July 28 2004 GLAST Project
Installation ReviewLAT
1
Tracker Tower
Installation Review
Peter Amnuaypayoat [email protected] x8985
July 28 2004 GLAST Project
Installation ReviewLAT
2
AgendaAgenda
• Tracker- Mock-up Eng. Dev. (R. Ruland)
Lessons Learned (Peter A.)• I&T Flow for Tracker Installation (T. Borden)• Grid Interface Hardware List• Notation
Coordinate System
Side Wall Identification
Flexure Identification• Installation Procedure – INFN
Static Test (Non-Aligning)• Presetting Procedure
Alignment of inner cone relative to outer cone• Installation Procedure – INFN
Vibration Test (Aligning to CMM measurement)• Dithering Procedure• Shimming Procedure• Cone Removal Procedure
• Alignment Tools• Optical Survey Tools• Near-Term Plans
Final CMM of Mock-up at SLAC (8/5-6 tbd)
I&T Training
Grid I/F Hardware for I&T• Future Topics (Next Meeting)
Flex Circuit Cable Installation
Cable Bending
Cable Bonding
Connector Saver Plan
July 28 2004 GLAST Project
Installation ReviewLAT
3
Tracker Mock-up Engineering DevelopmentTracker Mock-up Engineering Development
• CMM Program established from Tower Mock-up model
Developed in Bay area and at INFN
• Experience gained from Mock-up
Tower to Grid simulator installation
Alignment of Eccentric cones
Testing of the CMM program
• Differences between Mock-up model and E.M. (Flight like) model
Corner Flexures are non flight like (older rev.)
Does not contain corner brackets or flight like reflector ball nests
July 28 2004 GLAST Project
Installation ReviewLAT
4
Tower Alignment SummaryTower Alignment Summary
• Measurements at INFN
– Used their CMM which runs PC-DMIS
– Created measurement scripts for automated measurements
– Derived CS which puts tower in optimized position, i.e. Z-axis vertical wrt gravity, X, Y symmetrical to actual shape
– Determined coordinates of flexure conicals in tower CS
– Comparing actuals vs design yields dial-in settings for cones
– Applied settings, mounted tower to base
– Cross-checks good to 500 µm (TBs too small and loose)
• Planned measurements at SLAC
– Verify procedure by independently creating equivalent measurement routine on our Leitz PMM using Quindos
– Repeat measurement / alignment cycle at least three times
July 28 2004 GLAST Project
Installation ReviewLAT
5
I&T Flow For Tracker InstallationI&T Flow For Tracker Installation
ReceiveTKR
Tower
Inspect, Metrology & El Test
Final Test
Remove CAL, TEM, TEM-PS, & TKR Tower from
Single Bay
Install CAL, TEM, & TEM-PS
Install TKR into alignment
fixture
Measure TKR and
Align Cones
Test
Prepare
GridBay
Install TKR Tower into Grid Bay
Install TKR Tower into Single Bay
Install CAL, TEM, & TEM-PS
July 28 2004 GLAST Project
Installation ReviewLAT
6
Grid Interface Hardware listGrid Interface Hardware list
• Installation Shims: LAT-DS-03506
• Outer Eccentric Cone: LAT-DS-02788
• Inner Eccentric Cone: LAT-DS-02787
• Hex Bushing: LAT-DS-02789
• Hex Nut: LAT-DS-03925
• Shoulder Stud: LAT-DS-02791
Corner Flexure
Grid
July 28 2004 GLAST Project
Installation ReviewLAT
7
NotationNotation
+Y, +x
+Y, -x -X, +y
-Y, -x
-Y, +x+X,-y
+X, +y
-X,+Y
+X,+Y(reference location)
-X,-y
-X,-Y(reference location)
+X, -Y (reference location)
+X
+Z
+Y
Grid Simulator(Tower base plate)
+X, +y designates the stud on the + y side of the flexure which is on located on the +X side wall.
For all side flexures, the side flexure identifier is capitalized, while the side flexure conical(stud) is in lower case.
July 28 2004 GLAST Project
Installation ReviewLAT
8
Installation Procedure (Static test) - INFNInstallation Procedure (Static test) - INFN
• Refer to section 2.1 of LAT-DS-0425-01
• Installed Grid simulator with no Aligning– Performed on Tower Mock-up– requires no Aligning tools– Adjusting tools required
• Preset three inner and outer cones to the concentric position
For three reference locationsUsed to locate the position of TowerAlign slots on both cones
• Remaining cones are to be “Dithered”Process in which cones seat to their required position
July 28 2004 GLAST Project
Installation ReviewLAT
9
Presetting ProcedurePresetting Procedure
Refer to section 6.1 of LAT-DS-04245
Section 6.1.9: determine α by using Matlab program “angtool”
Setting α, “inner to outer cone angle”
July 28 2004 GLAST Project
Installation ReviewLAT
10
Installation Procedure (Aligning to CMM measurement) - INFNInstallation Procedure (Aligning to CMM measurement) - INFN
• Refer to LAT-MD-03566 and LAT-PS-04245
Tower C.S +Z
Struc C.S +Z
Tower C.S +Z
Define a coordinate systembased on the location of
Top and Bottom Tray Hardware. Then move it so it is centered on the shape and size of the
Sidewalls
Calculate Flexure Point offsets from nominal
and check against available travel
Set Eccentric Cone rotation,
then mount Grid Simulator
and fit with shims.
Determine β for each reference locationLAT-PS-04245: Section 2.3
July 28 2004 GLAST Project
Installation ReviewLAT
11
Installation Adjusting ProceduresInstallation Adjusting Procedures
• Dithering
Process in which cones seat to their required position
Tool LAT-DS-04337
• Shimming Procedure
Refer to LAT-PS-04245 section 9• Measurement of gap• Selection of shim stack
• Cone removal procedure
Refer to LAT-PS-04245 section 8• Assembly of the cone Extractor• Removal of the Inner cone from the
Corner Flexure• Removal of the Outer cone from the
Corner Flexure• Separation of Inner cone from Outer cone
July 28 2004 GLAST Project
Installation ReviewLAT
12
Alignment ToolsAlignment Tools
ItemDrawing Number Title
Recommended Quantity Needed
at each Installation sight
Quantity at INFN
Quantity at SLAC
Vendor Contact Number
Cost Total
Need Date
Delivery Date Comments Done
1
LAT-DS-04335
Outer Cone Adjuster, Spanner 3 (Sets) 2 (Sets) 0 SLAC TBD 30-Jul-04 30-Jul-04
Need to order sets for I&T need date
2
LAT-DS-04336
Inner Cone Adjuster, Spanner 3 2 0 SLAC TBD 30-Jul-04 30-Jul-04
Need to order sets for I&T need date
3
LAT-DS-04337Dithering
Tool 10? 3? 0 SLAC? TBD 30-Jul-04 30-Jul-04
Need to order for I&T need date, possible outside
vendor
4
LAT-DS-04344Alignment Template 2 1 2? SLAC TBD 13-Aug-04 TBD
Touches Cones, need Q.C.?? Possible material
change to steel?5
LAT-DS-04345Alignment
Block 2 1 0 SLAC TBD 13-Aug-04 TBDNeed to order one for I&T
need date6
LAT-DS-04346Alignment
Dial 2 1 1 SLAC TBD 13-Aug-04 TBD
Touches Flight Cones, need Q.C.?? Need to order
for I&T need date. 7
LAT-DS-04347Cones Aligner 2 2 0 SLAC TBD 13-Aug-04 TBD
Touches Flight Cones, need Q.C.?? Need to order
for I&T need date. 8
LAT-DS-04348Clamping Template 6 3 1 SLAC? TBD 13-Aug-04 TBD
Contact Flight Flexure, need Q.C.?? Need to order
for I&T need date.
9LAT-DS-04339
Extraction Rod 2 2 0 SLAC TBD 30-Jul-04 30-Jul-04
Need to order some for I&T need date
10
LAT-DS-04340
Extraction Tube, Inner
Cone 4 3 0 SLAC TBD 30-Jul-04 30-Jul-04
INFN will be able to use future extraction bracket,
due to access from behind. Need to order some for I&T
need date11
LAT-DS-04341
Extraction Tube, Outer
Cone 4 2 0 SLAC TBD 30-Jul-04 30-Jul-04
INFN will be able to use future extraction bracket,
due to access from behind. Need to order some for I&T
need date12
LAT-DS-04342Pull Rod
Base 2 2 0 SLAC TBD 30-Jul-04 30-Jul-04Need to order some for I&T
need date13
TBDExtraction Bracket 2 0 0 SLAC TBD TBD TBD
Needs to be Designed. For use at INFN (Arthur?)
CONE EXTRACTION TOOLS
INTERFACE AND ALIGNMENT TOOLS FOR TOWER "A"
CONE ADJUSTING TOOLS
CONE ALIGNMENT TOOLS
July 28 2004 GLAST Project
Installation ReviewLAT
13
Additional TopicsAdditional Topics
• Optical Survey Tools
• Near-Term Plans
Final CMM of Mock-up at SLAC (8/5-6 tbd)
I&T Training
Grid I/F Hardware for I&T
• Future Topics (Next Meeting)
Flex Circuit Cable Installation
Cable Bending
Cable Bonding