© ABB Group Slide 1 NSP Maritime Link Project ABB Supplier Information Morning Session Presentation Jeff Buckner – ABB Canada Project Manager

Transcript of Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information...

Page 1: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group Slide 1

NSP Maritime Link Project ABB Supplier Information Morning Session Presentation

Jeff Buckner – ABB Canada Project Manager

Page 2: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group September 26, 2014 | Slide 2

~150,000 employees

Present in

countries +100

Formed in

1988 merger of Swiss (BBC, 1891) and Swedish (ASEA, 1883) engineering companies

In revenue (2013)

billion 42 $

NSP Maritime Link Project Introduction to ABB - Our Company

Page 3: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group | Slide 3 February 13, 2014

As one of the world’s leading engineering companies, we help our customers to use electrical power efficiently, to increase industrial productivity and to lower environmental impact in a sustainable way.

NSP Maritime Link Project Introduction to ABB – Our Mission

Page 4: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group | Slide 4 February 13, 2014

NSP Maritime Link Project Introduction to ABB – Five Global Divisions

Page 5: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group Slide 5 PowDoc id

High Voltage Direct Current (HVDC)

Power Semiconductors

Power Cables

Offshore Wind Connections

Consulting

Service and Upgrades

NSP Maritime Link Project Introduction to ABB – Power Systems, Grid Systems

Page 6: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group September 26, 2014 | Slide 6

Transmission and Distribution Substations

T&D Infrastructure and Grid Integration

Solutions Service

Flexible AC Transmission Systems

NSP Maritime Link Project Introduction to ABB – Power Systems, Substations

Page 7: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

Trans. stn

Trans. stn

345 kV AC

230 kV AC

230 kV AC

1 km Underground Cable (Installation Only)

HVDC

HVDC

HVDC Light Converter Stations with AC Substation Bottom Brook, NL Woodbine, NS

3 Transitions stations Cape Ray, NL Point Aconi, NS Woodbine, NS

AC Substation Granite Canal, NL

NSP Maritime Link Project ABB Scope of Work

Page 8: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

Our Commitment – Every ABB employee, as well as those of our suppliers, is responsible for creating a safe, healthy, and environmentally friendly culture which includes strict compliance with EH&S requirements.

Our passion and priority is to ensure everyone's health & safety while sustaining the environment.

NSP Maritime Link Project ABB Environmental, Health, and Safety Expectations

© ABB Group September 26, 2014 | Slide 8

Page 9: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

ABB fully supports the local economic benefits for the Maritime Link project and is committed to all diversity targets established by NSPML.

ABB and all of our subcontractors will provide the following:

Opportunities for workers to self-identify as part of an underrepresented group.

Invite qualified applicants from NS and NL for supply and labor.

Ensure employees attend project orientation.

Immediate investigation of any and all complaints of harassment/discrimination.

NSP Maritime Link Project ABB Local Benefits Commitments

© ABB Group September 26, 2014 | Slide 9

Page 10: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

NSP Maritime Link Project ABB Purchasing Processes

Purchases (Equipment/Material):

Two stage qualification process with second stage only required for major purchases.

Examples of information required in stage two are financial statements, insurance certificates, health and safety records, bonding limits, etc.

Services (Professional):

For subcontracted services prequalification occurs through the global supplier qualification process questionnaire.

© ABB Group September 26, 2014 | Slide 10

Page 11: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

NSP Maritime Link Project ABB Purchasing Processes and Requirements

© ABB Group September 26, 2014 | Slide 11

Potential suppliers of services or components complete the prequalification process.

ABB will send a request for proposal or quotation package to applicable suppliers.

All submittals which meet the commercial terms will be evaluated based on the technical requirements, price, and experience with prior supply.

Suppliers must agree to ABB terms & conditions, which include signing and strictly abiding by the ABB Code of Conduct.

Page 12: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

Environmental and Wildlife Management

Civil and Electrical Engineering Design

Geotechnical and Laboratory Testing

Signage and Jobsite Consumables

Personal Protective Equipment (PPE)

Accommodations for ABB Personnel

Ports of Entry for International Shipments

NSP Maritime Link Project ABB Procurement

Professional and Other Services

© ABB Group September 26, 2014 | Slide 12

Page 13: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

NSP Maritime Link Project ABB Procurement – con’t

Station Service Systems

125 and 48 Volt DC Battery Systems

120 Volt AC UPS Inverter Systems

Diesel Generators and Related Control Equipment

Cables – Control, Power, and Fiber Optic

© ABB Group September 26, 2014 | Slide 13

Page 14: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

NSP Maritime Link Project ABB Procurement – con’t

Other Materials

Galvanized Steel (Lattice, Tubular, and Plate)

Insulators

Tubular Bus, Conductors, Connectors, and Hardware

Outdoor Lighting

Cable Trench

Conduit

© ABB Group September 26, 2014 | Slide 14

Page 15: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

NSP Maritime Link Project ABB Overall Project Schedule

© ABB Group September 26, 2014 | Slide 15

DESIGN

2014 2015 2016 2017

PROCURE

CONSTRUCT

COMMISSION

Page 16: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

NSP Maritime Link Project ABB Supply Chain Contact

Peter Prahalis Supply Chain Manager Email: [email protected] Format email as follows: Subject Line: Maritime Link Project Supplier Interest Body of Email: Company name with contact information Business address Explain the type of supply you are interested in Provide any certifications, registrations, etc. Reference list for similar work/supply

© ABB Group September 26, 2014 | Slide 16

Page 17: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group September 26, 2014 | Slide 17

Page 18: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group September 26, 2014 | Slide 18

Page 19: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group September 26, 2014 | Slide 19

Page 20: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group September 26, 2014 | Slide 20

Page 21: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group September 26, 2014 | Slide 21

Page 22: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

© ABB Group September 26, 2014 | Slide 22

Page 23: Jeff Buckner – ABB Canada Project Manager NSP … Procurement... · ABB Supplier Information Morning Session Presentation . Jeff Buckner – ABB Canada Project Manager ... Slide

NSP Maritime Link Project ABB Closing

ABB is very proud to be a part of this historic project and appreciative of the warm welcome into your communities.

© ABB Group September 26, 2014 | Slide 23