1-5000-JY-101-1503+

WT   A1-5000-JY-101-TB2-4-   - 4- TB 2- A1 -5 00 0- JY -1 01 A 1- 50 00 -J Y- 10 1- 15 04 - - 15 04 -A 1- 50 00 -J Y- 10 1 A 1- 50 00 -J Y- 10 1- 3

SCL 18A- 18A+

24V DC SUPPLY

+ -

5000-JT-00003-PDN 1 1

TB1

 A1-5000-HZSH-101

5000-JT-00003-PDN

BL   A1-5000-HZSH-101-TB1-5+   +5-TB1-A1-5000-HZSH-101 A1-5000-HZSH-101-705+

WT   A1-5000-HZSH-101-TB1-6-   - 6-TB1-A1 -5 00 0-HZ SH-1 01 A1-50 00 -HZSH-10 1-70 6- - 70 6-A1 -5 00 0-HZ SH-1 01 A1-50 00 -HZSH-10 1-5

SCL

1A+ 1A-

24V DC SUPPLY

+ -

5000-JT-00003-PDN 1 1

TB1

 A1-5000-HZSL-101

5000-JT-00003-PDN

BL   A1-5000-HZSL-101-TB1-7+   +7-TB1-A1-5000-HZSL-101 A1-5000-HZSL-101-707+

WT   A1-5000-HZSL-101-TB1-8-   - 8-TB1-A1 -5 00 0-HZ SL -1 01 A1-50 00 -HZSL-10 1-70 8- - 70 8-A1 -5 00 0-HZ SL -1 01 A1-50 00 -HZSL-10 1-7

SCL

1A+ 1A-

5000

HSAH

2

8 G ND- 3

IN-2

GND-26

1756-OB16DK

RACK-1, SLOT-6

PACKAGE

   A   1  -   5   0   0   0  -   H   Z   S   H  -   1   0   1

   A   1  -   5   0   0   0  -   H   Z   S   L  -   1   0   1

WATER TREATMENT PLANT

ZSH

ZSL

5000

HSAH

1756-IB161K

RACK-0, SLOT-1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

LOOP SERVICE: TECHNICAL.WTR.TNK TA-001 IN VLV

5

9

1756-IB161K

RACK-0, SLOT-1

LOOP NO.: A1-5000-X-101

NO   7 IN-38 708  101

TERMINALS

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

JY

101

5000

JY

101

SHEET 293

PLC MODULE

5000

5

3

101

7

7 707

NO   6 706

 A1-5000-HZSL-101

C

C   5 705

 A1-5000-JP-00004

S

   A   1  -   5   0   0   0  -   J   Y  -   1   0

 A1-5000-HZSH-101   A1-5000-JP-00004

+   1503

-   4 1504

 A1-5000-JY-101

4

3

+DC-0

OUT-1

 A1-5000-JP-00005

JY

101

101

5000

HSAL

101

5000

XA

5000

HSAL

101

4

6

101

5000

XA

101

50005000

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE  CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 13/293

13 OF

5000-JT-00004-PAN

TB1

FI-11756-IF16K

5000-JT-00004-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-1

 A1-5000-FT-101-TB1-3+   +3-TB1-A1 -5 00 0-FT -1 01 A1-50 00 -F T-10 1-01 5+ +01 5-A1 -5 00 0-FT -1 01 A1-50 00 -F T-10 1-04 A+

+7-A1-5000-FT-101 A1-5000-FT-101-16+

 A1-5000-FT-101-TB1-4-   - 4- TB 1- A1 -5 00 0- FT -1 01 A 1- 50 00 -F T- 10 1- 01 6- - 01 6- A1 -5 00 0- FT -1 01 A 1- 50 00 -F T- 10 1- 04 B-

-8-A1-5000-FT-101 A1-5000-FT-101-18-

SCL

H H

5000

FIC

5000

FIC

5000

FIC

100

100

100

   A   1  -   5   0   0   0  -   F   T  -   1   0   1

SHEET 293

PLC MODULETERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

1

04A

04B

+

-

10

2

9

015

016

8

6

4

LOOP NO.: A1-5000-FT-101

INSTRUMENT

FIELD

LOOP SERVICE: SLUGE TR.PMP PA003 A/B DIS. FLOW

3

5

7

 A1-5000-FT-101

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

17

iRTN6

iRTN7

PACKAGE WATER TREATMENT PLANT

8

+

-04C

7

IN7

16 IN6

15

18

5000

FI101

CE CE

CE

CE   CE   CE

CE

 A1-5000-FT-101 A1-5000-JP-00006

5000

FAH

101

5000

FTA

101

5000

FI

101

5000

FAH

101

5000

FTA

101

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 14/293

14 OF

-6 +5 -4 +3 -2 +1 X:20

5000-JT-00004-PAN

TB1 5000-JT-00004-PAN   +3-A1-5000-AT-101 A1-5000-AT-101-6+

 A1-5000-AT-101-TB1-1+   +1-TB1-A1 -5 00 0-AT -1 01 A1 -50 00 -AT-10 1-01 7+ +01 7-A1 -5 00 0-AT -1 01 A1-50 00 -AT-10 1-02 B+

 A1-5000-AT-101-TB1-2-   -2-TB1-A1-5000-AT-101 A1-5000-AT-101-018- -018-A1-5000-AT-101 A1-5000-AT-101-02C- -4-A1-5000-AT-101 A1-5000-AT-101-8-

SCL

H H

JT X1-24VDC

+

-

X2-0VDC

Note:

Instrument cable power supply cable tag number and ferruling is still under hold for this analyzer and shall be indicated

accordingly in next revision of this drawing.

5000

FIC

100

5000

FIC

100

5000

FIC

100

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

+

-

LOO P NO .: A1- 5000- AT-101 L OOP S ERVICE : S LUGE TR.PMP PA 003 A/B DIS.TURB I.

4

10

9

7

8

017

018

6

4

2

3

5

5

7

 A1-5000-AT-101

+

-

6

8

02B

02C

02A3

1

DCS (BY OTHERS)PROCESS CONTROL ROOM

FI-1

RACK-3, SLOT-1

iRTN3

SHEET

   A   1  -   5   0   0   0  -   A   T  -   1   0   1

IN2

IN3

iRTN2

293

PLC MODULETERMINALSJB

1756-IF16K

INSTRUMENT

FIELD

PACKAGE WATER TREATMENT PLANT

51

+   + 51

-   -

5000

 AI

101

CE CE   CECE   CE CE   CE

 A1-5000-AT-101 A1-5000-JP-00006

5000

 AAH

101

5000

 ATA

101

5000

 AI

101

5000

 AAH

101

5000

 ATA

101

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 15/293

15 OF

24V DC SUPPLY

- +

18 18

 A1-5000-JY-102 5000-JT-00005-PDN

TB2 5000-JT-00005-PDN

BL   A1-5000-JY-102-TB2-1+   +1-TB2-A1-5000-JY-102 A1-5000-JY-102-1511+

WT   A1-5000-JY-102-TB2-2-   - 2- TB 2- A1 -5 00 0- JY -1 02 A 1- 50 00 -J Y- 10 2- 15 12 - - 15 12 -A 1- 50 00 -J Y- 10 2 A 1- 50 00 -J Y- 10 2- 5

SCL 18A- 18A+

24V DC SUPPLY

+ -

1 1

 A1-5000-HZSH-102 5000-JT-00005-PDNTB1 5000-JT-00005-PDN

BL   A1-5000-HZSH-102-TB1-1+   +1-TB1-A1-5000-HZSH-102 A1-5000-HZSH-102-711+

WT   A1-5000-HZSH-102-TB1-2-   - 2-TB1-A1 -5 00 0-HZ SH-1 02 A1-50 00 -HZSH-10 2-71 2- - 71 2-A1 -5 00 0-HZ SH-1 02 A1-50 00 -HZSH-10 2-9

SCL

1A+ 1A-

24V DC SUPPLY

+ -

5000-JT-00005-PDN 1 1

TB1

 A1-5000-HZSL-102

5000-JT-00005-PDN

BL   A1-5000-HZSL-102-TB1-3+   +3-TB1-A1-5000-HZSL-102 A1-5000-HZSL-102-713+

WT   A1-5000-HZSL-102-TB1-4-   - 4-TB1-A1 -5 00 0-HZ SL -1 02 A1-50 00 -HZSL-10 2-71 4- - 71 4-A1 -5 00 0-HZ SL -1 02 A1-50 00 -HZSL-10 2-11

SCL

1A+ 1A-

5000

HSAH

1 2 G ND -5

IN-4

GND-410

102

5000

HSAL

PACKAGE

   A   1  -   5   0   0   0  -   H   Z   S   H  -   1   0   2

   A   1  -   5   0   0   0  -   H   Z   S   L  -   1   0   2

WATER TREATMENT PLANT

ZSH

ZSL

5000

HSAH

1756-IB161K

RACK-0, SLOT-1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

LOOP NO.: A1-5000-X-102

INSTRUMENT

FIELD

LOOP SERVICE: CLARI .WTR.BRAK.TNK TA-002 IN VLV

3

5

 A1-5000-HZSL-102

C

NO   11 IN- 54 714

1756-IB161K

RACK-0, SLOT-1

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5000

JY

102

5000

JY

1756-OB16DK

9

3

 A1-5000-JP-00007

3 713

NO

102

2 712

-   2 1512

C   1 711

S

   A   1  -   5   0   0   0  -   J   Y  -   1   0

 A1-5000-HZSH-102   A1-5000-JP-00007

RACK-1, SLOT-6

1+   1511

 A1-5000-JY-102

6

5

+DC-0

OUT-2

 A1-5000-JP-00008

102

102

5000

HSAL

102

102

5000

HIC

5000

XA

102

2

102

5000

XA

102

5000

JY

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 16/293

16 OF

24V DC SUPPLY

- +

5000-JT-00005-PDN 23 23

TB2

 A1-5000-JY-106

5000-JT-00005-PDN

BL   A1-5000-JY-106-TB2-3+   +3-TB2-A1-5000-JY-106 A1-5000-JY-106-1513+

WT   A1-5000-JY-106-TB2-4-   - 4-TB2-A1 -5 00 0-JY-1 06 A1 -5 00 0-JY-1 06 -1 51 4- - 15 14 -A1-50 00 -J Y-10 6 A1-50 00 -J Y-10 6-23

SCL 23A- 23A+

24V DC SUPPLY

+ -

5000-JT-00005-PDN 13 13

TB1

 A1-5000-HZSH-1065000-JT-00005-PDN

BL   A1-5000-HZSH-106-TB1-5+   +5-TB1-A1-5000-HZSH-106 A1-5000-HZSH-106-715+

WT   A1-5000-HZSH-106-TB1-6-   - 6-TB1-A1 -5 00 0-HZ SH-1 06 A1-50 00 -HZSH-10 6-71 6- - 71 6-A1 -5 00 0-HZ SH-1 06 A1-50 00 -HZSH-10 6-5

SCL

13A+ 13A-

24V DC SUPPLY

+ -

5000-JT-00005-PDN 13 13

TB1

 A1-5000-HZSL-106

5000-JT-00005-PDN

BL   A1-5000-HZSL-106-TB1-7+   +7-TB1-A1-5000-HZSL-106 A1-5000-HZSL-106-717+

WT   A1-5000-HZSL-106-TB1-8-   - 8-TB1-A1 -5 00 0-HZ SL -1 06 A1-50 00 -HZSL-10 6-71 8- - 71 8-A1 -5 00 0-HZ SL -1 06 A1-50 00 -HZSL-10 6-7

SCL

13A+ 13A-

106

4

6

106

5000

XA

106

50005000

HIC

5000

XA

5000

HSAL

JY

106

106

5000

HSAL

106

 A1-5000-JY-106

24

23

+DC-1

OUT-11

 A1-5000-JP-00008

S

   A   1  -   5   0   0   0  -   J   Y  -   1   0

 A1-5000-HZSH-106   A1-5000-JP-00007

+   1513

-   4 1514

C   5 715

 A1-5000-JP-00007

7 717

NO   6 716

 A1-5000-HZSL-106

C

5

3

106

7

SHEET 293

PLC MODULE

5000

JY

106

5000

JY

106

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

LOOP NO.: A1-5000-X-106

NO   7 IN-38 718  106

INSTRUMENT

FIELD

LOOP SER VI CE: T EC H. WT R. TN K. T A-001 I N VLV

5

9

1756-IB161K

RACK-0, SLOT-13

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   0   0   0  -   H   Z   S   H  -   1   0   6

   A   1  -   5   0   0   0  -   H   Z   S   L  -   1   0   6

WATER TREATMENT PLANT

ZSH

ZSL

5000

HSAH

1756-IB161K

RACK-0, SLOT-13

5000

HSAH

2

8 GND-3

IN-2

GND-26

1756-OB16DK

RACK-1, SLOT-11

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 17/293

17 OF

24V DC SUPPLY

- +

5000-JT-00005-PDN 23 23

TB2

 A1-5000-JY-106

5000-JT-00005-PDN

BL   A1-5000-JY-106-TB2-5+   +5-TB2-A1-5000-JY-106 A1-5000-JY-106-1513+

WT   A1-5000-JY-106-TB2-6-   - 6-TB2-A1 -5 00 0-JY-1 06 A1 -5 00 0-JY-1 06 -1 51 4- - 15 14 -A1-50 00 -J Y-10 6 A1-50 00 -J Y-10 6-23

SCL 23A- 23A+

24V DC SUPPLY

+ -

5000-JT-00005-PDN 13 13

TB1

 A1-5000-HZSH-1065000-JT-00005-PDN

BL   A1-5000-HZSH-106-TB1-9+   +9-TB1-A1-5000-HZSH-106 A1-5000-HZSH-106-715+

WT   A1-5000-HZSH-106-TB1-10-   - 10 -T B1 -A1-50 00 -HZSH-10 6 A1-50 00 -HZSH-10 6-71 6- - 71 6-A1 -5 00 0-HZ SH-1 06 A1-50 00 -HZSH-10 6-5

SCL

13A+ 13A-

24V DC SUPPLY

+ -

5000-JT-00005-PDN 13 13

TB1

 A1-5000-HZSL-106

5000-JT-00005-PDN

BL   A1-5000-HZSL-106-TB1-11+   +11-TB1-A1-5000-HZSL-106 A1-5000-HZSL-106-717+

WT   A1-5000-HZSL-106-TB1-12-   - 12 -T B1 -A1-50 00 -HZSL-10 6 A1-50 00 -HZSL-10 6-71 8- - 71 8-A1 -5 00 0-HZ SL -1 06 A1-50 00 -HZSL-10 6-7

SCL

13A+ 13A-

5000

HSAH

4

8 GND- 3

IN-2

GND-26

1756-OB16DK

RACK-1, SLOT-11

PACKAGE

   A   1  -   5   0   0   0  -   H   Z   S   H  -   1   0   6

   A   1  -   5   0   0   0  -   H   Z   S   L  -   1   0   6

WATER TREATMENT PLANT

ZSH

ZSL

5000

HSAH

1756-IB161K

RACK-0, SLOT-13

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

LOOP SER VI CE: T EC H. WT R. SU PPLY. L IN E VLV

7

13

1756-IB161K

RACK-0, SLOT-13

LOOP NO.: A1-5000-X-106

NO   7 IN-312 718  106

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

106

5000

JY

106

SHEET 293

PLC MODULE

5000

5

5

106

11

11 717

NO   10 716

 A1-5000-HZSL-106

C

C   9 715

 A1-5000-JP-00007

S

   A   1  -   5   0   0   0  -   J   Y  -   1   0

 A1-5000-HZSH-106   A1-5000-JP-00007

+   1513

-   6 1514

 A1-5000-JY-106

24

23

+DC-1

OUT-11

 A1-5000-JP-00008

JY

106

106

5000

HSAL

106

5000

XA

5000

HSAL

106

8

10

106

5000

XA

106

50005000

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 18/293

18 OF

FI-15000-JT-00006-PAN 1756-IF16K

TB1 5000-JT-00006-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-1

 A1-5000-LT-101-TB1-1+   + 1- TB 1- A1 -5 00 0- LT -1 01 A 1- 50 00 -L T- 10 1- 25 + + 25 -A 1- 50 00 -L T- 10 1 A 1- 50 00 -L T- 10 1- 08 A+

+15-A1-5000-LT-101 A1-5000-LT-101-34+

 A1-5000-LT-101-TB1-2-   - 2- TB 1- A1 -5 00 0- LT -1 01 A 1 -5 00 0- LT -1 01 -2 6- - 26 -A 1- 50 00 -L T- 10 1 A 1- 50 00 -L T- 10 1- 08 B-

-16-A1-5000-LT-101 A1-5000-LT-101-36-

SCL

LL LL

5000

FIC

100

100

5000

FIC

100

35

iRTN14

iRTN15

36 IN15

PACKAGE WATER TREATMENT PLANT

16

+

-08C

15 3408A

08B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

LOOP NO.: A1-5000-LT-101

INSTRUMENT

FIELD

LOOP SERVICE: SODIUM HYPO.DOSING TNK TA-007 LVL

025

5

7

 A1-5000-LT-101

10

2

9

026

8

6

4

3

JB

   A   1  -   5   0   0   0  -   L   T  -   1   0   1

1+

-

PLC MODULETERMINALS

SHEET 293

33

IN14

DCS (BY OTHERS)PROCESS CONTROL ROOM

13

14

20

21

15

16

17

18

19

5000

FIC

11

12

CE CE

CE

CE   CE   CE

CE

 A1-5000-LT-101  A1-5000-JP-00009

5000

LALL

101

5000

LTA

101

5000

LI

101

5000

LI

101

5000

LALL

101

5000

LTA

101

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 19/293

OF

 5000-JT-00006-PAN

TB1

1

2

3

4

FI-14

5000-JT-00006-PAN -6 +5 -4 +3 -2 +1 X:20 A1-5000-PT-114-TB1-7+   +7-TB1-A1 -5 00 0-PT -1 14 A1-50 00 -PT-11 4-02 7+ +02 7-A1 -5 00 0-PT -1 14 A1-50 00 -PT-11 4-01 A+

+1-A1-5000-PT-114 A1-5000-PT-114-001+

 A1-5000-PT-114-TB1-8-   - 8-TB1-A1 -5 00 0-PT -1 14 A1 -50 00 -PT-11 4-02 8- - 02 8-A1 -5 00 0-PT -1 14 A1-50 00 -PT-11 4-01 B-

-2-A1-5000-PT-114 A1-5000-PT-114-002-

SCL

HH HH

ESD (BY OTHERS)

5000FIC

TERMINALS

PROCESS CONTROL ROOM

MULTIPLEXOR

002

100

6

8

7  AI-ESD-001

00101B

19

20

10

028

LOOP NO.: A1-5000-PT-114

9

18

17

16

15

LOOP SERVICE: SOD.HYPO.DOS.PMP PD001A D.PRES.

027

 A1-5000-PT-114

14

13

12

11

01A+

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

P01

SHEET 29319

DOC. NO.

REV. NO.

FIELD

JB

-

PACKAGE WATER TREATMENT PLANT

2

+

-01C

1

TERMINALS

5

INSTRUMENT

21

Hard wired to

ESD by others

To AMS

System

5000

FIC

100

5000

FIC

100

CE   CE

CE

CE   CE   CE

CE

 A1-5000-PT-114 A1-5000-JP-00009

5000

PI

114

5000

PAHH

114

5000

PTA

114

ESD

System

5000

PI

114

5000

PAHH

114

5000

PTA

114

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 20/293

OF

 5000-JT-00006-PAN

TB1

1

2

3

4

FI-14

5000-JT-00006-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5000-PT-114-TB1-9+   +9-TB1-A1 -5 00 0-PT -1 14 A1-50 00 -PT-11 4-02 9+ +02 9-A1 -5 00 0-PT -1 14 A1-50 00 -PT-11 4-02 A+

+3-A1-5000-PT-114 A1-5000-PT-114-003+

 A1-5000-PT-114-TB1-10-   - 10 -T B1 -A1-50 00 -PT-11 4 A1-50 00 -PT-11 4-03 0- - 03 0-A1 -5 00 0-PT -1 14 A1-50 00 -PT-11 4-02 B-

-4-A1-5000-PT-114 A1-5000-PT-114-004-

SCL

HH HH

ESD (BY OTHERS)

20

KE01-A1-500-MT-I-HL-0001-000

P01

Hard wired toESD by others

To AMS

System

100

293

FIC

100

5000

FIC

004

SHEET

5000

19

20

10

  003

5000

FIC

100

+

-

INSTRUMENT

PROJECT

13

12

11

+

-

6

8

4

5

 A1-5000-PT-114

CLIENT

PROCESS CONTROL ROOMFIELD

JB

PACKAGE WATER TREATMENT PLANT

TERMINALS

7

LOOP NO.: A1-5000-PT-114

18

17

LOOP SERVICE:

21

030

16

15

SOD.HYPO.DOS.PMP PD001B D.PRES.

02C

3

02B

14

DOC. NO.

REV. NO.

 AI-ESD-0019 029 02A

MULTIPLEXOR

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

TERMINALS

CE CE

CE

CE   CE   CE

CE

 A1-5000-PT-114 A1-5000-JP-00009

5000

PI

115

5000

PAHH

115

5000

PTA

115

ESD

System

5000

PI

115

5000

PAHH

115

5000

PTA

115

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 21/293

21 OF

5000-JT-00006-PAN

TB1

5000-JT-00006-PAN

 A1-5000-UY-200-TB1-27+   + 27 -T B1 -A 1- 50 00 -U Y- 20 0 A 1- 50 00 -U Y- 20 0- 03 1+ + 03 1- A1 -5 00 0- UY -2 00   A1-5000-UY-200-15

 A1-5000-UY-200-TB1-28-   - 28 -T B1 -A 1- 50 00 -U Y- 20 0 A 1- 50 00 -U Y- 20 0- 03 2- - 03 2- A1 -5 00 0- UY -2 00   A1-5000-UY-200-19

SCL

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

I/P

LOO P NO .: A1- 5000- UY -200 LO OP SERV ICE: SOD.HYPO .DOS .PMP P D0 01A ANG CON

 A1-5000-UY-200

031

03228

27+

-29

FIELD

1756-OF6CIK

RACK-3, SLOT-1226

15

19 RTN4

17 ALT4

293

PLC MODULETERMINALS

WATER TREATMENT PLANT

INSTRUMENT

PACKAGE

ESD (BY OTHERS)PROCESS CONTROL ROOM

JB

DOC. NO.

REV. NO.

OUT4

   A   1  -   5   0   0   0  -   U   Y  -   2   0   0

SHEET

CE CECE   CE

 A1-5000-UY-200 A1-5000-JP-00009

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 22/293

22 OF

5000-JT-00006-PAN

TB1

5000-JT-00006-PAN

 A1-5000-UY-201-TB1-29+   + 29 -T B1 -A 1- 50 00 -U Y- 20 1 A 1- 50 00 -U Y- 20 1- 59 7+ + 59 7- A1 -5 00 0- UY -2 01   A1-5000-UY-201-16

 A1-5000-UY-201-TB1-30-   - 30 -T B1 -A 1- 50 00 -U Y- 20 1 A 1- 50 00 -U Y- 20 1- 59 8- - 59 8- A1 -5 00 0- UY -2 01   A1-5000-UY-201-20

SCL

 A1-5000-UY-201

597

PLC MODULETERMINALS

PACKAGE

OUT5

   A   1  -   5   0   0   0  -   U   Y  -   2   0   1

20 RTN5

18 ALT5

JB

RACK-3, SLOT-1227

16

CLIENT DOC. NO.

REV. NO.

59830

29+

-

FIELD

1756-OF6CIK

 A1-5000-UY-201 LOOP SERVICE:

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

SOD.HYPO.DOS.PMP PD001B ANG CON

I/P

LOOP NO.:

31

KE01-A1-500-MT-I-HL-0001-000

ESD (BY OTHERS)PROCESS CONTROL ROOM

SHEET 293

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

P01

WATER TREATMENT PLANT

INSTRUMENT

CE CECE   CE

 A1-5000-UY-201 A1-5000-JP-00009

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 23/293

OF

FI-15 5000-JT-00007-PAN

TB1 5000-JT-00007-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5000-LT-102-TB1-1+   1   +1-TB1-A1 -5 00 0-LT -1 02 A1-50 00 -L T-10 2-02 9+ +02 9-A1 -5 00 0-LT -1 02 A1-50 00 -L T-10 2-02 A+

+3-A1-5000-LT-102 A1-5000-LT-102-035+

 A1-5000-LT-102-TB1-2-   2   - 2- TB 1- A1 -5 00 0- LT -1 02 A 1- 50 00 -L T- 10 2- 03 0- - 03 0- A1 -5 00 0- LT -1 02 A 1- 50 00 -L T- 10 2- 02 B-

3   -4-A1-5000-LT-102 A1-5000-LT-102-036-

SCL

4

LL LL

100

FIC

100

5000

FIC

KE01-A1-500-MT-I-HL-0001-000

P01

23 293

030

16

15

FERRIC CHLO.DOSING TNK TA-003 LVL

5000

FIC

100

5000

14

13

5

Hard wired to

ESD by others

11

10

9

12

8

7

LOOP NO.: A1-5000-LT-102

18

17

LOOP SERVICE:

20

19

-

 A1-5000-LT-102

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

4

+

-

029

MULTIPLEXOR

035

+

CLIENT

TERMINALS

PACKAGE

INSTRUMENT

SHEET

TERMINALS

PROJECT

FIELD

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

PROCESS CONTROL ROOM

To AMS

System

WATER TREATMENT PLANT

02C

302A

036

ESD (BY OTHERS)JB

6

02B

 AI-ESD-001

DOC. NO.

REV. NO.

CE CE

CE

CE   CE   CE

CE

 A1-5000-LT-102 A1-5000-JP-00011

5000

LI

102

5000

LALL

102

5000

LTA

102

ESD

System

5000

PI

102

5000

LALL

102

5000

LTA

102

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 24/293

OF

 5000-JT-00007-PAN

TB1

1

FI-142

5000-JT-00007-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5000-PT-116-TB1-3+   3   +3-TB1-A1 -5 00 0-PT -1 16 A1-50 00 -PT-11 6-08 7+ +08 7-A1 -5 00 0-PT -1 16 A1-50 00 -PT-11 6-03 A+

+5-A1-5000-PT-116 A1-5000-PT-116-005+

 A1-5000-PT-116-TB1-4-   4   - 4- TB 1- A1 -5 00 0- PT -1 16 A 1- 50 00 -P T- 11 6- 08 8- - 08 8- A1 -5 00 0- PT -1 16 A 1 -5 00 0- PT -1 16 -0 3B -

-6-A1-5000-PT-116 A1-5000-PT-116-006-

SCL

HH HH

DOC. NO.

REV. NO.

100

FIC

100

5000

FIC

PROCESS CONTROL ROOM

03B088

ESD (BY OTHERS)

24

KE01-A1-500-MT-I-HL-0001-000

P01

293

16

15

FERIC.CHLO.DOS.PMP PD002A D.PRES.

7

12

6

5000

FIC

100

5000

11

10

9

-

LOOP NO.: A1-5000-PT-116

18

17

LOOP SERVICE:

20

19

14

13

 A1-5000-PT-116

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

6

+

-

087

MULTIPLEXOR

005

 AI-ESD-001+

CLIENT

TERMINALS

PACKAGE

INSTRUMENT

SHEET

TERMINALS

PROJECT

FIELD

JB

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

To AMS

System

WATER TREATMENT PLANT

03C

503A

006

8

5

Hard wired to

ESD by others

CE CE

CE

CE   CE   CE

CE

 A1-5000-PT-116 A1-5000-JP-00011

5000

PI

116

5000

PAHH

116

5000

PTA

116

ESDSystem

5000

PI

116

5000

PAHH

116

5000

PTA

116

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 25/293

OF

 5000-JT-00007-PAN

TB1

1

2

3

FI-144

5000-JT-00007-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5000-PT-117-TB1-5+   +5-TB1-A1 -5 00 0-PT -1 17 A1-50 00 -PT-11 7-08 9+ +08 9-A1 -5 00 0-PT -1 17 A1-50 00 -PT-11 7-04 A+

+7-A1-5000-PT-117 A1-5000-PT-117-007+

 A1-5000-PT-117-TB1-6-   - 6- TB 1- A1 -5 00 0- PT -1 17 A 1- 50 00 -P T- 11 7- 09 0- - 09 0- A1 -5 00 0- PT -1 17 A 1- 50 00 -P T- 11 7- 04 B-

-8-A1-5000-PT-117 A1-5000-PT-117-008-

SCL

HH HH

100

5000

FIC

100

FIC

100

5000

FIC

5000

To AMS

System

SHEET

PROCESS CONTROL ROOM

TERMINALS

008

25 293

ESD (BY OTHERS)MULTIPLEXOR

04C

7

INSTRUMENT

 A1-5000-PT-117

5

TERMINALS

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

PACKAGE WATER TREATMENT PLANT

DOC. NO.

REV. NO.

KE01-A1-500-MT-I-HL-0001-000

P01

+

8

PROJECT

FIELD

JB

-7

9

LOOP NO.: A1-5000-PT-117

18

17

LOOP SERVICE:

20

19

12

Hard wired to

ESD by others

089

6  007

 AI-ESD-001

04B

04A

8

+

-090

16

15

FERIC.CHLO.DOS.PMP PD002B D.PRES.

10

14

13

11

CE CE

CE

CE   CE   CE

CE

 A1-5000-PT-117 A1-5000-JP-00011

5000

PI

117

5000

PAHH

117

5000

PTA

117

ESD

System

5000

PI

117

5000

PAHH

117

5000

PTA

117

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 26/293

26 OF

5000-JT-00007-PAN

TB1

5000-JT-00007-PAN

 A1-5000-UY-202-TB1-7+   + 7- TB 1- A1 -5 00 0- UY -2 02 A 1- 50 00 -U Y- 20 2- 09 1+ + 09 1- A1 -5 00 0- UY -2 02   A1-5000-UY-202-1

 A1-5000-UY-202-TB1-8-   - 8- TB 1- A1 -5 00 0- UY -2 02 A 1- 50 00 -U Y- 20 2- 09 2- - 09 2- A1 -5 00 0- UY -2 02   A1-5000-UY-202-5

SCL

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

I/P

LOO P NO .: A1- 5000- UY -202 LO OP SERV ICE: FERIC.CHL O.DO S.P MP PD002A A NG CON

 A1-5000-UY-202

091

0928

7+

-9

FIELD

1756-OF6CIK

RACK-3, SLOT-136

1

5 RTN0

3 ALT0

293

PLC MODULETERMINALS

WATER TREATMENT PLANT

INSTRUMENT

PACKAGE

ESD (BY OTHERS)PROCESS CONTROL ROOM

JB

DOC. NO.

REV. NO.

OUT0

   A   1  -   5   0   0   0  -   U   Y  -   2   0   2

SHEET

CE CECE   CE

 A1-5000-UY-202 A1-5000-JP-00011

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 27/293

27 OF

5000-JT-00007-PAN

TB1

5000-JT-00007-PAN

 A1-5000-UY-203-TB1-9+   + 9- TB 1- A1 -5 00 0- UY -2 03 A 1- 50 00 -U Y- 20 3- 09 5+ + 09 5- A1 -5 00 0- UY -2 03   A1-5000-UY-203-2

 A1-5000-UY-203-TB1-10-   - 10 -T B1 -A 1- 50 00 -U Y- 20 3 A 1- 50 00 -U Y- 20 3- 09 6- - 09 6- A1 -5 00 0- UY -2 03   A1-5000-UY-203-6

SCL

 A1-5000-UY-203

095

PLC MODULETERMINALS

PACKAGE

OUT1

   A   1  -   5   0   0   0  -   U   Y  -   2

   0   3

6 RTN1

4 ALT1

JB

RACK-3, SLOT-138

2

CLIENT DOC. NO.

REV. NO.

09610

9+

-

FIELD

1756-OF6CIK

 A1-5000-UY-203 LOOP SERVICE:

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

FERIC.CHLO.DOS.PMP PD002B ANG CON

I/P

LOOP NO.:

11

KE01-A1-500-MT-I-HL-0001-000

ESD (BY OTHERS)PROCESS CONTROL ROOM

SHEET 293

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

P01

WATER TREATMENT PLANT

INSTRUMENT

CE CECE   CE

 A1-5000-UY-203 A1-5000-JP-00011

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 28/293

28 OF

FI-15000-JT-00008-PAN 1756-IF16K

TB1 5000-JT-00008-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-2

 A1-5000-LT-103-TB1-1+   + 1- TB 1- A1 -5 00 0- LT -1 03 A 1- 50 00 -L T- 10 3- 10 5+ + 10 5- A1 -5 00 0- LT -1 03 A 1- 50 00 -L T- 10 3- 10 A+

+19-A1-5000-LT-103 A1-5000-LT-103-6+

 A1-5000-LT-103-TB1-2-   - 2- TB 1- A1 -5 00 0- LT -1 03 A 1- 50 00 -L T- 10 3- 10 6- - 10 6- A1 -5 00 0- LT -1 03 A 1- 50 00 -L T- 10 3- 10 B-

-20-A1-5000-LT-103 A1-5000-LT-103-8-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

SHEET 293

5

IN2

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

   A   1  -   5   0   0   0  -   L   T  -   1   0   3

1+

-

PLC MODULETERMINALS

10

2

9

106

8

6

4

3

LOOP NO.: A1-5000-LT-103

INSTRUMENT

FIELD

LOOP SERVICE: POLY.ELECTRO. .PRE. TNK TA-006 LVL

105

5

7

 A1-5000-LT-103

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

20

+

-10C

19 610A

10B

7

iRTN2

iRTN3

8 IN3

11

12

13

14

19

20

15

16

17

18

5000

LI

103

CE CE

CE

CE   CE   CE

CE

 A1-5000-LT-103  A1-5000-JP-00012

5000

LAH

103

5000

LAL

103

5000

LTA

103

5000

LI

103

5000

LAH

103

5000

LAL

103

5000

LTA

103

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 29/293

OF

 5000-JT-00008-PAN

TB1

FI-15

5000-JT-00008-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5000-LT-104-TB1-3+   +3-TB1-A1 -5 00 0-LT -1 04 A1 -50 00 -L T-10 4-08 7+ +08 7-A1 -5 00 0-LT -1 04 A1-50 00 -L T-10 4-03 A+

+5-A1-5000-LT-104 A1-5000-LT-104-037+

 A1-5000-LT-104-TB1-4-   - 4- TB 1- A1 -5 00 0- LT -1 04 A 1- 50 00 -L T- 10 4- 08 8- - 08 8- A1 -5 00 0- LT -1 04 A 1- 50 00 -L T- 10 4- 03 B-

-6-A1-5000-LT-104 A1-5000-LT-104-038-

SCL

LL LL

5000

100

FIC

100

5000

FIC

PACKAGE WATER TREATMENT PLANT

6

+

-03C

5

INSTRUMENT TERMINALS TERMINALS

To AMS

System

SHEET

Hard wired to

ESD by others

038

ESD (BY OTHERS)

037

 AI-ESD-001

29 293

CLIENT

20

10

FIELD

JB

-

7

9

6

03A+

8

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

5

PROCESS CONTROL ROOM

03B

MULTIPLEXOR

1

087

 A1-5000-LT-104

14

13

12

11

2

3

4 088

LOOP NO.: A1-5000-LT-104

18

17

16

15

LOOP SERVICE: POLY.ELECTRO.DOS. TNK TA-005 LVL

19

DOC. NO.

REV. NO.

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

5000

FIC

KE01-A1-500-MT-I-HL-0001-000

P01

100

CE CE

CE

CE   CE   CE

CE

 A1-5000-LT-104 A1-5000-JP-00012

5000

LI

104

5000

LALL

104

5000

LTA

104

ESDSystem

5000

LI

104

5000

LALL

104

5000

LTA

104

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 30/293

30 OF

5000-JT-00008-PAN

TB1

5000-JT-00008-PAN

 A1-5000-UY-204-TB1-5+   + 5- TB 1- A1 -5 00 0- UY -2 04 A 1- 50 00 -U Y- 20 4- 11 3+ + 11 3- A1 -5 00 0- UY -2 04   A1-5000-UY-204-7

 A1-5000-UY-204-TB1-6-   - 6- TB 1- A1 -5 00 0- UY -2 04 A 1- 50 00 -U Y- 20 4- 11 4- - 11 4- A1 -5 00 0- UY -2 04   A1-5000-UY-204-11

SCL

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

I/P

LOO P NO .: A1- 5000- UY -204 LO OP SERV ICE: POL Y.ELECT.DO S.PMP PD003A A NG CON

 A1-5000-UY-204

113

1146

5+

-7

FIELD

1756-OF6CIK

RACK-3, SLOT-134

7

11 RTN2

9 ALT2

293

PLC MODULETERMINALS

WATER TREATMENT PLANT

INSTRUMENT

PACKAGE

ESD (BY OTHERS)PROCESS CONTROL ROOM

JB

DOC. NO.

REV. NO.

OUT2

   A   1  -   5   0   0   0  -   U   Y  -   2   0   4

SHEET

CE CECE   CE

 A1-5000-UY-204 A1-5000-JP-00012

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 31/293

31 OF

5000-JT-00008-PAN

TB1

5000-JT-00008-PAN

 A1-5000-UY-205-TB1-7+   + 7- TB 1- A1 -5 00 0- UY -2 05 A 1- 50 00 -U Y- 20 5- 11 7+ + 11 7- A1 -5 00 0- UY -2 05   A1-5000-UY-205-8

 A1-5000-UY-205-TB1-8-   - 8- TB 1- A1 -5 00 0- UY -2 05 A 1- 50 00 -U Y- 20 5- 11 8- - 11 8- A1 -5 00 0- UY -2 05   A1-5000-UY-205-12

SCL

 A1-5000-UY-205

117

PLC MODULETERMINALS

PACKAGE

OUT3

   A   1  -   5   0   0   0  -   U   Y  -   2   0   5

12 RTN3

10 ALT3

JB

RACK-3, SLOT-136

8

CLIENT DOC. NO.

REV. NO.

1188

7+

-

FIELD

1756-OF6CIK

 A1-5000-UY-205 LOOP SERVICE:

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

POLY.ELECT.DOS.PMP PD003B ANG CON

I/P

LOOP NO.:

9

KE01-A1-500-MT-I-HL-0001-000

ESD (BY OTHERS)PROCESS CONTROL ROOM

SHEET 293

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

P01

WATER TREATMENT PLANT

INSTRUMENT

CE CECE   CE

 A1-5000-UY-205 A1-5000-JP-00012

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 32/293

OF

  5000-JT-00009-PDN

TB1 5000-JT-00009-PDN A1-5000-LS-201-TB1-1+   +1 -TB 1- A1 -5 00 0- LS -2 01 A 1- 500 0- LS- 20 1- 83 5+ +8 35 -A1 -5 00 0- LS- 20 1 A1 -5 00 0- LS -2 01 -0 03 +

NC

 A1-5000-LS-201-TB1-2-   - 2- TB 1- A1 -5 00 0- LS -2 01 A1 -5 00 0- LS- 20 1- 83 6- - 83 6- A1 -5 00 0- LS -2 01 A1 -5 00 0- LS -2 01 -0 04 -

SCL

ESD (BY OTHERS)

Hard wired to

ESD by others

1

2 836

5

6

7

4

8

9

10

201

LOOP NO.: A1-50 00-L S-201 LOOP SERVICE: POLY.ELECTRO..PRE. TNK TA-006 LS

 A1-5000-LS-201

PROJECT K ASHA GA N DEVELOPMENT EXPERIMENTAL PROGRA M

JB

DI-ESD-001

INSTRUMENT TERMINALSTERMINALS

CLIENT

FIELD

293

PROCESS CONTROL ROOM

SHEETPACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

P01

32

DOC. NO.

REV. NO.

5000

LALL

 AGIP KAZA KHSTAN NORTH CASPIA N OPERATING COMPANY

003

004

3

835

CE CECE   CE

 A1-5000-LS-201 A1-5000-JP-00013

CE

5000

LALL

201

ESD

System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 33/293

33 OF

24V DC SUPPLY

- +

18 18

 A1-5000-JY-103 5000-JT-00009-PDN

TB2 5000-JT-00009-PDN

BL   A1-5000-JY-103-TB2-1+   +1-TB2-A1-5000-JY-103 A1-5000-JY-103-1591+

WT   A1-5000-JY-103-TB2-2-   - 2- TB 2- A1 -5 00 0- JY -1 03 A 1- 50 00 -J Y- 10 3- 15 92 - - 15 92 -A 1- 50 00 -J Y- 10 3 A 1- 50 00 -J Y- 10 3- 7

SCL 18A- 18A+

24V DC SUPPLY

+ -

5000-JT-00009-PDN 1 1

TB1

 A1-5000-HZSH-103

5000-JT-00009-PDNBL   A1-5000-HZSH-103-TB1-3+   +3-TB1-A1-5000-HZSH-103 A1-5000-HZSH-103-831+

WT   A1-5000-HZSH-103-TB1-4-   - 4-TB1-A1 -5 00 0-HZ SH-1 03 A1-50 00 -HZSH-10 3-83 2- - 83 2-A1 -5 00 0-HZ SH-1 03 A1-50 00 -HZSH-10 3-13

SCL

1A+ 1A-

24V DC SUPPLY

+ -

5000-JT-00009-PDN 1 1

TB1

 A1-5000-HZSL-103

5000-JT-00009-PDN

BL   A1-5000-HZSL-103-TB1-5+   +5-TB1-A1-5000-HZSL-103 A1-5000-HZSL-103-833+

WT   A1-5000-HZSL-103-TB1-6-   - 6-TB1-A1 -5 00 0-HZ SL -1 03 A1-50 00 -HZSL-10 3-83 4- - 83 4-A1 -5 00 0-HZ SL -1 03 A1-50 00 -HZSL-10 3-15

SCL

1A+ 1A-

5000

XA

103

2

4

103

5000

XA

103

5000

JY

103

5000

HIC

103

103

5000

HSAL

103

 A1-5000-JY-103

8

7

+DC-0

OUT-3

 A1-5000-JP-00014

S

   A   1  -   5   0   0   0  -   J   Y  -   1   0

 A1-5000-HZSH-103   A1-5000-JP-00013

4

RACK-1, SLOT-6

1+   1591

NO

103

4 832

-   2 1592

C   3 831

13

5

 A1-5000-JP-00013

5 833

SHEET 293

PLC MODULE

5000

JY

103

5000

JY

1756-OB16DK

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

 A1-5000-HZSL-103

C

NO   15 IN- 76 834

1756-IB161K

RACK-0, SLOT-1

LOOP NO.: A1-5000-X-103

INSTRUMENT

FIELD

LOOP SERVICE: POLYELECT. PRE.TNK INLET VLAVE

3

7

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   0   0   0  -   H   Z   S   H  -   1   0   3

   A   1  -   5   0   0   0  -   H   Z   S   L  -   1   0   3

WATER TREATMENT PLANT

ZSH

ZSL

5000

HSAH

1756-IB161K

RACK-0, SLOT-1

5000

HSAH

1 6 G ND -7

IN-6

GND-614

103

5000

HSAL

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 34/293

34 OF

FI-15000-JT-00010-PAN 1756-IF16K

TB1 5000-JT-00010-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-1

 A1-5000-FT-102-TB1-1+   +1-TB1-A1 -5 00 0-FT -1 02 A1 -5 00 0-FT -1 02 -1 35 + +13 5-A1 -5 00 0-FT -1 02 A1-50 00 -F T-10 2-05 A+

+9-A1-5000-FT-102 A1-5000-FT-102-20+

 A1-5000-FT-102-TB1-2-   - 2- TB 1- A1 -5 00 0- FT -1 02 A 1- 50 00 -F T- 10 2- 13 6- - 13 6- A1 -5 00 0- FT -1 02 A 1- 50 00 -F T- 10 2- 05 B-

-10-A1-5000-FT-102 A1-5000-FT-102-22-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

IN8

21

iRTN8

iRTN9

22 IN9

19

PACKAGE WATER TREATMENT PLANT

10

+

-05C

9 20+

-

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

LOO P NO .: A1- 5000- FT-10 2 LOO P S ERVICE: TE CH.WTR.PMP PA 001 A/B DIS. FL OW

13

7

18

19

20

14

15

16

 A1-5000-FT-102

05A

05B

10

2

9

135

136

SHEET 293

PLC MODULETERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

17

   A   1  -   5   0   0   0  -   F   T  -   1   0   2

1

11

12

8

6

4

3

5

5000

FI

102

CE CE

CE

CE   CE   CE

CE

 A1-5000-FT-102 A1-5000-JP-00015

5000FAH

102

5000

FTA

102

5000

FI

102

5000FAH

102

5000

FTA

102

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 35/293

35 OF

24V DC SUPPLY

- +

18 18

 A1-5000-JY-105 5000-JT-00011-PDN

TB2 5000-JT-00011-PDN

BL   A1-5000-JY-105-TB2-1+   +1-TB2-A1-5000-JY-105 A1-5000-JY-105-1605+

WT   A1-5000-JY-105-TB2-2-   - 2- TB 2- A1 -5 00 0- JY -1 05 A 1- 50 00 -J Y- 10 5- 16 06 - - 16 06 -A 1- 50 00 -J Y- 10 5 A 1- 50 00 -J Y- 10 5- 9

SCL 18A- 18A+

24V DC SUPPLY

+ -

1 1

 A1-5000-HZSH-105 5000-JT-00011-PDN

TB1 5000-JT-00011-PDNBL   A1-5000-HZSH-105-TB1-1+   +1-TB1-A1-5000-HZSH-105 A1-5000-HZSH-105-851+

WT   A1-5000-HZSH-105-TB1-2-   - 2-TB1-A1 -5 00 0-HZ SH-1 05 A1-50 00 -HZSH-10 5-85 2- - 85 2-A1 -5 00 0-HZ SH-1 05 A1-50 00 -HZSH-10 5-17

SCL

1A+ 1A-

24V DC SUPPLY

+ -

5000-JT-00011-PDN 1 1

TB1

 A1-5000-HZSL-105

5000-JT-00011-PDN

BL   A1-5000-HZSL-105-TB1-3+   +3-TB1-A1-5000-HZSL-105 A1-5000-HZSL-105-853+

WT   A1-5000-HZSL-105-TB1-4-   - 4-TB1-A1 -5 00 0-HZ SL -1 05 A1-50 00 -HZSL-10 5-85 4- - 85 4-A1 -5 00 0-HZ SL -1 05 A1-50 00 -HZSL-10 5-19

SCL

1A+ 1A-

5000

HSAH

2 0 G ND -9

IN-8

GND-818

105

5000

HSAL

PACKAGE

   A   1  -   5   0   0   0  -   H   Z   S   H  -   1   0   5

   A   1  -   5   0   0   0  -   H   Z   S   L  -   1   0   5

WATER TREATMENT PLANT

ZSH

ZSL

5000

HSAH

1756-IB161K

RACK-0, SLOT-1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

LOOP NO.: A1-5000-X-105

INSTRUMENT

FIELD

LOOP SERVICE: M.FLOW RECYCLE VLV TO 500-TA--001

3

5

 A1-5000-HZSL-105

C

NO   19 IN- 94 854

1756-IB161K

RACK-0, SLOT-1

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5000

JY

105

5000

JY

1756-OB16DK

17

3

 A1-5000-JP-00016

3 853

NO

105

2 852

-   2 1606

C   1 851

S

   A   1  -   5   0   0   0  -   J   Y  -   1   0

 A1-5000-HZSH-105   A1-5000-JP-00016

4

RACK-1, SLOT-6

1+   1605

 A1-5000-JY-105

10

9

+DC-0

OUT-4

 A1-5000-JP-00017

105

105

5000

HSAL

105

105

5000

HIC

5000

XA

105

2

105

5000

XA

105

5000

JY

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 36/293

36 OF

FI-25200-JT-00001-PAN 1756-IF16K

TB1 5200-JT-00001-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-3

 A1-5200-FT-100-TB1-1+   + 1- TB 1- A1 -5 20 0- FT -1 00 A 1- 52 00 -F T- 10 0- 15 5+ + 15 5- A1 -5 20 0- FT -1 00 A 1- 52 00 -F T- 10 0- 08 A+

+15-A1-5200-FT-100 A1-5200-FT-100-34+

 A1-5200-FT-100-TB1-2-   - 2- TB 1- A1 -5 20 0- FT -1 00 A 1- 52 00 -F T- 10 0- 15 6- - 15 6- A1 -5 20 0- FT -1 00 A 1- 52 00 -F T- 10 0- 08 B-

-16-A1-5200-FT-100 A1-5200-FT-100-36-

SCL

H H

5000

5000

5000

100

FIC

100

FIC

100

FIC

   A   1  -   5   2   0   0  -   F   T  -   1   0   0

35

iRTN4

IN4

16

+   34

-2 156

4

3

LOOP NO.: A1-5200-FT-100

INSTRUMENT

FIELD

RAW WTR.PMP PA001 A/B DIS. FLOW

155

 A1-5200-FT-100

JB

+

-

LOOP SERVICE:

1

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

iRTN5

36 IN5

PLC MODULE

33

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

293SHEET

DOC. NO.

REV. NO.

DCS (BY OTHERS)PROCESS CONTROL ROOM

PACKAGE WATER TREATMENT PLANT

TERMINALS

08C

1508A

08B

5200

FI

100

CE CE

CE

CE   CE   CE

CE

 A1-5200-FT-100 A1-5200-JP-00001

5200FAH

100

5200

FTA

100

5200

FI

100

5200FAH

100

5200

FTA

100

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 37/293

37 OF

24V DC SUPPLY

- +

18 18

 A1-5200-JY-100 5200-JT-00002-PDN

TB2 5200-JT-00002-PDN

BL   A1-5200-JY-100-TB2-1+   +1-TB2-A1-5200-JY-100 A1-5200-JY-100-1649+

WT   A1-5200-JY-100-TB2-2-   - 2-TB2-A1 -5 20 0-JY-1 00 A1 -5 20 0-JY-1 00 -1 65 0- - 16 50 -A1-52 00 -J Y-10 0 A1-52 00 -J Y-10 0-11

SCL 18A- 18A+

24V DC SUPPLY

+ -

1 1

 A1-5200-HZSH-100 5200-JT-00002-PDN

TB1 5200-JT-00002-PDNBL   A1-5200-HZSH-100-TB1-1+   +1-TB1-A1-5200-HZSH-100 A1-5200-HZSH-100-945+

WT   A1-5200-HZSH-100-TB1-2-   - 2-TB1-A1 -5 20 0-HZ SH-1 00 A1-52 00 -HZSH-10 0-94 6- - 94 6-A1 -5 20 0-HZ SH-1 00 A1-52 00 -HZSH-10 0-21

SCL

1A+ 1A-

24V DC SUPPLY

+ -

5200-JT-00002-PDN 1 1

TB1

 A1-5200-HZSL-100

5200-JT-00002-PDN

BL   A1-5200-HZSL-100-TB1-3+   +3-TB1-A1-5200-HZSL-100 A1-5200-HZSL-100-947+

WT   A1-5200-HZSL-100-TB1-4-   - 4-TB1-A1 -5 20 0-HZ SL -1 00 A1-52 00 -HZSL-10 0-94 8- - 94 8-A1 -5 20 0-HZ SL -1 00 A1-52 00 -HZSL-10 0-23

SCL

1A+ 1A-

5200

XA

100

2

100

5200

XA

100

5200

JY

100

5200

HIC

100

100

5200

HSAL

100

 A1-5200-JY-100

12

11

+DC-0

OUT-5

 A1-5200-JP-00003

S

   A   1  -   5   2   0   0  -   J   Y  -   1   0

 A1-5200-HZSH-100   A1-5200-JP-00002

4

RACK-1, SLOT-6

1+   1649

NO

100

2 946

-   2 1650

C   1 945

21

3

 A1-5200-JP-00002

3 947

SHEET 293

PLC MODULE

5200

JY

100

5200

JY

1756-OB16DK

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

 A1-5200-HZSL-100

C

NO   2 3 I N- 114 948

1756-IB161K

RACK-0, SLOT-1

LOOP NO.: A1-5200-X-100

INSTRUMENT

FIELD

LOOP SERVICE: M.FLOW RECYCLE VLV TO 500-TA--001

3

5

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   2   0   0  -   H   Z   S   H  -   1   0   0

   A   1  -   5   2   0   0  -   H   Z   S   L  -   1   0   0

WATER TREATMENT PLANT

ZSH

ZSL

5200

HSAH

1756-IB161K

RACK-0, SLOT-1

5200

HSAH

24 GND-11

IN-10

GND-1022

100

5200

HSAL

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 38/293

38 OF

 5300-JT-00003-PAN

TB1

FI-31756-IF16K

5300-JT-00003-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-1

 A1-5300-FT-100-TB1-3+   + 3- TB 1- A1 -5 30 0- FT -1 00 A 1- 53 00 -F T- 10 0- 15 9+ + 15 9- A1 -5 30 0- FT -1 00 A 1- 53 00 -F T- 10 0- 07 A+

+13-A1-5300-FT-100 A1-5300-FT-100-30+

 A1-5300-FT-100-TB1-4-   - 4- TB 1- A1 -5 30 0- FT -1 00 A 1- 53 00 -F T- 10 0- 16 0- - 16 0- A1 -5 30 0- FT -1 00 A 1- 53 00 -F T- 10 0- 07 B-

-14-A1-5300-FT-100 A1-5300-FT-100-32-

SCL

H H

L L

FIC

100

5000

5000

FIC

100

5000

10

4

9

160

8

6

32 IN13

+

FIELD

159

5

3

31

FLOW TO DMF ZM-002A/B/C

iRTN13

FIC

100

FIC

100

5000

LOOP NO.: A1-5300-FT-100

INSTRUMENT

LOOP SERVICE:

7

 A1-5300-FT-100

JB

1

2

-

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

293

29

IN12

DCS (BY OTHERS)

SHEET

PROCESS CONTROL ROOM

   A   1  -   5   3   0   0  -   F   T  -   1   0   0

iRTN12

TERMINALS PLC MODULE

PACKAGE WATER TREATMENT PLANT

14

+

-07C

13 3007A

07B

5300

FI

100

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-100 A1-5300-JP-00002

5300

FAH

100

5300

FAL

100

5300

FTA

100

5300

FI

100

5300

FAH

100

5300

FAL

100

5300

FTA

100

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 39/293

39 OF

FI-9 5300-JT-00002-PAN 1756-IF16K

TB1 5300-JT-00002-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-13

 A1-5300-PT-189-TB1-1+   + 1- TB 1- A1 -5 30 0- PT -1 89 A 1- 53 00 -P T- 18 9- 16 3+ + 16 3- A1 -5 30 0- PT -1 89 A 1- 53 00 -P T- 18 9- 02 A+

+3-A1-5300-PT-189 A1-5300-PT-189-6+

 A1-5300-PT-189-TB1-2-   - 2- TB 1- A1 -5 30 0- PT -1 89 A 1- 53 00 -P T- 18 9- 16 4- - 16 4- A1 -5 30 0- PT -1 89 A 1- 53 00 -P T- 18 9- 02 B-

-4-A1-5300-PT-189 A1-5300-PT-189-8-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

SHEET 293

5

IN2

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALS

IN33

JB

02A

164

7

iRTN2

iRTN3

8

   A   1  -   5   3   0   0  -   P   T  -   1   8   9

02B

6

LOOP NO.: A1-5300-PT-189

INSTRUMENT

FIELD

BLOWER KB002A/B DISCH.PRESS.TX

163

 A1-5300-PT-189

1

2

4

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

+

-

LOOP SERVICE:

PACKAGE WATER TREATMENT PLANT

4

+

-02C

3

5300

PI

189

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-189 A1-5300-JP-00001

5300PAH

189

5300

PAL

189

5300

PTA

189

5300

PI

189

5300PAH

189

5300

PAL

189

5300

PTA

189

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 40/293

OF

 5300-JT-00002-PAN

TB1

FI-14

5300-JT-00002-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5300-PT-245-TB1-3+   +3-TB1-A1 -5 30 0-PT -2 45 A1-53 00 -PT-24 5-16 5+ +16 5-A1 -5 30 0-PT -2 45 A1-53 00 -PT-24 5-15 A+

+29-A1-5300-PT-245 A1-5300-PT-245-029+

 A1-5300-PT-245-TB1-4-   - 4- TB 1- A1 -5 30 0- PT -2 45 A 1- 53 00 -P T- 24 5- 16 6- - 16 6- A1 -5 30 0- PT -2 45 A 1- 53 00 -P T- 24 5- 15 B-

-30-A1-5300-PT-245 A1-5300-PT-245-030-

SCL

HH HH

FIC

100

ESD (BY OTHERS)

To AMS

System

5000FIC

100

5000

FIC

293

MULTIPLEXOR

029

5000

40

100

15B

PACKAGE WATER TREATMENT PLANT

 A1-5300-PT-245

+  AI-ESD-001

FIELD

JB

165 15A29

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

LOOP NO.: A1-5300-PT-245 LOOP SERVICE:

166

BLOWER KB002A/B DISCH.PRESS.TX

+

-15C

-

INSTRUMENT

1

2

4

3

30

DOC. NO.

REV. NO.

Hard wired to

ESD by others

030

PROCESS CONTROL ROOM

TERMINALS

SHEET

TERMINALS

KE01-A1-500-MT-I-HL-0001-000

P01

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-245 A1-5300-JP-00064

5300PI

245

5300

PAHH

245

5300

PTA

245

ESD

System

5300PI

245

5300

PAHH

245

5300

PTA

245

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 41/293

41 OF

 5300-JT-00003-PAN

TB1

FI-31756-IF16K

5300-JT-00003-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-1

 A1-5300-FT-101-TB1-5+   + 5- TB 1- A1 -5 30 0- FT -1 01 A 1- 53 00 -F T- 10 1- 16 7+ + 16 7- A1 -5 30 0- FT -1 01 A 1- 53 00 -F T- 10 1- 08 A+

+15-A1-5300-FT-101 A1-5300-FT-101-34+

 A1-5300-FT-101-TB1-6-   - 6- TB 1- A1 -5 30 0- FT -1 01 A 1- 53 00 -F T- 10 1- 16 8- - 16 8- A1 -5 30 0- FT -1 01 A 1- 53 00 -F T- 10 1- 08 B-

-16-A1-5300-FT-101 A1-5300-FT-101-36-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

iRTN15

36 IN15

1

2

PACKAGE WATER TREATMENT PLANT

16

+

-08C

15 3408A

08B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

LOOP NO.: A1-5300-FT-101

INSTRUMENT

FIELD

LOOP SERVICE: INLET FLOW TO DMF ZM-002A/B/C

167

 A1-5300-FT-101

JB

5

10

6

9

168

8

7

35

   A   1  -   5   3   0   0  -   F   T  -   1   0   1

+

-

PLC MODULETERMINALS

3

4

SHEET 293

33

IN14

DCS (BY OTHERS)PROCESS CONTROL ROOM

iRTN14

5300

FI

101

CE   CE

CE

CE   CE   CE

CE

 A1-5300-FT-101 A1-5300-JP-00003

5300

FAH

101

5300

FAL

101

5300

FTA

101

5300

FI

101

5300

FAH

101

5300

FAL

101

5300

FTA

101

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 42/293

42 OF

FI-2 5300-JT-00003-PAN 1756-IF16K

TB1 5300-JT-00003-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-4

 A1-5300-AT-100-TB1-1+   + 1- TB 1- A1 -5 30 0- AT -1 00 A 1- 53 00 -A T- 10 0- 58 3+ + 58 3- A1 -5 30 0- AT -1 00 A 1- 53 00 -A T- 10 0- 09 A+

+17-A1-5300-AT-100 A1-5300-AT-100-2+

 A1-5300-AT-100-TB1-2-   - 2- TB 1- A1 -5 30 0- AT -1 00 A 1- 53 00 -A T- 10 0- 58 4- - 58 4- A1 -5 30 0- AT -1 00 A 1- 53 00 -A T- 10 0- 09 B-

-18-A1-5300-AT-100 A1-5300-AT-100-4-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

3

iRTN0

iRTN1

4 IN1

PACKAGE WATER TREATMENT PLANT

18

+

-09C

17 209A

09B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

LOOP NO.: A1-5300-AT-100

INSTRUMENT

FIELD

LOOP SERVICE: INLET COND. TO DMF ZM-002A/B/C

583

5

7

 A1-5300-AT-100

10

2

9

584

8

6

4

3

JB

   A   1  -   5   3   0   0  -   A   T  -   1   0   0

1+

-

PLC MODULETERMINALS

SHEET 293

1

IN0

DCS (BY OTHERS)PROCESS CONTROL ROOM

5300

 AI

100

CE CE

CE

CE   CE   CE

CE

 A1-5300-AT-100 A1-5300-JP-00002

5300 AAH

100

5300

 ATA

100

5300

 AI

100

5300 AAH

100

5300

 ATA

100

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 43/293

43 OF

FI-3 5300-JT-00004-PAN 1756-IF16K

TB1 5300-JT-00004-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-2

 A1-5300-FT-102-TB1-1+   + 1- TB 1- A1 -5 30 0- FT -1 02 A 1- 53 00 -F T- 10 2- 17 7+ + 17 7- A1 -5 30 0- FT -1 02 A 1- 53 00 -F T- 10 2- 09 A+

+17-A1-5300-FT-102 A1-5300-FT-102-2+

 A1-5300-FT-102-TB1-2-   - 2- TB 1- A1 -5 30 0- FT -1 02 A 1- 53 00 -F T- 10 2- 17 8- - 17 8- A1 -5 30 0- FT -1 02 A 1- 53 00 -F T- 10 2- 09 B-

-18-A1-5300-FT-102 A1-5300-FT-102-4-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

SHEET 293

1

IN0

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

   A   1  -   5   3   0   0  -   F   T  -   1   0   2

1+

-

PLC MODULETERMINALS

10

2

9

178

8

6

4

3

LOOP NO.: A1-5300-FT-102

INSTRUMENT

FIELD

LOOP SERVICE: INLET FLOW TO DMF ZM-002A

177

5

7

 A1-5300-FT-102

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

18

+

-09C

17 209A

09B

3

iRTN0

iRTN1

4 IN1

11

12

13

14

19

20

15

16

17

18

5300

FI

102

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-102 A1-5300-JP-00003

5300FAH

102

5300

FAL

102

5300

FTA

102

5300

FI

102

5300FAH

102

5300

FAL

102

5300

FTA

102

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 44/293

44 OF

 5300-JT-00004-PAN

TB1

FI-31756-IF16K

5300-JT-00004-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-2

 A1-5300-FT-103-TB1-3+   + 3- TB 1- A1 -5 30 0- FT -1 03 A 1- 53 00 -F T- 10 3- 17 9+ + 17 9- A1 -5 30 0- FT -1 03 A 1- 53 00 -F T- 10 3- 10 A+

+19-A1-5300-FT-103 A1-5300-FT-103-6+

 A1-5300-FT-103-TB1-4-   - 4- TB 1- A1 -5 30 0- FT -1 03 A 1- 53 00 -F T- 10 3- 18 0- - 18 0- A1 -5 30 0- FT -1 03 A 1- 53 00 -F T- 10 3- 10 B-

-20-A1-5300-FT-103 A1-5300-FT-103-8-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

20

PACKAGE WATER TREATMENT PLANT

20

+

-10C

19

INSTRUMENT

SHEET 293

17

19

FIELD

 A1-5300-FT-103

JB

   A   1  -   5   3   0   0  -   F   T  -   1   0   3

+

-

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

LOOP SERVICE: INLET FLOW TO DMF ZM-002B

179

8

10

14

15

4

18

6

180

LOOP NO.: A1-5300-FT-103

7

iRTN2

iRTN3

8 IN35

2

1

3

5

IN2

DCS (BY OTHERS)PROCESS CONTROL ROOM

610A

10B

PLC MODULETERMINALS

13

16

7

9

11

12

5300

FI

103

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-103 A1-5300-JP-00003

5300

FAH

103

5300

FAL

103

5300

FTA

103

5300

FI

103

5300

FAH

103

5300

FAL

103

5300

FTA

103

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 45/293

45 OF

 5300-JT-00004-PAN

TB1

FI-31756-IF16K

5300-JT-00004-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-2

 A1-5300-FT-104-TB1-5+   + 5- TB 1- A1 -5 30 0- FT -1 04 A 1- 53 00 -F T- 10 4- 18 1+ + 18 1- A1 -5 30 0- FT -1 04 A 1- 53 00 -F T- 10 4- 11 A+

+21-A1-5300-FT-104 A1-5300-FT-104-12+

 A1-5300-FT-104-TB1-6-   - 6- TB 1- A1 -5 30 0- FT -1 04 A 1- 53 00 -F T- 10 4- 18 2- - 18 2- A1 -5 30 0- FT -1 04 A 1- 53 00 -F T- 10 4- 11 B-

-22-A1-5300-FT-104 A1-5300-FT-104-14-

SCL

H H

L L

FIC

FIC

100

5000

100

FIC

100

5000

SHEET

JB

6

7

FIELD

PACKAGE

1

+

-

293

11

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

   A   1  -   5   3   0   0  -   F   T  -   1   0   4

WATER TREATMENT PLANT

-

21 12

TERMINALS

4

INSTRUMENT

 A1-5300-FT-104

2

3

IN5

PLC MODULE

13

1422

+

11C

11

10

iRTN4

iRTN5

FIC15

18

5000

5000

12

16

13

14

LOOP SERVICE: INLET FLOW TO DMF ZM-002C

17

100

19

182

LOOP NO.: A1-5300-FT-104

11A

11B

181

20

5

8

9

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

5300

FI

104

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-104 A1-5300-JP-00003

5300

FAH

104

5300

FAL

104

5300

FTA

104

5300

FI

104

5300

FAH

104

5300

FAL

104

5300

FTA

103

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 46/293

46 OF

 5300-JT-00004-PAN

TB1

FI-61756-IF16K

5300-JT-00004-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-7

 A1-5300-PDT-195-TB1-7+   +7-A1 -5 30 0-PDT-TB1-19 5 A1-53 00 -PDT -1 95 -1 83 + +18 3-A1 -5 30 0-PDT-19 5 A1-53 00 -PDT -1 95 -0 8A+

+15-A1-5300-PDT-195 A1-5300-PDT-195-34+

 A1-5300-PDT-195-TB1-8-   - 8-A1 -5 30 0-PDT-TB1-19 5 A1 -5 30 0-PDT-19 5-18 4- - 18 4-A1 -5 30 0-PDT-19 5 A1-53 00 -PDT -1 95 -0 8B-

-16-A1-5300-PDT-195 A1-5300-PDT-195-36-

SCL

H H

5000

5000

5000

FIC

100

100

FIC

100

3

4

15

14

10

11

12

6

7

184

20

13

17

18

19

LOOP SERVICE:

FIC

1

16

35

iRTN14

iRTN15

36

34

8

9

2

LOOP NO.: A1-5300-PDT-195

INSTRUMENT

FIELD

DIFF. PRESS.HI DMF 530-ZM-002A

183

 A1-5300-PDT-195

08A

08B

JB

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

IN14

DCS (BY OTHERS)PROCESS CONTROL ROOM

   A   1  -   5   3   0   0  -   P   D   T  -   1   9   5

PLC MODULETERMINALS

IN15

33

PACKAGE WATER TREATMENT PLANT

16

+

-08C

15+

-

5

5300

PDI

195

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-195   A1-5300-JP-00003

5300

PDAH

195

5300

PDTA

195

5300

PDI

195

5300

PDAH

195

5300

PDTA

195

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 47/293

47 OF

 5300-JT-00004-PAN

TB1

1

2

3

4

FI-61756-IF16K

5300-JT-00004-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-8

 A1-5300-PDT-196-TB1-9+   +9-TB1-A1 -5 30 0-PDT-19 6 A1-53 00 -PDT -1 96 -1 85 + +18 5-A1 -5 30 0-PDT-19 6 A1-53 00 -PDT -1 96 -0 9A+

+17-A1-5300-PDT-196 A1-5300-PDT-196-2+

 A1-5300-PDT-196-TB1-10-   - 10 -T B1 -A1-53 00 -PDT -1 96 A1-53 00 -PDT -1 96 -1 86 - - 18 6-A1 -5 30 0-PDT-19 6 A1-53 00 -PDT -1 96 -0 9B-

-18-A1-5300-PDT-196 A1-5300-PDT-196-4-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

09B

6

9

8

7

186

LOOP NO.: A1-5300-PDT-196

3

iRTN0

iRTN1

4 IN1

DIFF. PRESS.HI DMF 530-ZM-002B

185

 A1-5300-PDT-196

14

13

12

11

09A+

18

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

20

10

FIELD

JB

-

INSTRUMENT

17

16

15

5

SHEET 293

19

   A   1  -   5   3   0   0

  -   P   D   T  -   1   9   62

1

IN0

DCS (BY OTHERS)PROCESS CONTROL ROOM

LOOP SERVICE:

PACKAGE WATER TREATMENT PLANT

18

+

-09C

17

PLC MODULETERMINALS

5300

PDI

196

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-196 A1-5300-JP-00003

5300

PDAH

196

5300

PDTA

196

5300

PDI

196

5300

PDAH

196

5300

PDTA

196

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 48/293

48 OF

 5300-JT-00004-PAN

TB1

FI-61756-IF16K

5300-JT-00004-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-8

 A1-5300-PDT-197-TB1-11+   +11 -T B1 -A1-53 00 -PDT -1 97 A1-53 00 -PDT -1 97 -1 87 + +18 7-A1 -5 30 0-PDT-19 7 A1-53 00 -PDT -1 97 -1 0A+

+19-A1-5300-PDT-197 A1-5300-PDT-197-6+

 A1-5300-PDT-197-TB1-12-   - 12 -T B1 -A1-53 00 -PDT -1 97 A1-53 00 -PDT -1 97 -1 88 - - 18 8-A1 -5 30 0-PDT-19 7 A1-53 00 -PDT -1 97 -1 0B-

-20-A1-5300-PDT-197 A1-5300-PDT-197-8-

SCL

H H

100

FIC

100

5000

FIC

20

16

17

18

19

12

13

14

15

8

9

10

11

PACKAGE WATER TREATMENT PLANT

20

+

-10C

19 610A

10B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

LOOP NO.: A1-5300-PDT-197

INSTRUMENT

FIELD

DIFF. PRESS.HI DMF 530-ZM-002C

187

 A1-5300-PDT-197

1

2

3

188

7

iRTN2

iRTN3

8

5000

FIC

100

5000

+-

PLC MODULETERMINALS

IN3

4

5

6

7

LOOP SERVICE:

SHEET 293

5

IN2

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

   A   1  -   5   3   0   0  -   P   D   T  -   1   9   7

5300

PDI

197

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-197 A1-5300-JP-00003

5300

PDAH

197

5300

PDTA

197

5300

PDI

197

5300

PDAH

197

5300

PDTA

197

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 49/293

49 OF

24V DC SUPPLY

- +

18 18

 A1-5300-JY-100 5300-JT-00005-PDN

TB4 5300-JT-00005-PDN

BL   A1-5300-JY-100-TB4-1+   +1-TB4-A1-5300-JY-100 A1-5300-JY-100-1571+

WT   A1-5300-JY-100-TB4-2-   - 2-TB4-A1 -5 30 0-JY-1 00 A1 -5 30 0-JY-1 00 -1 57 2- - 15 72 -A1-53 00 -J Y-10 0 A1-53 00 -J Y-10 0-13

SCL 18A- 18A+

24V DC SUPPLY

+ -

1 1

 A1-5300-HZSH-100 5300-JT-00005-PDN

TB1 5300-JT-00005-PDN

BL   A1-5300-HZSH-100-TB1-1+   +1-TB1-A1-5300-HZSH-100 A1-5300-HZSH-100-791+

WT   A1-5300-HZSH-100-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 00 A1-53 00 -HZSH-10 0-79 2- - 79 2-A1 -5 30 0-HZ SH-1 00 A1-53 00 -HZSH-10 0-25

SCL

1A+ 1A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 1 1

TB1

 A1-5300-HZSL-100

5300-JT-00005-PDN

BL   A1-5300-HZSL-100-TB1-3+   +3-TB1-A1-5300-HZSL-100 A1-5300-HZSL-100-793+

WT   A1-5300-HZSL-100-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 00 A1-53 00 -HZSL-10 0-79 4- - 79 4-A1 -5 30 0-HZ SL -1 00 A1-53 00 -HZSL-10 0-27

SCL

1A+ 1A-

5300HSAH

28 GND-13

IN-12

GND-1226

100

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   0   0

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   0   0

WATER TREATMENT PLANT

ZSH

ZSL

5300HSAH

1756-IB161KRACK-0, SLOT-1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

LOOP NO.: A1-5300-X-100

INSTRUMENT

FIELD

LOOP SER VI CE: SER VI CE I NLET VLV D MF Z M-002A

3

5

 A1-5300-HZSL-100

C

NO   2 7 I N- 134 794

1756-IB161K

RACK-0, SLOT-1

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5300

JY

100

5300

JY

1756-OB16DK

25

3

 A1-5300-JP-00004

3 793

NO

100

2 792

-   2 1572

C   1 791

S

   A   1  -   5   3   0   0  -   J   Y  -   1   0

 A1-5300-HZSH-100   A1-5300-JP-00004

4

RACK-1, SLOT-6

1+   1571

 A1-5300-JY-100

14

13

+DC-0

OUT-6

 A1-5300-JP-00007

100

100

5300

HSAL

100

100

5300

HIC

5300

XA

100

2

100

5300

XA

100

5300

JY

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 50/293

50 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 18 18

TB4

 A1-5300-JY-101

5300-JT-00005-PDN

BL   A1-5300-JY-101-TB4-3+   +3-TB4-A1-5300-JY-101 A1-5300-JY-101-1573+

WT   A1-5300-JY-101-TB4-4-   - 4-TB4-A1 -5 30 0-JY-1 01 A1 -5 30 0-JY-1 01 -1 57 4- - 15 74 -A1-53 00 -J Y-10 1 A1-53 00 -J Y-10 1-15

SCL 18A- 18A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 1 1

TB1

 A1-5300-HZSH-101

5300-JT-00005-PDN

BL   A1-5300-HZSH-101-TB1-5+   +5-TB1-A1-5300-HZSH-101 A1-5300-HZSH-101-795+

WT   A1-5300-HZSH-101-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-1 01 A1-53 00 -HZSH-10 1-79 6- - 79 6-A1 -5 30 0-HZ SH-1 01 A1-53 00 -HZSH-10 1-29

SCL

1A+ 1A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 1 1

TB1

 A1-5300-HZSL-101

5300-JT-00005-PDN

BL   A1-5300-HZSL-101-TB1-7+   +7-TB1-A1-5300-HZSL-101 A1-5300-HZSL-101-797+

WT   A1-5300-HZSL-101-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -1 01 A1-53 00 -HZSL-10 1-79 8- - 79 8-A1 -5 30 0-HZ SL -1 01 A1-53 00 -HZSL-10 1-31

SCL

1A+ 1A-

4

6

101

53005300

HIC

5300

HSAL

JY

101

101

5300

HSAL

101

 A1-5300-JY-101

16

15

GND-0

OUT-7

 A1-5300-JP-00007

S

   A   1  -   5   3   0   0  -   J   Y  -   1   0   1

 A1-5300-HZSH-101   A1-5300-JP-00004

+   1573

-   4 1574

C   5 795

 A1-5300-JP-00004

7 797

NO   6 796

 A1-5300-HZSL-101

C

29

3

101

7

SHEET 293

PLC MODULE

5300

JY

101

5300

JY

101

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

LOOP NO.: A1-5300-X-101

NO   3 1 I N- 158 798  101

INSTRUMENT

FIELD

LOOP SER VI CE: BWASH OUT LET VLV D MF Z M-002A

5

9

1756-IB161K

RACK-0, SLOT-1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   0   1

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   0   1

WATER TREATMENT PLANT

ZSH

ZSL

5300HSAH

1756-IB161KRACK-0, SLOT-1

5300HSAH

2

32 GND-15

IN-14

GND-1430

1756-OB16DK

RACK-1, SLOT-6

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 51/293

51 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 18 18

TB4

 A1-5300-JY-102

5300-JT-00005-PDN

BL   A1-5300-JY-102-TB4-5+   +5-TB4-A1-5300-JY-102 A1-5300-JY-102-1525+

WT   A1-5300-JY-102-TB4-6-   - 6-TB4-A1 -5 30 0-JY-1 02 A1 -5 30 0-JY-1 02 -1 52 6- - 15 26 -A1-53 00 -J Y-10 2 A1-53 00 -J Y-10 2-17

SCL 18A- 18A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSH-102

5300-JT-00005-PDN

BL   A1-5300-HZSH-102-TB1-9+   +9-TB1-A1-5300-HZSH-102 A1-5300-HZSH-102-799+

WT   A1-5300-HZSH-102-TB1-10-   - 10 -T B1 -A1-53 00 -HZSH-10 2 A1-53 00 -HZSH-10 2-80 0- - 80 0-A1 -5 30 0-HZ SH-1 02 A1-53 00 -HZSH-10 2-1

SCL

2A+ 2A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSL-102

5300-JT-00005-PDN

BL   A1-5300-HZSL-102-TB1-11+   +11-TB1-A1-5300-HZSL-102 A1-5300-HZSL-102-801+

WT   A1-5300-HZSL-102-TB1-12-   - 12 -T B1 -A1-53 00 -HZSL-10 2 A1-53 00 -HZSL-10 2-80 2- - 80 2-A1 -5 30 0-HZ SL -1 02 A1-53 00 -HZSL-10 2-3

SCL

2A+ 2A-

5300HSAH

4

4 GND- 1

IN-0

GND-02

1756-OB16DK

RACK-1, SLOT-6

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   0   2

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   0   2

WATER TREATMENT PLANT

ZSH

ZSL

5300HSAH

1756-IB161KRACK-0, SLOT-2

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

LOOP SER VI CE: BWASH OUT LET VLV D MF Z M-002A

7

13

1756-IB161K

RACK-0, SLOT-2

LOOP NO.: A1-5300-X-102

NO   3 IN-112 802  102

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

102

5300

JY

102

SHEET 293

PLC MODULE

5300

1

5

102

11

11 801

NO   10 800

 A1-5300-HZSL-102

C

C   9 799

 A1-5300-JP-00004

S

   A   1  -   5   3   0   0  -   J   Y  -   1   0   2

 A1-5300-HZSH-102   A1-5300-JP-00004

+   1525

-   6 1526

 A1-5300-JY-102

18

17

+DC-1

OUT-8

 A1-5300-JP-00007

JY

102

102

5300

HSAL

102

5300

XA

5300

HSAL

102

8

10

102

5300

XA

102

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 52/293

52 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 18 18

TB4

 A1-5300-JY-103

5300-JT-00005-PDN

BL   A1-5300-JY-103-TB4-7+   +7-TB4-A1-5300-JY-103 A1-5300-JY-103-1577+

WT   A1-5300-JY-103-TB4-8-   - 8-TB4-A1 -5 30 0-JY-1 03 A1 -5 30 0-JY-1 03 -1 57 8- - 15 78 -A1-53 00 -J Y-10 3 A1-53 00 -J Y-10 3-19

SCL 18A- 18A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSH-103

5300-JT-00005-PDN

BL   A1-5300-HZSH-103-TB1-13+   +13-TB1-A1-5300-HZSH-103 A1-5300-HZSH-103-803+

WT   A1-5300-HZSH-103-TB1-14-   - 14 -T B1 -A1-53 00 -HZSH-10 3 A1-53 00 -HZSH-10 3-80 4- - 80 4-A1 -5 30 0-HZ SH-1 03 A1-53 00 -HZSH-10 3-5

SCL

2A+ 2A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSL-103

5300-JT-00005-PDN

BL   A1-5300-HZSL-103-TB1-15+   +15-TB1-A1-5300-HZSL-103 A1-5300-HZSL-103-805+

WT   A1-5300-HZSL-103-TB1-16-   - 16 -T B1 -A1-53 00 -HZSL-10 3 A1-53 00 -HZSL-10 3-80 6- - 80 6-A1 -5 30 0-HZ SL -1 03 A1-53 00 -HZSL-10 3-7

SCL

2A+ 2A-

103

12

14

103

5300

XA

103

53005300

HIC

5300

XA

5300

HSAL

JY

103

103

5300

HSAL

103

 A1-5300-JY-103

20

19

+DC-1

OUT-9

 A1-5300-JP-00007

S

   A   1  -   5   3   0   0  -   J   Y  -   1   0

 A1-5300-HZSH-103   A1-5300-JP-00004

+   1577

-   8 1578

C   13 803

 A1-5300-JP-00004

15 805

NO   14 804

 A1-5300-HZSL-103

C

5

7

103

15

SHEET 293

PLC MODULE

5300

JY

103

5300

JY

103

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

LOOP NO.: A1-5300-X-103

NO   7 IN-316 806  103

INSTRUMENT

FIELD

LOOP SER VI CE: R IN SE OUT LET VLV D MF Z M-002A

9

17

1756-IB161K

RACK-0, SLOT-2

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   0   3

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   0   3

WATER TREATMENT PLANT

ZSH

ZSL

5300HSAH

1756-IB161KRACK-0, SLOT-2

5300HSAH

6

8 GND- 3

IN-2

GND-26

1756-OB16DK

RACK-1, SLOT-6

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 53/293

53 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 18 18

TB4

 A1-5300-JY-104

5300-JT-00005-PDN

BL   A1-5300-JY-104-TB4-9+   +9-TB4-A1-5300-JY-104 A1-5300-JY-104-1579+

WT   A1-5300-JY-104-TB4-10-   - 10 -T B4 -A1-53 00 -J Y-10 4 A1 -5 30 0-JY-1 04 -1 58 0- - 15 80 -A1-53 00 -J Y-10 4 A1-53 00 -J Y-10 4-21

SCL 18A- 18A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSH-104

5300-JT-00005-PDN

BL   A1-5300-HZSH-104-TB1-17+   +17-TB1-A1-5300-HZSH-104 A1-5300-HZSH-104-807+

WT   A1-5300-HZSH-104-TB1-18-   - 18 -T B1 -A1-53 00 -HZSH-10 4 A1-53 00 -HZSH-10 4-80 8- - 80 8-A1 -5 30 0-HZ SH-1 04 A1-53 00 -HZSH-10 4-9

SCL

2A+ 2A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSL-104

5300-JT-00005-PDN

BL   A1-5300-HZSL-104-TB1-19+   +19-TB1-A1-5300-HZSL-104 A1-5300-HZSL-104-809+

WT   A1-5300-HZSL-104-TB1-20-   - 20 -T B1 -A1-53 00 -HZSL-10 4 A1-53 00 -HZSL-10 4-81 0- - 81 0-A1 -5 30 0-HZ SL -1 04 A1-53 00 -HZSL-10 4-11

SCL

2A+ 2A-

5300HSAH

8

1 2 G ND- 5

IN-4

GND-410

1756-OB16DK

RACK-1, SLOT-6

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   0   4

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   0   4

WATER TREATMENT PLANT

ZSH

ZSL

5300HSAH

1756-IB161KRACK-0, SLOT-2

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

LOOP SER VI CE: BWASH I NLET VLV D MF Z M-002A

11

21

1756-IB161K

RACK-0, SLOT-2

LOOP NO.: A1-5300-X-104

NO   11 IN-520 810  104

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

104

5300

JY

104

SHEET 293

PLC MODULE

5300

9

9

104

19

19 809

NO   18 808

 A1-5300-HZSL-104

C

C   17 807

 A1-5300-JP-00004

S

   A   1  -   5   3   0   0  -   J   Y  -   1   0

 A1-5300-HZSH-104   A1-5300-JP-00004

+   1579

-   10 1580

 A1-5300-JY-104

22

21

+DC-1

OUT-10

 A1-5300-JP-00007

JY

104

104

5300

HSAL

104

5300

XA

5300

HSAL

104

16

18

104

5300

XA

104

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 54/293

54 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 18 18

TB4

 A1-5300-JY-105

5300-JT-00005-PDN

BL   A1-5300-JY-105-TB4-11+   +11-TB4-A1-5300-JY-105 A1-5300-JY-105-1581+

WT   A1-5300-JY-105-TB4-12-   - 12 -T B4 -A1-53 00 -J Y-10 5 A1 -5 30 0-JY-1 05 -1 58 2- - 15 82 -A1-53 00 -J Y-10 5 A1-53 00 -J Y-10 5-23

SCL 18A- 18A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSH-105

5300-JT-00005-PDN

BL   A1-5300-HZSH-105-TB1-21+  +21-TB1-A1-5300-HZSH-105 A1-5300-HZSH-105-811+

WT   A1-5300-HZSH-105-TB1-22-   - 22 -T B1 -A1-53 00 -HZSH-10 5 A1-53 00 -HZSH-10 5-81 2- - 81 2-A1 -5 30 0-HZ SH-1 05 A1-53 00 -HZSH-10 5-13

SCL

2A+ 2A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSL-105

5300-JT-00005-PDN

BL   A1-5300-HZSL-105-TB1-23+   +23-TB1-A1-5300-HZSL-105 A1-5300-HZSL-105-813+

WT   A1-5300-HZSL-105-TB1-24-   - 24 -T B1 -A1-53 00 -HZSL-10 5 A1-53 00 -HZSL-10 5-81 4- - 81 4-A1 -5 30 0-HZ SL -1 05 A1-53 00 -HZSL-10 5-15

SCL

2A+ 2A-

3 OF

105

20

22

105

5300

XA

105

53005300

HIC

5300

XA

5300

HSAL

105

105

5300

HSAL

105

 A1-5300-JY-105

24

23

+DC-1

OUT-11

 A1-5300-JP-00007

S

   A   1  -   5   3   0   0  -   J   Y  -   1   0

 A1-5300-HZSH-105   A1-5300-JP-00004

+   1581

-   12 1582

C   21 811

 A1-5300-JP-00004

23

23 813

NO   22 812

 A1-5300-HZSL-105

C

293

PLC MODULE

5300

13  105

105

5300

JY

105

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

JY11

LOOP NO.: A1-5300-X-105

NO   15 IN-724 814  105

INSTRUMENT

FIELD

LOOP SER VI CE: SER VI CE OUT LET VLV D MF Z M-002A

13

25

1756-IB161K

RACK-0, SLOT-2

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   0   5

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   0   5

WATER TREATMENT PLANT

ZSH

ZSL

5300HSAH

1756-IB161KRACK-0, SLOT-2 5300HSAH

10

1 6 G ND- 7

IN-6

GND-614

1756-OB16DK

RACK-1, SLOT-6

SHEET

DOC. NO.

DOC. NO. KE01-A1-500-MT-I -HL-0001-000

REV. NO. P01

TERMINALS

SHEET

JY

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 55/293

55 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 18 18

TB4

 A1-5300-JY-106

5300-JT-00005-PDN

BL   A1-5300-JY-106-TB4-13+   +13-TB4-A1-5300-JY-106 A1-5300-JY-106-1583+

WT   A1-5300-JY-106-TB4-14-   - 14 -T B4 -A1-53 00 -J Y-10 6 A1 -5 30 0-JY-1 06 -1 58 4- - 15 84 -A1-53 00 -J Y-10 6 A1-53 00 -J Y-10 6-25

SCL 18A- 18A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSH-106

5300-JT-00005-PDN

BL   A1-5300-HZSH-106-TB1-25+  +25-TB1-A1-5300-HZSH-106 A1-5300-HZSH-106-815+

WT   A1-5300-HZSH-106-TB1-26-   - 26 -T B1 -A1-53 00 -HZSH-10 6 A1-53 00 -HZSH-10 6-81 6- - 81 6-A1 -5 30 0-HZ SH-1 06 A1-53 00 -HZSH-10 6-17

SCL

2A+ 2A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSL-106

5300-JT-00005-PDN

BL   A1-5300-HZSL-106-TB1-27+   +27-TB1-A1-5300-HZSL-106 A1-5300-HZSL-106-817+

WT   A1-5300-HZSL-106-TB1-28-   - 28 -T B1 -A1-53 00 -HZSL-10 6 A1-53 00 -HZSL-10 6-81 8- - 81 8-A1 -5 30 0-HZ SL -1 06 A1-53 00 -HZSL-10 6-19

SCL

2A+ 2A-

5300HSAH

12

2 0 G ND- 9

IN-8

GND-818

1756-OB16DK

RACK-1, SLOT-6

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   0   6

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   0   6

WATER TREATMENT PLANT

ZSH

ZSL

5300HSAH1756-IB161KRACK-0, SLOT-2

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

LOOP SER VI CE: A IR I NLET VLV D MF Z M-002A

15

29

1756-IB161K

RACK-0, SLOT-2

LOOP NO.: A1-5300-X-106

NO   19 IN-928 818  106

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

106

5300

JY

106

SHEET 293

PLC MODULE

5300

17

13

106

27

27 817

NO   26 816

 A1-5300-HZSL-106

C

C   25 815

 A1-5300-JP-00004

S

   A   1  -   5   3   0   0  -   J   Y  -   1   0

 A1-5300-HZSH-106   A1-5300-JP-00004

+   1583

-   14 1584

 A1-5300-JY-106

26

25

+DC-1

OUT-12

 A1-5300-JP-00007

JY

106

106

5300

HSAL

106

5300

XA

5300

HSAL

106

24

26

106

5300

XA

106

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

KE01 A1 500 MT I HL 0001 000CLIENT AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY DOC NO

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 56/293

56 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 18 18

TB4

 A1-5300-JY-107

5300-JT-00005-PDN

BL   A1-5300-JY-107-TB4-15+   +15-TB4-A1-5300-JY-107 A1-5300-JY-107-1585+

WT   A1-5300-JY-107-TB4-16-   - 16 -T B4 -A1-53 00 -J Y-10 7 A1 -5 30 0-JY-1 07 -1 58 6- - 15 86 -A1-53 00 -J Y-10 7 A1-53 00 -J Y-10 7-27

SCL 18A- 18A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSH-107

5300-JT-00005-PDN

BL  A1-5300-HZSH-107-TB1-29+   +29-TB1-A1-5300-HZSH-107 A1-5300-HZSH-107-819+

WT   A1-5300-HZSH-107-TB1-30-   - 30 -T B1 -A1-53 00 -HZSH-10 7 A1-53 00 -HZSH-10 7-82 0- - 82 0-A1 -5 30 0-HZ SH-1 07 A1-53 00 -HZSH-10 7-21

SCL

2A+ 2A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSL-107

5300-JT-00005-PDN

BL   A1-5300-HZSL-107-TB1-31+   +31-TB1-A1-5300-HZSL-107 A1-5300-HZSL-107-821+

WT   A1-5300-HZSL-107-TB1-32-   - 32 -T B1 -A1-53 00 -HZSL-10 7 A1-53 00 -HZSL-10 7-82 2- - 82 2-A1 -5 30 0-HZ SL -1 07 A1-53 00 -HZSL-10 7-23

SCL

2A+ 2A-

107

28

30

107

5300

XA

107

53005300

HIC

5300

XA

5300

HSAL

JY

107

107

5300

HSAL

107

 A1-5300-JY-107

28

27

+DC-1

OUT-13

 A1-5300-JP-00007

S

   A   1  -   5   3   0   0  -   J   Y  -   1   0

 A1-5300-HZSH-107   A1-5300-JP-00004

+   1585

-   16 1586

C   29 819

 A1-5300-JP-00004

31 821

NO   30 820

 A1-5300-HZSL-107

C

21

15

107

31

SHEET 293

PLC MODULE

5300

JY

107

5300

JY

107

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

LOOP NO.: A1-5300-X-107

NO   2 3 I N- 1132 822  107

INSTRUMENT

FIELD

LOOP SER VI CE: SER VI CE I NLET VLV D MF Z M-002A

17

33

1756-IB161K

RACK-0, SLOT-2

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   0   7

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   0   7

WATER TREATMENT PLANT

ZSH

ZSL

5300HSAH

1756-IB161K

RACK-0, SLOT-2 5300HSAH

14

24 GND-11

IN-10

GND-1022

1756-OB16DK

RACK-1, SLOT-6

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

KE01-A1-500-MT-I-HL-0001-000CLIENT AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY DOC. NO.

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 57/293

57 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 18 18

TB4

 A1-5300-JY-108

5300-JT-00005-PDN

BL   A1-5300-JY-108-TB4-17+   +17-TB4-A1-5300-JY-108 A1-5300-JY-108-1521+

WT   A1-5300-JY-108-TB4-18-   - 18 -T B4 -A1-53 00 -J Y-10 8 A1 -5 30 0-JY-1 08 -1 52 2- - 15 22 -A1-53 00 -J Y-10 8 A1-53 00 -J Y-10 8-29

SCL 18A- 18A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSH-108

5300-JT-00005-PDN

BL   A1-5300-HZSH-108-TB1-33+   +33-TB1-A1-5300-HZSH-108 A1-5300-HZSH-108-731+

WT   A1-5300-HZSH-108-TB1-34-   - 34 -T B1 -A1-53 00 -HZSH-10 8 A1-53 00 -HZSH-10 8-73 2- - 73 2-A1 -5 30 0-HZ SH-1 08 A1-53 00 -HZSH-10 8-25

SCL

2A+ 2A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB1

 A1-5300-HZSL-108

5300-JT-00005-PDN

BL   A1-5300-HZSL-108-TB1-35+   +35-TB1-A1-5300-HZSL-108 A1-5300-HZSL-108-733+

WT   A1-5300-HZSL-108-TB1-36-   - 36 -T B1 -A1-53 00 -HZSL-10 8 A1-53 00 -HZSL-10 8-73 4- - 73 4-A1 -5 30 0-HZ SL -1 08 A1-53 00 -HZSL-10 8-27

SCL

2A+ 2A-

5300

HSAH

16

28 GND-13

IN-12

GND-1226

1756-OB16DK

RACK-1, SLOT-6

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   0

   8

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   0   8

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-2

KE01 A1 500 MT I HL 0001 000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

LOOP SER VI CE: BWASH OUT LET VLV D MF Z M-002B

19

37

1756-IB161K

RACK-0, SLOT-2

LOOP NO.: A1-5300-X-108

NO   2 7 I N- 1336 734  108

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

108

5300

JY

108

SHEET 293

PLC MODULE

5300

25

17

108

35

35 733

NO   34 732

 A1-5300-HZSL-108

C

C   33 731

 A1-5300-JP-00004

S

   A   1  -   5   3   0   0  -   J   Y  -   1   0

 A1-5300-HZSH-108   A1-5300-JP-00004

+   1521

-   18 1522

 A1-5300-JY-108

30

29

+DC-1

OUT-14

 A1-5300-JP-00007

JY

108

108

5300

HSAL

108

5300

XA

5300

HSAL

108

32

34

108

5300

XA

108

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

KE01-A1-500-MT-I-HL-0001-000CLIENT  AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY DOC. NO.

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 58/293

58 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 18 18

TB4

 A1-5300-JY-109

5300-JT-00005-PDN

BL   A1-5300-JY-109-TB4-19+   +19-TB4-A1-5300-JY-109 A1-5300-JY-109-1523+

WT   A1-5300-JY-109-TB4-20-   - 20 -T B4 -A1-53 00 -J Y-10 9 A1 -5 30 0-JY-1 09 -1 52 4- - 15 24 -A1-53 00 -J Y-10 9 A1-53 00 -J Y-10 9-31

SCL 18A- 18A-

24V DC SUPPLY

+ -

2 2

 A1-5300-HZSH-109 5300-JT-00005-PDN

TB2 5300-JT-00005-PDN

BL   A1-5300-HZSH-109-TB2-1+   +1-TB2-A1-5300-HZSH-109 A1-5300-HZSH-109-735+

WT   A1-5300-HZSH-109-TB2-2-   - 2-TB2-A1 -5 30 0-HZ SH-1 09 A1-53 00 -HZSH-10 9-73 6- - 73 6-A1 -5 30 0-HZ SH-1 09 A1-53 00 -HZSH-10 9-29

SCL

2A+ 2A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 2 2

TB2

 A1-5300-HZSL-109

5300-JT-00005-PDN

BL   A1-5300-HZSL-109-TB2-3+   +3-TB2-A1-5300-HZSL-109 A1-5300-HZSL-109-737+

WT   A1-5300-HZSL-109-TB2-4-   - 4-TB2-A1 -5 30 0-HZ SL -1 09 A1-53 00 -HZSL-10 9-73 8- - 73 8-A1 -5 30 0-HZ SL -1 09 A1-53 00 -HZSL-10 9-31

SCL

2A+ 2A-

109

2

109

5300

XA

109

53005300

HIC

5300

XA

5300

HSAL

JY

109

109

5300

HSAL

109

 A1-5300-JY-109

32

31

+GND-1

OUT-15

 A1-5300-JP-00007

S

   A   1  -   5   3   0   0  -   J   Y  -   1   0

 A1-5300-HZSH-109   A1-5300-JP-00005

+   1523

-   20 1524

C   1 735

 A1-5300-JP-00005

3 737

NO   2 736

 A1-5300-HZSL-109

C

29

19

109

3

SHEET 293

PLC MODULE

5300

JY

109

5300

JY

109

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

LOOP NO.: A1-5300-X-109

NO   31 IN-154 738  109

INSTRUMENT

FIELD

LOOP SER VI CE: A IR R ELEASE VLV D MF Z M-002B

21

5

1756-IB161K

RACK-0, SLOT-2

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM REV. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   0

   9

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   0   9

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-2

5300

HSAH

18

3 2 G ND -1 5

IN-14

GND-1430

1756-OB16DK

RACK-1, SLOT-6

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

KE01-A1-500-MT-I-HL-0001-000CLIENT  AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY DOC. NO.

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 59/293

59 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 19 19

TB4

 A1-5300-JY-110

5300-JT-00005-PDN

BL   A1-5300-JY-110-TB4-21+   +21-TB4-A1-5300-JY-110 A1-5300-JY-110-1525+

WT   A1-5300-JY-110-TB4-22-   - 22 -T B4 -A1-53 00 -J Y-11 0 A1-53 00 -J Y-11 0-15 26 - - 15 26 -A1-53 00 -J Y-11 0 A1-53 00 -J Y-11 0-1

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSH-110

5300-JT-00005-PDN

BL   A1-5300-HZSH-110-TB2-5+   +5-TB2-A1-5300-HZSH-110 A1-5300-HZSH-110-739+

WT   A1-5300-HZSH-110-TB2-6-   - 6-TB2-A1 -5 30 0-HZ SH-1 10 A1-53 00 -HZSH-11 0-74 0- - 74 0-A1 -5 30 0-HZ SH-1 10 A1-53 00 -HZSH-11 0-1

SCL

3A+ 3A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSL-110

5300-JT-00005-PDN

BL   A1-5300-HZSL-110-TB2-7+   +7-TB2-A1-5300-HZSL-110 A1-5300-HZSL-110-741+

WT   A1-5300-HZSL-110-TB2-8-   - 8-TB2-A1 -5 30 0-HZ SL -1 10 A1-53 00 -HZSL-11 0-74 2- - 74 2-A1 -5 30 0-HZ SL -1 10 A1-53 00 -HZSL-11 0-3

SCL

3A+ 3A-

5300

HSAH

4 G ND- 1

IN-0

GND-02

110

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   1

   0

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   0

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-3

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM REV. NO.

LOOP NO.: A1-5300-X-110

INSTRUMENT

FIELD

LOOP SER VI CE: R IN SE OUT LET VLV D MF Z M-002B

23

9

 A1-5300-HZSL-110

C

NO   3 IN-18 742

1756-IB161K

RACK-0, SLOT-3

110

5300

JY

1756-OB16DK

293

PLC MODULE

5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

7 741

SHEET

TERMINALSJB

739

1

7

 A1-5300-JP-00005

NO

4

110

6 740

-   22 1526

C   5

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-110   A1-5300-JP-00005

RACK-1, SLOT-7

21+   1525

 A1-5300-JY-110

2

1

+DC-0

OUT-0

 A1-5300-JP-00007

20

110

110

5300

HSAL

110

110

5300

HIC

5300

XA

110

6

110

5300

XA

110

5300

JY

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV NO

DOC. NO.

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 60/293

60 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 19 19

TB4

 A1-5300-JY-111

5300-JT-00005-PDN

BL   A1-5300-JY-111-TB4-23+   +23-TB4-A1-5300-JY-111 A1-5300-JY-111-1527+

WT   A1-5300-JY-111-TB4-24-   - 24 -T B4 -A1-53 00 -J Y-11 1 A1-53 00 -J Y-11 1-15 28 - - 15 28 -A1-53 00 -J Y-11 1 A1-53 00 -J Y-11 1-3

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSH-111

5300-JT-00005-PDN

BL   A1-5300-HZSH-111-TB2-9+   +9-TB2-A1-5300-HZSH-111 A1-5300-HZSH-111-743+

WT   A1-5300-HZSH-111-TB2-10-   - 10 -T B2 -A1-53 00 -HZSH-11 1 A1-53 00 -HZSH-11 1-74 4- - 74 4-A1 -5 30 0-HZ SH-1 11 A1-53 00 -HZSH-11 1-5

SCL

3A+ 3A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSL-111

5300-JT-00005-PDN

BL   A1-5300-HZSL-111-TB2-7+   +7-TB2-A1-5300-HZSL-111 A1-5300-HZSL-111-745+

WT   A1-5300-HZSL-111-TB2-8-   - 8-TB2-A1 -5 30 0-HZ SL -1 11 A1-53 00 -HZSL-11 1-74 6- - 74 6-A1 -5 30 0-HZ SL -1 11 A1-53 00 -HZSL-11 1-7

SCL

3A+ 3A-

111

8

10

111

5300

XA

111

53005300

HIC

5300

XA

5300

HSAL

JY

111

111

5300

HSAL

111

 A1-5300-JY-111

4

3

+DC-0

OUT-1

 A1-5300-JP-00007

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-111   A1-5300-JP-00005

+   1527

-   24 1528

C   9 743

 A1-5300-JP-00005

11 745

NO   10 744

 A1-5300-HZSL-111

C

5

23

111

11

SHEET 293

PLC MODULE

5300

JY

111

5300

JY

111

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

LOOP NO.: A1-5300-X-111

NO   7 IN-312 746  111

INSTRUMENT

FIELD

LOOP SER VI CE: BWASH I NLET VLV D MF Z M-002B

25

13

1756-IB161K

RACK-0, SLOT-3

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM REV. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   1

   1

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   1

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-3

5300

HSAH

22

8 G ND- 3

IN-2

GND-26

1756-OB16DK

RACK-1, SLOT-7

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 61/293

61 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 19 19

TB4

 A1-5300-JY-112

5300-JT-00005-PDN

BL   A1-5300-JY-112-TB4-25+   +25-TB4-A1-5300-JY-112 A1-5300-JY-112-1529+

WT   A1-5300-JY-112-TB4-26-   - 26 -T B4 -A1-53 00 -J Y-11 2 A1-53 00 -J Y-11 2-15 30 - - 15 30 -A1-53 00 -J Y-11 2 A1-53 00 -J Y-11 2-5

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSH-112

5300-JT-00005-PDN

BL   A1-5300-HZSH-112-TB2-13+   +13-TB2-A1-5300-HZSH-112 A1-5300-HZSH-112-747+

WT   A1-5300-HZSH-112-TB2-14-   - 14 -T B2 -A1-53 00 -HZSH-11 2 A1-53 00 -HZSH-11 2-74 8- - 74 8-A1 -5 30 0-HZ SH-1 12 A1-53 00 -HZSH-11 2-9

SCL

3A+ 3A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSL-112

5300-JT-00005-PDN

BL   A1-5300-HZSL-112-TB2-15+   +15-TB2-A1-5300-HZSL-112 A1-5300-HZSL-112-749+

WT   A1-5300-HZSL-112-TB2-16-   - 16 -T B2 -A1-53 00 -HZSL-11 2 A1-53 00 -HZSL-11 2-75 0- - 75 0-A1 -5 30 0-HZ SL -1 12 A1-53 00 -HZSL-11 2-11

SCL

3A+ 3A-

5300

XA

112

14

112

5300

XA

112

5300

JY

112

5300

HIC

112

5300

HSAL

112

 A1-5300-JY-112

6

5

+DC-0

OUT-2

 A1-5300-JP-00007

747

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-112   A1-5300-JP-00005

RACK-1, SLOT-7

25+   1529

24

15 749

NO

112

14 748

-   26 1530

C

112

5300

JY

1756-OB16DK

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)JB

SHEET

 A1-5300-HZSL-112

RACK-0, SLOT-3

TERMINALS

9

15

 A1-5300-JP-00005

13

C

NO   11 IN- 516 750

1756-IB161K

RACK-0, SLOT-3   HSAL

LOOP NO.: A1-5300-X-112

INSTRUMENT

FIELD

LOOP SER VI CE: SER VI CE OUT LET VLV D MF Z M-002B

27

17

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   1

   2

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   2

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

12

5300

HSAH

1 2 G ND -5

IN-4

GND-410

112

5300

112

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 62/293

62 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 19 19

TB4

 A1-5300-JY-113

5300-JT-00005-PDN

BL   A1-5300-JY-113-TB4-27+   +27-TB4-A1-5300-JY-113 A1-5300-JY-113-1531+

WT   A1-5300-JY-113-TB4-28-   - 28 -T B4 -A1-53 00 -J Y-11 3 A1-53 00 -J Y-11 3-15 32 - - 15 32 -A1-53 00 -J Y-11 3 A1-53 00 -J Y-11 3-7

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSH-113

5300-JT-00005-PDN

BL   A1-5300-HZSH-113-TB2-17+   +17-TB2-A1-5300-HZSH-113 A1-5300-HZSH-113-751+

WT   A1-5300-HZSH-113-TB2-18-   - 18 -T B2 -A1-53 00 -HZSH-11 3 A1-53 00 -HZSH-11 3-75 2- - 75 2-A1 -5 30 0-HZ SH-1 13 A1-53 00 -HZSH-11 3-13

SCL

3A+ 3A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSL-113

5300-JT-00005-PDN

BL   A1-5300-HZSL-113-TB2-19+   +19-TB2-A1-5300-HZSL-113 A1-5300-HZSL-113-753+

WT   A1-5300-HZSL-113-TB2-20-   - 20 -T B2 -A1-53 00 -HZSL-11 3 A1-53 00 -HZSL-11 3-75 4- - 75 4-A1 -5 30 0-HZ SL -1 13 A1-53 00 -HZSL-11 3-15

SCL

3A+ 3A-

5300

HSAH

1 6 G ND -7

IN-6

GND-614

113

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   1   3

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   3

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-3

LOOP NO.: A1-5300-X-113

INSTRUMENT

FIELD

LOOP SER VI CE: A IR I NLET VLV D MF Z M-002B

29

21

 A1-5300-HZSL-113

C

NO   15 IN- 720 754

1756-IB161K

RACK-0, SLOT-3

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5300

JY

113

5300

JY

1756-OB16DK

13

19

 A1-5300-JP-00005

19 753

NO

113

18 752

-   28 1532

C   17 751

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-113   A1-5300-JP-00005

RACK-1, SLOT-7

27+   1531

 A1-5300-JY-113

8

7

+DC-0

OUT-3

 A1-5300-JP-00007

26

113

113

5300

HSAL

113

JY

113

5300

HIC

5300

XA

113

16

18

113

5300

XA

113

5300

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

63 293SHEET

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 63/293

63 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 19 19

TB4

 A1-5300-JY-114

5300-JT-00005-PDN

BL   A1-5300-JY-114-TB4-29+   +29-TB4-A1-5300-JY-114 A1-5300-JY-114-1533+

WT   A1-5300-JY-114-TB4-30-   - 30 -T B4 -A1-53 00 -J Y-11 4 A1-53 00 -J Y-11 4-15 34 - - 15 34 -A1-53 00 -J Y-11 4 A1-53 00 -J Y-11 4-9

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSH-114

5300-JT-00005-PDN

BL   A1-5300-HZSH-114-TB2-21+   +21-TB2-A1-5300-HZSH-114 A1-5300-HZSH-114-755+

WT   A1-5300-HZSH-114-TB2-22-   - 22 -T B2 -A1-53 00 -HZSH-11 4 A1-53 00 -HZSH-11 4-75 6- - 75 6-A1 -5 30 0-HZ SH-1 14 A1-53 00 -HZSH-11 4-17

SCL

3A+ 3A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSL-114

5300-JT-00005-PDN

BL   A1-5300-HZSL-114-TB2-23+   +23-TB2-A1-5300-HZSL-114 A1-5300-HZSL-114-757+

WT   A1-5300-HZSL-114-TB2-24-   - 24 -T B2 -A1-53 00 -HZSL-11 4 A1-53 00 -HZSL-11 4-75 8- - 75 8-A1 -5 30 0-HZ SL -1 14 A1-53 00 -HZSL-11 4-19

SCL

3A+ 3A-

5300

XA

114

22

114

5300

XA

114

5300

JY

114

5300

HIC

114

5300

HSAL

114

 A1-5300-JY-114

10

9

+DC-0

OUT-4

 A1-5300-JP-00007

755

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-114   A1-5300-JP-00005

RACK-1, SLOT-7

29+   1533

28

23 757

NO

114

22 756

-   30 1534

C

114

5300

JY

1756-OB16DK

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)JB

SHEET

 A1-5300-HZSL-114

RACK-0, SLOT-3

TERMINALS

17

23

 A1-5300-JP-00005

21

C

NO   19 IN- 924 758

1756-IB161K

RACK-0, SLOT-3   HSAL

LOOP NO.: A1-5300-X-114

INSTRUMENT

FIELD

LOOP SER VI CE: SER VI CE I NLET VLV D MF Z M-002C

31

25

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   1   4

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   4

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

20

5300

HSAH

2 0 G ND -9

IN-8

GND-818

114

5300

114

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

64 OFPACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

SHEET 293

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 64/293

64 OF

24V DC SUPPLY

- +

5300-JT-00005-PDN 19 19

TB4

 A1-5300-JY-115

5300-JT-00005-PDN

BL   A1-5300-JY-115-TB4-31+   +31-TB4-A1-5300-JY-115 A1-5300-JY-115-1535+

WT   A1-5300-JY-115-TB4-32-   - 32 -T B4 -A1-53 00 -J Y-11 5 A1 -5 30 0-JY-1 15 -1 53 6- - 15 36 -A1-53 00 -J Y-11 5 A1-53 00 -J Y-11 5-11

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSH-115

5300-JT-00005-PDN

BL   A1-5300-HZSH-115-TB2-25+   +25-TB2-A1-5300-HZSH-115 A1-5300-HZSH-115-759+

WT   A1-5300-HZSH-115-TB2-26-   - 26 -T B2 -A1-53 00 -HZSH-11 5 A1-53 00 -HZSH-11 5-76 0- - 76 0-A1 -5 30 0-HZ SH-1 15 A1-53 00 -HZSH-11 5-21

SCL

3A+ 3A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSL-115

5300-JT-00005-PDN

BL   A1-5300-HZSL-115-TB2-27+   +27-TB2-A1-5300-HZSL-115 A1-5300-HZSL-115-761+

WT   A1-5300-HZSL-115-TB2-28-   - 28 -T B2 -A1-53 00 -HZSL-11 5 A1-53 00 -HZSL-11 5-76 2- - 76 2-A1 -5 30 0-HZ SL -1 15 A1-53 00 -HZSL-11 5-23

SCL

3A+ 3A-

5300

HSAH

24 GND-11

IN-10

GND-1022

115

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1

   1   5

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   5

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-3

LOOP NO.: A1-5300-X-115

INSTRUMENT

FIELD

LOOP SER VI CE: BWASH OUT LET VLV D MF Z M-002C

33

29

 A1-5300-HZSL-115

C

NO   2 3 I N- 1128 762

1756-IB161K

RACK-0, SLOT-3

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5300

JY

115

5300

JY

1756-OB16DK

21

27

 A1-5300-JP-00005

27 761

NO

115

26 760

-   32 1536

C  25 759

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-115   A1-5300-JP-00005

RACK-1, SLOT-7

31+   1535

 A1-5300-JY-115

12

11

+DC-0

OUT-5

 A1-5300-JP-00007

30

115

115

5300

HSAL

115

JY

115

5300

HIC

24

5300

XA

115

26

115

5300

XA

115

5300

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

65 OF 293SHEET

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 65/293

24V DC SUPPLY

- +

5300-JT-00005-PDN 19 19

TB4

 A1-5300-JY-116

5300-JT-00005-PDN

BL   A1-5300-JY-116-TB4-33+   +33-TB4-A1-5300-JY-116 A1-5300-JY-116-1537+

WT   A1-5300-JY-116-TB4-34-   - 34 -T B4 -A1-53 00 -J Y-11 6 A1 -5 30 0-JY-1 16 -1 53 8- - 15 38 -A1-53 00 -J Y-11 6 A1-53 00 -J Y-11 6-13

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSH-116

5300-JT-00005-PDN

BL   A1-5300-HZSH-116-TB2-29+   +29-TB2-A1-5300-HZSH-116 A1-5300-HZSH-116-763+

WT   A1-5300-HZSH-116-TB2-30-   - 30 -T B2 -A1-53 00 -HZSH-11 6 A1-53 00 -HZSH-11 6-76 4- - 76 4-A1 -5 30 0-HZ SH-1 16 A1-53 00 -HZSH-11 6-25

SCL

3A+ 3A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSL-116

5300-JT-00005-PDN

BL   A1-5300-HZSL-116-TB2-31+   +31-TB2-A1-5300-HZSL-116 A1-5300-HZSL-116-765+

WT   A1-5300-HZSL-116-TB2-32-   - 32 -T B2 -A1-53 00 -HZSL-11 6 A1-53 00 -HZSL-11 6-76 6- - 76 6-A1 -5 30 0-HZ SL -1 16 A1-53 00 -HZSL-11 6-27

SCL

3A+ 3A-

5300

XA

116

30

116

5300

XA

116

5300

JY

116

5300

HIC

116

5300

HSAL

116

 A1-5300-JY-116

14

13

+DC-0

OUT-6

 A1-5300-JP-00007

763

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-116   A1-5300-JP-00005

RACK-1, SLOT-7

33+   1537

32

31 765

NO

116

30 764

-   34 1538

C

116

5300

JY

1756-OB16DK

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)JB

 A1-5300-HZSL-116

RACK-0, SLOT-3

TERMINALS

25

31

 A1-5300-JP-00005

29

C

NO   2 7 I N- 1332 766

1756-IB161K

RACK-0, SLOT-3   HSAL

LOOP NO.: A1-5300-X-116

INSTRUMENT

FIELD

LOOP SER VI CE: A IR R ELEASE VLV D MF Z M-002C

35

33

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1

   1   6

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   6

ZSH

ZSL

5300

HSAH

1756-IB161K

28

5300

HSAH

28 GND-13

IN-12

GND-1226

116

5300

116

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

66 OFPACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

SHEET 293

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 66/293

24V DC SUPPLY

- +

5300-JT-00005-PDN 19 19

TB4

 A1-5300-JY-117

5300-JT-00005-PDN

BL   A1-5300-JY-117-TB4-35+   +35-TB4-A1-5300-JY-117 A1-5300-JY-117-1539+

WT   A1-5300-JY-117-TB4-36-   - 36 -T B4 -A1-53 00 -J Y-11 7 A1 -5 30 0-JY-1 17 -1 54 0- - 15 40 -A1-53 00 -J Y-11 7 A1-53 00 -J Y-11 7-15

SCL 19A- 19A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSH-117

5300-JT-00005-PDN

BL   A1-5300-HZSH-117-TB2-33+   +33-TB2-A1-5300-HZSH-117 A1-5300-HZSH-117-771+

WT   A1-5300-HZSH-117-TB2-34-   - 34 -T B2 -A1-53 00 -HZSH-11 7 A1-53 00 -HZSH-11 7-77 2- - 77 2-A1 -5 30 0-HZ SH-1 17 A1-53 00 -HZSH-11 7-29

SCL

3A+ 3A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 3 3

TB2

 A1-5300-HZSL-117

5300-JT-00005-PDN

BL   A1-5300-HZSL-117-TB2-35+   +35-TB2-A1-5300-HZSL-117 A1-5300-HZSL-117-773+

WT   A1-5300-HZSL-117-TB2-36-   - 36 -T B2 -A1-53 00 -HZSL-11 7 A1-53 00 -HZSL-11 7-77 4- - 77 4-A1 -5 30 0-HZ SL -1 17 A1-53 00 -HZSL-11 7-31

SCL

3A+ 3A-

5300

HSAH

34

32 GND-15

IN-14

GND-1430

1756-OB16DK

RACK-1, SLOT-7

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1

   1   7

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   7

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-3

INSTRUMENT

FIELD

LOOP SER VI CE: R IN SE OUT LET VLV D MF Z M-002C

37

37

1756-IB161K

RACK-0, SLOT-3

LOOP NO.: A1-5300-X-117

NO   3 1 I N- 1536 774  117

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

117

5300

JY

117

PLC MODULE

5300

29

35

117

35

35 773

NO   34 772

 A1-5300-HZSL-117

C

C  33 771

 A1-5300-JP-00005

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-117   A1-5300-JP-00005

+   1539

-   36 1540

 A1-5300-JY-117

16

15

GND-0

OUT-7

 A1-5300-JP-00007

JY

117

117

5300

HSAL

117

5300

XA

5300

HSAL

117

32

34

117

5300

XA

117

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

67 OFSHEET 293

PROCESS CONTROLROOMFIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 67/293

24V DC SUPPLY

- +

19 19

 A1-5300-JY-118 5300-JT-00005-PDN

TB5 5300-JT-00005-PDN

BL   A1-5300-JY-118-TB5-1+   +1-TB5-A1-5300-JY-118 A1-5300-JY-118-1561+

WT   A1-5300-JY-118-TB5-2-   - 2-TB5-A1 -5 30 0-JY-1 18 A1 -5 30 0-JY-1 18 -1 56 2- - 15 62 -A1-53 00 -J Y-11 8 A1-53 00 -J Y-11 8-17

SCL 19A- 19A+

24V DC SUPPLY

+ -

4 4

 A1-5300-HZSH-118 5300-JT-00005-PDN

TB3 5300-JT-00005-PDN

BL   A1-5300-HZSH-118-TB3-1+   +1-TB3-A1-5300-HZSH-118 A1-5300-HZSH-118-775+

WT   A1-5300-HZSH-118-TB3-2-   - 2-TB3-A1 -5 30 0-HZ SH-1 18 A1-53 00 -HZSH-11 8-77 6- - 77 6-A1 -5 30 0-HZ SH-1 18 A1-53 00 -HZSH-11 8-1

SCL

4A+ 4A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 4 4

TB3

 A1-5300-HZSL-118

5300-JT-00005-PDN

BL   A1-5300-HZSL-118-TB3-3+   +3-TB3-A1-5300-HZSL-118 A1-5300-HZSL-118-777+

WT   A1-5300-HZSL-118-TB3-4-   - 4-TB3-A1 -5 30 0-HZ SL -1 18 A1-53 00 -HZSL-11 8-77 8- - 77 8-A1 -5 30 0-HZ SL -1 18 A1-53 00 -HZSL-11 8-3

SCL

4A+ 4A-

XA

118

2

118

5300

XA

118

5300

JY

5300

HIC

5300

118

5300

HSAL

118

118

 A1-5300-JY-118

18

17

+DC-1

OUT-8

 A1-5300-JP-00008

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-118   A1-5300-JP-00006

+   1561

-   2 1562

1

C

C  1 775

 A1-5300-JP-00006

NO   2 776

 A1-5300-HZSL-118

3

3 777  5300

HSAL

PLC MODULE

5300

JY

118

5300

JY

118

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

LOOP NO.: A1-5300-X-118

NO   3 IN-14 778  118

118

INSTRUMENT

FIELD

LOOP SER VI CE: SER VI CE OUT LET VLV D MF Z M-002C

3

5

1756-OB16DK

RACK-1, SLOT-7

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1

   1   8

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   8

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-4

5300

HSAH

4 GND- 1

IN-0

GND-02

1756-IB161K

RACK-0, SLOT-4

1

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

68 OFPACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

FIELD PROCESS CONTROL ROOM

SHEET 293

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 68/293

24V DC SUPPLY

- +

5300-JT-00005-PDN 19 19

TB5

 A1-5300-JY-119

5300-JT-00005-PDN

BL   A1-5300-JY-119-TB5-3+   +3-TB5-A1-5300-JY-119 A1-5300-JY-119-1563+

WT   A1-5300-JY-119-TB5-4-   - 4-TB5-A1 -5 30 0-JY-1 19 A1 -5 30 0-JY-1 19 -1 56 4- - 15 64 -A1-53 00 -J Y-11 9 A1-53 00 -J Y-11 9-19

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 4 4

TB3

 A1-5300-HZSH-119

5300-JT-00005-PDN

BL   A1-5300-HZSH-119-TB3-5+   +5-TB3-A1-5300-HZSH-119 A1-5300-HZSH-119-779+

WT   A1-5300-HZSH-119-TB3-6-   - 6-TB3-A1 -5 30 0-HZ SH-1 19 A1-53 00 -HZSH-11 9-78 0- - 78 0-A1 -5 30 0-HZ SH-1 19 A1-53 00 -HZSH-11 9-5

SCL

4A+ 4A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 4 4

TB3

 A1-5300-HZSL-119

5300-JT-00005-PDN

BL   A1-5300-HZSL-119-TB3-7+   +7-TB3-A1-5300-HZSL-119 A1-5300-HZSL-119-781+

WT   A1-5300-HZSL-119-TB3-8-   - 8-TB3-A1 -5 30 0-HZ SL -1 19 A1-53 00 -HZSL-11 9-78 2- - 78 2-A1 -5 30 0-HZ SL -1 19 A1-53 00 -HZSL-11 9-7

SCL

4A+ 4A-

5300

HSAH

2

8 GND-3

IN-2

GND-26

1756-OB16DK

RACK-1, SLOT-7

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1

   1   9

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   9

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-4

INSTRUMENT

FIELD

LOOP SER VI CE: BWASH I NLET VLV D MF Z M-002C

5

9

1756-IB161K

RACK-0, SLOT-4

LOOP NO.: A1-5300-X-119

NO   7 IN-38 782  119

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

119

5300

JY

119

PLC MODULE

5300

5

3

119

7

7 781

NO   6 780

 A1-5300-HZSL-119

C

C  5 779

 A1-5300-JP-00006

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-119   A1-5300-JP-00006

+   1563

-   4 1564

 A1-5300-JY-119

20

19

+DC-1

OUT-9

 A1-5300-JP-00008

JY

119

119

5300

HSAL

119

5300

XA

5300

HSAL

119

4

6

119

5300

XA

119

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

69 OFSHEET 293

PROCESS CONTROL ROOMFIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 69/293

24V DC SUPPLY

- +

5300-JT-00005-PDN 19 19

TB5

 A1-5300-JY-120

5300-JT-00005-PDN

BL   A1-5300-JY-120-TB5-5+   +5-TB5-A1-5300-JY-120 A1-5300-JY-120-1565+

WT   A1-5300-JY-120-TB5-6-   - 6-TB5-A1 -5 30 0-JY-1 20 A1 -5 30 0-JY-1 20 -1 56 6- - 15 66 -A1-53 00 -J Y-12 0 A1-53 00 -J Y-12 0-21

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00005-PDN 4 4

TB3

 A1-5300-HZSH-120

5300-JT-00005-PDN

BL   A1-5300-HZSH-120-TB3-9+   +9-TB3-A1-5300-HZSH-120 A1-5300-HZSH-120-783+

WT   A1-5300-HZSH-120-TB3-10-   - 10 -T B3 -A1-53 00 -HZSH-12 0 A1-53 00 -HZSH-12 0-78 4- - 78 4-A1 -5 30 0-HZ SH-1 20 A1-53 00 -HZSH-12 0-9

SCL

4A+ 4A-

24V DC SUPPLY

+ -

5300-JT-00005-PDN 4 4

TB3

 A1-5300-HZSL-120

5300-JT-00005-PDN

BL   A1-5300-HZSL-120-TB3-11+   +11-TB3-A1-5300-HZSL-120 A1-5300-HZSL-120-785+

WT   A1-5300-HZSL-120-TB3-12-   - 12 -T B3 -A1-53 00 -HZSL-12 0 A1-53 00 -HZSL-12 0-78 6- - 78 6-A1 -5 30 0-HZ SL -1 20 A1-53 00 -HZSL-12 0-11

SCL

4A+ 4A-

120

8

10

120

5300

XA

120

53005300

HIC

5300

XA

5300

HSAL

JY

120

120

5300

HSAL

120

 A1-5300-JY-120

22

21

+DC-1

OUT-10

 A1-5300-JP-00008

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-120   A1-5300-JP-00006

+   1565

-   6 1566

C  9 783

 A1-5300-JP-00006

11 785

NO   10 784

 A1-5300-HZSL-120

C

9

5

120

11

PLC MODULE

5300

JY

120

5300

JY

120

TERMINALSDCS (BY OTHERS)JB

LOOP NO.: A1-5300-X-120

NO   11 IN-512 786  120

INSTRUMENT

LOOP SER VI CE: A IR I NLET VLV D MF Z M-002C

7

13

1756-IB161K

RACK-0, SLOT-4

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   2   0

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   0

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-4

5300

HSAH

4

12 GND-5

IN-4

GND-410

1756-OB16DK

RACK-1, SLOT-7

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

70 OF

FIELD

KE01-A1-500-MT-I-HL-0001-000

P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

SHEET 293WATER TREATMENT PLANT

DOC. NO.

REV. NO.PROJECT

PACKAGE

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

DCS (BY OTHERS)PROCESS CONTROL ROOM

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 70/293

FI-5 5300-JT-00007-PAN 1756-IF16K

TB1 5300-JT-00007-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-6

 A1-5300-LT-100-TB1-1+   + 1- TB 1- A1 -5 30 0- LT -1 00 A 1- 53 00 -L T- 10 0- 20 1+ + 20 1- A1 -5 30 0- LT -1 00 A 1- 53 00 -L T- 10 0- 15 A+

+29-A1-5300-LT-100 A1-5300-LT-100-30+

 A1-5300-LT-100-TB1-2-   - 2- TB 1- A1 -5 30 0- LT -1 00 A 1- 53 00 -L T- 10 0- 20 2- - 20 2- A1 -5 30 0- LT -1 00 A 1- 53 00 -L T- 10 0- 15 B-

-30-A1-5300-LT-100 A1-5300-LT-100-32-

SCL

H H

L L

FIC

100

5000

FIC

100

5000

100

5000

FIC

100

4

15C

201 15A

5000

FIC

-

29

30

1

2

3

+

-

INSTRUMENT

 A1-5300-LT-100

LOOP NO.: A1-5300-LT-100

31

iRTN12

iRTN13

FILTER BWASH WTR TNK TA-083 LVL

JB

29

IN12

   A   1  -   5   3   0   0  -   L   T  -   1   0   0

30

32

LOOP SERVICE:

202 15B

+

IN13

DCS (BY OTHERS)PLC MODULETERMINALS

5300

LI

100

CE   CE

CE

CE   CE   CE

CE

 A1-5300-LT-100 A1-5300-JP-00009

5300

LAH

100

5300

LAL

100

5300

LTA

100

5300

LI

100

5300

LAH

100

5300

LAL

100

5300

LTA

100

To AMS System

OF71

 AGIP KAZA KHSTAN NORTH CASPIA N OPERATING COMPANY

TERMINALS TERMINALS

DOC. NO.

REV. NO.

CLIENT

FIELD

293

PROCESS CONTROL ROOM

SHEETPACKAGE WATER TREATMENT PLANT

ESD (BY OTHERS)

KE01-A1-500-MT-I-HL-0001-000

P01PROJECT K ASHA GA N DEVELOPMENT EXPERIMENTAL PROGRA M

JBINSTRUMENT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 71/293

  5300-JT-00008-PDN

TB1 5300-JT-00008-PDN A1-5300-LS-201-TB1-1+   +1 -TB 1- A1 -5 30 0- LS -2 01 A 1- 530 0- LS- 20 1- 95 5+ +9 55 -A1 -5 30 0- LS- 20 1 A1 -5 30 0- LS -2 01 -0 05 +

NC

 A1-5300-LS-201-TB1-2-   - 2- TB 1- A1 -5 30 0- LS -2 01 A1 -5 30 0- LS- 20 1- 95 6- - 95 6- A1 -5 30 0- LS -2 01 A1 -5 30 0- LS -2 01 -0 06 -

SCL

9

10

4

006

 A1-5300-LS-201 DI-ESD-001

956

LOOP NO.: A1-5300-LS-201 LOOP SERVICE: FILTER BWASH WTR TNK TA-083 LS

5

6

7

8

1

2

3

955

5300

LALL

201

Hard wired to

ESD by others

005

CE CECE   CE

 A1-5300-LS-201 A1-5300-JP-00010

CE

5300

LALL

201

ESD

System

72 OFPACKAGE WATER TREATMENT PLANT

INSTRUMENT

FIELD

TERMINALS

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

JB

SHEET 293

PLC MODULEDCS (BY OTHERS)

PROCESS CONTROL ROOM

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 72/293

24V DC SUPPLY

- +

19 19

 A1-5300-JY-121 5300-JT-00008-PDN

TB2 5300-JT-00008-PDN

BL   A1-5300-JY-121-TB2-1+   +1-TB2-A1-5300-JY-121 A1-5300-JY-121-1653+

WT   A1-5300-JY-121-TB2-2-   - 2-TB2-A1 -5 30 0-JY-1 21 A1 -5 30 0-JY-1 21 -1 65 4- - 16 54 -A1-53 00 -J Y-12 1 A1-53 00 -J Y-12 1-23

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00008-PDN 4 4

TB1

 A1-5300-HZSH-121

5300-JT-00008-PDN

BL   A1-5300-HZSH-121-TB1-3+   +3-TB1-A1-5300-HZSH-121 A1-5300-HZSH-121-957+

WT   A1-5300-HZSH-121-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SH-1 21 A1-53 00 -HZSH-12 1-95 8- - 95 8-A1 -5 30 0-HZ SH-1 21 A1-53 00 -HZSH-12 1-13

SCL

4A+ 4A-

24V DC SUPPLY

+ -

5300-JT-00008-PDN 4 4

TB1

 A1-5300-HZSL-121

5300-JT-00008-PDN

BL   A1-5300-HZSL-121-TB1-5+   +5-TB1-A1-5300-HZSL-121 A1-5300-HZSL-121-959+

WT   A1-5300-HZSL-121-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SL -1 21 A1-53 00 -HZSL-12 1-96 0- - 96 0-A1 -5 30 0-HZ SL -1 21 A1-53 00 -HZSL-12 1-15

SCL

4A+ 4A-

5300

HSAH

16 GND-7

IN-6

GND-614

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   11756-IB161K

RACK-0, SLOT-4

   A   1  -   5   3   0   0  -   H   Z   S   H  -

   1   2   1

ZSH

INSTRUMENT TERMINALS

4

13

5

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-4

121

5 959

NO   4

960  121

LOOP SERVICE: INLET VLV TO BWASH WTR.TNK TA-083

7

JY

121

JB

JY1

LOOP NO.: A1-5300-X-121

NO   15 IN-76

121

5300

JY

121

PLC MODULE

5300

1756-OB16DK

RACK-1, SLOT-7

958

 A1-5300-HZSL-121

C

C   3 957

 A1-5300-JP-00010

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-121   A1-5300-JP-00010

+   1653

-   2 1654

3

 A1-5300-JY-121

24

23

+DC-1

OUT-11

 A1-5300-JP-00011

121

5300

HSAL

121

5300

XA

5300

HSAL

121

2

4

121

5300

XA

121

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

73 OFSHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

TERMINALSINSTRUMENT

FIELD

JB PLC MODULE

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 73/293

 5300-JT-00009-PAN

TB1

FI-31756-IF16K

5300-JT-00009-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-2

 A1-5300-FT-106-TB1-7+   + 7- TB 1- A1 -5 30 0- FT -1 06 A 1- 53 00 -F T- 10 6- 20 5+ + 20 5- A1 -5 30 0- FT -1 06 A 1- 53 00 -F T- 10 6- 13 A+

+25-A1-5300-FT-106 A1-5300-FT-106-20+

 A1-5300-FT-106-TB1-8-   - 8- TB 1- A1 -5 30 0- FT -1 06 A 1- 53 00 -F T- 10 6- 20 6- - 20 6- A1 -5 30 0- FT -1 06 A 1- 53 00 -F T- 10 6- 13 B-

-26-A1-5300-FT-106 A1-5300-FT-106-22-

SCL

H H

5300-JT-00026-PAN

TB1

L L

5300-JT-00026-PAN

 A1-5300-UY-202-TB1-7+  + 7- TB 1- A1 -5 30 0- UY -2 02 A 1- 53 00 -U Y- 20 2- 40 4+ + 40 4- A1 -5 30 0- UY -2 02

  A1-5300-UY-202-7

 A1-5300-UY-202-TB1-8-   - 8- TB 1- A1 -5 30 0- UY -2 02 A 1- 53 00 -U Y- 20 2- 40 5- - 40 5- A1 -5 30 0- UY -2 02   A1-5300-UY-202-11

SCL

5300-JT-00026-PAN

TB1

5300-JT-00026-PAN

 A1-5300-UY-203-TB1-9+   + 9- TB 1- A1 -5 30 0- UY -2 03 A 1- 53 00 -U Y- 20 3- 40 8+ + 40 8- A1 -5 30 0- UY -2 03   A1-5300-UY-203-8

 A1-5300-UY-203-TB1-10-   - 1 0- TB 1- A1 -5 30 0- UY -2 03 A 1- 53 00 -U Y- 20 3- 40 9- - 40 9- A1 -5 30 0- UY -2 03   A1-5300-UY-203-12

SCL

5300-JT-00027-PAN

TB1

5300-JT-00027-PAN

 A1-5300-UY-204-TB1-7+   + 7- TB 1- A1 -5 30 0- UY -2 04 A 1- 53 00 -U Y- 20 4- 42 4+ + 42 4- A1 -5 30 0- UY -2 04   A1-5300-UY-204-15

 A1-5300-UY-204-TB1-8-   - 8- TB 1- A1 -5 30 0- UY -2 04 A 1- 53 00 -U Y- 20 4- 42 5- - 42 5- A1 -5 30 0- UY -2 04   A1-5300-UY-204-19

SCL

5300-JT-00027-PAN

TB1

5300-JT-00027-PAN

 A1-5300-UY-205-TB1-9+   + 9- TB 1- A1 -5 30 0- UY -2 05 A 1- 53 00 -U Y- 20 5- 42 8+ + 42 8- A1 -5 30 0- UY -2 05   A1-5300-UY-205-16

 A1-5300-UY-205-TB1-10-   - 1 0- TB 1- A1 -5 30 0- UY -2 05 A 1- 53 00 -U Y- 20 5- 42 9- - 42 9- A1 -5 30 0- UY -2 05   A1-5300-UY-205-20

SCL

FIC

100

5000

FIC

100

5000

100

5000

FIC

100

19

IN8

IN9

8

13A

13B

LOOP SERVICE:

9

11

9

17 ALT4

206

21

iRTN8

iRTN9

22

   A   1  -   5   3   0   0  -   F   T  -   1   0   6

5000

FIC

1756-OF6CIK

FLOW TO CF 530-ZL002A/B/C

205

 A1-5300-FT-1066

7

 A1-5300-UY-204

 A1-5300-UY-203

 A1-5300-UY-205

+

I/P

I/P-

LOOP NO.: A1-5300-FT-106

26

+

-13C

25 20+

-

1756-OF6CIK

RACK-3, SLOT-11

-   40912

+   408

10

OUT4

19 RTN4

   A   1  -   5   3   0   0  -   P   Y  -   2   1   2

RACK-3, SLOT-11

 ALT3

OUT3

   A   1  -   5   3   0   0  -   P   Y  -   2   1   2

8

9  8

10

   A   1  -   5   3   0   0  -   P   Y  -   2   1   2

I/P

6

+   7 424

8

15

-   10

 A1-530-PD-003A

 A1-530-PD-003B

 A1-530-PD-004A

 A1-530-PD-004B

RTN2

 A1-5300-UY-202

1756-OF6CIK

 RACK-3, SLOT-11

7 OUT2

9

 ALT2

   A   1  -   5   3   0   0  -   P   Y  -   2

   1   2

I/P   +   7 404

-   8 40511

9

425

428

20 RTN5429

1756-OF6CIK

18 ALT5

8RACK-3, SLOT-11

16 OUT5

9

RTN3

11

5300

FIC

106

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-106 A1-5300-JP-00012

5300

FAH

106

5300

FAL

106

5300

FTA

106

5300

FIC

106

5300

FAH

106

5300

FAL

106

5300

FTA

106

CE CECE   CE

 A1-5300-UY-202   A1-5300-JP-00039

CE

CE CECE   CE

 A1-5300-UY-203   A1-5300-JP-00039

CE

CE CECE   CE

 A1-5300-UY-204 A1-5300-JP-00040

CE

CE CECE   CE

 A1-5300-UY-205   A1-5300-JP-00040

CE

To AMS System

74 OFSHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

INSTRUMENT JB PLC MODULETERMINALS

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 74/293

 5300-JT-00009-PAN

TB1

FI-61756-IF16K

5300-JT-00009-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-8

 A1-5300-PDT-198-TB1-9+   +9-TB1-A1 -5 30 0-PDT-19 8 A1 -5 30 0-PDT-19 8-20 7+ +20 7-A1 -5 30 0-PDT-19 8 A1-53 00 -PDT -1 98 -1 1A+

+21-A1-5300-PDT-198 A1-5300-PDT-198-12+

 A1-5300-PDT-198-TB1-10-   - 10 -T B1 -A1-53 00 -PDT -1 98 A1-53 00 -PDT -1 98 -2 08 - - 20 8-A1 -5 30 0-PDT-19 8 A1-53 00 -PDT -1 98 -1 1B-

-22-A1-5300-PDT-198 A1-5300-PDT-198-14-

SCL

H H

FIC

100

5000

FIC

11

IN4

   A   1  -   5   3   0   0  -   P   D   T  -   1   9   8

208

14 IN511

4

9

7

6

+

-

14

155000

19

20

LOOP SERVICE:

100

5000

FIC

100

LOOP NO.: A1-5300-PDT-198

13

iRTN4

iRTN5

16

17

18

12

13

DIFF. PRESS.HI CF 530-ZL-002A

207

10

 A1-5300-PDT-198

1

2

3

5

8

22

+

-11C

21 1211A

11B

5300

PDI

198

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-198 A1-5300-JP-00012

5300

PDAH

198

5300

PDTA

198

5300

PDI

198

5300

PDAH

198

5300

PDTA

198

To AMS System

75 OFPACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

PLC MODULETERMINALS

SHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 75/293

 5300-JT-00009-PAN

TB1

FI-61756-IF16K

5300-JT-00009-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-8

 A1-5300-PDT-200-TB1-11+   +11 -T B1 -A1-53 00 -PDT -2 00 A1-53 00 -PDT -2 00 -2 09 + +20 9-A1 -5 30 0-PDT-20 0 A1-53 00 -PDT -2 00 -1 2A+

+23-A1-5300-PDT-200 A1-5300-PDT-200-16+

 A1-5300-PDT-200-TB1-12-   - 12 -T B1 -A1-53 00 -PDT -2 00 A1-53 00 -PDT -2 00 -2 10 - - 21 0-A1 -5 30 0-PDT-20 0 A1-53 00 -PDT -2 00 -1 2B-

-24-A1-5300-PDT-200 A1-5300-PDT-200-18-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

20

16

17

18

19

12

13

14

15

24

+

-12C

23 1612A

12B

LOOP NO.: A1-5300-PDT-200 DIFF. PRESS.HI CF 530-ZL-002B

209

 A1-5300-PDT-200

5

6

7

2

210

4

3

17

iRTN6

iRTN7

18

+

-IN7

8

9

10

11

LOOP SERVICE:

15

IN6

   A   1  -   5   3   0   0  -   P   D   T  -   2   0   0

1

5300

PDI

200

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-200 A1-5300-JP-00012

5300

PDAH

200

5300

PDTA200

5300

PDI

200

5300

PDAH

200

5300

PDTA200

To AMS System

76 OFSHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB PLC MODULETERMINALSINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 76/293

 5300-JT-00009-PAN

TB1

FI-61756-IF16K

5300-JT-00009-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-8

 A1-5300-PDT-202-TB1-13+   +13 -T B1 -A1-53 00 -PDT -2 02 A1-53 00 -PDT -2 02 -2 11 + +21 1-A1 -5 30 0-PDT-20 2 A1-53 00 -PDT -2 02 -1 3A+

+25-A1-5300-PDT-202 A1-5300-PDT-202-20+

 A1-5300-PDT-202-TB1-14-   - 14 -T B1 -A1-53 00 -PDT -2 02 A1-53 00 -PDT -2 02 -2 12 - - 21 2-A1 -5 30 0-PDT-20 2 A1-53 00 -PDT -2 02 -1 3B-

-26-A1-5300-PDT-202 A1-5300-PDT-202-22-

SCL

H H

FIC

100

5000

FIC

100

5000

1

2

18

5

6

10

11

12

13

14

19

IN8

   A   1  -   5   3   0   0  -   P   D   T  -   2   0   2

3

+

-IN9

4

212

21

iRTN8

iRTN9

22

5000

FIC

100

LOOP NO.: A1-5300-PDT-202 DIFF. PRESS.HI CF 530-ZL-002C

211

 A1-5300-PDT-202

7

8

9

26

+

-13C

25 2013A

13B

LOOP SERVICE:

15

16

17

20

19 5300

PDI

202

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-202 A1-5300-JP-00012

5300

PDAH

202

5300

PDTA

202

5300

PDI

202

5300

PDAH

202

5300

PDTA

202

To AMS System

77 OFSHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB PLC MODULETERMINALSINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 77/293

FI-2 5300-JT-00009-PAN 1756-IF16K

TB1 5300-JT-00009-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-4

 A1-5300-AT-101A-TB1-1+   +1-TB1-A1 -5 30 0-AT -1 01 A A1-53 00 -AT-10 1A-2 13 + +21 3-A1 -5 30 0-AT -1 01 A A1-53 00 -AT-10 1A-1 0A+

+19-A1-5300-AT-101A A1-5300-AT-101A-6+

 A1-5300-AT-101A-TB1-2-   - 2-TB1-A1 -5 30 0-AT -1 01 A A1 -5 30 0-AT -1 01 A-21 4- - 21 4-A1 -5 30 0-AT -1 01 A A1-53 00 -AT-10 1A-1 0B-

-20-A1-5300-AT-101A A1-5300-AT-101A-8-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

5

IN2

   A   1  -   5   3   0   0  -   A   T  -   1   0   1   A

1+

-

10

2

9

214

8

6

4

3

LOOP NO.: A1-5300-AT-101A LOOP SERVICE: RO FEED WATER CONDUCTIVITY

213

5

7

 A1-5300-AT-101A

20

+

-10C

19 610A

10B

7

iRTN2

iRTN3

8 IN3

11

12

13

14

19

20

15

16

17

18

5300

 AI

101A

CE CE

CE

CE   CE   CE

CE

 A1-5300-AT-101A A1-5300-JP-00012

5300

 AAH

101A

5300

 ATA

101A

5300

 AI

101A

5300

 AAH

101A

5300

 ATA

101A

To AMS System

78 OFPACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

JB PLC MODULETERMINALS

SHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 78/293

 5300-JT-00009-PAN

TB1

FI-21756-IF16K

5300-JT-00009-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-4

 A1-5300-AT-101B-TB1-3+   +3-TB1-A1 -5 30 0-AT -1 01 B A1-53 00 -AT-10 1B-2 15 + +21 5-A1 -5 30 0-AT -1 01 B A1-53 00 -AT-10 1B-1 1A+

+21-A1-5300-AT-101B A1-5300-AT-101B-12+

 A1-5300-AT-101B-TB1-4-   - 4-TB1-A1 -5 30 0-AT -1 01 B A1 -5 30 0-AT -1 01 B-21 6- - 21 6-A1 -5 30 0-AT -1 01 B A1-53 00 -AT-10 1B-1 1B-

-22-A1-5300-AT-101B A1-5300-AT-101B-14-

SCL

HH HH

100

FIC

100

5000

FIC

5000

FIC

100

5000

13

iRTN4

iRTN5

14 IN522

+

-11C

21 1211A

11B

LOOP NO.: A1-5300-AT-101B L OO P S ERV IC E: RO F EE D W AT ER O RP

215

7

 A1-5300-AT-101B

12

10

4

9

216

8

6

5

11

   A   1  -   5   3   0   0  -   A   T  -   1   0   1   B

3+

-

2

1

11

IN4

13

14

15

16

17

18

19

20

5300

 AI

101B

CE CE

CE

CE   CE   CE

CE

 A1-5300-AT-101B A1-5300-JP-00012

5300

 AAHH

101B

5300

 ATA

101B

5300

 AI

101B

5300

 AAHH

101B

5300

 ATA

101B

To AMS System

79 OFSHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB PLC MODULETERMINALSINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 79/293

 5300-JT-00009-PAN

TB1

FI-21756-IF16K

5300-JT-00009-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-4

 A1-5300-AT-101C-TB1-5+   +5-TB1-A1 -5 30 0-AT -1 01 C A1-53 00 -AT-10 1C-2 17 + +21 7-A1 -5 30 0-AT -1 01 C A1-53 00 -AT-10 1C-1 2A+

+23-A1-5300-AT-101C A1-5300-AT-101C-16+

 A1-5300-AT-101C-TB1-6-   - 6-TB1-A1 -5 30 0-AT -1 01 C A1 -5 30 0-AT -1 01 C-21 8- - 21 8-A1 -5 30 0-AT -1 01 C A1-53 00 -AT-10 1C-1 2B-

-24-A1-5300-AT-101C A1-5300-AT-101C-18-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

15

IN6

iRTN6    A   1  -   5   3   0   0  -   A   T  -   1   0   1   C

5+

-

4

3

10

6

9

218

8

7

17

13

LOOP NO.: A1-5300-AT-101C L OO P S ERV IC E: R O F EE D WA TE R p H

217

 A1-5300-AT-101C

11

12

24

+

-12C

23 1612A

12B

iRTN7

18 IN7

1

2

18

19

20

14

15

16

17

5300

 AI

101C

CE CE

CE

CE   CE   CE

CE

 A1-5300-AT-101C A1-5300-JP-00012

5300

 AAH

101C

5300

 ATA

101C

5300

 AAL

101C

5300

 AI

101C

5300

 AAH

101C

5300

 ATA

101C

5300

 AAL

101C

To AMS System

80 OF

PROJECT

PROCESS CONTROL ROOMDCS (BY OTHERS)

PACKAGE WATER TREATMENT PLANT

CLIENT KE01-A1-500-MT-I-HL-0001-000

INSTRUMENT

FIELD

JB

SHEET 293

PLC MODULETERMINALS

P01

DOC. NO.

REV. NO.

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 80/293

 5300-JT-00009-PAN

TB1

FI-91756-IF16K

5300-JT-00009-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-13

 A1-5300-TT-100-TB1-15+   + 15 -T B1 -A 1- 53 00 -T T- 10 0 A 1- 53 00 -T T- 10 0- 21 9+ + 21 9- A1 -5 30 0- TT -1 00 A 1- 53 00 -T T- 10 0- 07 A+

+13-A1-5300-TT-100 A1-5300-TT-100-30+

 A1-5300-TT-100-TB1-16-   - 16 -T B1 -A 1- 53 00 -T T- 10 0 A 1- 53 00 -T T- 10 0- 22 0- - 22 0- A1 -5 30 0- TT -1 00 A 1- 53 00 -T T- 10 0- 07 B-

-14-A1-5300-TT-100 A1-5300-TT-100-32-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

15

16

3007A

07B

IN1213

13

   A   1  -   5   3   0   0  -   T   T  -   1   0   0

+

-

29

14

+

-

 A1-5300-TT-100

3

4

LOOP SERVICE: RO FEED WATER TEMP AT CF OUTLET

219

12

14

18

19

17

20

07C

220

LOOP NO.: A1-5300-TT-100

31

iRTN12

iRTN13

32 IN13

11

1

2

6

7

9

5

8

10

5300

TI

100

CE CE

CE

CE   CE   CE

CE

 A1-5300-TT-100 A1-5300-JP-00012

5300

TAH

100

5300

TAL

100

5300

TTA

100

5300

TI

100

5300

TAH

100

5300

TAL

100

5300

TTA

100

To AMS System

81 OFSHEET 293

PLC MODULETERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 81/293

24V DC SUPPLY

- +

19 19

 A1-5300-JY-122 5300-JT-00010-PDN

TB2 5300-JT-00010-PDN

BL   A1-5300-JY-122-TB2-1+   +1-TB2-A1-5300-JY-122 A1-5300-JY-122-1601+

WT   A1-5300-JY-122-TB2-2-   - 2-TB2-A1 -5 30 0-JY-1 22 A1 -5 30 0-JY-1 22 -1 60 2- - 16 02 -A1-53 00 -J Y-12 2 A1-53 00 -J Y-12 2-25

SCL 19A- 19A+

24V DC SUPPLY

+ -

4 4

 A1-5300-HZSH-122 5300-JT-00010-PDN

TB1 5300-JT-00010-PDN

BL   A1-5300-HZSH-122-TB1-1+   +1-TB1-A1-5300-HZSH-122 A1-5300-HZSH-122-841+

WT   A1-5300-HZSH-122-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 22 A1-53 00 -HZSH-12 2-84 2- - 84 2-A1 -5 30 0-HZ SH-1 22 A1-53 00 -HZSH-12 2-17

SCL

4A+ 4A-

24V DC SUPPLY

+ -

5300-JT-00010-PDN 4 4

TB1

 A1-5300-HZSL-122

5300-JT-00010-PDN

BL   A1-5300-HZSL-122-TB1-3+   +3-TB1-A1-5300-HZSL-122 A1-5300-HZSL-122-843+

WT   A1-5300-HZSL-122-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 22 A1-53 00 -HZSL-12 2-84 4- - 84 4-A1 -5 30 0-HZ SL -1 22 A1-53 00 -HZSL-12 2-19

SCL

4A+ 4A-

HIC

5300

JY

122

122

2

122

5300

XA

122

53005300

HSAL

122

XA

5300

HSAL

 A1-5300-JY-122

26

25

+DC-1

OUT-12

 A1-5300-JP-00014

1

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-122   A1-5300-JP-00013

+   1601

-   2 1602

4

C

C   1 841

 A1-5300-JP-00013

4

NO   2 842

 A1-5300-HZSL-122

122

3

3 843

5300

1756-OB16DK

RACK-1, SLOT-7

JY

122

5300

JY

122

LOOP NO.: A1-5300-X-122

NO   19 IN-94 844  122

LOOP SER VI CE: C F Z L-002A/B /C OUT VLV T O D RAIN

3

5

1756-IB161K

RACK-0, SLOT-4

   A   1  -   5   3   0   0  -   H   Z   S   H

  -   1   2   2

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   2

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-4

5300

HSAH

20 GND-9

IN-8

GND-818

17   122

5300

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

82 OF

PLC MODULETERMINALS

CLIENT

INSTRUMENT

FIELD

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

JB

KE01-A1-500-MT-I-HL-0001-000

SHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

PACKAGE WATER TREATMENT PLANT

DOC. NO.

REV. NO.

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 82/293

FI-6 5300-JT-00011-PAN 1756-IF16K

TB1 5300-JT-00011-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-10

 A1-5300-PT-204-TB1-1+   + 1- TB 1- A1 -5 30 0- PT -2 04 A 1- 53 00 -P T- 20 4- 22 5+ + 22 5- A1 -5 30 0- PT -2 04 A 1- 53 00 -P T- 20 4- 14 A+

+27-A1-5300-PT-204 A1-5300-PT-204-24+

 A1-5300-PT-204-TB1-2-   - 2- TB 1- A1 -5 30 0- PT -2 04 A 1- 53 00 -P T- 20 4- 22 6- - 22 6- A1 -5 30 0- PT -2 04 A 1- 53 00 -P T- 20 4- 14 B-

-28-A1-5300-PT-204 A1-5300-PT-204-26-

SCL

L L

FIC

100

5000

FIC

20

16

17

18

19

11

12

IN11

2

3

226

26

25

iRTN10

iRTN11

   A   1  -   5   3   0   0  -   P   T  -   2   0   4

5000

FIC

100

5000

100

LOOP NO.: A1-5300-PT-204 RO HPP PA-082A INLET PRESSURE

225

 A1-5300-PT-204

8

9

14A124

14B

+

-

23

IN10

4

5

28

+

-14C

27

LOOP SERVICE:

14

15

13

10

7

6

5300

PI

204

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-204 A1-5300-JP-00015

5300

PAL

204

5300

PTA

204

5300

PI

204

5300

PAL

204

5300

PTA

204

To AMS System

83 OFSHEET 293PACKAGE WATER TREATMENT PLANT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALSINSTRUMENT JB

FIELD

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 83/293

 5300-JT-00011-PAN

TB1

FI-71756-IF16K

5300-JT-00011-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-10

 A1-5300-PT-205-TB1-3+   + 3- TB 1- A1 -5 30 0- PT -2 05 A 1- 53 00 -P T- 20 5- 22 9+ + 22 9- A1 -5 30 0- PT -2 05 A 1- 53 00 -P T- 20 5- 15 A+

+29-A1-5300-PT-205 A1-5300-PT-205-30+

 A1-5300-PT-205-TB1-4-   - 4- TB 1- A1 -5 30 0- PT -2 05 A 1- 53 00 -P T- 20 5- 23 0- - 23 0- A1 -5 30 0- PT -2 05 A 1- 53 00 -P T- 20 5- 15 B-

-30-A1-5300-PT-205 A1-5300-PT-205-32-

SCL

L L

100

FIC

100

5000

FIC

5000

FIC

100

5000

15A

15B

20

15C

229

12

14

19

230

6

LOOP NO.: A1-5300-PT-205

31

32

LOOP SERVICE: RO HPP PA-082B INLET PRESSURE

iRTN12

iRTN13

+

-

29 30

30 IN13

+

-

 A1-5300-PT-205

   A   1  -   5   3   0   0  -   P   T  -   2   0   5

8

9

1

2

3

4

29

IN12

5

7

18

10

11

13

15

16

17

5300

PI

205

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-205 A1-5300-JP-00015

5300

PAL

205

5300

PTA

205

5300

PI

205

5300

PAL

205

5300

PTA

205

To AMS System

84 OF

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALSJBINSTRUMENT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293PACKAGE WATER TREATMENT PLANT

FIELD

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 84/293

 5300-JT-00011-PAN

TB1

FI-71756-IF16K

5300-JT-00011-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-10

 A1-5300-PT-206-TB1-5+   + 5- TB 1- A1 -5 30 0- PT -2 06 A 1- 53 00 -P T- 20 6- 23 3+ + 23 3- A1 -5 30 0- PT -2 06 A 1- 53 00 -P T- 20 6- 16 A+

+31-A1-5300-PT-206 A1-5300-PT-206-34+

 A1-5300-PT-206-TB1-6-   - 6- TB 1- A1 -5 30 0- PT -2 06 A 1- 53 00 -P T- 20 6- 23 4- - 23 4- A1 -5 30 0- PT -2 06 A 1- 53 00 -P T- 20 6- 16 B-

-32-A1-5300-PT-206 A1-5300-PT-206-36-

SCL

L L

5000

FIC

100

5000

FIC

100

5000

FIC

100

3416A

16B

IN14

IN15

+

-

8

7

234

LOOP NO.: A1-5300-PT-206

35

iRTN14

iRTN15

36

33

 A1-5300-PT-206

15

20

18

12

13

11

LOOP SERVICE: RO HPP PA-082C INLET PRESSURE

233

14

16

9

17

19

3

4

5

6

   A   1  -   5   3   0   0  -   P   T  -   2   0   6

10

32

+

-16C

31

1

2

5300

PI

206

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-206 A1-5300-JP-00015

5300

PAL

206

5300

PTA

206

5300

PI

206

5300

PAL

206

5300

PTA

206

To AMS System

85 OFPACKAGE WATER TREATMENT PLANT

PLC MODULETERMINALS

SHEET 293

FIELD

JB

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

INSTRUMENT DCS (BY OTHERS)PROCESS CONTROL ROOM

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 85/293

 5300-JT-00011-PAN

TB1

1

2

3

4

FI-81756-IF16K

5300-JT-00011-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-11

 A1-5300-PT-207-TB1-7+   + 7- TB 1- A1 -5 30 0- PT -2 07 A 1- 53 00 -P T- 20 7- 23 7+ + 23 7- A1 -5 30 0- PT -2 07 A 1- 53 00 -P T- 20 7- 01 A+

+1-A1-5300-PT-207 A1-5300-PT-207-2+

 A1-5300-PT-207-TB1-8-   - 8- TB 1- A1 -5 30 0- PT -2 07 A 1- 53 00 -P T- 20 7- 23 8- - 23 8- A1 -5 30 0- PT -2 07 A 1- 53 00 -P T- 20 7- 01 B-

-2-A1-5300-PT-207 A1-5300-PT-207-4-

SCL

L L

100

FIC

100

5000

FIC

5000

FIC

100

5000

2

+

-01C

1

5

19

20

10   A   1  -   5   3   0   0  -   P   T  -   2   0   7

-

LOOP SERVICE: RO HPP PA-082D INLET PRESSURE

237

 A1-5300-PT-207

14

13

12

11

01A+238

LOOP NO.: A1-5300-PT-207

3

iRTN0

iRTN1

4 IN1

2

1

IN0

9

01B

6

8

7

18

17

16

15

5300

PI

207

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-207 A1-5300-JP-00015

5300

PAL

207

5300

PTA

207

5300

PI

207

5300

PAL

207

5300

PTA

207

To AMS System

86 OFPACKAGE WATER TREATMENT PLANT

INSTRUMENT

FIELD

TERMINALS

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

JB

SHEET 293

PLC MODULEDCS (BY OTHERS)

PROCESS CONTROL ROOM

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 86/293

24V DC SUPPLY- +

19 19

 A1-5300-JY-123 5300-JT-00012-PDN

TB2 5300-JT-00012-PDN

BL   A1-5300-JY-123-TB2-1+   +1-TB2-A1-5300-JY-123 A1-5300-JY-123-1609+

WT   A1-5300-JY-123-TB2-2-   - 2-TB2-A1 -5 30 0-JY-1 23 A1 -5 30 0-JY-1 23 -1 61 0- - 16 10 -A1-53 00 -J Y-12 3 A1-53 00 -J Y-12 3-27

SCL 19A- 19A+

24V DC SUPPLY

+ -

4 4

 A1-5300-HZSH-123 5300-JT-00012-PDN

TB1 5300-JT-00012-PDN

BL   A1-5300-HZSH-123-TB1-1+   +1-TB1-A1-5300-HZSH-123 A1-5300-HZSH-123-865+

WT   A1-5300-HZSH-123-TB1-2-  - 2-TB1-A1 -5 30 0-HZ SH-1 23 A1-53 00 -HZSH-12 3-86 6- - 86 6-A1 -5 30 0-HZ SH-1 23 A1-53 00 -HZSH-12 3-21

SCL

4A+ 4A-

24V DC SUPPLY

+ -

5300-JT-00012-PDN 4 4

TB1

 A1-5300-HZSL-123

5300-JT-00012-PDN

BL   A1-5300-HZSL-123-TB1-3+   +3-TB1-A1-5300-HZSL-123 A1-5300-HZSL-123-867+

WT   A1-5300-HZSL-123-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 23 A1-53 00 -HZSL-12 3-86 8- - 86 8-A1 -5 30 0-HZ SL -1 23 A1-53 00 -HZSL-12 3-23

SCL

4A+ 4A-

5300

HSAH

2 4 G ND -1 1

IN-10

GND-1022

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   3

123

5300

   A   1  -   5   3   0   0  -   H   Z   S

   H  -   1   2   3

ZSH

866 21

3

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-4

123

3 867

NO   2

123

LOOP SER VI CE: F LU SH IN G VLV F OR 530 -PA-082A

5

JY

123

HIC

JY1

LOOP NO.: A1-5300-X-123

NO   23 IN- 114

123

5300

JY

123

5300+DC-1

RACK-1, SLOT-7

1756-OB16DK

 A1-5300-HZSL-123

C

C   1

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-123   A1-5300-JP-00016

+   1609

-   2

3

OUT-13

 A1-5300-JY-123

28

27

865

 A1-5300-JP-00017

1610

 A1-5300-JP-00016

868

1756-IB161K

RACK-0, SLOT-4   HSAL

123

5300

XA

5300

HSAL

123

2

123

5300

XA

123

53005300

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

87 OF

24V DC SUPPLY

SHEET 293

PLC MODULETERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 87/293

24V DC SUPPLY- +

5300-JT-00012-PDN 19 19

TB2

 A1-5300-JY-124

5300-JT-00012-PDN

BL   A1-5300-JY-124-TB2-3+   +3-TB2-A1-5300-JY-124 A1-5300-JY-124-1611+

WT   A1-5300-JY-124-TB2-4-   - 4-TB2-A1 -5 30 0-JY-1 24 A1 -5 30 0-JY-1 24 -1 61 2- - 16 12 -A1-53 00 -J Y-12 4 A1-53 00 -J Y-12 4-29

SCL 19A- 19A+

24V DC SUPPLY

+ -

5300-JT-00012-PDN 4 4

TB1

 A1-5300-HZSH-124

5300-JT-00012-PDN

BL   A1-5300-HZSH-124-TB1-5+   +5-TB1-A1-5300-HZSH-124 A1-5300-HZSH-124-869+

WT  A1-5300-HZSH-124-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-1 24 A1-53 00 -HZSH-12 4-87 0- - 87 0-A1 -5 30 0-HZ SH-1 24 A1-53 00 -HZSH-12 4-25

SCL

4A+ 4A-

24V DC SUPPLY

+ -

5300-JT-00012-PDN 4 4

TB1

 A1-5300-HZSL-124

5300-JT-00012-PDN

BL   A1-5300-HZSL-124-TB1-7+   +7-TB1-A1-5300-HZSL-124 A1-5300-HZSL-124-871+

WT   A1-5300-HZSL-124-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -1 24 A1-53 00 -HZSL-12 4-87 2- - 87 2-A1 -5 30 0-HZ SL -1 24 A1-53 00 -HZSL-12 4-27

SCL

4A+ 4A-

124

4

6

124

5300

XA

124

53005300

HIC

5300

XA

5300

HSAL

JY

124

124

5300

HSAL

124

 A1-5300-JY-124

30

29

+DC-1

OUT-14

 A1-5300-JP-00017

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-124   A1-5300-JP-00016

+   1611

-   4 1612

C   5 869

 A1-5300-JP-00016

7 871

NO   6 870

 A1-5300-HZSL-124

C

25

3

124

7

5300

JY

124

5300

JY

124

LOOP NO.: A1-5300-X-124

NO   27 IN- 138 872  124

LOOP SER VI CE: F EED I NLET VLV F OR 530 -PA-082A

5

9

1756-IB161K

RACK-0, SLOT-4

   A   1  -   5   3   0   0  -   H   Z   S

   H  -   1   2   4

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   4

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-4

5300

HSAH

2

2 8 G ND -1 3

IN-12

GND-1226

1756-OB16DK

RACK-1, SLOT-7

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

88 OF

24V DC SUPPLY

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 88/293

24V DC SUPPLY- +

5300-JT-00012-PDN 19 19

TB2

 A1-5300-JY-125

5300-JT-00012-PDN

BL   A1-5300-JY-125-TB2-5+   +5-TB2-A1-5300-JY-125 A1-5300-JY-125-1613+

WT   A1-5300-JY-125-TB2-6-   - 6-TB2-A1 -5 30 0-JY-1 25 A1 -5 30 0-JY-1 25 -1 61 4- - 16 14 -A1-53 00 -J Y-12 5 A1-53 00 -J Y-12 5-31

SCL 19A- 19A-

24V DC SUPPLY

+ -

5300-JT-00012-PDN 4 4

TB1

 A1-5300-HZSH-125

5300-JT-00012-PDN

BL   A1-5300-HZSH-125-TB1-9+   +9-TB1-A1-5300-HZSH-125 A1-5300-HZSH-125-873+

WT   A1-5300-HZSH-125-TB1-10-   - 10 -T B1 -A1-53 00 -HZSH-12 5 A1-53 00 -HZSH-12 5-87 4- - 87 4-A1 -5 30 0-HZ SH-1 25 A1-53 00 -HZSH-12 5-29

SCL

4A+ 4A-

24V DC SUPPLY

+ -

5300-JT-00012-PDN 4 4

TB1

 A1-5300-HZSL-125

5300-JT-00012-PDN

BL   A1-5300-HZSL-125-TB1-11+   +11-TB1-A1-5300-HZSL-125 A1-5300-HZSL-125-875+

WT   A1-5300-HZSL-125-TB1-12-   - 12 -T B1 -A1-53 00 -HZSL-12 5 A1-53 00 -HZSL-12 5-87 6- - 87 6-A1 -5 30 0-HZ SL -1 25 A1-53 00 -HZSL-12 5-31

SCL

4A+ 4A-

5300

HSAH

4

3 2 G ND -1 5

IN-14

GND-1430

1756-OB16DK

RACK-1, SLOT-7

   A   1  -   5   3   0   0  -   H   Z   S

   H  -   1   2   5

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   5

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-4

LOOP SER VI CE: F LU SH IN G VLV F OR 530 -PA-082B

7

13

1756-IB161K

RACK-0, SLOT-4

LOOP NO.: A1-5300-X-125

NO   31 IN- 1512 876  125

JY

125

5300

JY

125

5300

29

5

125

11

8

11 875

NO   10 874

 A1-5300-HZSL-125

C

C   9 873

 A1-5300-JP-00016

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-125   A1-5300-JP-00016

+   1613

-   6 1614

 A1-5300-JY-125

32

31

+GND-1

OUT-15

 A1-5300-JP-00017

125

5300

HSAL

125

XA

5300

HSAL

JY

125

125

10

125

5300

XA

125

53005300

HIC

5300

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

89 OF

24V DC SUPPLY+

SHEET

TERMINALSJB

293

PLC MODULEDCS (BY OTHERS)

PROCESS CONTROL ROOM

INSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 89/293

- +

5300-JT-00012-PDN 20 20

TB2

 A1-5300-JY-126

5300-JT-00012-PDN

BL   A1-5300-JY-126-TB2-7+   +7-TB2-A1-5300-JY-126 A1-5300-JY-126-1615+

WT   A1-5300-JY-126-TB2-8-   - 8- TB 2- A1 -5 30 0- JY -1 26 A 1- 53 00 -J Y- 12 6- 16 16 - - 16 16 -A 1- 53 00 -J Y- 12 6 A 1- 53 00 -J Y- 12 6- 1

SCL 20A- 20A+

24V DC SUPPLY

+ -

5300-JT-00012-PDN 5 5

TB1

 A1-5300-HZSH-126

5300-JT-00012-PDN

BL   A1-5300-HZSH-126-TB1-13+   +13-TB1-A1-5300-HZSH-126 A1-5300-HZSH-126-877+

WT   A1-5300-HZSH-126-TB1-14-   - 14 -T B1 -A1-53 00 -HZSH-12 6 A1-53 00 -HZSH-12 6-87 8- - 87 8-A1 -5 30 0-HZ SH-1 26 A1-53 00 -HZSH-12 6-1

SCL

5A+ 5A-

24V DC SUPPLY

+ -

5300-JT-00012-PDN 5 5

TB1

 A1-5300-HZSL-126

5300-JT-00012-PDN

BL   A1-5300-HZSL-126-TB1-15+   +15-TB1-A1-5300-HZSL-126 A1-5300-HZSL-126-879+

WT   A1-5300-HZSL-126-TB1-16-   - 16 -T B1 -A1-53 00 -HZSL-12 6 A1-53 00 -HZSL-12 6-88 0- - 88 0-A1 -5 30 0-HZ SL -1 26 A1-53 00 -HZSL-12 6-3

SCL

5A+ 5A-

5300

XA

126

14

126

5300

XA

126

5300

JY

126

5300

HIC

126

126

5300

HSAL

126

 A1-5300-JY-126

2

1

+DC-0

OUT-0

 A1-5300-JP-00017

6

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-126   A1-5300-JP-00016

RACK-1, SLOT-8

7+   1615

NO

12

126

14 878

-   8 1616

C   13

15 879

877

1

15

 A1-5300-JP-00016

5300

JY

126

5300

JY

1756-OB16DK

 A1-5300-HZSL-126

C

NO   3 IN-116 880

1756-IB161K

RACK-0, SLOT-5

LOOP NO.: A1-5300-X-126 LOOP SER VI CE: F EED I NLET VLV F OR 530 -PA-082B

9

17

   A   1  -   5   3   0   0  -   H   Z   S

   H  -   1   2   6

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   6

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-5

5300

HSAH

4 G ND- 1

IN-0

GND-02

126

5300

HSAL

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

90 OF

24V DC SUPPLY- +

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 90/293

5300-JT-00012-PDN 20 20

TB2

 A1-5300-JY-127

5300-JT-00012-PDN

BL   A1-5300-JY-127-TB2-9+   +9-TB2-A1-5300-JY-127 A1-5300-JY-127-1617+

WT   A1-5300-JY-127-TB2-10-   - 10 -T B2 -A1-53 00 -J Y-12 7 A1-53 00 -J Y-12 7-16 18 - - 16 18 -A1-53 00 -J Y-12 7 A1-53 00 -J Y-12 7-3

SCL 20A- 20A+

24V DC SUPPLY

+ -

5300-JT-00012-PDN 5 5

TB1

 A1-5300-HZSH-127

5300-JT-00012-PDN

BL   A1-5300-HZSH-127-TB1-17+   +17-TB1-A1-5300-HZSH-127 A1-5300-HZSH-127-881+

WT   A1-5300-HZSH-127-TB1-18-   - 18 -T B1 -A1-53 00 -HZSH-12 7 A1-53 00 -HZSH-12 7-88 2- - 88 2-A1 -5 30 0-HZ SH-1 27 A1-53 00 -HZSH-12 7-5

SCL

5A+ 5A-

24V DC SUPPLY

+ -

5300-JT-00012-PDN 5 5

TB1

 A1-5300-HZSL-127

5300-JT-00012-PDN

BL   A1-5300-HZSL-127-TB1-19+   +19-TB1-A1-5300-HZSL-127 A1-5300-HZSL-127-883+

WT   A1-5300-HZSL-127-TB1-20-   - 20 -T B1 -A1-53 00 -HZSL-12 7 A1-53 00 -HZSL-12 7-88 4- - 88 4-A1 -5 30 0-HZ SL -1 27 A1-53 00 -HZSL-12 7-7

SCL

5A+ 5A-

5300

HSAH

8

8 G ND- 3

IN-2

GND-26

1756-OB16DK

RACK-1, SLOT-8

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   2   7

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   7

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-5

LOOP SER VI CE: F LU SH IN G VLV F OR 530 -PA-082C

11

21

1756-IB161K

RACK-0, SLOT-5

LOOP NO.: A1-5300-X-127

NO   7 IN-320 884  127

JY

127

5300

JY

127

5300

5

9

127

19

19 883

NO   18 882

 A1-5300-HZSL-127

C

C   17 881

 A1-5300-JP-00016

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-127   A1-5300-JP-00016

+   1617

-   10 1618

 A1-5300-JY-127

4

3

+DC-0

OUT-1

 A1-5300-JP-00017

JY

127

127

5300

HSAL

127

5300

XA

5300

HSAL

127

16

18

127

5300

XA

127

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

91 OF

24V DC SUPPLY- +

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

JB

SHEET

TERMINALS

293

PLC MODULE

PROCESS CONTROL ROOMDCS (BY OTHERS)

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 91/293

5300-JT-00012-PDN 20 20

TB2

 A1-5300-JY-128

5300-JT-00012-PDN

BL   A1-5300-JY-128-TB2-11+   +11-TB2-A1-5300-JY-128 A1-5300-JY-128-1619+

WT   A1-5300-JY-128-TB2-12-   - 12 -T B2 -A1-53 00 -J Y-12 8 A1-53 00 -J Y-12 8-16 20 - - 16 20 -A1-53 00 -J Y-12 8 A1-53 00 -J Y-12 8-5

SCL 20A- 20A+

24V DC SUPPLY

+ -

5300-JT-00012-PDN 5 5

TB1

 A1-5300-HZSH-128

5300-JT-00012-PDN

BL   A1-5300-HZSH-128-TB1-21+   +21-TB1-A1-5300-HZSH-128 A1-5300-HZSH-128-885+

WT   A1-5300-HZSH-128-TB1-22-   - 22 -T B1 -A1-53 00 -HZSH-12 8 A1-53 00 -HZSH-12 8-88 6- - 88 6-A1 -5 30 0-HZ SH-1 28 A1-53 00 -HZSH-12 8-9

SCL

5A+ 5A-

24V DC SUPPLY

+ -

5300-JT-00012-PDN 5 5

TB1

 A1-5300-HZSL-128

5300-JT-00012-PDN

BL   A1-5300-HZSL-128-TB1-23+   +23-TB1-A1-5300-HZSL-128 A1-5300-HZSL-128-887+

WT   A1-5300-HZSL-128-TB1-24-   - 24 -T B1 -A1-53 00 -HZSL-12 8 A1-53 00 -HZSL-12 8-88 8- - 88 8-A1 -5 30 0-HZ SL -1 28 A1-53 00 -HZSL-12 8-11

SCL

5A+ 5A-

5300

HSAH

1 2 G ND -5

IN-4

GND-410

128

5300

128

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   2   8

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   8

ZSH

ZSL

5300

HSAH

1756-IB161K

20

LOOP NO.: A1-5300-X-128 LOOP SER VI CE: F EED I NLET VLV F OR 530 -PA-082C

13

25

C

NO   11 IN- 524 888

1756-IB161K

RACK-0, SLOT-5   HSAL

 A1-5300-HZSL-128

RACK-0, SLOT-5

9

23

 A1-5300-JP-00016

21

5300

JY

128

5300

JY

1756-OB16DK

23 887

NO

128

22 886

-   12 1620

C   885

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-128   A1-5300-JP-00016

RACK-1, SLOT-8

11+   1619

10

 A1-5300-JY-128

6

5

+DC-0

OUT-2

 A1-5300-JP-00017

128

5300

HSAL

128

128

5300

HIC

5300

XA

128

22

128

5300

XA

128

5300

JY

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

92 OF

24V DC SUPPLY- +

5300 JT 00012 PDN 20 20

SHEET 293

PLC MODULETERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 92/293

5300-JT-00012-PDN 20 20

TB2

 A1-5300-JY-129

5300-JT-00012-PDN

BL   A1-5300-JY-129-TB2-13+   +13-TB2-A1-5300-JY-129 A1-5300-JY-129-1621+

WT   A1-5300-JY-129-TB2-14-   - 14 -T B2 -A1-53 00 -J Y-12 9 A1-53 00 -J Y-12 9-16 22 - - 16 22 -A1-53 00 -J Y-12 9 A1-53 00 -J Y-12 9-7

SCL 20A- 20A+

24V DC SUPPLY

+ -

5300-JT-00012-PDN 5 5

TB1

 A1-5300-HZSH-129

5300-JT-00012-PDN

BL   A1-5300-HZSH-129-TB1-25+   +25-TB1-A1-5300-HZSH-129 A1-5300-HZSH-129-889+

WT   A1-5300-HZSH-129-TB1-26-   - 26 -T B1 -A1-53 00 -HZSH-12 9 A1-53 00 -HZSH-12 9-89 0- - 89 0-A1 -5 30 0-HZ SH-1 29 A1-53 00 -HZSH-12 9-13

SCL

5A+ 5A-

24V DC SUPPLY

+ -

5300-JT-00012-PDN 5 5

TB1

 A1-5300-HZSL-129

5300-JT-00012-PDN

BL   A1-5300-HZSL-129-TB1-27+   +27-TB1-A1-5300-HZSL-129 A1-5300-HZSL-129-891+

WT   A1-5300-HZSL-129-TB1-28-   - 28 -T B1 -A1-53 00 -HZSL-12 9 A1-53 00 -HZSL-12 9-89 2- - 89 2-A1 -5 30 0-HZ SL -1 29 A1-53 00 -HZSL-12 9-15

SCL

5A+ 5A-

5300

XA

129

24

26

129

5300

XA

129

5300

JY

129

5300

HIC

129

129

5300

HSAL

129

 A1-5300-JY-129

8

7

+DC-0

OUT-3

 A1-5300-JP-00017

12

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-129   A1-5300-JP-00016

RACK-1, SLOT-8

13+   1621

NO

129

26 890

-   14 1622

C   25 889

13

27

 A1-5300-JP-00016

27 891

5300

JY

129

5300

JY

1756-OB16DK

 A1-5300-HZSL-129

C

NO   15 IN- 728 892

1756-IB161K

RACK-0, SLOT-5

LOOP NO.: A1-5300-X-129 LOOP SER VI CE: F LU SH IN G VLV F OR 530 -PA-082D

15

29

   A   1  -   5   3   0   0  -   H   Z

   S   H  -   1   2   9

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   9

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-5

5300

HSAH

1 6 G ND -7

IN-6

GND-614

129

5300

HSAL

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

93 OF

24V DC SUPPLY- +

5300-JT-00012-PDN 20 20

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

JB

SHEET

TERMINALS

293

PLC MODULE

PROCESS CONTROL ROOMDCS (BY OTHERS)

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 93/293

TB2

 A1-5300-JY-130

5300-JT-00012-PDN

BL   A1-5300-JY-130-TB2-15+   +15-TB2-A1-5300-JY-130 A1-5300-JY-130-1623+

WT   A1-5300-JY-130-TB2-16-   - 16 -T B2 -A1-53 00 -J Y-13 0 A1-53 00 -J Y-13 0-16 24 - - 16 24 -A1-53 00 -J Y-13 0 A1-53 00 -J Y-13 0-9

SCL 20A- 20A+

24V DC SUPPLY

+ -

5300-JT-00012-PDN 5 5

TB1

 A1-5300-HZSH-130

5300-JT-00012-PDN

BL   A1-5300-HZSH-130-TB1-29+   +29-TB1-A1-5300-HZSH-130 A1-5300-HZSH-130-893+

WT   A1-5300-HZSH-130-TB1-30-   - 30 -T B1 -A1-53 00 -HZSH-13 0 A1-53 00 -HZSH-13 0-89 4- - 89 4-A1 -5 30 0-HZ SH-1 30 A1-53 00 -HZSH-13 0-17

SCL

5A+ 5A-

24V DC SUPPLY

+ -

5300-JT-00012-PDN 5 5

TB1

 A1-5300-HZSL-130

5300-JT-00012-PDN

BL   A1-5300-HZSL-130-TB1-31+   +31-TB1-A1-5300-HZSL-130 A1-5300-HZSL-130-895+

WT   A1-5300-HZSL-130-TB1-32-   - 32 -T B1 -A1-53 00 -HZSL-13 0 A1-53 00 -HZSL-13 0-89 6- - 89 6-A1 -5 30 0-HZ SL -1 30 A1-53 00 -HZSL-13 0-19

SCL

5A+ 5A-

5300

HSAH

2 0 G ND -9

IN-8

GND-818

130

5300

130

   A   1  -   5   3   0   0  -   H   Z

   S   H  -   1   3   0

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   3   0

ZSH

ZSL

5300

HSAH

1756-IB161K

28

LOOP NO.: A1-5300-X-130 LOOP SER VI CE: F EED I NLET VLV F OR 530 -PA-082D

17

33

C

NO   19 IN- 932 896

1756-IB161K

RACK-0, SLOT-5   HSAL

 A1-5300-HZSL-130

RACK-0, SLOT-5

17

31

 A1-5300-JP-00016

29

5300

JY

130

5300

JY

1756-OB16DK

31 895

NO

130

30 894

-   16 1624

C   893

S

   A   1  -   5   3   0   0  -   J   Y  -   1   3

 A1-5300-HZSH-130   A1-5300-JP-00016

RACK-1, SLOT-8

15+   1623

14

 A1-5300-JY-130

10

9

+DC-0

OUT-4

 A1-5300-JP-00017

130

5300

HSAL

130

130

5300

HIC

5300

XA

130

30

130

5300

XA

130

5300

JY

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

94 OF

 5300-JT-00013-PAN

TB1

FI-31756-IF16K

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

 A1-5300-FT-107

PLC MODULETERMINALS

1

SHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

2

 A1-5300-FT-107 A1-5300-JP-00018

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 94/293

5300-JT-00013-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-2

 A1-5300-FT-107-TB1-3+   + 3- TB 1- A1 -5 30 0- FT -1 07 A 1- 53 00 -F T- 10 7- 22 7+ + 22 7- A1 -5 30 0- FT -1 07 A 1- 53 00 -F T- 10 7- 14 A+

+27-A1-5300-FT-107 A1-5300-FT-107-24+

 A1-5300-FT-107-TB1-4-   - 4- TB 1- A1 -5 30 0- FT -1 07 A 1- 53 00 -F T- 10 7- 22 8- - 22 8- A1 -5 30 0- FT -1 07 A 1- 53 00 -F T- 10 7- 14 B-

-28-A1-5300-FT-107 A1-5300-FT-107-26-

SCL

L L

FIC

100

5000

FIC

100

5000

19

14

15

16

17

18

28

+

-14C

27 2414A

14B

LOOP NO.: A1-5300-FT-107 FLOW TO RO HPP PA-006A

227

7

8

9

228

25

iRTN10

iRTN11

26

5000

FIC

100

+

-IN11

20

23

IN10

   A   1  -   5   3   0   0  -   F   T  -   1   0   7

3

LOOP SERVICE:

21

2

4

5

6

10

11

12

13

5300

FI

107

CE CE

CE

CE   CE   CE

CE

5300

FAL

107

5300

FTA

107

5300

FI

107

5300

FAL

107

5300

FTA

107

To AMS System

95 OF

 5300-JT-00013-PANTB1

SHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALSJBINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

1

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 95/293

FI-81756-IF16K

5300-JT-00013-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-11

 A1-5300-PT-208-TB1-13+   + 13 -T B1 -A 1- 53 00 -P T- 20 8 A 1- 53 00 -P T- 20 8- 24 5+ + 24 5- A1 -5 30 0- PT -2 08 A 1- 53 00 -P T- 20 8- 02 A+

+3-A1-5300-PT-208 A1-5300-PT-208-6+

 A1-5300-PT-208-TB1-14-   - 14 -T B1 -A 1- 53 00 -P T- 20 8 A 1- 53 00 -P T- 20 8- 24 6- - 24 6- A1 -5 30 0- PT -2 08 A 1- 53 00 -P T- 20 8- 02 B-

-4-A1-5300-PT-208 A1-5300-PT-208-8-

SCL

H

 A1-5300-PCV-208 5300-JT-00011-PAN

TB1 H

5300-JT-00011-PAN 1 2 +3 -4 +5 -6

 A1-5300-PY-208-TB1-9+ +9-TB1-A1-5300-PY-208 A1-5300-PY-208-259+ +259-A1-5300-PY-208 A1-FY-5300-100-3+

 A1-5300-PY-208-TB1-10+ -10-TB1-A1-5300-PY-208 A1-5300-PY-208-260- -260-A1-5300-PY-208 A1-5300-PY-208-4- 02B-A1-5300-PY-208 A1-5300-PY-208-2

02C-A1-5300-PY-208 A1-5300-PY-208-6

SCL   6 RTN1

4 ALT1

OUT1

   A   1  -   5   3   0   0  -   P   Y  -   2   0   8

-   10 260 - 4 02B

11 02C

81756-OF6CIK

I/P  +   9 259 + 3 02A

RACK-3, SLOT-9

To AMS System

5300

FIC

100

16

8

12

13

14

5

IN2

4 -02CIN3

3

15

02B

5

246

7

iRTN2

iRTN3

8

   A   1  -   5   3   0   0  -   P   T  -   2   0   8

FI-12

2

LOOP NO.: A1-5300-PT-208 RO ZZ-001A INLET PRESSURE

245

 A1-5300-PT-208

9

10

11

+

7

+3 602A

-

LOOP SERVICE:

2

21

17

18

20

19

4

6

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-208 A1-5300-JP-00018

5300

PIC

208   5300

PAH

208

5300

PTA

208

CE   CE

 A1-5300-JP-00015

CE   CE

CE CE

CE

 A1-5300-PY-208 5300

PIC

208

5300

PTA

208

5300

PAH

208

96 OF

 5300-JT-00013-PANTB1

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

PLC MODULETERMINALS

293

DCS (BY OTHERS)PROCESS CONTROL ROOM

SHEET

JB

1

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 96/293

FI-81756-IF16K

5300-JT-00013-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-11

 A1-5300-PT-211-TB1-15+   + 15 -T B1 -A 1- 53 00 -P T- 21 1 A 1- 53 00 -P T- 21 1- 24 7+ + 24 7- A1 -5 30 0- PT -2 11 A 1- 53 00 -P T- 21 1- 03 A+

+5-A1-5300-PT-211 A1-5300-PT-211-12+

 A1-5300-PT-211-TB1-16-   - 16 -T B1 -A 1- 53 00 -P T- 21 1 A 1- 53 00 -P T- 21 1- 24 8- - 24 8- A1 -5 30 0- PT -2 11 A 1- 53 00 -P T- 21 1- 03 B-

-6-A1-5300-PT-211 A1-5300-PT-211-14-

SCL

H H

100

FIC100

5000

FIC

5000

FIC

100

5000

6

+

-03C

5 12

3

4

LOOP NO.: A1-5300-PT-211 ZZ-001A/2A REJECT OUTLET PRESS.

247

 A1-5300-PT-211

11

12

13

248

13

iRTN4

iRTN5

14

   A   1  -   5   3   0   0  -   P   T  -   2   1   1

03A

03B

+

-IN5

5

6

8

9

11

IN4

7

20

19

10

14

15

16

17

LOOP SERVICE:

2

21

18

5300

PI

211

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-211 A1-5300-JP-00018

5300

PAH211

5300

PTA

211

5300

PI

211

5300

PAH211

5300

PTA

211

To AMS System

97 OF

FI-2

 5300-JT-00013-PAN 1756-IF16KTB1 5300-JT-00013-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-4

 A1-5300-AT-102-TB1-1+   + 1- TB 1- A1 -5 30 0- AT -1 02 A 1- 53 00 -A T- 10 2- 24 9+ + 24 9- A1 -5 30 0- AT -1 02 A 1- 53 00 -A T- 10 2- 13 A+

+25-A1-5300-AT-102 A1-5300-AT-102-20+

PACKAGE WATER TREATMENT PLANT

+25 2013A

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

249

 A1-5300-AT-102

JB

2

1+

PLC MODULETERMINALS

SHEET 293

IN8

DCS (BY OTHERS)PROCESS CONTROL ROOM

 A1-5300-AT-102 A1-5300-JP-00018

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 97/293

 A1-5300-AT-102-TB1-2-   - 2- TB 1- A1 -5 30 0- AT -1 02 A 1- 53 00 -A T- 10 2- 25 0- - 25 0- A1 -5 30 0- AT -1 02 A 1- 53 00 -A T- 10 2- 13 B-

-26-A1-5300-AT-102 A1-5300-AT-102-22-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

21

iRTN8

iRTN8

22 IN926 -13C

13B

LOOP NO.: A1-5300-AT-102 LOOP SERVICE: RO ZZ-001A/2A OUT CONDUCTIVITY

5

7

10

2

9

250

8

6

4

3

   A   1  -   5   3   0   0  -   A   T  -   1   0   2

-

19

11

12

13

14

19

20

21

15

16

17

18

5300

 AI

102

CE CE

CE

CE   CE   CE

CE

5300

 AAH

102

5300

 ATA

102

5300

 AI

102

5300

 AAH

102

5300

 ATA

102

To AMS System

98 OF

 5300-JT-00013-PAN

TB1

SHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALSJBINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

1

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 98/293

FI-41756-IF16K

5300-JT-00013-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-3

 A1-5300-FT-111-TB1-5+   + 5- TB 1- A1 -5 30 0- FT -1 11 A 1- 53 00 -F T- 11 1- 25 1+ + 25 1- A1 -5 30 0- FT -1 11 A 1- 53 00 -F T- 11 1- 02 A+

+3-A1-5300-FT-111 A1-5300-FT-111-6+

 A1-5300-FT-111-TB1-6-   - 6- TB 1- A1 -5 30 0- FT -1 11 A 1- 53 00 -F T- 11 1- 25 2- - 25 2- A1 -5 30 0- FT -1 11 A 1- 53 00 -F T- 11 1- 02 B-

-4-A1-5300-FT-111 A1-5300-FT-111-8-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC100

500015

16

8

12

13

14

+

7

IN2

IN3

3

5

252

7

iRTN2

iRTN3

8

   A   1  -   5   3   0   0  -   F   T  -   1   1   1

02B

5

LOOP NO.: A1-5300-FT-111 RO ZZ-001A OUTLET PERMIATE FLOW

251

 A1-5300-FT-111

9

10

11

4

+

-02C

3 602A

-

LOOP SERVICE:

1

2

21

17

18

20

19

4

6

5300

FI111

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-111 A1-5300-JP-00018

5300

FAH

111

5300

FAL

111

5300

FTA

111

5300

FI111

5300

FAH

111

5300

FAL

111

5300

FTA

111

To AMS System

99 OF

 5300-JT-00013-PAN

TB1

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

PLC MODULETERMINALS

1

2

293

DCS (BY OTHERS)PROCESS CONTROL ROOM

SHEET

JB

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 99/293

FI-41756-IF16K

5300-JT-00013-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-3

 A1-5300-FT-112-TB1-7+   + 7- TB 1- A1 -5 30 0- FT -1 12 A 1- 53 00 -F T- 11 2- 25 3+ + 25 3- A1 -5 30 0- FT -1 12 A 1- 53 00 -F T- 11 2- 03 A+

+5-A1-5300-FT-112 A1-5300-FT-112-12+

 A1-5300-FT-112-TB1-8-   - 8- TB 1- A1 -5 30 0- FT -1 12 A 1- 53 00 -F T- 11 2- 25 4- - 25 4- A1 -5 30 0- FT -1 12 A 1- 53 00 -F T- 11 2- 03 B-

-6-A1-5300-FT-112 A1-5300-FT-112-14-

SCL

H

L

 A1-5300-FCV-112 5300-JT-00013-PAN

TB1

 5300-JT-00013-PAN 1 2 +3 -4 +5 -6

 A1-5300-FY-112-TB1-17+ +17-TB1-A1-5300-FY-112 A1-5300-FY-112-263+ +263-A1-5300-FY-112 A1-FY-5300-100-1+

 A1-5300-FY-112-TB1-18+ -18-TB1-A1-5300-FY-112 A1-5300-FY-112-264- -264-A1-5300-FY-112 A1-5300-FY-112-2- 05B-A1-5300-FY-112 A1-5300-FY-112-1

05C-A1-5300-FY-112 A1-5300-FY-112-5

SCL

H

L

10 05B

19 05C

-   18 264 -

RACK-3, SLOT-9

15 OU T4

   A   1  -   5   3   0   0  -   F   Y  -   1   1   2

19 R TN 4

17 ALT4

FI-1216

1756-OF6CIK

I/P  +   17 263 + 9 05A

To AMS System

5300

FIC

100

6

+

-03C

5 12

3

4

LOOP NO.: A1-5300-FT-112 RO ZZ-001A/002A REJECT FLOW

253

 A1-5300-FT-112

11

+

-   254

13

iRTN4

iRTN5

14

   A   1  -   5   3   0   0  -   F   T  -   1   1   2

03A

03B

IN5

5

6

8

9

2

11

IN47

10

LOOP SERVICE:

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-112 A1-5300-JP-00018

5300

FIC

112   5300

FAH

112

5300

FAL

112

5300

FTA

112

CE   CE

 A1-5300-JP-00018

CE   CE

CE CE

CE

 A1-5300-FY-112

5300

FAH

112

5300

FAL

112

5300

FTA

112

5300

FIC

112

100 OF

 5300-JT-00013-PAN

TB1

PACKAGE WATER TREATMENT PLANT SHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALS

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

FIELD

1

INSTRUMENT

2

JB

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 100/293

FI-61756-IF16K

5300-JT-00013-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-8

 A1-5300-PDT-213-TB1-9+   +9-TB1-A1 -5 30 0-PDT-21 3 A1-53 00 -PDT -2 13 -2 55 + +25 5-A1 -5 30 0-PDT-21 3 A1-53 00 -PDT -2 13 -1 4A+

+27-A1-5300-PDT-213 A1-5300-PDT-213-24+

 A1-5300-PDT-213-TB1-10-   - 10 -T B1 -A1-53 00 -PDT -2 13 A1-53 00 -PDT -2 13 -2 56 - - 25 6-A1 -5 30 0-PDT-21 3 A1-53 00 -PDT -2 13 -1 4B-

-28-A1-5300-PDT-213 A1-5300-PDT-213-26-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

11

21

28

+

-14C

27

18

23

IN10

IN11

24

DIFF. PRESS.HI RO ZZ-001A

255

 A1-5300-PDT-2138

9

10

15

7

14B

LOOP NO.: A1-5300-PDT-213

4

14

3

5

6

16

256

25

iRTN10

iRTN11

26

   A   1  -   5   3   0   0  -   P   D   T  -   2   1   3

14A

17

LOOP SERVICE:

+

-

12

13

20

19

5300

PDI

213

CE   CE

CE

CE   CE   CE

CE

 A1-5300-PDT-213 A1-5300-JP-00018

5300

PDAH

213

5300

PDTA

213

5300

PDI

213

5300

PDAH

213

5300

PDTA

213

To AMS System

101 OF

 5300-JT-00013-PAN

TB1

DCS (BY OTHERS)PROCESS CONTROL ROOMFIELD

JB PLC MODULETERMINALSINSTRUMENT

1

2

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 101/293

FI-61756-IF16K

5300-JT-00013-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-8

 A1-5300-PDT-210-TB1-11+   +11 -T B1 -A1-53 00 -PDT -2 10 A1-53 00 -PDT -2 10 -2 57 + +25 7-A1 -5 30 0-PDT-21 0 A1-53 00 -PDT -2 10 -1 5A+

+29-A1-5300-PDT-210 A1-5300-PDT-210-30+

 A1-5300-PDT-210-TB1-12-   - 12 -T B1 -A1-53 00 -PDT -2 10 A1-53 00 -PDT -2 10 -2 58 - - 25 8-A1 -5 30 0-PDT-21 0 A1-53 00 -PDT -2 10 -1 5B-

-30-A1-5300-PDT-210 A1-5300-PDT-210-32-SCL

H H

100

5000

FIC

100

FIC

100

5000

FIC

3

30

18

10

11

13

15

16

175000

+

5

7

 A1-5300-PDT-210

8

9

-

6

+

4

LOOP NO.: A1-5300-PDT-210

31

32

LOOP SER VI CE: D IF F. PRESS.H I R O Z Z-002A

iRTN12   A   1  -   5   3   0   0  -

   P   D   T  -   2   1   0

iRTN13

15A

15B

20

30

29

IN13-

IN1229

21

15C

257

12

14

19

258

5300

PDI

210

CE   CE

CE

CE   CE   CE

CE

 A1-5300-PDT-210 A1-5300-JP-00018

5300

PDAH

210

5300

PDTA

210

5300

PDI

210

5300

PDAH

210

5300

PDTA

210

To AMS System

102 OF

24V DC SUPPLY

- +20 20

 A1-5300-JY-131 5300-JT-00014-PDN

 A1-5300-JY-131  A1-5300-JP-00020

SHEET 293

PLC MODULE

1756-OB16DK

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 102/293

TB2 5300-JT-00014-PDN

BL   A1-5300-JY-131-TB2-1+   +1-TB2-A1-5300-JY-131 A1-5300-JY-131-1629+

WT   A1-5300-JY-131-TB2-2-   - 2-TB2-A1 -5 30 0-JY-1 31 A1 -5 30 0-JY-1 31 -1 63 0- - 16 30 -A1-53 00 -J Y-13 1 A1-53 00 -J Y-13 1-11

SCL 20A- 20A+

24V DC SUPPLY

+ -

5 5

 A1-5300-HZSH-131 5300-JT-00014-PDN

TB1 5300-JT-00014-PDN

BL   A1-5300-HZSH-131-TB1-1+   +1-TB1-A1-5300-HZSH-131 A1-5300-HZSH-131-905+

WT   A1-5300-HZSH-131-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 31 A1-53 00 -HZSH-13 1-90 6- - 90 6-A1 -5 30 0-HZ SH-1 31 A1-53 00 -HZSH-13 1-21

SCL

5A+ 5A-

24V DC SUPPLY

+ -

5300-JT-00014-PDN 5 5

TB1

 A1-5300-HZSL-131

5300-JT-00014-PDN

BL   A1-5300-HZSL-131-TB1-3+   +3-TB1-A1-5300-HZSL-131 A1-5300-HZSL-131-907+

WT   A1-5300-HZSL-131-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 31 A1-53 00 -HZSL-13 1-90 8- - 90 8-A1 -5 30 0-HZ SL -1 31 A1-53 00 -HZSL-13 1-23

SCL

5A+ 5A-

5300

XA

131

2

131

5300

XA

131

5300

JY

131

5300

HIC

131

131

5300

HSAL

131

12

11

+DC-0

OUT-5

S

   A   1  -   5   3   0   0  -   J   Y  -   1   3

 A1-5300-HZSH-131   A1-5300-JP-00019

RACK-1, SLOT-8

1+   1629

NO

131

2 906

-   2 1630

C   1 905

21

3

 A1-5300-JP-00019

3 907

5300

JY

131

5300

JY

 A1-5300-HZSL-131

C

NO   2 3 I N- 114 908

1756-IB161K

RACK-0, SLOT-5

LOOP NO.: A1-5300-X-131 LOOP SER VI CE: VEN T R ELEASE VLV R O Z Z-001/ 2A

3

5

   A   1  -   5   3   0   0  -   H

   Z   S   H  -   1   3   1

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   3   1

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-5

5300

HSAH

24 GND-11

IN-10

GND-1022

131

5300

HSAL

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

103 OF

24V DC SUPPLY

- +5300-JT-00014-PDN 20 20

TB2

 A1-5300-JY-132

5300 JT 00014 PDN

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

JB

SHEET

TERMINALS

293

PLC MODULE

PROCESS CONTROL ROOMDCS (BY OTHERS)

1756-OB16DK3RACK 1 SLOT 8

2

 A1-5300-JY-132  A1-5300-JP-00020

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 103/293

5300-JT-00014-PDN

BL   A1-5300-JY-132-TB2-3+   +3-TB2-A1-5300-JY-132 A1-5300-JY-132-1631+

WT   A1-5300-JY-132-TB2-4-   - 4-TB2-A1 -5 30 0-JY-1 32 A1 -5 30 0-JY-1 32 -1 63 2- - 16 32 -A1-53 00 -J Y-13 2 A1-53 00 -J Y-13 2-13

SCL 20A- 20A+

24V DC SUPPLY

+ -

5300-JT-00014-PDN 5 5

TB1

 A1-5300-HZSH-132

5300-JT-00014-PDN

BL   A1-5300-HZSH-132-TB1-5+   +5-TB1-A1-5300-HZSH-132 A1-5300-HZSH-132-909+

WT   A1-5300-HZSH-132-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-1 32 A1-53 00 -HZSH-13 2-91 0- - 91 0-A1 -5 30 0-HZ SH-1 32 A1-53 00 -HZSH-13 2-25

SCL

5A+ 5A-

24V DC SUPPLY

+ -

5300-JT-00014-PDN 5 5

TB1

 A1-5300-HZSL-132

5300-JT-00014-PDN

BL   A1-5300-HZSL-132-TB1-7+   +7-TB1-A1-5300-HZSL-132 A1-5300-HZSL-132-911+

WT   A1-5300-HZSL-132-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -1 32 A1-53 00 -HZSL-13 2-91 2- - 91 2-A1 -5 30 0-HZ SL -1 32 A1-53 00 -HZSL-13 2-27

SCL

5A+ 5A-

5300

HSAH

28 GND-13

IN-12

GND-1226

132

5300

132

   A   1  -   5   3   0   0  -   H

   Z   S   H  -   1   3   2

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   3   2

ZSH

ZSL

5300

HSAH

1756-IB161K

4

LOOP NO.: A1-5300-X-132 LOOP SER VI CE: PER MI AT E VLV R O Z Z-001/ 2A

5

9

C

NO   2 7 I N- 138 912

1756-IB161K

RACK-0, SLOT-5   HSAL

 A1-5300-HZSL-132

RACK-0, SLOT-5

25

7

 A1-5300-JP-00019

5

5300

JY

132

5300

JY

7 911

NO

132

6 910

-   4 1632

C   909

S

   A   1  -   5   3   0   0  -   J   Y  -   1   3

 A1-5300-HZSH-132   A1-5300-JP-00019

RACK-1, SLOT-8

3+   1631 14

13

+DC-0

OUT-6

132

5300

HSAL

132

132

5300

HIC

5300

XA

132

6

132

5300

XA

132

5300

JY

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

104 OF

24V DC SUPPLY

- +5300-JT-00014-PDN 20 20

TB2

 A1-5300-JY-133

5300-JT-00014-PDN

 A1-5300-JY-133  A1-5300-JP-00020

1   3

SHEET 293

PLC MODULETERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

41756-OB16DK

RACK-1, SLOT-8

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 104/293

BL   A1-5300-JY-133-TB2-5+   +5-TB2-A1-5300-JY-133 A1-5300-JY-133-1633+

WT   A1-5300-JY-133-TB2-6-   - 6-TB2-A1 -5 30 0-JY-1 33 A1 -5 30 0-JY-1 33 -1 63 4- - 16 34 -A1-53 00 -J Y-13 3 A1-53 00 -J Y-13 3-15

SCL 20A- 20A-

24V DC SUPPLY

+ -

5300-JT-00014-PDN 5 5

TB1

 A1-5300-HZSH-133

5300-JT-00014-PDN

BL   A1-5300-HZSH-133-TB1-9+   +9-TB1-A1-5300-HZSH-133 A1-5300-HZSH-133-913+

WT   A1-5300-HZSH-133-TB1-10-   - 10 -T B1 -A1-53 00 -HZSH-13 3 A1-53 00 -HZSH-13 3-91 4- - 91 4-A1 -5 30 0-HZ SH-1 33 A1-53 00 -HZSH-13 3-29

SCL

5A+ 5A-

24V DC SUPPLY

+ -

5300-JT-00014-PDN 5 5

TB1

 A1-5300-HZSL-133

5300-JT-00014-PDN

BL   A1-5300-HZSL-133-TB1-11+   +11-TB1-A1-5300-HZSL-133 A1-5300-HZSL-133-915+

WT   A1-5300-HZSL-133-TB1-12-   - 12 -T B1 -A1-53 00 -HZSL-13 3 A1-53 00 -HZSL-13 3-91 6- - 91 6-A1 -5 30 0-HZ SL -1 33 A1-53 00 -HZSL-13 3-31

SCL

5A+ 5A-

133

8

10

133

5300

XA

133

53005300

HIC

5300

XA

5300

HSAL

JY

133

133

5300

HSAL

133

16

15

GND-0

OUT-7

S

   A   1  -   5   3   0   0  -   J   Y  -   1

 A1-5300-HZSH-133   A1-5300-JP-00019

+   1633

-   6 1634

C   9 913

 A1-5300-JP-00019

11 915

NO   10 914

 A1-5300-HZSL-133

C

29

5

133

11

5300

JY

133

5300

JY

133

LOOP NO.: A1-5300-X-133

NO   3 1 I N- 1512 916  133

LOOP SER VI CE: D UM P W AT ER VLV R O Z Z-001/ 2A

7

13

1756-IB161K

RACK-0, SLOT-5

   A   1  -   5   3   0   0  -   H

   Z   S   H  -   1   3   3

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   3   3

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-5

5300

HSAH

32 GND-15

IN-14

GND-1430

,

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

105 OF

24V DC SUPPLY

- +5300-JT-00014-PDN 20 20

TB2

 A1-5300-JY-140

5300-JT-00014-PDN

BL +7 TB2 A1 5300 JY 140 A1 5300 JY 140 1635+

61756-OB16DK

RACK-1, SLOT-8

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

5300

SHEET 293

PLC MODULE

5300-   1

   4

 A1-5300-JY-140  A1-5300-JP-00020

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 105/293

BL   A1-5300-JY-140-TB2-7+   +7-TB2-A1-5300-JY-140 A1-5300-JY-140-1635+

WT   A1-5300-JY-140-TB2-8-   - 8-TB2-A1 -5 30 0-JY-1 40 A1 -5 30 0-JY-1 40 -1 63 6- - 16 36 -A1-53 00 -J Y-14 0 A1-53 00 -J Y-14 0-29

SCL 20A- 20A+

24V DC SUPPLY

+ -

5300-JT-00014-PDN 6 6

TB1

 A1-5300-HZSH-140

5300-JT-00014-PDN

BL   A1-5300-HZSH-140-TB1-13+   +13-TB1-A1-5300-HZSH-140 A1-5300-HZSH-140-917+

WT   A1-5300-HZSH-140-TB1-14-   - 14 -T B1 -A1-53 00 -HZSH-14 0 A1-53 00 -HZSH-14 0-91 8- - 91 8-A1 -5 30 0-HZ SH-1 40 A1-53 00 -HZSH-14 0-25

SCL

6A+ 6A-

24V DC SUPPLY

+ -

5300-JT-00014-PDN 6 6

TB1

 A1-5300-HZSL-140

5300-JT-00014-PDN

BL   A1-5300-HZSL-140-TB1-15+   +15-TB1-A1-5300-HZSL-140 A1-5300-HZSL-140-919+

WT   A1-5300-HZSL-140-TB1-16-   - 16 -T B1 -A1-53 00 -HZSL-14 0 A1-53 00 -HZSL-14 0-92 0- - 92 0-A1 -5 30 0-HZ SL -1 40 A1-53 00 -HZSL-14 0-27

SCL

6A+ 6A-

5300

HSAH

2 8 G ND -1 3

IN-12

GND-1226

   A   1  -   5   3   0   0  -   H

   Z   S   H  -   1   4   0

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   4   0

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-6

LOOP SER VI CE: R EJ AC T BYPASS VLV R O Z Z-001/ 2A

9

17

1756-IB161K

RACK-0, SLOT-6

LOOP NO.: A1-5300-X-140

NO   27 IN- 1316 920  140

JY

140

5300

JY

140

5300

25

7

140

15

15 919

NO   14 918

 A1-5300-HZSL-140

C

C   13 917

 A1-5300-JP-00019

S

   A   1  -   5   3   0   0  -   J   Y  -

 A1-5300-HZSH-140   A1-5300-JP-00019

+   1635

-   8 1636

30

29

+DC-1

OUT-14

JY

140

140

5300

HSAL

140

5300

XA

5300

HSAL

140

12

14

140

5300

XA

140

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

106 OF

 5300-JT-00015-PAN

TB1

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALSINSTRUMENT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

FIELD

JB

PACKAGE WATER TREATMENT PLANT

1

2

3

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 106/293

FI-81756-IF16K

5300-JT-00015-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-11

 A1-5300-PT-212-TB1-15+   + 15 -T B1 -A 1- 53 00 -P T- 21 2 A 1- 53 00 -P T- 21 2- 28 5+ + 28 5- A1 -5 30 0- PT -2 12 A 1- 53 00 -P T- 21 2- 04 A+

+7-A1-5300-PT-212 A1-5300-PT-212-16+

 A1-5300-PT-212-TB1-16-   - 16 -T B1 -A 1- 53 00 -P T- 21 2 A 1- 53 00 -P T- 21 2- 28 6- - 28 6- A1 -5 30 0- PT -2 12 A 1- 53 00 -P T- 21 2- 04 B-

-8-A1-5300-PT-212 A1-5300-PT-212-18-

SCL

H

 A1-5300-PCV-212 5300-JT-00011-PAN

TB1

H

 5300-JT-00011-PAN 1 2 +3 -4 +5 -6

 A1-5300-PY-212-TB1-11+ +11-TB1-A1-5300-PY-212 A1-5300-PY-212-299+ +299-A1-5300-PY-212 A1-FY-5300-100-5+

 A1-5300-PY-212-TB1-12+ -12-TB1-A1-5300-PY-212 A1-5300-PY-212-300- -300-A1-5300-PY-212 A1-5300-PY-212-6- 03B-A1-5300-PY-212 A1-5300-PY-212-7

03C-A1-5300-PY-212 A1-5300-PY-212-11

SCL

03B

13 03C11

12 300 - 6

RACK-3, SLOT-9

7 OUT2

   A   1  -   5   3   0   0  -   P   Y  -   2   1   2

RTN2

9 ALT2

FI-1210

1756-OF6CIK

I/P  +   11 299 + 5 03A

To AMS System

5300

FIC

100

04B

18

17

11

10

9

8

7

16

13

IN6

   A   1  -   5   3   0   0  -   P   T  -   2   1   2

+

-

15

286

LOOP NO.: A1-5300-PT-212

17

iRTN6

iRTN7

18 IN7

RO ZZ-001B INLET PRESSURE

285

 A1-5300-PT-212

16

15

14

04A

21

LOOP SERVICE:

-

19

20

12

4

5

6

8

+

-04C

7

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-212 A1-5300-JP-00021

5300

PIC

212   5300PAH

212

5300

PTA

212

CE   CE

 A1-5300-JP-00015

CE   CE

CE CE

CE

 A1-5300-PY-212

5300

PIC

112

5300

PTA

212

5300

PAH

212

107 OF

 5300-JT-00015-PAN

TB1

3

CLIENT KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

PROCESS CONTROL ROOM

PACKAGE WATER TREATMENT PLANT 293

DCS (BY OTHERS)FIELD

DOC. NO.

REV. NO.

1

2

SHEET

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

PLC MODULETERMINALSINSTRUMENT JB

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 107/293

FI-81756-IF16K

5300-JT-00015-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-11

 A1-5300-PT-217-TB1-17+   + 17 -T B1 -A 1- 53 00 -P T- 21 7 A 1- 53 00 -P T- 21 7- 28 7+ + 28 7- A1 -5 30 0- PT -2 17 A 1- 53 00 -P T- 21 7- 05 A+

+9-A1-5300-PT-217 A1-5300-PT-217-20+

 A1-5300-PT-217-TB1-18-   - 18 -T B1 -A 1- 53 00 -P T- 21 7 A 1- 53 00 -P T- 21 7- 28 8- - 28 8- A1 -5 30 0- PT -2 17 A 1- 53 00 -P T- 21 7- 05 B-

-10-A1-5300-PT-217 A1-5300-PT-217-22-

SCL

H H

FIC

4

IN8

5

8

9

11

13

21

LOOP NO.: A1-5300-PT-217

21

iRTN8

iRTN9

5000

FIC

100

5000

100

LOOP SERVICE:

288

22 IN9

20

FIC

100

5000

19

ZZ-001B/2B REJECT OUTLET PRESS.

287

10

12

16

17

20   A   1  -   5   3   0   0  -   P   T  -   2   1   7

6

7

19

05A

14

15

18

10

+

 A1-5300-PT-217

+

--05C

9

05B

5300

PI

217

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-217 A1-5300-JP-00021

5300

PAH

217

5300

PTA

217

5300

PI

217

5300

PAL

217

5300

PTA

217

To AMS System

108 OF

FI-2 5300-JT-00015-PAN 1756-IF16K

TB1 5300-JT-00015-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-4 A1-5300-AT-103-TB1-1+   + 1- TB 1- A1 -5 30 0- AT -1 03 A 1- 53 00 -A T- 10 3- 28 9+ + 28 9- A1 -5 30 0- AT -1 03 A 1- 53 00 -A T- 10 3- 14 A+

+27-A1-5300-AT-103 A1-5300-AT-103-24+

 A1-5300-AT-103-TB1-2-   - 2- TB 1- A1 -5 30 0- AT -1 03 A 1- 53 00 -A T- 10 3- 29 0- - 29 0- A1 -5 30 0- AT -1 03 A 1- 53 00 -A T- 10 3- 14 B-

-28-A1-5300-AT-103 A1-5300-AT-103-26-

SCL

SHEET 293

IN10

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

3   0   0  -   A   T  -   1   0   3

1+

-

PLC MODULETERMINALS

2 290

3

INSTRUMENT

FIELD

289

 A1-5300-AT-103

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

28

+

-14C

27 2414A

14B

26 IN11

 A1-5300-AT-103 A1-5300-JP-00021

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 108/293

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

23    A   1  -   5   

10

9

8

6

4

LOOP NO.: A1-5300-AT-103 LOOP SERVICE: RO ZZ-001B/2B OUT CONDUCTIVITY

5

7

25

iRTN10

iRTN11

11

12

13

14

19

20

21

15

16

17

18

5300

 AI

103

CE CE

CE

CE   CE   CE

CE

5300

 AAH

103

5300

 ATA

103

5300

 AI

103

5300

 AAH

103

5300

 ATA

103

To AMS System

109 OF

 5300-JT-00015-PAN

TB1

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALSINSTRUMENT

3

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

4

FIELD

JB

PACKAGE WATER TREATMENT PLANT

1

2

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 109/293

FI-41756-IF16K

5300-JT-00015-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-3

 A1-5300-FT-113-TB1-7+   + 7- TB 1- A1 -5 30 0- FT -1 13 A 1- 53 00 -F T- 11 3- 29 1+ + 29 1- A1 -5 30 0- FT -1 13 A 1- 53 00 -F T- 11 3- 04 A+

+7-A1-5300-FT-113 A1-5300-FT-113-16+

 A1-5300-FT-113-TB1-8-   - 8- TB 1- A1 -5 30 0- FT -1 13 A 1- 53 00 -F T- 11 3- 29 2- - 29 2- A1 -5 30 0- FT -1 13 A 1- 53 00 -F T- 11 3- 04 B-

-8-A1-5300-FT-113 A1-5300-FT-113-18-

SCL

H

H

L

L

 A1-5300-FCV-113 5300-JT-00015-PAN

TB1

 5300-JT-00015-PAN 1 2 +3 -4 +5 -6

 A1-5300-FY-113-TB1-19+ +19-TB1-A1-5300-FY-113 A1-5300-FY-113-303+ +303-A1-5300-FY-113 A1-FY-5300-100-11+

 A1-5300-FY-113-TB1-20+ -20-TB1-A1-5300-FY-113 A1-5300-FY-113-304- -304-A1-5300-FY-113 A1-5300-FY-113-12- 06B-A1-5300-FY-113 A1-5300-FY-113-1

06C-A1-5300-FY-113 A1-5300-FY-113-5SCL

- 12 06B

21 06C

RACK-3, SLOT-9

1 6 OU T5

   A   1  -   5   3   0   0  -   F   Y  -   1   1   3

2 0 R TN 5

18 ALT5

FI-1218

1756-OF6CIK

I/P  +   19 303 + 11 06A

To AMS System

5300

FIC

100

04B

11

10

9

8

716 IN6

   A   1  -   5   3   0   0  -   F   T  -   1   1   3

+

-

15

8

+

-

7

292

LOOP NO.: A1-5300-FT-113

17

iRTN6

iRTN7

18 IN7

LOOP SERVICE: RO ZZ-001B/002B REJECT FLOW

291

 A1-5300-FT-113

04A

6

04C

-   20 304

4

5

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-110 A1-5300-JP-00021

5300

FIC

113   5300

FAH

113

5300

FAL

113

5300

FTA

113

CE   CE

 A1-5300-JP-00021

CE   CE

CE CE

CE

 A1-5300-FY-113

5300

FAH

113

5300

FTA

113

5300

FAL

113

5300

FIC

113

110 OF

 5300-JT-00015-PAN

TB1

DOC. NO.

1

2

WATER TREATMENT PLANT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM REV. NO.

INSTRUMENT

3

4

PLC MODULETERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

FIELD

JB

CLIENT KE01-A1-500-MT-I-HL-0001-000

SHEET 293PACKAGE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 110/293

FI-41756-IF16K

5300-JT-00015-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-3

 A1-5300-FT-115-TB1-9+   + 9- TB 1- A1 -5 30 0- FT -1 15 A 1- 53 00 -F T- 11 5- 29 3+ + 29 3- A1 -5 30 0- FT -1 15 A 1- 53 00 -F T- 11 5- 06 A+

+11-A1-5300-FT-115 A1-5300-FT-115-24+

 A1-5300-FT-115-TB1-10-   - 10 -T B1 -A 1- 53 00 -F T- 11 5 A 1- 53 00 -F T- 11 5- 29 4- - 29 4- A1 -5 30 0- FT -1 15 A 1- 53 00 -F T- 11 5- 06 B-

-12-A1-5300-FT-115 A1-5300-FT-115-26-

SCL

H H

L L

100

5000FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

06A

6

7

8

+293

11

 A1-5300-FT-115

+

-06C

18

17

16

15

LOOP SERVICE: RO ZZ-001B OUTLET PERMIATE FLOW

19

20

LOOP NO.: A1-5300-FT-115

25

iRTN10

iRTN11

12

13

14

26 IN1112 -10 294

4

5

06B

21

9

   A   1  -   5   3   0   0  -   F   T  -   1   1   5

23

11

24 IN10

5300

FI

115

CE   CE

CE

CE   CE   CE

CE

 A1-5300-FT-115 A1-5300-JP-00021

5300

FAH

115

5300

FAL

115

5300FTA

115

5300

FI

115

5300

FAH

115

5300

FAL

115

5300FTA

115

To AMS System

111 OF

 5300-JT-00015-PAN

TB1

PACKAGE WATER TREATMENT PLANT

1

2

SHEET 293

3

4

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

FIELD

JB PLC MODULETERMINALSINSTRUMENT DCS (BY OTHERS)PROCESS CONTROL ROOM

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 111/293

FI-61756-IF16K

5300-JT-00015-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-8

 A1-5300-PDT-214-TB1-11+   +11 -T B1 -A1-53 00 -PDT -2 14 A1-53 00 -PDT -2 14 -2 95 + +29 5-A1 -5 30 0-PDT-21 4 A1-53 00 -PDT -2 14 -1 6A+

+31-A1-5300-PDT-214 A1-5300-PDT-214-34+

 A1-TB1-5300-PDT-214-12-   - 12 -T B1 -A1-53 00 -PDT -2 14 A1-53 00 -PDT -2 14 -2 96 - - 29 6-A1 -5 30 0-PDT-21 4 A1-53 00 -PDT -2 14 -1 6B-

-32-A1-5300-PDT-214 A1-5300-PDT-214-36-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

500021

32

+

-16C

31

17

19

5

6

   A   1  -   5   3   0   0  -   P   D   T  -   2   1   4

10

LOOP SER VI CE: D IF F. PRESS.H I R O Z Z-001B

295

14

16

 A1-5300-PDT-214

15

20

296

LOOP NO.: A1-5300-PDT-214

35

iRTN14

iRTN15

36 IN15

7

33

IN14

9

+

-

18

12

13

3416A

16B

11

8

5300

PDI

214

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-214 A1-5300-JP-00021

5300

PDAH

214

5300

PDTA

214

5300

PDI

214

5300

PDAH

214

5300

PDTA

214

To AMS System

112 OF

 5300-JT-00015-PAN

TB1

1

2

3

4

DCS (BY OTHERS)PROCESS CONTROL ROOM

INSTRUMENT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

FIELD

JB

PACKAGE WATER TREATMENT PLANT

PLC MODULETERMINALS

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 112/293

FI-71756-IF16K

5300-JT-00015-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-9

 A1-5300-PDT-216-TB1-13+   +13 -T B1 -A1-53 00 -PDT -2 16 A1-53 00 -PDT -2 16 -2 97 + +29 7-A1 -5 30 0-PDT-21 6 A1-53 00 -PDT -2 16 -0 1A+

+1-A1-5300-PDT-216 A1-5300-PDT-216-2+

 A1-5300-PDT-216-TB1-14-   - 14 -T B1 -A1-53 00 -PDT -2 16 A1-53 00 -PDT -2 16 -2 98 - - 29 8-A1 -5 30 0-PDT-21 6 A1-53 00 -PDT -2 16 -0 1B-

-2-A1-5300-PDT-216 A1-5300-PDT-216-4-

SCL

H H

100

18

5000

FIC

FIC

100

5000

FIC

100

5000

01B

6

9

8

7

2

1

IN0

11

15

17

16

298

LOOP NO.: A1-5300-PDT-216

3

iRTN0

iRTN1

4 IN1

LOOP SER VI CE: D IF F. PRESS.H I R O Z Z-002B

297

 A1-5300-PDT-216

14

13

12

01A+

21

19

20

10

   A   1  -   5   3   0   0  -   P   D   T  -   2   1   6

-2

+

-01C

1

5

5300

PDI

216

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-216 A1-5300-JP-00021

5300

PDAH

216

5300

PDTA

216

5300

PDI

216

5300

PDAH

216

5300

PDTA

216

To AMS System

113 OF

 5300-JT-00015-PAN

TB1

FI-31756-IF16K

5300-JT-00015-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-2

 A1-5300-FT-108-TB1-3+   + 3- TB 1- A1 -5 30 0- FT -1 08 A 1- 53 00 -F T- 10 8- 23 1+ + 23 1- A1 -5 30 0- FT -1 08 A 1- 53 00 -F T- 10 8- 15 A+

+29-A1-5300-FT-108 A1-5300-FT-108-30+

 A1-5300-FT-108-TB1-4-   - 4- TB 1- A1 -5 30 0- FT -1 08 A 1- 53 00 -F T- 10 8- 23 2- - 23 2- A1 -5 30 0- FT -1 08 A 1- 53 00 -F T- 10 8- 15 B-

1

3

SHEET 293

IN12

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

   T  -   1   0   8

4

+

-

PLC MODULETERMINALS

2

232

INSTRUMENT

FIELD

231

 A1-5300-FT-108

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

+29 3015A

15B

 A1-5300-FT-108 A1-5300-JP-00021

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 113/293

-30-A1-5300-FT-108 A1-5300-FT-108-32-

SCL

L L

100

FIC100

5000

FIC

5000

FIC

100

5000

18

6

7

9

11

12

13

16

29    A   1  -   5   3   0   0  -   F

5

LOOP NO.: A1-5300-FT-108

31

iRTN12

iRTN13

32 IN13

LOOP SER VI CE: F LOW T O R O H PP PA-006B

8

10

14

15

30 -15C

17

19

20

21

5300

FI

108

CE CE

CE

CE   CE   CE

CE

5300

FAL108

5300

FTA

108

5300

FI

108

5300

FAL108

5300

FTA

108

To AMS System

114 OF

 5300-JT-00015-PAN

TB1

1

2

3

FI-44 1756-IF16K

5300-JT-00015-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-3

A1 5300 FT 110 TB1 5 + 5 TB 1 A1 5 30 0 FT 1 10 A 1 53 00 F T 11 0 23 9+ + 23 9 A1 5 30 0 FT 1 10 A 1 53 00 F T 11 0 01 A+

PACKAGE WATER TREATMENT PLANT

PLC MODULETERMINALS

SHEET 293

FIELD

JB

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

 A1-5300-FT-110

INSTRUMENT DCS (BY OTHERS)PROCESS CONTROL ROOM

 A1-5300-FT-110 A1-5300-JP-00021

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 114/293

 A1-5300-FT-110-TB1-5+   + 5- TB 1- A1 -5 30 0- FT -1 10 A 1- 53 00 -F T- 11 0- 23 9+ + 23 9- A1 -5 30 0- FT -1 10 A 1- 53 00 -F T- 11 0- 01 A+

+1-A1-5300-FT-110 A1-5300-FT-110-2+

 A1-5300-FT-110-TB1-7-   - 6- TB 1- A1 -5 30 0- FT -1 10 A 1- 53 00 -F T- 11 0- 24 0- - 24 0- A1 -5 30 0- FT -1 10 A 1- 53 00 -F T- 11 0- 01 B-

-2-A1-5300-FT-110 A1-5300-FT-110-4-

SCL

L L

100

FIC

100

5000

FIC

5000

FIC

100

5000

2

+

-01C

15

19

20

10

   A   1  -   5   3   0   0  -   F   T  -   1   1   0

-

LOOP SER VI CE: F LOW T O R O H PP PA-006D

239

14

13

12

11

01A+240

LOOP NO.: A1-5300-FT-110

3

iRTN0

iRTN1

4 IN1

2

1

IN0

01B6

21

9

8

7

18

17

16

15

5300

FI

110

CE CE

CE

CE   CE   CE

CE

5300

FAL

110

5300

FTA

110

5300

FI

110

5300

FAL

110

5300

FTA

110

To AMS System

115 OF

24V DC SUPPLY

- +

20 20

 A1-5300-JY-134 5300-JT-00016-PDN

TB2 5300-JT-00016-PDN

BL   A1-5300-JY-134-TB2-1+   +1-TB2-A1-5300-JY-134 A1-5300-JY-134-1639+

WT   A1-5300-JY-134-TB2-2-   - 2-TB2-A1 -5 30 0-JY-1 34 A1 -5 30 0-JY-1 34 -1 64 0- - 16 40 -A1-53 00 -J Y-13 4 A1-53 00 -J Y-13 4-17

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

1756-OB16DK

RACK-1, SLOT-8

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

134

5300

JY

134

SHEET 293

PLC MODULE

5300

S

1  -   5   3   0   0  -   J   Y  -   1   3

+   1639

-   2 1640

1

 A1-5300-JY-134

18

17

+DC-1

OUT-8

 A1-5300-JP-00023

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 115/293

SCL 20A- 20A+

24V DC SUPPLY

+ -

6 6

 A1-5300-HZSH-134 5300-JT-00016-PDN

TB1 5300-JT-00016-PDN

BL   A1-5300-HZSH-134-TB1-1+   +1-TB1-A1-5300-HZSH-134 A1-5300-HZSH-134-925+

WT   A1-5300-HZSH-134-TB1-20-   - 2-TB1-A1 -5 30 0-HZ SH-1 34 A1-53 00 -HZSH-13 4-92 6- - 92 6-A1 -5 30 0-HZ SH-1 34 A1-53 00 -HZSH-13 4-1

SCL

6A+ 6A-

24V DC SUPPLY

+ -

5300-JT-00016-PDN 6 6

TB1

 A1-5300-HZSL-134

5300-JT-00016-PDN

BL   A1-5300-HZSL-134-TB1-3+   +3-TB1-A1-5300-HZSL-134 A1-5300-HZSL-134-927+

WT   A1-5300-HZSL-134-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 34 A1-53 00 -HZSL-13 4-92 8- - 92 8-A1 -5 30 0-HZ SL -1 34 A1-53 00 -HZSL-13 4-3

SCL

6A+ 6A-

5300

HSAH

4 GND- 1

IN-0

GND-02

1756-IB161K

RACK-0, SLOT-6

1

   A   1  -   5   3   0   0

  -   H   Z   S   H  -   1   3   4

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   3   4

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-6

LOOP SER VI CE: VEN T R ELEASE VLV R O Z Z-001/ 2B

3

5

LOOP NO.: A1-5300-X-134

NO   3 IN-14 928  134

134

3 927  5300

HSALC

C   1 925

 A1-5300-JP-00022

NO   2 926

 A1-5300-HZSL-134

3

   A   1

 A1-5300-HZSH-134   A1-5300-JP-00022

5300

HIC

5300

134

5300

HSAL

134

134

XA

134

2

134

5300

XA

134

5300

JY

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

116 OF

24V DC SUPPLY

- +

5300-JT-00016-PDN 20 20

TB2

 A1-5300-JY-135

5300-JT-00016-PDN

BL   A1-5300-JY-135-TB2-3+   +3-TB2-A1-5300-JY-135 A1-5300-JY-135-1641+

WT   A1-5300-JY-135-TB2-4-   - 4-TB2-A1 -5 30 0-JY-1 35 A1 -5 30 0-JY-1 35 -1 64 2- - 16 42 -A1-53 00 -J Y-13 5 A1-53 00 -J Y-13 5-19

 A1-5300-JY-135

20

19

+DC-1

OUT-9

 A1-5300-JP-00023

S

A   1  -   5   3   0   0  -   J   Y  -   1   3

+   1641

-   4 1642

3

SHEET 293

PLC MODULE

5300

JY

135

5300

JY

135

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

21756-OB16DK

RACK-1, SLOT-8

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 116/293

SCL 20A- 20A+

24V DC SUPPLY

+ -

5300-JT-00016-PDN 6 6

TB1

 A1-5300-HZSH-135

5300-JT-00016-PDN

BL   A1-5300-HZSH-135-TB1-5+   +5-TB1-A1-5300-HZSH-135 A1-5300-HZSH-135-929+

WT   A1-5300-HZSH-135-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-1 35 A1-53 00 -HZSH-13 5-93 0- - 93 0-A1 -5 30 0-HZ SH-1 35 A1-53 00 -HZSH-13 5-5

SCL

6A+ 6A-

24V DC SUPPLY

+ -

5300-JT-00016-PDN 6 6

TB1

 A1-5300-HZSL-135

5300-JT-00016-PDN

BL   A1-5300-HZSL-135-TB1-7+   +7-TB1-A1-5300-HZSL-135 A1-5300-HZSL-135-931+

WT   A1-5300-HZSL-135-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -1 35 A1-53 00 -HZSL-13 5-93 2- - 93 2-A1 -5 30 0-HZ SL -1 35 A1-53 00 -HZSL-13 5-7

SCL

6A+ 6A-

135

4

6

135

5300

XA

135

53005300

HIC

5300

XA

5300

HSAL

JY

135

135

5300

HSAL

135

   A

 A1-5300-HZSH-135   A1-5300-JP-00022

C   5 929

 A1-5300-JP-00022

7 931

NO   6 930

 A1-5300-HZSL-135

C

5135

7

LOOP NO.: A1-5300-X-135

NO   7 IN-38 932  135

LOOP SER VI CE: PER MI AT E VLV R O Z Z-001/ 2B

5

9

1756-IB161K

RACK-0, SLOT-6

   A   1  -   5   3   0   0

  -   H   Z   S   H  -   1   3   5

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   3   5

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-6

5300

HSAH

8 GND-3

IN-2

GND-26

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

117 OF

24V DC SUPPLY

- +

5300-JT-00016-PDN 20 20TB2

 A1-5300-JY-136

5300-JT-00016-PDN

BL   A1-5300-JY-136-TB2-5+   +5-TB2-A1-5300-JY-136 A1-5300-JY-136-1643+

WT   A1-5300-JY-136-TB2-6-   - 6-TB2-A1 -5 30 0-JY-1 36 A1 -5 30 0-JY-1 36 -1 64 4- - 16 44 -A1-53 00 -J Y-13 6 A1-53 00 -J Y-13 6-21

41756-OB16DK

RACK-1, SLOT-8

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

7

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

136

5300

JY

136

SHEET 293

PLC MODULE

53005

S

   A   1  -   5   3   0   0  -   J   Y  -   1   3

+   1643

-   6 1644

 A1-5300-JY-136

22

21

+DC-1

OUT-10

 A1-5300-JP-00023

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 117/293

SCL 20A- 20A+

24V DC SUPPLY

+ -

5300-JT-00016-PDN 6 6

TB1

 A1-5300-HZSH-136

5300-JT-00016-PDN

BL   A1-5300-HZSH-136-TB1-9+   +9-TB1-A1-5300-HZSH-136 A1-5300-HZSH-136-917+

WT   A1-5300-HZSH-136-TB1-10-   - 10 -T B1 -A1-53 00 -HZSH-13 6 A1-53 00 -HZSH-13 6-91 8- - 91 8-A1 -5 30 0-HZ SH-1 36 A1-53 00 -HZSH-13 6-9

SCL

6A+ 6A-

24V DC SUPPLY

+ -

5300-JT-00016-PDN 6 6

TB1

 A1-5300-HZSL-136

5300-JT-00016-PDN

BL   A1-5300-HZSL-136-TB1-11+   +11-TB1-A1-5300-HZSL-136 A1-5300-HZSL-136-919+

WT   A1-5300-HZSL-136-TB1-12-   - 12 -T B1 -A1-53 00 -HZSL-13 6 A1-53 00 -HZSL-13 6-92 0- - 92 0-A1 -5 30 0-HZ SL -1 36 A1-53 00 -HZSL-13 6-11

SCL

6A+ 6A-

5300

HSAH

12 GND-5

IN-4

GND-410

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   3   6

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   3   6

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-6

LOOP SER VI CE: D UM P W AT ER VLV R O Z Z-001/ 2B

7

13

1756-IB161K

RACK-0, SLOT-6

LOOP NO.: A1-5300-X-136

NO   11 IN-512 920  136

9136

11

11 919

NO   10 918

 A1-5300-HZSL-136

C

C   9 917

 A1-5300-JP-00022

 A1-5300-HZSH-136   A1-5300-JP-00022

JY

136

136

5300

HSAL

136

5300

XA

5300

HSAL

136

8

10

136

5300

XA

136

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

118 OF

24V DC SUPPLY

- +

5300-JT-00016-PDN 20 20TB2

 A1-5300-JY-141

5300-JT-00016-PDN

BL   A1-5300-JY-141-TB2-7+   +7-TB2-A1-5300-JY-141 A1-5300-JY-141-1645+

WT   A1-5300-JY-141-TB2-8-   - 8-TB2-A1 -5 30 0-JY-1 41 A1 -5 30 0-JY-1 41 -1 64 6- - 16 46 -A1-53 00 -J Y-14 1 A1-53 00 -J Y-14 1-31

 A1-5300-JY-141

32

31

+GND-1

OUT-15

 A1-5300-JP-00023

S

   A   1  -   5   3   0   0  -   J   Y  -   1   4

+   1645

-   8 1646

7

SHEET 293

PLC MODULE

5300

JY

141

5300

JY

141

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

9

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

61756-OB16DK

RACK-1, SLOT-8

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 118/293

SCL 20A- 20A-

24V DC SUPPLY

+ -

5300-JT-00016-PDN 6 6

TB1

 A1-5300-HZSH-141

5300-JT-00016-PDN

BL   A1-5300-HZSH-141-TB1-13+   +13-TB1-A1-5300-HZSH-141 A1-5300-HZSH-141-937+

WT   A1-5300-HZSH-141-TB1-14-   - 14 -T B1 -A1-53 00 -HZSH-14 1 A1-53 00 -HZSH-14 1-93 8- - 93 8-A1 -5 30 0-HZ SH-1 41 A1-53 00 -HZSH-14 1-29

SCL

6A+ 6A-

24V DC SUPPLY

+ -

5300-JT-00016-PDN 6 6

TB1

 A1-5300-HZSL-141

5300-JT-00016-PDN

BL   A1-5300-HZSL-141-TB1-15+   +15-TB1-A1-5300-HZSL-141 A1-5300-HZSL-141-939+

WT   A1-5300-HZSL-141-TB1-16-   - 16 -T B1 -A1-53 00 -HZSL-14 1 A1-53 00 -HZSL-14 1-94 0- - 94 0-A1 -5 30 0-HZ SL -1 41 A1-53 00 -HZSL-14 1-31

SCL

6A+ 6A-

141

14

141

5300

XA

141

53005300

HIC

5300

XA

5300

HSAL

JY

141

141

5300

HSAL

141

 A1-5300-HZSH-141   A1-5300-JP-00022

C   13 937

 A1-5300-JP-00022

15 939

NO   14 938

 A1-5300-HZSL-141

C

29141

15

12

LOOP NO.: A1-5300-X-141

NO   31 IN- 1516 940  141

LOOP SER VI CE: VEN T R ELEASE VLV R O Z Z-001/ 2C

9

17

1756-IB161K

RACK-0, SLOT-6

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   4   1

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   4   1

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-6

5300

HSAH

3 2 G ND -1 5

IN-14

GND-1430

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

119 OF

 5300-JT-00017-PAN

TB1

DOC. NO. AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

SHEET 293PACKAGE WATER TREATMENT PLANT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM REV. NO.

INSTRUMENT

FIELD

JB

1

2

5

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALS

3

4

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 119/293

FI-81756-IF16K

5300-JT-00017-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-11

 A1-5300-PT-218-TB1-13+   + 13 -T B1 -A 1- 53 00 -P T- 21 8 A 1- 53 00 -P T- 21 8- 32 5+ + 32 5- A1 -5 30 0- PT -2 18 A 1- 53 00 -P T- 21 8- 06 A+

+11-A1-5300-PT-218 A1-5300-PT-218-24+

 A1-5300-PT-218-TB1-14-   - 14 -T B1 -A 1- 53 00 -P T- 21 8 A 1- 53 00 -P T- 21 8- 32 6- - 32 6- A1 -5 30 0- PT -2 18 A 1- 53 00 -P T- 21 8- 06 B-

-12-A1-5300-PT-218 A1-5300-PT-218-26-

SCL

H

 A1-5300-PCV-218 5300-JT-00011-PAN

TB1

H

 5300-JT-00011-PAN 1 2 +3 -4 +5 -6

 A1-5300-PY-218-TB1-13+ +13-TB1-A1-5300-PY-218 A1-5300-PY-218-339+ +339-A1-5300-PY-218 A1-FY-5300-100-7+

 A1-5300-PY-218-TB1-14+ -14-TB1-A1-5300-PY-218 A1-5300-PY-218-340- -340-A1-5300-PY-218 A1-5300-PY-218-8- 04B-A1-5300-PY-218 A1-5300-PY-218-8

04C-A1-5300-PY-218 A1-5300-PY-218-12

SCL

+325

11

25

340 - 8 04B

7 04ARACK-3, SLOT-9

8 OUT3

To AMS System

5300

FIC

100

 A1-5300-PT-218

+-

RO ZZ-001C INLET PRESSURE

21

LOOP SERVICE:

I/P  +   13 339 +

1756-OF6CIK

   A   1  -   5   3   0   0  -   P   Y  -   2   1   8

04C1 2 R TN 3

10 ALT3

12

15

iRTN10

iRTN11

FI-12

LOOP NO.: A1-5300-PT-218

-   14

15

10

326

12

13

14

6

9

26

06A

7

8

11

06C  12 -   IN11

06B

   A   1  -   5   3   0   0  -   P   T  -   2   1   8

23

24 IN10

18

17

16CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-218 A1-5300-JP-00024

5300

PIC

218   5300

PAH

218

5300

PTA

218

CE   CE

 A1-5300-JP-00015

CE   CE

CE CE

CE

 A1-5300-PY-218

5300

PIC

112

5300

PTA

218

5300

PAH

218

120 OF

 5300-JT-00017-PAN

TB1

PROJECT

PROCESS CONTROL ROOMDCS (BY OTHERS)

5

PACKAGE WATER TREATMENT PLANT

3

4

1

2

6

CLIENT KE01-A1-500-MT-I-HL-0001-000

INSTRUMENT

FIELD

JB

SHEET 293

PLC MODULETERMINALS

P01

DOC. NO.

REV. NO.

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 120/293

FI-8 1756-IF16K5300-JT-00017-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-11

 A1-5300-PT-222-TB1-15+   + 15 -T B1 -A 1- 53 00 -P T- 22 2 A 1- 53 00 -P T- 22 2- 32 7+ + 32 7- A1 -5 30 0- PT -2 22 A 1- 53 00 -P T- 22 2- 07 A+

+13-A1-5300-PT-222 A1-5300-PT-222-30+

 A1-5300-PT-222-TB1-16-   - 16 -T B1 -A 1- 53 00 -P T- 22 2 A 1- 53 00 -P T- 22 2- 32 8- - 32 8- A1 -5 30 0- PT -2 22 A 1- 53 00 -P T- 22 2- 07 B-

-14-A1-5300-PT-222 A1-5300-PT-222-32-

SCL

H H

5000

100

FIC

100

5000

FIC

15

16

3007A

07B

IN1213

13

   A   1  -   5   3   0   0  -   P   T  -   2   2   2

+

-

29

07C  14

+

-

 A1-5300-PT-222

11

6

14

18

19

21

17

20

LOOP NO.: A1-5300-PT-222

31

iRTN12

iRTN13

LOOP SERVICE: ZZ-001C/2C REJECT OUTLET PRESS.

5000

FIC

100

8

328

32 IN13

327

12

10

7

9

5300

PI

222

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-222 A1-5300-JP-00024

5300

PAH

222

5300

PTA

222

5300

PI

222

5300

PAH

222

5300

PTA

222

To AMS System

121 OF

FI-2 5300-JT-00017-PAN 1756-IF16K

TB1 5300-JT-00017-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-4

 A1-5300-AT-104-TB1-1+   + 1- TB 1- A1 -5 30 0- AT -1 04 A 1- 53 00 -A T- 10 4- 32 9+ + 32 9- A1 -5 30 0- AT -1 04 A 1- 53 00 -A T- 10 4- 15 A+

+29-A1-5300-AT-104 A1-5300-AT-104-30+

 A1-5300-AT-104-TB1-2-   - 2- TB 1- A1 -5 30 0- AT -1 04 A 1- 53 00 -A T- 10 4- 33 0- - 33 0- A1 -5 30 0- AT -1 04 A 1- 53 00 -A T- 10 4- 15 B-

-30-A1-5300-AT-104 A1-5300-AT-104-32-

SCL

31

iRTN12

iRTN13

32 IN13

PACKAGE WATER TREATMENT PLANT

30

+

-15C

29 3015A

15B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

329

5

 A1-5300-AT-104

2 330

6

4

3

JB

   A   1  -   5   3   0   0  -   A   T  -   1   0   4

1+

-

PLC MODULETERMINALS

SHEET 293

29

IN12

DCS (BY OTHERS)PROCESS CONTROL ROOM

CE CE

CE

CE   CE   CE

CE

 A1-5300-AT-104 A1-5300-JP-00024

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 121/293

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

LOOP NO.: A1-5300-AT-104 LOOP SERVICE: RO ZZ-001C/2C OUT CONDUCTIVITY

7

10

9

8

6

11

12

13

14

19

20

21

15

16

17

18

5300

 AI

104

5300

 AAH

104

5300

 ATA

104

5300

 AI

104

5300

 AAH

104

5300

 ATA

104

To AMS System

122 OF

 5300-JT-00017-PAN

TB1

FI-41756-IF16K

5300-JT-00017-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-3

 A1-5300-FT-114-TB1-5+   + 5- TB 1- A1 -5 30 0- FT -1 14 A 1- 53 00 -F T- 11 4- 33 1+ + 33 1- A1 -5 30 0- FT -1 14 A 1- 53 00 -F T- 11 4- 05 A+

+9-A1-5300-FT-114 A1-5300-FT-114-20+

 A1-5300-FT-114-TB1-6-   - 6- TB 1- A1 -5 30 0- FT -1 14 A 1- 53 00 -F T- 11 4- 33 2- - 33 2- A1 -5 30 0- FT -1 14 A 1- 53 00 -F T- 11 4- 05 B-

+

PROCESS CONTROL ROOM

2005A

05B

IN8

PLC MODULETERMINALSINSTRUMENT

4 A1-5300-FT-114

332-

3315

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

JB

-   1   1   4

6

DCS (BY OTHERS)

3

PACKAGE WATER TREATMENT PLANT

+9

1

2

FIELD

 A1-5300-FT-114 A1-5300-JP-00024

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 122/293

-10-A1-5300-FT-114 A1-5300-FT-114-22-

SCL

 A1-5300-FCV-114 5300-JT-00017-PAN

TB1

 5300-JT-00017-PAN 1 2 +3 -4 +5 -6

 A1-5300-FY-114-TB1-17+ +17-TB1-A1-5300-FY-114 A1-5300-FY-114-343+ +343-A1-5300-FY-114 A1-FY-5300-100-13+

 A1-5300-FY-114-TB1-18+ -18-TB1-A1-5300-FY-114 A1-5300-FY-114-344- -344-A1-5300-FY-114 A1-5300-FY-114-13- 07B-A1-5300-FY-114 A1-5300-FY-114-1

07C-A1-5300-FY-114 A1-5300-FY-114-5

SCL  07C

5 RTN0

3 ALT0

1 OUT0

   A   1  -   5   3   0   0  -   F   Y  -   1   1   4

-   18 344 - 14 07B

21

FI-12

1756-OF6CIK

I/P  +   17 343 + 13 07A

RACK-3, SLOT-10

To AMS System

5300

FIC

100

LOOP NO.: A1-5300-FT-114

21

iRTN8

iRTN9

22 IN9

-

8

11

LOOP SERVICE: RO ZZ-001C/002C REJECT FLOW

10

9

16

   A   1  -   5   3   0   0  -   F   T  -

7

19

10 -05C

CE CE

CE

CE   CE   CE

CE

5300

FIC

114   5300

FAH

114

5300

FAL

114

5300

FTA

114

CE   CE

 A1-5300-JP-00024

CE   CE

CE CE

CE

 A1-5300-FY-114

5300

PTA

271

5300

PAH

271

5300

PAL

271

5300

FIC

112

123 OF

 5300-JT-00017-PAN

TB1

FI-41756-IF16K

5300-JT-00017-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-3

PACKAGE WATER TREATMENT PLANT

3

4

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 A1-5300-FT-116

5

CLIENT KE01-A1-500-MT-I-HL-0001-000

INSTRUMENT

FIELD

JB

SHEET 293

PLC MODULETERMINALS

DOC. NO.

DCS (BY OTHERS)PROCESS CONTROL ROOM

1

2

6

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

 A1-5300-FT-116 A1-5300-JP-00024

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 123/293

5300 JT 00017 PAN 6 5 4 3 2 1 X:20 RACK 2, SLOT 3

 A1-5300-FT-116-TB1-7+   + 7- TB 1- A1 -5 30 0- FT -1 16 A 1- 53 00 -F T- 11 6- 33 3+ + 33 3- A1 -5 30 0- FT -1 16 A 1- 53 00 -F T- 11 6- 07 A+

+13-A1-5300-FT-116 A1-5300-FT-116-30+

 A1-5300-FT-116-TB1-8-   - 8- TB 1- A1 -5 30 0- FT -1 16 A 1- 53 00 -F T- 11 6- 33 4- - 33 4- A1 -5 30 0- FT -1 16 A 1- 53 00 -F T- 11 6- 07 B-

-14-A1-5300-FT-116 A1-5300-FT-116-32-

SCL

H H

L L

100

100

5000

FIC

100

5000

FIC

5000

FIC

20

14

+

-07C

13

19

   A   1  -   5   3   0   0  -   F   T  -   1   1   6

+

-

LOOP SERVICE: RO ZZ-001C OUTLET PERMIATE FLOW

333

12

14

18

8

10

11

21

334

LOOP NO.: A1-5300-FT-116

31

iRTN12

iRTN13

32 IN13

17

29

IN123007A

07B

9

13

16

7

5000

15

FIC

100

5300

FI

116

CE CE

CE

CE   CE   CE

CE

5300

FAH

116

5300

FAL

116

5300

FTA

116

5300

FI

116

5300

FAH

116

5300

FAL

116

5300

FTA

116

To AMS System

124 OF

 5300-JT-00017-PAN

TB1

1

2

4

6

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

JB

5

PLC MODULETERMINALS

3

SHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 124/293

FI-71756-IF16K

5300-JT-00017-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-9

 A1-5300-PDT-219-TB1-9+   +9-TB1-A1 -5 30 0-PDT-21 9 A1-53 00 -PDT -2 19 -3 35 + +33 5-A1 -5 30 0-PDT-21 9 A1-53 00 -PDT -2 19 -0 2A+

+3-A1-5300-PDT-219 A1-5300-PDT-219-6+

 A1-5300-PDT-219-TB1-10-   - 10 -T B1 -A1-53 00 -PDT -2 19 A1-53 00 -PDT -2 19 -3 36 - - 33 6-A1 -5 30 0-PDT-21 9 A1-53 00 -PDT -2 19 -0 2B-

-4-A1-5300-PDT-219 A1-5300-PDT-219-8-

SCL

H H

FIC

100

5000

FIC

100

5000

21

17

18

20

19

7

4

+

-02C

3 602A

02B

LOOP NO.: A1-5300-PDT-219 DIFF. PRESS.HI RO ZZ-001C

335

 A1-5300-PDT-219

9

10

11

336

7

iRTN2

iRTN3

8

5000

FIC

100

   A   1  -   5   3   0   0  -   P   D   T  -   2   1   9+

-IN3

5

IN2

LOOP SERVICE:

15

16

8

12

13

14

5300

PDI

219

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-219 A1-5300-JP-00024

5300

PDAH

219

5300

PDTA

219

5300

PDI

219

5300

PDAH

219

5300

PDTA

219

To AMS System

125 OF

 5300-JT-00017-PAN

TB1

1

2

SHEET

JB

293

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALS

5

6

INSTRUMENT

FIELD

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

3

4

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 125/293

FI-71756-IF16K

5300-JT-00017-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-9

 A1-5300-PDT-221-TB1-11+   +11 -T B1 -A1-53 00 -PDT -2 21 A1-53 00 -PDT -2 21 -3 37 + +33 7-A1 -5 30 0-PDT-22 1 A1-53 00 -PDT -2 21 -0 3A+

+5-A1-5300-PDT-221 A1-5300-PDT-221-12+

 A1-5300-PDT-221-TB1-12-   - 12 -T B1 -A1-53 00 -PDT -2 21 A1-53 00 -PDT -2 21 -3 38 - - 33 8-A1 -5 30 0-PDT-22 1 A1-53 00 -PDT -2 21 -0 3B-

-6-A1-5300-PDT-221 A1-5300-PDT-221-14-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

500021

7

20

19

10

1411

IN4+

-IN5

8

9

338

13

iRTN4

iRTN5

14

   A   1  -   5   3   0   0  -   P   D   T  -   2   2   1

03A

03B

LOOP NO.: A1-5300-PDT-221 DIFF. PRESS.HI RO ZZ-002C

337

 A1-5300-PDT-221

11

12

136

+

-03C

5 12

LOOP SERVICE:

15

16

17

18

5300

PDI

221

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-221 A1-5300-JP-00024

5300

PDAH

221

5300

PDTA

221

5300

PDI

221

5300

PDAH

221

5300

PDTA

221

To AMS System

126 OF

 5300-JT-00017-PAN

TB1

FI-31756-IF16K

5300-JT-00017-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-2

 A1-5300-FT-109-TB1-3+   + 3- TB 1- A1 -5 30 0- FT -1 09 A 1- 53 00 -F T- 10 9- 23 5+ + 23 5- A1 -5 30 0- FT -1 09 A 1- 53 00 -F T- 10 9- 16 A+

+31-A1-5300-FT-109 A1-5300-FT-109-34+

 A1-5300-FT-109-TB1-4-   - 4- TB 1- A1 -5 30 0- FT -1 09 A 1- 53 00 -F T- 10 9- 23 6- - 23 6- A1 -5 30 0- FT -1 09 A 1- 53 00 -F T- 10 9- 16 B-

-32-A1-5300-FT-109 A1-5300-FT-109-36-

SCL

+

-+

-16C

31

DCS (BY OTHERS)PROCESS CONTROL ROOM

PACKAGE WATER TREATMENT PLANT

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

SHEET 293

DOC. NO.

REV. NO.PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

PLC MODULETERMINALS

2

IN14

iRTN1433

JB

236

36 IN15

235

   A   1  -   5   3   0   0  -   F   T  -   1   0   9

4

5

FIELD

INSTRUMENT

 A1-5300-FT-109

3416A

16B

32

1

3

6

7

CE CE

CE

CE   CE   CE

 A1-5300-FT-109 A1-5300-JP-00024

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 126/293

L L

100

FIC

100

5000

FIC

5000

FIC

100

5000

20

17

19

LOOP NO.: A1-5300-FT-109

35 iRTN15

LOOP SER VI CE: F LOW T O R O H PP PA-006C

8

10

14

16

15

21

18

7

9

11

12

13

5300

FI

109

CE CE

5300

FAL

109

5300

FTA

109

5300

FI

109

5300

FAL

109

5300

FTA

109

To AMS System

127 OF

24V DC SUPPLY

- +

20 20

 A1-5300-JY-137 5300-JT-00018-PDN

TB2 5300-JT-00018-PDN

BL   A1-5300-JY-137-TB2-1+   +1-TB2-A1-5300-JY-137 A1-5300-JY-137-1657+

WT   A1-5300-JY-137-TB2-2-   - 2-TB2-A1 -5 30 0-JY-1 37 A1 -5 30 0-JY-1 37 -1 65 8- - 16 58 -A1-53 00 -J Y-13 7 A1-53 00 -J Y-13 7-23

SCL 20A- 20A+

 A1-5300-JY-137

24

23

+DC-1

OUT-11

 A1-5300-JP-00026

S

   A   1  -   5   3   0   0  -   J   Y  -   1   3

+   1657

-   2 1658

3

SHEET 293

PLC MODULE

5300

DCS (BY OTHERS)PROCESS CONTROL ROOM

1756-OB16DK

RACK-1, SLOT-8

137

5300

JY

137

JB

JY1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

INSTRUMENT

FIELD

TERMINALS

4

CE CECE   CE   CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 127/293

24V DC SUPPLY

+ -

6 6

 A1-5300-HZSH-137 5300-JT-00018-PDN

TB1 5300-JT-00018-PDN

BL   A1-5300-HZSH-137-TB1-1+   +1-TB1-A1-5300-HZSH-137 A1-5300-HZSH-137-965+

WT   A1-5300-HZSH-137-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 37 A1-53 00 -HZSH-13 7-96 6- - 96 6-A1 -5 30 0-HZ SH-1 37 A1-53 00 -HZSH-13 7-13

SCL

6A+ 6A-

24V DC SUPPLY

+ -

5300-JT-00018-PDN 6 6

TB1

 A1-5300-HZSL-137

5300-JT-00018-PDN

BL   A1-5300-HZSL-137-TB1-3+   +3-TB1-A1-5300-HZSL-137 A1-5300-HZSL-137-967+

WT   A1-5300-HZSL-137-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 37 A1-53 00 -HZSL-13 7-96 8- - 96 8-A1 -5 30 0-HZ SL -1 37 A1-53 00 -HZSL-13 7-15

SCL

6A+ 6A-

137

2

137

5300

XA

137

53005300

HIC

5300

XA

5300

HSAL

JY

137

137

5300

HSAL

137

 A1-5300-HZSH-137   A1-5300-JP-00025

966

 A1-5300-HZSL-137

C

C   1 965

 A1-5300-JP-00025

4

LOOP NO.: A1-5300-X-137

NO   15 IN-74 968  137

LOOP SER VI CE: VEN T R ELEASE VLV R O Z Z-001/ 2C

5

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-6

137

3 967

NO   2

   A   1  -   5   3

   0   0  -   H   Z   S   H  -   1   3   7

ZSH

13

3

5300

HSAH

16 GND-7

IN-6

GND-614

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   3   71756-IB161K

RACK-0, SLOT-6

CE CECE   CE

CE

CE CECE   CE

CE

128 OF

24V DC SUPPLY

- +

5300-JT-00018-PDN 20 20

TB2

 A1-5300-JY-138

5300-JT-00018-PDN

BL   A1-5300-JY-138-TB2-3+   +3-TB2-A1-5300-JY-138 A1-5300-JY-138-1659+

WT   A1-5300-JY-138-TB2-4-   - 4-TB2-A1 -5 30 0-JY-1 38 A1 -5 30 0-JY-1 38 -1 66 0- - 16 60 -A1-53 00 -J Y-13 8 A1-53 00 -J Y-13 8-25

SCL 20A- 20A+

3JY

138

5300

JY

138

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

5

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5300

1756-OB16DK

RACK-1, SLOT-8

S

   A   1  -   5   3   0   0  -   J   Y  -   1   3

+   1659

-   4 1660

 A1-5300-JY-138

26

25

+DC-1

OUT-12

 A1-5300-JP-00026

2

CE CECE   CE   CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 128/293

24V DC SUPPLY

+ -

5300-JT-00018-PDN 6 6

TB1

 A1-5300-HZSH-138

5300-JT-00018-PDN

BL   A1-5300-HZSH-138-TB1-5+   +5-TB1-A1-5300-HZSH-138 A1-5300-HZSH-138-969+

WT   A1-5300-HZSH-138-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-1 38 A1-53 00 -HZSH-13 8-97 0- - 97 0-A1 -5 30 0-HZ SH-1 38 A1-53 00 -HZSH-13 8-17

SCL

6A+ 6A-

24V DC SUPPLY

+ -

5300-JT-00018-PDN 6 6

TB1

 A1-5300-HZSL-138

5300-JT-00018-PDN

BL   A1-5300-HZSL-138-TB1-7+   +7-TB1-A1-5300-HZSL-138 A1-5300-HZSL-138-971+

WT   A1-5300-HZSL-138-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -1 38 A1-53 00 -HZSL-13 8-97 2- - 97 2-A1 -5 30 0-HZ SL -1 38 A1-53 00 -HZSL-13 8-19

SCL

6A+ 6A-

4

5300

HSAH

20 GND-9

IN-8

GND-818

17

   A   1  -   5   3

   0   0  -   H   Z   S   H  -   1   3   8

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   3   8

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-6

LOOP SER VI CE: PER MI AT E VLV R O Z Z-001/ 2C

9

1756-IB161K

RACK-0, SLOT-6

LOOP NO.: A1-5300-X-138

NO   19 IN-98 972  138

138

7 971

NO   6 970

 A1-5300-HZSL-138

C

C   5 969

 A1-5300-JP-00025

7

 A1-5300-HZSH-138   A1-5300-JP-00025

138

5300

HSAL

138

XA

5300

HSAL

JY

138

138

6

138

5300

XA

138

53005300

HIC

5300

CE CECE   CE

CE

CE CECE   CE

CE

129 OF

24V DC SUPPLY

- +

5300-JT-00018-PDN 20 20

TB2

 A1-5300-JY-139

5300-JT-00018-PDN

BL   A1-5300-JY-139-TB2-5+   +5-TB2-A1-5300-JY-139 A1-5300-JY-139-1661+

WT   A1-5300-JY-139-TB2-6-   - 6-TB2-A1 -5 30 0-JY-1 39 A1 -5 30 0-JY-1 39 -1 66 2- - 16 62 -A1-53 00 -J Y-13 9 A1-53 00 -J Y-13 9-27

SCL 20A- 20A+

139

   A   1  -   5   3   0   0  -   J   Y  -   1   3RACK-1, SLOT-8

OUT-13

 A1-5300-JP-00026

1662139

 A1-5300-JY-139

28

27

1756-OB16DK4

7

+   1661

-   6

SHEET 293

PLC MODULE

5300+DC-1

  5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

JY5

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

INSTRUMENT

FIELD

TERMINALSJB

S

CE CECE   CE   CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 129/293

24V DC SUPPLY

+ -

5300-JT-00018-PDN 6 6

TB1

 A1-5300-HZSH-139

5300-JT-00018-PDN

BL   A1-5300-HZSH-139-TB1-9+   +9-TB1-A1-5300-HZSH-139 A1-5300-HZSH-139-973+

WT   A1-5300-HZSH-139-TB1-10-   - 10 -T B1 -A1-53 00 -HZSH-13 9 A1-53 00 -HZSH-13 9-97 4- - 97 4-A1 -5 30 0-HZ SH-1 39 A1-53 00 -HZSH-13 9-21

SCL

6A+ 6A-

24V DC SUPPLY

+ -

5300-JT-00018-PDN 6 6

TB1

 A1-5300-HZSL-139

5300-JT-00018-PDN

BL   A1-5300-HZSL-139-TB1-11+   +11-TB1-A1-5300-HZSL-139 A1-5300-HZSL-139-975+

WT   A1-5300-HZSL-139-TB1-12-   - 12 -T B1 -A1-53 00 -HZSL-13 9 A1-53 00 -HZSL-13 9-97 6- - 97 6-A1 -5 30 0-HZ SL -1 39 A1-53 00 -HZSL-13 9-23

SCL

6A+ 6A-

5300

HSAL

1756-IB161K

RACK-0, SLOT-6

21

139

10

139

5300

XA

139

53005300

HSAL

139

5300

XA

JY

139

HIC

 A1-5300-JP-00025

973

8

 A1-5300-HZSH-139   A1-5300-JP-00025

C

C   9

11

LOOP NO.: A1-5300-X-139

NO   23 IN- 1112

 A1-5300-HZSL-139

976  139

LOOP SER VI CE: D UM P W AT ER VLV R O Z Z-001/ 2C

13

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-6

139

11 975

NO   10

   A   1  -   5   3

   0   0  -   H   Z   S   H  -   1   3   9

ZSH

974

5300

HSAH

2 4 G ND -1 1

IN-10

GND-1022

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   3   9

139

5300

CE CECE   CE

CE

CE CECE   CE

CE

130 OF

24V DC SUPPLY

- +

5300-JT-00018-PDN 21 21

TB2

 A1-5300-JY-142

5300-JT-00018-PDN

BL   A1-5300-JY-142-TB2-7+   +7-TB2-A1-5300-JY-142 A1-5300-JY-142-1663+

WT   A1-5300-JY-142-TB2-8-   - 8- TB 2- A1 -5 30 0- JY -1 42 A 1- 53 00 -J Y- 14 2- 16 64 - - 16 64 -A 1- 53 00 -J Y- 14 2 A 1- 53 00 -J Y- 14 2- 1

SCL 21A- 21A+

24V DC SUPPLY

 A1-5300-JY-142

2

1

+DC-0

OUT-0

 A1-5300-JP-00026

6

S

   A   1  -   5   3   0   0  -   J   Y  -   1   4RACK-1, SLOT-9

7+   1663

142-   8 1664

SHEET

TERMINALSJB

293

PLC MODULE

5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

142

5300

JY

1756-OB16DK

INSTRUMENT

FIELD

9

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

CE CECE   CE   CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 130/293

24V DC SUPPLY

+ -

5300-JT-00018-PDN 7 7

TB1

 A1-5300-HZSH-142

5300-JT-00018-PDN

BL   A1-5300-HZSH-142-TB1-13+   +13-TB1-A1-5300-HZSH-142 A1-5300-HZSH-142-977+

WT   A1-5300-HZSH-142-TB1-14-   - 14 -T B1 -A1-53 00 -HZSH-14 2 A1-53 00 -HZSH-14 2-97 8- - 97 8-A1 -5 30 0-HZ SH-1 42 A1-53 00 -HZSH-14 2-1

SCL

7A+ 7A-

24V DC SUPPLY

+ -

5300-JT-00018-PDN 7 7

TB1

 A1-5300-HZSL-142

5300-JT-00018-PDN

BL   A1-5300-HZSL-142-TB1-15+   +15-TB1-A1-5300-HZSL-142 A1-5300-HZSL-142-979+

WT   A1-5300-HZSL-142-TB1-16-   - 16 -T B1 -A1-53 00 -HZSL-14 2 A1-53 00 -HZSL-14 2-98 0- - 98 0-A1 -5 30 0-HZ SL -1 42 A1-53 00 -HZSL-14 2-3

SCL

7A+ 7A-

5300

XA

142

14

142

5300

XA

142

5300

JY

142

5300

HIC

142

142

5300

HSAL

142

 A1-5300-HZSH-142   A1-5300-JP-00025

NO

12

14 978

C   13

15 979

977

1

15

 A1-5300-JP-00025 A1-5300-HZSL-142

C

NO   3 IN-116 980

1756-IB161K

RACK-0, SLOT-7

LOOP NO.: A1-5300-X-142 LOOP SER VI CE: R EJ AC T BYPASS VLV R O Z Z-001/ 2C

17

   A   1  -   5   3

   0   0  -   H   Z   S   H  -   1   4   2

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   4   2

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-7

5300

HSAH

4 G ND- 1

IN-0

GND-02

142

5300

HSAL

CE CECE   CE

CE

CE CECE   CE

CE

131 OF

FI-9 5300-JT-00019-PAN 1756-IF16K

TB1 5300-JT-00019-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-13

 A1-5300-PT-226-TB1-1+  + 1- TB 1- A1 -5 30 0- PT -2 26 A 1- 53 00 -P T- 22 6- 56 7+ + 56 7- A1 -5 30 0- PT -2 26 A 1- 53 00 -P T- 22 6- 03 A+

+5-A1-5300-PT-226 A1-5300-PT-226-12+

 A1-5300-PT-226-TB1-2-   - 2- TB 1- A1 -5 30 0- PT -2 26 A 1- 53 00 -P T- 22 6- 56 8- - 56 8- A1 -5 30 0- PT -2 26 A 1- 53 00 -P T- 22 6- 03 B-

-6-A1-5300-PT-226 A1-5300-PT-226-14-

SCL

H H

5000

FIC

5

3

1

KE01-A1-500-MT-I-HL-0001-000

293

PLC MODULETERMINALS

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

WATER TREATMENT PLANT

DOC. NO.

REV. NO.

IN5

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

PACKAGE

6

+

-03C

CLIENT

INSTRUMENT

FIELD

567

 A1-5300-PT-226

+-

11

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

568

iRTN4

14

   A   1  -   5   3   0   0  -   P   T  -   2   2   6

03A 12

2

SHEET

JB

13 iRTN5

03B

4

5300

PI

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-226 A1-5300-JP-00027

5300

PI

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 131/293

L L

5000

FIC

100

100

5000

FIC

100

FIC

100

5000

FIC

LOOP NO.: A1-5300-PT-226 BLOWER KB080A/B DISCH.PRESS.TXLOOP SERVICE:

PI

226

5300

PAH

226

5300

PAL

226

5300

PTA

226

PI

226

5300

PAH

226

5300

PAL

226

5300

PTA

226

To AMS System

132 OF

FI-5 5300-JT-00020-PAN 1756-IF16K

TB1 5300-JT-00020-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-6

 A1-5300-LT-101-TB1-1+   + 1- TB 1- A1 -5 30 0- LT -1 01 A 1- 53 00 -L T- 10 1- 36 6+ + 36 6- A1 -5 30 0- LT -1 01 A 1- 53 00 -L T- 10 1- 16 A+

+31-A1-5300-LT-101 A1-5300-LT-101-34+

 A1-5300-LT-101-TB1-2-   - 2- TB 1- A1 -5 30 0- LT -1 01 A 1- 53 00 -L T- 10 1- 36 7- - 36 7- A1 -5 30 0- LT -1 01 A 1- 53 00 -L T- 10 1- 16 B-

-32-A1-5300-LT-101 A1-5300-LT-101-36-

SCL

H H

SHEET 293

   A   1  -   5   3   0   0  -   L   T  -   1   0   1

PACKAGE WATER TREATMENT PLANT

32

+

-16C

31

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

FIELD

366

 A1-5300-LT-101

JB TERMINALS

1

INSTRUMENT

367

36 IN15

+-   2

3

35

5000

FIC

iRTN14

iRTN15

334

DCS (BY OTHERS)PROCESS CONTROL ROOM

3416A

16B

IN14

PLC MODULE

5300

LI

CE CE

CE

CE   CE   CE

CE

 A1-5300-LT-101 A1-5300-JP-00028

5300

LI

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 132/293

L L

FIC

100

100

5000

FIC

100

DEGASSED WTR STO. TNK TA-084 LVLLOOP NO.: A1-5300-LT-101 LOOP SERVICE:

100

5000

FIC

5000

101

5300

LAH

101

5300

LAL

101

5300

LTA

101

101

5300

LAH

101

5300

LAL

101

5300

LTA

101

To AMS System

133 OF

FI-4 5300-JT-00021-PAN 1756-IF16K

TB1 5300-JT-00021-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-3

 A1-5300-FT-117-TB1-1+   + 1- TB 1- A1 -5 30 0- FT -1 17 A 1- 53 00 -F T- 11 7- 37 0+ + 37 0- A1 -5 30 0- FT -1 17 A 1- 53 00 -F T- 11 7- 08 A+

+15-A1-5300-FT-117 A1-5300-FT-117-34+

 A1-5300-FT-117-TB1-2-   - 2- TB 1- A1 -5 30 0- FT -1 17 A 1- 53 00 -F T- 11 7- 37 1- - 37 1- A1 -5 30 0- FT -1 17 A 1- 53 00 -F T- 11 7- 08 B-

-16-A1-5300-FT-117 A1-5300-FT-117-36-

SCL

H H

PACKAGE WATER TREATMENT PLANT

16

+

-08C

15 3408A

08B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

370

 A1-5300-FT-117

JB PLC MODULE

+-

33

2 371

4

3

35

293

IN14

DCS (BY OTHERS)PROCESS CONTROL ROOM

   A   1  -   5   3   0   0  -   F   T  -   1   1   7

iRTN14

36

TERMINALS

IN15

SHEET

1

iRTN15

5000

FIC

100

5300

FI

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-117 A1-5300-JP-00029

5300

FI

117

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 133/293

100

FIC

100

5000

FIC

LOOP NO.: A1-5300-FT-117 FLOW TO DEMIN WTR TNK TA-003LOOP SERVICE:

100

5000

117

5300

FAH

117

5300

FTA

117

117

5300

FAL

117

5300

FTA

117

To AMS System

OF

  5300-JT-00023-PDN

TB1 5300-JT-00023-PDN A1-5300-LS-202-TB1-1+   +1 -TB 1- A1 -5 30 0- LS -2 02 A 1- 530 0- LS- 20 2- 98 5+ +9 85 -A1 -5 30 0- LS- 20 2 A1 -5 30 0- LS -2 02 -0 07 +

NC

 A1-5300-LS-202-TB1-2-   - 2- TB 1- A1 -5 30 0- LS -2 02 A1 -5 30 0- LS- 20 2- 98 6- - 98 6- A1 -5 30 0- LS -2 02 A1 -5 30 0- LS -2 02 -0 08 -

SCL

KE01-A1-500-MT-I-HL-0001-000

P01

134

DOC. NO.

293

ESD (BY OTHERS)

Hard wired to

ESD by others

1

2

3

985  007

LALL

 A1-5300-LS-202

PROJECT K ASHA GA N DEVELOPMENT EXPERIMENTAL PROGRA M

PROCESS CONTROL ROOM

SHEETPACKAGE WATER TREATMENT PLANT

DI-ESD-001

REV. NO.

986

4

5300

202

008

 AGIP KAZA KHSTAN NORTH CASPIA N OPERATING COMPANY

TERMINALSTERMINALSJBINSTRUMENT

CLIENT

FIELD

CE CECE   CE

 A1-5300-LS-202 A1-5300-JP-00030

CE

5300

LALL

202

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 134/293

LOOP NO.: A1-5300-LS-202 LOOP SERVICE: DEGASSED WTR STO. TNK TA-084 LS

202 202

ESD

System

135 OF

24V DC SUPPLY

- +

21 21

 A1-5300-JY-143 5300-JT-00044-PDN

TB2 5300-JT-00044-PDN

BL   A1-5300-JY-143-TB2-1+   +1-TB2-A1-5300-JY-143 A1-5300-JY-143-1793+

WT   A1-5300-JY-143-TB2-2-   - 2- TB 2- A1 -5 30 0- JY -1 43 A 1- 53 00 -J Y- 14 3- 17 94 - - 17 94 -A 1- 53 00 -J Y- 14 3 A 1- 53 00 -J Y- 14 3- 3

SCL 21A- 21A+

24V DC SUPPLY

+ -

7 7

PACKAGE WATER TREATMENT PLANT

TERMINALS

+

JB

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

3

143

5300

JY

143

JY

SHEET 293

PLC MODULE

5300

DCS (BY OTHERS)PROCESS CONTROL ROOM

1793

1756-OB16DK

RACK-1, SLOT-9

4

-   2 1794

S

   A   1  -   5   3   0   0  -   J   Y  -   1   4

1

 A1-5300-JY-143

4

3

+DC-0

OUT-1

 A1-5300-JP-00031

CE CECE   CE   CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 135/293

7 7

 A1-5300-HZSH-143 5300-JT-00044-PDN

TB1 5300-JT-00044-PDN

BL   A1-5300-HZSH-143-TB1-1+   +1-TB1-A1-5300-HZSH-143 A1-5300-HZSH-143-1213+

WT   A1-5300-HZSH-143-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 43 A1-53 00 -HZSH-14 3-12 14 - - 12 14 -A1-53 00 -HZSH-14 3 A1-53 00 -HZSH-14 3-5

SCL

7A+ 7A-

24V DC SUPPLY

+ -

5300-JT-00044-PDN 7 7

TB1

 A1-5300-HZSL-143

5300-JT-00044-PDN

BL   A1-5300-HZSL-143-TB1-3+   +3-TB1-A1-5300-HZSL-143 A1-5300-HZSL-143-1215+

WT   A1-5300-HZSL-143-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 43 A1-53 00 -HZSL-14 3-12 16 - - 12 16 -A1-53 00 -HZSL-14 3 A1-53 00 -HZSL-14 3-7

SCL

7A+ 7A-

5300

HSAH

8 G ND- 3

IN-2

GND-26

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   4   3

143

5300

   A   1  -   5

   3   0   0  -   H   Z   S   H  -   1   4   3

ZSHC

NO 2

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-7

 A1-5300-HZSL-143

C

NO

1756-IB161K

RACK-0, SLOT-7

LOOP NO.: A1-5300-X-143 LOOP SERVICE: FLOW RECY.VLV.DGAS TNK FOR PA-008

5

7 IN-34 1216

JY

143

5300

HIC

 A1-5300-JP-00032

3 1215

3

4

1 1213

51214

 A1-5300-HZSH-143   A1-5300-JP-00032

143

143

5300

HSAL

143

5300

XA

143

2

143

5300

XA

143

5300

HSAL

CE CECE   CE

CE

CE CECE   CE

CE

136 OF

FI-4 5300-JT-00028-PAN 1756-IF16K

TB1 5300-JT-00028-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-4

 A1-5300-FT-118-TB1-1+   + 1- TB 1- A1 -5 30 0- FT -1 18 A 1- 53 00 -F T- 11 8- 37 4+ + 37 4- A1 -5 30 0- FT -1 18 A 1- 53 00 -F T- 11 8- 09 A+

+17-A1-5300-FT-118 A1-5300-FT-118-2+

 A1-5300-FT-118-TB1-2-   - 2- TB 1- A1 -5 30 0- FT -1 18 A 1- 53 00 -F T- 11 8- 37 5- - 37 5- A1 -5 30 0- FT -1 18 A 1- 53 00 -F T- 11 8- 09 B-

-18-A1-5300-FT-118 A1-5300-FT-118-4-

SCL

H H

5000

FIC

100

JB

   A   1  -   5   3   0   0  -   F   T  -   1   1   8

1+-

PLC MODULETERMINALS

IN1

1

2 375

4

3

3

iRTN0

iRTN1

4

INSTRUMENT

FIELD

374

 A1-5300-FT-118

5

6

7

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

IN0

DCS (BY OTHERS)PROCESS CONTROL ROOM

PACKAGE WATER TREATMENT PLANT

18

+

-09C

17 209A

09B

8

5300

FI

118

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-118 A1-5300-JP-00033

5300

FI

118

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 136/293

100

FIC

100

5000

FIC

5000

LOOP NO.: A1-5300-FT-118 FLOW TO SOFTENERS GL-001A/B/CLOOP SERVICE:

9

10

5300

FAH

118

5300

FTA

118

5300

FAL

118

5300

FTA

118

To AMS System

137 OF

 5300-JT-00028-PAN

TB1

FI-41756-IF16K

5300-JT-00028-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-4

 A1-5300-FT-120-TB1-3+   + 3- TB 1- A1 -5 30 0- FT -1 20 A 1- 53 00 -F T- 12 0- 43 8+ + 43 8- A1 -5 30 0- FT -1 20 A 1- 53 00 -F T- 12 0- 11 A+

+21-A1-5300-FT-120 A1-5300-FT-120-12+

 A1-5300-FT-120-TB1-4-   - 4- TB 1- A1 -5 30 0- FT -1 20 A 1- 53 00 -F T- 12 0- 43 9- - 43 9- A1 -5 30 0- FT -1 20 A 1- 53 00 -F T- 12 0- 11 B-

-22-A1-5300-FT-120 A1-5300-FT-120-14-

SCL

H H

PACKAGE WATER TREATMENT PLANT

22

+

-11C

21 1211A

11B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

1

2

3

5

9

7

438

8

   A   1  -   5   3   0   0  -   F   T  -   1   2   0

INSTRUMENT

4

11

13

iRTN4

iRTN5

SHEET 293

+

-   439

14 IN5

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

6

JB PLC MODULETERMINALS

FIELD

 A1-5300-FT-120

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-120 A1-5300-JP-00033

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 137/293

100

FIC

100

5000

FIC

5000

FIC

100

5000

LOOP NO.: A1-5300-FT-120

9

DEMIN PMP PA003A/B DISCH.FLOW

10

LOOP SERVICE:

5300

FI

120

5300

FAH

120

5300

FTA

120

5300

FI

120

5300

FAL

120

5300

FTA

120

To AMS System

138 OF

24V DC SUPPLY

- +

21 21

 A1-5300-JY-144 5300-JT-00029-PDN

TB2 5300-JT-00029-PDN

BL   A1-5300-JY-144-TB2-1+   +1-TB2-A1-5300-JY-144 A1-5300-JY-144-1795+

WT   A1-5300-JY-144-TB2-2-   - 2- TB 2- A1 -5 30 0- JY -1 44 A 1- 53 00 -J Y- 14 4- 17 96 - - 17 96 -A 1- 53 00 -J Y- 14 4 A 1- 53 00 -J Y- 14 4- 5

SCL 21A- 21A+

24V DC SUPPLY

+ -

7 7

PACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

3

JB

SHEET

TERMINALS

4

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

144

5300

JY

1756-OB16DK

144S

   A   1  -   5   3   0   0  -   J   Y  -   1   4RACK-1, SLOT-9

+   17951

-   2

 A1-5300-JY-144

6

5

+DC-0

OUT-2

 A1-5300-JP-00034

1796

CE CECE   CE   CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 138/293

 A1-5300-HZSH-144 5300-JT-00029-PDN

TB1 5300-JT-00029-PDN

BL   A1-5300-HZSH-144-TB1-1+   +1-TB1-A1-5300-HZSH-144 A1-5300-HZSH-144-1217+

WT   A1-5300-HZSH-144-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 44 A1-53 00 -HZSH-14 4-12 18 - - 12 18 -A1-53 00 -HZSH-14 4 A1-53 00 -HZSH-14 4-9

SCL

7A+ 7A-

24V DC SUPPLY

+ -

5300-JT-00029-PDN 7 7

TB1

 A1-5300-HZSL-144

5300-JT-00029-PDN

BL   A1-5300-HZSL-144-TB1-3+   +3-TB1-A1-5300-HZSL-144 A1-5300-HZSL-144-1219+

WT   A1-5300-HZSL-144-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 44 A1-53 00 -HZSL-14 4-12 20 - - 12 20 -A1-53 00 -HZSL-14 4 A1-53 00 -HZSL-14 4-11

SCL

7A+ 7A-

5300

HSAH

1 2 G ND -5

IN-4

GND-410

144

5300

144

   A   1  -   5

   3   0   0  -   H   Z   S   H  -   1   4   4

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   4   4

ZSH

ZSL

5300

HSAH

1756-IB161K1

LOOP SERVICE: FLOW RECY.VLV.DGAS TNK FOR PA-009

5

1756-IB161K

RACK-0, SLOT-7

LOOP NO.: A1-5300-X-144

NO   11 IN- 54 1220

144

5300

 A1-5300-HZSL-144

RACK-0, SLOT-7

4

9

3

C   1217

 A1-5300-JP-00035

3 1219

NO   2 1218

C

 A1-5300-HZSH-144   A1-5300-JP-00035

HIC

5300

144

5300

HSAL

144

HSAL

XA

144

2

144

5300

XA

144

5300

JY

CE CECE   CE

CE

CE CECE   CE

CE

139 OF

24V DC SUPPLY

5300-JT-00029-PDN - +

TB2 21 21

 A1-5300-JY-145

5300-JT-00029-PDN

BL   A1-5300-JY-145-TB2-3+   +3-TB2-A1-5300-JY-145 A1-5300-JY-145-1667+

WT   A1-5300-JY-145-TB2-4-   - 4- TB 2- A1 -5 30 0- JY -1 45 A 1- 53 00 -J Y- 14 5- 16 68 - - 16 68 -A 1- 53 00 -J Y- 14 5 A 1- 53 00 -J Y- 14 5- 7

SCL 21A- 21A+

24V DC SUPPLY

+ -

5300-JT-00029-PDN 7 7

TB1

 A1-5300-JY-145

8

7

+DC-0

OUT-3

 A1-5300-JP-000341

S

   A   1  -   5   3   0   0  -   J   Y  -   1   4RACK-1, SLOT-9

2

+   16673

145-   1668

SHEET 293

PLC MODULE

5300

JY

145

5300

JY

1756-OB16DK

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

4

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE WATER TREATMENT PLANT

CE CECE   CE   CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 139/293

 A1-5300-HZSH-145

5300-JT-00029-PDN

BL   A1-5300-HZSH-145-TB1-5+   +5-TB1-A1-5300-HZSH-145 A1-5300-HZSH-145-993+

WT   A1-5300-HZSH-145-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-1 45 A1-53 00 -HZSH-14 5-99 4- - 99 4-A1 -5 30 0-HZ SH-1 45 A1-53 00 -HZSH-14 5-13

SCL

7A+ 7A-

24V DC SUPPLY

+ -

7 7

5300-JT-00029-PDN

 A1-5300-HZSL-145 TB1

5300-JT-00029-PDN

BL   A1-5300-HZSL-145-TB1-7+   +7-TB1-A1-5300-HZSL-145 A1-5300-HZSL-145-995+

WT   A1-5300-HZSL-145-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -1 45 A1-53 00 -HZSL-14 5-99 6- - 99 6-A1 -5 30 0-HZ SL -1 45 A1-53 00 -HZSL-14 5-15

SCL

7A+ 7A-

5300

XA

145

4

7

145

5300

XA

145

5300

JY

145

5300

HIC

145

145

5300

HSAL

145

 A1-5300-HZSH-145   A1-5300-JP-00035

NO 6 994

C   5 993

13

7

 A1-5300-JP-00035

8

995

 A1-5300-HZSL-145

C

NO   15 IN-7

9

996

1756-IB161K

RACK-0, SLOT-7

LOOP NO.: A1-5300-X-145 LOOP SERVICE: FLOW RECYCLE VLV TOD.TNK TA-003

10

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   4   5

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   4   5

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-7

5300

HSAH

16 GND-7

IN-6

GND-614

145

5300

HSAL

CE CECE   CE

CE

CE CECE   CE

CE

140 OF

 5300-JT-00024-PAN

TB1

FI-61756-IF16K

5300-JT-00024-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-7

 A1-5300-LT-102-TB1-3+   + 3- TB 1- A1 -5 30 0- LT -1 02 A 1- 53 00 -L T- 10 2- 38 8+ + 38 8- A1 -5 30 0- LT -1 02 A 1- 53 00 -L T- 10 2- 01 A+

+1-A1-5300-LT-102 A1-5300-LT-102-2+

 A1-5300-LT-102-TB1-4-   - 4- TB 1- A1 -5 30 0- LT -1 02 A 1- 53 00 -L T- 10 2- 38 9- - 38 9- A1 -5 30 0- LT -1 02 A 1- 53 00 -L T- 10 2- 01 B-

-2-A1-5300-LT-102 A1-5300-LT-102-4-

SCL

H H

5000

PLC MODULETERMINALS

IN1

01B389

3

iRTN0

iRTN1

4

   A   1  -   5   3   0   0  -   L   T  -   1   0   2

1

01A

INSTRUMENT

FIELD

388

 A1-5300-LT-102

7

8

JB

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

IN0

DCS (BY OTHERS)PROCESS CONTROL ROOM

PACKAGE WATER TREATMENT PLANT

2

+

-01C

1 2+

-

6

1

2

4

5

3

9 5300

CE CE

CE

CE   CE   CE

CE

 A1-5300-LT-102 A1-5300-JP-00036

5300

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 140/293

L L

100

5000

FIC

100

FIC

100

5000

FIC

FIC

100

5000

LOOP NO.: A1-5300-LT-102 CLEANING TNK TA-005 LVLLOOP SERVICE:

10LI

102

5300

LAH

102

5300

LAL

102

5300

LTA

102

LI

102

5300

LAH

102

5300

LAL

102

5300

LTA

102

To AMS System

141 OF

FI-4 5300-JT-00024-PAN 1756-IF16K

TB1 5300-JT-00024-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-4

 A1-5300-FT-119-TB1-1+   + 1- TB 1- A1 -5 30 0- FT -1 19 A 1- 53 00 -F T- 11 9- 39 0+ + 39 0- A1 -5 30 0- FT -1 19 A 1- 53 00 -F T- 11 9- 09 A+

+19-A1-5300-FT-119 A1-5300-FT-119-6+ A1-5300-FT-119-TB1-2-   - 2- TB 1- A1 -5 30 0- FT -1 19 A 1- 53 00 -F T- 11 9- 39 1- - 39 1- A1 -5 30 0- FT -1 19 A 1- 53 00 -F T- 11 9- 09 B-

-20-A1-5300-FT-119 A1-5300-FT-119-8-

SCL

H H

L L

100

PACKAGE WATER TREATMENT PLANT

20

+

-10C

19 610A

10B

SHEET 293

IN2

DCS (BY OTHERS)PROCESS CONTROL ROOM

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

FIELD

390

 A1-5300-FT-119

5

6

7

8

9

iRTN3

8

7

5000

FIC

+-

PLC MODULETERMINALS

IN3

2 391

3

INSTRUMENT JB

   A   1  -   5   3   0   0  -   F   T  -   1   1   9

1

54

iRTN2

5300

FI

119

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-119 A1-5300-JP-00036

5300

FI

119

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 141/293

FIC

100

5000

FIC

100

5000

5000

FIC

100

FLOW CLEANING CF ZL-003

10

LOOP NO.: A1-5300-FT-119 LOOP SERVICE:

5300

FAH

119

5300FAL

119

5300

FTA

119

5300

FAH

119

5300

FAL

119

5300

FTA

119

To AMS System

142 OF

 5300-JT-00024-PAN

TB1

FI-91756-IF16K

5300-JT-00024-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-13

 A1-5300-TT-101-TB1-7+   + 7- TB 1- A1 -5 30 0- TT -1 01 A 1- 53 00 -T T- 10 1- 39 2+ + 39 2- A1 -5 30 0- TT -1 01 A 1- 53 00 -T T- 10 1- 08 A+

+15-A1-5300-TT-101 A1-5300-TT-101-34+

 A1-5300-TT-101-TB1-8-   - 8- TB 1- A1 -5 30 0- TT -1 01 A 1- 53 00 -T T- 10 1- 39 3- - 39 3- A1 -5 30 0- TT -1 01 A 1- 53 00 -T T- 10 1- 08 B-

-16-A1-5300-TT-101 A1-5300-TT-101-36-

SCL

PACKAGE WATER TREATMENT PLANT

3408A

08B

16

+

-08C

15

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

+

-

INSTRUMENT

FIELD

 A1-5300-TT-101

JB

5

6

7

8

293

IN14

DCS (BY OTHERS)PROCESS CONTROL ROOM

-   5   3   0   0  -   T   T  -   1   0   1

TERMINALS

392

PLC MODULE

2

4

3

9

10

393

1

IN15

SHEET

36

CE

 A1-5300-TT-101 A1-5300-JP-00036

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 142/293

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

LOOP NO.: A1-5300-TT-101 RO CLEANING WTR TEMP.CF OUTLETLOOP SERVICE:

   A   1  -

iRTN1433

35

10

iRTN15

5300

TI

101

CE CE

CE

CE   CE   CE

CE

5300

TAH

101

5300

TAL

101

5300

TTA

101

5300

TI

101

5300

TAH

101

5300

TAL

101

5300

TTA

101

To AMS System

143 OF

 5300-JT-00024-PAN

TB1

FI-61756-IF16K

5300-JT-00024-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-10

 A1-5300-PDT-227-TB1-5+   +5-TB1-A1 -5 30 0-PDT-22 7 A1-53 00 -PDT -2 27 -3 94 + +39 4-A1 -5 30 0-PDT-22 7 A1-53 00 -PDT -2 27 -1 3A+

+25-A1-5300-PDT-227 A1-5300-PDT-227-20+

 A1-5300-PDT-227-TB1-6-   - 6-TB1-A1 -5 30 0-PDT-22 7 A1 -5 30 0-PDT-22 7-39 5- - 39 5-A1 -5 30 0-PDT-22 7 A1-53 00 -PDT -2 27 -1 3B-

-26-A1-5300-PDT-227 A1-5300-PDT-227-22-

SCL

PACKAGE WATER TREATMENT PLANT

26

+

-13C

25 2013A

13B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

394

 A1-5300-PDT-227

7

8

9

395

21

iRTN8

iRTN9

22

JB

   A   1  -   5   3   0   0  -   P   D   T  -   2   2   7

3

+

-

PLC MODULETERMINALS

IN9

4

SHEET 293

19

IN8

DCS (BY OTHERS)PROCESS CONTROL ROOM

10

1

2

5

6

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-227 A1-5300-JP-00036

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 143/293

H H

FIC

100

5000

FIC

100

5000

LOOP NO.: A1-5300-PDT-227 DIFF. PRESS.CLEAN. SYS CF ZL-003

5000

FIC

100

LOOP SERVICE:

10

5300

PDI

227

5300

PDAH

227

5300

PDTA

227

5300

PDI

227

5300

PDAH

227

5300

PDTA

227

To AMS System

OF

  5300-JT-00025-PDN

TB1 5300-JT-00025-PDN A1-5300-LS-203-TB1-1+   +1 -TB 1- A1 -5 30 0- LS -2 03 A 1- 530 0- LS- 20 3- 98 9+ +9 89 -A1 -5 30 0- LS- 20 3 A1 -5 30 0- LS -2 03 -0 09 +

NC

 A1-5300-LS-203-TB1-2-   - 2- TB 1- A1 -5 30 0- LS -2 03 A1 -5 30 0- LS- 20 3- 99 0- - 99 0- A1 -5 30 0- LS -2 03 A1 -5 30 0- LS -2 03 -0 10 -

SCL

144

ESD (BY OTHERS)

 AGIP KAZA KHSTAN NORTH CASPIA N OPERATING COMPANYCLIENT

FIELD

293

PROCESS CONTROL ROOM

SHEETPACKAGE WATER TREATMENT PLANT

KE01-A1-500-MT-I-HL-0001-000

P01

 A1-5300-LS-203

PROJECT K ASHA GA N DEVELOPMENT EXPERIMENTAL PROGRA M

JB

DI-ESD-001

INSTRUMENT TERMINALSTERMINALS

990

4

010

3

Hard wired to

ESD by others

1

2

989  009

203

DOC. NO.

REV. NO.

5300

LALL

CE CECE   CE

 A1-5300-LS-203 A1-5300-JP-00037

CE

5300

LALL

203

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 144/293

LOOP NO.: A1-5300-LS-203 LOOP SERVICE: CLEANING TNK TA-005 LS

ESD

System

OF

5000-JT-00006-PAN

TB1

FI-155000-JT-00006-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5300-LT-103-TB1-3+   +3-TB1-A1 -5 30 0-LT -1 03 A1 -53 00 -L T-10 3-08 9+ +08 9-A1 -5 30 0-LT -1 03 A1-53 00 -L T-10 3-04 A+

+7-A1-5300-LT-103 A1-5300-LT-103-039+

 A1-5300-LT-103-TB1-4-   - 4- TB 1- A1 -5 30 0- LT -1 03 A 1- 53 00 -L T- 10 3- 09 0- - 09 0- A1 -5 30 0- LT -1 03 A 1- 53 00 -L T- 10 3- 04 B-

-8-A1-5300-LT-103 A1-5300-LT-103-040-

SCL

145 293

PROCESS CONTROL ROOM

+

-04C

7

090

089

 A1-5300-LT-103

04A+

8

KE01-A1-500-MT-I-HL-0001-000

P01

10

FIELD

JB

-

7

9

6

MULTIPLEXOR

04B

1

2

3

4

8

INSTRUMENT

5

TERMINALS

To AMS

System

TERMINALS

039

 AI-ESD-001

Hard wired to

ESD by others

040

ESD (BY OTHERS)

DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT SHEET

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

CE CE

CE

CE   CE   CE

CE

 A1-5300-LT-103 A1-5300-JP-00009

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 145/293

LL LL

FIC

100

FIC

100

5000

FIC

100

5000

5000

LOOP NO.: A1-5300-LT-103

18

17

16

15

LOOP SERVICE: SODIUM HYPO.DOS. TNK TA-006 LVL

14

13

12

11

21

20

19

5300

LI

103

5300

LALL

103

5300

LTA

103

ESD

System

5300

LI

103

5300

LALL

103

5300

LTA

103

OF

5000-JT-00006-PAN

TB1

1

2

3

4

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

FIELD

JB

6

8

7

9

10

DCS (BY OTHERS)MULTIPLEXOR TERMINALS

PROCESS CONTROL ROOM

DOC. NO.CLIENT

SHEET 293PACKAGE WATER TREATMENT PLANT

PROJECT

KE01-A1-500-MT-I-HL-0001-000

P01

146

REV. NO.

5

INSTRUMENT TERMINALS

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 146/293

FI-14

5000-JT-00006-PAN -6 +5 -4 +3 -2 +1 X:20 A1-5300-PT-223-TB1-15+   +15 -T B1 -A1-53 00 -PT-22 3 A1-53 00 -PT-22 3-04 7+ +04 7-A1 -5 30 0-PT -2 23 A1-53 00 -PT-22 3-07 A+

+13-A1-5300-PT-223 A1-5300-PT-223-013+

 A1-5300-PT-223-TB1-16-   - 16 -T B1 -A1-53 00 -PT-22 3 A1-53 00 -PT-22 3-04 8- - 04 8-A1 -5 30 0-PT -2 23 A1-53 00 -PT-22 3-07 B-

-14-A1-5300-PT-223 A1-5300-PT-223-014-

SCL

HH HH

FIC

100

5000

FIC

100

5000

To AMS

System

FIC

100

5000

 AI-ESD-001

11

13

12

13

14

Hard wired to

ESD by others

013048

LOOP NO.: A1-5300-PT-223

18

17

16

LOOP SERVICE:

14 -

SOD.HYPO.DOS.PMP 530-PD002A PT

047

19

20

07C

07B

07A

21

014

+   15

-+

 A1-5300-PT-223

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-223 A1-5000-JP-00009

5300

PI

223

5300

PAHH

223

5300

PTA

223

ESD

System

5300

PI

223

5300

PAHH

223

5300

PTA

223

OF

5000-JT-00006-PAN

TB1

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

FIELD

TERMINALSINSTRUMENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

TERMINALS

PROCESS CONTROL ROOM

DOC. NO.

REV. NO.

10

5

6

8

7

SHEETWATER TREATMENT PLANT

ESD (BY OTHERS)

KE01-A1-500-MT-I-HL-0001-000

P01

147 293PACKAGE

CLIENT

PROJECT

2

3

4

JB MULTIPLEXOR

9

11

1

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 147/293

FI-14

5000-JT-00006-PAN -6 +5 -4 +3 -2 +1 X:20 A1-5300-PT-224-TB1-17+   +17 -T B1 -A1-53 00 -PT-22 4 A1-53 00 -PT-22 4-04 9+ +04 9-A1 -5 30 0-PT -2 24 A1-53 00 -PT-22 4-08 A+

+15-A1-5300-PT-224 A1-5300-PT-224-015+

 A1-5300-PT-224-TB1-18-   - 18 -T B1 -A1-53 00 -PT-22 4 A1 -53 00 -PT-22 4-05 0- - 05 0-A1 -5 30 0-PT -2 24 A1-53 00 -PT-22 4-08 B-

-16-A1-5300-PT-224 A1-5300-PT-224-016-

SCL

HH HH

100

5000

FIC

100

FIC

100

5000

FIC

15

Hard wired to

ESD by others-08B

08A15

 AI-ESD-001

015

016

 A1-5300-PT-224

14

16

13

12

050

16

+

5000

To AMS

System

21

SOD.HYPO.DOS.PMP 530-PD002B PT

049

08C19

17

-

LOOP NO.: A1-5300-PT-224

20

18

LOOP SERVICE:

+

11

CE   CE

CE

CE   CE   CE

CE

 A1-5300-PT-224 A1-5000-JP-00009

5300

PI

224

5300

PAHH

224

5300

PTA

224

ESD

System

5300

PI

224

5300

PAHH

224

5300

PTA

224

148 OF

5000-JT-00006-PAN

TB1

5000-JT-00006-PAN

 A1-5300-UY-200-TB1-19+   + 19 -T B1 -A 1- 53 00 -U Y- 20 0 A 1- 53 00 -U Y- 20 0- 05 1+ + 05 1- A1 -5 30 0- UY -2 00  A1-5300-PY-212-7

 A1-5300-UY-200-TB1-20-   - 20 -T B1 -A 1- 53 00 -U Y- 20 0 A 1- 53 00 -U Y- 20 0- 05 2- - 05 2- A1 -5 30 0- UY -2 00  A1-5300-PY-212-11

SCL

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZAKHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

21

19

05220

1756-OF6CIK

RACK-3, SLOT-11

 A1-5300-UY-200

I/P

18

+

TERMINALS

051

JBINSTRUMENT

3 ALT0

SHEET 293WATER TREATMENT PLANT

FIELD

PACKAGE

-

PLC MODULE

DOC. NO.

REV. NO.

ESD (BY OTHERS)PROCESS CONTROL ROOM

1 OUT0

   A   1  -   5   3   0   0  -   U   Y  -   2   0   0

5 RTN0

CE CECE

  CE

 A1-5300-UY-200 A1-5300-JP-00009

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 148/293

 

LOOP N O. : A1- 530 0- UY- 200 L OOP SERVI CE: SOD .H YPO. DOS. PMP 53 0- PD00 2A C ON

149 OF

5000-JT-00006-PAN

TB1

5000-JT-00006-PAN

 A1-5300-UY-201-TB1-19+   + 19 -T B1 -A 1- 53 00 -U Y- 20 1 A 1- 53 00 -U Y- 20 1- 05 5+ + 05 5- A1 -5 30 0- UY -2 01  A1-5300-UY-201-2

 A1-5300-UY-201-TB1-20-   - 20 -T B1 -A 1- 53 00 -U Y- 20 1 A 1- 53 00 -U Y- 20 1- 05 6- - 05 6- A1 -5 30 0- UY -2 01  A1-5300-UY-201-6

SCL

 A1-5300-UY-201

055

PLC MODULETERMINALS

PACKAGE

OUT1

   A   1  -   5   3   0   0  -   U   Y  -   2   0   1

6 RTN1

4 ALT1

JB

RACK-3, SLOT-1120

2

CLIENT DOC. NO.

REV. NO.

05622

21+

-

FIELD

1756-OF6CIK

PROJ ECT K ASH AGA N D EVEL OPME NT EXPER IMEN TA L PROGR AM

I/P

23

KE01-A1-500-MT-I-HL-0001-000

ESD (BY OTHERS)PROCESS CONTROL ROOM

SHEET 293

 AGIP KAZAKHSTAN NORTH CASPIAN OPERATING COMPANY

P01

WATER TREATMENT PLANT

INSTRUMENT

CE CECE

  CE

 A1-5300-UY-201 A1-5300-JP-00009

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 149/293

 A1-5300-UY-201 LOOP SERVICE: SOD.HYPO.DOS.PMP 530-PD002B CONLOOP NO.:

OF

FI-15 5300-JT-00026-PAN

TB1 5300-JT-00026-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5300-LT-104-TB1-1+   +1-TB1-A1 -5 30 0-LT -1 04 A1 -53 00 -L T-10 4-07 5+ +07 5-A1 -5 30 0-LT -1 04 A1-53 00 -L T-10 4-05 A+

+9-A1-5300-LT-104 A1-5300-LT-104-041+

 A1-5300-LT-104-TB1-2-   - 2- TB 1- A1 -5 30 0- LT -1 04 A 1- 53 00 -L T- 10 4- 07 6- - 07 6- A1 -5 30 0- LT -1 04 A 1- 53 00 -L T- 10 4- 05 B-

-10-A1-5300-LT-104 A1-5300-LT-104-042-

SCL

SHEET

PROCESS CONTROL ROOM

TERMINALSESD (BY OTHERS)

150

5000

FIC

042

Hard wired to

ESD by others

293

To AMS

System

041

 AI-ESD-001075 05A

05B076

 A1-5300-LT-104

+

8

4

1

2

KE01-A1-500-MT-I-HL-0001-000

P01

FIELD

JB

-

7

9

6

5

MULTIPLEXOR

3

9

10

+

-05C

INSTRUMENT

DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

TERMINALS

CE CE

CE

CE   CE   CE

CE

 A1-5300-LT-104 A1-5300-JP-00039

5300

LI

5300

LI

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 150/293

LL LL

 

100

FIC

100

5000

FIC

100

5000

FIC

19

LOOP NO.: A1-5300-LT-104

18

17

16

15

LOOP SERVICE: SMB DOSING TNK TA-007 LVL

14

13

12

11

20

10

LI

104

5300

LALL

104

5300

LTA

104

ESD

System

LI

104

5300

LALL

104

5300

LTA

104

OF

 5300-JT-00026-PAN

TB1

1

FI-142

5300-JT-00026-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5300-PT-228-TB1-3+   3   +3-TB1-A1 -5 30 0-PT -2 28 A1-53 00 -PT-22 8-40 0+ +40 0-A1 -5 30 0-PT -2 28 A1-53 00 -PT-22 8-09 A+

+17-A1-5300-PT-228 A1-5300-PT-228-017+

 A1-5300-PT-228-TB1-4-   4   - 4- TB 1- A1 -5 30 0- PT -2 28 A 1- 53 00 -P T- 22 8- 40 1- - 40 1- A1 -5 30 0- PT -2 28 A 1 -5 30 0- PT -2 28 -0 9B -

-18-A1-5300-PT-228 A1-5300-PT-228-018-

SCL

HH HH

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

INSTRUMENT TERMINALS

018

KE01-A1-500-MT-I-HL-0001-000

P01

151 293

MULTIPLEXOR

017

 AI-ESD-001

09B

8

11

CLIENT

09A+

PROJECT

FIELD

JB TERMINALS

400

PACKAGE WATER TREATMENT PLANT

-

7

6

 A1-5300-PT-228

5

10

9

401

To AMS

System

5000

FIC

18

+

-

DOC. NO.

REV. NO.

Hard wired to

ESD by others

SHEET

PROCESS CONTROL ROOM

09C

17

ESD(BY OTHERS)

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-228 A1-5300-JP-00039

5300

PI

5300

PI

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 151/293

100

FIC

100

5000

FIC19

14

13

12

LOOP NO.: A1-5300-PT-228

18

17

LOOP SERVICE:

20

16

15

SMB DOSING PMP 530-PD003A PT

100

5000

228

5300

PAHH

228

5300

PTA

228

ESD

System

228

5300

PAHH

228

5300

PTA

228

OF

 5300-JT-00026-PAN

TB1

FI-14

5300-JT-00026-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5300-PT-229-TB1-5+   +5-TB1-A1 -5 30 0-PT -2 29 A1-53 00 -PT-22 9-40 2+ +40 2-A1 -5 30 0-PT -2 29 A1-53 00 -PT-22 9-10 A+

+19-A1-5300-PT-229 A1-5300-PT-229-019+

 A1-5300-PT-229-TB1-6-   - 6- TB 1- A1 -5 30 0- PT -2 29 A 1- 53 00 -P T- 22 9- 40 3- - 40 3- A1 -5 30 0- PT -2 29 A 1- 53 00 -P T- 22 9- 10 B-

-20-A1-5300-PT-229 A1-5300-PT-229-020-

SCL

152

020

Hard wired to

ESD by others

ESD (BY OTHERS)

019

To AMS

System

20

+

-

19

 A1-5300-PT-229

11

+

8

9

6

5

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

P01

293

10

FIELD

JB

-

MULTIPLEXOR

3

4

7

 AI-ESD-001

10B403

402 10A

10C

INSTRUMENT

SHEET

TERMINALS

PACKAGE WATER TREATMENT PLANT

PROCESS CONTROL ROOM

TERMINALS

DOC. NO.

REV. NO.

1

2

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-229 A1-5300-JP-00039

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 152/293

HH HH

FIC

100

5000

FIC

100

5000

5000

FIC

100

LOOP NO.: A1-5300-PT-229

18

17

16

15

LOOP SERVICE: SMB DOSING PMP 530-PD003B PT

20

14

13

12

19

5300

PI

229

5300

PAHH

229

5300

PTA

229

ESD

System

5300

PI

229

5300

PAHH

229

5300

PTA

229

153 OF

5300-JT-00026-PAN

TB1

5300-JT-00026-PAN

 A1-5300-UY-202-TB1-7+   + 7- TB 1- A1 -5 30 0- UY -2 02 A 1- 53 00 -U Y- 20 2- 40 4+ + 40 4- A1 -5 30 0- UY -2 02   A1-5300-UY-202-7

 A1-5300-UY-202-TB1-8-   - 8- TB 1- A1 -5 30 0- UY -2 02 A 1- 53 00 -U Y- 20 2- 40 5- - 40 5- A1 -5 30 0- UY -2 02   A1-5300-UY-202-11

SCL

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

I/P

 A1-5300-UY-202

404

4058

7+

-9

FIELD

1756-OF6CIK

RACK-3, SLOT-11

6

7

11 RTN2

9 ALT2

293

PLC MODULETERMINALS

WATER TREATMENT PLANT

INSTRUMENT

PACKAGE

ESD (BY OTHERS)PROCESS CONTROL ROOM

JB

DOC. NO.

REV. NO.

OUT2

   A   1  -   5   3   0   0  -   U   Y  -   2   0   2

SHEET

CE CECE   CE

 A1-5300-UY-202   A1-5300-JP-00039

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 153/293

LOO P NO .: A1- 5300- UY -202 LO OP SERV ICE: S MB.DO S.P UMP 5 30-PD00 3A CON

154 OF

5300-JT-00026-PAN

TB1

5300-JT-00026-PAN A1-5300-UY-203-TB1-9+   + 9- TB 1- A1 -5 30 0- UY -2 03 A 1- 53 00 -U Y- 20 3- 40 8+ + 40 8- A1 -5 30 0- UY -2 03   A1-5300-UY-203-8

 A1-5300-UY-203-TB1-10-   - 10 -T B1 -A 1- 53 00 -U Y- 20 3 A 1- 53 00 -U Y- 20 3- 40 9- - 40 9- A1 -5 30 0- UY -2 03   A1-5300-UY-203-12

SCL

 A1-5300-UY-203

408

PLC MODULETERMINALS

PACKAGE

OUT3

   A   1  -   5   3   0   0  -   U   Y  -   2   0   3

12 RTN3

10 ALT3

JB

RACK-3, SLOT-11

88

CLIENT DOC. NO.

REV. NO.

40910

9+

-

FIELD

1756-OF6CIK

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

I/P

11

KE01-A1-500-MT-I-HL-0001-000

ESD (BY OTHERS)PROCESS CONTROL ROOM

SHEET 293

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

P01

WATER TREATMENT PLANT

INSTRUMENT

CE CECE   CE

 A1-5300-UY-203   A1-5300-JP-00039

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 154/293

 A1-5300-UY-203 LOOP SERVICE: SMB.DOS.PUMP 530-PD003B CONLOOP NO.:

155 OF

FI-6 5300-JT-00027-PAN 1756-IF16K

TB1 5300-JT-00027-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-7

 A1-5300-LT-105-TB1-1+   + 1- TB 1- A1 -5 30 0- LT -1 05 A 1- 53 00 -L T- 10 5- 41 8+ + 41 8- A1 -5 30 0- LT -1 05 A 1- 53 00 -L T- 10 5- 04 A+

+7-A1-5300-LT-105 A1-5300-LT-105-16+

 A1-5300-LT-105-TB1-2-   - 2- TB 1- A1 -5 30 0- LT -1 05 A 1- 53 00 -L T- 10 5- 41 9- - 41 9- A1 -5 30 0- LT -1 05 A 1- 53 00 -L T- 10 5- 04 B-

-8-A1-5300-LT-105 A1-5300-LT-105-18-

SCL

LL LL

FIC

100

5000

FIC

100

5000

 A1-5300-LT-105

DCS (BY OTHERS)PROCESS CONTROL ROOM

04B

PLC MODULETERMINALS

   A   1  -   5   3   0   0  -   L   T  -   1   0   5

15

04AIN6+

-   419

418

IN78 -04C

iRTN6

iRTN7

5

6

7

8

4

FIELD

17

3  18

9

INSTRUMENT

16

JB

+71

2

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

SHEET 293PACKAGE WATER TREATMENT PLANT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

10

11

12

DOC. NO.

REV. NO.

5300

LI

105

CE CE

CE

CE   CE   CE

CE

 A1-5300-LT-105 A1-5300-JP-00040

5300

LALL

105

5300

LI

105

5300

LALL

105

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 155/293

100

5000

FIC

 ANTISCALANT DOSING TNK TA-008 LVLLOOP NO.: A1-5300-LT-105

13

LOOP SERVICE:

18

19

20

14

15

16

17

5300

LTA

105

5300

LTA

105

To AMS System

OF

 5300-JT-00027-PAN

TB1

FI-14

5300-JT-00027-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5300-PT-230-TB1-3+   +3-TB1-A1 -5 30 0-PT -2 30 A1-53 00 -PT-23 0-42 0+ +42 0-A1 -5 30 0-PT -2 30 A1-53 00 -PT-23 0-11 A+

+21-A1-5300-PT-230 A1-5300-PT-230-021+

 A1-5300-PT-230-TB1-4-   - 4- TB 1- A1 -5 30 0- PT -2 30 A 1- 53 00 -P T- 23 0- 42 1- - 42 1- A1 -5 30 0- PT -2 30 A 1- 53 00 -P T- 23 0- 11 B-

-22-A1-5300-PT-230 A1-5300-PT-230-022-

SCL

HH HH

293

5000

FIC

100

To AMS

System

Hard wired to

ESD by others

 AI-ESD-001

ESD (BY OTHERS)

5

-

1

2

3

4

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

+

PROCESS CONTROL ROOM

TERMINALS

FIELD

JBINSTRUMENT

SHEET

TERMINALS

CLIENT

MULTIPLEXOR

DOC. NO.

REV. NO.

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

PACKAGE WATER TREATMENT PLANT

420

 A1-5300-PT-230

12

11

11A

10

+11B

8

9

6

7

22

421  021

022-11C

21

KE01-A1-500-MT-I-HL-0001-000

P01

156

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-230 A1-5300-JP-00040

5300

PI

230

5300

PI

230

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 156/293

 ANTISCANT DOS. PMP 530-PD004A PT

14

13

LOOP NO.: A1-5300-PT-230

18

17

LOOP SERVICE:

19

20

16

155000

100

FIC

100

5000

FIC

5300PAHH

230

5300

PTA

230

ESD

System

5300

PAHH

230

5300

PTA

230

OF

 5300-JT-00027-PAN

TB1

FI-14

5300-JT-00027-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5300-PT-231-TB1-5+   +5-TB1-A1 -5 30 0-PT -2 31 A1-53 00 -PT-23 1-42 2+ +42 2-A1 -5 30 0-PT -2 31 A1-53 00 -PT-23 1-12 A+

+23-A1-5300-PT-231 A1-5300-PT-231-023+

 A1-5300-PT-231-TB1-6-   - 6- TB 1- A1 -5 30 0- PT -2 31 A 1- 53 00 -P T- 23 1- 42 3- - 42 3- A1 -5 30 0- PT -2 31 A 1- 53 00 -P T- 23 1- 12 B-

-24-A1-5300-PT-231 A1-5300-PT-231-024-

SCL

HH HH

ESD(BY OTHERS)

KE01-A1-500-MT-I-HL-0001-000

P01

157 293

To AMS

System

9

PROCESS CONTROL ROOM

12B6

TERMINALS

5

Hard wired to

ESD by others7

MULTIPLEXOR

423

CLIENT

422

 A1-5300-PT-231

12

11

12A

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

+

1

2

INSTRUMENT

PACKAGE WATER TREATMENT PLANT

FIELD

JB

23

SHEET

TERMINALS

10

8

000

-

023-

12C

DOC. NO.

REV. NO.

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

024

3

4

 AI-ESD-001

24

+

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-231 A1-5300-JP-00040

5300

5300

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 157/293

100

FIC

100

5000

FIC

LOOP NO.: A1-5300-PT-231

18

17

16

15

LOOP SERVICE:  ANTISCANT DOS. PMP 530-PD004B PT

14

13

19

20

5000

FIC

100

5000

5300

PI

231

5300

PAHH

231

5300

PTA

231

ESD

System

5300

PI

231

5300

PAHH

231

5300

PTA

231

158 OF

5300-JT-00027-PAN

TB1

5300-JT-00027-PAN A1-5300-UY-204-TB1-7+   + 7- TB 1- A1 -5 30 0- UY -2 04 A 1- 53 00 -U Y- 20 4- 42 4+ + 42 4- A1 -5 30 0- UY -2 04  A1-5300-UY-204-15

 A1-5300-UY-204-TB1-8-   - 8- TB 1- A1 -5 30 0- UY -2 04 A 1- 53 00 -U Y- 20 4- 42 5- - 42 5- A1 -5 30 0- UY -2 04  A1-5300-UY-204-19

SCL

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZAKHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

I/P

 A1-5300-UY-204

424

4258

7+

-9

FIELD

1756-OF6CIK

RACK-3, SLOT-116

15

19 RTN4

17 ALT4

293

PLC MODULETERMINALS

WATER TREATMENT PLANT

INSTRUMENT

PACKAGE

ESD (BY OTHERS)PROCESS CONTROL ROOM

JB

DOC. NO.

REV. NO.

OUT4

   A   1  -   5   3   0   0  -   U   Y  -   2   0   4

SHEET

CE CECE

  CE

 A1-5300-UY-204 A1-5300-JP-00040

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 158/293

LOOP N O. : A1- 530 0- UY- 204 L OOP SERVI CE: AN TI SCAL NT .D OS. PMP 5 30- PD0 04A

159 OF

5300-JT-00027-PAN

TB1

5300-JT-00027-PAN A1-5300-UY-205-TB1-9+   + 9- TB 1- A1 -5 30 0- UY -2 05 A 1- 53 00 -U Y- 20 5- 42 8+ + 42 8- A1 -5 30 0- UY -2 05  A1-5300-UY-205-16

 A1-5300-UY-205-TB1-10-   - 10 -T B1 -A 1- 53 00 -U Y- 20 5 A 1- 53 00 -U Y- 20 5- 42 9- - 42 9- A1 -5 30 0- UY -2 05  A1-5300-UY-205-20

SCL

 A1-5300-UY-205

428

PLC MODULETERMINALS

PACKAGE

OUT5

   A   1  -   5   3   0   0  -   U   Y  -   2   0   5

20 RTN5

18 ALT5

JB

RACK-3, SLOT-118

16

CLIENT DOC. NO.

REV. NO.

42910

9+

-

FIELD

1756-OF6CIK

PROJ ECT K ASH AGA N D EVEL OPME NT EXPER IMEN TA L PROGR AM

I/P

11

KE01-A1-500-MT-I-HL-0001-000

ESD (BY OTHERS)PROCESS CONTROL ROOM

SHEET 293

 AGIP KAZAKHSTAN NORTH CASPIAN OPERATING COMPANY

P01

WATER TREATMENT PLANT

INSTRUMENT

CE CECE

  CE

 A1-5300-UY-205   A1-5300-JP-00040

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 159/293

 A1-5300-UY-205 LOOP SERVICE:  ANTISCALNT.DOS.PMP 530-PD004ALOOP NO.:

160 OF

FI-4 5300-JT-00030-PAN

TB1 5300-JT-00030-PAN -6 +5 -4 +3 -2 +1

 A1-5300-FT-121-TB1-1+   + 1- TB 1- A1 -5 30 0- FT -1 21 A 1- 53 00 -F T- 12 1- 44 3+ + 44 3- A1 -5 30 0- FT -1 21 A 1- 53 00 -F T- 12 1- 12 A+

+23-A1-5300-FT-121 A1-5300-FT-121-16+

 A1-5300-FT-121-TB1-2-   - 2- TB 1- A1 -5 30 0- FT -1 21 A 1- 53 00 -F T- 12 1- 44 4- - 44 4- A1 -5 30 0- FT -1 21 A 1- 53 00 -F T- 12 1- 12 B-

-24-A1-5300-FT-121 A1-5300-FT-121-18-

SCL

H H

L L

FIC

100

5000

FIC

100

5000

SHEET 293

15

IN6

DCS (BY OTHERS)PROCESS CONTROL ROOM

RACK-2, SLOT-4

JB

   A   1  -   5   3   0   0  -   F   T  -   1   2

   1

1+

-

PLC MODULETERMINALS

IN7

1756-IF16K

2 444

4

3

17

iRTN6

iRTN7

18

INSTRUMENT

FIELD

443

 A1-5300-FT-121

5

6

7

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

24

+

-12C

23 1612A

12B

8

9

10

11

12

13

5300

FI

121

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-121 A1-5300-JP-00041

5300

FAH

121

5300

FI

121

5300

FAH

121

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 160/293

100

5000

FIC

100

5000

FIC

LOOP NO.: A1-5300-FT-121 INLET FLOW TO DMF 530-ZM-001A

3

14

15

LOOP SERVICE:

20

16

17

18

19

5300

FAL121

5300

FTA

121

5300

FAL121

5300

FTA

121

To AMS System

161 OF

 5300-JT-00030-PAN

TB1

FI-4

5300-JT-00030-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-3

 A1-5300-FT-122-TB1-3+   + 3- TB 1- A1 -5 30 0- FT -1 22 A 1- 53 00 -F T- 12 2- 44 5+ + 44 5- A1 -5 30 0- FT -1 22 A 1- 53 00 -F T- 12 2- 13 A+

+25-A1-5300-FT-122 A1-5300-FT-122-20+

 A1-5300-FT-122-TB1-4-   - 4- TB 1- A1 -5 30 0- FT -1 22 A 1- 53 00 -F T- 12 2- 44 6- - 44 6- A1 -5 30 0- FT -1 22 A 1- 53 00 -F T- 12 2- 13 B-

-26-A1-5300-FT-122 A1-5300-FT-122-22-

SCL

H H

L L

5000

FIC

PACKAGE WATER TREATMENT PLANT

26

+

-13C

25 2013A

13B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

445

 A1-5300-FT-122

7

8

9

446

21

iRTN8

iRTN9

22

5000

FIC

100

+

-

PLC MODULETERMINALS

IN9

4

1756-IF16K

SHEET 293

19

IN8

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

   A   1  -   5   3   0   0  -   F   T  -   1   2   2

3

1

2

5

6

10

11

12

13

5300

FI

122

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-122 A1-5300-JP-00041

5300

FAH

5300

FI

122

5300

FAH

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 161/293

100

FIC

100

5000

FIC

FIC

100

5000

15

16

17

20

19

LOOP NO.: A1-5300-FT-122 INLET FLOW TO DMF 530-ZM-001B

14

LOOP SERVICE:

18

FAH

122

5300

FAL

122

5300

FTA

122

FAH

122

5300

FAL

122

5300

FTA

122

To AMS System

162 OF

 5300-JT-00030-PAN

TB1

FI-41756-IF16K

5300-JT-00030-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-2

 A1-5300-FT-123-TB1-5+   + 5- TB 1- A1 -5 30 0- FT -1 23 A 1- 53 00 -F T- 12 3- 44 7+ + 44 7- A1 -5 30 0- FT -1 23 A 1- 53 00 -F T- 12 3- 14 A+

+27-A1-5300-FT-123 A1-5300-FT-123-24+

 A1-5300-FT-123-TB1-6-   - 6- TB 1- A1 -5 30 0- FT -1 23 A 1- 53 00 -F T- 12 3- 44 8- - 44 8- A1 -5 30 0- FT -1 23 A 1- 53 00 -F T- 12 3- 14 B-

-28-A1-5300-FT-123 A1-5300-FT-123-26-

SCL

H H

L L

5000

FIC

100

+

-

PLC MODULETERMINALS

IN11

2

3

5

6 448

25

iRTN10

iRTN11

26

   A   1  -   5   3   0   0  -   F   T  -   1   2   3

14A

14B

INSTRUMENT

FIELD

447

 A1-5300-FT-123

8

9

10

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

11

12

13

KE01-A1-500-MT-I-HL-0001-000

SHEET 293

23

IN10

DCS (BY OTHERS)PROCESS CONTROL ROOM

24

1

7

JB

4

PACKAGE WATER TREATMENT PLANT

28

+

-14C

27

5300

FI

123

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-123 A1-5300-JP-00041

5300

FI

123

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 162/293

100

5000

FIC

100

FIC

100

5000

FIC

5000

LOOP NO.: A1-5300-FT-123 INLET FLOW TO ACF 530-ZN-001A

20

19

16

17

18

LOOP SERVICE:

14

15 5300FAH

123

5300

FAL

123

5300

FTA

123

5300FAH

123

5300

FAL

123

5300

FTA

123

To AMS System

163 OF

 5300-JT-00030-PAN

TB1

FI-41756-IF16K

5300-JT-00030-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-4

 A1-5300-FT-124-TB1-7+   + 7- TB 1- A1 -5 30 0- FT -1 24 A 1- 53 00 -F T- 12 4- 44 9+ + 44 9- A1 -5 30 0- FT -1 24 A 1- 53 00 -F T- 12 4- 15 A+

+29-A1-5300-FT-124 A1-5300-FT-124-30+

 A1-5300-FT-124-TB1-8-   - 8- TB 1- A1 -5 30 0- FT -1 24 A 1- 53 00 -F T- 12 4- 45 0- - 45 0- A1 -5 30 0- FT -1 24 A 1- 53 00 -F T- 12 4- 15 B-

-30-A1-5300-FT-124 A1-5300-FT-124-32-

SCL

H H

5000

FIC

SHEET 293PACKAGE WATER TREATMENT PLANT

P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

PROJECT

DOC. NO.

REV. NO.

15C

449

12

450

iRTN13

15A

15B

30

8

9

29

31

32

iRTN12   A   1  -   5   3   0   0  -   F   T  -   1   2   4

DCS (BY OTHERS)PROCESS CONTROL ROOM

+

-

PLC MODULETERMINALS

6

INSTRUMENT

+

1

2

3

4

IN13-

IN12

FIELD

5

7

 A1-5300-FT-124

JB

29 30

10

11

13 5300

FI

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-124 A1-5300-JP-00041

5300

FI

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 163/293

L L

100

5000

FIC

100

FIC

100

5000

FIC

FIC

100

5000

20

14

19

LOOP NO.: A1-5300-FT-124 LOOP SERVICE: INLET FLOW TO ACF 530-ZN-001B

18

15

16

17

FI

124

5300

FAH

124

5300

FAL

124

5300

FTA

124

FI

124

5300

FAH

124

5300

FAL

124

5300

FTA

124

To AMS System

164 OF

 5300-JT-00030-PAN

TB1

FI-71756-IF16K

5300-JT-00030-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-9

 A1-5300-PDT-176-TB1-11+   +11 -T B1 -A1-53 00 -PDT -1 76 A1-53 00 -PDT -1 76 -4 51 + +45 1-A1 -5 30 0-PDT-17 6 A1-53 00 -PDT -1 76 -0 4A+

+7-A1-5300-PDT-176 A1-5300-PDT-176-16+

 A1-5300-PDT-176-TB1-12-   - 12 -T B1 -A1-53 00 -PDT -1 76 A1-53 00 -PDT -1 76 -4 52 - - 45 2-A1 -5 30 0-PDT-17 6 A1-53 00 -PDT -1 76 -0 4B-

-8-A1-5300-PDT-176 A1-5300-PDT-176-18-

SCL

PACKAGE WATER TREATMENT PLANT

8

+

-04C

7

1

2

3

SHEET 293

12

4

5

6

FIELD

JB

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

451

 A1-5300-PDT-176

14

13

04A

452

18 IN7

IN6

-   5   3   0   0  -   P   D   T  -   1   7   6+

-

TERMINALS

7

INSTRUMENT

16

DCS (BY OTHERS)PROCESS CONTROL ROOM

04B

11

10

9

8

PLC MODULE

CE CE

CE CE CE

 A1-5300-PDT-176 A1-5300-JP-00041

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 164/293

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

19

20

DIFF. PRESS.HI DMF 530-ZM-001A

16

15

14

LOOP SERVICE:LOOP NO.: A1-5300-PDT-176

17

iRTN6

iRTN7

   A   1  

15

18

17 5300

PDI

176

CE CE

CE

CE   CE   CE

CE

5300

PDAH

176

5300

PDTA

176

5300

PDI

176

5300

PDAH

176

5300

PDTA

176

To AMS System

165 OF

 5300-JT-00030-PAN

TB1

FI-71756-IF16K

5300-JT-00030-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-9

 A1-5300-PDT-177-TB1-13+   +13 -T B1 -A1-53 00 -PDT -1 77 A1-53 00 -PDT -1 77 -4 53 + +45 3-A1 -5 30 0-PDT-17 7 A1-53 00 -PDT -1 77 -0 5A+

+9-A1-5300-PDT-177 A1-5300-PDT-177-20+

 A1-5300-PDT-177-TB1-14-   - 14 -T B1 -A1-53 00 -PDT -1 77 A1-53 00 -PDT -1 77 -4 54 - - 45 4-A1 -5 30 0-PDT-17 7 A1-53 00 -PDT -1 77 -0 5B-

PACKAGE WATER TREATMENT PLANT

+9

1

2

 A1-5300-PDT-177

SHEET 293

JB

T  -   1   7   7

6

7

DCS (BY OTHERS)FIELD

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

453

10

12

14 454

+

PLC MODULETERMINALS

4

IN8

3

5

INSTRUMENT

PROCESS CONTROL ROOM

2005A

05B

8

9

11

13

 A1-5300-PDT-177 A1-5300-JP-00041

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 165/293

-10-A1-5300-PDT-177 A1-5300-PDT-177-22-SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

10 -05C

19

   A   1  -   5   3   0   0  -   P   D   T

19

DIFF. PRESS.HI DMF 530-ZM-001B

16

17

20

14

15

18

454

LOOP NO.: A1-5300-PDT-177

21

iRTN8

iRTN9

22 IN9

- 05B

LOOP SERVICE:

5300

PDI

177

CE CE

CE

CE   CE   CE

CE

5300

PDAH

177

5300

PDTA

177

5300

PDI

177

5300

PDAH

177

5300

PDTA

177

To AMS System

166 OF

 5300-JT-00030-PAN

TB1

FI-71756-IF16K

5300-JT-00030-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2 SLOT-9

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALS

12

13

3

4

11

8

9

10

14 A1-5300-PDT-180

5

6

7

1

2

FIELD

JB

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

INSTRUMENT

KE01-A1-500-MT-I-HL-0001-000

SHEET 293PACKAGE WATER TREATMENT PLANT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

DOC. NO.

REV. NO.

 A1-5300-PDT-180 A1-5300-JP-00041

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 166/293

5300-JT-00030-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-9

 A1-5300-PDT-180-TB1-15+  +15 -T B1 -A1-53 00 -PDT -1 80 A1-53 00 -PDT -1 80 -4 55 + +45 5-A1 -5 30 0-PDT-18 0 A1-53 00 -PDT -1 80 -0 6A+

+11-A1-5300-PDT-180 A1-5300-PDT-180-24+

 A1-5300-PDT-180-TB1-16-   - 16 -T B1 -A1-53 00 -PDT -1 80 A1-53 00 -PDT -1 80 -4 56 - - 45 6-A1 -5 30 0-PDT-18 0 A1-53 00 -PDT -1 80 -0 6B-

-12-A1-5300-PDT-180 A1-5300-PDT-180-26-

SCL

H H

100

06B

   A   1  -   5   3   0   0  -   P   D   T  -   1   8   0

23

IN10

IN11

11

12

24455

26-06C

+06A

456

DIFF. PRESS.HI ACF 530-ZN-001A

19

20

LOOP SERVICE:

25

iRTN10

iRTN11

18

17

15

16

5000

FIC

100

5000

FIC

100

5000

FIC

+

-

LOOP NO.: A1-5300-PDT-180

5300

PDI

180

CE CE

CE

CE   CE   CE

CE

5300

PDAH

180

5300

PDTA

180

5300

PDI

180

5300

PDAH

180

5300

PDTA

180

To AMS System

167 OF

 5300-JT-00030-PAN

TB1

10

11

4

9

2

6

7

8

DCS (BY OTHERS)PROCESS CONTROL ROOM

12

14

13

KE01-A1-500-MT-I-HL-0001-000

INSTRUMENT

FIELD

JB

SHEET 293

PLC MODULETERMINALS

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

5

PACKAGE WATER TREATMENT PLANT

3

1

DOC. NO.

REV. NO.

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 167/293

FI-71756-IF16K

5300-JT-00030-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-9

 A1-5300-PDT-181-TB1-17+   +17 -T B1 -A1-53 00 -PDT -1 81 A1-53 00 -PDT -1 81 -4 57 + +45 7-A1 -5 30 0-PDT-18 1 A1-53 00 -PDT -1 81 -0 7A+

+13-A1-5300-PDT-181 A1-5300-PDT-181-30+

 A1-5300-PDT-181-TB1-18-   - 18 -T B1 -A1-53 00 -PDT -1 81 A1-53 00 -PDT -1 81 -4 58 - - 45 8-A1 -5 30 0-PDT-18 1 A1-53 00 -PDT -1 81 -0 7B-

-14-A1-5300-PDT-181 A1-5300-PDT-181-32-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

29

IN123007A

07B

   A   1  -   5   3   0   0  -   P   D   T  -   1   8   1

14

+458

LOOP NO.: A1-5300-PDT-181

31

iRTN12

iRTN13

32 IN13

LOOP SERVICE: DIFF. PRESS.HI ACF 530-ZN-001B

457

18

19

17

15

 A1-5300-PDT-18116

+

-

20

-07C

13

5300

PDI

181

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-181 A1-5300-JP-00041

5300

PDAH

181

5300

PDTA

181

5300

PDI

180

5300

PDAH

181

5300

PDTA

181

To AMS System

168 OF

24V DC SUPPLY

- +

21 21

 A1-5300-JY-146 5300-JT-00031-PDNTB5 5300-JT-00031-PDN

BL   A1-5300-JY-146-TB5-1+   +1-TB5-A1-5300-JY-146 A1-5300-JY-146-1671+

WT   A1-5300-JY-146-TB5-2-   - 2- TB 5- A1 -5 30 0- JY -1 46 A 1- 53 00 -J Y- 14 6- 16 72 - - 16 72 -A 1- 53 00 -J Y- 14 6 A 1- 53 00 -J Y- 14 6- 9

SCL 21A- 21A+

24V DC SUPPLY

+ -

7 7

 A1-5300-HZSH-146 5300-JT-00031-PDN

TB1 5300-JT-00031-PDN

BL   A1-5300-HZSH-146-TB1-1+   +1-TB1-A1-5300-HZSH-146 A1-5300-HZSH-146-1003+

WT   A1-5300-HZSH-146-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 46 A1-53 00 -HZSH-14 6-10 04 - - 10 04 -A1-53 00 -HZSH-14 6 A1-53 00 -HZSH-14 6-17

SCL

7A+ 7A

5300

HSAH

IN-8

GND-818

146

PACKAGE

A   1  -   5   3   0   0  -   H   Z   S   H  -   1   4   6

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

4

JB

SHEET

RACK-0, SLOT-7

TERMINALS

17

4

2

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

146

5300

JY

1756-OB16DK

NO

146

3

1004

-

3

1672

C   1003

S

   A   1  -   5   3   0   0  -   J   Y  -   1   4

 A1-5300-HZSH-146   A1-5300-JP-00042

RACK-1, SLOT-9

2

+   16711

 A1-5300-JY-146

10

9

+DC-0

OUT-4

 A1-5300-JP-00046

146

CE CECE   CE   CE

CE CECE CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 168/293

7A+ 7A-

24V DC SUPPLY

+ -

5300-JT-00031-PDN 7 7

TB1

 A1-5300-HZSL-146

5300-JT-00031-PDN

BL   A1-5300-HZSL-146-TB1-3+   +3-TB1-A1-5300-HZSL-146 A1-5300-HZSL-146-1005+

WT   A1-5300-HZSL-146-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 46 A1-53 00 -HZSL-14 6-10 06 - - 10 06 -A1-53 00 -HZSL-14 6 A1-53 00 -HZSL-14 6-19

SCL

7A+ 7A-

2 0 G ND -9

5300

146

   A

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   4   6

ZSL

LOOP NO.: A1-5300-X-146 LOOP SER VI CE: SER VI CE I NLET VLV D MF Z M-002C

5

C

NO   19 IN-94 1006

1756-IB161K

RACK-0, SLOT-7   HSAL

 A1-5300-HZSL-146  A1-5300-JP-00042

3 10055300

HSAL

146

146

5300

HIC

5300

XA

146

2

146

5300

XA

146

5300

JY

  CE

CE

CE CECE   CE

CE

169 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-1475300-JT-00031-PDN

BL   A1-5300-JY-147-TB5-3+   +3-TB5-A1-5300-JY-147 A1-5300-JY-147-1673+

WT   A1-5300-JY-147-TB5-4-   - 4-TB5-A1 -5 30 0-JY-1 47 A1 -5 30 0-JY-1 47 -1 67 4- - 16 74 -A1-53 00 -J Y-14 7 A1-53 00 -J Y-14 7-11

SCL 21A- 21A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 7 7

TB1

 A1-5300-HZSH-147

5300-JT-00031-PDN

BL   A1-5300-HZSH-147-TB1-5+   +5-TB1-A1-5300-HZSH-147 A1-5300-HZSH-147-1007+

WT   A1-5300-HZSH-147-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-1 47 A1-53 00 -HZSH-14 7-10 08 - - 10 08 -A1-53 00 -HZSH-14 7 A1-53 00 -HZSH-14 7-21

SCL

7A+ 7A-

4

147

 A1-5300-JY-147

12

11

+DC-0

OUT-5

 A1-5300-JP-00046

2

S

   A   1  -   5   3   0   0  -   J   Y  -   1   4

 A1-5300-HZSH-147   A1-5300-JP-00042

RACK-1, SLOT-9

3+   1673

NO

147

6 1008

-   4 1674

C   5 1007

21

7

SHEET 293

PLC MODULE

5300

JY

147

5300

JY

1756-OB16DK

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

5

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   4   7

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-7

5300

HSAH

IN-10

GND-1022

147

CE CECE   CE   CE

CE CECE   CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 169/293

24V DC SUPPLY

+ -

5300-JT-00031-PDN 7 7

TB1

 A1-5300-HZSL-147

5300-JT-00031-PDN

BL   A1-5300-HZSL-147-TB1-7+   +7-TB1-A1-5300-HZSL-147 A1-5300-HZSL-147-1009+

WT   A1-5300-HZSL-147-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -1 47 A1-53 00 -HZSL-14 7-10 10 - - 10 10 -A1-53 00 -HZSL-14 7 A1-53 00 -HZSL-14 7-23

SCL

7A+ 7A-

5300

XA

147

6

147

5300

XA

147

5300

JY

147

5300

HIC

147

5300

HSAL

147

 A1-5300-JP-00042

7 1009

 A1-5300-HZSL-147

C

NO   2 3 I N- 118 1010

1756-IB161K

RACK-0, SLOT-7

LOOP NO.: A1-5300-X-147 LOOP SER VI CE: BWASH OUT LET VLV D MF Z M-001A

9

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   4   7

ZSL

24 GND-11

5300

HSAL

CE

CE CECE   CE

CE

170 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-1185300-JT-00031-PDN

BL   A1-5300-JY-118-TB5-5+   +5-TB5-A1-5300-JY-118 A1-5300-JY-118-1675+

WT   A1-5300-JY-118-TB5-6-   - 6-TB5-A1 -5 30 0-JY-1 18 A1 -5 30 0-JY-1 18 -1 67 6- - 16 76 -A1-53 00 -J Y-11 8 A1-53 00 -J Y-11 8-13

SCL 21A- 21A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 7 7

TB1

 A1-5300-HZSH-118

5300-JT-00031-PDN

BL   A1-5300-HZSH-118-TB1-9+   +9-TB1-A1-5300-HZSH-118 A1-5300-HZSH-118-1011+

WT   A1-5300-HZSH-118-TB1-10-   -10-TB1-A1-5300-HZSH-118 A1-5300-HZSH-118-1012- -1012-A1-5300-HZSH-118 A1-5300-HZSH-118-25

SCL

7A+ 7A-

5300

HSAH

IN-12

GND-1226

118

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   1   8

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

8

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

7

JB

SHEET

RACK-0, SLOT-7

TERMINALS

25

11

9

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

118

5300

JY

1756-OB16DK

NO

118

10 1012

-   6 1676

C   1011

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-118   A1-5300-JP-00042

RACK-1, SLOT-9

5+   1675

4

 A1-5300-JY-118

14

13

+DC-0

OUT-6

 A1-5300-JP-00046

118

CE CECE   CE   CE

CE CECE   CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 170/293

24V DC SUPPLY

+ -

5300-JT-00031-PDN 7 7

TB1

 A1-5300-HZSL-118

5300-JT-00031-PDN

BL   A1-5300-HZSL-118-TB1-11+   +11-TB1-A1-5300-HZSL-118 A1-5300-HZSL-118-1013+

WT   A1-5300-HZSL-118-TB1-12-   - 12 -T B1 -A1-53 00 -HZSL-11 8 A1-53 00 -HZSL-11 8-10 14 - - 10 14 -A1-53 00 -HZSL-11 8 A1-53 00 -HZSL-11 8-27

SCL

7A+ 7A-

28 GND-13

5300

118

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   8

ZSL

LOOP NO.: A1-5300-X-118 LOOP SER VI CE: A IR R ELEASE VLV D MF Z M-001A

13

C

NO   2 7 I N- 1312 1014

1756-IB161K

RACK-0, SLOT-7   HSAL

 A1-5300-HZSL-118  A1-5300-JP-00042

11 10135300

HSAL

118

118

5300

HIC

5300

XA

118

10

118

5300

XA

118

5300

JY

CE

CE CECE   CE

CE

171 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-1495300-JT-00031-PDN

BL   A1-5300-JY-149-TB5-7+   +7-TB5-A1-5300-JY-149 A1-5300-JY-149-1677+

WT   A1-5300-JY-149-TB5-8-   - 8-TB5-A1 -5 30 0-JY-1 49 A1 -5 30 0-JY-1 49 -1 67 8- - 16 78 -A1-53 00 -J Y-14 9 A1-53 00 -J Y-14 9-15

SCL 21A- 21A-

24V DC SUPPLY

+ -

5300-JT-00031-PDN 7 7

TB1

 A1-5300-HZSH-149

5300-JT-00031-PDN

BL   A1-5300-HZSH-149-TB1-13+   +13-TB1-A1-5300-HZSH-149 A1-5300-HZSH-149-1015+

WT   A1-5300-HZSH-149-TB1-14-   -14-TB1-A1-5300-HZSH-149 A1-5300-HZSH-149-1016- -1016-A1-5300-HZSH-149 A1-5300-HZSH-149-29

SCL

7A+ 7A-

12

149

 A1-5300-JY-149

16

15

GND-0

OUT-7

 A1-5300-JP-00046

S

   A   1  -   5   3   0   0  -   J   Y  -   1   4

 A1-5300-HZSH-149   A1-5300-JP-00042

+   1677

-   8 1678

C   13 1015

NO   14 1016 29

7

149

15

SHEET 293

PLC MODULE

5300

JY

149

5300

JY

149

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

9

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   4   9

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-7

5300

HSAH

6

IN-14

GND-1430

1756-OB16DKRACK-1, SLOT-9

CE CECE   CE   CE

CE CECE   CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 171/293

24V DC SUPPLY

+ -

5300-JT-00031-PDN 7 7

TB1

 A1-5300-HZSL-149

5300-JT-00031-PDN

BL   A1-5300-HZSL-149-TB1-15+   +15-TB1-A1-5300-HZSL-149 A1-5300-HZSL-149-1017+

WT   A1-5300-HZSL-149-TB1-16-   - 16 -T B1 -A1-53 00 -HZSL-14 9 A1-53 00 -HZSL-14 9-10 18 - - 10 18 -A1-53 00 -HZSL-14 9 A1-53 00 -HZSL-14 9-31

SCL

7A+ 7A-

149

14

149

5300

XA

149

53005300

HIC

5300

XA

5300

HSAL

JY

149

5300

HSAL

149

 A1-5300-JP-00042

15 1017

 A1-5300-HZSL-149

C

LOOP NO.: A1-5300-X-149

NO   3 1 I N- 1516 1018  149

LOOP SER VI CE: R IN SE OUT LET VLV D MF Z M-001A

17

1756-IB161K

RACK-0, SLOT-7

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   4   9

ZSL

32 GND-15

CE

CE CECE   CE

CE

172 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-150 5300-JT-00031-PDN

BL   A1-5300-JY-150-TB5-9+   +9-TB5-A1-5300-JY-150 A1-5300-JY-150-1679+

WT   A1-5300-JY-150-TB5-10-   - 10 -T B5 -A1-53 00 -J Y-15 0 A1 -5 30 0-JY-1 50 -1 68 0- - 16 80 -A1-53 00 -J Y-15 0 A1-53 00 -J Y-15 0-17

SCL 21A- 21A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

TB1

 A1-5300-HZSH-150

5300-JT-00031-PDN

BL   A1-5300-HZSH-150-TB1-17+   +17-TB1-A1-5300-HZSH-150 A1-5300-HZSH-150-1019+

WT   A1-5300-HZSH-150-TB1-18-   - 18 -T B1 -A1-53 00 -HZSH-15 0 A1-53 00 -HZSH-15 0-10 20 - - 10 20 -A1-53 00 -HZSH-15 0 A1-53 00 -HZSH-15 0-1

SCL

8A+ 8A-

5300

HSAH

IN-0

GND-02

1

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   5   0

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-8

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

11

1756-OB16DKRACK-1, SLOT-9

150

5300

JY

150

293

PLC MODULE

5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

150

19

16

SHEET

TERMINALSJB

NO   18 1020

C   17 1019

S

   A   1  -   5   3   0   0  -   J   Y  -   1   5

 A1-5300-HZSH-150   A1-5300-JP-00042

+   1679

-   10 1680

8

 A1-5300-JY-150

18

17

+DC-1

OUT-8

 A1-5300-JP-00046

9

150

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 172/293

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

TB1

 A1-5300-HZSL-150

5300-JT-00031-PDN

BL   A1-5300-HZSL-150-TB1-19+   +19-TB1-A1-5300-HZSL-150 A1-5300-HZSL-150-1021+

WT   A1-5300-HZSL-150-TB1-20-   - 20 -T B1 -A1-53 00 -HZSL-15 0 A1-53 00 -HZSL-15 0-10 22 - - 10 22 -A1-53 00 -HZSL-15 0 A1-53 00 -HZSL-15 0-3

SCL

8A+ 8A-

4 GND- 1

1756-IB161K

RACK-0, SLOT-8

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   5   0

ZSL

LOOP SER VI CE: BWASH I NLET VLV D MF Z M-001A

21

LOOP NO.: A1-5300-X-150

NO   3 IN-120 1022  150

19 1021

 A1-5300-HZSL-150

C

 A1-5300-JP-00042

5300

HSAL

150

5300

HSAL

150

5300

HIC

5300

XA

150

18

150

5300

XA

150

5300

JY

CE

CE CECE   CE

CE

173 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-151 5300-JT-00031-PDN

BL   A1-5300-JY-151-TB5-11+   +11-TB5-A1-5300-JY-151 A1-5300-JY-151-1681+

WT   A1-5300-JY-151-TB5-12-   - 12 -T B5 -A1-53 00 -J Y-15 1 A1 -5 30 0-JY-1 51 -1 68 2- - 16 82 -A1-53 00 -J Y-15 1 A1-53 00 -J Y-15 1-19

SCL 21A- 21A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

TB1

 A1-5300-HZSH-151

5300-JT-00031-PDN

BL   A1-5300-HZSH-151-TB1-21+   +21-TB1-A1-5300-HZSH-151 A1-5300-HZSH-151-1023+

WT   A1-5300-HZSH-151-TB1-22-   - 22 -T B1 -A1-53 00 -HZSH-15 1 A1-53 00 -HZSH-15 1-10 24 - - 10 24 -A1-53 00 -HZSH-15 1 A1-53 00 -HZSH-15 1-5

SCL

8A+ 8A-

24V DC SUPPLY

20

151

 A1-5300-JY-151

20

19

+DC-1

OUT-9

 A1-5300-JP-00046

S

   A   1  -   5   3   0   0  -   J   Y  -   1   5

 A1-5300-HZSH-151   A1-5300-JP-00042

+   1681

-   12 1682

C   21 1023

NO   22 1024 5

11

151

23

SHEET 293

PLC MODULE

5300

JY

151

5300

JY

151

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

13

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   5   1

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-8

5300

HSAH

10

IN-2

GND-26

1756-OB16DKRACK-1, SLOT-9

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 173/293

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

TB1

 A1-5300-HZSL-151

5300-JT-00031-PDN

BL   A1-5300-HZSL-151-TB1-23+   +23-TB1-A1-5300-HZSL-151 A1-5300-HZSL-151-1025+

WT   A1-5300-HZSL-151-TB1-24-   - 24 -T B1 -A1-53 00 -HZSL-15 1 A1-53 00 -HZSL-15 1-10 26 - - 10 26 -A1-53 00 -HZSL-15 1 A1-53 00 -HZSL-15 1-7

SCL

8A+ 8A-

151

22

151

5300

XA

151

53005300

HIC

5300

XA

5300

HSAL

JY

151

5300

HSAL

151

 A1-5300-JP-00042

23 1025

 A1-5300-HZSL-151

C

LOOP NO.: A1-5300-X-151

NO   7 IN-324 1026  151

LOOP SER VI CE: SER VI CE OUT LET VLV D MF Z M-001A

25

1756-IB161K

RACK-0, SLOT-8

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   5   1

ZSL

8 GND-3

CE

CE CECE   CE

CE

174 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-120

5300-JT-00031-PDN

BL   A1-5300-JY-120-TB5-13+   +13-TB5-A1-5300-JY-120 A1-5300-JY-120-1683+

WT   A1-5300-JY-120-TB5-14-   - 14 -T B5 -A1-53 00 -J Y-12 0 A1 -5 30 0-JY-1 20 -1 68 4- - 16 84 -A1-53 00 -J Y-12 0 A1-53 00 -J Y-12 0-21

SCL 21A- 21A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

TB1

 A1-5300-HZSH-120

5300-JT-00031-PDN

BL   A1-5300-HZSH-120-TB1-25+   +25-TB1-A1-5300-HZSH-120 A1-5300-HZSH-120-1027+

WT   A1-5300-HZSH-120-TB1-26-   - 26 -T B1 -A1-53 00 -HZSH-12 0 A1-53 00 -HZSH-12 0-10 28 - - 10 28 -A1-53 00 -HZSH-12 0 A1-53 00 -HZSH-12 0-9

SCL

8A+ 8A-

24V DC SUPPLY

5300

HSAH

12

IN-4

GND-410

1756-OB16DK

RACK-1, SLOT-9

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   2   0

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-8

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

15

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

120

5300

JY

120

SHEET 293

PLC MODULE

5300

9

13

120

27

NO   26 1028

C   25 1027

S

   A   1  -   5   3   0   0  -   J   Y  -   1   2

 A1-5300-HZSH-120   A1-5300-JP-00042

+   1683

-   14 1684

 A1-5300-JY-120

22

21

+DC-1

OUT-10

 A1-5300-JP-00046

120

24

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 174/293

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

TB1

 A1-5300-HZSL-120

5300-JT-00031-PDN

BL   A1-5300-HZSL-120-TB1-27+   +27-TB1-A1-5300-HZSL-120 A1-5300-HZSL-120-1029+

WT   A1-5300-HZSL-120-TB1-28-   - 28 -T B1 -A1-53 00 -HZSL-12 0 A1-53 00 -HZSL-12 0-10 30 - - 10 30 -A1-53 00 -HZSL-12 0 A1-53 00 -HZSL-12 0-11

SCL

8A+ 8A-

12 GND-5

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   2   0

ZSL

LOOP SER VI CE: SER VI CE I NLET VLV D MF Z M-001B

29

1756-IB161K

RACK-0, SLOT-8

LOOP NO.: A1-5300-X-120

NO   11 IN-528 1030  120

27 1029

 A1-5300-HZSL-120

C

 A1-5300-JP-00042

JY

120

5300

HSAL

120

5300

XA

5300

HSAL

120

26

120

5300

XA

120

53005300

HIC

CE CECE   CE

CE

175 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-153

5300-JT-00031-PDN

BL   A1-5300-JY-153-TB5-15+   +15-TB5-A1-5300-JY-153 A1-5300-JY-153-1685+

WT   A1-5300-JY-153-TB5-16-   - 16 -T B5 -A1-53 00 -J Y-15 3 A1 -5 30 0-JY-1 53 -1 68 6- - 16 86 -A1-53 00 -J Y-15 3 A1-53 00 -J Y-15 3-23

SCL 21A- 21A+

24V DC SUPPLY

+ -

8 8

 A1-5300-HZSH-153 5300-JT-00031-PDN

TB2 5300-JT-00031-PDN

BL   A1-5300-HZSH-153-TB2-1+   +1-TB2-A1-5300-HZSH-153 A1-5300-HZSH-153-1031+

WT   A1-5300-HZSH-153-TB2-2-   - 2-TB2-A1 -5 30 0-HZ SH-1 53 A1-53 00 -HZSH-15 3-10 32 - - 10 32 -A1-53 00 -HZSH-15 3 A1-53 00 -HZSH-15 3-13

SCL

8A+ 8A-

24V DC SUPPLY

1

153

 A1-5300-JY-153

24

23

+DC-1

OUT-11

 A1-5300-JP-00046

S

   A   1  -   5   3   0   0  -   J   Y  -   1   5

 A1-5300-HZSH-153   A1-5300-JP-00043

+   1685

-

15

168616

1032

C

2

1031

SHEET 293

PLC MODULE

5300

DCS (BY OTHERS)PROCESS CONTROL ROOM

1756-OB16DK

RACK-1, SLOT-9

153

5300

JY

153

JB

JY

14

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

5300

HSAH

1756-IB161K

RACK-0, SLOT-8

153NO

3

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   5   3

WATER TREATMENT PLANT

ZSH

INSTRUMENT

FIELD

TERMINALS

17

13

4

5300

HSAH

IN-6

GND-614

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 175/293

+ -

5300-JT-00031-PDN 8 8

TB2

 A1-5300-HZSL-153

5300-JT-00031-PDN

BL   A1-5300-HZSL-153-TB2-3+   +3-TB2-A1-5300-HZSL-153 A1-5300-HZSL-153-1033+

WT   A1-5300-HZSL-153-TB2-4-   - 4-TB2-A1 -5 30 0-HZ SL -1 53 A1-53 00 -HZSL-15 3-10 34 - - 10 34 -A1-53 00 -HZSL-15 3 A1-53 00 -HZSL-15 3-15

SCL

8A+ 8A-

153

2

153

5300

XA

153

53005300

HIC

5300

XA

5300

HSAL

5300

HSAL

153

 A1-5300-HZSL-153

C

 A1-5300-JP-00043

LOOP NO.: A1-5300-X-153

NO   15 IN-74 1034  153

LOOP SER VI CE: BWASH OUT LET VLV D MF Z M-001B

5

JY

153

ZSL

3 1033

16 GND-7

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   5   31756-IB161K

RACK-0, SLOT-8

CE CECE   CE

CE

176 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-154

5300-JT-00031-PDN

BL   A1-5300-JY-154-TB5-17+   +17-TB5-A1-5300-JY-154 A1-5300-JY-154-1687+

WT   A1-5300-JY-154-TB5-18-   - 18 -T B5 -A1-53 00 -J Y-15 4 A1-53 00 -J Y-15 4-16 88 - - 16 88 -A1-53 00 -J Y-15 4 A1-53 00 -J Y-15 4-25

SCL 21A- 21A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

TB2

 A1-5300-HZSH-154

5300-JT-00031-PDN

BL   A1-5300-HZSH-154-TB2-5+   +5-TB2-A1-5300-HZSH-154 A1-5300-HZSH-154-1035+

WT   A1-5300-HZSH-154-TB2-6-   - 6-TB2-A1 -5 30 0-HZ SH-1 54 A1-53 00 -HZSH-15 4-10 36 - - 10 36 -A1-53 00 -HZSH-15 4 A1-53 00 -HZSH-15 4-17

SCL

8A+ 8A-

24V DC SUPPLY

+

5300

HSAH

IN-8

GND-818

17  154

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   5   4

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-8

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

19

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

154

5300

JY

154

SHEET 293

PLC MODULE

5300

1756-OB16DK

RACK-1, SLOT-9

154

4

C   5 1035

7

NO   6 1036

S

   A   1  -   5   3   0   0  -   J   Y  -   1   5

 A1-5300-HZSH-154   A1-5300-JP-00043

+   1687

-   18 1688

17

 A1-5300-JY-154

26

25

+DC-1

OUT-12

 A1-5300-JP-00046

16

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 176/293

+ -

5300-JT-00031-PDN 8 8

TB2

 A1-5300-HZSL-154

5300-JT-00031-PDN

BL   A1-5300-HZSL-154-TB2-7+   +7-TB2-A1-5300-HZSL-154 A1-5300-HZSL-154-1037+

WT   A1-5300-HZSL-154-TB2-8-   - 8-TB2-A1 -5 30 0-HZ SL -1 54 A1-53 00 -HZSL-15 4-10 38 - - 10 38 -A1-53 00 -HZSL-15 4 A1-53 00 -HZSL-15 4-19

SCL

8A+ 8A-

20 GND- 9

5300

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   5   4

ZSL

LOOP SER VI CE: A IR R ELEASE VLV D MF Z M-001B

9

1756-IB161K

RACK-0, SLOT-8

LOOP NO.: A1-5300-X-154

NO   19 IN-98 1038  154

7 1037C

 A1-5300-JP-00043 A1-5300-HZSL-154

XA

5300

HSAL

154

6

154

5300

XA

154

53005300

HSAL

154

HIC

5300

JY

154

CE CECE   CE

CE

177 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-155

5300-JT-00031-PDN

BL   A1-5300-JY-155-TB5-19+   +19-TB5-A1-5300-JY-155 A1-5300-JY-155-1689+

WT   A1-5300-JY-155-TB5-20-   - 20 -T B5 -A1-53 00 -J Y-15 5 A1 -5 30 0-JY-1 55 -1 69 0- - 16 90 -A1-53 00 -J Y-15 5 A1-53 00 -J Y-15 5-27

SCL 21A- 21A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

TB2

 A1-5300-HZSH-155

5300-JT-00031-PDN

BL   A1-5300-HZSH-155-TB2-9+   +9-TB2-A1-5300-HZSH-155 A1-5300-HZSH-155-1043+

WT   A1-5300-HZSH-155-TB2-10-   -10-TB2-A1-5300-HZSH-155 A1-5300-HZSH-155-1044- -1044-A1-5300-HZSH-155 A1-5300-HZSH-155-21

SCL

8A+ 8A-

24V DC SUPPLY

+ -

155

21

   A   1  -   5   3   0   0  -   J   Y  -   1   5RACK-1, SLOT-9

OUT-13

 A1-5300-JP-00046

1690155

 A1-5300-JY-155

28

27

1043

1756-OB16DK

8

18

 A1-5300-HZSH-155   A1-5300-JP-00043

21

+   1689

-   20

C   9

11

SHEET 293

PLC MODULE

5300+DC-1

  5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

JY19

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

5300

HSAH

1756-IB161K

RACK-0, SLOT-8

155NO   10

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   5   5

WATER TREATMENT PLANT

ZSH

INSTRUMENT

FIELD

TERMINALS

1044

JB

S

5300

HSAH

IN-10

GND-1022

155

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 177/293

5300-JT-00031-PDN 8 8

TB2

 A1-5300-HZSL-155

5300-JT-00031-PDN

BL   A1-5300-HZSL-155-TB2-11+   +11-TB2-A1-5300-HZSL-155 A1-5300-HZSL-155-1045+

WT   A1-5300-HZSL-155-TB2-12-   - 12 -T B2 -A1-53 00 -HZSL-15 5 A1-53 00 -HZSL-15 5-10 46 - - 10 46 -A1-53 00 -HZSL-15 5 A1-53 00 -HZSL-15 5-23

SCL

8A+ 8A-

5300

HSAL

1756-IB161K

RACK-0, SLOT-8

155

10

155

5300

XA

155

53005300

HSAL

155

5300

XA

JY

155

HIC

 A1-5300-JP-00043

C

LOOP NO.: A1-5300-X-155

NO   23 IN- 1112

 A1-5300-HZSL-155

1046  155

LOOP SER VI CE: R IN SE OUT LET VLV D MF Z M-001B

13

ZSL

11 1045

2 4 G ND -1 1

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   5   5 5300

CE CECE   CE

CE

178 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-156

5300-JT-00031-PDN

BL   A1-5300-JY-156-TB5-21+   +21-TB5-A1-5300-JY-156 A1-5300-JY-156-1691+

WT   A1-5300-JY-156-TB5-22-   - 22 -T B5 -A1-53 00 -J Y-15 6 A1-53 00 -J Y-15 6-16 92 - - 16 92 -A1-53 00 -J Y-15 6 A1-53 00 -J Y-15 6-29

SCL 21A- 21A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

TB2

 A1-5300-HZSH-156

5300-JT-00031-PDN

BL   A1-5300-HZSH-156-TB2-13+   +13-TB2-A1-5300-HZSH-156 A1-5300-HZSH-156-1047+

WT   A1-5300-HZSH-156-TB2-14-   - 14 -T B2 -A1-53 00 -HZSH-15 6 A1-53 00 -HZSH-15 6-10 48 - - 10 48 -A1-53 00 -HZSH-15 6 A1-53 00 -HZSH-15 6-25

SCL

8A+ 8A-

24V DC SUPPLY

+ -

5300

HSAH

20

IN-12

GND-1226

1756-OB16DK

RACK-1, SLOT-9

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   5   6

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-8

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

23

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

156

5300

JY

156

SHEET 293

PLC MODULE

5300

25

21

156

15

NO   14 1048

C   13 1047

S

   A   1  -   5   3   0   0  -   J   Y  -   1   5

 A1-5300-HZSH-156   A1-5300-JP-00043

+   1691

-   22 1692

 A1-5300-JY-156

30

29

+DC-1

OUT-14

 A1-5300-JP-00046

156

12

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 178/293

5300-JT-00031-PDN 8 8

TB2

 A1-5300-HZSL-156

5300-JT-00031-PDN

BL   A1-5300-HZSL-156-TB2-15+   +15-TB2-A1-5300-HZSL-156 A1-5300-HZSL-156-1049+

WT   A1-5300-HZSL-156-TB2-16-   - 16 -T B2 -A1-53 00 -HZSL-15 6 A1-53 00 -HZSL-15 6-10 50 - - 10 50 -A1-53 00 -HZSL-15 6 A1-53 00 -HZSL-15 6-27

SCL

8A+ 8A-

2 8 G ND -1 3

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   5   6

ZSL

LOOP SER VI CE: BWASH I NLET VLV D MF Z M-001B

17

1756-IB161K

RACK-0, SLOT-8

LOOP NO.: A1-5300-X-156

NO   27 IN- 1316 1050  156

15 1049

 A1-5300-HZSL-156

C

 A1-5300-JP-00043

JY

156

5300

HSAL

156

5300

XA

5300

HSAL

156

14

156

5300

XA

156

53005300HIC

CE CECE   CE

CE

179 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 21 21

TB5

 A1-5300-JY-157

5300-JT-00031-PDNBL   A1-5300-JY-157-TB5-23+   +23-TB5-A1-5300-JY-157 A1-5300-JY-157-1693+

WT   A1-5300-JY-157-TB5-24-   - 24 -T B5 -A1-53 00 -J Y-15 7 A1-53 00 -J Y-15 7-16 94 - - 16 94 -A1-53 00 -J Y-15 7 A1-53 00 -J Y-15 7-31

SCL 21A- 21A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

TB2

 A1-5300-HZSH-157

5300-JT-00031-PDN

BL   A1-5300-HZSH-157-TB2-17+   +17-TB2-A1-5300-HZSH-157 A1-5300-HZSH-157-1051+

WT   A1-5300-HZSH-157-TB2-18-   - 18 -T B2 -A1-53 00 -HZSH-15 7 A1-53 00 -HZSH-15 7-10 52 - - 10 52 -A1-53 00 -HZSH-15 7 A1-53 00 -HZSH-15 7-29

SCL

8A+ 8A-

24V DC SUPPLY

+ -

5300-JT-00031-PDN 8 8

157

 A1-5300-JY-157

32

31

+GND-1

OUT-15

 A1-5300-JP-00046

S

   A   1  -   5   3   0   0  -   J   Y  -   1   5

 A1-5300-HZSH-157   A1-5300-JP-00043

+   1693

-   24 1694

C   17 1051

NO   18 1052 29

23

157

19

16

SHEET 293

PLC MODULE

5300

JY

157

5300

JY

157

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

25

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   5   7

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-8

5300

HSAH

22

IN-14

GND-1430

1756-OB16DK

RACK-1, SLOT-9

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 179/293

5300-JT-00031-PDN 8 8

TB2

 A1-5300-HZSL-157

5300-JT-00031-PDN

BL   A1-5300-HZSL-157-TB2-19+   +19-TB2-A1-5300-HZSL-157 A1-5300-HZSL-157-1053+

WT   A1-5300-HZSL-157-TB2-20-   - 20 -T B2 -A1-53 00 -HZSL-15 7 A1-53 00 -HZSL-15 7-10 54 - - 10 54 -A1-53 00 -HZSL-15 7 A1-53 00 -HZSL-15 7-31

SCL

8A+ 8A-

157

18

157

5300

XA

157

53005300HIC

5300

XA

5300

HSAL

JY

157

5300

HSAL

157

 A1-5300-JP-00043

19 1053

 A1-5300-HZSL-157

C

LOOP NO.: A1-5300-X-157

NO   31 IN- 1520 1054  157

LOOP SER VI CE: SER VI CE OUT LET VLV D MF Z M-001B

21

1756-IB161K

RACK-0, SLOT-8

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   5   7

ZSL

3 2 G ND -1 5

CE CECE   CE

CE

180 OF

24V DC SUPPLY

- +

22 22

 A1-5300-JY-158 5300-JT-00031-PDN

TB6 5300-JT-00031-PDNBL   A1-5300-JY-158-TB6-1+   +1-TB6-A1-5300-JY-158 A1-5300-JY-158-1695+

WT   A1-5300-JY-158-TB6-2-   - 2- TB 6- A1 -5 30 0- JY -1 58 A 1- 53 00 -J Y- 15 8- 16 96 - - 16 96 -A 1- 53 00 -J Y- 15 8 A1 -5 30 0- JY -1 58 -1

SCL 22A- 22A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

TB2

 A1-5300-HZSH-158

5300-JT-00031-PDN

BL   A1-5300-HZSH-158-TB2-21+   +21-TB2-A1-5300-HZSH-158 A1-5300-HZSH-158-1055+

WT   A1-5300-HZSH-158-TB2-22-   - 22 -T B2 -A1-53 00 -HZSH-15 8 A1-53 00 -HZSH-15 8-10 56 - - 10 56 -A1-53 00 -HZSH-15 8 A1-53 00 -HZSH-15 8-1

SCL

9A+ 9A-

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

158

 A1-5300-JY-158

2

1

+DC-0

OUT-0

 A1-5300-JP-00047

1

S

   A   1  -   5   3   0   0  -   J   Y  -   1   5

 A1-5300-HZSH-158   A1-5300-JP-00043

RACK-1, SLOT-10

2

+   1695

NO

20

158

22 1056

-

3

1696

C   21

SHEET

TERMINALSJB

1055

1

23

293

PLC MODULE

5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

158

5300

JY

1756-OB16DK

INSTRUMENT

FIELD

4

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   5   8

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-9

5300

HSAH

IN-0

GND-02

158

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 180/293

TB2

 A1-5300-HZSL-158

5300-JT-00031-PDN

BL   A1-5300-HZSL-158-TB2-23+   +23-TB2-A1-5300-HZSL-158 A1-5300-HZSL-158-1057+

WT   A1-5300-HZSL-158-TB2-24-   - 24 -T B2 -A1-53 00 -HZSL-15 8 A1-53 00 -HZSL-15 8-10 58 - - 10 58 -A1-53 00 -HZSL-15 8 A1-53 00 -HZSL-15 8-3

SCL

9A+ 9A-

5300

XA

158

22

158

5300

XA

158

5300JY

158

5300HIC

158

5300

HSAL

158

23 1057

 A1-5300-JP-00043 A1-5300-HZSL-158

C

NO   3 IN-124 1058

1756-IB161K

RACK-0, SLOT-9

LOOP NO.: A1-5300-X-158 LOOP SER VI CE: SER VI CE I NLET VLV ACF Z N-001A

25

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   5   8

ZSL

4 GND-1

5300

HSAL

CE CECE   CE

CE

181 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 22 22

TB6

 A1-5300-JY-159

5300-JT-00031-PDNBL   A1-5300-JY-159-TB6-3+   +3-TB6-A1-5300-JY-159 A1-5300-JY-159-1697+

WT   A1-5300-JY-159-TB6-4-   - 4- TB 6- A1 -5 30 0- JY -1 59 A 1- 53 00 -J Y- 15 9- 16 98 - - 16 98 -A 1- 53 00 -J Y- 15 9 A 1- 53 00 -J Y- 15 9- 3

SCL 22A- 22A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

TB2

 A1-5300-HZSH-159

5300-JT-00031-PDN

BL   A1-5300-HZSH-159-TB2-25+   +25-TB2-A1-5300-HZSH-159 A1-5300-HZSH-159-1059+

WT   A1-5300-HZSH-159-TB2-26-   - 26 -T B2 -A1-53 00 -HZSH-15 9 A1-53 00 -HZSH-15 9-10 60 - - 10 60 -A1-53 00 -HZSH-15 9 A1-53 00 -HZSH-15 9-5

SCL

9A+ 9A-

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

TB2

5300

HSAH

2

IN-2

GND-26

1756-OB16DK

RACK-1, SLOT-10

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   5   9

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-9

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

5

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

159

5300

JY

159

SHEET 293

PLC MODULE

5300

5

3

159

27

NO   26 1060

C   25 1059

S

   A   1  -   5   3   0   0  -   J   Y  -   1   5

 A1-5300-HZSH-159   A1-5300-JP-00043

+   1697

-   4 1698

 A1-5300-JY-159

4

3

+DC-0

OUT-1

 A1-5300-JP-00047

159

24

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 181/293

TB2

 A1-5300-HZSL-159

5300-JT-00031-PDN

BL   A1-5300-HZSL-159-TB2-27+   +27-TB2-A1-5300-HZSL-159 A1-5300-HZSL-159-1061+

WT   A1-5300-HZSL-159-TB2-28-   - 28 -T B2 -A1-53 00 -HZSL-15 9 A1-53 00 -HZSL-15 9-10 62 - - 10 62 -A1-53 00 -HZSL-15 9 A1-53 00 -HZSL-15 9-7

SCL

9A+ 9A-

8 GND-3

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   5   9

ZSL

LOOP SER VI CE: BWASH OUT LET VLV ACF Z N-001A

29

1756-IB161K

RACK-0, SLOT-9

LOOP NO.: A1-5300-X-159

NO   7 IN-328 1062  159

27 1061

 A1-5300-HZSL-159

C

 A1-5300-JP-00043

JY

159

5300

HSAL

159

5300

XA

5300

HSAL

159

26

159

5300

XA

159

53005300HIC

CE CECE   CE

CE

182 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 22 22

TB6

 A1-5300-JY-112

5300-JT-00031-PDNBL   A1-5300-JY-112-TB6-5+   +5-TB6-A1-5300-JY-112 A1-5300-JY-112-1699+

WT   A1-5300-JY-112-TB6-6-   - 6- TB 6- A1 -5 30 0- JY -1 12 A 1- 53 00 -J Y- 11 2- 17 00 - - 17 00 -A 1- 53 00 -J Y- 11 2 A 1- 53 00 -J Y- 11 2- 5

SCL 22A- 22A+

24V DC SUPPLY

+ -

9 9

 A1-5300-HZSH-112 5300-JT-00031-PDN

TB3 5300-JT-00031-PDN

BL   A1-5300-HZSH-112-TB3-1+   +1-TB3-A1-5300-HZSH-112 A1-5300-HZSH-112-1063+

WT   A1-5300-HZSH-112-TB3-2-   - 2-TB3-A1 -5 30 0-HZ SH-1 12 A1-53 00 -HZSH-11 2-10 64 - - 10 64 -A1-53 00 -HZSH-11 2 A1-53 00 -HZSH-11 2-9

SCL

9A+ 9A-

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

TB3

5300

HSAH

IN-4

GND-410

112

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   1   2

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

7

JB

SHEET

RACK-0, SLOT-9

TERMINALS

9

4

2

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

112

5300

JY

1756-OB16DK

NO

112

3

1064

-   6 1700

C   1063

S

   A   1  -   5   3   0   0  -   J   Y  -   1   1

 A1-5300-HZSH-112   A1-5300-JP-00044

RACK-1, SLOT-10

5+   1699

4

 A1-5300-JY-112

6

5

+DC-0

OUT-2

 A1-5300-JP-00047

112

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 182/293

TB3

 A1-5300-HZSL-112

5300-JT-00031-PDN

BL   A1-5300-HZSL-112-TB3-3+   +3-TB3-A1-5300-HZSL-112 A1-5300-HZSL-112-1065+

WT   A1-5300-HZSL-112-TB3-4-   - 4-TB3-A1 -5 30 0-HZ SL -1 12 A1-53 00 -HZSL-11 2-10 66 - - 10 66 -A1-53 00 -HZSL-11 2 A1-53 00 -HZSL-11 2-11

SCL

9A+ 9A-

1 2 GN D- 5

5300

112

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   1   2

ZSL

LOOP NO.: A1-5300-X-112 LOOP SER VI CE: A IR R ELEASE VLV ACF Z N-001A

5

C

NO   11 IN-54 1066

1756-IB161K

RACK-0, SLOT-9   HSAL

 A1-5300-HZSL-112  A1-5300-JP-00044

3 10655300

HSAL

112

112

5300HIC

5300

XA

112

2

112

5300

XA

112

5300JY

CE CECE   CE

CE

183 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 22 22

TB6

 A1-5300-JY-161

5300-JT-00031-PDNBL   A1-5300-JY-161-TB6-7+   +7-TB6-A1-5300-JY-161 A1-5300-JY-161-1701+

WT   A1-5300-JY-161-TB6-8-   - 8- TB 6- A1 -5 30 0- JY -1 61 A 1- 53 00 -J Y- 16 1- 17 02 - - 17 02 -A 1- 53 00 -J Y- 16 1 A 1- 53 00 -J Y- 16 1- 7

SCL 22A- 22A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

TB3

 A1-5300-HZSH-161

5300-JT-00031-PDN

BL   A1-5300-HZSH-161-TB3-5+   +5-TB3-A1-5300-HZSH-161 A1-5300-HZSH-161-1067+

WT   A1-5300-HZSH-161-TB3-6-   - 6-TB3-A1 -5 30 0-HZ SH-1 61 A1-53 00 -HZSH-16 1-10 68 - - 10 68 -A1-53 00 -HZSH-16 1 A1-53 00 -HZSH-16 1-13

SCL

9A+ 9A-

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

TB3

4

161

 A1-5300-JY-161

8

7

+DC-0

OUT-3

 A1-5300-JP-00047

6

S

   A   1  -   5   3   0   0  -   J   Y  -   1   6

 A1-5300-HZSH-161   A1-5300-JP-00044

RACK-1, SLOT-10

7+   1701

NO

161

6 1068

-   8 1702

C   5 1067

13

7

SHEET 293

PLC MODULE

5300

JY

161

5300

JY

1756-OB16DK

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

9

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   6   1

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-9

5300

HSAH

IN-6

GND-614

161

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 183/293

 A1-5300-HZSL-161

5300-JT-00031-PDN

BL   A1-5300-HZSL-161-TB3-7+   +7-TB3-A1-5300-HZSL-161 A1-5300-HZSL-161-1069+

WT   A1-5300-HZSL-161-TB3-8-   - 8-TB3-A1 -5 30 0-HZ SL -1 61 A1-53 00 -HZSL-16 1-10 70 - - 10 70 -A1-53 00 -HZSL-16 1 A1-53 00 -HZSL-16 1-15

SCL

9A+ 9A-

5300

XA

161

6

161

5300

XA

161

5300JY

161

5300HIC

161

5300

HSAL

161

 A1-5300-JP-00044

7 1069

 A1-5300-HZSL-161

C

NO   15 IN-78 1070

1756-IB161K

RACK-0, SLOT-9

LOOP NO.: A1-5300-X-161 LOOP SER VI CE: R IN SE OUT LET VLV ACF Z N-001A

9

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   6   1

ZSL

1 6 G ND -7

5300

HSAL

CE CECE   CE

CE

184 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 22 22

TB6

 A1-5300-JY-162

5300-JT-00031-PDNBL   A1-5300-JY-162-TB6-9+   +9-TB6-A1-5300-JY-162 A1-5300-JY-162-1703+

WT   A1-5300-JY-162-TB6-10-   - 10 -T B6 -A 1- 53 00 -J Y- 16 2 A 1 -5 30 0- JY -1 62 -1 70 4- - 17 04 -A 1- 53 00 -J Y- 16 2 A 1- 53 00 -J Y- 16 2- 9

SCL 22A- 22A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

TB3

 A1-5300-HZSH-162

5300-JT-00031-PDN

BL   A1-5300-HZSH-162-TB3-9+   +9-TB3-A1-5300-HZSH-162 A1-5300-HZSH-162-1071+

WT   A1-5300-HZSH-162-TB3-10-   - 10 -T B3 -A1-53 00 -HZSH-16 2 A1-53 00 -HZSH-16 2-10 72 - - 10 72 -A1-53 00 -HZSH-16 2 A1-53 00 -HZSH-16 2-17

SCL

9A+ 9A-

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

TB3

5300

HSAH

IN-8

GND-818

162

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   6   2

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

8

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

11

JB

SHEET

A1 5300 HZSL 162

RACK-0, SLOT-9

TERMINALS

17

11

A1 5300 JP 00044

9

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

162

5300

JY

1756-OB16DK

NO

162

10 1072

-   10 1704

C   1071

S

   A   1  -   5   3   0   0  -   J   Y  -   1   6

 A1-5300-HZSH-162   A1-5300-JP-00044

RACK-1, SLOT-10

9+   1703

8

 A1-5300-JY-162

10

9

+DC-0

OUT-4

 A1-5300-JP-00047

162

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 184/293

 A1-5300-HZSL-162

5300-JT-00031-PDN

BL   A1-5300-HZSL-162-TB3-11+   +11-TB3-A1-5300-HZSL-162 A1-5300-HZSL-162-1073+

WT   A1-5300-HZSL-162-TB3-12-   - 12 -T B3 -A1-53 00 -HZSL-16 2 A1-53 00 -HZSL-16 2-10 74 - - 10 74 -A1-53 00 -HZSL-16 2 A1-53 00 -HZSL-16 2-19

SCL

9A+ 9A-

2 0 GN D- 9

5300

162

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   6   2

ZSL

LOOP NO.: A1-5300-X-162 LOOP SER VI CE: BWASH I NLET VLV ACF Z N-001A

13

C

NO   19 IN-912 1074

1756-IB161K

RACK-0, SLOT-9   HSAL

 A1-5300-HZSL-162  A1-5300-JP-00044

11 10735300

HSAL

162

162

5300HIC

5300

XA

162

10

162

5300

XA

162

5300JY

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 185/293

186 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 22 22

TB6

 A1-5300-JY-164

5300-JT-00031-PDNBL   A1-5300-JY-164-TB6-13+   +13-TB6-A1-5300-JY-164 A1-5300-JY-164-1713+

WT   A1-5300-JY-164-TB6-14-   - 14 -T B6 -A1-53 00 -J Y-16 4 A1 -5 30 0-JY-1 64 -1 71 4- - 17 14 -A1-53 00 -J Y-16 4 A1-53 00 -J Y-16 4-13

SCL 22A- 22A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

TB3

 A1-5300-HZSH-164

5300-JT-00031-PDN

BL   A1-5300-HZSH-164-TB3-17+   +17-TB3-A1-5300-HZSH-164 A1-5300-HZSH-164-1087+

WT   A1-5300-HZSH-164-TB3-18-   -18-TB3-A1-5300-HZSH-164 A1-5300-HZSH-164-1088- -1088-A1-5300-HZSH-164 A1-5300-HZSH-164-25

SCL

9A+ 9A-

24V DC SUPPLY+ -

5300-JT-00031-PDN 9 9

TB3

5300

HSAH

IN-12

GND-1226

164

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   6   4

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

16

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

15

JB

SHEET

 A1-5300-HZSL-164

RACK-0, SLOT-9

TERMINALS

25

19

 A1-5300-JP-00044

17

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

164

5300

JY

1756-OB16DK

NO

164

18 1088

-   14 1714

C   1087

S

   A   1  -   5   3   0   0  -   J   Y  -   1   6

 A1-5300-HZSH-164   A1-5300-JP-00044

RACK-1, SLOT-1013+   1713

12

 A1-5300-JY-164

14

13

+DC-0

OUT-6

 A1-5300-JP-00047

164

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 186/293

 A1-5300-HZSL-164

5300-JT-00031-PDN

BL   A1-5300-HZSL-164-TB3-19+   +19-TB3-A1-5300-HZSL-164 A1-5300-HZSL-164-1089+

WT   A1-5300-HZSL-164-TB3-20-   - 20 -T B3 -A1-53 00 -HZSL-16 4 A1-53 00 -HZSL-16 4-10 90 - - 10 90 -A1-53 00 -HZSL-16 4 A1-53 00 -HZSL-16 4-27

SCL

9A+ 9A-

28 GND-13

5300

164

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   6   4

ZSL

LOOP NO.: A1-5300-X-164 LOOP SER VI CE: SER VI CE I NLET VLV ACF Z N-001B

21

C

NO   2 7 I N- 1320 1090

1756-IB161K

RACK-0, SLOT-9   HSAL19 1089

5300

HSAL

164

164

5300HIC

5300

XA

164

18

164

5300

XA

164

5300JY

CE CECE   CE

CE

187 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 22 22

TB6

 A1-5300-JY-165

5300-JT-00031-PDNBL   A1-5300-JY-165-TB6-15+   +15-TB6-A1-5300-JY-165 A1-5300-JY-165-1715+

WT   A1-5300-JY-165-TB6-16-   - 16 -T B6 -A1-53 00 -J Y-16 5 A1 -5 30 0-JY-1 65 -1 71 6- - 17 16 -A1-53 00 -J Y-16 5 A1-53 00 -J Y-16 5-15

SCL 22A- 22A-

24V DC SUPPLY

+ -

5300-JT-00031-PDN 9 9

TB3

 A1-5300-HZSH-165

5300-JT-00031-PDN

BL   A1-5300-HZSH-165-TB3-21+   +21-TB3-A1-5300-HZSH-165 A1-5300-HZSH-165-1091+

WT   A1-5300-HZSH-165-TB3-22-   -22-TB3-A1-5300-HZSH-165 A1-5300-HZSH-165-1092- -1092-A1-5300-HZSH-165 A1-5300-HZSH-165-29

SCL

9A+ 9A-

24V DC SUPPLY+ -

5300-JT-00031-PDN 9 9

TB3

A1 5300 HZSL 165

20

165

 A1-5300-JY-165

16

15

GND-0

OUT-7

 A1-5300-JP-00047

S

   A   1  -   5   3   0   0  -   J   Y  -   1

   6

 A1-5300-HZSH-165   A1-5300-JP-00044

+   1715

-   16 1716

C   21 1091

 A1-5300-JP-00044

NO   22 1092

 A1-5300-HZSL-165

29

15

165

23

SHEET 293

PLC MODULE

5300

JY

165

5300

JY

165

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

17

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   6   5

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-9

5300

HSAH

14

IN-14

GND-1430

1756-OB16DK

RACK-1, SLOT-10

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 187/293

 A1-5300-HZSL-165

5300-JT-00031-PDN

BL   A1-5300-HZSL-165-TB3-23+   +23-TB3-A1-5300-HZSL-165 A1-5300-HZSL-165-1093+

WT   A1-5300-HZSL-165-TB3-24-   - 24 -T B3 -A1-53 00 -HZSL-16 5 A1-53 00 -HZSL-16 5-10 94 - - 10 94 -A1-53 00 -HZSL-16 5 A1-53 00 -HZSL-16 5-31

SCL

9A+ 9A-

165

22

165

5300

XA

165

53005300

HIC

5300

XA

5300

HSAL

JY

165

5300

HSAL

165

23 1093C

LOOP NO.: A1-5300-X-165

NO   3 1 I N- 1524 1094  165

LOOP SER VI CE: BWASH OUT LET VLV ACF Z N-001B

25

1756-IB161K

RACK-0, SLOT-9

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   6   5

ZSL

32 GND-15

CE CECE   CE

CE

188 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 22 22

TB6

 A1-5300-JY-166

5300-JT-00031-PDNBL   A1-5300-JY-166-TB6-17+   +17-TB6-A1-5300-JY-166 A1-5300-JY-166-1717+

WT   A1-5300-JY-166-TB6-18-   - 18 -T B6 -A1-53 00 -J Y-16 6 A1-53 00 -J Y-16 6-17 18 - - 17 18 -A1-53 00 -J Y-16 6 A1-53 00 -J Y-16 6-17

SCL 22A- 22A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 10 10

TB3

 A1-5300-HZSH-166

5300-JT-00031-PDN

BL   A1-5300-HZSH-166-TB3-25+   +25-TB3-A1-5300-HZSH-166 A1-5300-HZSH-166-1095+

WT   A1-5300-HZSH-166-TB3-26-   - 26 -T B3 -A1-53 00 -HZSH-16 6 A1-53 00 -HZSH-16 6-10 96 - - 10 96 -A1-53 00 -HZSH-16 6 A1-53 00 -HZSH-16 6-1

SCL

10A+ 10A-

24V DC SUPPLY+ -

5300-JT-00031-PDN 10 10

TB3

 A1-5300-HZSL-166

5300

HSAH

IN-0

GND-02

1

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   6   6

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-10

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

19

1756-OB16DK

RACK-1, SLOT-10

166

5300

JY

166

293

PLC MODULE

5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

166

27

24

SHEET

TERMINALSJB

NO   26 1096

 A1-5300-HZSL-166

C   25 1095

 A1-5300-JP-00044

S

   A   1  -   5   3   0   0  -   J   Y  -   1

   6

 A1-5300-HZSH-166   A1-5300-JP-00044

+   1717

-   18 1718

16

 A1-5300-JY-166

18

17

+DC-1

OUT-8

 A1-5300-JP-00047

17

166

26

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 188/293

5300-JT-00031-PDN

BL   A1-5300-HZSL-166-TB3-27+   +27-TB3-A1-5300-HZSL-166 A1-5300-HZSL-166-1097+

WT   A1-5300-HZSL-166-TB3-28-   - 28 -T B3 -A1-53 00 -HZSL-16 6 A1-53 00 -HZSL-16 6-10 98 - - 10 98 -A1-53 00 -HZSL-16 6 A1-53 00 -HZSL-16 6-3

SCL

10A+ 10A-

4 GND-1

1756-IB161K

RACK-0, SLOT-10

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   6   6

ZSL

LOOP SER VI CE: A IR R ELEASE VLV ACF Z N-001B

29

LOOP NO.: A1-5300-X-166

NO   3 IN-128 1098  166

27 1097C 5300

HSAL

166

5300

HSAL

166

5300

HIC

5300

XA

166

26

166

5300

XA

166

5300

JY

CE CECE   CE

CE

189 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 22 22

TB6

 A1-5300-JY-167

5300-JT-00031-PDNBL   A1-5300-JY-167-TB6-19+   +19-TB6-A1-5300-JY-167 A1-5300-JY-167-1719+

WT   A1-5300-JY-167-TB6-20-   - 20 -T B6 -A1-53 00 -J Y-16 7 A1-53 00 -J Y-16 7-17 20 - - 17 20 -A1-53 00 -J Y-16 7 A1-53 00 -J Y-16 7-19

SCL 22A- 22A+

24V DC SUPPLY

+ -

10 10

 A1-5300-HZSH-167 5300-JT-00031-PDN

TB4 5300-JT-00031-PDN

BL   A1-5300-HZSH-167-TB4-1+   +1-TB4-A1-5300-HZSH-167 A1-5300-HZSH-167-1099+

WT   A1-5300-HZSH-167-TB4-2-   - 2-TB4-A1 -5 30 0-HZ SH-1 67 A1-53 00 -HZSH-16 7-11 00 - - 11 00 -A1-53 00 -HZSH-16 7 A1-53 00 -HZSH-16 7-5

SCL

10A+ 10A-

24V DC SUPPLY+ -

5300-JT-00031-PDN 10 10

TB4

 A1-5300-HZSL-167

5300 JT 00031 PDN

1

2

167

 A1-5300-JY-167

20

19

+DC-1

OUT-9

 A1-5300-JP-00047

S

   A   1  -   5   3   0   0  -   J   Y  -   1

   6

 A1-5300-HZSH-167   A1-5300-JP-00045

+   1719

-   20 1720

C

2

1099

 A1-5300-JP-00045

NO

3

1100

 A1-5300-HZSL-167

5

19

167

4

SHEET 293

PLC MODULE

5300

JY

167

5300

JY

167

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

21

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   6   7

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-10

5300

HSAH

18

IN-2

GND-26

1756-OB16DK

RACK-1, SLOT-10

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 189/293

5300-JT-00031-PDN

BL   A1-5300-HZSL-167-TB4-3+   +3-TB4-A1-5300-HZSL-167 A1-5300-HZSL-167-1101+

WT   A1-5300-HZSL-167-TB4-4-   - 4-TB4-A1 -5 30 0-HZ SL -1 67 A1-53 00 -HZSL-16 7-11 02 - - 11 02 -A1-53 00 -HZSL-16 7 A1-53 00 -HZSL-16 7-7

SCL

10A+ 10A-

167

167

5300

XA

167

53005300

HIC

5300

XA

5300

HSAL

JY

167

5300

HSAL

167

3 1101C

LOOP NO.: A1-5300-X-167

NO   7 IN-34 1102  167

LOOP SER VI CE: R IN SE OUT LET VLV ACF Z N-001B

5

1756-IB161K

RACK-0, SLOT-10

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   6   7

ZSL

8 GND- 3

CE CECE   CE

CE

190 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 22 22

TB6

 A1-5300-JY-168

5300-JT-00031-PDN

BL   A1-5300-JY-168-TB6-21+   +21-TB6-A1-5300-JY-168 A1-5300-JY-168-1721+

WT   A1-5300-JY-168-TB6-22-   - 22 -T B6 -A1-53 00 -J Y-16 8 A1 -5 30 0-JY-1 68 -1 72 2- - 17 22 -A1-53 00 -J Y-16 8 A1-53 00 -J Y-16 8-21

SCL 22A- 22A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 10 10

TB4

 A1-5300-HZSH-168

5300-JT-00031-PDN

BL   A1-5300-HZSH-168-TB4-5+   +5-TB4-A1-5300-HZSH-168 A1-5300-HZSH-168-1103+

WT   A1-5300-HZSH-168-TB4-6-   - 6-TB4-A1 -5 30 0-HZ SH-1 68 A1-53 00 -HZSH-16 8-11 04 - - 11 04 -A1-53 00 -HZSH-16 8 A1-53 00 -HZSH-16 8-9

SCL

10A+ 10A-

24V DC SUPPLY+ -

5300-JT-00031-PDN 10 10

TB4

 A1-5300-HZSL-168

5300-JT-00031-PDN

5300

HSAH

20

IN-4

GND-410

1756-OB16DK

RACK-1, SLOT-10

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   6   8

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-10

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

23

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

168

5300

JY

168

SHEET 293

PLC MODULE

5300

9

21

168

7

NO   6 1104

 A1-5300-HZSL-168

C   5 1103

 A1-5300-JP-00045

S

   A   1  -   5   3   0   0  -   J   Y  -   1

   6

 A1-5300-HZSH-168   A1-5300-JP-00045

+   1721

-   22 1722

 A1-5300-JY-168

22

21

+DC-1

OUT-10

 A1-5300-JP-00047

168

4

6

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 190/293

5300-JT-00031-PDN

BL   A1-5300-HZSL-168-TB4-7+   +7-TB4-A1-5300-HZSL-168 A1-5300-HZSL-168-1105+

WT   A1-5300-HZSL-168-TB4-8-   - 8-TB4-A1 -5 30 0-HZ SL -1 68 A1-53 00 -HZSL-16 8-11 06 - - 11 06 -A1-53 00 -HZSL-16 8 A1-53 00 -HZSL-16 8-11

SCL

10A+ 10A-

1 2 G ND -5

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   6   8

ZSL

LOOP SER VI CE: BWASH I NLET VLV ACF Z N-001B

9

1756-IB161K

RACK-0, SLOT-10

LOOP NO.: A1-5300-X-168

NO   11 IN-58 1106  168

7 1105C

JY

168

5300

HSAL

168

5300

XA

5300

HSAL

168

168

5300

XA

168

53005300

HIC

CE CECE   CE

CE

191 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 22 22

TB6

 A1-5300-JY-169

5300-JT-00031-PDN

BL   A1-5300-JY-169-TB6-23+   +23-TB6-A1-5300-JY-169 A1-5300-JY-169-1723+

WT   A1-5300-JY-169-TB6-24-   - 24 -T B6 -A1-53 00 -J Y-16 9 A1 -5 30 0-JY-1 69 -1 72 4- - 17 24 -A1-53 00 -J Y-16 9 A1-53 00 -J Y-16 9-23

SCL 22A- 22A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 10 10

TB4

 A1-5300-HZSH-169

5300-JT-00031-PDN

BL   A1-5300-HZSH-169-TB4-9+   +9-TB4-A1-5300-HZSH-169 A1-5300-HZSH-169-1107+

WT   A1-5300-HZSH-169-TB4-10-   -10-TB4-A1-5300-HZSH-169 A1-5300-HZSH-169-1108- -1108-A1-5300-HZSH-169 A1-5300-HZSH-169-13

SCL

10A+ 10A-

24V DC SUPPLY+ -

5300-JT-00031-PDN 10 10

TB4

 A1-5300-HZSL-169

5300-JT-00031-PDN

8

10

169

 A1-5300-JY-169

24

23

+DC-1

OUT-11

 A1-5300-JP-00047

22

S

   A   1  -   5   3   0   0  -   J   Y  -   1

   6

 A1-5300-HZSH-169   A1-5300-JP-00045

+   1723

-   24 1724

1108

 A1-5300-HZSL-169

C   9 1107

 A1-5300-JP-00045

SHEET 293

PLC MODULE

5300

DCS (BY OTHERS)PROCESS CONTROL ROOM

1756-OB16DK

RACK-1, SLOT-10

169

5300

JY

169

JB

JY23

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

5300

HSAH

1756-IB161K

RACK-0, SLOT-10

169NO   10

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   6   9

WATER TREATMENT PLANT

ZSH

INSTRUMENT

FIELD

TERMINALS

25

13

11

5300

HSAH

IN-6

GND-614

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 191/293

BL   A1-5300-HZSL-169-TB4-11+   +11-TB4-A1-5300-HZSL-169 A1-5300-HZSL-169-1109+

WT   A1-5300-HZSL-169-TB4-12-   - 12 -T B4 -A1-53 00 -HZSL-16 9 A1-53 00 -HZSL-16 9-11 10 - - 11 10 -A1-53 00 -HZSL-16 9 A1-53 00 -HZSL-16 9-15

SCL

10A+ 10A-

169

169

5300

XA

169

53005300

HIC

5300

XA

5300

HSAL

5300

HSAL

169

C

LOOP NO.: A1-5300-X-169

NO   15 IN-712 1110  169

LOOP SER VI CE: SER VI CE OUT LET VLV ACF Z N-001B

13

JY169

ZSL

11 1109

1 6 G ND -7

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   6   91756-IB161K

RACK-0, SLOT-10

CE CECE   CE

CE

192 OF

 5300-JT-00030-PAN

TB1

FI-41756-IF16K

5300-JT-00030-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-4

 A1-5300-FT-125-TB1-9+   + 9- TB 1- A1 -5 30 0- FT -1 25 A 1- 53 00 -F T- 12 5- 46 3+ + 46 3- A1 -5 30 0- FT -1 25 A 1- 53 00 -F T- 12 5- 16 A+

+31-A1-5300-FT-125 A1-5300-FT-125-34+

 A1-5300-FT-125-TB1-10-   - 10 -T B1 -A 1- 53 00 -F T- 12 5 A 1- 53 00 -F T- 12 5- 46 4- - 46 4- A1 -5 30 0- FT -1 25 A 1- 53 00 -F T- 12 5- 16 B-

-32-A1-5300-FT-125 A1-5300-FT-125-36-

SCL

H H

L L

5000

5000

FIC100

36 IN15

DCS (BY OTHERS)PROCESS CONTROL ROOM

3416A

16B

PLC MODULETERMINALS

+

-

12

13

11

464

35

iRTN14

iRTN15

33

IN14

 A1-5300-FT-125

15

JB

18

8

7

INSTRUMENT

9 463

14

16

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

17

19

3

4

5

6

   A   1  -   5   3   0   0  -   F   T  -   1   2   5

10

PACKAGE WATER TREATMENT PLANT

32

+

-16C

31

1

2

FIELD

5300

FIC125

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-125 A1-5300-JP-00041

5300

5300

FIC125

5300

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 192/293

100

FIC

5000

FIC

100

FIC

5000

100

LOOP NO.: A1-5300-FT-125

20

LOOP SERVICE: INLET FLOW TO TNK TA-001/2

19FAH

125

5300

FAL

125

5300

FTA

125

FAH

125

5300

FAL

125

5300

FTA

125

To AMS System

193 OF

-6 +5 -4 +3 -2 +1 X:20

5300-JT-00030-PAN

TB1 5300-JT-00030-PAN   +9-A1-5300-AT-110A A1-5300-AT-110A-20+

 A1-5300-AT-110A-TB1-1+   + 1-TB 1-A1 -5 30 0-AT -1 10 A A1 -5 30 0-AT -1 10 A-46 5+ + 46 5-A1 -5 30 0-AT -1 10 A A 1-53 00 -A T-11 0A -0 5B +

 A1-5300-AT-110A-TB1-2-   - 2- TB 1- A1- 53 00- AT- 110A A1 -530 0- AT- 11 0A -466 - - 46 6- A1 -53 00- AT- 110A A 1- 5300 -AT -110 A- 05C- - 10- A1- 5300 -AT -110 A A 1- 53 00- AT- 110A -22 -

SCL

H H

5000

FIC

5000

FIC

100

5000

SHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

WATER TREATMENT PLANT

FIELD

PACKAGE

PLC MODULETERMINALS

   A   1  -   5   3   0   0  -   A

   T  -   1   1   0   A

IN8

IN9

iRTN8

FI-3

JB

1756-IF16K

 A1-5300-AT-110A

+

-

20

22

05B

05C

05A

+

-

8

465

466

6

INSTRUMENT

1

2

3

4

5

9

RACK-2, SLOT-1

100

iRTN9

19

21

FIC

100

10

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZAKHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

9

10

7

11

12

13

14

15

16

17

18

DOC. NO.

REV. NO.

19

5300

 AI

110A

CE

  CE   CECE   CE CE   CE

 A1-5300-AT-110A A1-5300-JP-00041

5300

 AAH

110A

5300

 ATA

110A

5300

 AI

110A

5300

 AAH

110A

5300

 ATA

110A

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 193/293

JT X1-24VDC

+

-

X2-0VDC

Note:

Instrument cable power supply cable tag number and ferruling is still under hold for this analyzer and shall be indicated

accordingly in next revision of this drawing.

LOOP NO.: A1-5300-AT-110A LOOP SERVICE: INLET TURBIDITY TNK TA-001/2

20

+   + 52

-   - 52

19

To AMS System

194 OF

5300-JT-00030-PAN

TB1

-6 +5 -4 +3 -2 +1 X:20

5300-JT-00030-PAN   +11-A1-5300-AT-110B A1-5300-AT-110B-24+

 A1-5300-AT-110B-TB1-3+   +3-TB1-A1 -5 30 0-AT -1 10 B A1-53 00 -AT-11 0B-4 67 + +46 7-A1 -5 30 0-AT -1 10 B A1-53 00 -AT-11 0B-0 6B+

 A1-5300-AT-110B-TB1-4-   - 4- TB 1- A1- 530 0- AT -1 10B A 1- 53 00- AT -110 B- 46 8- - 468 -A1- 53 00- AT- 11 0B A1 -5300 -AT -1 10B -06C - - 12- A1- 530 0- AT -110B A 1- 530 0- AT -110B -26-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

18

17

19

13

14

15

16

11

12

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

11

12

RACK-2, SLOT-1

INSTRUMENT

3

4

5

6

7

8

+-

FIELD

PACKAGE

1

2

9

10

467

468

23

25

 A1-5300-AT-110B

+

-

24

26

06B

06C

06A

293

PLC MODULETERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

FI-3

JB

1756-IF16K

WATER TREATMENT PLANT

DOC. NO.

REV. NO.

iRTN11

SHEET

   A   1  -   5   3   0   0  -   A   T  -   1   1   0   B

IN10

IN11

iRTN10

5300

 AI

110B

CE CE   CECE   CE CE   CE

 A1-5300-AT-110B A1-5300-JP-00041

5300

 AAH

110B

5300

 AAL

110B

5300

 ATA

110B

5300

 AI

110B

5300

 AAH

110B

5300

 AAL

110B

5300

 ATA

110B

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 194/293

JT X1-24VDC

+

-

X2-0VDC

Note:

Instrument cable power supply cable tag number and ferruling is still under hold for this analyzer and shall be indicated

accordingly in next revision of this drawing.

10020

LOO P NO .: A1- 5300- AT-110 B LOO P S ERVICE: INL ET RES .CHLO RINE TNK TA-00 1/2

-

+

-

+ 53

53

110B110B

To AMS System

195 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 23 23

TB5

 A1-5300-JY-183

5300-JT-00031-PDN

BL   A1-5300-JY-183-TB5-25+   +25-TB5-A1-5300-JY-183 A1-5300-JY-183-1731+

WT   A1-5300-JY-183-TB5-26-   - 26 -T B5 -A1-53 00 -J Y-18 3 A1-53 00 -J Y-18 3-17 32 - - 17 32 -A1-53 00 -J Y-18 3 A1-53 00 -J Y-18 3-19

SCL 23A- 23A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 12 12

TB2

 A1-5300-HZSH-183

5300-JT-00031-PDN

BL   A1-5300-HZSH-183-TB2-29+   +29-TB2-A1-5300-HZSH-183 A1-5300-HZSH-183-1123+

WT   A1-5300-HZSH-183-TB2-30-   - 30 -T B2 -A1-53 00 -HZSH-18 3 A1-53 00 -HZSH-18 3-11 24 - - 11 24 -A1-53 00 -HZSH-18 3 A1-53 00 -HZSH-18 3-29

SCL

12A+ 12A-

24V DC SUPPLY+ -

5300-JT-00031-PDN 12 12

TB2

 A1-5300-HZSL-183

5300-JT-00031-PDN

BL   A1-5300-HZSL-183-TB2-31+   +31-TB2-A1-5300-HZSL-183 A1-5300-HZSL-183-1125+

5300

HSAH

24

IN-14

GND-1430

1756-OB16DK

RACK-1, SLOT-11

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   8   3

   8   3

WATER TREATMENT PLANT

ZSH

5300

HSAH

1756-IB161K

RACK-0, SLOT-12

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

27

1756-IB161K

RACK 0 SLOT 12

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

183

5300JY

183

SHEET 293

PLC MODULE

5300

29

25

183

31

28

31 1125

NO   1124

 A1-5300-HZSL-183

C

C

30

1123

 A1-5300-JP-00043

S

   A   1  -   5   3   0   0  -   J   Y  -

   1   8

 A1-5300-HZSH-183   A1-5300-JP-00043

+   1731

-   26 1732

 A1-5300-JY-183

20

19

+DC-1

OUT-9

 A1-5300-JP-00046

183

5300

HSAL

5300

HSAL

29

30

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 195/293

WT   A1-5300-HZSL-183-TB2-32-   - 32 -T B2 -A1-53 00 -HZSL-18 3 A1-53 00 -HZSL-18 3-11 26 - - 11 26 -A1-53 00 -HZSL-18 3 A1-53 00 -HZSL-18 3-31

SCL

12A+ 12A-

32 GND-15

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1ZSL

LOOP SERVICE: ACF OUTLET VLV TO TECH.WTR.TNK

33

RACK-0, SLOT-12

LOOP NO.: A1-5300-X-183

NO   3 1 I N- 1532 1126  183

C

JY183

HSAL

183

5300

XA

HSAL

183

183

5300

XA

183

53005300

HIC

CE CECE   CE

CE

196 OF

24V DC SUPPLY

- +

5300-JT-00031-PDN 23 23

TB6

 A1-5300-JY-184

5300-JT-00031-PDN

BL   A1-5300-JY-184-TB6-25+   +25-TB6-A1-5300-JY-184 A1-5300-JY-184-1733+

WT   A1-5300-JY-184-TB6-26-   - 26 -T B6 -A1-53 00 -J Y-18 4 A1-53 00 -J Y-18 4-17 34 - - 17 34 -A1-53 00 -J Y-18 4 A1-53 00 -J Y-18 4-21

SCL 23A- 23A+

24V DC SUPPLY

+ -

5300-JT-00031-PDN 13 13

TB4

 A1-5300-HZSH-184

5300-JT-00031-PDN

BL   A1-5300-HZSH-184-TB4-13+   +13-TB4-A1-5300-HZSH-184 A1-5300-HZSH-184-1127+

WT   A1-5300-HZSH-184-TB4-14-   - 14 -T B4 -A1-53 00 -HZSH-18 4 A1-53 00 -HZSH-18 4-11 28 - - 11 28 -A1-53 00 -HZSH-18 4 A1-53 00 -HZSH-18 3-1

SCL

13A+ 13A-

24V DC SUPPLY

+ -

5300-JT-00031-PDN 13 13

TB4

 A1-5300-HZSL-184

5300-JT-00031-PDN

BL   A1-5300-HZSL-184-TB4-15+   +15-TB4-A1-5300-HZSL-184 A1-5300-HZSL-184-1129+

12

14

5300

HSAL

184

5300

HSAL

 A1-5300-JY-184

22

21

+DC-1

OUT-10

 A1-5300-JP-00047

S

   A   1  -   5   3   0   0  -   J   Y  -   1   8

 A1-5300-HZSH-184   A1-5300-JP-00045

+   1733

-   26 1734

C   13 1127

 A1-5300-JP-00045

15 1129

NO   14 1128

 A1-5300-HZSL-184

C

1

25

184

15

SHEET 293

PLC MODULE

5300JY

184

5300JY

184

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JBINSTRUMENT

FIELD

27

1756-IB161K

RACK-0, SLOT-13

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   8   4

-   1   8   4

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-13

5300

HSAH

34

IN-0

GND-02

1756-OB16DK

RACK-1, SLOT-11

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 196/293

WT   A1-5300-HZSL-184-TB4-16-   - 16 -T B4 -A1-53 00 -HZSL-18 4 A1-53 00 -HZSL-18 4-11 30 - - 11 30 -A1-53 00 -HZSL-18 4 A1-53 00 -HZSL-18 3-3

SCL

13A+ 13A-

184

184

5300

XA

184

53005300

HIC

5300

XA

JY184

184

LOOP NO.: A1-5300-X-184

NO   3 IN-116 1130  184

LOOP SER VI CE: ACF OUT LET VLV T O POT .W TR .T NK

17

,

   A   1  -   5   3   0   0  -   H   Z   S   L  -ZSL

4 GND-1

CE CECE   CE

CE

197 OF

FI-5 5300-JT-00010-PAN 1756-IF16K

TB1 5300-JT-00010-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-5

 A1-5300-FT-126-TB1-1+   + 1- TB 1- A1 -5 30 0- FT -1 26 A 1- 53 00 -F T- 12 6- 12 5+ + 12 5- A1 -5 30 0- FT -1 26 A 1- 53 00 -F T- 12 6- 01 A+

+1-A1-5300-FT-126 A1-5300-FT-126-2+

 A1-5300-FT-126-TB1-2-   - 2- TB 1- A1 -5 30 0- FT -1 26 A 1- 53 00 -F T- 12 6- 12 6- - 12 6- A1 -5 30 0- FT -1 26 A 1- 53 00 -F T- 12 6- 01 B-

-2-A1-5300-FT-126 A1-5300-FT-126-4-

SCL

H H

5000

FIC

100

100

5000

FIC

100

PACKAGE WATER TREATMENT PLANT

2

+

-01C

1 201A

01B

SHEET 293

IN0

DCS (BY OTHERS)PROCESS CONTROL ROOM

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

FIELD

125

 A1-5300-FT-126

5

6

7

8

9

10

iRTN1

4

3

5000

FIC

+

-

PLC MODULETERMINALS

IN1

2 126

3

INSTRUMENT JB

   A   1  -   5   3   0   0

  -   F   T  -   1   2   6

1

14

iRTN0

5300

FI

126

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-126 A1-5300-JP-00013

5300

FAH

126

5300

FTA

126

5300

FI

126

5300

FAL

126

5300

FTA

126

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 197/293

INLET FLOW TO CF 530-ZL-001ALOOP NO.: A1-5300-FT-126 LOOP SERVICE:

To AMS System

198 OF

 5000-JT-00010-PAN

TB1

FI-71756-IF16K

5000-JT-00010-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-9

 A1-5300-PDT-184-TB1-3+   +3-TB1-A1 -5 30 0-PDT-18 4 A1-53 00 -PDT -1 84 -1 27 + +12 7-A1 -5 30 0-PDT-18 4 A1-53 00 -PDT -1 84 -0 8A+

+15-A1-5300-PDT-184 A1-5300-PDT-184-34+

 A1-5300-PDT-184-TB1-4-   - 4-TB1-A1 -5 30 0-PDT-18 4 A1-53 00 -PDT -1 84 -1 28 - - 12 8-A1 -5 30 0-PDT-18 4 A1-53 00 -PDT -1 84 -0 8B-

-16-A1-5300-PDT-184 A1-5300-PDT-184-36-

SCL

H H

100

5000

FIC

9

10

2

4

TERMINALS

1

128

-

7

8

5

6

35

iRTN14

iRTN15

5000

FIC

100

5000

100

FIC

IN15

KE01-A1-500-MT-I-HL-0001-000

153

FIELD

127

 A1-5300-PDT-184

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PLC MODULE

36

PACKAGE SHEET

IN14

PROCESS CONTROL ROOM

   A   1  -   5   3   0   0  -   P   D   T  -   1   8   4

33

08B

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

INSTRUMENT JB

293

DCS (BY OTHERS)

WATER TREATMENT PLANT

3408A+-

16

+

08C

5300

PDI

184

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-184 A1-5000-JP-00015

5300

PDAH

184

5300

PDTA

184

5300

PDI

184

5300

PDAH

184

5300

PDTA

184

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 198/293

LOOP SERVICE: DIFF. PRESS.HI CF 530-ZL-001ALOOP NO.: A1-5300-PDT-184

To AMS System

199 OF

 5000-JT-00010-PAN

TB1

FI-71756-IF16K

5000-JT-00010-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-10

 A1-5300-PDT-277-TB1-5+   +5-TB1-A1 -5 30 0-PDT-27 7 A1 -5 30 0-PDT-27 7-12 9+ +12 9-A1 -5 30 0-PDT-27 7 A1-53 00 -PDT -2 77 -0 9A+

+17-A1-5300-PDT-277 A1-5300-PDT-277-2+

 A1-5300-PDT-277-TB1-6-   - 6-TB1-A1 -5 30 0-PDT-27 7 A1-53 00 -PDT -2 77 -1 30 - - 13 0-A1 -5 30 0-PDT-27 7 A1-53 00 -PDT -2 77 -0 9B-

-18-A1-5300-PDT-277 A1-5300-PDT-277-4-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

PACKAGE WATER TREATMENT PLANT

18

+

-09C

17

PLC MODULETERMINALS

5

SHEET 293

10

FIELD

JB

   A   1  -   5   3   0   0  -   P   D   T  -   2   7   7

-

INSTRUMENT

2

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

129

 A1-5300-PDT-277

09A+

4

130

3

iRTN0

iRTN1

4 IN1

1

IN0

1

2

3

9

8

7

DCS (BY OTHERS)PROCESS CONTROL ROOM

09B6

5300

PDI

277

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-277 A1-5300-JP-00015

5300

PDAH

277

5300

PDTA

277

5300

PDI

277

5300

PDAH

277

5300

PDTA

277

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 199/293

DIFF. PRESS.HI CF 530-ZL-001BLOOP SERVICE:LOOP NO.: A1-5300-PDT-277

To AMS System

200 OF

24V DC SUPPLY

- +

22 22

 A1-5300-JY-170 5300-JT-00034-PDN

TB2 5300-JT-00034-PDN

BL   A1-5300-JY-170-TB2-1+   +1-TB2-A1-5300-JY-170 A1-5300-JY-170-1741+

WT   A1-5300-JY-170-TB2-2-   - 2-TB2-A1 -5 30 0-JY-1 70 A1 -5 30 0-JY-1 70 -1 74 2- - 17 42 -A1-53 00 -J Y-17 0 A1-53 00 -J Y-17 0-25

SCL 22A- 22A+

24V DC SUPPLY

+ -

10 10

 A1-5300-HZSH-170 5300-JT-00034-PDN

TB1 5300-JT-00034-PDN

BL   A1-5300-HZSH-170-TB1-1+   +1-TB1-A1-5300-HZSH-170 A1-5300-HZSH-170-1133+

WT   A1-5300-HZSH-170-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 70 A1-53 00 -HZSH-17 0-11 34 - - 11 34 -A1-53 00 -HZSH-17 0 A1-53 00 -HZSH-17 0-17

SCL

10A+ 10A-

24V DC SUPPLY

+ -5300-JT-00034-PDN 10 10

TB1

 A1-5300-HZSL-170

5300-JT-00034-PDN

BL   A1-5300-HZSL-170-TB1-3+   +3-TB1-A1-5300-HZSL-170 A1-5300-HZSL-170-1135+

WT   A1-5300-HZSL-170-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 70 A1-53 00 -HZSL-17 0-11 36 - - 11 36 -A1-53 00 -HZSL-17 0 A1-53 00 -HZSL-17 0-19

5300

HSAH

IN-8

GND-818

17  170

5300

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   7   0

Z   S   L  -   1   7   0

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-10

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

3

1756-IB161K

RACK-0, SLOT-10

NO   19 IN-94 1136  170

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

170

5300JY

170

SHEET 293

PLC MODULE

5300

1756-OB16DK

RACK-1, SLOT-10

170

3

3 1135C

C   1 1133

 A1-5300-JP-00048

4

NO   2 1134

 A1-5300-HZSL-170

S

   A   1  -   5   3   0   0  -   J   Y

  -   1   7

 A1-5300-HZSH-170   A1-5300-JP-00048

+   1741

-   2 1742

4

5300

HSAL

 A1-5300-JY-170

26

25

+DC-1

OUT-12

 A1-5300-JP-00049

1

2

HSAL

170

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 200/293

SCL

10A+ 10A-

20 GND-9

   A   1  -   5   3   0   0  -   H   Z

LOOP SERVICE: FLOW RECYCLE VLV TO POT.WTR.TNK

5

LOOP NO.: A1-5300-X-170

NO

XA

170

170

5300

XA

170

53005300

HIC

5300

JY170

CE CECE   CE

CE

201 OF

 5000-JT-00006-PAN

TB1

FI-61756-IF16K

5000-JT-00006-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-7

 A1-5300-LT-106-TB1-5+   + 5- TB 1- A1 -5 30 0- LT -1 06 A 1- 53 00 -L T- 10 6- 06 5+ + 06 5- A1 -5 30 0- LT -1 06 A 1- 53 00 -L T- 10 6- 05 A+

+9-A1-5300-LT-106 A1-5300-LT-106-20+

 A1-5300-LT-106-TB1-6-   - 6- TB 1- A1 -5 30 0- LT -1 06 A 1- 53 00 -L T- 10 6- 06 6- - 06 6- A1 -5 30 0- LT -1 06 A 1- 53 00 -L T- 10 6- 05 B-

-10-A1-5300-LT-106 A1-5300-LT-106-22-

SCL

LL LL

100

FIC

100

5000

FIC

11

18

5000

FIC

100

500015

17

19

IN8

DCS (BY OTHERS)PROCESS CONTROL ROOM

2005A

05B

9

   A   1  -   5   3   0   0  -   L   T  -   1   0   6

6

4

198

9

066

21

iRTN8

iRTN9

22 IN9

065

14

16

20

10

12

13

05C

KE01-A1-500-MT-I-HL-0001-000

INSTRUMENT

FIELD

JB

SHEET 293

PROJECT P01

PLC MODULETERMINALS

+

-

PACKAGE WATER TREATMENT PLANT

10

+

-7

5

DOC. NO.

REV. NO.KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 A1-5300-LT-106

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

1

2

3

5300

LI

106

CE CE

CE

CE   CE   CE

CE

 A1-5300-LT-106 A1-5300-JP-00009

5300

LALL

106

5300

LTA

106

5300

LI

106

5300

LALL

106

5300

LTA

106

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 201/293

21

LOOP NO.: A1-5300-LT-106 LOOP SERVICE: SODIUM HYPO.DOSING TNK TA-080 LVL

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 202/293

203 OF

5000-JT-00006-PAN

TB1

5000-JT-00006-PAN

 A1-5300-UY-207-TB1-25+   + 25 -T B1 -A 1- 53 00 -U Y- 20 7 A 1- 53 00 -U Y- 20 7- 07 1+ + 07 1- A1 -5 30 0- UY -2 07   A1-5300-UY-207-2

 A1-5300-UY-207-TB1-26-   - 26 -T B1 -A 1- 53 00 -U Y- 20 7 A 1- 53 00 -U Y- 20 7- 07 2- - 07 2- A1 -5 30 0- UY -2 07   A1-5300-UY-207-6

SCL

 A1-5300-UY-207

071

PLC MODULETERMINALS

PACKAGE

OUT1

   A   1  -   5   3   0   0  -   U

   Y  -   2   0   7

6 RTN1

4 ALT1

JB

RACK-3, SLOT-1224

2

CLIENT DOC. NO.

REV. NO.

07226

25+

-

FIELD

1756-OF6CIK

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

I/P

27

KE01-A1-500-MT-I-HL-0001-000

ESD (BY OTHERS)PROCESS CONTROL ROOM

SHEET 293

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

P01

WATER TREATMENT PLANT

INSTRUMENT

CE CECE   CE

 A1-5300-UY-207 A1-5000-JP-00009

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 203/293

 A1-5300-UY-207 LOOP SERVICE: SOD.HYPO.DOS.PMP 530-PD001B CONLOOP NO.:

OF

 5000-JT-00006-PAN

TB1

1

2

3

4

FI-14

5000-JT-00006-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5300-PT-185-TB1-11+   +11 -T B1 -A1-53 00 -PT-18 5 A1 -5 30 0-PT -1 85 -0 75 + +07 5-A1 -5 30 0-PT -1 85 A1-53 00 -PT-18 5-05 A+

+9-A1-5300-PT-185 A1-5300-PT-185-009+

 A1-5300-PT-185-TB1-12-   - 12 -T B1 -A1-53 00 -PT-18 5 A1-53 00 -PT-18 5-07 6- - 07 6-A1 -5 30 0-PT -1 85 A1-53 00 -PT-18 5-05 B-

-10-A1-5300-PT-185 A1-5300-PT-185-010-

SCL

HH HH

5000

293

TERMINALS

PROCESS CONTROL ROOM

Hard wired to

ESD by others

 AI-ESD-001075 05A

TERMINALS

To AMS

System

15

05B

19

20

14

13

16

076

FIC

100

010

18

17

21

FIELD

JB

8

7

INSTRUMENT

6

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

10

-   12

 A1-5300-PT-185

9

11+009

PACKAGE WATER TREATMENT PLANT

10

+

-05C

9

MULTIPLEXOR

5

DOC. NO.

REV. NO.

SHEET

ESD (BY OTHERS)

KE01-A1-500-MT-I-HL-0001-000

P01

204

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-185 A1-5000-JP-00009

5300

PI

185

5300

PI

185

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 204/293

100

5000

5000

SOD.HYPO.DOS.PMP 530-PD001A PT

FIC

100

FIC

LOOP NO.: A1-5300-PT-185 LOOP SERVICE:

21

5300

PAHH

185

5300

PTA

185

ESD

System

5300

PAHH

185

5300

PTA

185

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 205/293

OF

  5300-JT-00035-PDN

TB1 5300-JT-00035-PDN A1-5300-LS-204-TB1-1+   +1 -TB 1- A1 -5 30 0- LS -2 04 A 1- 530 0- LS- 20 4- 11 47+ +1 14 7- A1 -5 30 0- LS -2 04 A1 -5 30 0- LS -2 04 -0 09 +

NC

 A1-5300-LS-204-TB1-2-   - 2- TB 1- A1 -5 30 0- LS -2 04 A 1- 530 0- LS- 20 4- 11 48- - 11 48 -A 1- 53 00 -L S- 204 A1 -5 30 0- LS -2 04 -0 10 -

SCL  3

DI-ESD-001

Hard wired to

ESD by others

1

2

1147  009

1148

4

9

10

5

CLIENT

FIELD

293

PROCESS CONTROL ROOM

SHEETPACKAGE WATER TREATMENT PLANT

PROJECT KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM P01

6

7

8

 AGIP KAZA KHSTAN NORTH CASPIA N OPERATING COMPANY

JBINSTRUMENT TERMINALSTERMINALS

 A1-5300-LS-204

LALL

204

DOC. NO. KE01-A1-500-MT-I-HL-0001-000

REV. NO.

5300

206

ESD (BY OTHERS)

010

CE CECE   CE

 A1-5300-LS-204 A1-5300-JP-00050

CE

5300

LALL

204

ESD

System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 206/293

LOOP NO.: A1-5300-LS-204 LOOP SERVICE: BACK WASH WATER TNK TA-081 LS

207 OF

24V DC SUPPLY

- +

22 22

 A1-5300-JY-171 5300-JT-00035-PDN

TB2 5300-JT-00035-PDN

BL   A1-5300-JY-171-TB2-1+   +1-TB2-A1-5300-JY-171 A1-5300-JY-171-1745+

WT   A1-5300-JY-171-TB2-2-   - 2-TB2-A1 -5 30 0-JY-1 71 A1 -5 30 0-JY-1 71 -1 74 6- - 17 46 -A1-53 00 -J Y-17 1 A1-53 00 -J Y-17 1-27

SCL 22A- 22A+

24V DC SUPPLY

+ -

10 10

 A1-5300-HZSH-171 5300-JT-00035-PDN

TB1 5300-JT-00035-PDN

BL   A1-5300-HZSH-171-TB1-1+   +1-TB1-A1-5300-HZSH-171 A1-5300-HZSH-171-1143+

WT   A1-5300-HZSH-171-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 71 A1-53 00 -HZSH-17 1-11 44 - - 11 44 -A1-53 00 -HZSH-17 1 A1-53 00 -HZSH-17 1-21

SCL

10A+ 10A-

24V DC SUPPLY

+ -5300-JT-00035-PDN 10 10

TB1

 A1-5300-HZSL-171

5300-JT-00035-PDN

BL   A1-5300-HZSL-171-TB1-3+   +3-TB1-A1-5300-HZSL-171 A1-5300-HZSL-171-1145+

WT   A1-5300-HZSL-171-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 71 A1-53 00 -HZSL-17 1-11 46 - - 11 46 -A1-53 00 -HZSL-17 1 A1-53 00 -HZSL-17 1-23

SCL

5300

HSAL

2

HSAL

171

 A1-5300-JY-171

28

27

1143

 A1-5300-JP-00051

1746

1756-OB16DK

S

   A   1  -   5   3   0   0  -   J

   Y  -   1   7

 A1-5300-HZSH-171   A1-5300-JP-00050

+   1745

-   2

3

OUT-13

 A1-5300-HZSL-171

C

C   1

2

SHEET 293

PLC MODULE

5300+DC-1

DCS (BY OTHERS)PROCESS CONTROL ROOM

RACK-1, SLOT-10

5300

JY

171

JY1

171

NO   2 3 I N- 114  171

5

3

 A1-5300-JP-00050

1146

1756-IB161K

RACK-0, SLOT-10

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

JB

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-10

171

3 1145

NO

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   7   1

WATER TREATMENT PLANT

ZSH

INSTRUMENT

FIELD

TERMINALS

1144

4

21

5300

HSAH

24 GND-11

IN-10

GND-1022

5   3   0   0  -   H   Z   S   L  -   1   7   1

171

5300

CE CECE   CE   CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 207/293

10A+ 10A-

171

171

5300

XA

171

53005300

5300

XA

LOOP NO.: A1-5300-X-171 LOOP SER VI CE: BWASH W TR .T NK I NLET VLAVLE

JY

171

HIC

   A   1  -   5

CE CECE   CE

CE

208 OF

FI-6 5300-JT-00036-PAN 1756-IF16K

TB1 5300-JT-00036-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-7

 A1-5300-LT-107-TB1-1+   + 1- TB 1- A1 -5 30 0- LT -1 07 A 1- 53 00 -L T- 10 7- 47 5+ + 47 5- A1 -5 30 0- LT -1 07 A 1- 53 00 -L T- 10 7- 06 A+

+11-A1-5300-LT-107 A1-5300-LT-107-24+

 A1-5300-LT-107-TB1-2-   - 2- TB 1- A1 -5 30 0- LT -1 07 A 1- 53 00 -L T- 10 7- 47 6- - 47 6- A1 -5 30 0- LT -1 07 A 1- 53 00 -L T- 10 7- 06 B-

-12-A1-5300-LT-107 A1-5300-LT-107-26-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

SHEET 293

FIELD

JB

PACKAGE WATER TREATMENT PLANT

INSTRUMENT DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULE

P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

PROJECT

DOC. NO.

REV. NO.

2

TERMINALS

4

12

 A1-5300-LT-107

1

3

+

-   476

25

iRTN10

iRTN11

+

06C

   A   1  -   5   3

   0   0  -   L   T  -   1   0   7

23

475 06A

IN11-

11

06B

24 IN10

26

5300

LI

107

CE CE

CE

CE   CE   CE

CE

 A1-5300-LT-107 A1-5300-JP-00052

5300

LAH

107

5300

LAL

107

5300

LTA

107

5300

LI

107

5300

LAH

107

5300

LAL

107

5300

LTA

107

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 208/293

LOOP NO.: A1-5300-LT-107 LOOP SERVICE: BACK WASH WATER TNK TA-081 LVL

209 OF

FI-5 5300-JT-00036-PAN 1756-IF16K

TB1 5300-JT-00036-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-5

 A1-5300-FT-128-TB1-1+   + 1- TB 1- A1 -5 30 0- FT -1 28 A 1- 53 00 -F T- 12 8- 47 3+ + 47 3- A1 -5 30 0- FT -1 28 A 1- 53 00 -F T- 12 8- 03 A+

+5-A1-5300-FT-128 A1-5300-FT-128-12+

 A1-5300-FT-128-TB1-2-   - 2- TB 1- A1 -5 30 0- FT -1 28 A 1- 53 00 -F T- 12 8- 47 4- - 47 4- A1 -5 30 0- FT -1 28 A 1- 53 00 -F T- 12 8- 03 B-

-6-A1-5300-FT-128 A1-5300-FT-128-14-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

1

2

TERMINALS

IN5

474

13

iRTN4

iRTN5

14

   A   1  -   5   3

   0   0  -   F   T  -   1   2   8

03A

03B

INSTRUMENT

FIELD

473

 A1-5300-FT-128

+

-

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

293

4

3

KE01-A1-500-MT-I-HL-0001-000

JB

11

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

12

PACKAGE WATER TREATMENT PLANT

6

+

-03C

5

PLC MODULE

SHEET

5300

FI

128

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-128 A1-5300-JP-00052

5300

FAH

128

5300

FAL

128

5300

FTA

128

5300

FI

128

5300

FAH

128

5300

FAL

128

5300

FTA

128

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 209/293

LOOP NO.: A1-5300-FT-128 BWASH INLET FLOW TO DMF/ACFLOOP SERVICE:

210 OF

FI-8 5300-JT-00037-PAN 1756-IF16K

TB1 5300-JT-00037-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-12

 A1-5300-FT-137-TB1-1+   + 1- TB 1- A1 -5 30 0- FT -1 37 A 1- 53 00 -F T- 13 7- 50 3+ + 50 3- A1 -5 30 0- FT -1 37 A 1- 53 00 -F T- 13 7- 09 A+

+17-A1-5300-FT-137 A1-5300-FT-137-2+

 A1-5300-FT-137-TB1-2-   - 2- TB 1- A1 -5 30 0- FT -1 37 A 1- 53 00 -F T- 13 7- 50 4- - 50 4- A1 -5 30 0- FT -1 37 A 1- 53 00 -F T- 13 7- 09 B-

-18-A1-5300-FT-137 A1-5300-FT-137-4-

SCL

H H

L L

5000

FIC

100

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

6

1

IN01

2

3

503

4

09A

5

11

12

13

14

19

20

15

16

17

9

8

7

18

10

504

3

iRTN0

iRTN1

4 IN1

2

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

 A1-5300-FT-137

DCS (BY OTHERS)PROCESS CONTROL ROOM

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

293

+

-09C

17

INSTRUMENT TERMINALS

18

+09B

DOC. NO.

REV. NO.

   A   1  -   5   3

   0   0  -   F   T  -   1   3   7

-

SHEET

FIELD

JB

PACKAGE WATER TREATMENT PLANT

PLC MODULE

5300

FI

137

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-137 A1-5300-JP-00053

5300

FAH

137

5300

FAL

137

5300

FTA

137

5300

FQ

137

5300

FI

137

5300

FAH

137

5300

FAL

137

5300

FTA

137

5300

FQ

137

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 210/293

100

INLET FLOW SOFTNER GL-001ALOOP SERVICE:LOOP NO.: A1-5300-FT-137

137137

To AMS System

211 OF

 5300-JT-00037-PAN

TB1

FI-81756-IF16K

5300-JT-00037-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-12

 A1-5300-FT-138-TB1-3+   + 3- TB 1- A1 -5 30 0- FT -1 38 A 1- 53 00 -F T- 13 8- 50 5+ + 50 5- A1 -5 30 0- FT -1 38 A 1- 53 00 -F T- 13 8- 10 A+

+19-A1-5300-FT-138 A1-5300-FT-138-6+

 A1-5300-FT-138-TB1-4-   - 4- TB 1- A1 -5 30 0- FT -1 38 A 1- 53 00 -F T- 13 8- 50 6- - 50 6- A1 -5 30 0- FT -1 38 A 1- 53 00 -F T- 13 8- 10 B-

-20-A1-5300-FT-138 A1-5300-FT-138-8-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000FIC

5000

FIC

100

5000

18

20

13

14

15

16

19

10

11

12

17

6

7

8

9

PACKAGE WATER TREATMENT PLANT

20

+

-10C

19

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

INSTRUMENT

FIELD

505

 A1-5300-FT-138

506

7

iRTN2

iRTN3

8

610A

10B

+

-

TERMINALS

IN3

1

2

3

4

5

PLC MODULE

SHEET 293

5

IN2

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

   A   1  -   5   3   0   0  -   F   T  -   1   3   8

5300

FI

138

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-138 A1-5300-JP-00053

5300

FAH

138

5300FAL

138

5300

FTA

138

5300

FI

138

5300

FAH

138

5300FAL

138

5300

FTA

138

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 211/293

5000

FIC

100

LOOP NO.: A1-5300-FT-138 INLET FLOW SOFTNER GL-001BLOOP SERVICE:

5300

FQ

138

5300

FQ

138

To AMS System

212 OF

 5300-JT-00037-PAN

TB1

FI-8

1756-IF16K5300-JT-00037-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-12

 A1-5300-FT-139-TB1-5+   + 5- TB 1- A1 -5 30 0- FT -1 39 A 1- 53 00 -F T- 13 9- 50 7+ 5 07 -A 1- 53 00 -F T- 13 9 A 1- 53 00 -F T- 13 9- 11 A+

+21-A1-5300-FT-139 A1-5300-FT-139-12+

 A1-5300-FT-139-TB1-6-   - 6- TB 1- A1 -5 30 0- FT -1 39 A 1- 53 00 -F T- 13 9- 50 8- - 50 8- A1 -5 30 0- FT -1 39 A 1- 53 00 -F T- 13 9- 11 B-

-22-A1-5300-FT-139 A1-5300-FT-139-14-

SCL

H H

L L

FIC

100

5000

FIC

100

5000

SHEET 293

11

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALS

14 IN5

JB

   A   1  -   5   3   0   0  -   F   T  -   1   3   9

11

INSTRUMENT

4

9

7

6

+

-

12

17

iRTN5

13

14

5000

FIC

100

5000

FIC15

18

19

16

20

100

 A1-5300-FT-139

11B

3

5

508

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

1

2

KE01-A1-500-MT-I-HL-0001-000

507

10

8

13

iRTN4

PACKAGE WATER TREATMENT PLANT

22

+

-11C

21 1211A

FIELD

5300

FI

139

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-139 A1-5300-JP-00053

5300

FAH

139

5300

FAL

139

5300

FTA

139

5300

FI

139

5300

FAH

139

5300

FAL

139

5300

FTA

139

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 212/293

100

5000

FIC

LOOP NO.: A1-5300-FT-139 LOOP SERVICE: INLET FLOW SOFTNER GL-001C

139

5300

FQ

139

5300

FQ

139

To AMS System

213 OF

FI-25000-JT-00037-PAN 1756-IF16K

TB1 5000-JT-00037-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-3

 A1-5300-PDT-251-TB1-1+   +1-TB1-A1 -5 30 0-PDT-25 1 A1-53 00 -PDT -2 51 -4 97 + +49 7-A1 -5 30 0-PDT-25 1 A1-53 00 -PDT -2 51 -0 3A+

+5-A1-5300-PDT-251 A1-5300-PDT-251-12+

 A1-5300-PDT-251-TB1-2-   - 2-TB1-A1 -5 30 0-PDT-25 1 A1 -5 30 0-PDT-25 1-49 8- - 49 8-A1 -5 30 0-PDT-25 1 A1-53 00 -PDT -2 51 -0 3B-

-6-A1-5300-PDT-251 A1-5300-PDT-251-14-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

13

iRTN4

iRTN5

14 IN5

PACKAGE WATER TREATMENT PLANT

6

+

-03C

5 1203A

03B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

497

5

7

 A1-5300-PDT-251

10

2

9

498

8

6

4

3

JB

   A   1  -   5   3   0   0  -   P   D   T  -   2   5   1

1+

-

PLC MODULETERMINALS

SHEET 293

11

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

11

12

13

14

19

20

15

16

17

18

5300

PDI

251

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-251 A1-5000-JP-00053

5300

PDAH

251

5300

PDTA

251

5300

PDI

251

5300

PDAH

251

5300

PDTA

251

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 213/293

LOOP NO.: A1-5300-PDT-251 LOOP SERVICE: SOFTENR GL-001A DIFF.PRESS.

214 OF

5000-JT-00037-PAN

TB1

FI-21756-IF16K

5000-JT-00037-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-3

 A1-5300-PDT-252-TB1-3+   +3-TB1-A1 -5 30 0-PDT-25 2 A1-53 00 -PDT -2 52 -4 99 + +49 9-A1 -5 30 0-PDT-25 2 A1-53 00 -PDT -2 52 -0 4A+

+7-A1-5300-PDT-252 A1-5300-PDT-252-16+

 A1-5300-PDT-252-TB1-4-   - 4-TB1-A1 -5 30 0-PDT-25 2 A1 -5 30 0-PDT-25 2-50 0- - 50 0-A1 -5 30 0-PDT-25 2 A1-53 00 -PDT -2 52 -0 4B-

-8-A1-5300-PDT-252 A1-5300-PDT-252-16-

SCL

H H

100

FIC

100

5000FIC

5000

FIC

100

5000

SHEET 293

15

IN6

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

   A   1  -   5   3   0   0  -   P   D   T  -   2

   5   2

3+

-

PLC MODULETERMINALS

2

10

4

9

500

8

6

5

11

INSTRUMENT

FIELD

499

7

 A1-5300-PDT-252

1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

8

+

-04C

7 1604A

04B

17

iRTN6

iRTN7

18 IN7

12

13

14

15

20

16

17

18

19

5300

PDI

252

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-252 A1-5000-JP-00053

5300

PDAH

252

5300

PDTA

252

5300

PDI

252

5300

PDAH

252

5300

PDTA

252

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 214/293

LOOP NO.: A1-5300-PDT-252 LOOP SERVICE: SOFTENR GL-001B DIFF.PRESS.

215 OF

5000-JT-00037-PAN

TB1

FI-2

1756-IF16K5000-JT-00037-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-3

 A1-5300-PDT-253-TB1-5+   +5-TB1-A1 -5 30 0-PDT-25 3 A1-53 00 -PDT -2 53 -5 01 + +50 1-A1 -5 30 0-PDT-25 3 A1-53 00 -PDT -2 53 -0 5A+

+9-A1-5300-PDT-253 A1-5300-PDT-253-20+

 A1-5300-PDT-253-TB1-6-   - 6-TB1-A1 -5 30 0-PDT-25 3 A1 -53 00 -PDT -2 53 -5 02 - - 50 2-A1 -5 30 0-PDT-25 3 A1-53 00 -PDT -2 53 -0 5B-

-10-A1-5300-PDT-253 A1-5300-PDT-253-22-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

21

iRTN8

iRTN9

22 IN9

19

-05C

9 2005A

05B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

501

 A1-5300-PDT-253

JB

12

11

INSTRUMENT

-

10

6

9

502

8

7

SHEET 293

5+

   A   1  -   5   3   0   0  -   P   D   T  -   2   5   3

FIELD

PACKAGE WATER TREATMENT PLANT

10

+   IN8

DCS (BY OTHERS)PROCESS CONTROL ROOM

4

3

2

1

PLC MODULETERMINALS

13

14

15

16

17

18

19

20

5300

PDI

253

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-253 A1-5000-JP-00053

5300

PDAH

253

5300

PDTA

253

5300

PDI

253

5300

PDAH

253

5300

PDTA

253

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 215/293

SOFTENR GL-001C DIFF.PRESS.LOOP NO.: A1-5300-PDT-253 LOOP SERVICE:

To AMS System

216 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-185

5300-JT-00045-PDN

BL   A1-5300-JY-185-TB4-35+   +35-TB4-A1-5300-JY-185 A1-5300-JY-185-1817+

WT   A1-5300-JY-185-TB4-366-   - 36 -T B4 -A 1- 53 00 -J Y- 18 5 A 1- 53 00 -J Y- 18 5- 18 18 - - 18 18 -A 1- 53 00 -J Y- 18 5 A 1- 53 00 -J Y- 18 5- 1

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 13 13

TB2

 A1-5300-HZSH-185

5300-JT-00045-PDN

BL   A1-5300-HZSH-185-TB2-33+   +33-TB2-A1-5300-HZSH-185 A1-5300-HZSH-185-1263+

WT   A1-5300-HZSH-185-TB2-34-   - 34 -T B2 -A1-53 00 -HZSH-18 5 A1-53 00 -HZSH-18 5-12 64 - - 12 64 -A1-53 00 -HZSH-18 5 A1-53 00 -HZSH-18 5-13

SCL

13A+ 13A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 13 13TB2

 A1-5300-HZSL-185

5300-JT-00045-PDN

BL   A1-5300-HZSL-185-TB2-35+   +35-TB2-A1-5300-HZSL-185 A1-5300-HZSL-185-1265+

WT   A1-5300-HZSL-185-TB2-36-   - 36 -T B2 -A1-53 00 -HZSL-18 5 A1-53 00 -HZSL-18 5-12 66 - - 12 66 -A1-53 00 -HZSL-18 5 A1-53 00 -HZSL-18 5-15

SCL

13A+ 13A-

5300

HSAH

1 6 G ND -7

IN-6

GND-614

185

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   8   5

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   8   5

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-13

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

37

37

 A1-5300-HZSL-185

C

NO   15 IN-736 1266

1756-IB161K

RACK-0, SLOT-13

185

5300

JY

1756-OB16DK

293

PLC MODULE

5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

35 1265

SHEET

TERMINALSJB

1263

13

35

 A1-5300-JP-00056

NO

32

185

34 1264

-   1818

C   33

S

   A   1  -   5   3   0   0  -   J   Y  -   1   8

 A1-5300-HZSH-185   A1-5300-JP-00056

RACK-1, SLOT-13

36+

  1817

34

 A1-5300-JY-185

2

1

+DC-0

OUT-0

 A1-5300-JP-00054

35

185

185

5300

HSAL

185

34

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 216/293

LOOP NO.: A1-5300-X-185 LOOP SERVICE: SERVICE INLET VLV SFTNER GL-001A

185

5300

HIC

5300

XA

185

185

5300

XA

185

5300

JY

CE

217 OF

24V DC SUPPLY

- +

25 25

 A1-5300-JY-186 5300-JT-00045-PDN

TB4 5300-JT-00045-PDN

BL   A1-5300-JY-186-TB4-1+   +1-TB4-A1-5300-JY-186 A1-5300-JY-186-1819+

WT   A1-5300-JY-186-TB4-2-   - 2- TB 4- A1 -5 30 0- JY -1 86 A 1- 53 00 -J Y- 18 6- 18 20 - - 18 20 -A 1- 53 00 -J Y- 18 6 A 1- 53 00 -J Y- 18 6- 3

SCL 25A- 25A+

24V DC SUPPLY

+ -

13 13

 A1-5300-HZSH-186 5300-JT-00045-PDN

TB1 5300-JT-00045-PDN

BL   A1-5300-HZSH-186-TB1-1+   +1-TB1-A1-5300-HZSH-186 A1-5300-HZSH-186-1267+

WT   A1-5300-HZSH-186-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 86 A1-53 00 -HZSH-18 6-12 68 - - 12 68 -A1-53 00 -HZSH-18 6 A1-53 00 -HZSH-18 6-17

SCL

13A+ 13A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 13 13TB1

 A1-5300-HZSL-186

5300-JT-00045-PDN

BL   A1-5300-HZSL-186-TB1-3+   +3-TB1-A1-5300-HZSL-186 A1-5300-HZSL-186-1269+

WT   A1-5300-HZSL-186-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 86 A1-53 00 -HZSL-18 6-12 70 - - 12 70 -A1-53 00 -HZSL-18 6 A1-53 00 -HZSL-18 6-19

SCL

13A+ 13A-

1

2

5300

HSAL

186

5300

HSAL

186

 A1-5300-JY-186

4

3

+DC-0

OUT-1

 A1-5300-JP-00054

1756-OB16DK

S

   A   1  -   5   3   0   0

  -   J   Y  -   1   8

 A1-5300-HZSH-186   A1-5300-JP-00055

+  1819

RACK-1, SLOT-13

NO   1268

-   1820

C

2

1267

3

 A1-5300-JP-00055

3 1269

SHEET 293

PLC MODULEDCS (BY OTHERS)

PROCESS CONTROL ROOM

JY

5300

JY

5300

19 IN-94 1270  186

INSTRUMENT

FIELD

3

5

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-13

 A1-5300-HZSL-186

C

NO

1756-IB161K

RACK-0, SLOT-13

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   8   6

WATER TREATMENT PLANT

ZSH

TERMINALS

186

17  186

JB

2

5300

HSAH

1

2 0 GN D- 9

IN-8

GND-818

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   8   6

186

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 217/293

5300

XA

186

186

5300

XA

186

5300

JY

186

5300

HIC

LOOP NO.: A1-5300-X-186 LOOP SERVICE: SERVICE OUTLET VLV SFTNER GL-001A

218 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-187

5300-JT-00045-PDN

BL   A1-5300-JY-187-TB4-3+   +3-TB4-A1-5300-JY-187 A1-5300-JY-187-1821+

WT   A1-5300-JY-187-TB4-4-   - 4- TB 4- A1 -5 30 0- JY -1 87 A 1- 53 00 -J Y- 18 7- 18 22 - - 18 22 -A 1- 53 00 -J Y- 18 7 A 1- 53 00 -J Y- 18 7- 5

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 13 13

TB1

 A1-5300-HZSH-187

5300-JT-00045-PDN

BL   A1-5300-HZSH-187-TB1-5+   +5-TB1-A1-5300-HZSH-187 A1-5300-HZSH-187-1271+

WT   A1-5300-HZSH-187-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-1 87 A1-53 00 -HZSH-18 7-12 72 - - 12 72 -A1-53 00 -HZSH-18 7 A1-53 00 -HZSH-18 7-21

SCL

13A+ 13A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 13 13TB1

 A1-5300-HZSL-187

5300-JT-00045-PDN

BL   A1-5300-HZSL-187-TB1-7+   +7-TB1-A1-5300-HZSL-187 A1-5300-HZSL-187-1273+

WT   A1-5300-HZSL-187-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -1 87 A1-53 00 -HZSL-18 7-12 74 - - 12 74 -A1-53 00 -HZSL-18 7 A1-53 00 -HZSL-18 7-23

SCL

13A+ 13A-

6

187

5300

HSAL

187

S

   A   1  -   5   3   0   0

  -   J   Y  -   1   8

 A1-5300-HZSH-187   A1-5300-JP-00055

RACK-1, SLOT-13

3+   1821

2

6

7 1273

NO

187

1272

-   4 1822

C   1271

5300

JY

1756-OB16DK

5

+DC-0

OUT-2

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

 A1-5300-JP-00054

SHEET

187

 A1-5300-HZSL-187

RACK-0, SLOT-13

TERMINALS

21

7

 A1-5300-JP-00055

6

 A1-5300-JY-187

5

JB

C

NO   2 3 I N- 118 1274

1756-IB161K

RACK-0, SLOT-13   HSAL

INSTRUMENT

FIELD

5

9

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

187

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   8   7

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   8   7

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

4

5300

HSAH

24 GND-11

IN-10

GND-1022

187

5300

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 218/293

5300

XA

187

187

5300

XA

187

5300

JY

187

5300

HIC

LOOP NO.: A1-5300-X-187 LOOP SERVICE: RINSE OUTLET VLV SFTNER GL-001A

219 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-188

5300-JT-00045-PDN

BL   A1-5300-JY-188-TB4-5+   +5-TB4-A1-5300-JY-188 A1-5300-JY-188-1823+

WT   A1-5300-JY-188-TB4-6-   - 6- TB 4- A1 -5 30 0- JY -1 88 A 1- 53 00 -J Y- 18 8- 18 24 - - 18 24 -A 1- 53 00 -J Y- 18 8 A 1- 53 00 -J Y- 18 8- 7

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 13 13

TB1

 A1-5300-HZSH-188

5300-JT-00045-PDN

BL   A1-5300-HZSH-188-TB1-9+   +9-TB1-A1-5300-HZSH-188 A1-5300-HZSH-188-1275+

WT   A1-5300-HZSH-188-TB1-10-   - 10 -T B1 -A1-53 00 -HZSH-18 8 A1-53 00 -HZSH-18 8-12 76 - - 12 76 -A1-53 00 -HZSH-18 8 A1-53 00 -HZSH-18 8-25

SCL

13A+ 13A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 13 13TB1

 A1-5300-HZSL-188

5300-JT-00045-PDN

BL   A1-5300-HZSL-188-TB1-11+   +11-TB1-A1-5300-HZSL-188 A1-5300-HZSL-188-1277+

WT   A1-5300-HZSL-188-TB1-12-   - 12 -T B1 -A1-53 00 -HZSL-18 8 A1-53 00 -HZSL-18 8-12 78 - - 12 78 -A1-53 00 -HZSL-18 8 A1-53 00 -HZSL-18 8-27

SCL

13A+ 13A-

5300

HSAH

28 GND-13

IN-12

GND-1226

188

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   8   8

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   8   8

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB188K

RACK-0, SLOT-13

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

7

13

 A1-5300-HZSL-188

C

NO   2 7 I N- 1312 1278

1756-IB188K

RACK-0, SLOT-13

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5300

JY188

5300

JY

1756-OB16DK

25

11

 A1-5300-JP-00055

11 1277

NO

188

10 1276

-   6 1824

C   9 1275

S

   A   1  -   5   3   0   0

  -   J   Y  -   1   8

 A1-5300-HZSH-188   A1-5300-JP-00055

RACK-1, SLOT-13

5+   1823

 A1-5300-JY-188

8

7

+DC-0

OUT-3

 A1-5300-JP-00054

4

188

188

5300

HSAL

188

8

10

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 219/293

LOOP NO.: A1-5300-X-188 LOOP SER VI CE: BRI NE I NLET VLV SFT NER GL-001A

JY

188

5300

HIC

5300

XA

188

188

5300

XA

188

5300

220 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-189

5300-JT-00045-PDN

BL   A1-5300-JY-189-TB4-7+   +7-TB4-A1-5300-JY-189 A1-5300-JY-189-1825+

WT   A1-5300-JY-189-TB4-8-   - 8- TB 4- A1 -5 30 0- JY -1 89 A 1 -5 30 0- JY -1 89 -1 82 6- - 18 26 -A 1- 53 00 -J Y- 18 9 A1 -5 30 0- JY -1 89 -9

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 13 13

TB1

 A1-5300-HZSH-189

5300-JT-00045-PDN

BL   A1-5300-HZSH-189-TB1-13+   +13-TB1-A1-5300-HZSH-189 A1-5300-HZSH-189-1279+

WT   A1-5300-HZSH-189-TB1-14-   - 14 -T B1 -A1-53 00 -HZSH-18 9 A1-53 00 -HZSH-18 9-12 80 - - 12 80 -A1-53 00 -HZSH-18 9 A1-53 00 -HZSH-18 9-29

SCL

13A+ 13A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 13 13TB1

 A1-5300-HZSL-189

5300-JT-00045-PDN

BL   A1-5300-HZSL-189-TB1-15+   +15-TB1-A1-5300-HZSL-189 A1-5300-HZSL-189-1281+

WT   A1-5300-HZSL-189-TB1-16-   - 16 -T B1 -A1-53 00 -HZSL-18 9 A1-53 00 -HZSL-18 9-12 82 - - 12 82 -A1-53 00 -HZSL-18 9 A1-53 00 -HZSL-18 9-31

SCL

13A+ 13A-

14

189

5300

HSAL

189

 A1-5300-JY-189

10

9

+DC-0

OUT-4

 A1-5300-JP-00054

1279

S

   A   1  -   5   3   0   0

  -   J   Y  -   1   8

 A1-5300-HZSH-189   A1-5300-JP-00055

RACK-1, SLOT-13

7+   1825

6

15 1281

NO

189

14 1280

-   8 1826

C

189

5300

JY

1756-OB16DK

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)JB

SHEET

 A1-5300-HZSL-189

RACK-0, SLOT-13

TERMINALS

29

15

 A1-5300-JP-00055

13

C

NO   3 1 I N- 1516 1282

1756-IB161K

RACK-0, SLOT-13   HSAL

INSTRUMENT

FIELD

9

17

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   8   9

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   8   9

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

12

5300

HSAH

32 GND-15

IN-14

GND-1430

189

5300

189

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 220/293

5300

XA

189

189

5300

XA

189

5300

JY

189

5300

HIC

LOOP NO.: A1-5300-X-189 LOOP SERVICE: BRINE OUTLET VLV SFTNER GL-001A

221 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-190

5300-JT-00045-PDN

BL   A1-5300-JY-190-TB4-9+   +9-TB4-A1-5300-JY-190 A1-5300-JY-190-1827+

WT   A1-5300-JY-190-TB4-10-   - 10 -T B4 -A1-53 00 -J Y-19 0 A1 -5 30 0-JY-1 90 -1 82 8- - 18 28 -A1-53 00 -J Y-19 0 A1-53 00 -J Y-19 0-11

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14

TB1

 A1-5300-HZSH-190

5300-JT-00045-PDN

BL   A1-5300-HZSH-190-TB1-17+   +17-TB1-A1-5300-HZSH-190 A1-5300-HZSH-190-1283+

WT   A1-5300-HZSH-190-TB1-18-   - 18 -T B1 -A1-53 00 -HZSH-19 0 A1-53 00 -HZSH-19 0-12 84 - - 12 84 -A1-53 00 -HZSH-19 0 A1-53 00 -HZSH-19 0-1

SCL

14A+ 14A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14TB1

 A1-5300-HZSL-190

5300-JT-00045-PDN

BL   A1-5300-HZSL-190-TB1-19+   +19-TB1-A1-5300-HZSL-190 A1-5300-HZSL-190-1285+

WT   A1-5300-HZSL-190-TB1-20-   - 20 -T B1 -A1-53 00 -HZSL-19 0 A1-53 00 -HZSL-19 0-12 86 - - 12 86 -A1-53 00 -HZSL-19 0 A1-53 00 -HZSL-19 0-3

SCL

14A+ 14A-

5300

HSAH

4 GND- 1

IN-0

GND-02

190

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   9   0

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   9   0

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-14

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

11

21

 A1-5300-HZSL-190

C

NO   3 IN-120 1286

1756-IB161K

RACK-0, SLOT-14

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5300

JY

190

5300

JY

1756-OB16DK

1

19

 A1-5300-JP-00055

19 1285

NO

190

18 1284

-   10 1828

C   17 1283

S

   A   1  -   5   3   0   0

  -   J   Y  -   1   9

 A1-5300-HZSH-190   A1-5300-JP-00055

RACK-1, SLOT-13

9+   1827

 A1-5300-JY-190

12

11

+DC-0

OUT-5

 A1-5300-JP-00054

8

190

190

5300

HSAL

190

16

18

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 221/293

LOOP NO.: A1-5300-X-190 LOOP SER VI CE: A IR R ELEASE VLV SFT NER GL-001A

JY

190

5300

HIC

5300

XA

190

190

5300

XA

190

5300

222 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-191

5300-JT-00045-PDN

BL   A1-5300-JY-191-TB4-11+   +11-TB4-A1-5300-JY-191 A1-5300-JY-191-1829+

WT   A1-5300-JY-191-TB4-12-   - 12 -T B4 -A1-53 00 -J Y-19 1 A1 -5 30 0-JY-1 91 -1 83 0- - 18 30 -A1-53 00 -J Y-19 1 A1-53 00 -J Y-19 1-13

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14

TB1

 A1-5300-HZSH-191

5300-JT-00045-PDN

BL   A1-5300-HZSH-191-TB1-21+   +21-TB1-A1-5300-HZSH-191 A1-5300-HZSH-191-1287+

WT   A1-5300-HZSH-191-TB1-22-   - 22 -T B1 -A1-53 00 -HZSH-19 1 A1-53 00 -HZSH-19 1-12 88 - - 12 88 -A1-53 00 -HZSH-19 1 A1-53 00 -HZSH-19 1-5

SCL

14A+ 14A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14TB1

 A1-5300-HZSL-191

5300-JT-00045-PDN

BL   A1-5300-HZSL-191-TB1-23+   +23-TB1-A1-5300-HZSL-191 A1-5300-HZSL-191-1289+

WT   A1-5300-HZSL-191-TB1-24-   - 24 -T B1 -A1-53 00 -HZSL-19 1 A1-53 00 -HZSL-19 1-12 90 - - 12 90 -A1-53 00 -HZSL-19 1 A1-53 00 -HZSL-19 1-7

SCL

14A+ 14A-

22

191

5300

HSAL

191

 A1-5300-JY-191

14

13

+DC-0

OUT-6

 A1-5300-JP-00054

1287

S

   A   1  -   5   3   0   0  -   J   Y  -   1   9

 A1-5300-HZSH-191   A1-5300-JP-00055

RACK-1, SLOT-13

11+   1829

10

23 1289

NO

191

22 1288

-   12 1830

C

191

5300

JY

1756-OB16DK

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)JB

SHEET

 A1-5300-HZSL-191

RACK-0, SLOT-14

TERMINALS

5

23

 A1-5300-JP-00055

21

C

NO   7 IN-324 1290

1756-IB161K

RACK-0, SLOT-14   HSAL

INSTRUMENT

FIELD

13

25

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   9   1

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   9   1

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

20

5300

HSAH

8 GND- 3

IN-2

GND-26

191

5300

191

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 222/293

5300

XA

191

191

5300

XA

191

5300

JY

191

5300

HIC

LOOP NO.: A1-5300-X-191 LOOP SERVICE: SERVICE INLET VLV SFTNER GL-001B

223 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-192

5300-JT-00045-PDN

BL   A1-5300-JY-192-TB4-13+   +13-TB4-A1-5300-JY-192 A1-5300-JY-192-1831+

WT   A1-5300-JY-192-TB4-14-   - 14 -T B4 -A1-53 00 -J Y-19 2 A1 -5 30 0-JY-1 92 -1 83 2- - 18 32 -A1-53 00 -J Y-19 2 A1-53 00 -J Y-19 2-15

SCL 25A- 25A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14

TB1

 A1-5300-HZSH-192

5300-JT-00045-PDN

BL   A1-5300-HZSH-192-TB1-25+   +25-TB1-A1-5300-HZSH-192 A1-5300-HZSH-192-1291+

WT   A1-5300-HZSH-192-TB1-26-   - 26 -T B1 -A1-53 00 -HZSH-19 2 A1-53 00 -HZSH-19 2-12 92 - - 12 92 -A1-53 00 -HZSH-19 2 A1-53 00 -HZSH-19 2-9

SCL

14A+ 14A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14TB1

 A1-5300-HZSL-192

5300-JT-00045-PDN

BL   A1-5300-HZSL-192-TB1-27+   +27-TB1-A1-5300-HZSL-192 A1-5300-HZSL-192-1293+

WT   A1-5300-HZSL-192-TB1-28-   - 28 -T B1 -A1-53 00 -HZSL-19 2 A1-53 00 -HZSL-19 2-12 94 - - 12 94 -A1-53 00 -HZSL-19 2 A1-53 00 -HZSL-19 2-11

SCL

14A+ 14A-

5300

HSAH

12

1 2 G ND -5

IN-4

GND-410

1756-OB16DK

RACK-1, SLOT-13

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   9   2

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   9   2

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-14

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

15

29

1756-IB161K

RACK-0, SLOT-14

NO   11 IN-528 1294  192

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

192

5300

JY

192

SHEET 293

PLC MODULE

5300

9

13

192

27

27 1293

NO   26 1292

 A1-5300-HZSL-192

C

C   25 1291

 A1-5300-JP-00055

S

   A   1  -   5   3   0   0  -   J   Y  -   1   9

 A1-5300-HZSH-192   A1-5300-JP-00055

+   1831

-   14 1832

 A1-5300-JY-192

16

15

GND-0

OUT-7

 A1-5300-JP-00054

192

5300

HSAL

192

5300

HSAL

24

26

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 223/293

LOOP SERVICE: SERVICE OUTLET VLV SFTNER GL-001BLOOP NO.: A1-5300-X-192

JY

192

5300

XA

192

192

5300

XA

192

53005300

HIC

224 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-193

5300-JT-00045-PDN

BL   A1-5300-JY-193-TB4-15+   +15-TB4-A1-5300-JY-193 A1-5300-JY-193-1833+

WT   A1-5300-JY-193-TB4-16-   - 16 -T B4 -A1-53 00 -J Y-19 3 A1-53 00 -J Y-19 3-18 34 - - 18 34 -A1-53 00 -J Y-19 3 A1-53 00 -J Y-19 3-17

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14

TB1

 A1-5300-HZSH-193

5300-JT-00045-PDN

BL   A1-5300-HZSH-193-TB1-29+   +29-TB1-A1-5300-HZSH-193 A1-5300-HZSH-193-1295+

WT   A1-5300-HZSH-193-TB1-30-   - 30 -T B1 -A1-53 00 -HZSH-19 3 A1-53 00 -HZSH-19 3-12 96 - - 12 96 -A1-53 00 -HZSH-19 3 A1-53 00 -HZSH-19 3-13

SCL

14A+ 14A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14TB1

 A1-5300-HZSL-193

5300-JT-00045-PDN

BL   A1-5300-HZSL-193-TB1-31+   +31-TB1-A1-5300-HZSL-193 A1-5300-HZSL-193-1297+

WT   A1-5300-HZSL-193-TB1-32-   - 32 -T B1 -A1-53 00 -HZSL-19 3 A1-53 00 -HZSL-19 3-12 98 - - 12 98 -A1-53 00 -HZSL-19 3 A1-53 00 -HZSL-19 3-15

SCL

14A+ 14A-

30

5300

HSAL

193

5300

HSAL

193

 A1-5300-JY-193

18

17

+DC-1

OUT-8

 A1-5300-JP-00054

15

S

   A   1  -   5   3   0

   0  -   J   Y  -   1   9

 A1-5300-HZSH-193   A1-5300-JP-00055

+   1833

-   16 1834

14

C   29 1295

 A1-5300-JP-00055

31 1297

NO   30 1296

 A1-5300-HZSL-193

C

193

31

28

SHEET

TERMINALSJB

293

PLC MODULE

5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

193

5300

JY

193

NO   15 IN-732 1298  193

INSTRUMENT

FIELD

17

33

1756-OB16DK

RACK-1, SLOT-13

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   9   3

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   9   3

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-14

5300

HSAH

1 6 GN D- 7

IN-6

GND-614

1756-IB161K

RACK-0, SLOT-14

13

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 224/293

5300

XA

193

193

5300

XA

193

5300

JY

193

5300

HIC

LOOP NO.: A1-5300-X-193 LOOP SERVICE: RINSE OUTLET VLV SFTNER GL-001B

225 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-194

5300-JT-00045-PDN

BL   A1-5300-JY-194-TB4-17+   +17-TB4-A1-5300-JY-194 A1-5300-JY-194-1835+

WT   A1-5300-JY-194-TB4-18-   - 18 -T B4 -A1-53 00 -J Y-19 4 A1 -5 30 0-JY-1 94 -1 83 60 - - 18 36 -A1-53 00 -J Y-19 4 A1-53 00 -J Y-19 4-19

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14

TB1

 A1-5300-HZSH-194

5300-JT-00045-PDN

BL   A1-5300-HZSH-194-TB1-33+   +33-TB1-A1-5300-HZSH-194 A1-5300-HZSH-194-1301+

WT   A1-5300-HZSH-194-TB1-34-   - 34 -T B1 -A1-53 00 -HZSH-19 4 A1-53 00 -HZSH-19 4-13 02 - - 13 02 -A1-53 00 -HZSH-19 4 A1-53 00 -HZSH-19 4-19

SCL

14A+ 14A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14TB1

 A1-5300-HZSL-194

5300-JT-00045-PDN

BL   A1-5300-HZSL-194-TB1-35+   +35-TB1-A1-5300-HZSL-194 A1-5300-HZSL-194-1299+

WT   A1-5300-HZSL-194-TB1-36-   - 36 -T B1 -A1-53 00 -HZSL-19 4 A1-53 00 -HZSL-19 4-13 00 - - 13 00 -A1-53 00 -HZSL-19 4 A1-53 00 -HZSL-19 4-17

SCL

14A+ 14A-

5300

HSAH

16

1 8 G ND- 8

IN-9

GND-920

1756-OB16DK

RACK-1, SLOT-13

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   9   4

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   9   4

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-14

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

19

37

1756-IB161K

RACK-0, SLOT-14

NO   17 IN-836 1300  194

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

JY

194

5300

JY

194

SHEET 293

PLC MODULE

5300

19

17

194

35

32

35 1299

NO   1302

 A1-5300-HZSL-194

C

C

34

1301

 A1-5300-JP-00055

S

   A   1  -   5   3   0

   0  -   J   Y  -   1   9

 A1-5300-HZSH-194   A1-5300-JP-00055

+   1835

-   18 1836

 A1-5300-JY-194

20

19

+DC-1

OUT-9

 A1-5300-JP-00054

194

5300

HSAL

194

5300

HSAL

33

34

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 225/293

LOOP SER VI CE: BRI NE I NLET VLV SFT NER GL-001BLOOP NO.: A1-5300-X-194

JY

194

5300

XA

194

194

5300

XA

194

53005300

HIC

226 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-168

5300-JT-00045-PDN

BL   A1-5300-JY-168-TB4-19+   +19-TB4-A1-5300-JY-168 A1-5300-JY-168-1837+

WT   A1-5300-JY-168-TB4-20-   - 20 -T B4 -A1-53 00 -J Y-16 8 A1-53 00 -J Y-16 8-18 38 - - 18 38 -A1-53 00 -J Y-16 8 A1-53 00 -J Y-16 8-21

SCL 25A- 25A+

24V DC SUPPLY

+ -

14 14

 A1-5300-HZSH-168 5300-JT-00045-PDN

TB2 5300-JT-00045-PDN

BL   A1-5300-HZSH-168-TB2-1+   +1-TB2-A1-5300-HZSH-168 A1-5300-HZSH-168-1303+

WT   A1-5300-HZSH-168-TB2-2-   - 2-TB2-A1 -5 30 0-HZ SH-1 68 A1-53 00 -HZSH-16 8-13 04 - - 13 04 -A1-53 00 -HZSH-16 8 A1-53 00 -HZSH-16 8-21

SCL

14A+ 14A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14TB2

 A1-5300-HZSL-168

5300-JT-00045-PDN

BL   A1-5300-HZSL-168-TB2-3+   +3-TB2-A1-5300-HZSL-168 A1-5300-HZSL-168-1305+

WT   A1-5300-HZSL-168-TB2-4-   - 4-TB2-A1 -5 30 0-HZ SL -1 68 A1-53 00 -HZSL-16 8-13 06 - - 13 06 -A1-53 00 -HZSL-16 8 A1-53 00 -HZSL-16 8-23

SCL

14A+ 14A-

1

2

5300

HSAL

168

5300

HSAL

168

 A1-5300-JY-168

22

21

+DC-1

OUT-10

 A1-5300-JP-00054

S

   A   1  -   5   3   0

   0  -   J   Y  -   1   6

 A1-5300-HZSH-168   A1-5300-JP-00056

+   1837

-   20 1838

C

2

1303

 A1-5300-JP-00056

3 1305

NO   1304

 A1-5300-HZSL-168

C

21

19

168

3

SHEET 293

PLC MODULE

5300

JY

168

5300

JY

168

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

NO   2 3 I N- 114 1306  168

INSTRUMENT

FIELD

21

5

1756-IB161K

RACK-0, SLOT-14

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   6   8

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   6   8

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-14

5300

HSAH

18

24 GND-11

IN-10

GND-1022

1756-OB16DK

RACK-1, SLOT-13

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 226/293

168

168

5300

XA

168

53005300

HIC

5300

XA

JY

168

LOOP NO.: A1-5300-X-168 LOOP SERVICE: BRINE OUTLET VLV SFTNER GL-001B

227 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-196

5300-JT-00045-PDN

BL   A1-5300-JY-196-TB4-21+   +21-TB4-A1-5300-JY-196 A1-5300-JY-196-1839+

WT   A1-5300-JY-196-TB4-22-   - 22 -T B4 -A1-53 00 -J Y-19 6 A1-53 00 -J Y-19 6-18 40 - - 18 40 -A1-53 00 -J Y-19 6 A1-53 00 -J Y-19 6-23

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14

TB2

 A1-5300-HZSH-196

5300-JT-00045-PDN

BL   A1-5300-HZSH-196-TB2-5+   +5-TB2-A1-5300-HZSH-196 A1-5300-HZSH-196-1307+

WT   A1-5300-HZSH-196-TB2-6-   - 6-TB2-A1 -5 30 0-HZ SH-1 96 A1-53 00 -HZSH-19 6-13 08 - - 13 08 -A1-53 00 -HZSH-19 6 A1-53 00 -HZSH-19 6-25

SCL

14A+ 14A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14

TB2

 A1-5300-HZSL-196

5300-JT-00045-PDN

BL   A1-5300-HZSL-196-TB2-7+   +7-TB2-A1-5300-HZSL-196 A1-5300-HZSL-196-1309+

WT   A1-5300-HZSL-196-TB2-8-   - 8-TB2-A1 -5 30 0-HZ SL -1 96 A1-53 00 -HZSL-19 6-13 10 - - 13 10 -A1-53 00 -HZSL-19 6 A1-53 00 -HZSL-19 6-27

SCL

14A+ 14A-

5300

HSAH

28 GND-13

IN-12

GND-1226

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   9   61756-IB161K

RACK-0, SLOT-14

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   9   6

WATER TREATMENT PLANT

ZSH

INSTRUMENT

FIELD

TERMINALS

23

25

7

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-14

196

7 1309

NO   6

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

1310  196

9

JB

JY21

NO   2 7 I N- 138

196

5300

JY

196

SHEET 293

PLC MODULE

5300

DCS (BY OTHERS)PROCESS CONTROL ROOM

1756-OB16DK

RACK-1, SLOT-13

1308

 A1-5300-HZSL-196

C

C   5 1307

 A1-5300-JP-00056

S

   A   1  -   5   3   0

   0  -   J   Y  -   1   9

 A1-5300-HZSH-196   A1-5300-JP-00056

+   1839

-   22 1840

 A1-5300-JY-196

24

23

+DC-1

OUT-11

 A1-5300-JP-00054

20

196

5300

HSAL

196

5300

HSAL

4

6

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 227/293

LOOP SER VI CE: A IR R ELEASE VLV SFT NER GL-001B

JY

196

LOOP NO.: A1-5300-X-196

5300

XA

196

196

5300

XA

196

53005300

HIC

228 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-170

5300-JT-00045-PDN

BL   A1-5300-JY-170-TB4-23+   +23-TB4-A1-5300-JY-170 A1-5300-JY-170-1841+

WT   A1-5300-JY-170-TB4-24-   - 24 -T B4 -A1-53 00 -J Y-17 0 A1 -5 30 0-JY-1 70 -1 84 2- - 18 42 -A1-53 00 -J Y-17 0 A1-53 00 -J Y-17 0-25

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14

TB2

 A1-5300-HZSH-170

5300-JT-00045-PDN

BL   A1-5300-HZSH-170-TB2-9+   +9-TB2-A1-5300-HZSH-170 A1-5300-HZSH-170-1311+

WT   A1-5300-HZSH-170-TB2-10-   -10-TB2-A1-5300-HZSH-170 A1-5300-HZSH-170-1312- -1312-A1-5300-HZSH-170 A1-5300-HZSH-170-29

SCL

14A+ 14A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 14 14

TB2

 A1-5300-HZSL-170

5300-JT-00045-PDN

BL   A1-5300-HZSL-170-TB2-11+   +11-TB2-A1-5300-HZSL-170 A1-5300-HZSL-170-1313+

WT   A1-5300-HZSL-170-TB2-12-   - 12 -T B2 -A1-53 00 -HZSL-17 0 A1-53 00 -HZSL-17 0-13 14 -13 14 -A1-53 00 -HZSL-17 0 A1-53 00 -HZSL-17 0-31

SCL

14A+ 14A-

22

8

170

11 1313

JY

10

HSAL

170

5300

HSAL

 A1-5300-JY-170

26

25

+DC-1

OUT-12

 A1-5300-JP-00054

23

S

   A   1  -   5   3   0

   0  -   J   Y  -   1   7

 A1-5300-HZSH-170   A1-5300-JP-00056

+   1841

-   24 1842

25

C

C   9 1311

 A1-5300-JP-00056

11

NO   10 1312

 A1-5300-HZSL-170

SHEET 293

PLC MODULE

5300

1756-OB16DK

RACK-1, SLOT-13

170

5300

JY

170

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

NO   31 IN- 1512 1314  170

INSTRUMENT

FIELD

13

1756-IB161K

RACK-0, SLOT-14

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   7   0

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   7   0

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-14

5300

HSAH

3 2 G ND -1 5

IN-14

GND-1430

29  170

5300

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 228/293

HIC

5300

JY

170

170

170

5300

XA

170

53005300

XA

 A1-5300-X-170 LOOP SERVICE: SERVICE INLET VLV SFTNER GL-001CLOOP NO.:

229 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB2

 A1-5300-JY-198

5300-JT-00045-PDN

BL   A1-5300-JY-198-TB4-25+   +25-TB4-A1-5300-JY-198 A1-5300-JY-198-1843+

WT   A1-5300-JY-198-TB4-26-   - 26 -T B4 -A1-53 00 -J Y-19 8 A1 -5 30 0-JY-1 98 -1 84 4- - 18 44 -A1-53 00 -J Y-19 8 A1-53 00 -J Y-19 8-27

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 15 15

TB2

 A1-5300-HZSH-198

5300-JT-00045-PDN

BL   A1-5300-HZSH-198-TB2-13+   +13-TB2-A1-5300-HZSH-198 A1-5300-HZSH-198-1315+

WT   A1-5300-HZSH-198-TB2-14-   - 14 -T B2 -A1-53 00 -HZSH-19 8 A1-53 00 -HZSH-19 8-13 16 - - 13 16 -A1-53 00 -HZSH-19 8 A1-53 00 -HZSH-19 8-1

SCL

15A+ 15A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 15 15

TB2

 A1-5300-HZSL-198

5300-JT-00045-PDN

BL   A1-5300-HZSL-198-TB2-15+   +15-TB2-A1-5300-HZSL-198 A1-5300-HZSL-198-1317+

WT   A1-5300-HZSL-198-TB2-16-   - 16 -T B2 -A1-53 00 -HZSL-19 8 A1-53 00 -HZSL-19 8-13 18 - - 13 18 -A1-53 00 -HZSL-19 8 A1-53 00 -HZSL-19 8-3

SCL

15A+ 15A-

5300

HSAH

4 GND- 1

IN-0

GND-02

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   9   8

198

5300

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   9   8

WATER TREATMENT PLANT

ZSH

INSTRUMENT

FIELD

TERMINALS

1316

27

1

JB

ZSL

5300

HSAH

1756-IB161K

RACK-1, SLOT-1

198

15 1317

NO

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

15

 A1-5300-JP-00056

1318

1756-IB161K

RACK-1, SLOT-1

17

NO   3 IN-116  198

198

JY25

198

SHEET 293

PLC MODULE

5300+DC-1

DCS (BY OTHERS)PROCESS CONTROL ROOM

RACK-1, SLOT-13

5300

JY

 A1-5300-HZSL-198

C

C   13

14

S

   A   1  -   5   3   0   0  -   J   Y  -   1   9

 A1-5300-HZSH-198   A1-5300-JP-00056

+   1843

-   26 OUT-13

 A1-5300-JY-198

28

27

1315

 A1-5300-JP-00054

1844

1756-OB16DK24

12

HSAL

198

5300

HSAL

14

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 229/293

JY

198

HIC

SERVICE OUTLET VLV SFTNER GL-001CLOOP NO.: A1-5300-X-198 LOOP SERVICE:

5300

XA

198

198

5300

XA

198

53005300

230 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-199

5300-JT-00045-PDN

BL   A1-5300-JY-199-TB4-27+   +27-TB4-A1-5300-JY-199 A1-5300-JY-199-1845+

WT   A1-5300-JY-199-TB4-28-   - 28 -T B4 -A1-53 00 -J Y-19 9 A1 -5 30 0-JY-1 99 -1 84 6- - 18 46 -A1-53 00 -J Y-19 9 A1-53 00 -J Y-19 9-29

SCL 25A- 25A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 15 15

TB2

 A1-5300-HZSH-199

5300-JT-00045-PDN

BL   A1-5300-HZSH-199-TB2-17+   +17-TB2-A1-5300-HZSH-199 A1-5300-HZSH-199-1319+

WT   A1-5300-HZSH-199-TB2-18-   - 18 -T B2 -A1-53 00 -HZSH-19 9 A1-53 00 -HZSH-19 9-13 20 - - 13 20 -A1-53 00 -HZSH-19 9 A1-53 00 -HZSH-19 9-5

SCL

15A+ 15A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 15 15

TB2

 A1-5300-HZSL-199

5300-JT-00045-PDN

BL   A1-5300-HZSL-199-TB2-19+   +19-TB2-A1-5300-HZSL-199 A1-5300-HZSL-199-1321+

WT   A1-5300-HZSL-199-TB2-20-   - 20 -T B2 -A1-53 00 -HZSL-19 9 A1-53 00 -HZSL-19 9-13 22 - - 13 22 -A1-53 00 -HZSL-19 9 A1-53 00 -HZSL-19 9-7

SCL

15A+ 15A-

17

18

5300

HSAL

199

5300

HSAL

199

199

 A1-5300-JY-199

30

29

+DC-1

OUT-14

 A1-5300-JP-00054

26

S

   A   1  -   5   3   0   0  -   J   Y  -   1   9

 A1-5300-HZSH-199   A1-5300-JP-00056

+   1845

-   1846

29

C

C

18

1319

 A1-5300-JP-00056

19

16

19 1321

1320

SHEET 293

PLC MODULE

5300

1756-OB16DK

RACK-1, SLOT-13

5300

DCS (BY OTHERS)PROCESS CONTROL ROOM

JY

199

TERMINALSJB

NO

INSTRUMENT

5

28

NO

 A1-5300-HZSL-199

IN-320 1322  199

FIELD

21

1756-IB161K

RACK-1, SLOT-1

7

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   9   9

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   9   9

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-1, SLOT-1

5300

HSAH

27

8 GND- 3

IN-2

GND-26

JY

199

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 230/293

199

199

5300

XA

199

53005300

HIC

5300

XA

JY

199

LOOP NO.: A1-5300-X-199 LOOP SERVICE: RINSE OUTLET VLV SFTNER GL-001C

231 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 25 25

TB4

 A1-5300-JY-200

5300-JT-00045-PDN

BL   A1-5300-JY-200-TB4-29+   +29-TB4-A1-5300-JY-200 A1-5300-JY-200-1847+

WT   A1-5300-JY-200-TB4-30-   - 30 -T B4 -A1-53 00 -J Y-20 0 A1 -5 30 0-JY-2 00 -1 84 8- - 18 48 -A1-53 00 -J Y-20 0 A1-53 00 -J Y-20 0-31

SCL 25A- 25A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 15 15

TB2

 A1-5300-HZSH-200

5300-JT-00045-PDN

BL   A1-5300-HZSH-200-TB2-21+   +21-TB2-A1-5300-HZSH-200 A1-5300-HZSH-200-1323+

WT   A1-5300-HZSH-200-TB2-22-   - 22 -T B2 -A1-53 00 -HZSH-20 0 A1-53 00 -HZSH-20 0-13 24 - - 13 24 -A1-53 00 -HZSH-20 0 A1-53 00 -HZSH-20 0-9

SCL

15A+ 15A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 15 15

TB2

 A1-5300-HZSL-200

5300-JT-00045-PDN

BL   A1-5300-HZSL-200-TB2-23+   +23-TB2-A1-5300-HZSL-200 A1-5300-HZSL-200-1325+

WT   A1-5300-HZSL-200-TB2-24-   - 24 -T B2 -A1-53 00 -HZSL-20 0 A1-53 00 -HZSL-20 0-13 26 - - 13 26 -A1-53 00 -HZSL-20 0 A1-53 00 -HZSL-20 0-11

SCL

15A+ 15A-

5300

HSAH

29

1 2 G ND -5

IN-4

GND-410

   A   1  -   5   3   0   0  -   H   Z   S   L  -   2   0   0

200

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   2   0   0

WATER TREATMENT PLANT

ZSH

INSTRUMENT

FIELD

TERMINALS

200

20

28

ZSL

5300

HSAH

1756-IB161K

RACK-1, SLOT-1

200

21

23 1325

NO

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

1756-IB161K

RACK-1, SLOT-1

9

23

1326  200

25

JY

30

NO   11 IN-524

C

SHEET 293

PLC MODULE

5300

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

JY

5300

C

22

1323

 A1-5300-JP-00056

1324

 A1-5300-HZSL-200

S

   A   1  -   5   3

   0   0  -   J   Y  -   2   0

 A1-5300-HZSH-200   A1-5300-JP-00056

+   1847

-   1848

31

 A1-5300-JY-200

32

31

+GND-1

OUT-15

 A1-5300-JP-00054

1756-OB16DK

RACK-1, SLOT-13

200

5300

HSAL

200

5300

HSAL

22

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 231/293

LOOP SER VI CE: BRI NE I NLET VLV SFT NER GL-001CLOOP NO.: A1-5300-X-200

XA

JY

200

200

200

5300

XA

200

53005300

HIC

5300

232 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 26 26

TB4

 A1-5300-JY-201

5300-JT-00045-PDN

BL   A1-5300-JY-201-TB4-31+   +31-TB4-A1-5300-JY-201 A1-5300-JY-201-1849+

WT   A1-5300-JY-201-TB4-32-   - 32 -T B4 -A1-53 00 -J Y-20 1 A1-53 00 -J Y-20 1-18 50 - - 18 50 -A1-53 00 -J Y-20 1 A1-53 00 -J Y-20 1-1

SCL 26A- 26A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 15 15

TB2

 A1-5300-HZSH-201

5300-JT-00045-PDN

BL   A1-5300-HZSH-201-TB2-25+   +25-TB2-A1-5300-HZSH-201 A1-5300-HZSH-201-1327+

WT   A1-5300-HZSH-201-TB2-26-   -26-TB2-A1-5300-HZSH-201 A1-5300-HZSH-201-1328- -1328-A1-5300-HZSH-201 A1-5300-HZSH-201-13

SCL

15A+ 15A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 15 15

TB2

 A1-5300-HZSL-201

5300-JT-00045-PDN

BL   A1-5300-HZSL-201-TB2-27+   +27-TB2-A1-5300-HZSL-201 A1-5300-HZSL-201-1329+

WT   A1-5300-HZSL-201-TB2-28-   - 28 -T B2 -A1-53 00 -HZSL-20 1 A1-53 00 -HZSL-20 1-13 30 - - 13 30 -A1-53 00 -HZSL-20 1 A1-53 00 -HZSL-20 1-15

SCL

15A+ 15A-

5300

HSAH

31

1 6 G ND -7

IN-6

GND-614

JY

201

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   2   0   1

   A   1  -   5   3   0   0  -   H   Z   S   L  -   2   0   1

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-1, SLOT-1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

FIELD

29

1756-IB161K

RACK-1, SLOT-1

15 IN-728 1330  201

JB

NO

INSTRUMENT

13

32

NO

 A1-5300-HZSL-201

JY

201

TERMINALS

SHEET 293

PLC MODULE

5300

1756-OB16DK

RACK-1, SLOT-14

5300

DCS (BY OTHERS)PROCESS CONTROL ROOM

24

27 1329

1328

C

C

26

1327

 A1-5300-JP-00056

27

S

   A   1  -   5   3

   0   0  -   J   Y  -   2   0

 A1-5300-HZSH-201   A1-5300-JP-00056

+   1849

-   1850

33

 A1-5300-JY-201

2

1

+DC-0

OUT-0

 A1-5300-JP-00054

30

201

5300

HSAL

201

201

5300

HSAL

25

26

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 232/293

LOOP SERVICE: BRINE OUTLET VLV SFTNER GL-001CLOOP NO.: A1-5300-X-201

JY

201

5300

XA

201

201

5300

XA

201

53005300

HIC

233 OF

24V DC SUPPLY

- +

5300-JT-00045-PDN 26 26

TB4

 A1-5300-JY-202

5300-JT-00045-PDN

BL   A1-5300-JY-202-TB4-33+   +33-TB4-A1-5300-JY-202 A1-5300-JY-202-1851+

WT   A1-5300-JY-202-TB4-34-  - 34 -T B4 -A1-53 00 -J Y-20 2 A1-53 00 -J Y-20 2-18 52 - - 18 52 -A1-53 00 -J Y-20 2 A1-53 00 -J Y-20 2-3

SCL 26A- 26A+

24V DC SUPPLY

+ -

5300-JT-00045-PDN 15 15

TB2

 A1-5300-HZSH-202

5300-JT-00045-PDN

BL   A1-5300-HZSH-202-TB2-29+   +29-TB2-A1-5300-HZSH-202 A1-5300-HZSH-202-1331+

WT   A1-5300-HZSH-202-TB2-30-   -30-TB2-A1-5300-HZSH-202 A1-5300-HZSH-202-1332- -1332-A1-5300-HZSH-202 A1-5300-HZSH-202-17

SCL

15A+ 15A-

24V DC SUPPLY

+ -

5300-JT-00045-PDN 15 15

TB2

 A1-5300-HZSL-202

5300-JT-00045-PDN

BL   A1-5300-HZSL-202-TB2-31+   +31-TB2-A1-5300-HZSL-202 A1-5300-HZSL-202-1333+

WT   A1-5300-HZSL-202-TB2-32-   - 32 -T B2 -A1-53 00 -HZSL-20 2 A1-53 00 -HZSL-20 2-13 34 - - 13 34 -A1-53 00 -HZSL-20 2 A1-53 00 -HZSL-20 2-19

SCL

15A+ 15A-

30

5300

HSAL

202

5300

HSAL

202

 A1-5300-JY-202

4

3

+DC-0

OUT-1

 A1-5300-JP-00054

1756-OB16DK

RACK-1, SLOT-14

S

   A   1  -   5   3

   0   0  -   J   Y  -   2   0

 A1-5300-HZSH-202   A1-5300-JP-00056

+   1851

-   1852

35

C

30

1331

 A1-5300-JP-00056

1332

 A1-5300-HZSL-202

C

SHEET 293

PLC MODULE

5300

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

JY

5300

JY

34

NO   19 IN-932 1334  202

33

1756-IB161K

RACK-1, SLOT-1

17

31

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

ZSL

5300

HSAH

1756-IB161K

RACK-1, SLOT-1

202

29

31 1333

NO

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   2   0   2

WATER TREATMENT PLANT

ZSH

INSTRUMENT

FIELD

TERMINALS

202

28

32

5300

HSAH

33

2 0 G ND -9

IN-8

GND-818

   A   1  -   5   3   0   0  -   H   Z   S   L  -   2   0   2

202

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 233/293

202

202

5300

XA

202

53005300

HIC

5300

XA

JY

202

LOOP NO.: A1-5300-X-202 LOOP SER VI CE: A IR R ELEASE VLV SFT NER GL-001C

234 OF

FI-5 5300-JT-00038-PAN 1756-IF16K

TB1 5300-JT-00038-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-5

 A1-5300-FT-129-TB1-1+   + 1- TB 1- A1 -5 30 0- FT -1 29 A 1- 53 00 -F T- 12 9- 51 9+ + 51 9- A1 -5 30 0- FT -1 29 A 1- 53 00 -F T- 12 9- 04 A+

+7-A1-5300-FT-129 A1-5300-FT-129-16+

 A1-5300-FT-129-TB1-2-   - 2- TB 1- A1 -5 30 0- FT -1 29 A 1- 53 00 -F T- 12 9- 52 0- - 52 0- A1 -5 30 0- FT -1 29 A 1- 53 00 -F T- 12 9- 04 B-

-8-A1-5300-FT-129 A1-5300-FT-129-18-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

SHEET 293PACKAGE WATER TREATMENT PLANT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

JB

+71

2

04A

FIELD

17

-04C

INSTRUMENT

16

 A1-5300-FT-129

iRTN6

iRTN7

3

4

18 IN78

IN6+

-   520

519

DOC. NO.

REV. NO.

DCS (BY OTHERS)PROCESS CONTROL ROOM

04B

PLC MODULETERMINALS

   A

   1  -   5   3   0   0  -   F   T  -   1   2   9

15

5300

FI

129

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-129 A1-5300-JP-00057

5300

FAH

129

5300

FTA

129

5300

FI

129

5300

FAH

129

5300

FTA

129

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 234/293

LOOP NO.: A1-5300-FT-129 PA004A/B/C DISCH FLOWLOOP SERVICE:

235 OF

24V DC SUPPLY

- +

22 22

 A1-5300-JY-172 5300-JT-00039-PDN

TB2 5300-JT-00039-PDN

BL   A1-5300-JY-172-TB2-1+   +1-TB2-A1-5300-JY-172 A1-5300-JY-172-1749+

WT   A1-5300-JY-172-TB2-2-  - 2-TB2-A1 -5 30 0-JY-1 72 A1 -5 30 0-JY-1 72 -1 75 0- - 17 50 -A1-53 00 -J Y-17 2 A1-53 00 -J Y-17 2-29

SCL 22A- 22A+

24V DC SUPPLY

+ -

10 10

 A1-5300-HZSH-172 5300-JT-00039-PDN

TB1 5300-JT-00039-PDN

BL   A1-5300-HZSH-172-TB1-1+   +1-TB1-A1-5300-HZSH-172 A1-5300-HZSH-172-1153+

WT   A1-5300-HZSH-172-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 72 A1-53 00 -HZSH-17 2-11 54 - - 11 54 -A1-53 00 -HZSH-17 2 A1-53 00 -HZSH-17 2-25

SCL

10A+ 10A-

24V DC SUPPLY

+ -

5300-JT-00039-PDN 10 10

TB1

 A1-5300-HZSL-172

5300-JT-00039-PDN

BL   A1-5300-HZSL-172-TB1-3+   +3-TB1-A1-5300-HZSL-172 A1-5300-HZSL-172-1155+

WT   A1-5300-HZSL-172-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 72 A1-53 00 -HZSL-17 2-11 56 - - 11 56 -A1-53 00 -HZSL-17 2 A1-53 00 -HZSL-17 2-27

SCL

10A+ 10A-

JY

172

5

4

5300

HSAH

28 GND-13

IN-12

GND-12

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-10

27

3 1155

1154

C

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   7   2

26

WATER TREATMENT PLANT

ZSH

1

FIELD

JB

3

1750

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

IN-13

2

4

1756-IB161K

RACK-0, SLOT-10

25

 A1-5300-JP-00058

1153

 A1-5300-JP-00058

1156

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   7   2

JY

172

   A   1  -   5   3

   0   0  -   J   Y  -   1   7

172

NO

INSTRUMENT

C

S

 A1-5300-HZSH-172

+

-

NO

SHEET 293

PLC MODULE

5300

1756-OB16DK

RACK-1, SLOT-10

5300

DCS (BY OTHERS)PROCESS CONTROL ROOM

TERMINALS

30

29

+DC-1

OUT-14

 A1-5300-JY-172   A1-5300-JP-00059

 A1-5300-HZSL-172

1

2

2

1749

3

172

5300

HSAL

172

5300

HSAL

172

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 235/293

LOOP NO.: A1-5300-X-172 LOOP SERVICE: FLOW RECYLE VLV TO TNK 530-TA-004

172172

5300

HIC JY

5300

5300

XA

172

5300

XA

172

236 OF

FI-7 5300-JT-00040-PAN 1756-IF16K

TB1 5300-JT-00040-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-10

 A1-5300-PDT-236-TB1-1+   +1-TB1-A1 -5 30 0-PDT-23 6 A1-53 00 -PDT -2 36 -4 87 + +48 7-A1 -5 30 0-PDT-23 6 A1-53 00 -PDT -2 36 -1 0A+

+19-A1-5300-PDT-236 A1-5300-PDT-236-6+

 A1-5300-PDT-236-TB1-2-   - 2-TB1-A1 -5 30 0-PDT-23 6 A1 -5 30 0-PDT-23 6-48 8- - 48 8-A1 -5 30 0-PDT-23 6 A1-53 00 -PDT -2 36 -1 0B-

-20-A1-5300-PDT-236 A1-5300-PDT-236-8-

SCL

H H

FIC

100

5000

FIC

100

5000

SHEET 293

5

IN2

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

   A

   1  -   5   3   0   0  -   P   D   T  -   2   3   6+

-

PLC MODULETERMINALS

IN3

488

7

iRTN2

iRTN3

8

5000

FIC

100

INSTRUMENT

FIELD

487

 A1-5300-PDT-236

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

20

+

-10C

19 610A

10B

1

2

3

4

9

10

5

6

7

8

5300

PDI

236

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-236 A1-5300-JP-00060

5300

PDAH

236

5300

PDTA

236

5300

PDI

236

5300

PDAH

236

5300

PDTA

236

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 236/293

LOOP NO.: A1-5300-PDT-236 CAR. FILTER ZL004A DIFF.PRESS.LOOP SERVICE:

237 OF

 5300-JT-00040-PAN

TB1

FI-71756-IF16K

5300-JT-00040-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-10

 A1-5300-PDT-237-TB1-3+   +3-TB1-A1 -5 30 0-PDT-23 7 A1 -5 30 0-PDT-23 7-48 9+ 4 89 -A1-53 00 -PDT -2 37 A1-53 00 -PDT -2 37 -1 1A+

+21-A1-5300-PDT-237 A1-5300-PDT-237-12+

 A1-5300-PDT-237-TB1-4-   - 4-TB1-A1 -5 30 0-PDT-23 7 A1 -5 30 0-PDT-23 7-49 0- - 49 0-A1 -5 30 0-PDT-23 7 A1-53 00 -PDT -2 37 -1 1B-

-22-A1-5300-PDT-237 A1-5300-PDT-237-14-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

PACKAGE WATER TREATMENT PLANT

22

+

-11C

21 1211A

11B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

FIELD

489

10

 A1-5300-PDT-237

1

2

3

5

813

iRTN4

iRTN5

14 IN5

PLC MODULETERMINALS

490

INSTRUMENT

4

9

7

6

+

-

SHEET 293

11

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

   A   1  -   5   3   0   0  -   P   D

   T  -   2   3   7

5300

PDI

237

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-237 A1-5300-JP-00060

5300

PDAH

237

5300

PDTA

237

5300

PDI

237

5300

PDAH

237

5300

PDTA

237

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 237/293

CAR. FILTER ZL004B DIFF.PRESS.LOOP NO.: A1-5300-PDT-237 LOOP SERVICE:

238 OF

 5300-JT-00040-PAN

TB1

FI-71756-IF16K

5300-JT-00040-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-10 A1-5300-PDT-238-TB1-5+   +5-TB1-A1 -5 30 0-PDT-23 8 A1-53 00 -PDT -2 38 -4 91 + +49 1-A1 -5 30 0-PDT-23 8 A1-53 00 -PDT -2 38 -1 2A+

+23-A1-5300-PDT-238 A1-5300-PDT-238-16+

 A1-5300-PDT-238-TB1-6-   - 6-TB1-A1 -5 30 0-PDT-23 8 A1 -5 30 0-PDT-23 8-49 2- - 49 2-A1 -5 30 0-PDT-23 8 A1-53 00 -PDT -2 38 -1 2B-

-24-A1-5300-PDT-238 A1-5300-PDT-238-18-

SCL

H H

100

FIC

100

5000

FIC

5000

FIC

100

5000

10

6

7

8

9

2

3

4

5+

-

PLC MODULETERMINALS

IN7

1

IN61612A

492

17

iRTN6

iRTN7

18

INSTRUMENT

FIELD

491

 A1-5300-PDT-238

JB

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

   A   1  -   5   3   0   0  -   P   D   T  -   2   3   8

15

DCS (BY OTHERS)PROCESS CONTROL ROOM

12B

PACKAGE WATER TREATMENT PLANT

24

+

-12C

23

5300

PDI

238

CE CE

CE

CE   CE   CE

CE

 A1-5300-PDT-238 A1-5300-JP-00060

5300

PDAH

238

5300

PDTA

238

5300

PDI

238

5300

PDAH

238

5300

PDTA

238

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 238/293

 A1-5300-PDT-238 CAR. FILTER ZL004C DIFF.PRESS.LOOP SERVICE:LOOP NO.:

239 OF

 5300-JT-00042-PAN

TB1

FI-81756-IF16K

5300-JT-00042-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-12

 A1-5300-FT-141-TB1-15+   + 15 -T B1 -A 1- 53 00 -F T- 14 1 A 1- 53 00 -F T- 14 1- 54 1+ + 54 1- A1 -5 30 0- FT -1 41 A 1- 53 00 -F T- 14 1- 13 A+

+25-A1-5300-FT-141 A1-5300-FT-141-20+

 A1-5300-FT-141-TB1-16-   - 16 -T B1 -A 1- 53 00 -F T- 14 1 A 1- 53 00 -F T- 14 1- 54 2- - 54 2- A1 -5 30 0- FT -1 41 A 1- 53 00 -F T- 14 1- 13 B-

-26-A1-5300-FT-141 A1-5300-FT-141-22-

SCL

H

L

15

16

21

17

18

19

20

SHEET 293

19

IN8

DCS (BY OTHERS)PROCESS CONTROL ROOM

   A   1  -   5   3   0

   0  -   F   T  -   1   4   1

IN9

542

3

+

-

4

5

6

10

13

14

JB PLC MODULETERMINALS

1

2

11

12

21

iRTN8

iRTN9

22

INSTRUMENT

FIELD

541

 A1-5300-FT-141

7

8

9

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

26

+

-13C

25 2013A

13B

To AMS System

5300

FIC

100

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-141 A1-5300-JP-00061

5300

FIC

141   5300

FAH

141

5300

FAH

141

5300

FTA

141

5300

FAL

141

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 239/293

 A1-5300-FCV-141 5300-JT-00042-PAN

TB1

 5300-JT-00042-PAN 1 2 +3 -4 +5 -6

 A1-5300-FY-141-TB1-23+ +23-TB1-A1-5300-FY-141 A1-5300-FY-141-543+ +543-A1-5300-FY-141 A1-FY-5300-100-21+

 A1-5300-FY-141-TB1-24+ -24-TB1-A1-5300-FY-141 A1-5300-FY-141-544- -544-A1-5300-FY-141 A1-5300-FY-141-22- 11B-A1-5300-FY-141 A1-5300-FY-141-15

11C-A1-5300-FY-141 A1-5300-FY-141-19

SCL

H

L

+ 21 11A

LOOP NO.: A1-5300-FT-141 FLOW TO EDI GL-003ALOOP SERVICE:

FI-1222

1756-OF6CIK

I/P  +   23 543

-   24 544

RACK-3, SLOT-10

1 5 OU T4

   A   1  -   5   3   0   0  -   F   Y  -   1   4   1

1 9 R TN 4

17 ALT4

- 22 11B

25 11C

5300

FAL

141

5300

FTA

141

CE   CE

 A1-5300-JP-00061

CE   CE

CE CE

CE

 A1-5300-FY-141

5300

FIC

112

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 240/293

241 OF

FI-15300-JT-00042-PAN 1756-IF16K

TB1 5300-JT-00042-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-2

 A1-5300-PT-273-TB1-1+   + 1- TB 1- A1 -5 30 0- PT -2 73 A 1- 53 00 -P T- 27 3- 56 7+ + 56 7- A1 -5 30 0- PT -2 73 A 1- 53 00 -P T- 27 3- 16 A+

+31-A1-5300-PT-273 A1-5300-PT-273-34+

 A1-5300-PT-273-TB1-2-   - 2- TB 1- A1 -5 30 0- PT -2 73 A 1- 53 00 -P T- 27 3- 56 8- - 56 8- A1 -5 30 0- PT -2 73 A 1- 53 00 -P T- 27 3- 16 B-

-32-A1-5300-PT-273 A1-5300-PT-273-36-

SCL

H

L

 A1-5300-PCV-273 5300-JT-00042-PAN

TB1

 5300-JT-00042-PAN 1 2 +3 -4 +5 -6 A1-5300-PY-273-TB1-29+ +29-TB1-A1-5300-PY-273 A1-5300-PY-273-569+ +569-A1-5300-PY-273 A1-5300-PY-273-3+

 A1-5300-PY-273-TB1-30+ -30-TB1-A1-5300-PY-273 A1-5300-PY-273-570- -570-A1-5300-PY-273 A1-5300-PY-273-4- 02B-A1-5300-PY-273 A1-5300-PY-273-2

02C-A1-5300-PY-273 A1-5300-PY-273-6

SCL

H

L

PACKAGE WATER TREATMENT PLANT

32

+

-16C

31

PLC MODULE

SHEET 293

DCS (BY OTHERS)PROCESS CONTROL ROOM

TERMINALS

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

INSTRUMENT

FIELD

567

 A1-5300-PT-273

JB

6

33

5

10

iRTN14   A   1  -   5   3   0   0  -   P   T  -   2   7   3

iRTN15

8

11

+

-

9

7

4

2

1

36 IN153

3416A

16B

IN14

568

35

31

28

29

30

FI-13

1756-OF6CIK

3 02ARACK-3, SLOT-14

To AMS System

I/P  +   569 +

-   570 -

   A   1  -   5   3   0   0  -   P   Y  -   2   7   3

RTN1

24

4 ALT1

OUT102B

02C6

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-273 A1-5300-JP-00061

5300

PAH

273

5300

PAL

273

5300

PTA

273

CE

  CE

 A1-5300-JP-00061

CE   CE

CE CE

CE

 A1-5300-PY-273

5300

PTA

273

5300

PAH

273

5300

PAL

273

5300

PIC

272

5300

PIC

273

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 241/293

LOOP NO.: A1-5300-PT-273 LOOP SERVICE: CONCENTRATE IN PRES.T GL-003B

242 OF

 5300-JT-00042-PAN

TB1

FI-51756-IF16K

5300-JT-00042-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-5

 A1-5300-FT-130-TB1-9+   + 9- TB 1- A1 -5 30 0- FT -1 30 A 1- 53 00 -F T- 13 0- 52 1+ + 52 1- A1 -5 30 0- FT -1 30 A 1- 53 00 -F T- 13 0- 05 A+

+9-A1-5300-FT-130 A1-5300-FT-130-20+

 A1-5300-FT-130-TB1-10-   - 10 -T B1 -A 1- 53 00 -F T- 13 0 A 1- 53 00 -F T- 13 0- 52 2- - 52 2- A1 -5 30 0- FT -1 30 A 1- 53 00 -F T- 13 0- 05 B-

-10-A1-5300-FT-130 A1-5300-FT-130-22-

SCL

H H

L L

5000

FIC

100

100

5000

FIC

100

FIC

100

5000

FIC

6

4

11

5000

+

-

CLIENT

PACKAGE WATER TREATMENT PLANT

10

+

-

 A1-5300-FT-130

KE01-A1-500-MT-I-HL-0001-000

INSTRUMENT

FIELD

JB

SHEET 293

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

PLC MODULE

521

14

16

20

10

12

13

05C

522

21

iRTN8

iRTN9

22 IN9

19

IN8

DCS (BY OTHERS)PROCESS CONTROL ROOM

2005A

05B

9

   A   1  -   5   3   0   0  -   F   T  -   1   3   0

TERMINALS

18

21

15

17

19

DOC. NO.

REV. NO.

8

9

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

7

1

2

3

5

5300

FI

130

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-130 A1-5300-JP-00061

5300

FAH

130

5300

FAL

130

5300

FTA

130

5300

FI

130

5300

FAH

130

5300

FAL

130

5300

FTA

130

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 242/293

LOOP SERVICE: CONCEN. INLET FLOW EDI GL-003BLOOP NO.: A1-5300-FT-130

To AMS System

243 OF

5300-JT-00042-PAN

TB1

FI-21756-IF16K

5300-JT-00042-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-4

 A1-5300-AT-105-TB1-5+   + 5- TB 1- A1 -5 30 0- AT -1 05 A 1- 53 00 -A T- 10 5- 57 7+ + 57 7- A1 -5 30 0- AT -1 05 A 1- 53 00 -A T- 10 5- 16 A+

+31-A1-5300-AT-105 A1-5300-AT-105-34+

 A1-5300-AT-105-TB1-6-   - 6- TB 1- A1 -5 30 0- AT -1 05 A 1- 53 00 -A T- 10 5- 57 8- - 57 8- A1 -5 30 0- AT -1 05 A 1- 53 00 -A T- 10 5- 16 B-

-32-A1-5300-AT-105 A1-5300-AT-105-36-

SCL

H H

L L

5000

FIC

100

100

5000FIC

100

FIC

100

5000

FIC

SHEET 293

33

IN14

DCS (BY OTHERS)PROCESS CONTROL ROOM

iRTN14

+

-

PLC MODULETERMINALS

1

2

3

4

10

6 578

8

7

   A   1  -   5   3   0   0  -   A   T  -   1   0   5

5

35

INSTRUMENT

FIELD

577

9

 A1-5300-AT-105

JB

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

32

+-16C

31 3416A

16B

iRTN15

36 IN15

115000

12

13

14

15

20

21

16

17

18

19

5300

 AI

105

CE CE

CE

CE   CE   CE

CE

 A1-5300-AT-105 A1-5300-JP-00061

5300

 AAH

105

5300 AAL

105

5300

 ATA

105

5300

 AI

105

5300

 AAH

105

5300 AAL

105

5000

 ATA

105

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 243/293

LOOP NO.: A1-5300-AT-105 LOOP SERVICE: CONCENTRATE IN COND.T GL-003B

244 OF

5300-JT-00042-PAN

TB1

FI-21756-IF16K

5300-JT-00042-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-3

 A1-5300-PT-274-TB1-3+   + 3- TB 1- A1 -5 30 0- PT -2 74 A 1- 53 00 -P T- 27 4- 57 1+ + 57 1- A1 -5 30 0- PT -2 74 A 1- 53 00 -P T- 27 4- 01 A+

+1-A1-5300-PT-274 A1-5300-PT-274-2+

 A1-5300-PT-274-TB1-4-   - 4- TB 1- A1 -5 30 0- PT -2 74 A 1- 53 00 -P T- 27 4- 57 2- - 57 2- A1 -5 30 0- PT -2 74 A 1- 53 00 -P T- 27 4- 01 B-

-2A1-5300-PT-274 A1-5300-PT-274-4-

SCL

 A1-5300-PCV-274 5300-JT-00042-PANTB1

 5300-JT-00042-PAN 1 2 +3 -4 +5 -6

 A1-5300-PY-274-TB1-31+ +31-TB1-A1-5300-PY-274 A1-5300-PY-274-573+ +573-A1-5300-PY-274 A1-5300-PY-274-5+

 A1-5300-PY-274-TB1-32+ -32-TB1-A1-5300-PY-274 A1-5300-PY-274-574- -574-A1-5300-PY-274 A1-5300-PY-274-6- 03B-A1-5300-PY-274 A1-5300-PY-274-7

03C-A1-5300-PY-274 A1-5300-PY-274-11

SCL

-

PLC MODULETERMINALS

1

3IN02

01A

01B

8

572

7

7

5

4

3

iRTN0

INSTRUMENT

FIELD

571

6

8

 A1-5300-PT-274

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

iRTN1

4 IN1

   A   1  -   5   3   0   0  -   P

   T  -   2   7   4

1

DCS (BY OTHERS)PROCESS CONTROL ROOM

PACKAGE WATER TREATMENT PLANT

2

+

-01C

1

JB

2

+

30

31

32

9

10

11

To AMS System

FI-13

1756-OF6CIK

I/P  +   573 + 5 03A

RACK-3, SLOT-14

703B

33 03C11

-   574 - 6

9 ALT2

OUT2

   A   1  -   5   3   0   0  -   P   Y  -   2   7   4

RTN2

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-274 A1-5300-JP-00062

5300

PAH

274

5300

PAL

274

5300

PTA

274

CE   CE

 A1-5300-JP-00061

CE   CE

CE CE

CE

 A1-5300-PY-274

5300

PTA

274

5300

PAH

274

5300

PAL

274

5300

PIC

274

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 244/293

LOOP NO.: A1-5300-PT-274 LOOP SERVICE: CONCENTRATE IN PRES.T GL-003A

245 OF

5300-JT-00042

TB1

FI-51756-IF16K

5300-JT-00042-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-5

 A1-5300-FT-131-TB1-11+   + 11 -T B1 -A 1- 53 00 -F T- 13 1 A 1- 53 00 -F T- 13 1- 52 3+ + 52 3- A1 -5 30 0- FT -1 31 A 1- 53 00 -F T- 13 1- 06 A+

+11-A1-5300-FT-131 A1-5300-FT-131-24+

 A1-5300-FT-131-TB1-12-   - 12 -T B1 -A 1- 53 00 -F T- 13 1 A 1- 53 00 -F T- 13 1- 52 4- - 52 4- A1 -5 30 0- FT -1 31 A 1- 53 00 -F T- 13 1- 06 B-

-12-A1-5300-FT-131 A1-5300-FT-131-26-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC100

5000

DCS (BY OTHERS)PROCESS CONTROL ROOM

06B

PLC MODULETERMINALS

   A   1  -   5   3   0   0  -   F   T  -   1   3   1

23

523 06A

INSTRUMENT

24 IN10

3

4

12

+

-IN11

 A1-5300-FT-131

21

13

14

15

524

25

iRTN10

iRTN11

26

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

19

20

16

8

9

10

FIELD

JB

PACKAGE WATER TREATMENT PLANT

12

+

-06C

11

5

6

7

1

2

17

18

11

5300

FI131

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-131 A1-5300-JP-00061

5300

FAH

131

5300

FAL

131

5300

FTA

131

5300

FI

131

5300

FAH

131

5300

FAL

131

5300

FTA

131

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 245/293

LOOP SERVICE:LOOP NO.: A1-5300-FT-131 CONCEN. INLET FLOW EDI GL-003A

To AMS System

246 OF

 5300-JT-00042-PAN

TB1

FI-31756-IF16K

5300-JT-00042-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-1

 A1-5300-AT-106-TB1-7+   + 7- TB 1- A1 -5 30 0- AT -1 06 A 1- 53 00 -A T- 10 6- 57 9+ + 57 9- A1 -5 30 0- AT -1 06 A 1- 53 00 -A T- 10 6- 01 A+

+1-A1-5300-AT-106 A1-5300-AT-106-2+

 A1-5300-AT-106-TB1-8-   - 8- TB 1- A1 -5 30 0- AT -1 06 A 1- 53 00 -A T- 10 6- 58 0- - 58 0- A1 -5 30 0- AT -1 06 A 1- 53 00 -A T- 10 6- 01 B-

-2-A1-5300-AT-106 A1-5300-AT-106-4-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

SHEET 293

1

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

iRTN4

JB

   A   1  -   5   3   0   0  -   A   T  -   1   0   6

6

+

-

PLC MODULETERMINALS

5

4

10

9

3

13

14

15

16

17

INSTRUMENT

FIELD

5797

 A1-5300-AT-106

2

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

2

+

-01C

1 201A

01B

1

iRTN5

4 IN5

3

5808

11

12

18

19

20

21

5300

 AI

106

CE CE

CE

CE   CE   CE

CE

 A1-5300-AT-106 A1-5300-JP-00061

5300

 AAH

106

5300

 AAL

106

5300

 ATA

106

5300

 AI

106

5300

 AAH

106

5300

 AAL

106

5300

 ATA

106

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 246/293

LOOP NO.: A1-5300-AT-106 LOOP SERVICE: CONCENTRATE IN COND.T GL-003A

247 OF

 5300-JT-00042-PAN

TB1

FI-51756-IF16K

5300-JT-00042-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-5

 A1-5300-FT-132-TB1-13+   + 13 -T B1 -A 1- 53 00 -F T- 13 2 A 1- 53 00 -F T- 13 2- 52 5+ + 52 5- A1 -5 30 0- FT -1 32 A 1- 53 00 -F T- 13 2- 07 A+

+13-A1-5300-FT-132 A1-5300-FT-132-30+

 A1-5300-FT-132-TB1-14-   - 14 -T B1 -A 1- 53 00 -F T- 13 2 A 1- 53 00 -F T- 13 2- 52 6- - 52 6- A1 -5 30 0- FT -1 32 A 1- 53 00 -F T- 13 2- 07 B-

-14-A1-5300-FT-132 A1-5300-FT-132-32-

SCL

H

L

 A1-5300-FCV-132 5300-JT-00042-PAN

TB1

5300 JT 00042 PAN 1 2 +3 4 +5 6

To AMS System

5300

FIC

100

293

29

IN12

DCS (BY OTHERS)PROCESS CONTROL ROOM

TERMINALS

IN13

07A

07B

SHEET

526

31

iRTN12

iRTN13

32

   A   1  -   5   3   0   0  -   F   T  -   1   3   2

FI-12

1756 OF6CIK

INSTRUMENT

FIELD

525

 A1-5300-FT-132

JB

+

-

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PLC MODULE

21

15

18

19

16

17

20

3

PACKAGE WATER TREATMENT PLANT

14

+

-07C

13 30

1

2

4

5

6

7

13

14

8

9

11

12

10

20

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-132 A1-5300-JP-00061

5300

FIC

132   5300

FAH

132

5300

FAL

 A1-5300-JP-00061 A1-5300-FY-132

5300

FAH

132

5300

FTA

132

5300

FAL

132

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 247/293

 5300-JT-00042-PAN 1 2 +3 -4 +5 -6

 A1-5300-FY-132-TB1-21+ +21-TB1-A1-5300-FY-132 A1-5300-FY-132-527+ +527-A1-5300-FY-132 A1-FY-5300-100-15+

 A1-5300-FY-132-TB1-22+ -22-TB1-A1-5300-FY-132 A1-5300-FY-132-528- -528-A1-5300-FY-132 A1-5300-FY-132-16- 08B-A1-5300-FY-132 A1-5300-FY-132-2

08C-A1-5300-FY-132 A1-5300-FY-132-6

SCL

H

L

RTN1

4 ALT1

   A   1  -   5   3   0   0  -   F   Y  -   1   3   2

608C

-   22 528 -

+ 15 08ARACK-3, SLOT-10

2 OUT116 08B

I/P   +  21 527

1756-OF6CIK

LOOP NO.: A1-5300-FT-132 FLOW TO HPP PA-006A/B/C/DLOOP SERVICE:

23

132

5300

FTA

132

CE   CE CE   CE

CE CE

CE

5300

FIC

132

248 OF

 5300-JT-00042-PAN

TB1

FI-81756-IF16K

5300-JT-00042-PAN -6 +5 -4 +3 -2 +1 RACK-2, SLOT-12

 A1-5300-FT-179-TB1-19+   + 19 -T B1 -A 1- 53 00 -F T- 17 9 A 1- 53 00 -F T- 17 9- 54 9+ + 54 9- A1 -5 30 0- FT -1 79 A 1- 53 00 -F T- 17 9- 15 A+

+29-A1-5300-FT-179 A1-5300-FT-179-30+

 A1-5300-FT-179-TB1-20-   - 20 -T B1 -A 1- 53 00 -F T- 17 9 A 1- 53 00 -F T- 17 9- 55 0- - 55 0- A1 -5 30 0- FT -1 79 A 1- 53 00 -F T- 17 9- 15 B-

-30-A1-5300-FT-179 A1-5300-FT-179-32-

SCL

H

L

 A1-5300-FCV-179 5300-JT-00042-PAN

TB1

 5300-JT-00042-PAN 1 2 +3 -4 +5 -6

 A1-5300-FY-179-TB1-27+ +27-TB1-A1-5300-FY-179 A1-5300-FY-179-551+ +551-A1-5300-FY-179 A1-5300-FY-179-1+

 A1-5300-FY-179-TB1-28+ -28-TB1-A1-5300-FY-179 A1-5300-FY-179-552- -552-A1-5300-FY-179 A1-5300-FY-179-2- 01B-A1-5300-FY-179 A1-5300-FY-179-1

01C-A1-5300-FY-179 A1-5300-FY-179-5

SCL

H

DOC. NO.

30 -

IN12

IN13

29

31

   A   1  -   5   3   0   0  -   F   T  -   1   7   9

29

+

32

549

550

DCS (BY OTHERS)PROCESS CONTROL ROOM

30

PLC MODULETERMINALS

15A

15B

iRTN12

iRTN13

21 15C

FI-13

+

-

-

26

 A1-5300-FT-179

JB

FIELD

20

19

17

INSTRUMENT

18

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

SHEET 293PACKAGE WATER TREATMENT PLANT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

To AMS System

5300

FIC

100

1756-OF6CIK

I/P  +   27 551 + 1 01A

RACK-3, SLOT-14

1

5 RTN0

3 ALT0

REV. NO.

01B

29 01C

28 552 - 2  OUT0

   A   1  -   5   3   0   0  -   F   Y  -   1   7   9

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-179 A1-5300-JP-00061

5300

FIC

179   5300

FAH

179

5300

FAL

179

5300

FTA

179

CE

  CE

 A1-5300-JP-00061

CE   CE

CE CE

CE

 A1-5300-FY-179

5300

FTA

179

5300

FAH

179

5300

FAL

179

5300

FIC

179

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 248/293

L

LOOP NO.: A1-5300-FT-179 LOOP SERVICE: FLOW TO HPP PA-006A/B/C/D

249 OF

24V DC SUPPLY

- +

5300-JT-00046-PDN 26 26

 A1-5300-JY-206 5300-JT-00033-PDN

TB2 5300-JT-00046-PDN

BL   A1-5300-JY-206-TB2-1+   +1-TB2-A1-5300-JY-206 A1-5300-JY-206-1861+

WT   A1-5300-JY-206-TB2-2-   - 2- TB 2- A1 -5 30 0- JY -2 06 A 1- 53 00 -J Y- 20 6- 18 62 - - 18 62 -A 1- 53 00 -J Y- 20 6 A 1- 53 00 -J Y- 20 6- 9

SCL 26A- 26A+

24V DC SUPPLY

+ -

5300-JT-00046-PDN 15 15

 A1-5300-HZSH-206 5300-JT-00033-PDN

TB1 5300-JT-00046-PDN

BL   A1-5300-HZSH-206-TB1-1+   +1-TB1-A1-5300-HZSH-206 A1-5300-HZSH-206-1351+

WT   A1-5300-HZSH-206-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-2 06 A1-53 00 -HZSH-20 6-13 52 - - 13 52 -A1-53 00 -HZSH-20 6 A1-53 00 -HZSH-20 6-29

SCL

15A+ 15A-

24V DC SUPPLY

+ -

5300-JT-00046-PDN 15 15

TB1

 A1-5300-HZSL-206

5300-JT-00046-PDN

BL   A1-5300-HZSL-206-TB1-3+   +3-TB1-A1-5300-HZSL-206 A1-5300-HZSL-206-1353+

WT   A1-5300-HZSL-206-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -2 06 A1-53 00 -HZSL-20 6-13 54 - - 13 54 -A1-53 00 -HZSL-20 6 A1-53 00 -HZSL-20 6-31

SCL

15A+ 15A-

5300

HSAH

32 GND-15

IN-14

GND-1430

206

5300

206

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   2   0   6

   A   1  -   5   3   0   0  -   H   Z   S   L  -   2   0   6

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K1

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

4

5

1756-IB161K

RACK-1, SLOT-1   HSAL

NO   3 1 I N- 154 1354

3

JB

SHEET

 A1-5300-HZSL-206

RACK-1, SLOT-1

TERMINALS

29

3

 A1-5300-JP-00062

2

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

206

5300

JY

1756-OB16DK

1353

NO

206

1352

-

3

1862

C

C

1351

S

   A   1

  -   5   3   0   0  -   J   Y  -   2   0

 A1-5300-HZSH-206   A1-5300-JP-00062

RACK-1, SLOT-14

2

+   18611

 A1-5300-JY-206

10

9

+DC-0

OUT-4

 A1-5300-JP-00063

206

5300

HSAL

206

206

5300

HIC

2

206

5300

JY

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 249/293

LOOP SER VI CE: SER VI CE I NLET VLV EDI GL-003ALOOP NO.: A1-5300-X-206

5300

XA

206

5300

XA

206

250 OF

24V DC SUPPLY

- +

5300-JT-00046-PDN 26 26

TB2

 A1-5300-JY-207

5300-JT-00046-PDN

BL   A1-5300-JY-207-TB2-3+   +3-TB2-A1-5300-JY-207 A1-5300-JY-207-1863+

WT   A1-5300-JY-207-TB2-4-   - 4-TB2-A1 -5 30 0-JY-2 07 A1-53 00 -J Y-20 7-18 64 - - 18 64 -A1-53 00 -J Y-20 7 A1-53 00 -J Y-20 7-11

SCL 22A- 22A+

24V DC SUPPLY

+ -

5300-JT-00046-PDN 16 16

TB1

 A1-5300-HZSH-207

5300-JT-00046-PDN

BL   A1-5300-HZSH-207-TB1-5+   +5-TB1-A1-5300-HZSH-207 A1-5300-HZSH-207-1127+

WT   A1-5300-HZSH-207-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-2 07 A1-53 00 -HZSH-20 7-11 28 - - 11 28 -A1-53 00 -HZSH-20 7 A1-53 00 -HZSH-20 7-1

SCL

16A+ 16A-

24V DC SUPPLY

+ -

5300-JT-00046-PDN 16 16

TB1

 A1-5300-HZSL-207

5300-JT-00046-PDN

BL   A1-5300-HZSL-207-TB1-7+   +7-TB1-A1-5300-HZSL-207 A1-5300-HZSL-207-1129+

WT   A1-5300-HZSL-207-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -2 07 A1-53 00 -HZSL-20 7-11 30 - - 11 30 -A1-53 00 -HZSL-20 7 A1-53 00 -HZSL-20 7-3

SCL

16A+ 16A-

5300

HSAH

4 GND-1

IN-0

GND-02

207

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   2   0   7

   A   1  -   5   3   0   0  -   H   Z   S   L  -   2   0   7

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-1, SLOT-2

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

5

9

 A1-5300-HZSL-207

C

NO   3 IN-18 1130

1756-IB161K

RACK-1, SLOT-2

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5300

JY

207

5300

JY

1756-OB16DK

1

7

 A1-5300-JP-00062

7 1129

NO

207

6 1128

-   4 1864

C   5 1127

S

   A   1

  -   5   3   0   0  -   J   Y  -   2   0

 A1-5300-HZSH-207   A1-5300-JP-00062

RACK-1, SLOT-14

3+   1863

 A1-5300-JY-207

12

11

+DC-0

OUT-5

 A1-5300-JP-00063

2

207

207

5300

HSAL

207

JY

207

5300

HIC

4

6

207

5300

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 250/293

LOOP NO.: A1-5300-X-207 LOOP SERVICE: CONCENTRATE MAKEUP VLV.FOR GL003B

5300

XA

207

5300

XA

207

251 OF

FI-6 5300-JT-00043-PAN 1756-IF16K

TB1 5300-JT-00043-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-7

 A1-5300-LT-108-TB1-1+   + 1- TB 1- A1 -5 30 0- LT -1 08 A 1- 53 00 -L T- 10 8- 51 7+ + 51 7- A1 -5 30 0- LT -1 08 A 1- 53 00 -L T- 10 8- 07 A+

+13-A1-5300-LT-108 A1-5300-LT-108-30+

 A1-5300-LT-108-TB1-2-   - 2- TB 1- A1 -5 30 0- LT -1 08 A 1- 53 00 -L T- 10 8- 51 8- - 51 8- A1 -5 30 0- LT -1 08 A 1- 53 00 -L T- 10 8- 07 B-

-14-A1-5300-LT-108 A1-5300-LT-108-32-

SCL

H H

LL LL

5000

FIC

100

100

5000

FIC

100

FIC

100

5000

FIC

14

8

9

11

12

10

PACKAGE WATER TREATMENT PLANT

14

+

-07C

13 301

2

19

16

17

20

PLC MODULE

15

18

3

4

5

6

7

13

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

LOOP NO : A1-5300-LT-108

INSTRUMENT

FIELD

BRINE DOSING TNK TA-011 LVL

517

 A1-5300-LT-108

JB

+

-

SHEET

518

31

iRTN12

iRTN13

32

   A   1  -   5   3   0   0  -   L   T  -   1   0   8

5000

LOOP SERVICE:

293

29

IN12

DCS (BY OTHERS)PROCESS CONTROL ROOM

TERMINALS

IN13

07A

07B

5300

LI

108

CE CE

CE

CE   CE   CE

CE

 A1-5300-LT-108 A1-5300-JP-00064

5300

LAH

108

5300

LALL

108

5300LTA

108

5300

LI

108

5300

LAH

108

5300

LALL

108

5300LTA

108

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 251/293

LOOP NO.: A1 5300 LT 108 BRINE DOSING TNK TA 011 LVLLOOP SERVICE:

OF

 5300-JT-00043-PAN

TB1

FI-14

5300-JT-00043-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5300-PT-242-TB1-3+   +3-TB1-A1 -5 30 0-PT -2 42 A1-53 00 -PT-24 2-59 1+ +59 1-A1 -5 30 0-PT -2 42 A1-53 00 -PT-24 2-13 A+

+25-A1-5300-PT-242 A1-5300-PT-242-025+

 A1-5300-PT-242-TB1-4-   - 4- TB 1- A1 -5 30 0- PT -2 42 A 1- 53 00 -P T- 24 2- 59 2- - 59 2- A1 -5 30 0- PT -2 42 A 1- 53 00 -P T- 24 2- 13 B-

-26-A1-5300-PT-242 A1-5300-PT-242-026-

SCL

HH HH

100

5000

FIC

100

ESD(BY OTHERS)

KE01-A1-500-MT-I-HL-0001-000

P01

252 293SHEET

TERMINALS

PACKAGE WATER TREATMENT PLANT

MULTIPLEXOR

FIELD

JBINSTRUMENT

13

026

3

4

 AI-ESD-001

26

25

025

10

11

-

7

 A1-5300-PT-242

+

2

5

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

18

17

19

20

592

16

15

+

-13C

14

5000

FIC

Hard wired to

ESD by others

591 13A

13B

5000

FIC

10012

DOC. NO.

REV. NO.

To AMS

System

9

1

8

PROCESS CONTROL ROOM

6

TERMINALS

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-242 A1-5300-JP-00064

5300

PI

242

5300

PAHH

242

5300

PTA

242

ESD

System

5300

PI

242

5300

PAHH

242

5300

PTA

242

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 252/293

LOOP NO.: A1-5300-PT-242 LOOP SERVICE: BRINE DOSING PMUP 530-PD005A PT

OF

 5300-JT-00043-PAN

TB1

FI-14

5300-JT-00043-PAN -6 +5 -4 +3 -2 +1 X:20

 A1-5300-PT-243-TB1-5+  +5-TB1-A1 -5 30 0-PT -2 43 A1-53 00 -PT-24 3-59 3+ +59 3-A1 -5 30 0-PT -2 43 A1-53 00 -PT-24 3-14 A+

+27-A1-5300-PT-243 A1-5300-PT-243-027+

 A1-5300-PT-243-TB1-6-   - 6- TB 1- A1 -5 30 0- PT -2 43 A 1- 53 00 -P T- 24 3- 59 4- - 59 4- A1 -5 30 0- PT -2 43 A 1- 53 00 -P T- 24 3- 14 B-

-28-A1-5300-PT-243 A1-5300-PT-243-028-

SCL

HH HH

5000

FIC

100

100

5000

FIC

100

ESD (BY OTHERS)

KE01-A1-500-MT-I-HL-0001-000

P01

253 293

14B6

TERMINALS

5

MULTIPLEXOR

593 14A

1

Hard wired to

ESD by others

594

+

-14C

027

028

 AI-ESD-001

28

27

12

11

To AMS

System

16

15

5000

FIC

14

13

9

18

17

19

20

 A1-5300-PT-243

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

PROCESS CONTROL ROOM

DOC. NO.

REV. NO.

2

INSTRUMENT

10

FIELD

JB

-

3

4

8

7

+

SHEET

TERMINALS

PACKAGE WATER TREATMENT PLANT

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-243 A1-5300-JP-00064

5300

PI

243

5300

PAHH

243

5300

PTA

243

ESD

System

5300

PI

243

5300

PAHH

243

5300

PTA

243

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 253/293

BRINE DOSING PMUP 530-PD005B PTLOOP NO.: A1-5300-PT-243 LOOP SERVICE:

OF

 5300-JT-00043-PAN

TB1

FI-15

5300-JT-00043-PAN -6 +5 -4 +3 -2 +1 X:20 A1-5300-PT-263-TB1-7+   +7-TB1-A1 -5 30 0-PT -2 63 A1-53 00 -PT-26 3-26 3+ +26 3-A1 -5 30 0-PT -2 63 A1-53 00 -PT-26 3-01 A+

+1-A1-5300-PT-263 A1-5300-PT-263-033+

 A1-5300-PT-263-TB1-8-   - 8- TB 1- A1 -5 30 0- PT -2 63 A 1- 53 00 -P T- 26 3- 26 4- - 26 4- A1 -5 30 0- PT -2 63 A 1- 53 00 -P T- 26 3- 01 B-

-2-A1-5300-PT-263 A1-5300-PT-263-034-

SCL

HH HH

FIC

100

5000

FIC

100

5000

KE01-A1-500-MT-I-HL-0001-000

P01

254 293

1

 A1-5300-PT-263

5

ESD (BY OTHERS)

6

SHEET

TERMINALS

PACKAGE WATER TREATMENT PLANT

MULTIPLEXOR

PROCESS CONTROL ROOM

TERMINALSINSTRUMENT

10

FIELD

JB

-

3

4

8

+

2

PROJ ECT K ASHA GA N DEVE LOPMENT E XPERIMENTA L PROGRA M

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

18

17

19

20

To AMS

System

16

155000

14

13

FIC

100

2

1

12

11

9

263 01A

01B

7

DOC. NO.

REV. NO.

Hard wired to

ESD by others

264

+

-01C

033

034

 AI-ESD-001

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-263 A1-5300-JP-00064

5300

PI

263

5300

PAHH

263

5300

PTA

263

ESD

System

5300

PI

263

5300

PAHH

263

5300

PTA

263

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 254/293

LOOP NO.: A1-5300-PT-263 LOOP SERVICE: BRINE DOSING PMUP 530-PD005C PT

255 OF

5300-JT-00043-PAN

TB1

5300-JT-00043-PAN

 A1-5300-UY-208-TB1-9+   + 9- TB 1- A1 -5 30 0- UY -2 08 A 1- 53 00 -U Y- 20 8- 58 5+ + 58 5- A1 -5 30 0- UY -2 08  A1-5300-UY-208-7

 A1-5300-UY-208-TB1-10-   - 10 -T B1 -A 1- 53 00 -U Y- 20 8 A 1- 53 00 -U Y- 20 8- 58 6- - 58 6- A1 -5 30 0- UY -2 08  A1-5300-UY-208-11

SCL

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZAKHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

I/P

 A1-5300-UY-208

585

58610

9+

-11

FIELD

1756-OF6CIK

RACK-3, SLOT-128

7

11 RTN2

9 ALT2

293

PLC MODULETERMINALS

WATER TREATMENT PLANT

INSTRUMENT

PACKAGE

ESD (BY OTHERS)PROCESS CONTROL ROOM

JB

DOC. NO.

REV. NO.

OUT2

   A

   1  -   5   3   0   0  -   U   Y  -   2   0   8

SHEET

CE CECE

  CE

 A1-5300-UY-208 A1-5300-JP-00064

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 255/293

LOOP N O. : A1- 530 0- UY- 208 L OOP SERVI CE: BR IN E DOSI NG PU MP P D00 5A AN G CON

256 OF

5300-JT-00043-PAN

TB1

5300-JT-00043-PAN

 A1-5300-UY-209-TB1-11+   + 11 -T B1 -A 1- 53 00 -U Y- 20 9 A 1- 53 00 -U Y- 20 9- 58 7+ + 58 7- A1 -5 30 0- UY -2 09  A1-5300-UY-209-8

 A1-5300-UY-209-TB1-12-   - 12 -T B1 -A 1- 53 00 -U Y- 20 9 A 1- 53 00 -U Y- 20 9- 58 8- - 58 8- A1 -5 30 0- UY -2 09  A1-5300-UY-209-12

SCL

 A1-5300-UY-209

587

PLC MODULETERMINALS

PACKAGE

OUT3

   A   1  -   5   3   0   0  -   U   Y  -   2   0   9

12 RTN3

10 ALT3

JB

RACK-3, SLOT-1210

8

CLIENT DOC. NO.

REV. NO.

58812

11+

-

FIELD

1756-OF6CIK

PROJ ECT K ASH AGA N D EVEL OPME NT EXPER IMEN TA L PROGR AM

I/P

13

KE01-A1-500-MT-I-HL-0001-000

ESD (BY OTHERS)PROCESS CONTROL ROOM

SHEET 293

 AGIP KAZAKHSTAN NORTH CASPIAN OPERATING COMPANY

P01

WATER TREATMENT PLANT

INSTRUMENT

CE CECE   CE

 A1-5300-UY-209 A1-5000-JP-00064

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 256/293

 A1-5300-UY-209 LOOP SERVICE: BRINE DOSING PUMP PD005B ANG CONLOOP NO.:

257 OF

5300-JT-00043-PAN

TB1

5300-JT-00043-PAN

 A1-5300-UY-210-TB1-13+   + 13 -T B1 -A 1- 53 00 -U Y- 21 0 A 1- 53 00 -U Y- 21 0- 58 9+ + 58 9- A1 -5 30 0- UY -2 10  A1-5300-UY-210-15

 A1-5300-UY-210-TB1-14-   - 14 -T B1 -A 1- 53 00 -U Y- 21 0 A 1- 53 00 -U Y- 21 0- 59 0- - 59 0- A1 -5 30 0- UY -2 10  A1-5300-UY-210-19

SCL

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZAKHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

I/P

 A1-5300-UY-210

589

59014

13+

-15

FIELD

1756-OF6CIK

RACK-3, SLOT-1212

15

19 RTN4

17 ALT4

293

PLC MODULETERMINALS

WATER TREATMENT PLANT

INSTRUMENT

PACKAGE

ESD (BY OTHERS)PROCESS CONTROL ROOM

JB

DOC. NO.

REV. NO.

OUT4

   A   1  -   5   3   0   0  -   U   Y  -   2   1   0

SHEET

CE CECE   CE

 A1-5300-UY-210 A1-5000-JP-00064

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 257/293

LOOP N O. : A1- 530 0- UY- 210 L OOP SERVI CE: BRI NE D OSI NG PUM P PD 005B ANG C ON

258 OF

24V DC SUPPLY

- +

26 26

 A1-5300-JY-204 5300-JT-00032-PDN

TB1 5300-JT-00032-PDN

BL   A1-5300-JY-204-TB1-1+   +1-TB1-A1-5300-JY-204 A1-5300-JY-204-1859+

WT   A1-5300-JY-204-TB1-2-   - 2- TB 1- A1 -5 30 0- JY -2 04 A 1- 53 00 -J Y- 20 4- 18 60 - - 18 60 -A 1- 53 00 -J Y- 20 4 A 1- 53 00 -J Y- 20 4- 7

SCL 26A- 26A+

24V DC SUPPLY

+ -

5300-JT-00032-PDN 15 15

TB1

 A1-5300-HZSH-204

5300-JT-00032-PDN

BL   A1-5300-HZSH-204-TB1-5+   +5-TB1-A1-5300-HZSH-204 A1-5300-HZSH-204-1347+

WT   A1-5300-HZSH-204-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-2 04 A1-53 00 -HZSH-20 4-13 48 - - 13 48 -A1-53 00 -HZSH-20 4 A1-53 00 -HZSH-20 4-25

SCL

15A+ 15A-

24V DC SUPPLY

+ -

5300-JT-00032-PDN 15 15

TB1

 A1-5300-HZSL-204

5300-JT-00032-PDN

BL   A1-5300-HZSL-204-TB1-7+   +7-TB1-A1-5300-HZSL-204 A1-5300-HZSL-204-1349+

WT   A1-5300-HZSL-204-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -2 04 A1-53 00 -HZSL-20 4-13 50 - - 13 50 -A1-53 00 -HZSL-20 4 A1-53 00 -HZSL-20 4-27

SCL

15A+ 15A-

6

204

5300

JY

204

5300

HSAL

204

C

1347

S

   A

   1  -   5   3   0   0  -   J   Y  -   2   0

 A1-5300-HZSH-204   A1-5300-JP-00065

RACK-1, SLOT-14

2

+   1859

NO

204

1348

-   1860

C

7 OUT-3

3

204

5300

JY

1756-OB16DK

8 +DC-0  5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

 A1-5300-JP-00066 A1-5300-JY-204

INSTRUMENT JB

293

PLC MODULETERMINALS

25

SHEET

   A   1  -   5   3   0   0  -   H   Z   S   H  -   2   0   4   5300

HSAH

IN-12

7

 A1-5300-JP-00065

6

1

4

7 13491756-IB161K

RACK-1, SLOT-1

NO   2 7 I N- 138

204

5300

HIC

PACKAGE

9

FIELD

 A1-5300-HZSL-204

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K5

1350

RACK-1, SLOT-1

HSAL

204

GND-1226

204

5300

   A   1  -   5   3   0   0  -   H   Z   S   L  -   2   0   4

28 GND-13

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 258/293

NOTE:

5300

XA

204

5300

XA

204

 A1-5300-X-204 L OO P S ER VI CE : E JE CT OR S UC TI ON V LV

This junction box is existing with 10 TBs. However, this drawing represents this JB with "after modification"

on number of Tbs. 4 terminals are added. If not then they are to be added accordingly.

LOOP NO.:

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 259/293

260 OF

24V DC SUPPLY

- +

26 26

 A1-5300-JY-203 5300-JT-00006-PDN

TB1 5300-JT-00006-PDN

BL   A1-5300-JY-203-TB1-1+   +1-TB1-A1-5300-JY-203 A1-5300-JY-203-1857+

WT   A1-5300-JY-203-TB1-2-   - 2- TB 1- A1 -5 30 0- JY -2 03 A 1- 53 00 -J Y- 20 3- 18 58 - - 18 58 -A 1- 53 00 -J Y- 20 3 A 1- 53 00 -J Y- 20 3- 5

SCL 26A- 26A+

24V DC SUPPLY

+ -

5300-JT-00006-PDN 15 15

TB1

 A1-5300-HZSH-203

5300-JT-00006-PDN

BL   A1-5300-HZSH-203-TB1-3+   +3-TB1-A1-5300-HZSH-203 A1-5300-HZSH-203-1343+

WT   A1-5300-HZSH-203-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SH-2 03 A1-53 00 -HZSH-20 3-13 44 - - 13 44 -A1-53 00 -HZSH-20 3 A1-53 00 -HZSH-20 3-21

SCL

15A+ 15A-

24V DC SUPPLY

+ -

5300-JT-00006-PDN 15 15

TB1

 A1-5300-HZSL-203

5300-JT-00006-PDN

BL   A1-5300-HZSL-203-TB1-5+   +5-TB1-A1-5300-HZSL-203 A1-5300-HZSL-203-1345+

WT   A1-5300-HZSL-203-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SL -2 03 A1-53 00 -HZSL-20 3-13 46 - - 13 46 -A1-53 00 -HZSL-20 3 A1-53 00 -HZSL-20 3-23

SCL

15A+ 15A-

5300

HSAH

24 GND-11

IN-10

GND-1022

203

5300

203

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   2   0   3

   A   1  -   5   3   0   0  -   H   Z   S   L  -   2   0   3

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K3

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

4

6

1756-IB161K

RACK-1, SLOT-1   HSAL

NO   2 3 I N- 111346

5 1345

JB

SHEET

 A1-5300-HZSL-203

RACK-1, SLOT-1

TERMINALS

21

5

 A1-5300-JP-00067

4

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

203

5300

JY

1756-OB16DK

+DC-0

NO

203

1344

-

3

1858

C

OUT-2

2

C

1343

S

   A

   1  -   5   3   0   0  -   J   Y  -   2   0

 A1-5300-HZSH-203   A1-5300-JP-00067

RACK-1, SLOT-14

2

+   18571

 A1-5300-JY-203

6

5

 A1-5300-JP-00068

203

5300

HSAL

203

4

203

5300

JY

203

5300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 260/293

NOTE:

LOOP SER VI CE: EJECT OR POW ER W TR I NLET VLVLOOP NO.: A1-5300-X-203

This junction box is existing with 4 TBs. However, this drawing represents this JB with "after modification" on

number of Tbs. 2 terminals are added. If not then they are to be added accordingly.

5300

XA

203203

5300

XA

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 261/293

262 OF

24V DC SUPPLY

- +

22 22

 A1-5300-JY-173 5300-JT-00043-PDN

TB2 5300-JT-00043-PDN

BL   A1-5300-JY-173-TB2-1+   +1-TB2-A1-5300-JY-173 A1-5300-JY-173-1753+

WT   A1-5300-JY-173-TB2-2-   - 2-TB2-A1 -5 30 0-JY-1 73 A1 -5 30 0-JY-1 73 -1 75 4- - 17 54 -A1-53 00 -J Y-17 3 A1-53 00 -J Y-17 3-31

SCL 22A- 22A-

24V DC SUPPLY

+ -

10 10

 A1-5300-HZSH-173 5300-JT-00043-PDN

TB1 5300-JT-00043-PDN

BL   A1-5300-HZSH-173-TB1-1+   +1-TB1-A1-5300-HZSH-173 A1-5300-HZSH-173-1163+

WT   A1-5300-HZSH-173-TB1-2-   - 2-TB1-A1 -5 30 0-HZ SH-1 73 A1-53 00 -HZSH-17 3-11 64 - - 11 64 -A1-53 00 -HZSH-17 3 A1-53 00 -HZSH-17 3-29

SCL

10A+ 10A-

24V DC SUPPLY

+ -

5300-JT-00043-PDN 10 10

TB1

 A1-5300-HZSL-1735300-JT-00043-PDN

BL   A1-5300-HZSL-173-TB1-3+   +3-TB1-A1-5300-HZSL-173 A1-5300-HZSL-173-1165+

WT   A1-5300-HZSL-173-TB1-4-   - 4-TB1-A1 -5 30 0-HZ SL -1 73 A1-53 00 -HZSL-17 3-11 66 - - 11 66 -A1-53 00 -HZSL-17 3 A1-53 00 -HZSL-17 3-31

SCL

10A+ 10A-

2

173

53005300

173

RACK-1, SLOT-10

OUT-15

   A   1  -   5   3   0   0  -   J   Y  -   1   7

173

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   7   3   5300

HSAL

+GND-1JY

JY

173

S

 A1-5300-HZSH-173   A1-5300-JP-00071

+

-

3

 A1-5300-HZSL-173

1753

1754

32

31

4

2

1163

1164

3 1 I N- 154

5

NO   1166

HSAL

29

32 GND-15

1756-IB161K

173

5300

SHEET 293

PLC MODULE

HIC

5300

HSAH

IN-14

GND-1430

RACK-0, SLOT-10

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

KE01-A1-500-MT-I-HL-0001-000

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-10

173

1

3 1165C

NO

 A1-5300-JP-00070 A1-5300-JY-173

DCS (BY OTHERS)PROCESS CONTROL ROOM

5300

1756-OB16DK

173

JY

5300

JB

 A1-5300-JP-00071

3

1

2

4

C

DOC. NO.

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   7   3

WATER TREATMENT PLANT

ZSH

INSTRUMENT

FIELD

TERMINALS

173

PACKAGE

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 262/293

NOTE:

173

5300

XA

173

XA

5300

LOOP SER VI CE: SER VI CE I NLET VLV EDI GL-003ALOOP NO.: A1-5300-X-173

The junction box TB2 exists with 10 TBs. However, this drawing represents this JB with "after modification"

on number of Tbs. 10 terminals are added. If not then they are to be added accordingly.

263 OF

24V DC SUPPLY

- +

5300-JT-00043-PDN 23 23

TB2

 A1-5300-JY-174

5300-JT-00043-PDN

BL   A1-5300-JY-174-TB2-3+   +3-TB2-A1-5300-JY-174 A1-5300-JY-174-1755+

WT   A1-5300-JY-174-TB2-4-   - 4- TB 2- A1 -5 30 0- JY -1 74 A 1- 53 00 -J Y- 17 4- 17 56 - - 17 56 -A 1- 53 00 -J Y- 17 4 A1 -5 30 0- JY -1 74 -1

SCL 23A- 23A+

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSH-174

5300-JT-00043-PDN

BL   A1-5300-HZSH-174-TB1-5+   +5-TB1-A1-5300-HZSH-174 A1-5300-HZSH-174-1167+

WT   A1-5300-HZSH-174-TB1-6-   - 6-TB1-A1 -5 30 0-HZ SH-1 74 A1-53 00 -HZSH-17 4-11 68 - - 11 68 -A1-53 00 -HZSH-17 4 A1-53 00 -HZSH-17 4-1

SCL

11A+ 11A-

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSL-1745300-JT-00043-PDN

BL   A1-5300-HZSL-174-TB1-7+   +7-TB1-A1-5300-HZSL-174 A1-5300-HZSL-174-1169+

WT   A1-5300-HZSL-174-TB1-8-   - 8-TB1-A1 -5 30 0-HZ SL -1 74 A1-53 00 -HZSL-17 4-11 70 - - 11 70 -A1-53 00 -HZSL-17 4 A1-53 00 -HZSL-17 4-3

SCL

11A+ 11A-

5300

HSAH

4 GND-1

IN-0

GND-02

174

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   7   4

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   7   4

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-11

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

5

9

 A1-5300-HZSL-174

C

NO   3 IN-18 1170

1756-IB161K

RACK-0, SLOT-11

174

5300

JY

1756-OB16DK

293

PLC MODULE

5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

7 1169

SHEET

TERMINALSJB

1167

1

7

 A1-5300-JP-00071

NO

4

174

6 1168

-   1756

C   5

S

   A   1  -   5   3   0   0  -   J   Y  -   1   7

 A1-5300-HZSH-174   A1-5300-JP-00071

RACK-1, SLOT-11

4

+   1755

 A1-5300-JY-174

2

1

+DC-0

OUT-0

 A1-5300-JP-00070

3

2

174

174

5300

HSAL

174

6

174

5300

JY

174

5300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 263/293

NOTE:

LOOP NO.: A1-5300-X-174 LOOP SER VI CE: C ON CENT . I NLET VLV EDI GL-003A

5300

XA

The junction box TB2 exists with 10 TBs. However, this drawing represents this JB with "after modification"

on number of Tbs. 10 terminals are added. If not then they are to be added accordingly.

5300

XA

174174

264 OF

24V DC SUPPLY

- +

5300-JT-00043-PDN 23 23

TB2

 A1-5300-JY-175

5300-JT-00043-PDN

BL   A1-5300-JY-175-TB2-3+   +3-TB2-A1-5300-JY-175 A1-5300-JY-175-1757+

WT   A1-5300-JY-175-TB2-4-   - 4-TB2-A1 -5 30 0-JY-1 75 A1-53 00 -J Y-17 5-17 58 - - 17 60 -A1-53 00 -J Y-17 58 A1-53 00 -J Y-17 5-3

SCL 23A- 23A+

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSH-175

5300-JT-00043-PDN

BL   A1-5300-HZSH-175-TB1-9+   +9-TB1-A1-5300-HZSH-175 A1-5300-HZSH-175-1171+

WT   A1-5300-HZSH-175-TB1-10-   - 10 -T B1 -A1-53 00 -HZSH-17 5 A1-53 00 -HZSH-17 5-11 72 - - 11 72 -A1-53 00 -HZSH-17 5 A1-53 00 -HZSH-17 5-5

SCL

11A+ 11A-

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSL-1755300-JT-00043-PDN

BL   A1-5300-HZSL-175-TB1-11+   +11-TB1-A1-5300-HZSL-175 A1-5300-HZSL-175-1173+

WT   A1-5300-HZSL-175-TB1-12-   - 12 -T B1 -A1-53 00 -HZSL-17 5 A1-53 00 -HZSL-17 5-11 74 - - 11 74 -A1-53 00 -HZSL-17 5 A1-53 00 -HZSL-17 5-7

SCL

11A+ 11A-

1756-IB161K

RACK-0, SLOT-11

175

5300

5300

HSAL

JY

175

175

5300

HSAL

175

 A1-5300-JY-175

4

3

+DC-0

OUT-1

 A1-5300-JP-00070

S

   A   1  -   5   3   0   0  -   J   Y  -   1   7

 A1-5300-HZSH-175   A1-5300-JP-00071

+   17575

-

7

1758

C   9 1175

 A1-5300-JP-00071

11 1173

NO   10 1172

C

10

5

6

175

11

8

SHEET 293

PLC MODULE

5300

JY

175

5300

JY

175

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

NO   7 IN-312 1174  175

5300

HIC

INSTRUMENT

FIELD

13

 A1-5300-HZSL-175

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   7   5

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   7   5

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-11

5300

HSAH

4

8 GND-3

IN-2

GND-26

1756-OB16DK

RACK-1, SLOT-11

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 264/293

NOTE:

XA

175

5300

XA

175

5300

The junction box TB2 exists with 10 TBs. However, this drawing represents this JB with "after modification"

on number of Tbs. 10 terminals are added. If not then they are to be added accordingly.

LOOP NO.: A1-5300-X-175 LOOP SER VI CE: PRODU CT OUT LET VLV EDI GL-003A

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 265/293

266 OF

24V DC SUPPLY

- +

5300-JT-00043-PDN 23 23

TB2

 A1-5300-JY-177

5300-JT-00043-PDN

BL   A1-5300-JY-177-TB2-9+   +9-TB2-A1-5300-JY-177 A1-5300-JY-177-1761+

WT   A1-5300-JY-177-TB2-10-   - 10 -T B2 -A 1- 53 00 -J Y- 17 7 A 1- 53 00 -J Y- 17 7- 17 62 - - 17 62 -A 1- 53 00 -J Y- 17 7 A1 -5 30 0- JY -1 77 -7

SCL 23A- 23A+

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSH-177

5300-JT-00043-PDN

BL   A1-5300-HZSH-177-TB1-17+   +17-TB1-A1-5300-HZSH-177 A1-5300-HZSH-177-1179+

WT   A1-5300-HZSH-177-TB1-18-   - 18 -T B1 -A1-53 00 -HZSH-17 7 A1-53 00 -HZSH-17 7-11 80 - - 11 80 -A1-53 00 -HZSH-17 7 A1-53 00 -HZSH-17 7-13

SCL

11A+ 11A-

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSL-1775300-JT-00043-PDN

BL   A1-5300-HZSL-177-TB1-19+   +19-TB1-A1-5300-HZSL-177 A1-5300-HZSL-177-1181+

WT   A1-5300-HZSL-177-TB1-20-   - 20 -T B1 -A1-53 00 -HZSL-17 7 A1-53 00 -HZSL-17 7-11 82 - - 11 82 -A1-53 00 -HZSL-17 7 A1-53 00 -HZSL-17 7-15

SCL

11A+ 11A-

5300

HSAH

1 6 G ND -7

IN-6

GND-614

177

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   7   7

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   7   7

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB177K

RACK-0, SLOT-11

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

21

 A1-5300-HZSL-177

C

NO   15 IN-720 1182

1756-IB177K

RACK-0, SLOT-11

177

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5300

JY

177

5300

JY

1756-OB16DK

13

19

 A1-5300-JP-00071

19 1181

NO

177

18 1180

-   10 1762

C   17 1179

S

   A   1  -   5   3   0   0  -   J   Y  -   1   7

 A1-5300-HZSH-177   A1-5300-JP-00071

RACK-1, SLOT-11

9+   1761

11

 A1-5300-JY-177

8

7

+DC-0

OUT-3

 A1-5300-JP-00070

8

177

5300

HSAL

177

16

18

177

5300

JY

177

5300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 266/293

NOTE:

LOOP NO.: A1-5300-X-177 LOOP SERVICE: CONCENT.OUTLET VLV EDI GL-003A

5300

The junction box TB2 exists with 10 TBs. However, this drawing represents this JB with "after modification"

on number of Tbs. 10 terminals are added. If not then they are to be added accordingly.

5300

XA

177

XA

177

267 OF

24V DC SUPPLY

- +

5300-JT-00043-PDN 23 23

TB2

 A1-5300-JY-178

5300-JT-00043-PDN

BL   A1-5300-JY-178-TB2-11+   +11-TB2-A1-5300-JY-178 A1-5300-JY-178-1763+

WT   A1-5300-JY-178-TB2-12-   - 12 -T B2 -A 1- 53 00 -J Y- 17 8 A 1 -5 30 0- JY -1 78 -1 76 4- - 17 64 -A 1- 53 00 -J Y- 17 8 A 1- 53 00 -J Y- 17 8- 9

SCL 23A- 23A+

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSH-178

5300-JT-00043-PDN

BL   A1-5300-HZSH-178-TB1-21+   +21-TB1-A1-5300-HZSH-178 A1-5300-HZSH-178-1183+

WT   A1-5300-HZSH-178-TB1-22-   - 22 -T B1 -A1-53 00 -HZSH-17 8 A1-53 00 -HZSH-17 8-11 84 - - 11 84 -A1-53 00 -HZSH-17 8 A1-53 00 -HZSH-17 8-17

SCL

11A+ 11A-

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSL-1785300-JT-00043-PDN

BL   A1-5300-HZSL-178-TB1-23+   +23-TB1-A1-5300-HZSL-178 A1-5300-HZSL-178-1185+

WT   A1-5300-HZSL-178-TB1-24-   - 24 -T B1 -A1-53 00 -HZSL-17 8 A1-53 00 -HZSL-17 8-11 86 - - 11 86 -A1-53 00 -HZSL-17 8 A1-53 00 -HZSL-17 8-19

SCL

11A+ 11A-

22

178

5300

JY

178

178

5300

HIC

10

178

5300

HSAL23 1185

178

5300

JY

1756-OB16DK

S

   A   1  -   5   3   0   0  -   J   Y  -   1   7

 A1-5300-HZSH-178   A1-5300-JP-00071

RACK-1, SLOT-11

11+   1763 10

9

NO

178

22 1184

-   12 1764

C   HSAH

1756-IB161K

+DC-0

OUT-4

293

PLC MODULE

5300

JY

PROCESS CONTROL ROOMDCS (BY OTHERS)

 A1-5300-JP-00070

SHEET

 A1-5300-HZSL-178

RACK-0, SLOT-11

TERMINALS

17

23

 A1-5300-JP-00071

21 1183

 A1-5300-JY-178

20

C

NO   19 IN-924 1186

1756-IB161K

RACK-0, SLOT-11   HSAL

INSTRUMENT

FIELD

25

13

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

JB

178

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   7   8

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   7   8

WATER TREATMENT PLANT

ZSH

ZSL

5300 5300

HSAH

2 0 GN D- 9

IN-8

GND-818

178

5300

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 267/293

NOTE:

5300

XA

178

5300

XA

178

LOOP NO.: A1-5300-X-178 LOOP SER VI CE: SER VI CE I NLET VLV EDI GL-003B

The junction box TB2 exists with 10 TBs. However, this drawing represents this JB with "after modification"

on number of Tbs. 10 terminals are added. If not then they are to be added accordingly.

268 OF

24V DC SUPPLY

- +

5300-JT-00043-PDN 23 23

TB2

 A1-5300-JY-179

5300-JT-00043-PDN

BL   A1-5300-JY-179-TB2-13+   +13-TB2-A1-5300-JY-179 A1-5300-JY-179-1765+

WT   A1-5300-JY-179-TB2-14-   - 14 -T B2 -A1-53 00 -J Y-17 9 A1-53 00 -J Y-17 9-17 66 - - 17 66 -A1-53 00 -J Y-17 9 A1-53 00 -J Y-17 9-11

SCL 23A- 23A+

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSH-179

5300-JT-00043-PDN

BL   A1-5300-HZSH-179-TB1-253+   +25-TB1-A1-5300-HZSH-179 A1-5300-HZSH-179-1187+

WT   A1-5300-HZSH-179-TB1-26-   - 26 -T B1 -A1-53 00 -HZSH-17 9 A1-53 00 -HZSH-17 9-11 88 - - 11 88 -A1-53 00 -HZSH-17 9 A1-53 00 -HZSH-17 9-21

SCL

11A+ 11A-

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSL-1795300-JT-00043-PDN

BL   A1-5300-HZSL-179-TB1-27+   +27-TB1-A1-5300-HZSL-179 A1-5300-HZSL-179-1189+

WT   A1-5300-HZSL-179-TB1-28-   - 28 -T B1 -A1-53 00 -HZSL-17 9 A1-53 00 -HZSL-17 9-11 90 - - 11 90 -A1-53 00 -HZSL-17 9 A1-53 00 -HZSL-17 9-23

SCL

11A+ 11A-

5300

HSAH

24 GND-11

IN-10

GND-1022

179

5300

HSAL

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   7   9

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   7   9

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-11

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

29

 A1-5300-HZSL-179

C

NO   2 3 I N- 1128 1190

1756-IB161K

RACK-0, SLOT-11

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

SHEET 293

PLC MODULE

5300

JY

179

5300

JY

1756-OB16DK

21

27

 A1-5300-JP-00071

27 1189

NO

179

26 1188

-   14 1766

C   25 1187

S

   A   1  -   5   3   0   0  -   J   Y  -   1   7

 A1-5300-HZSH-179   A1-5300-JP-00071

RACK-1, SLOT-11

13+   1765

15

 A1-5300-JY-179

12

11

+DC-0

OUT-5

 A1-5300-JP-00070

12

179

179

5300

HSAL

179

JY

179

5300

HIC

24

5300

26

179

5300

5300

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 268/293

NOTE:

LOOP NO.: A1-5300-X-179 LOOP SER VI CE: C ON CENT . I NLET VLV EDI GL-003B

The junction box TB2 exists with 10 TBs. However, this drawing represents this JB with "after modification"

on number of Tbs. 10 terminals are added. If not then they are to be added accordingly.

5300

XA

179

5300

XA

179

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 269/293

270 OF

24V DC SUPPLY

- +

5300-JT-00043-PDN 23 23

TB2

 A1-5300-JY-181

5300-JT-00043-PDN

BL   A1-5300-JY-181-TB2-17+   +17-TB2-A1-5300-JY-181 A1-5300-JY-181-1769+

WT   A1-5300-JY-181-TB2-18-   - 18 -T B2 -A1-53 00 -J Y-18 1 A1 -5 30 0-JY-1 81 -1 77 0- - 17 70 -A1-53 00 -J Y-18 1 A1-53 00 -J Y-18 1-15

SCL 23A- 23A-

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSH-181

5300-JT-00043-PDN

BL   A1-5300-HZSH-181-TB1-33+   +33-TB1-A1-5300-HZSH-181 A1-5300-HZSH-181-1195+

WT   A1-5300-HZSH-181-TB1-34-   -34-TB1-A1-5300-HZSH-181 A1-5300-HZSH-181-1196- -1196-A1-5300-HZSH-181 A1-5300-HZSH-181-29

SCL

11A+ 11A-

24V DC SUPPLY

+ -

5300-JT-00043-PDN 11 11

TB1

 A1-5300-HZSL-1815300-JT-00043-PDN

BL   A1-5300-HZSL-181-TB1-35+   +35-TB1-A1-5300-HZSL-181 A1-5300-HZSL-181-1197+

WT   A1-5300-HZSL-181-TB1-36-   - 36 -T B1 -A1-53 00 -HZSL-18 1 A1-53 00 -HZSL-18 1-11 98 - - 11 98 -A1-53 00 -HZSL-18 1 A1-53 00 -HZSL-18 1-31

SCL

11A+ 11A-

5300

HSAH

32 GND-15

IN-14

GND-1430

29

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   8   1

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   8   1

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-11

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

INSTRUMENT

FIELD

37

1756-IB161K

RACK-0, SLOT-11

NO   3 1 I N- 1536 1198  181

TERMINALSDCS (BY OTHERS)

PROCESS CONTROL ROOM

JB

5300

JY

181

35 1197

SHEET 293

PLC MODULE

5300

1756-OB16DK

RACK-1, SLOT-11

JY

181

C

C   33 1195

 A1-5300-JP-00071

NO   34 1196

 A1-5300-HZSL-181

35

S

   A   1  -   5   3   0   0  -   J   Y  -   1   8

 A1-5300-HZSH-181   A1-5300-JP-00071

+   1769

-   18 1770

19

 A1-5300-JY-181

16

15

GND-0

OUT-7

 A1-5300-JP-00070

16

17

JY

181

181

5300

HSAL

181

181

5300

5300

HSAL

32

34

181

5300

53005300

HIC

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 270/293

NOTE:

LOOP SER VI CE: PRODU CT D UM P VLV EDI GL-003B

The junction box TB2 exists with 10 TBs. However, this drawing represents this JB with "after modification"

on number of Tbs. 10 terminals are added. If not then they are to be added accordingly.

LOOP NO.: A1-5300-X-181

XA

181

XA

181

271 OF

24V DC SUPPLY

- +

5300-JT-00043-PDN 23 23

TB2

 A1-5300-JY-182

5300-JT-00043-PDN

BL   A1-5300-JY-182-TB2-19+   +19-TB2-A1-5300-JY-182 A1-5300-JY-182-1771+

WT   A1-5300-JY-182-TB2-20-   - 20 -T B2 -A1-53 00 -J Y-18 2 A1-53 00 -J Y-18 2-17 72 - - 17 72 -A1-53 00 -J Y-18 2 A1-53 00 -J Y-18 2-17

SCL 23A- 23A+

24V DC SUPPLY

+ -

5300-JT-00043-PDN 12 12

TB1

 A1-5300-HZSH-182

5300-JT-00043-PDN

BL   A1-5300-HZSH-182-TB1-37+   +37-TB1-A1-5300-HZSH-182 A1-5300-HZSH-182-1203+

WT   A1-5300-HZSH-182-TB1-38-   - 38 -T B1 -A1-53 00 -HZSH-18 2 A1-53 00 -HZSH-18 2-12 04 - - 12 04 -A1-53 00 -HZSH-18 2 A1-53 00 -HZSH-18 2-1

SCL

12A+ 12A-

24V DC SUPPLY

+ -

5300-JT-00043-PDN 12 12

TB1

 A1-5300-HZSL-182 5300-JT-00043-PDN

BL   A1-5300-HZSL-182-TB1-39+   +39-TB1-A1-5300-HZSL-182 A1-5300-HZSL-182-1205+

WT   A1-5300-HZSL-182-TB1-40-   - 40 -T B1 -A1-53 00 -HZSL-18 2 A1-53 00 -HZSL-18 2-12 06 - - 12 06 -A1-53 00 -HZSL-18 2 A1-53 00 -HZSL-18 2-3

SCL

12A+ 12A-

5300

XA

38

182

5300

XA

5300

JY

5300

HSAL

182

5300

HSAL

 A1-5300-JY-182

18

17

+DC-1

OUT-8

 A1-5300-JP-00070

19

S

   A   1  -   5   3   0   0  -   J   Y  -   1   8

 A1-5300-HZSH-182   A1-5300-JP-00071

+   1771

-   20 1772

JB

18

1205

NO   38 1204

 A1-5300-HZSL-182

C

C   37

293

PLC MODULE

5300

JY

DCS (BY OTHERS)PROCESS CONTROL ROOM

SHEET

TERMINALS

5300

JY

39

1206  182

 A1-5300-JP-00071

182

182

39

36

1203

182

5300

HSAH

182

NO   3 IN-1

182

5300

HIC

INSTRUMENT

FIELD

40

1756-OB16DK

RACK-1, SLOT-11

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

DOC. NO.

PACKAGE

   A   1  -   5   3   0   0  -   H   Z   S   H  -   1   8   2

   A   1  -   5   3   0   0  -   H   Z   S   L  -   1   8   2

WATER TREATMENT PLANT

ZSH

ZSL

5300

HSAH

1756-IB161K

RACK-0, SLOT-12

4 GND-1

IN-0

GND-02

1756-IB161K

RACK-0, SLOT-12

1

CE CECE   CE   CE

CE CECE   CE

CE

CE CECE   CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 271/293

NOTE:

XA

182

XA

182

LOOP NO.: A1-5300-X-182 LOOP SERVICE: CONCENT.OUTLET VLV EDI GL-003B

The junction box TB2 exists with 10 TBs. However, this drawing represents this JB with "after modification"

on number of Tbs. 10 terminals are added. If not then they are to be added accordingly.

272 OF

5300-JT-00047-PAN

TB1

FI-11756-IF16K

5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-2

 A1-5300-PT-269-TB1-3+   +3-TB1-A1 -5 30 0-PT -2 69 A1 -5 30 0-PT -2 69 -5 55 + +55 5-A1 -5 30 0-PT -2 69 A1-53 00 -PT-26 9-12 A+

+23-A1-5300-PT-269 A1-5300-PT-269-16+

 A1-5300-PT-269-TB1-4-   - 4- TB 1- A1 -5 30 0- PT -2 69 A 1- 53 00 -P T- 26 9- 55 6- - 55 6- A1 -5 30 0- PT -2 69 A 1- 53 00 -P T- 26 9- 12 B-

-24-A1-5300-PT-269 A1-5300-PT-269-18-

SCL

H H

L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

PACKAGE WATER TREATMENT PLANT

24

+

-12C

23

JB

2

+

SHEET 293

iRTN7

18 IN7

   A   1  -   5   3   0   0  -   P   T  -   2   6   9

15

DCS (BY OTHERS)PROCESS CONTROL ROOM

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

INSTRUMENT

FIELD

555

6

8

 A1-5300-PT-269

10

556

9

7

5

4

17

iRTN6

-

PLC MODULETERMINALS

1

3IN616

12A

12B

11

12

13

14

19

20

15

16

17

18

5300

PI

269

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-269 A1-5300-JP-00095

5300

PAH

269

5300

PAL

269

5300

PTA

269

5300

PI

269

5300

PAH

269

5300

PAL

269

5300

PTA

269

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 272/293

LOOP NO.: A1-5300-PT-269 LOOP SERVICE: FEED PRESS. TO EDI 530-GL-003A

273 OF

FI-15300-JT-00047-PAN 1756-IF16K

TB1 5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-2

 A1-5300-PT-172-TB1-1+   +1-TB1-A1 -5 30 0-PT -1 72 A1 -5 30 0-PT -1 72 -5 53 + +55 3-A1 -5 30 0-PT -1 72 A1-53 00 -PT-17 2-11 A+

+21-A1-5300-PT-172 A1-5300-PT-172-34+

 A1-5300-PT-172-TB1-2-   - 2- TB 1- A1 -5 30 0- PT -1 72 A 1- 53 00 -P T- 17 2- 55 4- - 55 4- A1 -5 30 0- PT -1 72 A 1- 53 00 -P T- 17 2- 11 B-

-22-A1-5300-PT-172 A1-5300-PT-172-36-

SCL

H H

L L

100

5000

FIC100

FIC

100

5000

FIC

5000

FIC

100

5000

SHEET 293

11

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

JB

   A   1  -   5   3   0   0  -   P   T  -   1   7   2

1+

-

PLC MODULETERMINALS

10

2

9

554

8

6

4

3

INSTRUMENT

FIELD

553

5

7

 A1-5300-PT-172

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

PACKAGE WATER TREATMENT PLANT

22

+

-11C

21 1211A

11B

13

iRTN4

iRTN5

14 IN5

11

12

13

14

19

20

15

16

17

18

5300

PI

172

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-172 A1-5300-JP-00095

5300

PAH

172

5300

PAL

172

5300

PTA172

5300

PI

172

5300

PAH

172

5300

PAL

172

5300

PTA172

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 273/293

LOOP NO.: A1-5300-PT-172 LOOP SERVICE: PRODUCT.PRESS.EDI 530-GL-003A

274 OF

 5300-JT-00047-PANTB1

FI-31756-IF16K

5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-1

 A1-5300-AT-108-TB1-13+   + 13 -T B1 -A 1- 53 00 -A T- 10 8 A 1- 53 00 -A T- 10 8- 58 1+ + 58 1- A1 -5 30 0- AT -1 08 A 1- 53 00 -A T- 10 8- 03 A+

+5-A1-5300-AT-108 A1-5300-AT-108-12+

 A1-5300-AT-108-TB1-14-   - 14 -T B1 -A 1- 53 00 -A T- 10 8 A 1- 53 00 -A T- 10 8- 58 2- - 58 2- A1 -5 30 0- AT -1 08 A 1- 53 00 -A T- 10 8- 03 B-

-6-A1-5300-AT-108 A1-5300-AT-108-14-

SCL

L L

100

FIC

100

5000

FIC

5000

FIC

100

5000

iRTN5

14 IN5

13

582

18  13

PACKAGE WATER TREATMENT PLANT

6

+

-03C

5 1203A

03B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

FIELD

581

17

 A1-5300-AT-10812

11

INSTRUMENT

20

19

JB

   A   1  -   5   3   0   0  -   A   T  -   1   0   8

16

+

-

PLC MODULETERMINALS

15

14

1

2

3

4

5

SHEET 293

11

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

iRTN4

10

6

7

8

9

5300

 AI

108

CE

  CE

CE

CE   CE   CE

CE

 A1-5300-AT-108 A1-5300-JP-00095

5300

 AAL

108

5300

 ATA

108

5300

 AI

108

5300

 AAL

108

5300

 ATA

108

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 274/293

LOOP SERVICE: EDI GL-003A OUTLET RESISTIVITYLOOP NO.: A1-5300-AT-108

275 OF

FI-5 5300-JT-00047-PAN 1756-IF16K

TB2 5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-5

 A1-5300-FT-133-TB2-1+   + 1- TB 2- A1 -5 30 0- FT -1 33 A 1- 53 00 -F T- 13 3- 52 9+ + 52 9- A1 -5 30 0- FT -1 33 A 1- 53 00 -F T- 13 3- 08 A+

+15-A1-5300-FT-133 A1-5300-FT-133-34+

 A1-5300-FT-133-TB2-2-   - 2- TB 2- A1 -5 30 0- FT -1 33 A 1- 53 00 -F T- 13 3- 53 0- - 53 0- A1 -5 30 0- FT -1 33 A 1- 53 00 -F T- 13 3- 08 B-

-16-A1-5300-FT-133 A1-5300-FT-133-36-

SCL

H H

L L

100

5000

FIC100

FIC

100

5000

FIC

5000

FIC

100

5000

PACKAGE WATER TREATMENT PLANT

16

+

-08C

15+

-

SHEET 293

IN14

DCS (BY OTHERS)PROCESS CONTROL ROOM

   A   1  -   5   3   0   0  -   F   T  -   1   3   3

PLC MODULETERMINALS

IN15

33

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

INSTRUMENT

FIELD

529

 A1-5300-FT-133

08A

08B

JB

530

1

16

35

iRTN14

iRTN15

36

34

5

6

7

8

19

9

10

11

12

20

13

2

3

4

15

14

17

18

5300

FI

133

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-133 A1-5300-JP-00095

5300

FAH

133

5300

FAL

133

5300

FTA133

5300

FI

133

5300

FAH

133

5300

FAL

133

5300

FTA133

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 275/293

LOOP NO.: A1-5300-FT-133 EDI GL-003A OUTLET FLOWLOOP SERVICE:

276 OF

5300-JT-00047-PAN

TB1

FI-1

1756-IF16K5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-2

 A1-5300-PT-271-TB1-7+   + 7- TB 1- A1 -5 30 0- PT -2 71 A 1- 53 00 -P T- 27 1- 55 9+ + 55 9- A1 -5 30 0- PT -2 71 A 1- 53 00 -P T- 27 1- 14 A+

+27-A1-5300-PT-271 A1-5300-PT-271-24+

 A1-5300-PT-271-TB1-8-   - 8- TB 1- A1 -5 30 0- PT -2 71 A 1- 53 00 -P T- 27 1- 56 0- - 56 0- A1 -5 30 0- PT -2 71 A 1- 53 00 -P T- 27 1- 14 B-

-28-A1-5300-PT-271 A1-5300-PT-271-26-

SCL

H

L

 A1-5300-PCV-271 5300-JT-00042-PAN

TB1

 5300-JT-00042-PAN 1 2 +3 -4 +5 -6

 A1-5300-PY-271-TB1-33+ +33-TB1-A1-5300-PY-271 A1-5300-PY-271-561+ +561-A1-5300-PY-271 A1-5300-PY-271-7+

 A1-5300-PY-271-TB1-34+ -34-TB1-A1-5300-PY-271 A1-5300-PY-271-562- -562-A1-5300-PY-271 A1-5300-PY-271-8- 04B-A1-5300-PY-271 A1-5300-PY-271-8

04C-A1-5300-PY-271 A1-5300-PY-271-12

SCL

H

L

PACKAGE WATER TREATMENT PLANT

28

+

-14C

27 2414A

14B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

559

 A1-5300-PT-271

JB

+

10

560

9

8

25

iRTN10   A   1  -   5   3   0   0  -   P   T  -   2   7   1

iRTN11

-

PLC MODULETERMINALS

5

7

1

2

3

4

6

SHEET 293

11

23

IN10

DCS (BY OTHERS)PROCESS CONTROL ROOM

26 IN11

10

11

12

7

8

9  To AMS System

5300

FIC

100

FI-1332

1756-OF6CIK

I/P  +   33 561 + 7 04A

RACK-3, SLOT-14

8 OUT3

   A   1  -   5   3   0   0  -   P   Y  -   2   7   1

12 R TN 3

10 ALT3

-   34 562 - 8 04B

35 04C

5300

PTA

271

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-271 A1-5300-JP-00095

5300

PIC

271   5300

PAH271

5300

PAL

271

5300

PTA

271

CE   CE

 A1-5300-JP-00061

CE   CE

CE CE

CE

 A1-5300-PY-271

5300

PAH

271

5300

PAL

271

5300PIC

271

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 276/293

LOOP NO.: A1-5300-PT-271 LOOP SERVICE: CONCEN.OUT.PRESS. EDI GL-003A

277 OF

 5300-JT-00047-PAN

TB2

FI-51756-IF16K

5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-6

 A1-5300-FT-134-TB2-3+   + 3- TB 2- A1 -5 30 0- FT -1 34 A 1- 53 00 -F T- 13 4- 53 1+ + 53 1- A1 -5 30 0- FT -1 34 A 1- 53 00 -F T- 13 4- 09 A+

+17-A1-5300-FT-134 A1-5300-FT-134-2+

 A1-5300-FT-134-TB2-4-   - 4- TB 2- A1 -5 30 0- FT -1 34 A 1- 53 00 -F T- 13 4- 53 2- - 53 2- A1 -5 30 0- FT -1 34 A 1- 53 00 -F T- 13 4- 09 B-

-18-A1-5300-FT-134 A1-5300-FT-134-4-

SCL

H

L

 A1-5300-FCV-134 5300-JT-00047-PAN

TB2

 5300-JT-00047-PAN 1 2 +3 -4 +5 -6

 A1-5300-FY-134-TB1-9+ +9-TB1-A1-5300-FY-134 A1-5300-FY-134-533+ +533-A1-5300-FY-134 A1-FY-5300-100-17+

 A1-5300-FY-134-TB1-10+ -10-TB1-A1-5300-FY-134 A1-5300-FY-134-534- -534-A1-5300-FY-134 A1-5300-FY-134-18- 09B-A1-5300-FY-134 A1-5300-FY-134-7

09C-A1-5300-FY-134 A1-5300-FY-134-11

SCL

H

L

8

11

7

8

9

10

JB

   A   1  -   5

   3   0   0  -   F   T  -   1   3   4

+

-

PLC MODULETERMINALS

IN1

1

5

6

532

3

iRTN0

iRTN1

4

2

7 OUT2

INSTRUMENT

FIELD

531

 A1-5300-FT-134

09A

09B4

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

IN0

DCS (BY OTHERS)PROCESS CONTROL ROOM

PACKAGE WATER TREATMENT PLANT

18

+

-09C

17

1

2

3

To AMS System

5300

FIC

100

FI-121756-OF6CIK

17 09ARACK-3, SLOT-10

I/P  +   533 +9

-   18 09B

11 09C

10 534 -

RTN2

9 ALT2

   A   1  -   5   3   0   0  -   F   Y  -   1   3   4

11

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-134 A1-5300-JP-00095

5300

FIC

134   5300

FAH

134

5300FAL

134

5300

FTA

134

CE   CE

 A1-5300-JP-00095

CE   CE

CE CE

CE

 A1-5300-FY-134

5300

FAH

134

5300

FTA

134

5300

FAL

134

5300

FIC

134

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 277/293

LOOP NO.: A1-5300-FT-134 REJECT FLOW TO DRN EDI GL-003ALOOP SERVICE:

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 278/293

279 OF

5300-JT-00047-PAN

TB1

FI-21756-IF16K

5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-3

 A1-5300-PT-276-TB1-11+   +11 -T B1 -A1-53 00 -PT-27 6 A1-53 00 -PT-27 6-57 5+ +57 5-A1 -5 30 0-PT -2 76 A1-53 00 -PT-27 6-02 A+

+3-A1-5300-PT-276 A1-5300-PT-276-6+

 A1-5300-PT-276-TB1-12-   - 12 -T B1 -A 1- 53 00 -P T- 27 6 A 1- 53 00 -P T- 27 6- 57 6- - 57 6- A1 -5 30 0- PT -2 76 A 1- 53 00 -P T- 27 6- 02 B-

-4-A1-5300-PT-276 A1-5300-PT-276-8-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

PACKAGE WATER TREATMENT PLANT

4

+

-02C

3 602A

02B

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

INSTRUMENT

FIELD

575

 A1-5300-PT-276

JB

13

15

16

5

17

7

iRTN2   A   1  -   5   3   0   0  -   P   T  -   2   7   6

iRTN3

+

-

PLC MODULETERMINALS

9

IN2

8

10

11

SHEET 293

14

DCS (BY OTHERS)PROCESS CONTROL ROOM

8 IN3

12 576

18

19

20

1

2

3

4

5

6

7

5300

PI

276

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-276 A1-5300-JP-00095

5300

PAL

276

5300

PAH

276

5300

PTA

276

5300

PI

276

5300

PAL

276

5300

PAH

276

5300

PTA

270

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 279/293

LOOP NO.: A1-5300-PT-276 LOOP SERVICE: PRODUCT.PRESS.EDI 530-GL-003B

280 OF

 5300-JT-00047-PANTB1

FI-31756-IF16K

5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-1

 A1-5300-AT-109-TB1-15+   + 15 -T B1 -A 1- 53 00 -A T- 10 9 A 1- 53 00 -A T- 10 9- 58 3+ + 58 3- A1 -5 30 0- AT -1 09 A 1- 53 00 -A T- 10 9- 04 A+

+7-A1-5300-AT-109 A1-5300-AT-109-16+

 A1-5300-AT-109-TB1-16-   - 16 -T B1 -A 1- 53 00 -A T- 10 9 A 1 -5 30 0- AT -1 09 -5 84 - - 58 4- A1 -5 30 0- AT -1 09 A 1- 53 00 -A T- 10 9- 04 B-

17   -8-A1-5300-AT-109 A1-5300-AT-109-18-

SCL

18

L L

FIC

100

5000

FIC

100

5000

15

16

SHEET 293

1604A

04B

18 IN7

584

IN6

DCS (BY OTHERS)PROCESS CONTROL ROOM

iRTN6   A   1  -   5   3   0   0  -   A   T  -   1   0   9

+

-04C

7

PLC MODULETERMINALS

12

INSTRUMENT JB

1

2

3

4

20

19

iRTN717

15

5000

FIC

100

+

-

FIELD

583

 A1-5300-AT-10914

13

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

PACKAGE WATER TREATMENT PLANT

8

11

5

6

7

8

DOC. NO.

REV. NO.

9

10

5300

 AI

109

CE

  CE

CE

CE   CE   CE

CE

 A1-5300-AT-109 A1-5300-JP-00095

5300

 AAL

109

5300

 ATA

109

5300

 AI

109

5300

 AAL

109

5300

 ATA

109

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 280/293

LOOP SERVICE: EDI GL-003B OUTLET RESISTIVITYLOOP NO.: A1-5300-AT-109

281 OF

 5300-JT-00047-PAN

TB2

FI-51756-IF16K

5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-6

 A1-5300-FT-135-TB2-5+   + 5- TB 2- A1 -5 30 0- FT -1 35 A 1- 53 00 -F T- 13 5- 53 5+ + 53 5- A1 -5 30 0- FT -1 35 A 1- 53 00 -F T- 13 5- 10 A+

+19-A1-5300-FT-135 A1-5300-FT-135-6+

 A1-5300-FT-135-TB2-6-   - 6- TB 2- A1 -5 30 0- FT -1 35 A 1- 53 00 -F T- 13 5- 53 6- - 53 6- A1 -5 30 0- FT -1 35 A 1- 53 00 -F T- 13 5- 10 B-

-20-A1-5300-FT-135 A1-5300-FT-135-8-

SCL

H H

L L

100

5000

FIC

100

FIC

100

5000

FIC

5000

FIC

100

5000

JB

   A   1  -   5   3   0   0  -   F   T  -   1   3

   5

1

+

-

PLC MODULETERMINALS

IN3

5

2

536

4

3

7

iRTN2

iRTN3

8

INSTRUMENT

FIELD

535

 A1-5300-FT-135

5

6

7

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

REV. NO.

610A

10B

KE01-A1-500-MT-I-HL-0001-000

SHEET 293

IN2

DCS (BY OTHERS)PROCESS CONTROL ROOM

DOC. NO.

8

9

10

PACKAGE WATER TREATMENT PLANT

20

+

-10C

19

11

12

13

14

19

20

15

16

17

18

5300

FI

135

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-135 A1-5300-JP-00095

5300

FAH

135

5300

FAL135

5300

FTA

135

5300

FI

135

5300

FAH

135

5300

FAL135

5300

FTA

135

To AMS System

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 281/293

LOOP NO.: A1-5300-FT-135 EDI GL-003B OUTLET FLOWLOOP SERVICE:

282 OF

5300-JT-00047-PAN

TB1

FI-11756-IF16K

5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-3, SLOT-2

 A1-5300-PT-272-TB1-9+   + 9- TB 1- A1 -5 30 0- PT -2 72 A 1- 53 00 -P T- 27 2- 56 3+ + 56 3- A1 -5 30 0- PT -2 72 A 1- 53 00 -P T- 27 2- 15 A+

+29-A1-5300-PT-272 A1-5300-PT-272-30+

 A1-5300-PT-272-TB1-10-   - 10 -T B1 -A 1- 53 00 -P T- 27 2 A 1- 53 00 -P T- 27 2- 56 4- - 56 4- A1 -5 30 0- PT -2 72 A 1- 53 00 -P T- 27 2- 15 B-

-30-A1-5300-PT-272 A1-5300-PT-272-32-

SCL

H

L

 A1-5300-PCV-272 5300-JT-00042-PAN

TB1

 5300-JT-00042-PAN 1 2 +3 -4 +5 -6

 A1-5300-PY-271-TB1-35+ +35-TB1-A1-5300-PY-271 A1-5300-PY-271-565+ +565-A1-5300-PY-271 A1-5300-PY-271-9+

 A1-5300-PY-271-TB1-36+ -36-TB1-A1-5300-PY-271 A1-5300-PY-271-566- -566-A1-5300-PY-271 A1-5300-PY-271-10- 05B-A1-5300-PY-271 A1-5300-PY-271-15

05C-A1-5300-PY-271 A1-5300-PY-271-19

SCL

H

L

   A   1  -   5   3   0   0  -   P   T  -   2   7   2

DOC. NO.

5

SHEET 293

12

DCS (BY OTHERS)PROCESS CONTROL ROOM

32 IN13

10

13

14

7

6

+

-

IN129

15B564

7

8

9

10

11

FI-1334

1756-OF6CIK

INSTRUMENT

FIELD

563

 A1-5300-PT-272

JB

11

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT

REV. NO.

PLC MODULETERMINALS

8

KE01-A1-500-MT-I-HL-0001-000

1

2

3

4

PACKAGE WATER TREATMENT PLANT

30

+

-15C

29 3015A

To AMS System

I/P  +   35 565 + 9 05A

RACK-3, SLOT-14

15 OU T410 05B

37 05C

-   36 566 -

RTN4

17 ALT4

   A   1  -   5   3   0   0  -   P   Y  -   2   7   1

19

iRTN13

29

30

iRTN12

CE CE

CE

CE   CE   CE

CE

 A1-5300-PT-272 A1-5300-JP-00095

5300

PAH

272

5300

PAL

272

5300

PTA

272

CE

  CE

 A1-5300-JP-00061

CE   CE

CE CE

CE

 A1-5300-PY-272

5300

PIC

272

5300PTA

272

5300PAH

271

5300PAL

272

5300PIC

272

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 282/293

LOOP NO.: A1-5300-PT-272 LOOP SERVICE: CONCEN.OUT.PRESS. EDI GL-003B

283 OF

 5300-JT-00047-PAN

TB2

FI-5

1756-IF16K5300-JT-00047-PAN -6 +5 -4 +3 -2 +1 X:20 RACK-2, SLOT-6

 A1-5300-FT-136-TB2-7+   + 7- TB 2- A1 -5 30 0- FT -1 36 A 1- 53 00 -F T- 13 6- 53 7+ + 53 7- A1 -5 30 0- FT -1 36 A 1- 53 00 -F T- 13 6- 11 A+

+21-A1-5300-FT-136 A1-5300-FT-136-12+

 A1-5300-FT-136-TB2-8-   - 8- TB 1- A1 -5 30 0- FT -1 36 A 1- 53 00 -F T- 13 6- 53 8- - 53 8- A1 -5 30 0- FT -1 36 A 1- 53 00 -F T- 13 6- 11 B-

-22-A1-5300-FT-136 A1-5300-FT-136-14-

SCL

 A1-5300-FCV-136 5300-JT-00047-PAN

TB2

 5300-JT-00047-PAN 1 2 +3 -4 +5 -6

 A1-5300-FY-136-TB1-11+ +11-TB1-A1-5300-FY-136 A1-5300-FY-136-539+ +539-A1-5300-FY-136 A1-FY-5300-100-19+

 A1-5300-FY-136-TB1-12+ -12-TB1-A1-5300-FY-136 A1-5300-FY-136-540- -540-A1-5300-FY-136 A1-5300-FY-136-20- 10B-A1-5300-FY-136 A1-5300-FY-136-8

10C-A1-5300-FY-136 A1-5300-FY-136-12

SCL

H

L

5

+

-14 IN5

11

JB

6

11

9

7

4

13

iRTN4

538

I/P  +   539 + 19

-

iRTN5

   A   1  -   5   3   0   0  -   F   T  -   1   3   6

8

FI-1210

1756-OF6CIK

11 10A

FIELD

537

10

 A1-5300-FT-136

1

2

3

13

INSTRUMENT

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000DOC. NO.

REV. NO.

SHEET 293

IN4

DCS (BY OTHERS)PROCESS CONTROL ROOM

PLC MODULETERMINALS

PACKAGE WATER TREATMENT PLANT

22

+

-11C

21 1211A

11B

To AMS System

5300

FIC

100

RACK-3, SLOT-10

8 OUT310B

   A   1  -   5   3   0   0  -   F   Y  -   1   3   6

1 2 R TN 3

10 ALT3

10C

12 540 - 20

CE CE

CE

CE   CE   CE

CE

 A1-5300-FT-136 A1-5300-JP-00095

5300

FIC

136   5300

FAH

136

5300

FAL

136

5300

FTA

136

CE   CE

 A1-5300-JP-00095

CE   CE

CE CE

CE

 A1-5300-FY-136

5300

FAH

136

5300

FTA

136

5300

FAL

136

5300FIC

136

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 283/293

LOOP NO.: A1-5300-FT-136 LOOP SERVICE: REJECT FLOW TO DRN EDI GL-003B

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 284/293

DOC. NO.

REV. NO.

SHEET 285 OF

+ -

16 16

5000-EZ-00001A

 A1-5300-XB-401-1377+

 A1-5300-XB-401-1378- -1378-A1-5300-XB-401 A1-5300-XB-401-17

SCL

16A+ 16A-

- +

24 24

5000-EZ-00001A

 A1-5300-XSH-401-1874+

 A1-5300-XSH-401-1875- -1875-A1-5300-XSH-401 A1-5300-XSH-401-29-

24A- 24A+

+ -

16 16

5000-EZ-00001A

 A1-5300-XAA-401-1379+

 A1-5300-XAA-401-1380- -1380-5300-XAA-401 A1-5300-XAA-401-19+

16A+ 16A-

+ -

16 16

5000-EZ-00001A

 A1-5300-XHS-401-1399+

 A1-5300-XHS-401-1400+ 1400-A1-5300-XAB-401 A1-5300-XAB-401-23+

16A+ 16A-

+ -

16 16

5000-EZ-00001A

 A1-5300-XAB-401-1381+

 A1-5300-XAB-401-1382+ -1382-A1-5300-XAB-401 A1-5300-XAB-401-21

16A+ 16A-

+ -

16 16

5000-EZ-00001A

 A1-5300-XA-401-1375+

 A1-5300-XA-401-1376- -1376-A1-5300-XA-401 A1-5300-XA-401-15

401

5300

XA

401

5300

XA

401

XHS

401

5300

XAB

5300

XAA

401

5300

   A   1  -   5   3   0   0  -   H   Z   S   H  -   4   0   1

5300

XAA

401

5300

XHS

401

5300

XAB

401

XSH

400

   A   1  -   5   3   0   0  -   H   Z   S   H  -   4   0   1

5300

XB

400

5300 5300

XSH

400

IN-8

18 GND-8

1756-IB161K

 A1-5300-JP-00079

 A1-5300-JP-00079

 A1-5300-JP-00079

 A1-5300-JP-00079

 A1-5300-JP-00079

 A1-5300-JP-00079

1756-IB161K

3   0   0  -   H   Z   S   H  -   4   0   1

RACK-1, SLOT-2

15 IN-7

16 GND-7

RACK-1, SLOT-2

23 IN-11

2 4 GN D- 11

1756-IB161K

   A   1  -   5   3   0   0  -   H   Z   S   H  -   4   0   1

JB

1756-IB161K

RACK-1, SLOT-2

19 IN-9

20 GND-9

   A   1  -   5   3   0   0  -   H   Z   S   H  -   4   0   1

2 9 OU T- 14

293

DCS/ESD (BY OTHERS)PROCESS CONTROL ROOM

1756-IB161K

RACK-1, SLOT-12

30 DC-1

   A   1  -   5   3   0   0  -   H   Z   S   H  -   4   0

X

X

X

X

22

13

DC POWER ON

11

12HAND OPERATION

MODE11

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT AGIP KAZAKHSTAN NORTH CASPIAN OPERATING COMPANY

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

PACKAGE

10

11

START/ STOP

WATER TREATMENT PLANT

5300

XB

400

RACK-1, SLOT-2

17

1874

1875

INSTRUMENT

FIELD

17

16 AUTO

MODE

1377

1378

GND-10

24V DC Supply

1756-IB161K

RACK-1, SLOT-2

21 IN-10

24V DC Supply

24V DC Supply

24V DC Supply

24V DC Supply

CONTROL POWER

ON

FAULT

1379

1380

1399

1400

1381

1382

1375

1376

PLC/PCPTERMINALSPCP

24V DC Supply

CE

  CE

CE

CE

CE

CE

CE

CE

CE

CE

CE

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 285/293

16A+ 16A-    A   1  -   5   3

LOO P NO .: A1 -5300 -X-40 1 EDI GL-003B RECTIFIER

CE

CE

DOC. NO.

286 OF

5300-JT-XXXXX

SCL

5300-JT-XXXXX

SCL

Stop signal to pump

530-PA-082A

 A1-5300-JP-00080

 A1-5300-JP-00080 A1-5300-USL-102A A1-5300-USL-102A

1799 Hard Wired to DCS by

Others1800

Start signal to pump

530-PA-082A

Hard Wired to DCS by

Others

   A   1  -   5   3   0   0  -   U   S   L  -   1   0   2   A

RACK-1, SLOT-12

4 +DC-0

3 OUT-1

1756-OB16DK

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

LOOP NO.: A1-5300-USH/USL-102A

PCP/PLC

LOOP SERVICE: HIGH PRESS. PUMP 530-PA-082A

1756-OB16DK

RACK-1, SLOT-12

2 +DC-0

DCS (BY OTHERS)

SHEET

TERMINALS IN PCP

293PACKAGE WATER TREATMENT PLANT

PROCESS CONTROL ROOM

   A   1  -   5   3   0   0  -   U   S   H  -   1   0   2   A

 A1-5300-USH-102A A1-5300-USH-102A

1 OUT-0

1797

1798

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 286/293

DOC. NO.

287 OF

5300-JT-XXXXX

SCL

5300-JT-XXXXX

SCL

Stop signal to pump

530-PA-082B

1803 Hard Wired to DCS by

Others7 OUT-3 1804

   A   1  -   5   3   0   0  -   U   S

   L  -   1   0   2   B 1756-OB16DK

RACK-1, SLOT-12

8 +DC-0

 A1-5300-JP-00083

 A1-5300-JP-00083 A1-5300-USL-102B A1-5300-USL-102B

 A1-5300-USH-102B A1-5300-USH-102B

Hard Wired to DCS by

Others

+DC-0

   A   1  -   5   3   0   0  -   U   S   H  -   1   0   2   B

Start signal to pump

530-PA-082B

1801

1802

6

5

DCS (BY OTHERS)

SHEET

TERMINALS IN PCP

PROCESS CONTROL ROOM

PACKAGE 293

LOOP NO.: A1-5300-USH/USL-102B

WATER TREATMENT PLANT

OUT-2

PCP/PLC

LOOP SERVICE: HIGH PRESS. PUMP 530-PA-082B

1756-OB16DK

RACK-1, SLOT-12

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 287/293

DOC. NO.

288 OF

5300-JT-XXXXX

SCL

5300-JT-XXXXX

SCL

Stop signal to pump

530-PA-082C

1807 Hard Wired to DCS byOthers

11 OUT-5 1808

   A   1  -   5   3   0   0  -   U   S

   L  -   1   0   2   C 1756-OB16DK

RACK-1, SLOT-12

12 +DC-0

 A1-5300-JP-00086

 A1-5300-JP-00086 A1-5300-USL-102C A1-5300-USL-102C

 A1-5300-USH-102C A1-5300-USH-102C

Hard Wired to DCS by

Others

+DC-0

   A   1  -   5   3   0   0  -   U   S   H  -   1   0   2   C

Start signal to pump

530-PA-082C

1805

1806

10

9

DCS (BY OTHERS)

SHEET

TERMINALS IN PCP

PROCESS CONTROL ROOM

PACKAGE 293

LOOP NO.: A1-5300-USH/USL-102C

WATER TREATMENT PLANT

OUT-4

PCP/PLC

LOOP SERVICE: HIGH PRESS. PUMP 530-PA-082C

1756-OB16DK

RACK-1, SLOT-12

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 288/293

DOC. NO.

289 OF

5300-JT-XXXXX

SCL

5300-JT-XXXXX

SCL

Start signal to pump

530-PA-082D

Hard Wired to DCS byOthers

15 OUT-7 1812

 A1- 5300 - JP - 00089 A1-5300-USL-102D A1-5300-USL-102D

   A   1  -   5   3   0   0  -   U   S   L  -   1   0   2   D

1756-OB16DK

RACK-1, SLOT-12

16 +GND-0 1811

KE01-A1-500-MT-I-HL-0001-000

PROJECT P01

CLIENT

KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

REV. NO.

PCP/PLC

1756-OB16DK

RACK-1, SLOT-12

14 +DC-0

DCS (BY OTHERS)

SHEET

TERMINALS IN PCP

293PACKAGE WATER TREATMENT PLANT

PROCESS CONTROL ROOM

   A   1  -   5   3   0   0  -   U   S   H  -   1   0   2   D

 A1-5300-USH-102D A1-5300-USH-102D

13 OUT-6

 A1- 5300 - JP - 00089

Start signal to pump

530-PA-082D

1809

1810

Hard Wired to DCS by

Others

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 289/293

LOOP NO.: A1-5300-USH-102D LOOP SERVICE: HIGH PRESS. PUMP 530-PA-082D

290 OF

FI-9

5300-JT-XXXXX -6 +5 -4 +3 -2 +1 X:201-5300-XI-100-641+ +641-A1-5300-XI-100   A1-5300-XI-100-09A+

NC   +17-A1-5300-XI-100 A1-5300-XI-100-2+

 A1-5300-XI-100-642-   -642-A1-5300-XI-100   A1-5300-XI-100-09B-

-18-A1-5300-XI-100 A1-5300-XI-100-4-

SCL

   A   1  -   5   3   0   0  -   X   I  -   1   0   0

SHEET

iRTN0

1756-IF16K

RACK-2, SLOT-14

PROCESS CONTROL ROOM

WATER TREATMENT PLANT

PLC MODULETERMINALS

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT DOC. NO.

REV. NO.

KE01-A1-500-MT-I-HL-0001-000

 

DCS (BY OTHERS)

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

293PACKAGE

INSTRUMENT

3 iRTN1

100

09A

5000

FIC

18

09B

+

-09C

17 2

1

4 IN1

IN0641

642

FIELD

5300

XIH

100

CE

CE

CE

 A1-5300-XI-100 A1-5300-JP-00101

5300

XIH

100

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 290/293

LOOP NO.: A1-5300-XI-100 LOOP SERVICE: EMERGENCY E YE/BODY SHOWER ALARM

291 OF

FI-9

5300-JT-XXXXX -6 +5 -4 +3 -2 +1 X:201-5300-XI-100-643+ +643-A1-5300-XI-100   A1-5300-XI-101-10A+

NC   +19-A1-5300-XI-101 A1-5300-XI-101-6+

 A1-5300-XI-100-644-   -644-A1-5300-XI-100   A1-5300-XI-101-10B-

-20-A1-5300-XI-101 A1-5300-XI-101-8-

SCL

8 IN3

6

5

IN210A

5000

FIC

7 iRTN3

100

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

 

DCS (BY OTHERS)

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

293PACKAGE

20

10B

+

-10C

19

WATER TREATMENT PLANT

PLC MODULEINSTRUMENT TERMINALS

FIELD

643

644

DOC. NO.

REV. NO.

   A   1  -   5   3   0   0  -   X   I  -   1   0   1

SHEET

iRTN2

1756-IF16K

RACK-2, SLOT-14

PROCESS CONTROL ROOM

5300

XIH

101

CE

CE

CE

 A1-5300-XI-101 A1-5300-JP-00102

5300

XIH

101

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 291/293

EMERGENCY E YE/BODY SHOWER ALARMLOOP NO.: A1-5300-XI-101 LOOP SERVICE:

292 OF

FI-9

5300-JT-XXXXX -6 +5 -4 +3 -2 +1 X:201-5300-XI-100-645+ +645-A1-5300-XI-100   A1-5300-XI-102-11A+

NC   +21-A1-5300-XI-102 A1-5300-XI-102-12+

 A1-5300-XI-100-646-   -646-A1-5300-XI-100   A1-5300-XI-102-11B-

-22-A1-5300-XI-102 A1-5300-XI-102-14-

SCL

RACK-2, SLOT-14

PROCESS CONTROL ROOM

WATER TREATMENT PLANT

PLC MODULEINSTRUMENT TERMINALS

REV. NO.

SHEET

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANY

1756-IF16K

CLIENT KE01-A1-500-MT-I-HL-0001-000

 

DCS (BY OTHERS)

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

293PACKAGE

DOC. NO.

13 iRTN5

100

22

11B

+

-11C

21

FIELD

12

11   A   1  -   5   3   0   0  -   X   I  -   1   0   2

iRTN4

IN5

645

646

14

IN411A

5000

FIC

5300

XIH

102

CE

CE

CE

 A1-5300-XI-102 A1-5300-JP-00103

5300

XIH

102

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 292/293

LOOP NO.: A1-5300-XI-102 LOOP SERVICE: EMERGENCY E YE/BODY SHOWER ALARM

293 OF

5300-JT-XXXXX

NC

SCL

 

5300-JT-XXXXX

5300-JT-XXXXX

5300-JT-XXXXX

NOTE:

Temp.Control

26

FIC

100

5000

Temp. Control

5000

1756-IF16K

RACK-2, SLOT-14

24 IN10

15

19 iRTN8

21 iRTN9

IN6

5000

FIC

22 IN9

16

18 IN7

17 iRTN7

100

T4

T3

 AGIP KAZA KHSTAN NORTH CASPIAN OPERATING COMPANYCLIENT KE01-A1-500-MT-I-HL-0001-000

 

DCS/ESD (BY OTHERS)

PROJECT P01KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM

293PACKAGE

INSTRUMENT TERMINALS

FIELD

DOC. NO.

REV. NO.

SHEET

iRTN6

1756-IF16K

RACK-2, SLOT-14

PROCESS CONTROL ROOM

WATER TREATMENT PLANT

PLC MODULE

C4

C3

647

648

647

648

ON/OFF ON/OFF

1756-IF16K

RACK-2, SLOT-14

20 IN8

C2

C1

649

650

T4

IN11

2 3 i RT N1 0

2 5 i RT N1 1

ESD

5000

FIC

100

 AGIP KCO is to advise suitbale tag suffixes according to project tagging philosophy. Tentatively, "XSH" to

represent 'ON/OFF," "TCS" has been used to represent "Temperature Control Switch," "TAH" to represent

"Hi h T t Al " d "TLSH" t t "T t Li it C t l"

FIC

100

CLOSE DRY

CONTACT FOR

HEATER ON

TEMPERATURE

CONTROL

THERMOSTAT

OPEN DRY

CONTACT FOR HIGH

TEMPERATURE

 ALARM

HIGH

TEMPERATURE

LIMIT CONTROLTHERMOSTAT

  T3

651

652

5300

XSH

410

CE

 A1-5300-JP-00100

5300

XSH

410

CE

5300

TCS

410

5300

TCS

410

CE

5300

TAH

410

5300

TAH

410

5300

TLSH

410

5300

TLSH

410

7/25/2019 KE01-A1-500-MT-I-HL-0001-000-P01 Instrument Loop Diagram FFU500,520,530,620

http://slidepdf.com/reader/full/ke01-a1-500-mt-i-hl-0001-000-p01-instrument-loop-diagram-ffu500520530620 293/293

CLEANING TANK HEATERLOOP NO.: A1-5300-XSH-410 LOOP SERVICE:

"High Temperature Alarm" and "TLSH" to represent "Temperature Limit Control"