Job Sheet 3 – Trainer Components
Grid-Tied Equipment
The electric utility grid is a large-scale power system that is maintained by electric utility
companies across the United States. Alternative energy systems that convert solar or wind
power to electricity can supply electric power to the utility grid. Figure 3-1 shows one example
of a simple solar energy system that is grid-connected, or grid-tied. It is a block diagram of a
utility-interactive system.
Figure 3-1. Typical Grid-Tied Solar Energy System.
modules provides a high DC voltage to the input of a string inverter. The addition of parallel-
connected sub-arrays offers higher current and more overall input power to the inverter. The
main function of the inverter is to convert DC voltage to an AC voltage, which is compatible with
the local utility grid. The AC output from the inverter is commonly distributed throughout the
residential house or commercial building via an AC power load center or AC power distribution
panel (also called a main service panel), which contains AC circuit breakers for each electrical
load branch. The utility grid is connected to the load center through a utility (kWh) meter, which
tracks energy usage as it is imported or exported in or out of the renewable energy system.
Inverter operation is intended to be fully automatic.
voltage and frequency are correct, the inverter starts feeding energy to the grid. At dusk, the
sunset decreases irradiance on the solar array. Once power drops to an inadequate level, the
inverter stops feeding energy to the grid.
Additional parts and equipment are typically needed to correctly install a solar power system,
such as a DC disconnect switch on the DC input to the inverter, and an AC disconnect switch
on the AC output from the inverter. Some string inverters have disconnect switches already
integrated into their enclosure. Most string inverters also include a host of other features
Trainer Components
14 © Festo Didactic Inc. 88191-20
and functions as well, such as a digital display, optional remote displays, data logging, data
communication ports (Ethernet, telephone, serial, etc.), external sensors (temperature,
built-in circuit protection, including string fuses. A ground-fault detection and interruption (GFDI)
circuit may be incorporated into the inverter to ensure compliance with NEC and UL standards.
There are many commercially-available brands of string inverters that include:
•
•
• Samlex America Soleil series
• SMA America Sunny Boy series
•
Additional parts and equipment that are often required for a solar power system include
mounting hardware, wire, conduit, combiner and junction boxes, DC circuit breakers, a ground-
Installation
In the United States, electrical installations must be in accordance with the National Electrical
regulations for the site as well, such as UL, CSA, IEEE, and FCC.
interact with the utility grid. This procedure assumes that the solar array is mounted on the roof
already.
• Choose an appropriate indoor or outdoor location for the power inverter.
• Mount the power inverter on the wall vertically.
• Turn off the utility grid circuit breaker before wiring.
• Cover all solar modules with opaque material or install the DC wiring at night.
•
install conduit and pull wires as needed for the system.
•
• Select and install the proper AC branch circuit breaker or fuses and AC disconnect.
• Connect the electric utility grid based on the electrical AC service provided.
• Connect a GFDI circuit for either positive or negative DC ground as required.
• Select and install the proper DC string fuses and DC disconnect.
© Festo Didactic Inc. 88191-20 15
Trainer Components
• Connect the solar module strings and add a combiner box, if needed.
• Close the power inverter cabinet and all box covers.
• Label all boxes as required by the NEC.
• Turn on the utility grid circuit breaker.
Figure 3-2, respectively.
Figure 3-2. Wiring of AC Power.
NOTE:
The DC inputs to the inverter can be wired from multiple strings of solar modules, as shown
in Figure 3-3. Refer to the NEC for information regarding the use of fuses and fuse holders
as DC disconnects in source circuits. External disconnect switches may be required by local
authorities known as the authority having jurisdiction (AHJ).
© Festo Didactic Inc. 88191-20 17
Trainer Components
Refer to the NEC for information regarding AC disconnects.
Figure 3-4. Wiring of Multiple Inverters.
The inverter requires the installation of several ground connections, as shown in Figure 3-5.
Refer to the NEC for information regarding ground connections. The grounded electrode
conductor (GEC) is a conductor that connects the grounded electrode (also called a ground
rod) to the rest of the electrical grounding system. This point in the grounding system is
commonly located at the chassis of the AC power distribution panel (and the bonded neutral
Trainer Components
18 © Festo Didactic Inc. 88191-20
lead of the AC power source). The metal frames of all solar modules within the solar array,
including mounting racks, are normally connected to the grounding system through an
equipment grounding conductor (EGC). These conductors connect all exposed metal within
the power system to the grounding system, and electrically connect each chassis together,
including the string inverter, AC power distribution panel, and other circuit-breaker boxes,
junction boxes, combiner boxes, and utility (kWh) meters. Surge arrestors can be added to
the DC and AC parts of the system for additional equipment protection, but they do not protect
against a direct lightning strike.
Figure 3-5. Inverter Ground Connections.
Commonly used copper wire insulation colors for DC power are red for positive, white (or gray)
for negative (grounded), black for negative (ungrounded), and green (or green with one or more
2.
© Festo Didactic Inc. 88191-20 19
Trainer Components
Commissioning
•
• Check the polarity of all solar module wiring.
• Check all wiring and labeling for proper installation. Make sure that all electrical
connections and mechanical mounts are secure and weatherproofed.
• Ensure the job site is clean and safe.
•
are within the correct DC voltage range.
•
• Ensure the DC voltage ratings of the circuit protection and inverter input cannot be
exceeded under any circumstances.
• Check and enable the DC disconnect to apply power to the system.
• Check and enable the ground-fault protection.
• Check and enable the AC disconnect to energize the AC loads.
• If available on the string inverter, run the built-in diagnostic test to check for any system
problems, troubleshoot and repair any faults, and reset power.
Maintenance
AC sides of the inverter. The GFDI fuse and string fuses must be checked for proper continuity.
Any inverter cooling fans must be checked for proper operation and kept clean and free of
debris as well.
Utility-Interactive Software
data interface hardware and personal computer software. Digital data can be logged or stored
in computer memory for later analysis by computer programs that can display plotted data in
the form of graphs and charts. In addition, smart grid technology allows the utility company to
monitor energy usage of a residential home or commercial business. This data can be analyzed
and used to control electricity consumption and cost throughout the course of each day.
A typical data monitoring system is shown in Figure 3-6. The router permits digital data
communication between devices within a local area network (LAN) and can also allow
broadband access with a wide area network (WAN). A computer can provide the necessary
Trainer Components
20 © Festo Didactic Inc. 88191-20
data-logging (storage) function, in addition to any data analysis features that may be required
by the system user.
Figure 3-6. Monitoring System.
settings on string inverters and other data communication equipment. Often, remote displays or
the direct connection of sensor outputs.
Hardware and software monitoring tools can vary greatly between different equipment
manufacturers. Below is a list of some common makes and models that are readily available.
Hardware
•
•
•
Software
• Fronius USA SolarNet (solar.access and solar.web)
• SMA America Sunny (Design and Explorer) and Flashview
•
© Festo Didactic Inc. 88191-20 21
Trainer Components
Data acquisition equipment and sensors are used to record, process, store, retrieve, and
features that are commonly available in many of today’s data loggers and monitoring systems:
•
• Energy generation (kWh) – solar yield
• Energy usage (kWh)
• Energy cost savings ($)
• Carbon dioxide (CO2
• Environmental conditions (cell and ambient temperatures, wind speed, and solar irradiance)
The hardware interfaces for transferring the digital data to a computer or microprocessor
for storing, analyzing, and displaying the information can vary greatly. Here is a list of some
common data interfaces that are often available on string inverters, monitoring accessories, and
remote controls.
•
remote monitoring or remote control
• Infrared port (IrDA) for remote control
•
network (WAN)
• Modem port (RJ-11 jack) for transmitting data between the utility company and the
residential power system or sending SMS text messages
•
The latter three interfaces are wired, and require cables to be routed through electrical conduit
or wire trays to distribute the data signals.
Trainer Components
22 © Festo Didactic Inc. 88191-20
Figure 3-7. Remote Display.
Remote data acquisition and power management techniques use specialized computer
Many monitoring systems allow the collected data to be analyzed and displayed on the
Internet and on remote monitors, sent to mobile phones via SMS text messages and personal
computers via e-mail messages, and viewed on other portable wireless devices as well.
Trainer Components
The grid-tie training system consists of the following components. Study the schematic and the
list of parts in Appendices E and F. The explanations below provide a better understanding of
each item’s function or purpose.
© Festo Didactic Inc. 88191-20 23
Trainer Components
Mobile workstation
Figure 3-8. Model 46125 Workstation.
Trainer Components
24 © Festo Didactic Inc. 88191-20
Solar array simulator
manually operated with an adjustable control knob to simulate sunrise and sunset, and includes
a power switch, a power indicator, and meter-ready output test jacks. It is fuse-protected with a
Figure 3-9. Solar Array Simulator (Supplied Assembled).
DC combiner box
bus bar junction point that feeds the string inverter. A safety device is also wired into the box
Figure 3-10. DC Combiner Box.
© Festo Didactic Inc. 88191-20 25
Trainer Components
DC disconnect switch
and local electrical codes). The DC disconnect switch is shown in Figure 3-11.
Figure 3-11. DC Disconnect Switch.
Trainer Components
26 © Festo Didactic Inc. 88191-20
Sunny Boy string inverter
single-phase. It supplies this power to residential loads and to the utility grid (Figure 3-12). The
Figure 3-12. Sunny Boy SB 700U String Inverter.
AC disconnect switch
disconnect the Sunny Boy string inverter from the AC distribution panel per NEC and local
electrical codes (Figure 3-13). A safety device is also wired into the box called an AC lightning
arrestor.
Figure 3-13. AC Disconnect Switch.
© Festo Didactic Inc. 88191-20 27
Trainer Components
AC distribution panel—used to supply AC power to the residential loads. The panel is
installed with four breakers: one for the mains disconnect, one for the inverter disconnect, and
two arc-fault circuit interrupters (AFCIs) for branch load circuit disconnects.
Figure 3-14. AC Distribution Panel.
Residential load outlet boxes—used to plug AC loads and to show the excess power from the
Figure 3-15. Residential Load Outlet Boxes.
Trainer Components
28 © Festo Didactic Inc. 88191-20
Earth ground—connection is used to simulate the ground rod outside a home that grounds the
distribution panel to earth (Figure 3-16).
Figure 3-16. Earth Ground Connection.
Service entrance—used to bring the utility wires (in this case, from a wall outlet) into the
Figure 3-17. Service Entrance.
© Festo Didactic Inc. 88191-20 29
Trainer Components
Digital multimeter (DMM)
simulator to the input of the inverter.
Figure 3-18. Digital Multimeter (DMM).
Power/usage monitor—portable meter for monitoring AC voltage, current, power, and power
Figure 3-19. Power/Usage Monitor.
Trainer Components
30 © Festo Didactic Inc. 88191-20
Lockout/tagout device (with hasp) (2)
Figure 3-20. Lockout/Tagout with Hasp.
Light socket adapters (2)
(Figure 3-21).
Figure 3-21. Light Socket Adapter.
© Festo Didactic Inc. 88191-20 31
Trainer Components
AC incandescent lamp (2)
(Figure 3-22).
Figure 3-22. Incandescent Lamp.
© Festo Didactic Inc. 88191-20 33
Trainer Components
OBJECTIVES
In this job, you will identify and locate the many different components of the grid-tie
training system.
EQUIPMENT REQUIRED
Refer to the Equipment Utilization Chart in Appendix A to obtain the list of equipment
required for this job.
SAFETY PROCEDURES
Before proceeding with this job, complete the following checklist.
You are wearing safety glasses.
You are wearing safety shoes.
You are not wearing anything that might get caught such as a tie, jewelry, or
loose clothes.
If your hair is long, tie it out of the way.
The working area is clean and free of oil.
Your sleeves are rolled up.
Instructor initials:
PROCEDURE
Utilization Chart in Appendix A.
points and electrical ground points of each component, in addition to
any mechanical interfacing between the various devices. Refer to the
schematic diagrams provided in Appendix E.
a sealable plastic bag and label the bag with the part number found in
Appendix A.
Trainer Components
34 © Festo Didactic Inc. 88191-20
Name: _________________________________ Date: ______________________
Instructor approval: ___________________________________________________
If the components are already in storage bags, remove the components
NOTE: You will take the trainer apart after all procedures within the entire Grid-Tie Training System curriculum have been completed. The components must be returned to the storage bags and placed in an area designated by the instructor.
If you are having trouble locating or identifying any components, ask
your instructor for assistance.
Ask your instructor to check and approve your work.