JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
Transcript of JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
TUSTIN CITY COUNCIL MEETING Tuesday July 21, 2015
PIPELINES LLC WICKLAND 1 1
JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
PROJECT TIMELINE October 2011 – Wickland Pipelines selected by Airlines
April 2012 – Meetings with Tustin, Irvine, and Orange County
May 2014 – CEQA Mitigated Negative Declaration approved
July 2015 – Tustin City Council
September 2015 – Irvine City Council
October 2015 – FAA Permit Complete
Winter 2015 – Pipeline construction complete in 90 days
PIPELINES LLC WICKLAND 2 2
JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
WICKLAND PIPELINES LLC Based in Sacramento, CA
California Public Utility Commission regulated public utility
Federal DOT and California State Fire Marshal oversight
35+ years experience in pipeline fuel distribution
Other California Airport Pipelines operated by Wickland: • Sacramento International Airport pipeline • San Jose International Airport pipeline
PIPELINES LLC WICKLAND 3 3
JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
PIPELINE DESCRIPTION Pipeline Size 12 inches diameter
Pipeline Length 5.3 miles
Pipe Depth 100% underground, between 5 and 50 feet deep
Pipe Material Carbon steel with fusion bonded epoxy
Product Jet Fuel (kerosene)
PIPELINES LLC WICKLAND 4 4
JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
PIPELINE TIE-IN
New SNA Pipeline Equipment at Tie-in
Tustin Ranch Road
New Leased Parking
Lot
Edinger Avenue
Public Storage Facility
Existing Products Pipeline
PIPELINES LLC WICKLAND 7 7
JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
CONSTRUCTION EQUIPMENT
Cranes and water trucks (San Jose, CA)
Welding equipment (San Jose, CA) HDD drill rig (San Jose, CA)
Backhoe and sideboom (San Jose, CA)
PIPELINES LLC WICKLAND 8 8
JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
SYSTEM SAFETY FEATURES Epoxy coating and cathodic protection
100% of welds x-rayed and certified
Constructed to ASTM, ANSI, API, NFPA, and PHMSA standards
Hydrostatic testing and smart pigging
24-hour operator and SCADA computer monitoring
Redundant alarms and automatic shutdown
Oversight from US DOT, CA Fire Marshall, and local agencies
PIPELINES LLC WICKLAND 9 9
JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
PROJECT BENEFITS “Reduced risk” and “Increased safety” – Calif. Fire Marshall
Eliminates more than 44 tanker truck trips per day
Reduces traffic and wear on local roads and highways
Decreased air pollution and greenhouse gases
Enhanced security in Airport secure zone
Increased reliability and security of fuel supply
Lower jet fuel costs at John Wayne Airport
PIPELINES LLC WICKLAND 10 10
JOHN WAYNE AIRPORT JET FUEL PIPELINE PROJECT
PROJECT BENEFITS EMISSION REDUCTIONS
0
1
2
3
4
5
6
7
8
9
10
0
100
200
300
400
500
600
700
800
900
1000
Emissions with Trucking Emissions with Pipeline
Met
ric T
ons o
f NO
x Pe
r Yea
r
Met
ric T
ons o
f CO
2 Pe
r Yea
r
Trucks CO2 per year (2008) Pipeline
CO2 per year
Trucks NOx per year (2008) Pipeline
NOx per year
PIPELINES LLC WICKLAND 11 11