Kaplan bulb turbines – · PDF fileKaplan bulb turbines ... KAWAKODA SCOPE OF SUPPLY:...
Transcript of Kaplan bulb turbines – · PDF fileKaplan bulb turbines ... KAWAKODA SCOPE OF SUPPLY:...
Kaplan bulb turbines –axial
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: RT-22,0VK4A Output: 2502 kW Head: 8 mSpeed: 210 min-1Year: 2010Country: Germany
PRATERKRAFTWERK
RENDELSTEINSCOPE OF SUPPLY: MAIN DATA:
Turbine Type: SZ – 16,0 / SR6AGear Output: 1653 kW Generator Head: 13,50 mHydraulic governor Speed: 305 min-1Erection and commissioning Year: 2010
Country: Italy
FRÖTUNASCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S – 17,0 / MR4Generator Output: 859 kW Hydraulic governor Head: 6,47 mErection and commissioning Speed: 250 min-1
Year: 2009Country: Sweden
LERNBO
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: 2 x S-17,0/SR6AGenerator Output: 2 x 3640 kW Hydraulic governor Head: 27 mErection and commissioning Speed: 428 min-1
Year: 2009Country: Sweden
GÖLOVA
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-10,6/SR6AGenerator Output: 1000 kW Hydraulic governor Head: 19 mDigital turbine controller Speed: 500 min-1Erection and commissioning Year: 2009
Country: Turkey
BURENTOBEL
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: AR16,5/MR3AGenerator Output: 292 kW Hydraulic governor Head: 3,35 mErection and commissioning Speed: 205 min-1
Year: 2008Country: Switzerland
LUDVIKA
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-21,2/SR6Generator Output: 3681 kW Hydraulic governor Head: 17,00 mErection and commissioning Speed: 273 min-1
Year: 2007Country: Sweden
YONGHUNG
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 3 x P-21,2/MR4Digital turbine controller Output: 3 x 1070 kW Hydraulic governor Head: 6,92 mGenerators Speed: 188 min-1Cooling systems Year: 2007Erection and commissioning Country: South Korea
PIHLAJAMAA
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-11,2/SR6Generator Output: 512 kW Hydraulic governor Head: 10,23 mElectrical equipment Speed: 381 min-1Erection and commissioning Year: 2006
Country: Finland
KÜHHÖRNDLWEHR
LIEFERUMFANG: HAUPTDATEN:
Turbine Type: S-12,5/MR4Generator Leistung: 664 kW Hydraulischer Regler Fallhöhe: 8,89 mMontage und Inbetriebnahme Drehzahl: 375 min-1
Jahr: 2005Land: Österreich
SCHALLAU
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: ART-11.2/MR4Generator Output: 254 kW Hydraulic governor Head: 4,75 mErection and commissioning Speed: 315 min-1
Year: 2005Country: Austria
STIFTSWERK
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: ART-16.5/MR3Generator Output: 387 kW Hydraulic governor Head: 3,60 mIntake structure Speed: 210 min-1Erection and commissioning Year: 2005
Country: Austria
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x S-19,0/MR4Generators Output: 2 x 1338 kW Hydraulic governors Head: 7,0 mErection and commissioning Speed: 231 min-1
Year: 2003Country: Austria
DORFMÜHLE
WALZWERK
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-16,0/MR4Hydraulic governor Output: 548 kW Intake structure Head: 5,16 mErection and commissioning Speed: 250 min-1
Year: 2003Country: Austria
AUWEHRSCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 1 x SZ-12,5/MR4Weir system 1 x SZ-8,5/MR4Intake structure Output: 918 / 432 kWHydraulic governor Head: 11,4 mErection and commissioning Speed: 428 / 600 min-1
Year: 2002Country: Austria
DOPPL
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-6,5/KR52Erection and commissioning Output: 142 kW
Head: 9,95 mSpeed: 600 min-1Year: 2002Country: Austria
ERLENHOLZ
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-9,0/SR6Generator Output: 449 kW Digital turbine controller Head: 12,80 mHydraulic governor Speed: 500 min-1Erection and commissioning Year: 2002
Country: Switzerland
KAWAKODA
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-10,0/SR6Hydraulic governor Output: 857 kW Erection and Commissioning Head: 21 m
Speed: 600 min-1Year: 2002Country: Japan
SCHAFLER
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: ART-11,2/R3Generator Output: 184 kW Hydraulic governor Head: 3,20 mErection and commissioning Speed: 304 min-1
Year: 2001Country: Austria
LAUFENAUER
SCOPE OF SUPPLY: MAIN DATA:
Kaplan A-type turbines Type: 2 x AR-19,0/SR3with belt drive Output: 2 x 326 kW
Head: 2,24 mSpeed: 163 min-1Year: 2000Country: Germany
KERSCHBAUM
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: AR-10,6/SR4Digital turbine controller Output: 152 kW Hydraulic governor Head: 3,75 mTrash rack cleaning machine Speed: 320 min-1Erection and commissioning Year: 1999
Country: Austria
GUNZESRIED
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-9,0/SR6Governor Output: 366 kW Steel structure Head: 10,30 mTrash rack cleaning machine Speed: 500 min-1Automation Year: 1998Erection and Commissioning Country: Germany
GLANZER
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-10,6/SR6Governor Output: 569 kW Steel structure Head: 11,50 mTrash rack cleaning machine Speed: 428 min-1Automation Year: 1996Erection and commissioning Country: Austria
BOHRWERK
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: SR-10,6/SR4Hydraulic governor Output: 448 kW Erection and commissioning Head: 8,38 m
Speed: 500 min-1Year: 1994Country: Austria
Kaplan turbines –vertical
AUSLAUFTURBINE
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-14,5/SK4BGear Output: 384 kWGenerator Head: 5,7 mHydraulic governor Speed: 220 min-1Erection and commissioning Year: 2009
Country: Austria
VILLA D’ALME
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-18,0/SK4AGenerator Output: 1020 kWHydraulic governor Head: 7,2 mIntake gate Speed: 231 min-1Electrical equipment Year: 2007Erection and commissioning Country: Italy
ST. AEGYD
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-7,4/KR4Belt drive Output: 50 kW Generator Head: 3,5 mHydraulic governor Speed: 400 min-1Steel structure Year: 2006Erection and commissioning Country: Austria
MÜHLTALWEHR
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-19,0/SK4aGear Output: 630 kWGenerator Head: 4,9 mHydraulic governor Speed: 175 min-1Erection and commissioning Year: 2005
Country: Austria
LOFERBACH
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-11,5/KR4Intake gate Output: 197 kW Hydraulic governor Head: 4,9 m
Speed: 285 min-1Year: 2003Country: Austria
GENIVOLTA
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-22,4/SK4Speed increaser Output: 1561 kW Hydraulic governor Head: 6,9 mErection and commissioning Speed: 175 min-1
Year: 2002Country: Italy
CIRISASCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 1 x VK -10,0/SK4Generators 1 x FSV-6,0/75Electrical equipment Output: 787 / 236 kWHydraulic governor Head: 17 mErection and commissioning Speed: 600 / 500 min-1
Year: 2002Country: Latvia
PETZOLDSCOPE OF SUPPLY: MAIN DATA:
Main and weir turbine Type: VK-15,3/SK4Trash rack cleaning machine FFV-9,0/250Digital turbine controller Output: 376 / 82 kW Hydraulic governor Head: 4,4 / 4,7 mSteel structure Speed: 220 / 169 min-1Erection and commissioning Year: 1999
Country: Austria
ALZARA
SCOPE OF SUPPLY: MAIN DATA:
Cooling water energy- Type: 6 x HK-10,0/K6recovery turbine Output: 6 x 457 kW6 x Kaplan spiral case turbines Head: 14,5 mHydraulic governor Speed: 425 min-1
Year: 1997Country: Syria
A Voith and Siemens Company