Japan Aerospace Exploration Agency K.Kawate, M. Miyoshi, S. Nakamura and S. Kogure H.Soga and...

26
Japan Aerospace Exploration Agency K.Kawate, M. Miyoshi, S. Nakamura and S. Kogure H.Soga and Y.Hirahara @NEC A.Yasuda and T.Takasu@Tokyo University of Marine Science and Technology The development result of the ground infrastructure for Real time PPP experiment by using QZSS

Transcript of Japan Aerospace Exploration Agency K.Kawate, M. Miyoshi, S. Nakamura and S. Kogure H.Soga and...

Japan Aerospace Exploration AgencyK.Kawate, M. Miyoshi, S. Nakamura and S. Kogure

H.Soga and Y.Hirahara @NECA.Yasuda and T.Takasu@Tokyo University of Marine Science and Technology

The development result of the ground infrastructure

for Real time PPP experiment by using QZSS

PPP WORKSHOP 2013

Outline

Real-time PPP Service via QZSS

Development Status of the Ground Infrastructure for Real-Time PPP Service

- MGM-net (monitoring network)

- MADOCA (Multi-GNSS offline & real-time estimator)

Evaluate Result

- Estimate accuracy of orbit and clock by MADOCA - PPP accuracy with MADOCA products

+ Announcement

PPP WORKSHOP 2013

IntroductionBackground

- Progression of “Multi-GNSS” by increase of positioning satellites

Prediction of visible satellites in 2020

- Expansion of GNSS utilization field

Not only Positioning, Navigation and Timing , But also Applied researches

Real-time PPP service with cm-level accuracy is required!

Today’s Topic“Development of Real-time PPP service using Multi-GNSS via QZSS by JAXA”

- Multi-GNSS monitoring network “MGM-net” - Precise Multi-GNSS orbit and clock estimator “MADOCA” - MADOCA-LEX signal

10    15    20 25   30 35

# of sats

PPP WORKSHOP 2013

Real-time PPP Service via QZSS

QZSS (Quasi-Zenith Satellite System)

PPP WORKSHOP 2013

What’s QZSS

- Sep. 11, 2010 Launch by H-IIA 18th

- June. 22, 2011 Start of public service (L1C/A, L2C)

First Quasi-Zenith Satellite “Michibiki”

Role of “Michibiki” 1)”GPS Availability Enhancement” (L1C/A, L2C, L1C, L5 signal)2) “GPS Performance Enhancement“(L1-SAIF, LEX signal)

Form 6.2m×3.1m×2.9m (Launch)Panel width: 25.3m

Wight App. 4000kg (Launch)

Power App. 5 kW

Orbit Altitude(initial orbit)  

Apogee: App. 39000kmPerigee: App. 33000km

Design Life over 10 years

Service via QZSS ( 1 / 2 )

- Regional Positioning system which can stay near zenith over Japan for many hours - Service area : all over Asia and Oceania region

PPP WORKSHOP 2013

Service via QZSS

Weather ForecastLEO satellite

Car/Human Navigation

Effective field of real-time PPP service via QZSS

Crustal deformation monitoring

Tsunami detectionPrecise Agriculture

Service via QZSS ( 2 / 2 )

- Broadcast of orbit and clock correction message using LEX signal

LEX signal- Center frequency : 1278.75MHz- Transfer rate : 2 kbps- Massage : Some messages broadcasted by time sharing         (JAXA 、 SPAC 、 NICT 、 GSI)

PPP WORKSHOP 2013

Development status of the Ground Infrastructure for Real-Time PPP Service

MGM-net etc.MGM-net etc.

MADOCA

Target accuracy < 10cm (H/V RMS)

PPP users

Development of ground infrastructure for providing real-time PPP service - Target PPP Accuracy in this system is less than 10 cm(H/V RMS)

8

GLONASS Galileo QZSS

・・・

LEX message

LEX message

PPP users

LEX signal

Tracking&Control Station

RTCMSSR

orbit & clockestimator

LEX messagegenerator

RTCM, Raw, BINEX…

NTRIP Caster(provided by BKG)

Data interface

LEXmessage

Master Control Station(MCS)

@Okinawa

@Tsukuba

navigation signal

PPP WORKSHOP 2013

GPS

MADOCA

Development status of the ground infrastructure ( 1 / 7 )

System of Real-time PPP Service

★   JAXA’s (9)●   MGM-net(Hosting) on running (11)●   MGM-net(Hosting) under construction (13)

■ MGM-net(Sharing) (7)▲ MGM-net(Sharing based on agreement) (40)

MGM-net (Multi-GNSS Monitoring network)

Aim of MGM-Net    - Improvement of Multi-GNSS orbit and clock estimate accuracy - Promotion of Multi-GNSS experiment including QZSS ■Please visit  “ MGA” website for detailed → www.multignss.asia

→   Call for Application of JAXA’s Rx hosting sites from 2011

Call for Application continuously untilarranged 60 sites!!

PPP WORKSHOP 2013

Development status of the ground infrastructure ( 2 / 7 )

International Cooperation   - Expansion of Multi-GNSS monitoring network - Cross-check of orbit and clock estimate result  

     →   Plan to participate into IGS M-GEX project

★   JAXA’s (9)●   MGM-net(Hosting) on running (11)●   MGM-net(Hosting) under construction(13)

■ MGM-net(Sharing) (7)▲ MGM-net(Sharing based on agreement) (40)▲   other partner’s (based on agreement) (4)

MGM-net ~ International cooperation (Multi-GNSS Monitoring network)

PPP WORKSHOP 2013

Development status of the ground infrastructure ( 3 / 7 )

International Cooperation   - Expansion of Multi-GNSS monitoring network - Cross-check of orbit and clock estimate result  

PPP WORKSHOP 2013

(Multi-GNSS Advanced Demonstration tool for Orbit and Clock Analysis)MADOCA

Offline Estimate Function Real-time Estimate FunctionPositioning System GPS GLO QZS Gal GPS GLO QZS GalSchedule 2011 2012Estimate Accuracy

Orbit[cm] 3 7 4 9Clock[ns] 0.1 0.25 0.1 0.25

Aim of MADOCA - Estimation of orbit and clock with high accuracy - Multi-GNSS Support (GPS, GLONASS, QZSS and Galileo)

Development - NEC, Tokyo University of Marine Science and Technology and JAXA

Goal - Estimate accuracy comparable to IGS products for RT positioning with < 10cm accuracy

Table. 1 Development Schedule & Target Accuracy

Development status of the ground infrastructure ( 4 / 7 )

PPP WORKSHOP 2013

MADOCA (Multi-GNSS Advanced Demonstration tool for Orbit and Clock Analysis)

Offline Real-Time

Algorithm Iterated Weighted LSQ Dual-Cycle-EKF

Estimated Parameters

Orbit, SRP/Emp-Acc, Clock, Position, ZTD/Grad, Ambiguity, Bias, EOP

NumericalSolver

NEQ by Cholesky Factorization

Numerical StableEKF

Clock Estimation Parameter Eliminationin NEQ

State as White-Noiseor Random-Walk

Integer Ambiguity Resolution

Network AR(Ge., 2005)

Real-Time Network AR

Parameter Adjustment  - Precise orbit & clock estimation using latest models - Reduction of processing time - High Stablity of numeric calculation

Table2 Parameter Adjustment

Development status of the ground infrastructure ( 5 / 7 )

PPP WORKSHOP 2013

Format - Definition of MADOCA-LEX format as MT=12 based on RTCM SSR

MADOCA-LEX

Preamble(8)

Reserved(6)

Message Length(10)

Data Message (Variable)

CRC(24)

Preamble(8)

Reserved(6)

Message Length(10)

Data Message (Variable)

CRC(24)

header(49)

TOW WN SSR Packet#1 (Variable)

SSR Packet#2 (Variable)

Reserved Reed-Solomon

(256)

Data Section(1695)LEX message (2000)

・・・

LEX message

(cf)RTCM SSR

・・・RTCM Message #1 RTCM Message #2

SSR Packet Message Number Update Interval

GPS QZSS Gal GLO

Orbit Correction 1057 1246* 1240* 1063 30sec

Satellite Code Bias 1059 1248* 1242* 1065 1day

URA 1061 1250* 1244* 1067 30sec

High rate Clock Correction 1062 1251* 1245* 1068 2sec

RTCM SSR MT using MADOCA-LEX message (* : draft )

(Multi-GNSS Advanced Demonstration tool for Orbit and Clock Analysis)

Development status of the ground infrastructure ( 7 / 7 )

■Please visit QZSS websites “QZ-vision” → http://qz-vision.jaxa.jp/USE/is-qzss/index_e.html

Please check !

PPP WORKSHOP 2013

Evaluate Result

PPP WORKSHOP 2013

Evaluation of offline estimation

2011/01/01 -12/31 (365 days), wrt IGS Final

GPS & GLONASS estimation   - Comparable accuracy with IGS ACs GPS

GLONASS

QZSS orbit estimation   - <6 cm accuracy on overlap evaluation QZSS

2011/06/04 - 2011/11/03 (153 days), 24 H-overlap

(cf.) Overlap evaluation

48 H 12 H 12 H

Estimation Arc

Overlap Error

Arcs12H 48H   12H

Overlap error

R :2.37cm , A :4.47cm , C :3.21cm, 3D :5.99cm

R

A

C

+1m

-1m

ReportedEvaluation result ( 1 / 6 )

Evaluation of offline PPP

PPP WORKSHOP 20132013/01/13 -1/20 (8 days), RTKLIB2.4.1b12, wrt PPP-static using IGS Final

Offline PPP around Asia and Oceania area using MADOCA offline products   - Offline PPP accuracy of enough less than 10cm !!

Average 3.8cm (HRMS) 5.6cm (VRMS)

Evaluation result ( 2 / 6 ) Reported

PPP WORKSHOP 2013

RNXSVR MGRTE RTKPOST2.4.2

MGEST

RT DataSimulator

( x 60)

2012/1/31RINEX OBS

RINEX NAV

TCP:RTCMMSM(30 s)

SINEX

2012/2/1~RINEX OBS

RINEX NAV

RINEX OBS/NAV

PPP solutions

RTCM SSR

EXTSYNC: SYNCTINT_CLK: 30 s

TINT: 300 sEST: OBT, CLK, EOP,

AMB, BIASFIX: POS

POS, STAINF

RT-StreamFile

Architecture

Orbit Error (Radial/Along/Cross)

Clock Error

R: 1.52 cm/ A: 2.49 cm/ C: 1.81 cm3D: 3.44 cm

STD: 0.114 ns / RMS:0.184ns

Simulated*1 GPS real-time estimation (1/2)   - Achievement of orbit accuracy of < 4 cm and clock accuracy of ~ 0.1 ns

2012/2/1 - 2/14 (14 days), 31 GPS satellites wrt IGS Final(* First 24H and unhealthy G14 excluded)

Evaluation result ( 3 / 6 )

Evaluation of simulated RT estimation

*1 : Evaluation of real-time estimator using simulated real-time data based on RINEX

Simulated GPS real-time estimation (2/2)   - Achievement of PPP accuracy of enough less than 10 cm

18

RMS *E: 1.93 cmN: 1.46 cm U: 3.91 cm

RMS *E: 1.80 cm N: 1.42 cm U: 3.25 cm

with Simulated MADOCA Clock/OrbitE

N

U

+0.2m

-0.2m

PPP WORKSHOP 201318

2012/2/2 - 2/14 (13 days), RTKPOST2.4.2, wrt IGS Final POS (* First 1H excluded) @TKSB

with IGS FINALE

N

U

+0.2m

-0.2m

Evaluation result ( 4 / 6 )

Evaluation of simulated RT PPP

JAXA’s (8) Other partner’s (5)

Ground Test of RT estimator (1/2)  - Ground Test of real-time estimator via NTRIP caster using MGM-net and IGS/MGEX sites

MGM-net (5)

PPP WORKSHOP 2013

IGS/MGEX (21)

Evaluation result ( 5 / 6 )

Evaluation of RT estimation

Sharing (7)

Evaluation of RT PPP

E-W

N-S

U-D

Ground Test of RT estimator (2/2)  - Achievement of PPP accuracy of < 10 cm using only GPS

PPP WORKSHOP 2013

E-W

N-S

U-D

+0.5m

-0.5m

10cm

10cm

RMSE: 2.51 cmN: 2.20 cmU: 7.57 cm

RMSE: 6.02 cmN: 3.75 cmU: 9.61 cm

2013/5/20 9:00-21:00 (12h), RTKLIB2.4.2,1Hz, wrt IGS Final POS

Evaluation result ( 6/ 6 )

with Real Time IGS

with Ground Test MADOCA

PPP WORKSHOP 2013

Announcement

Experiment Schedule

Please see “Experiment Schedule” on QZ-vision because LEX signal is on test.

Announcement ( 1 / 3 )

PPP WORKSHOP 2013

START of Test BroadcastTest Bradcast

- Start of MADOCA-LEX signal broadcast via “QZSS” on a trail !! 1st April 11 - April 13 2nd April 26 - May 3 3rd May 28 - June 1 On Test June 9 - June 15

■Please visit QZSS websites “QZ-vision” → http://qz-vision.jaxa.jp/USE/en/exp_schedules

Please check here!

START of Test BroadcastAnnouncement ( 2 / 3 )

E-W

N-S

U-D

+0.5m

-0.5m

PPP using MADOCA-LEX  - Achievement of PPP accuracy of ~ 10 cm using GPS+QZS

PPP WORKSHOP 2013

10cm

RMSE: 3.54cmN: 1.99 cmU: 13.10 cm

2012/5/30 12:00:00-23:59:59(12 hours),RTKLIB2.4.2, 31 GPS+QZS satellites, wrt PPP-static, IGS Final POS @NCKU

MGM-netIGS/MGEX

LEX msg.

MCS

@Okinawa@Tsukuba

MADOCALEX message

generator

JAXA’sLEX receiverSSR

RTCMBINEXRAW

LEX sig.

SSRorbit&clockestimator

with MADOCA-LEX

Architecture

8:30 Ottawa8:30 Tsukuba

QZSS

START of Test BroadcastAnnouncement ( 3 / 3 )

Demonstration of PPP using MADOCA-LEX

PPP WORKSHOP 2013

MGM-netIGS/MGEX

LEX msg.

MCS

@Okinawa@Tsukuba

MADOCALEX message

generator

JAXA’sLEX receiverSSR

RTCMBINEXRAW

LEX sig.

SSRorbit&clockestimator

Architecture

Please see PPP using MADOCA-LEX !

PPP WORKSHOP 2013

SummaryDevelopment status of ground infrastracture real-time PPP service

‐ MGM-net : Expansion of Multi-GNSS Monitoring Network   (84 sites) - MADOCA : Development of Multi-GNSS orbit and clock estimator with high accuracy

Achievement of “real-time” PPP service with < 10 cm (H/VRMS) accuracy on ground test

Future Plan - Evaluation of long-term stability of real-time estimator - Function addition for higher accuracy (PPP-AR, BeiDou etc.)   →  We aim to join IGS analysis centers in the future! - Start of regular broadcast of MADOCA-LEX signal

We look forward to providing real-time PPP service via QZSS!!

PPP WORKSHOP 2013

Thank you for your attention!!