KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway...

43
KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication

Transcript of KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway...

Page 1: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

KALINDEE RAIL NIRMAN (ENGINEERS) LTDA Leading Engineering & Construction Company

for Railway Infrastructure : Track, Civil, Signaling

and Telecommunication

Page 2: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

About KALINDEEAbout KALINDEE

Executing Railway Construction Projects since 1976. The only Company which has done more than 1000 Kms of B.G. Tracks

and modern Signalling at more than 800 Stations on Indian Railways. Corporate Enterprise since 1984 Sound Financial standing Vast Experience:- Railway Signalling, Telecom, Track, Bridges, Civil

Works & Metro Rail Projects Turnkey Construction Capabilities Successfully completed many Challenging Projects. ISO 9001:2000 Certified Company Operations covering all parts of India Equity widely held by Indian Public.

1

Page 3: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Board of Directors

Mr. R. D. Sharma

Chairman and Managing Director

Mr. Arvind Gemini

Whole-Time Director

Mr. Neeraj Kumar Singh Mr. S. K. Khanna

Director Director

Mr. Shanti Narayan Mr. S. P. Mehta

Director Director

 

Page 4: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Bankers

State Bank of India State Bank of Patiala Yes Bank Ltd., Overseas Branch, Commercial Branch 48, Nyay Marg,Jawahar Vyapar Bhawan, Chanderlok Building Chanakyapuri1, Tolstoy Marg, 36, Janpath New Delhi - 110021New Delhi – 110001 New Delhi – 110001

Axis Bank ABN AMRO Bank Ltd. HDFC Bank Ltd.2nd Floor,Statesman House “Hansalaya Building” M-39,2nd Floor,Barakhamba Road, 15,Barakhamba Road Outer CircleNew Delhi-110001 New Delhi-110001 Connaught Circus,

Opp. Super Bazar,

New Delhi-110001

Trade Mark3

Page 5: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Sector Focus Sector Focus

Railways Railways Track, Signaling and Telecommunication, Fixed Installations for Electric Traction, Civil WorksTrack, Signaling and Telecommunication, Fixed Installations for Electric Traction, Civil Works

Construction of infrastructure facilities for Surface Transport

and Telecommunication Systems

Metro Rail Systems Metro Rail Systems

Track, Signaling, Telecommunication, Access Control Systems and Automatic Fare Collection Track, Signaling, Telecommunication, Access Control Systems and Automatic Fare Collection

Corporate Corporate Rail Sidings, Installation and up gradation of Rail Yard, Civil Works. Rail Sidings, Installation and up gradation of Rail Yard, Civil Works.

PORT PORT Rail Track, Sidings, Yards, Signaling & Telecommunications, Civil WorksRail Track, Sidings, Yards, Signaling & Telecommunications, Civil Works

4

Page 6: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Shareholding Pattern:Shareholding Pattern:31st March 200931st March 2009

Promoter 17.21

Mutual Funds 9.10

Banks, FI and Insurance Companies

0.07

Body Corporate 23.13

FII’s 14.65

Indian Public 35.60

NRI/OCB’s 0.23

In percentage

5

Page 7: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Financial HighlightsFinancial Highlights

Year 

04-05 05-06 06-07 07-08 08-09

TURNOVER 540.836 

901.324 1881.201 2460.344 2812.236

OTHER INCOME 2.958 --- --- --- 2.740

MATERIAL COST & OTHER EXP.

492.958 820.903 1689.968 2228.216 2630.96

PROFIT BEFORE INTEREST, DEPRECIATION & TAX

50.836 80.421 191.233 252.051 174.404

DEPRECIATION 4.951 5.417 6.153 8.793 13.947

TAXATION 10.099 24.364 51.605 69.450 56.065

NET PROFIT AFTER TAX

19.715 36.092 94.415 142.160 104.392

PAID UP CAPITAL 49.458     49.458   105.204 107.274 112.248

NET WORTH 144.636 176.468 695.616 858.068 1029.552

EARNING PER SHARE (INR)

3.981 7.297 15..310 (basic) 14.930 (diluted)

13.59 (basic) 11.56 (diluted)

9.50

MILLION

INR

6

Page 8: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

TurnoverTurnover

7

TURNOVER (YEAR 2003-2008)

0

500

1000

1500

2000

2500

3000

2003 2004 2005 2006 2007 2008

YEAR

TU

RN

OV

ER

(M

ILL

ION

/IN

R)

Page 9: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Net Profit (After Tax)Net Profit (After Tax)

8

NET PROFIT AFTER TAX (YEAR 2003-2008)

0

50

100

150

2003 2004 2005 2006 2007 2008

YEAR

NE

T P

RO

FIT

AFT

ER

TA

X

(MIL

LIO

N /

INR

)

Page 10: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Financial PerformanceFinancial Performance (in Million INR)(in Million INR)

9

FINANCIAL

0

500

1000

1500

2000

2500

2003 2004 2005 2006 2007 2008

Year

Rs

(Mill

ion

)

Total Asset

Total Liabilities

Net Worth

Current Assets

Current Liabilities

Page 11: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Special FeaturesSpecial Features

Vast and diversified Experience

Experienced Man Power

Simultaneous Execution Of Several Projects spread at Different Locations

Quality & “On-time” Construction

Excellent Reputation with clients and others

Well Known For Co-operation

Amenable Attitude: No Litigation or Arbitration

10

Page 12: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Our CMD Mr. R. D. SharmaOur CMD Mr. R. D. Sharma

A modest beginning as an employee of Western Railway.

Founded the Company in 1984 and piloted the same to newer heights.

Pioneer in railway Construction by private agency for turnkey contracts.

A well known personality in the Construction Industry and on the Indian Railways.

Highly decorated with honours and awards .  

Recipient of prestigious “Bharat Ratna Visvesvaraya Award” in 1987 by the President of India.  

Recipient of Gulzari Lal Nanda foundation’s “NAITIK-SAMMAN” by Governor of Rajasthan on 5th August 2006.

11

Page 13: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

RecognitionRecognition

Sincere efforts and performance of KALINDEE has won all round appreciation and recognition which include:

Letters of Appreciation by Client Organizations

Articles of Commendation by the Press

Special requests by Client Organizations to Kalindee to under take works under Challenging Situations, where other companies had failed. .

12

Page 14: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Main Line of BusinessMain Line of Business

Design, Supply, Installation & Commissioning on Turn-Key basis of :

Metro Rail Track Work Railway New Line & Gauge Conversion Railway Yards and Sidings Civil Works: Earthwork, Buildings,

Bridges, Roads etc. Railway Safety and Signaling Systems. Fixed Traction Installations for Electric

Traction Metro’s Rail Access Control and Fare

Collection Systems Telecom Networks based on Optical

Fiber & Copper cable Wireless Networks Microwave Towers

13

Page 15: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Capability for Turn-Key ConstructionCapability for Turn-Key Construction

Design, Installation, Testing and Commissioning of :- Railway Yards and Lines including Track & Turn-Outs Associated Civil Works Alterations to existing Track, Signaling and Telecom Installations Railway Signaling Installations Telecommunication Installations Railway Electrification

Materials and Equipment Procurement & Supply Clearance from Ports

Logistical Support Manpower, Transport, Storage and Security

Liaison & Co-ordination at all Levels of executions and management. Maintenance and Warranty Support Simultaneous Management of Projects at Different Locations. Association with International Companies for ‘State of Art Technologies’ International practices for Project Management, Quality Control, Industrial

Safety, Environmental Protection, Designs, Drawings and Documentation

14

Page 16: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Management StrengthsManagement Strengths

Kalindee has acquired management capabilities to execute

Projects on Turnkey basis, Several Projects involving different technologies simultaneously

(Ballasted and Ballast-less Track, Railway yards, Automatic Fare Collection, GSM Radio network, Optical Fibre Communication, Signaling, Industrial Sidings, etc)

Several projects at different locations Projects on time or even ahead of schedule.

Kalindee can be proud of :

Adequate financial strength to undertake more projects, rapidly rising Turnover- INR 1881 M (2006/ 07) expected to rise to 11000 M by 2010

Skilled and Trained Manpower Capability to augment its infrastructure to meet requirements of projects

in hand

15

Page 17: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

RESOURCESRESOURCES

Man Power Management Staff 20 Engineers 30 Supervisors 60 Technicians 350

Construction Machines And Tools Signaling, Telecommunication, Civil

Works Technical skills

EI, PI, RRI, CLS, AFTC, OFC, AFC, WAN & LAN, GSM

Management skills Project, Finance, Manpower, Material Organizational capacity Several Projects simultaneously Sound Financial Position Turn Over 1881 M INR (2006-07 ) Reliable & Experienced Sub-

Contractors Railway Approved Quality Material

Suppliers Reliable & Experienced Material

Transporters Good Rapport with Railways

16

Page 18: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Industry Overview:Industry Overview:Indian Railways - OpportunitiesIndian Railways - Opportunities

Indian Railways is one of the largest rail networks of the world with more than 63,300 route kms network.

It constitutes the lifeline and mainstay of country’s transport infrastructure carrying about 40% of freight traffic and 20% of passenger traffic accounting for 2.3% of country’s GDP directly and several times larger with forward and backward linkages.

Over the last few years, Indian Railways has managed to achieve a dramatic reinvention of its business and is presently witnessing one of the most impressive and unprecedented expansion in its history. The freight and passenger traffic on Indian Railways has been growing at average rate of 9.2% and 7% respectively during last three years and is projected even faster in coming years.

Traffic growth of Railways now exceeds that of GDP - a phenomenon without precedent.

It has been assessed that Indian Railways would need to spend around Rs. 2,30,000 crore (US $ 50 billion) on various capacity enhancement measures over the next 5-10 years period.

In the past Indian Railways had made several attempts to rope in private participation in Joint Ventures for rail infrastructure projects which were however limited in scale and scope. The current strategy is to leverage private capital through PPPs to the maximum extent in areas which are amenable to PPPs to improve efficiencies and control costs. To begin with following projects have been identified to be implemented on PPP route:

17

Page 19: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Indian Railways - OpportunitiesIndian Railways - Opportunities

A new Dedicated Freight Corridor initially covering about 2700 route kms equivalent to around 5000 track kilometers at an approximate cost of Rs. 32,000 crores (US $ 7.80 billion) linking the ports of Western India and ports and mines of Eastern India to Delhi and Punjab.

World class Railway Stations particularly at Metro cities eg. Delhi, Mumbai etc.

Setting up of SPV for manufacturing of locomotives / coaches / wagons.

High Speed corridors on linking a few of bustling metropolises with high speed rail link to facilitate train travel over 600-1000 kms within 2 to 4 hours.

Operation of container trains and construction of Private Sidings etc.

Port connectivity works and other Infrastructure Projects through Rail Vikas Nigam Ltd (RVNL), New Delhi etc.

18

Page 20: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Indian Railways - OpportunitiesIndian Railways - Opportunities

Dedicated Freight CorridorDedicated Freight Corridor

The biggest railway project - and India’s largest infrastructure Project approved in 2005 by committee on Infrastructure headed by Prime Minister.

Construction on Rs. 600 billion project is expected to commence in early 2007-08 and will be completed in 11th Five Year Plan (2007-12) . Once completed, it would add 10,000 kms to existing rail network which is extremely significant considering that only 9625 kms has been added since 1950-51.

The corridor will initially encompass western and eastern routes with about 2,700 route km (equivalent to about 5,000 km of track)

Indian Railways will construct a multimodal high axle load freight corridor with computerised control with Rs. 32,000 crores approx in the first phase. This is the largest spending Railways will undertake in a decade after the ambitious Konkan Railway project.

The corridor will link the ports of western and eastern India to New Delhi and Punjab. The corridor project is being implemented through a special purpose vehicle Freight Corridor

Corporation of India Limited (DFCCIL) with an authorised capital of Rs. 40 billion created through a mix of engineering, procurement and construction and public-private partnership methods. Other freight corridors are to follow, leading to 11,500 km of dedicated freight corridors.

19

Page 21: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Railway Sidings- OpportunitiesRailway Sidings- Opportunities

All large industrial projects, power generation units, mining projects etc need Rail linkages with main Railway lines for smooth, efficient and reliable transportation of raw materials, finished goods etc.

With the faster Industrial growth envisaged in line with anticipated economic growth, demand for Rail linkages, Rail yards, Rail siding etc enabling huge business opportunities in this sector.

Company has already executed / commissioned such projects in the past for Mumbai port, Vishakhapatnam port, Adani port, Paradip port, BPCL, HPCL etc.

Company is presently executing Rail siding projects for Reliance for their power project in Yamuna Nagar, Haryana, Vedanta for their Aluminum Project in Orissa, Dalmia (OCL) for their Cement Project in Orissa etc.

20

Page 22: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Metro Rail Systems - OpportunitiesMetro Rail Systems - Opportunities

DELHI METROPHASE – I

Mass Rapid Transport Systems (MRTS) projects are gaining momentum and is being implemented through SPV DMRC owned by Union Government and Delhi State Government. The progress of the Delhi MRTS project is notable. In all, 65 kms of Delhi Metro under Phase – I is fully operational comprising Line 1 (Shahdara-Trinagar-Rithala: 22.06 kms), Line 2 (Delhi University to Central Secretariat: 10.84 kms), Line 3 (Indraprastha – Barakhamba Road – Dwarka subcity: .32.10 kms)

PHASE - II

Further expansion of Delhi Metro in other parts of city and outside in NCR region is under high momentum of execution covering a length of approx. 100 km at a cost of Rs. 13000 crore approx expected to be completed in 2010.

OTHER METRO PROJECTSMRTS projects of Mumbai, Bangalore and Hyderabad have already got Union Cabinet approval in March, 2006.

21

Page 23: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Metro Rail Systems - OpportunitiesMetro Rail Systems - Opportunities

Mumbai MRTS Project is to be implemented by MRDA through SPV route under BOT scheme in phases covering a length of about 145.38 kms and is expected to cost about Rs. 195.25 billion expected to be completed in 2021. In August 2004, Maharastra Government approved the implementation of first section (Versova – Andheri – Ghatkopar) of phase I on BOT through PPP model with Reliance Energy as preferred bidder and is expected to be completed by December, 2009 which started in November, 2006.

Bangalore MRTS Project is to be implemented by Bangalore Mass Rapid Transit Ltd (BMRTL) through SPV created by Karnataka Govt. and is proposed to be implemented in several phases spanning about 33 kms with an estimated outlay of Rs. 6395 crores. While Karnataka Government cleared the proposal in March, 2005, Union Government gave its approval in April, 2007. Work on first elevated section of 7 kms started in December, 2006. Phase I is expected to be commissioned in December, 2007.

Hyderabad MRTS Project cleared in Jan, 2007 is proposed to be implemented by a SPV Hyderabad Metro Rail Limited through PPP route on BOT basis with authorised capital of Rs. 10 billion and is expected to cost about Rs. 8760 crores. It is expected to commence in January, 2007 and is likely to be completed in 2011 with 66.39 kms long stretch.

22

Page 24: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Outstanding Achievements Outstanding Achievements

Turnkey Rail Track Contracts : (Ballast-less & Ballasted): Ballasted Track Assembly 2 Kms / Day Ballasted Track Speed Trial Run 130 Kmph Ballast-less Track work 300 m/day

Turnkey Rail Infrastructure Contracts Railway Signaling Works on Contract Telecommunication Works on Contract Turnkey Railway Signaling Contracts Turnkey Telecommunication Contracts Largest Contract undertaken :

On Konkan Railway Corporation for: Railway Signaling 54 stationsOFC 1000 KmTrack 60 Km

23

Page 25: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Major projects presently on hand Major projects presently on hand

Work value Turnkey Projects ( In Million USD)

• VILLUPURAM-MAYILADUTURAI (RVNL) 41.37

[121.78 kms Gauge conversion project if southern railway in JV with Tata Projects Ltd.]• VEDANTA ALUMINA LTD. 12.28

[Rly. Siding for Smelter Plant at Jharsuguda, Chhatisgarh]• RELIANCE ENERGY LTD. 2.82

[Rly. Siding at Yamuna Nagar for 2X300 MW DCR thermal power project]• GOOTY-PULLAMPET (RVNL) 23.34

[151.05 kms signalling project of south central railway in JV with Leighton Holdings Ltd., Singapore]

• PALWAL-BHUTESHWAR (RVNL) 26.98

[81 km track laying & signaling project in nothern railway in JV with Cobra SA, Spain]

• TRACK WORK FOR DMRC PHASE II 20.68 [31.30 kms (both underground & elevated track laying project

part -1 Corridor, Yamuna Bank Depot and Workshop]• AFC FOR DMRC PHASE II 18.22 [Installation & commissioning of AFC system in 41 stations of Delhi Metro

in JV with Samsung SDS ,Korea]24

Page 26: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Our Valued ClientsOur Valued Clients

Indian Railways Konkan Railway Corporation Bharti Telecom Vizag Port Trust Videsh Sanchar Nigam Mumbai Port Trust Adani Port Trust Tata Tele Services Indian Oil Tanking Reliance Energy Reliance Infrastructure Ltd

Delhi Metro Rail Corporation Maharastra State Electricity Board Bharat Petrochemicals National Thermal Power Corporation Hindustan Petroleum Corporation Rail Vikas Nigam OCL India Ltd. (Dalmia Group) Tata Steel Ltd. Vedanta Alumina Ltd. RITES

25

Page 27: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

International Co-operationInternational Co-operation (for Track & Civil Engineering) (for Track & Civil Engineering)

Kalindee Has Been Associated With:-

Company Country Technology TSO FRANCE METRO TRACKWERMER TRACTE GERMANY ROADSCHINA HARBOUR CO. CHINA CIVILEICHHOLZ GERMANY TRACKBWG GERMANY TRACKPANDROL UK TRACK

26

Page 28: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

International Co-operationInternational Co-operation (for Signaling)(for Signaling)

Kalindee Has Been Associated With :-

Company Country HARMON IND. USA INTERLOGIC UK SASIB (GRS) USA UNION SWITCH USAGE TRANSPORTATION USA

27

Page 29: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Kalindee Has Been Associated With :-

Company Country Technology ERICSSON SWEEDEN TELECOM BOSCH TELECOM GERMANY TELECOM KABEL RHEYDT GERMANY OFC ALCATEL PORTUGAL TELECOM MOTOROLA USA GSM SAMSUNG SDS KOREA AFC GE TRANSPORTATION UK TELECOM

International Co-operationInternational Co-operation (for Telecommunication)(for Telecommunication)

28

Page 30: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Rail Track Construction for Delhi MetroRail Track Construction for Delhi Metro

Salient Features of the Project completed are : Ballast-less Track : 24.271 Kms. Ballasted Track in Depot : 10.825 Kms. Ballast-less Scissor Cross Over (1:12) : 4 Sets Ballast-less Points and Crossing (1:12) : 4 Sets Ballast-less Points and Crossing (1:8.5) : 7 Sets Ballasted Scissor Crossover (1:8.5) : 1 Set Ballasted Points and Crossing (1:8.5) : 62 Sets Flash Butt Weld : 4346 Nos. A.T. Weld : 1388 Nos. Completion period : 18 months

29

Page 31: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Ballast-less Track WorkBallast-less Track Work

30

Page 32: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Ballast-less Points & Crossing in TunnelBallast-less Points & Crossing in Tunnel

31

Page 33: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Preparation for Casting - GSF SettingPreparation for Casting - GSF Setting

32

Page 34: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Ballast-less Track Works in TunnelBallast-less Track Works in Tunnel

33

Page 35: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Flash Butt WeldingFlash Butt Welding

34

Page 36: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

ACCESS CONTROL AND FARE COLLECTION SYSTEMS FOR METRO RAILACCESS CONTROL AND FARE COLLECTION SYSTEMS FOR METRO RAIL

Kalindee has acquired in the ‘State of Art Technology’ for Access Control and Automatic Fare Collection System having installed the same for Delhi Metro Rail Corporation.

This system uses the latest contact-less tokens for fare collection for the first time in the World for Single/Double journey in addition to the contact-less smart card. All the equipments at individual stations are connected to the Station computer through LAN (CAT5 / OFC) and all the stations in turn are connected to the Operation Control Central through WAN (OFC) at Shastri Park.

Till date Kalindee has successfully commissioned 34 Stations (24 Elevated and 10 Underground), 1 Operational Control Centre, 1 Software Development Centre and 1 Training Centre comprising of 317 Nos. of AFC Gates, 178 Ticket Office Machines (TOM) including the Excess Fare Collection Office, 98 Nos. of Ticket Readers (TR), 34 Station Computers, 31 sets of UPS ranging from 7.5 to 15 KVA, 145 Electrical Distribution Cabinets, 35 Nos. of Cisco Routers and 85 Nos. of HP Switches.

Recently Kalindee in Consortium with Samsung SDS has won the BS 22 A&B Contract from DMRC in a very tough Global Competition for implementing the AFC System on 19 Stations of Phase II. This includes 41 Stations Foreign Supplies also.

Similar AFC Projects are under consideration with MMOPL (Mumbai Metro Phase I).

• Array of AFC Gates

• Smart Card Reader

• Ticket Office Machine

35

Page 37: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Major Turnkey Projects CompletedMajor Turnkey Projects Completed

Remodeling & up-gradation of Railway Yard at Wadala and Raoli for Mumbai Port Trust

Installed Track : 18.7 Kms.Points & Crossings : 70 Nos.Traps : 3 Nos.

Private Railway Siding for IOTL at Navghar, MumbaiInstalled Track : 7.25 Kms.Points & Crossings : 18 Nos.Traps : 9 Nos.

Private Railway Siding for HPCL at Balasore, OrissaInstalled Track : 4 Kms.Points & Crossings : 10 Nos.Traps : 5 Nos.

Approach Road to Bina Thermal Power StationTotal Length : 6.85 Kms.

36

Page 38: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Track WorksTrack Works

Straight Track : 1068 Kms. Points & Crossings (1:12) : 204 Nos. Points & Crossings (1:8.5): 353 Nos. Points & Crossings (1:16) : 4 Nos. Trap Points : 154 Nos. Mixed Gauge Diamonds : 4 Nos.

37

Page 39: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Nokha – Naugar – Merta Road : 144 Kms. Track Work Completed In Record Time of 4 MonthsAchieved Highest Av. Linking Speed Of 2 Kms/day Executed in Hostile Environment of Desert Area Initial Speed Trial Of 120 Kmph Commercial Sanctioned Speed Of 100 Kmph Set A Land Mark Of Quality and On Time Track work for the contiguous Bikaner- Nokha (62 Kms) was completed by Railway Staff engaging 5 Contractors in 9 Months time and achieving speed trail of 60 Kmph only & Commercial sanctioned Speed of 50 Kmph only.

Jodhpur- Phulera : 300 Kms Track Work also Completed in Record Time of 4 Months Time. Phulera – Ajmer : 82 Kms Track work Completed in 2 Months and 10 Days only All these works reveal the highest level of quality and record time completion showing the competency of our Project Management along with efficient Manpower and Resources Management.

Above examples amply demonstrate our Project Management Capabilities to execute Quality Work in Record Time.

QUALITY PROJECT EXECUTION IN RECORD TIME

38

Page 40: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

PRESTIGIOUS PROJECTS UNDERTAKEN ON KONKAN RAILWAY

54 Stations Panel Interlocking : Biggest Signaling Project undertaken OFC System on 1000 Km: Biggest Telecom Project undertaken 60 Km of B.G. track : laid in hostile mountainous environment.

Route Map of Konkan Railway

Kalindee’s performance won all-round appreciation and applause for executing these projects in time and as per the highest standards of quality.

39

Page 41: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Signaling works completedSignaling works completed

Electronic Interlocking 8 Stns. Panel interlocking 212 Stns. Color light Signaling 182 Stns. Conventional Signaling 260 Stns. For 25 KV AC Traction 41 Stns. LC Interlocking 127 Nos. Route relay interlocking 26 Stns. Major yard Signaling 33 Stns. Token Less Block System 98 Stns. Multiple Aspect Signaling 58 Stns. Axle Counter Block Systems 137 Nos. Automatic Signaling 26 Kms. Audio Frequency Track Circuit Automatic (AFTC) for Signaling 115 Sets

40

Page 42: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Telecommunication works completedTelecommunication works completed

U/G Optical Fibre System 2,434 Kms

OFC Equipment Installation 100 Stations

Wireless Network (GSM) 60 Kms.

MSO and EBTS 4 Nos.

Mobile Train Radio 220 Cabs

U/G Copper Cable 6,984 Kms.

Overhead Lines 400 Kms.

Fab. And Erec. of M/W 32 Nos. Towers

41

Page 43: KALINDEE RAIL NIRMAN (ENGINEERS) LTD A Leading Engineering & Construction Company for Railway Infrastructure : Track, Civil, Signaling and Telecommunication.

Major S&T Turnkey Projects CompletedMajor S&T Turnkey Projects Completed

Signaling at 23 stations with panel interlocking on Nagpur - Durg section

Signaling at 54 stations on Konkan Railway.

1000 Km long OFC Communication System for Konkan Railway

150 Kms. OFC Communication System on Northern Railway

RRI System at Cuttack Station of East Coast Railway

42