January 2 3, 2011 - Edl · January 2 MEETING DSA Pre-A Horace M Beverly H Project 1 MEETING Decemb...
Transcript of January 2 3, 2011 - Edl · January 2 MEETING DSA Pre-A Horace M Beverly H Project 1 MEETING Decemb...
January 2 MEETING DSA Pre-AHorace MBeverly HProject 1 MEETING Decemb MEMBERS Douglas Ron VaugCheng-MFernandoCharles (Julio PalaRobert J. PURPOSE The purprelated q ITEMS DIS Structura
1. Th
2. WP
23, 2011
MINUTES
Application Mann SchooHills Unified Sc110102.01
DATE:
ber 19, 2011 -
S PRESENT:
Humphrey, Sghn, Senior A
Ming (C.M.) Lo Cervantes(Yuan) Chenacio, Program Uribe, Senio
OF MEETING
ose of the mquestions for
SCUSSED/RES
l Safety que
he meeting
WLC Architecre-Applicatio
a.
Meeting ol New Classrchool District
- 9:00 a.m. –
Supervising AArchitect, DiLin, S.E., Ph.D, Fire and Lif
n, LEED AP, Am Manager,
or Project Ma
G:
meeting was DSA’s confir
SOLVED:
stion session
began with
cts began won Meeting
DSA confirthe design
room Wing at
11:30 a.m.
Architect, Diivision of the
D., Senior Strue Safety Offi
Architect, Div, Bernards Buanager, WLC
to provide Wrmation on t
n:
formal introd
ith the Structform.
rmed that thn of the park
and Sitework
vision of thee State Archituctural Enginicer 1, Divisio
vision of the Suilding ManaC Architects,
WLC Architehe Horace M
ductions from
tural Questio
he Structural king structure
k
State Archittect
neer, Divisionon of the StaState Architeagement Se, Inc.
cts an oppoMann Schoo
m each of th
on listed on t
Engineer of e and two-st
tect
n of the Stateate Architectect rvices
ortunity to asol New Class
he attendee
the attache
Record shaory classroo
e Architect t
sk specific coroom Wing.
es.
d DSA
ll use I = 1.25m building.
ode
5 for
DSA Pre-Application Meeting Horace Mann School New Classroom Wing and Sitework Beverly Hills Unified School District Project 1110102.01 January 23, 2012 Page 2 b. WLC presented a question regarding required wind design exposure for use on this
project. See attached e-mail from IDS Group dated January 18, 2012. DSA replied to the question with an e-mail to WLC. See attached e-mail from DSA dated January 19, 2012.
Fire/Life Safety question session:
1. WLC Architects continued the meeting with the Fire/Life Safety question regarding exiting through an intervening room. DSA reviewed a typical classroom pod within the new Horace Mann School Classroom Wing and had questions about the use of the intervening room. WLC explained that the intervening room would only be used by the occupants of the surrounding classrooms. DSA will permit exiting through the intervening room but asked for a change in the flooring finish material to clearly demarcate the exiting path of travel for the intent to keep it clear of movable furniture.
2. DSA asked to have an exiting analysis included as part of the contract documents for their
review.
3. DSA requested a letter from the District stating the types of chemicals that will be housed in the Science Labs and Storage Rooms for their review.
Access Compliance question session:
1. DSA will expect to see the necessary provisions to make the main entrances of Building A accessible.
2. The Basement Storage/Mechanical/Electrical Rooms of Building A do not need an elevator as long as storage rooms are provided on the first and second floors for the students and teachers to access.
DSA Processing question session
1. Demolition Drawings for the Rotunda and Middle School need not be submitted to DSA if there are no changes being made to the existing exterior pedestrian traffic surfaces.
2. DSA will permit an in-person intake meeting with the intake architect for the plan review submittal of this project.
3. DSA asked that each new project for this campus generate its own DSA Application number and be self-reliant without relying upon work of a future DSA Application to make itself complete and code compliant.
DSA Pre-AHorace MBeverly HProject 1January 2Page 3 NEXT MEE The next to being by DSA. END OF M The abovme know Prepared ROBERT JSenior Pro RJU:rg/P0 Enclosure
cc: M N P
Sa Ja
Application Mann SchooHills Unified Sc110102.01 23, 2012
ETING
meeting will 50% comple
MEETING MIN
ve representw of any requ
d by,
J. URIBE oject Manag
01110102x5-m
e: DSA PIDS GrDSA e
Members PreNelson Cayab
atrick Cisneraid Hilmy, PEames P. DiC
Meeting ol New Classrchool District
l be schedulete. The SEO
NUTES
ts my best intuested modi
ger
mm
Pre-Applicatiroup e-mail d
e-mail dated
sent byab, Directros, Project ME, SE, Principaamillo, Arch
room Wing at
led when theR will attend
terpretation ifications or c
on Meeting dated Janua
d January 19
tor of FacilitieManager, Beal Structural itect, AIA, LE
and Sitework
e Design Ded the next DS
of the spirit acorrections a
Request Forary 18, 2012 , 2012
es, Beverly Heverly Hills Un Engineer, PhEEDTM AP, Pre
k
evelopment SSA pre-appli
and contenas soon as p
rm Dated Ja
Hills Unified Scnified Schooh.D., Integraesident, Princ
Structural Drcation meet
t of the discupossible.
anuary 19, 20
chool Districl District ted Design Scipal, WLC A
rawings are cting as reque
ussions. Plea
012
t
Services, IncArchitects, In