IWMP (2009-10) - I (BHAMOLAV)
Transcript of IWMP (2009-10) - I (BHAMOLAV)
GOVERNMENT OF RAJASTHAN
OFFICE OF ASSISTANT ENGINEER (PIA) I.W.M.P
PANCHYAT SAMITI- ARAIN (AJMER)
IWMP (2009-10) - I (BHAMOLAV) Block :- Arain District :- Ajmer Project Area :- 5840 ha.
Project Cost :- Rs. 700.80 Lacs Convergence Cost :- 364.89 Rs.
Total Cost :- 1065.64 Rs. Lacs -SUBMITTED BY-
PROJECT MANAGER
DISTRICT WATERSHED DEVELOPMENT UNIT
AJMER (Rajasthan) 305901
1111 Introduction Cheptar :-Introduction Cheptar :-Introduction Cheptar :-Introduction Cheptar :-1.1 Project Back ground
Name of Project:- BhamolavMacro No:- 3&4
Micro No:- 14,15,16,17,18 &1,2,
Table No 1.1.1 :- Project Beck groundDigree Minut Digree Minut
Latitude:- 26 5 To 27 58
Longitude:- 74 27 To 74 29
Total Project Area 5840 Ha.
Total Project area 5840 Ha is Proposed to be treated under Intrigated watershed Menagement Programme
Location:-
Nearest town:- Arain
Tahesil:- Kishangarh
Distt:- Ajmer
Social:-
Major cast:- Jat ,Gujar ,Rajput, Other
The livelihood of these people is based on rainfed agriculture,dairy, and
Distance from watershed
8 Km
28 Km
65 Km
The livelihood of these people is based on rainfed agriculture,dairy, and
sheep rearing,
1.2 Detail of Area covered
Table No 1.1.2 :- Basic Project InformationName of Gram
Panchyat
Bhamolav Arain Sandolia Chota lamba
Area covered 2555 685 1395 1205
Cost in Lakhs 306.60 82.20 167.40 144.60
Bhamolav
Arain
Sandolia
Chota lamba
1.31.31.31.3 Detail of Area to be treated in different Grampanchyat wise and village wiseDetail of Area to be treated in different Grampanchyat wise and village wiseDetail of Area to be treated in different Grampanchyat wise and village wiseDetail of Area to be treated in different Grampanchyat wise and village wise
Name Census code
1 Bhamolav Bhamolav 2498000 Kishangarh Ajmer 20322 Bhamolav Dang 2498200 Kishangarh Ajmer 523
Bhamolav Total GP 2555 306.603 Arain Arain 2497100 Kishangarh Ajmer 685
Arain Total GP 685 82.20
4 Sandolia Sandolia 2498400 Kishangarh Ajmer 1395Sandolia Total GP 1395 167.40
5 Chota lamba Chota lamba 2497000 Kishangarh Ajmer 1205Chota lamba Total GP 1205 144.60
5840 700.80
DistVillage
Table No 1.1.3 :- Basic Project InformationTable No 1.1.3 :- Basic Project InformationTable No 1.1.3 :- Basic Project InformationTable No 1.1.3 :- Basic Project Information
PIA
Total
Project
cost
So.NoName of
Project
AEN PS
ARAIN
Tahesil
Area
Proposed
to be treted
Total IWMP- Ist (BHAMOLAV) PROJECT
Name of gram
panchayat
IWMP
Bhamolav
5840 700.80
So.NoName of
Project
Name of gram
panchayatVillage Macro No Micro no
Proposed
for
Treatment
Bhamolav Bhamolav 4 1 1512
Bhamolav Bhamolav 4 2 520
Bhamolav Dang 3 18 523
Total Macro 4/1,2,3/18 2555
Arain Arain 3 14 200
Arain Arain 3 15 485
Total Macro 3/14,15 685
Chota lamba Chota lamba 3 16 1205
Total Macro 3/16 1205
Sandolia Sandolia 3 17 1395
Total Macro 3/17 1395
Total Watershed Area 5840
IWMP
BHAMOLAV
1
Table No 1.1.4:- Macro Micro InformationTable No 1.1.4:- Macro Micro InformationTable No 1.1.4:- Macro Micro InformationTable No 1.1.4:- Macro Micro Information
Total IWMP- Ist (BHAMOLAV) PROJECT
Total Watershed Area 5840
Table No 1.1.5:- Mecro Micro Information Village Wise
4/1 4/2 3/18 3/14 3/15 3/16 3/17 Total
1 Bhamolav Bhamolav 1512 1512 1512
2 Bhamolav Bhamolav 520 520 520
3 Bhamolav Dang 523 523 523
2555 1512 520 523 0 0 0 0 2555
4 Arain Arain 200 200 200
5 Arain Arain 485 485 485
685 0 0 0 200 485 0 0 685
6 Chota lamba Chota lamba 1205 1205 1205
1205 0 0 0 0 0 1205 0 1205
7 Sandolia Sandolia 1395 1395 1395
1395 0 0 0 0 0 0 1395 1395
5840 1512 520 523 200 485 1205 1395 5840
S.No. Gram
Panchya
Name of
Village
Area Area Covered in Macro/Micro
Table No 1.1.6 Detail of Area Macro/Micro wise
GP Bhamolav
GP Arain
GP Chota lamba
GP Sandolia
G Total
Macro/Micro 4/1 4/2 3/18 3/14 3/15 3/16 3/17 TotalArea 1512 520 523 200 485 1205 1395 5840
Digram :- 1.1.1 Micro Wise
26%
9%
9%
3%8%
21%
24%
0%
Detail of Area Macro/Micro Watershed4/1 4/2 3/18 3/14 3/15 3/16 3/17
1.2 Institutional arrangements 1.2 Institutional arrangements 1.2 Institutional arrangements 1.2 Institutional arrangements 1.2.1 State leval nodal agency (SLNA) :-
As per guide line pera no.- 4.4 state Govt.of Rajasthan constituted. State level Nodal agency (SLNA).
chairman of SLNA is Aditional chief Secretary (dovelopment) & member Secretary is Director watershed (CEO).
SLNA
Member secretary Post :- CEO
Designation & Address :- Director watershed dovelopment & Soil Conservation
Teliphone No. :- 0141 - 2227189
Fax No. :- 0141 - 2227858
E - mail :- dir_ wdsc @ dataone.in.
1.2.2 Dristict watershed development unit (DWDU) :-As per guide line pera no. 4.5 / 29 SLNA appointed District watershed development unit
at District level. Project menager of DWDU is XEn watershed at district level.
Detailes of DWDU
Designation & Address Project menager DWDU X En. Watershed Ajmer
(ii) Telephone 1452641329
(iii) Fax
(iv) E-mail [email protected].
1.2.3 Project Implementing agency
Tabel no. 1.2.1 :- Detaile of PIATabel no. 1.2.1 :- Detaile of PIATabel no. 1.2.1 :- Detaile of PIATabel no. 1.2.1 :- Detaile of PIA
Sr. No. Names of projectIWMP Bhamolav Designation & Address A.En. watershed
development & soil
consvetion Arain
(Ajmer).
(ii) Telephone 01463281123
(iii) Fax 01463281123
(iv) E-mail [email protected]
1.2.4 1.2.4 1.2.4 1.2.4 Watershed Development Team (WDT)
The WDT is an integral part of PIA and was been set up by the PIA.
Tabal no. 1.2.2 Staff at PIA level
Sr.no. Name Age Sex Designation Qualificatiion Specilization Job assigned Monthly
remuneration
1 Mukesh Lohar 24 M WDT( Eng.) Diploma in civil Engineer Eng.measures 10000
2 Maloo Ram Meena 25 M Wdt (Agri) M.sc. (Ag) AgricultureAgri.
Development10000
3Smt. Rekha
Choudhary32 F WDT(Sociology) M.A.(Sociology) Social
Community
Development8000
4 Jogendra Singh 31 M WDT(Vetinary)LSA Diploma 2
YearVeterinary
Veterinary
Development8000
Details of PIA
1.2.5 Watershed Committee (WC)Watershed Committee (WC)Watershed Committee (WC)Watershed Committee (WC)
Total area of the watershed 5840 ha. Comprise of seven Gram Panchayat namely Bhamolav, Arain, Sandolia, Chota Lamba
A separate watershed committee constituted for each Gram Panchayat.
As per circular F 18 (I 38) IWMP / WC 2009-10 / 78-248 Dated 28-4-10 Watershed dept. Directed that watershed committee
will be formed on basis of gram panchayat not village level.
The Gram sabha of each Garam Panchayat constituted users groups, slef-help groups and watershed committee.
Table 1.2.3Table 1.2.3Table 1.2.3Table 1.2.3
Sr.no.
1
2
3
4
1 2 3 4 5 6 7 8 9 10 11
S.N.
Name of
the
Districts
Name of
projects
Name of
WCs
Date of
Registration
as a Society
(dd/mm/yyyy
Designation Name M/F Category UG/SHGEducational
qualification
1 Ajmer Chairman Sh.Satya Narayan Batesar/ Sh. Ram karan M OBC SHG 8Th
Secy Sh. Brijraj Singh / Sh. Madan Singh M GEN Other BA
Member Sh. Uda Ram / Sh. Gopi Gurjar M OBC UG Litreate
Member Sh Shiv Raj / Sh. Ram karan Khatik M SC UG Litreate
Member Sh. Shambhoo Singh / Sh. Ratan Singh M GEN UG Litreate
Member Sh. Jugdish / Sh. Ram Lal Khati M OBC UG Litreate
Member Sh. Bhagwan Singh / Sh. Ganga Singh M GEN UG Litreate
Member Sh. Prahlad / Sh. Nahru Gurjar M OBC SHG Litreate
Member Sh. Kailash / Sh. Ram Nivas Sharma M GEN SHG Litreate
Member Sh. Hari Ram / Sh. Chandra Jat M OBC SHG Litreate
Member Sh. Lala / Sh. Ram Chandra Bairwa M OBC SHG Litreate
Member Sh. Mahaveer / Sh. Bansi Das Sadhu M OBC UG Litreate
Member Smt. Canda / Sh. Mangi Lal Bairwa F SC SHG Litreate
Member Smt. Teeja / Sh.Ram Pal Gusai F SC SHG Litreate
Member Smt. Kamla / Sh. Dhanna Jat F OBC SHG Litreate
Member Smt. Kishni / Sh. Ramdev Jat F OBC SHG Litreate
Member Sh. Jogendra Singh /Sh. Ganpat Singh M GEN Other 12 th
Gram Panchayat Date of Gram Sabha
Sandolia 16/06/2010
Chota lamba 25/06/2010
Bhamolav 17/6/2010
Arain 21/06/2010
Table- 1.2.4 :- Details of Watershed Committees (ws) BhamolavTable- 1.2.4 :- Details of Watershed Committees (ws) BhamolavTable- 1.2.4 :- Details of Watershed Committees (ws) BhamolavTable- 1.2.4 :- Details of Watershed Committees (ws) Bhamolav
BHAMOLAV
IWMP WS BHAMOLAV
342/Ajmer/
2010-11
Date 24-02-
2011
1 2 3 4 5 6 7 8 9 10
S.N. Name of
the Districts
Name of
projects
Name of
WCs
Date of
Registration as a
Society
Designation Name M/F
Category Name of UG/SHG
Chairman Sh. Ram dev / Sh.Chittar mali M OBC SHG
Secratary Sh. Kamlesh / Sh. Mahaveer Gaur M GEN Other
Member Sh. Om Prakash / Sh. Ramdhan Mali M OBC UG
Member Sh. Ratan Lal / SH. Ridh Karan Bhil M ST UG
Member Sh. Banwari / Sh. Raju Puri M OBC UG
Member Smt. Arti / Sh. Raghvendra F GEN SHG
Member Sh. Hanuman / Sh. Nanda Jat M OBC SHG
Member Sh. Prahlad / Sh. Narayan Jat M OBC SHG
Member Sh. Damodar / Sh Dhanna Regar M SC UG
Member Smt. Ratni / Sh. Gheesa Regar F OBC SHG
Member Smt Kamla /Sh Kalu Keer F SC SHG
Member Sh.Jogendra Singh / Sh.Ganpat Singh M GEN Other
1 2 3 4 5 6 7 8 9 10
S.N. Name of
the
Districts
Name of
projects
Name of
WCs
Date of
Registration
as a Society
Designatio
n
Name M/F
CategoryName of
UG/SHG
Chairman Sh. Ramgopal / Sh. Ramnath Jat M OBC SHG
Secratary Sh. Dinesh Chand / Sh. Ram Lal Soni M OBC Secretery
Member Sh. Prakash Chandra / Sh.Trilok Chandra Jain M GEN UG
Member Sh. Rama / Sh. Ladu Balia M SC UG
Member Smt. Guman / Sh.Narayan Goswami F OBC SHG
Member Sh. Ramdev /Sh. Raghunath Jat M OBC UG
Member Sh. Vishram / Ramkaram Jat M OBC UG
Member Smt. Geeta / Sh Deva Gurjar F OBC SHG
Member Smt Lada / Sh. Hari Bagria F ST SHG
Member Sh.Ganesh / Sh. Chotu Jat M OBC SHG
Member Sh. Madan / Sh. Bhima Harijan M SC SHG
Member Sh. Jogendra Singh / Sh. Ganpat Singh M GEN Others
Table- 1.2.5 :- Details of Watershed Committees (ws) ArainTable- 1.2.5 :- Details of Watershed Committees (ws) ArainTable- 1.2.5 :- Details of Watershed Committees (ws) ArainTable- 1.2.5 :- Details of Watershed Committees (ws) Arain
1 AjmerIWMP WS
BhamolavARAIN
183/Ajmer/
2010-11
Date 18-09-
2010
Table- 1.2.6 :- Details of Watershed Committees (ws) Chota LambaTable- 1.2.6 :- Details of Watershed Committees (ws) Chota LambaTable- 1.2.6 :- Details of Watershed Committees (ws) Chota LambaTable- 1.2.6 :- Details of Watershed Committees (ws) Chota Lamba
1 AjmerIWMP WS
Bhamolav
Chota
Lamba
182/Ajmer/
2010-11
Date
15-09-2010
11
Educational
qualification
8th
12th
10th
5th
Litreate
10 th
Litreate
Litreate
Litreate
Litreate
Litreate
12 th
11
Education
al
qualificatio
n12Th
12 th
12 th
5Th
8Th
5Th
BA
8 Th
Litreate
Litreate
5th
12 th
1 2 3 4 5 6 7 8 9 10 11
S.N. Name of
the
Districts
Name of
projects
Name of
WCs
Date of
Registration as
a Society
Designation Name M/F
Category Name of UG/SHG
Educational
qualification
Chairman Sh. Sajjan Singh/ Sh Mangal Singh M Gen. SHG 12Th
Secratary Sh. Ramraj/ Sh Ridh Karan Jat M OBC Others 12Th
Member Sh Shri Kishan / Sh Bhagirath Jat M OBC UG 12Th
Member Sh Ramesh / Sh Ram Gopal Shahu F OBC SHG 10Th
Member Smt. Hema / SH Ramdhan Balai F SC SHG 5th
Member Smt. Lali / SH Mani Ram Chunia F OBC SHG 4Th
Member Smt. Kamla / Sh Madan Lal Riyad M OBC UG 3rd
Member Sh. Kasra / Sh Ladu Berwa M SC UG 8 Th
Member Sh. Rameshwar / Sh Ramkaran M SC SHG Litreate
Member Sh. Hari Ram / Sh Deva Ram Jat M OBC SHG 12Th
Member Sh. Umrao / Sh Ramdhan M OBC UG 4Th
Member Sh. Raghunath / Sh Ram Chandra M OBC UG 4Th
Member Sh Jogendra Singh / SH Ganpat Singh M Gen. Others 12 TH
Table- 1.2.7 :- Details of Watershed Committees (ws) SANDOLIATable- 1.2.7 :- Details of Watershed Committees (ws) SANDOLIATable- 1.2.7 :- Details of Watershed Committees (ws) SANDOLIATable- 1.2.7 :- Details of Watershed Committees (ws) SANDOLIA
1
AjmerIWMP WS
BhamolavSandolia
128/Ajmer/
2010-11
1.2.61.2.61.2.61.2.6 Secretary Watershed CommitteesSecretary Watershed CommitteesSecretary Watershed CommitteesSecretary Watershed Committees
1 Convening meeting of the Gram Sabha, Gram Panchayat, Watershed Committee for facilitating the decision making processes in the
context of Watershed Development Project.
2 Taking follow up action on all decisions.
3 Maintaining all the records of project activities and proceedings of the meetings of gram panchayat, WC, and other institutions for watershed
development project.
4 Ensuring payments and other financial transactions.
5 Signing the cheques jointly with the WDT nominee on behalf of the watershed Committee.
1.3 :-1.3 :-1.3 :-1.3 :- Present status of land usePresent status of land usePresent status of land usePresent status of land useOut of 5840 ha. Of watershed area cultivators are farming on only 4649 Ha.for Production. Govt. land and Panchayat land
1191 Ha.not used for cultivation & pasture development.
Table No 1.3.1 :- Present status of land useTable No 1.3.1 :- Present status of land useTable No 1.3.1 :- Present status of land useTable No 1.3.1 :- Present status of land use
Non arable land TotalName of Arabel Land
Irrigated UnIrrigated Total DLT Pasture communi
ty land
Other Total
Ha. Ha. Ha. Ha. Ha. Ha.
BHAMOLAV 2692.00 1767.00 4459.00 190.00 1191.00 0.00 0.00 1381.00 5840.00
Non arable land TotalName of
Project
Arabel Land
0
500
1000
1500
2000
2500
3000
3500
4000
4500
Arabel Land Non arable
land
Series1
Series2
Series3
Table No 1.3.2:- Present status of land useTable No 1.3.2:- Present status of land useTable No 1.3.2:- Present status of land useTable No 1.3.2:- Present status of land use
Total
Irrigated UnIrrigated Total DLT Pasture
community
land Other
Ha. Ha. Ha. Ha. Ha. Ha. Ha.
1 Bhamolav Bhamolav 4 1 652.00 435.00 1087.00 60.00 365.00 0.00 0.00 425.00 1512.00
2 Bhamolav Bhamolav 4 2 287.00 190.00 477.00 0.00 43.00 0.00 0.00 43.00 520.00
3 Bhamolav Dang 3 18 272.00 181.00 453.00 0.00 70.00 0.00 0.00 70.00 523.00
1211.00 806.00 2017.00 60.00 478.00 0.00 0.00 538.00 2555.00
4 Arain Arain 3 14 30.00 23.00 53.00 10.00 137.00 0.00 0.00 147.00 200.00
5 Arain Arain 3 15 60.00 50.00 110.00 120.00 255.00 0.00 0.00 375.00 485.00
90.00 73.00 163.00 130.00 392.00 0.00 0.00 522.00 685.00
6 Chotalamba Chotalamba 3 16 655.00 437.00 1092.00 0.00 113.00 0.00 0.00 113.00 1205.00
655.00 437.00 1092.00 0.00 113.00 0.00 0.00 113.00 1205.00
7 Sandolia Sandolia 3 17 736.00 451.00 1187.00 0.00 208.00 0.00 208.00 1395.00
736.00 451.00 1187.00 0.00 208.00 0.00 0.00 208.00 1395.00
2692.00 1767.00 4459.00 190.00 1191.00 0.00 0.00 1381.00 5840.00
Arabel Land Non arable land
Total non
arable
S.N.
Name of
villageMacro no Micro noName of GP
1 Bhamolav Bhamolav 2032
2 Bhamolav Dang 523
3 Arain Arain 685
4 Chota Lamba Chota Lamba 1205
Detail of Area covered by Different Villages
Name of gram
panchayatName of Village
Area Covered in
Ha.S.No.
Bhamolav
35%
Dang
9%Arain
12%
Chota Lamba
20%
Sandolai
24%
Area Covered in Ha.
5 Sandoliia Sandolai 1395
Total 5840
1.4 :- Rain water storage1.4 :- Rain water storage1.4 :- Rain water storage1.4 :- Rain water storageThere is no water body except Nadi for water harvesting.Nadi in watershed area is not well maintained and not meneged
by the villegers.NREGS planed to excavated but water menegement is required.
Table No 1.4.1 :- Rain water storegeTable No 1.4.1 :- Rain water storegeTable No 1.4.1 :- Rain water storegeTable No 1.4.1 :- Rain water storege
S.N.Name of Gram
PanachyatName of village No of Nadi Anicut Khadeen Talab
Check
damDam
Common
Well
No. of
Hand
Pump
1 BHAMOLAV BHAMOLAV 5 1 0 1 0 0 5 9
2 BHAMOLAV DANG 2 0 0 1 0 0 2 4
3 ARAIN ARAIN 3 0 0 1 0 0 5 19
4 CHOTA LAMBA CHOTA LAMBA 5 0 0 1 0 0 4 8
5 SANDOLIA SANDOLIA 3 1 0 1 0 0 4 6
Total 18 2 0 5 0 0 20 46
1.5 :- Erosion status in project Area1.5 :- Erosion status in project Area1.5 :- Erosion status in project Area1.5 :- Erosion status in project AreaProject Area is effected by water erosion & wind erosion both.such that loss of soil fertility take place every year.
Production depleting year by year.
It is major problem of watershed
a Sheet 4700
b Rill 1000
c Gully 140
0 NA
23547
Table no.1.5.1 :- Erosion status in project Area
Cause
Type of
erosion
Average
soil loss
(Tonnes/
ha/ year)
Run
off(mm/
year)
Total for project
Wind erosion
Sub-Total
Water erosion
Area
affecte
d (ha)
1.6 Socio economic status :-1.6 Socio economic status :-1.6 Socio economic status :-1.6 Socio economic status :- Economy of farmers of project area is based on cultivation. Due to erosion & scanity of rainfall.
economic condition of farmers are very poor.
Table no. 1.6.1 Socio economic status and Population
APL BPL SC ST Total Male Female Child Total
1 BHAMOLAV BHAMOLAV 478 58 141 0 536 1201 1171 594594594594 2966
2 BHAMOLAV DANG 191 26 28 0 217 514 507 264264264264 1285
669 84 169 0 753 1715 1678 858 4251
3 ARAIN ARAIN 1024 165 273 86 1189 2817 2746 1034103410341034 6597
1024 165 273 86 1189 2817 2746 1034 6597
4 SANDOLIA SANDOLIA 352 42 86 0 394 1241 1097 638638638638 2976
352 42 86 0 394 1241 1097 638 2976
5 CHOTA LAMBA CHOTA LAMBA 607 74 134 0 681 2203 2161 871871871871 5235
607 74 134 0 681 2203 2161 871 5235
2652 365 662 86 3017 7976 7682 3401 19059
Total FamilyName of GP PopulationS.No. Name of Village
No Area No Area No Area No. Total
1 BHAMOLAV BHAMOLAV 112 174 0 0 370 1390 482 1564
2 BHAMOLAV DANG 22 34 0 0 171 419 193 453
134 208 0 0 541 1809 675 2017
3 ARAIN ARAIN 68 37 21 16 267 110 356 163
68 37 21 16 267 110 356 163
4 SANDOLIA SANDOLIA 68 105 0 0 270 1082 338 1187
68 105 0 0 270 1082 338 1187
5 CHOTA LAMBA CHOTA LAMBA 107 166 0 0 478 926 585 1092
107 166 0 0 478 926 585 1092
Total 377 516 21 16 1556 3927 1954 4459
Name of Gram
panchyat
SC STName of village TotalGeneralS.No
Big
farmer Area MF Area
Small
farmer Area
1 BHAMOLAV BHAMOLAV 6 96 216 1036 260 432
2 BHAMOLAV DANG 3 52 65 260 125 141
9 148 281 1296 385 573
3 ARAIN ARAIN 2 12 37 88 317 63
2 12 37 88 317 63
4 SANDOLIA SANDOLIA 4 32 174 942 160 213
4 32 174 942 160 213
5 CHOTA LAMBA CHOTA LAMBA 4 41 263 715 318 336
4 41 263 715 318 336
19 233 755 3041 1180 1185
farmers of unirrigated land. Education status of villegers are very poor.
S.No Name of Gram
panchyat
Name of village Detail Of Farmers category
Digrame no :- 1.6.1 No. Hausehold CultivatorsDigrame no :- 1.6.1 No. Hausehold CultivatorsDigrame no :- 1.6.1 No. Hausehold CultivatorsDigrame no :- 1.6.1 No. Hausehold Cultivators Digrame no :- 1.6.2 Total Area CultivatorsDigrame no :- 1.6.2 Total Area CultivatorsDigrame no :- 1.6.2 Total Area CultivatorsDigrame no :- 1.6.2 Total Area CultivatorsSC ST General SC ST General
377 21 1556 516 16 3927
1.71.71.71.7 Village wise Land Holding Pattern in Project areaVillage wise Land Holding Pattern in Project areaVillage wise Land Holding Pattern in Project areaVillage wise Land Holding Pattern in Project area
Table no. 1.7.1 :- IWMP Bhamolav
Irrigated (source) Rainfed Total Generel SC. ST. OBC. BPL
1 Large Farmer
Sr.no. Type of Farmer
Land holding (ha.) irrigation source wise Land holding (ha.) Social group wise
IWMP
BHAMOLAV
IWMP
Bhamolav
IWMP
BHAMOLAV
100%SC
19%
ST
1%
General
80%
Chart Title 51616
3927
SC
ST
General
1 Large Farmer
2 Small Farmer
3 Marginal Farmer
4 Landless Person
5 No. of BPL Household
Total 0 0 0 0 0 0 0 0
1.8 Problems1.8 Problems1.8 Problems1.8 Problems1 Land topography Land topography Land topography Land topography
Project area is micro & mecro basis SRSAC countour map & field visit during PRA shows that slope is very high in area.Erosion in land resulting low productivity of crops.
2 Lack of awarenessLack of awarenessLack of awarenessLack of awareness
Farmers of project area are not aware about Govt. schemes &do not have knowledge about letest technics of farming, horticulture plantation,drip irrigation or any outher
water saving technics.Like drip irrigation or any outher water saving technics.
3 Lack of water menegmentLack of water menegmentLack of water menegmentLack of water menegment
Farmers do not know to harvest surface runoff. They do not have much money to check runoff by making anicuts, earthenbunds and LSCD
4 Poor vegitation in pasture areaPoor vegitation in pasture areaPoor vegitation in pasture areaPoor vegitation in pasture area
5 Absence of micro interprisesAbsence of micro interprisesAbsence of micro interprisesAbsence of micro interprises
There is not a single small scale industry to support lively hood
6 Lack of capacity building programmes.Lack of capacity building programmes.Lack of capacity building programmes.Lack of capacity building programmes.
Farmers do not belive in latest technology becouse there is no demonstration activities to improve there capacity or to menage thenselves with avalable sources in better way.
There is not any managed pasture area, even there is a Govt. & community land in in Ramgarh, Jaswantpura etc. village. Such that farmers can not menage live stock for there daily
need of milk
2.12.12.12.1 Basic Features : - Basic Features : - Basic Features : - Basic Features : - As per page no. 6 Land use perterns is as follows
Land use & land classificationLand use & land classificationLand use & land classificationLand use & land classificationTotal
Irrigated UnIrrigated fellow DLT Pasture
community
land Other
Ha. Ha. Ha. Ha. Ha. Ha.
2692.00 1767.00 0.00 190.00 1191.00 0.00 0.00 5840.00
Digrame no :- 2.1.1 IWMP BhamolavDigrame no :- 2.1.1 IWMP BhamolavDigrame no :- 2.1.1 IWMP BhamolavDigrame no :- 2.1.1 IWMP Bhamolav
Cheptar II Cheptar II Cheptar II Cheptar II
Arabel Land Non arable land
IWMP BHAMOLAV
1191.00
IWMP BHAMOLAV
Arabel Land Irrigated Ha.
Arabel Land UnIrrigated Ha.
Non arable land fellow Ha.
2692.00
1767.00
190.00Non arable land fellow Ha.
Non arable land DLT Ha.
Non arable land Pasture
Non arable land community land Ha.
Non arable land Other Ha.
2.2 Net sown Area2.2 Net sown Area2.2 Net sown Area2.2 Net sown Area There is no source of irrigation other then wells.
Table No 2.2.1 :-Table No 2.2.1 :-Table No 2.2.1 :-Table No 2.2.1 :- Net sown AreaNet sown AreaNet sown AreaNet sown Area
One time Two times Three times
1 Bhamolav Bhamolav 1564.00 1564.00 280.00 Nil
2 Bhamolav Dang 453.00 453.00 62.00 Nil
Total 2017.00 2017.00 342.00
3 Arain Arain 163.00 163.00 61.00 Nil
Total 163.00 163.00 61.00
4 Sandolia Sandolia 1187.00 1187.00 140.00 Nil
Total 1187.00 1187.00 140.00
5 Chota Lamba Chota Lamba 1092.00 1092.00 136.00 Nil
Total 1092.00 1092.00 136.00
Total 4459.00 4459.00 679.00
Result:-
Total area of Watershed is 5840Ha out of which 4459ha is cultivated area accoroding
to revenue record . 4459ha area is been sown Remaining area 1381 Ha is Pasture land
and DLT.
Name of
Gram
panchyat
Name of
village Total cultiveted
Land
Net sown area (Ha)S.No
and DLT.
2.3 Crop productivity2.3 Crop productivity2.3 Crop productivity2.3 Crop productivity
Table No 2.3.2:- Crop details (Kharif)Table No 2.3.2:- Crop details (Kharif)Table No 2.3.2:- Crop details (Kharif)Table No 2.3.2:- Crop details (Kharif)
Area Ha
Productiv
ity
(Qt/Ha)
Prouction
Tonne Area Ha
Producti
vity
(Qt/Ha)
Prouction
Tonne
Area
Ha
Producti
vity
(Qt/Ha)
Prouction
Tonne Area Ha
Productivity
(Qt/Ha)
Prouction
Tonne Area Ha
Productiv
ity
(Qt/Ha)
Prouction
Tonne
1 Bhamolav Bhamolav 1564 422 6 2321 813 3 2033 93 7 605 156 4 546 80 2 160 1564
2 Bhamolav Dang 453 122 6 671 235 3 588 27 7 176 45 4 158 24 2 48 453
2017 544 2992 1048 2620 120 780 201 704 104 208 2017
3 Arain Arain 163 44 6 242 84 3 210 10 7 65 16 4 56 9 2 18 163
163 44 242 84 210 10 65 16 56 9 18 163
4 Sandolia Sandolia 1187 320 6 1760 617 3 1543 71 7 462 118 4 413 61 2 122 1187
1187 320 1760 617 1543 71 462 118 413 61 122 1187
5 Chota Lamba Chota Lamba 1092 294 6 1617 567 3 1418 65 7 423 109 4 382 57 2 114 1092
1092 294 1617 567 1418 65 423 109 382 57 114 1092
Total 4459 1202 0 6611 2316 0 5790 266 0 1729 444 0 1554 231 0 462 4459
MoongMaizeBajra othersS.no. G.P.
Jawar Village
Total
Sown
Area
Kharif (Mansoon)
Arble
Table No 2.3.3 :- Crop details (Rabi)Table No 2.3.3 :- Crop details (Rabi)Table No 2.3.3 :- Crop details (Rabi)Table No 2.3.3 :- Crop details (Rabi)
Area Ha
Productiv
ity
(Qt/Ha)
Prouction
Tonne Area Ha
Producti
vity
(Qt/Ha)
Prouction
Tonne
Area
Ha
Producti
vity
(Qt/Ha)
Prouction
Tonne Area Ha
Productivity
(Qt/Ha)
Prouction
Tonne
1 Bhamolav Bhamolav 939 281 12 3372 422 3 1266 187 4 655 49 11 539 939
2 Bhamolav Dang 272 81 12 972 122 3 366 54 4 189 15 11 165 272
1211 362 4344 544 6 1632 241 7 844 64 22 704 1211
3 Arain Arain 90 27 12 324 40 3 120 18 4 63 5 11 55 90
90 27 324 40 120 18 4 63 5 11 55 90
4 Sandolia Sandolia 736 220 12 2640 331 3 993 147 4 515 38 11 418 736
736 220 2640 331 993 147 4 515 38 11 418 736
5 Chota Lamba Chota Lamba 655 196 12 2352 294 3 882 131 4 459 34 11 374 655
655 196 2352 294 882 131 4 459 34 11 374 655
2692 805 0 9660 1209 6 3627 537 18 1880 141 55 1551 2692
s. noGram
panchyat
Gram
Village
Total
Area
sown in
Rabi
Irrigated
area
Rabi (Winter)
otherWheat Musterd
Net sown Area in watershed Net sown Area in watershed Net sown Area in watershed Net sown Area in watershed
Crop wiseCrop wiseCrop wiseCrop wise Kharif CropsKharif CropsKharif CropsKharif Crops Crop wiseCrop wiseCrop wiseCrop wise Rabi cropsRabi cropsRabi cropsRabi cropsCrop Bajra Jawar Maize Moong Other Crop wheat Gram Musterd Other
Area 1202 2316 266 444 231 Area 805 1209 537 141
Digrame no :- 2.3.1 Kharif crops (Net sown Area)Digrame no :- 2.3.1 Kharif crops (Net sown Area)Digrame no :- 2.3.1 Kharif crops (Net sown Area)Digrame no :- 2.3.1 Kharif crops (Net sown Area) Digrame no :- 2.3.2 Rabi crops (Net sown Area)Digrame no :- 2.3.2 Rabi crops (Net sown Area)Digrame no :- 2.3.2 Rabi crops (Net sown Area)Digrame no :- 2.3.2 Rabi crops (Net sown Area)
Bajra
Jawar Maize
Kharif Crop Detail
wheat
Gram
Musterd
Other
Result:- Low productivity
Reason low firtility of land,erosion of land,slope in land area & using traditional croping peterns. Page no. 11Page no. 11Page no. 11Page no. 11
x
2.42.42.42.4 Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Digrame no :- 2.4.1 Agriculture status.Digrame no :- 2.4.1 Agriculture status.Digrame no :- 2.4.1 Agriculture status.Digrame no :- 2.4.1 Agriculture status.
Cotton Productivity (Kg/Ha) Bajara Productivity (Kg/Ha)Botenical Name Gossipium species Botenical Name Pennisetum americanum
Family Malvaceae Family Gramineae
Origen India Origen India / Africa
India Rajasthan Ajmer Bhamolav India Rajasthan Ajmer Bhamolav
362 317 258 206 802 655 507 490
Mung Productivity (Kg/Ha) Moth Productivity (Kg/Ha)
0
100
200
300
400
India Rajasthan Ajmer BhamolavSeries1
0
100
200
300
400
500
600
700
800
900
India Rajasthan Ajmer Bhamolav Series1
Mung Productivity (Kg/Ha) Moth Productivity (Kg/Ha)Botenical Name Vigna radiata Botenical Name Phaseolus sconlitifolious
Family Leguminaceae Family Leguminaceae
Origen India Origen India
India Rajasthan Ajmer Bhamolav India Rajasthan Ajmer Bhamolav
317 159 200 186 144 122 271 200
Ref. :- VITAL Ag. Statistics & base line survey. Study by Amardeep Singh
0
50
100
150
200
250
300
350
India Rajasthan Ajmer BhamolavSeries1
0
50
100
150
200
250
300
India Rajasthan Ajmer BhamolavSeries1
Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops
Digrame no :- 2.4.2 Agriculture status.Digrame no :- 2.4.2 Agriculture status.Digrame no :- 2.4.2 Agriculture status.Digrame no :- 2.4.2 Agriculture status.
Wheat Productivity (Kg/Ha) Gram Productivity (Kg/Ha)Botenical Name Triticum species Botenical Name Cice arietinum
Family Gramineae Family Leguminaceae
Origen India Origen South West Asia
India Rajasthan Ajmer Bhamolav India Rajasthan Ajmer Bhamolav
2619 2762 2292 1975 808 443 905 710
0
500
1000
1500
2000
2500
3000
India Rajasthan Ajmer Bhamolav Series1
0
200
400
600
800
1000
India Rajasthan Ajmer Bhamolav Series1
Sesamum Productivity (Kg/Ha) Musterd Productivity (Kg/Ha)Botenical Name Sesamum indicum Botenical Name Brassica compestries
Family Pedaliaceae Family Cruferae
Origen Africa Origen India
India Rajasthan Ajmer Bahmaolav India Rajasthan Ajmer Bhamolav
310 149 172 140 1177 1232 1320 1170
Ref. :- VITAL Ag. Statistics & base line survey. Study by Amardeep Singh
India Rajasthan Ajmer Bhamolav Series1 India Rajasthan Ajmer Bhamolav
0
50
100
150
200
250
300
350
India Rajasthan Ajmer Bahmaolav Series1
1050
1100
1150
1200
1250
1300
1350
India Rajasthan Ajmer Bhamolav Series1
Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops
Digrame no :- 2.4.3 Agriculture status.Digrame no :- 2.4.3 Agriculture status.Digrame no :- 2.4.3 Agriculture status.Digrame no :- 2.4.3 Agriculture status.
Cumin Productivity (Kg/Ha)India Rajasthan Ajmer Bhamolav
285 387 292 174
0
100
200
300
400
India Rajasthan Ajmer Bhamolav
Series1
Ref. :- VITAL Ag. Statistics & base line survey. Study by Omprakash Ahalavat
2.5
M F Ch Total No. of h.h. Members No. of h.h. Members No. of h.h. Members
1 2 3 4a 4b 4c 4d 5a 5b 6a 6b 7a 7b
(i) cultivators 3017 7976 7682 3401 19059 674 4680 84 647 758 5327
(ii) Dairying Nill
(iii) Poultry Nill
(iv) Piggery Nill
(v) Landless Agri.
Labourers
0 74 396 7 39 81 477
(vi) Artisans 0
(vii) BPL 399 184 576 13 74 197 650
(viii) Others(specify) Nill
Total 3416 7976 7682 3401 19059 932 5652 20 113 1036 6454
Page no. 14Page no. 14Page no. 14Page no. 14
Socio-Economic ParametersSocio-Economic ParametersSocio-Economic ParametersSocio-Economic ParametersTable no. 2.5.1Table no. 2.5.1Table no. 2.5.1Table no. 2.5.1
Total
M= Male, F=Female, Ch=Children (below 14 years) h.h.=house hold
S.No.
Indicate against the occupation with income more than 50%
Household and Economic ActivityHousehold and Economic ActivityHousehold and Economic ActivityHousehold and Economic ActivityDescription
of Households
Total
No.of
household
Population in No. SC ST
Indicate only households with main occupation in the case of more than one occupation in a household .
Sr. no.Name of
VillageName of SHG Name of Chair man Members Activity involved Monthly income Fund available
Assistance
available
Source of
assistance
1 Bhamolav Luxmi Bai Mahila
SHG
Smt. Ramti /
Shabudin
12 Sweing 20 1200 watershed Watershed
2 Bhamolav Maha Laxmi Smt.Pani Devi /
Bhawar lal
12 Sweing 20 3000 watershed Watershed
3 Bhamolav Dev Maharaj Smt. Shayri / Bhanwar
singh
12 Sweing 20 watershed Watershed
4 Bhamolav Laxmi Mahila
SHG
Miss Manju / bhagu
singh
12 Sweing 50 watershed Watershed
5 Dand Jai mata di Smt Heeru / SavarLal 13 Sweing 50 1650 watershed Watershed
6 Dand Jai Maa Durga
SHG
Smt. Ramti /
Shabudin
11 Sweing 50 watershed Watershed
7 Dand Parvti Raj SHG Smt.Pani Devi /
Bhawar lal
11 Sweing 20 watershed Watershed
8 Dand Jai Ambey Mahil
SHG
Smt. Shayri / Bhanwar
singh
11 Sweing 20 1400 watershed Watershed
9 Sandolia Tejaji Maharaj
Mahila SHG
Miss Manju / bhagu
singh
11 Sweing 50 watershed Watershed
10 Sandolia Chand Mahila
SHG
Smt Ladi/ Madu ram 15 Sweing 50 1350 watershed Watershed
11 Sandolia ShivJi mahila
SHG
Smt Rukma/ Debi lal 10 Sweing 50 watershed Watershed
12 Sandolia Balaji mahila
SHG
Smt Dudi / Rama 11 Kasida Work 20 watershed Watershed
13 Chota Lamba Bhawani SHG Smt Jethi / Hathi Ram 13 Sweing 50 watershed Watershed
14 Chota Lamba Durga mahila
SHG
Smt Heeru / SavarLal 13 Kasida Work 50 watershed Watershed
15 Chota Lamba Laxmi Mahila
SHG
Smt Budhi / Naryan 12 Kasida Work 50 2500 watershed Watershed
16 Chota Lamba Jai Ambe Maa
Mahil SHG
Smt Rukma/ Debi lal 13 Kasida Work 50 2500 watershed Watershed
17 Arain Bheru baba Mahil
SHG
Smt Dudi / Rama 13 Sweing 50 ICDS ICDS
18 Arain Jai Ambey Mahil
SHG
Smt Jethi / Hathi Ram 12 Pashu palan 100 watershed Watershed
19 Arain Bajrang Bali Smt Heeru / SavarLal 12 Sweing 50 ICDS ICDS
20 Arain Balaji mahila
SHG
Smt Budhi / Naryan 12 Sweing 50 watershed Watershed
Tabel no. 2.5.2 Existing SHGTabel no. 2.5.2 Existing SHGTabel no. 2.5.2 Existing SHGTabel no. 2.5.2 Existing SHG
Training
received
No
2.6 Horticulture status & fuel avilability :-2.6 Horticulture status & fuel avilability :-2.6 Horticulture status & fuel avilability :-2.6 Horticulture status & fuel avilability :-No project of horticulture had been started last year by agriculture ext.deparment under Rastriya bagwani mission programme.
area. There is no plantation work done to provide fuel wood at lower cost.
Source/ Name
of report
Year of
referen
ce
Area
already
under
horticulture
Source/ Name
of report
Year of
reference
Area
already
under fuel-
wood
Source/
Name of
report
Year of
reference
NRHM 2009 2.60 ha.
2.7 Live stock status :-2.7 Live stock status :-2.7 Live stock status :-2.7 Live stock status :-In the Jaswantpura IWMP project, there are cows, buffalos, goats, sheeps, bullock & is as below. Mainly cows & buffaloes
are of local breeds like Nagouri & Murra respectively. Avalability of surface watar, fodder and pasture for these animals reducing day by day. Less noumber
of animals surveive by eating crop reduces. No parnanent pasture is there. This leads to heavy migration of villagers for grazing sheeps rearing to out of state.
Milk production is low in area. There is some dairy co-operative in project area. Where the Cultivator sale the milk at Dairy but milk is Insufficent in Quantity
production of milk leads poor health to children.
Sr.no. Name of GP Name of Village
No. Milk No. Milk No. Milk No. Milk
1 Bhamolav Bhamolav 130 39 126 38 496 149 752 226 380 27 1159
2 Bhamolav Dang 46 14 84 26 458 138 588 178 210 16 814
176 53 210 64 954 287 404 590 43 0 1973
3 Arain Arain 106 32 246 74 410 123 762 229 317 4 1083
106 32 246 74 410 123 229 317 4 0 1083
4 Sandolia Sandolia 94 29 78 24 217 66 389 119 396 2 787
94 29 78 24 217 66 119 396 2 0 787
5 Chota Lamba Chota lamba 72 22 57 18 206 62 335 102 306 2 643
72 22 57 18 206 62 102 306 2 0 643
Total 448 136 591 180 1787 538 0 854 1609 51 0 4486
2.8 Other infrastructure fascility avalable :-2.8 Other infrastructure fascility avalable :-2.8 Other infrastructure fascility avalable :-2.8 Other infrastructure fascility avalable :-t Had
Quarter
InBhamolav watershed all gram panchyat Head Quarter is connected to Road and has at least Sr. Sec school in Bhamolav and Arain senior secondy school in
other villages Primary school is available ,Bank, Telephone facility is available as per table given below. Electricty is avilable in all villages
Buffalo Cow Goat Sheep BullockTotal Total Live
stock
Other
1.60 Ha Govt . Land avalable
No pasture
maneged by
villagers, purposed
In Narega
Tabel no. 2.7.1 Live stock statusTabel no. 2.7.1 Live stock statusTabel no. 2.7.1 Live stock statusTabel no. 2.7.1 Live stock status
Tabel no. 2.6.1 Horticulture & fuel avilabilityTabel no. 2.6.1 Horticulture & fuel avilabilityTabel no. 2.6.1 Horticulture & fuel avilabilityTabel no. 2.6.1 Horticulture & fuel avilabilityExisting area under horticulture (ha) Existing area under fuel-wood (ha) Existing area
Sr.no. Name of GP Name of Village
No. Milk No. Milk No. Milk No. Milk
Buffalo Cow Goat Sheep BullockTotal Total Live
stock
Other
Tabel no. 2.8.1 Other infrastructure fascility avalable Tabel no. 2.8.1 Other infrastructure fascility avalable Tabel no. 2.8.1 Other infrastructure fascility avalable Tabel no. 2.8.1 Other infrastructure fascility avalable Name of GP Name of village School Road Co-Operative societyMedical facility Bank / Post officeTelephone
Bhamolav Bhamolav Sr.SecondaryBT No. Yes No. Yes
Bhamolav Dang Middle Gravel No No. Yes
Arain Arain Sr. Sec Gravel No. Yes Yes Yes
Chota Lamba Chota lamba Sr.SecondaryBT No. Yes No. Yes
Sandolia Sandolia Secondary Gravel No. Yes No. Yes
2.9 NREGA Status :-2.9 NREGA Status :-2.9 NREGA Status :-2.9 NREGA Status :-Tabel no. 2.9.1 NREGA Status Tabel no. 2.9.1 NREGA Status Tabel no. 2.9.1 NREGA Status Tabel no. 2.9.1 NREGA Status
Total Project
area
Total Project area Total Project
area
1 Bhamolav Bhamolav 1096 0 0 4 16
2 Bhamolav Dang 342 0 0 2 6
3 Arain Arain 460 0 0 3 6
4 Chota Lamba Chota lamba 1080 0 0 4 13
5 Sandolia Sandolia 847 0 0 3 8
3825 0 0 16 49 0 0
2.10 Development Indicators :-2.10 Development Indicators :-2.10 Development Indicators :-2.10 Development Indicators :-1 Stop surface runoff flowing out side from watershed area.
2 Develope pasture land for villagers to full fill there need of fuel, fodder & stop migration.
3 Increase productivity per Ha.
4 Stablise livelihood supporting activities to support land less labours.
5 Divert croping patterns form traditional system to horticulture and modern agriculture practices.
6 Improve water use efficiency by drip & sprinkler irrigation
7 Provide potable water for drinking purpose.
8 Rise in water table at down stream side to the harvesting structure.
Part II - Technical featurePart II - Technical featurePart II - Technical featurePart II - Technical feature2.11 Revenue Maps :-Revenue Maps :-Revenue Maps :-Revenue Maps :- Revenue maps is based on scale 1 : 10000 . Revenue records like khasra maps, khasra list has been collected
and printed.All records are avable at PIA level. Ridge line & contour line has been marked by SRSAC.
2.12 Topo Maps / Maps with drainage line :-Topo Maps / Maps with drainage line :-Topo Maps / Maps with drainage line :-Topo Maps / Maps with drainage line :- Revenue maps traced on plastic sheets and scaned by SRSAC. SRSAC marked
all topography, D.L.T. It has been atteched to DPR anuxure.
2.13 Ground water status and prospect maps :-Ground water status and prospect maps :-Ground water status and prospect maps :-Ground water status and prospect maps :- Watershed area falls under region of under masuda Panchyat samiti
measured data of water leval 45 to 60 mtr. In 1987. But now tubewell in area shows ground water is at 180 to 220 mtr. Hence ground water depliting
day by day. Well perameters type TW and proposed depth is 180 to 220 mtr. Or more discharge caculated 200 - 400 cum / day. in 1997.But now
discharge is very poor. No. of tubewell is decreasing year by year. EC of water is less then 4*103 µ
Sm. / cm.Development prospect is over exploited.
Such that Govt. declare dark zone to this area. Anuxure -------- As per anuxure --------- SRSAC change in water leval is ( - 7 to - 15) from 1984 to1997
Such that check the surface runoff and rechage the water aquifer is most.
Page no.Page no.Page no.Page no.
Total no.of job
cards
Name of GPSr. no. Activity taken in plan 2011-12
Categary 4 -25 Nadi Anicut
Name of village
2.152.152.152.15 Slope of watershed areaSlope of watershed areaSlope of watershed areaSlope of watershed areaTabel no. 2.15.1 Slope detailsTabel no. 2.15.1 Slope detailsTabel no. 2.15.1 Slope detailsTabel no. 2.15.1 Slope details
Macro No. Micro No. Name of Village Area Highest contour level Lowest contour level Level difference Length of treval % slope
20 379 371 8 600 1.33
180 378 371 7 1200 0.58
3 15 Arain 485 385 373 12 2200 0.55
Chota lamba 100 414 408 6 400 1.50
Chota lamba 120 408 399 9 650 1.38
Chota lamba 450 399 384 15 2000 0.75
Chota lamba 535 391 377 14 1500 0.93
Sandolia 150 405 395 10 1000 1.00
Sandolia 50 404 397 7 300 2.33
Sandolia 1195 401 377 24 2900 0.83
Dang 60 395 391 4 100 4.00
Dang 40 418 396 22 300 7.33
Dang 423 385 378 7 700 1.00
4 1 Bhamolav 1512 377 360 17 2200 0.77
4 2 Bhamolav 520 381 360 21 2500 0.84
It is average slope Maximum slope identified is 0.80 % in micro no 3/18 There is area shown slope more then 3% in table 2.16.2
Tabel no. 2.15.2 Area shown in table more then 3% slopeTabel no. 2.15.2 Area shown in table more then 3% slopeTabel no. 2.15.2 Area shown in table more then 3% slopeTabel no. 2.15.2 Area shown in table more then 3% slopeMicro no Total Area Slope <3% Slope>3%
3/14 200 200 0
3/15 485 485 0
3/16 1205 1205 0
3/17 1395 1395 0
3/18 523 423 100
4/1 1512 1512 0
4/2 520 520 0
5840 5740 100
Page no.Page no.Page no.Page no.
Small Hills are present
3 18
Location of land having more then 3% slope
3 14Arain
3 16
3 17
2.162.162.162.16 Avable surface runoff Based on average rainfallAvable surface runoff Based on average rainfallAvable surface runoff Based on average rainfallAvable surface runoff Based on average rainfallIt has been calculated on the basis of Streng's table . Maximum rain fall intencity of area is 10 cm/hr
Total mansoon rainfall 325 mm. per year
Tabel no. 2.16.1 Total runoff avableTabel no. 2.16.1 Total runoff avableTabel no. 2.16.1 Total runoff avableTabel no. 2.16.1 Total runoff avable
Micro no AreaTotal runoff
avable
Type of
catchment
3\14 200 1895 Average
3\15 485 4596 Average
3\16 1205 11420 Average
3\17 1395 23503 Good
3\18 523 8812 Good
4\1 1512 25474 Good
0 Good
5320 Total 75700
Result :- Total avable runoff 75700 Cum
2.172.172.172.17 Run off tapped in existing structureRun off tapped in existing structureRun off tapped in existing structureRun off tapped in existing structure
According to Base line survey of field only three structure fullfilled in last 10 years such that remaining structure do not require waste
weir. So nadi no 10 in micro 6,nadi no 3 in micro no1 & dam in micro 8 considered on basis of time of concentration.
Tabel no. 2.17.1 Net runoff tapped Tabel no. 2.17.1 Net runoff tapped Tabel no. 2.17.1 Net runoff tapped Tabel no. 2.17.1 Net runoff tapped
Name of GPExisting
structureNo. Area
% of
runoff to
rainfall
yield of runoff
from
catchment
per ha.(cum.)
Total runoff
tapped in
existing
structure
Type of
catchment
Submergence
area
average
depth
(mtr.)
Capacity of
structure
Net runoff
tapped in
existing
structure
Bhamolav Nadi /Talab 22 120 7.2 234 2022 Good 120 3 360 67
Arain Nadi /Talab 35 7.2 234 590 Good 35 2.5 87.5 84
Chota Lamba Nadi /Talab 25 7.2 234 421 Good 25 2.5 62.5 3255
Sandolia Nadi /Talab 15 7.2 234 253 Good 15 2.5 37.5 3406
Total runoff tapped
Page no. 19Page no. 19Page no. 19Page no. 19
7.2 234
5.4 175.5
7.2 234
7.2 234
% of runoff to rainfallyield of runoff from
catchment per ha.(cum.)
5.4 175.5
5.4 175.5
2.182.182.182.18Name of Agroclimatic Zone IWDP
1 2
s.no. YearAverage Annual
Rainfall(mm)
S.No
.Year June july Aug Sept
Total in four
month
1 2001 298 1 2001 29 195 61 13 298
2 2002 160 2 2002 32 35 69 24 160
3 2003 322 3 2003 25 121 148 28 322
4 2004 387 4 2004 31 103 240 13 387
5 2005 314 5 2005 85 114 7 108 314
6 2006 240 6 2006 44 89 68 39 240
7 2007 386 7 2007 53 208 94 31 386
8 2008 407 8 2008 106 106 122 73 407
9 2009 222 9 2009 19 45 88 70 222
10 2010 527 10 2010 18 195 204 110 527
3 4
Average Annual Rainfall(mm)
Maximum rainfall intensity Temperatue (Degree C)
Monthly rain fall in rainy seasion
Climatic and Hydrological information Climatic and Hydrological information Climatic and Hydrological information Climatic and Hydrological information
Table no.2.18.1 :- Climatic & Hydrological
3 4
s.no. Durationrainfall
intensity(mm)s.no. Max Min
(i) 15 minute
duration
66 mm(i) 49 31
(ii) 30 minute
duration
74 mm(ii) 29 4
(iii)60 minute
duration
109 mm(iii) 37 14
Page no. Page no. Page no. Page no.
Winter Season
Rainy Season
Season
Summer Season
Maximum rainfall intensity Temperatue (Degree C)
Problem demand and scope for comprehensive area development Problem demand and scope for comprehensive area development Problem demand and scope for comprehensive area development Problem demand and scope for comprehensive area development
2.19 NRM ( Netural resource menegement) :- watershed project require natural resource managament activities. To chack all runoff of project DPR comprises activities
like earthan bunds with waste weir, only waste weir where Bund had made by farmers in arable and
nonarable land to stop sheet & gully erosion. Productivity of watershed is low due to erosion hence earthenbund with
weste weir are proposed
DPR also comprisesKhadeen and Farm Ponds for Storage water and gully pluge.
Khettalai and Tanka activity taken to conserve water and harvest water for production of fruit plants.
2.21 Agriculture and horticulture productivity gap analysis :- Farmers of area using tradional metherds for croping & productivity
is below averege. They are not using drip & sprinkalar irrigation fascility to save water and using chemical fertilizer
for production. Project facilates to farmers for sprinklar & drip irrigation fascility by convergence with Agriculture
extention dept. and fascility also by vermicompost unit to replace chemical fertilizer.
The Neel gay is major problem to improve horticultuer plantation so that project fascilite
farmer for barbed wire fencing of 6 feet hight in production measurs.
Post for barbed wire fencing will be mamufactured in watershed area through livelihood activities.
2.22 livestock - gap or fodder avability :-Project area don' t have managed pasture area to ensure about fodder. From Narega Project Area comprises
two pasture of 10 Ha. each to meet requirment of fodder. Such that number milky animal can increase. Milk production of area
will increase.
Project will also run breed improvement programme and timely care of animals by veccination. A WDT member
is working for this.
2.23 Livelihood & micro interprises :-To overall development of area project connects farmers for various activities to earn money
in there free time or regularly. This activity fullfill there regular need as well as earn money by working in microinterprises.
A
S.No,
1
2
3
4
5
For preapering Development plan Following steps are follws1
2
3
4
5
6
7
8
9
10
11
CHAPTER - III CHAPTER - III CHAPTER - III CHAPTER - III
PROPOSED DEVELOPMENT PLANPROPOSED DEVELOPMENT PLANPROPOSED DEVELOPMENT PLANPROPOSED DEVELOPMENT PLAN
4/5/2010
2 Arain
The Activities are indicative addition /deletion in activities will be as per local
conditions
Preparatory phase activities Capacity Building Trainings and EPA
The IEC activities Group meetings, door to door campaign, slogans and wall writings etc.
were carried out in all the habitations of 3/14,15,16,17,18 & 4/1,4/2 Micro Watershed. A series of meetings
were conducted with GP members, community and discussed about the implementation of IWMP
programme. Self help Group and User groups were also formed.
17/6/2010
The PRA exercise was carried out in all the villages on the dates shown below:
4/5/2010
Arain
Chotalamba
Name of Village
Base maps (transport network, village/boundaries, and settlements).
Contours at 1 meter interval, slope map
Land Use / Land cover map.
Digitised Khasara maps of the villages falling in project area.
Network of Drainage lines, existing water bodies, falling in the project area.
Transict walk were carried out involving the community for Social mapping, Resource
mapping. Detailed discussions and deliberations with all the primary stakeholders were carried out.
Socio-economic survey was carried out during (dates) period
covering all the households and primary data on demography, Land holdings, Employment status,
Community activities etc. was collected as mentioned in chapter 2.
Various thematic layers provided by SRSAC are :
30/12/09
Date of PRA
16/12/09
18/12/09
3 Chotalamba
24/12/09
28/12/09
Sandolia
Chotalamba
Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as
discussed in chapter 2) final Treatment plan on revenue map for implementation has been framed. Thus
each intervention identified has been marked on Gram panchyat wise contour map with super imposed
Revenue village Khasra map provided by SRSAC in DPR as annexure------).The GIS based intervention
map, PRA based intervention map are annexed as ------.
State remote sensing department was assigned the work of preparing various
thematic layers using Cartosat-1 and LISS-3 imageries for Creation, development and management of
geo-spatial database depicting present conditions of land (terrain), water and vegetation with respect to
watershed under different ownerships at village level
Name of Grm
Bhamolav
Bhamolav
1 Bhamolav
Sandolia
Grama Sabhas were conducted for approval of EPA (Village), for selecting the
watershed committee and approval of DPR.
19/04/2010
Dang
Delineation of Macro/Micro watershed boundaries.
4
Sandolia
Bhamolav
Arain
S.No Name of the
Gram
Panchayat
Date on which Grama
Sabha approved EPA
(A) Preparatory phase activities capacity building trainings & EPA
Phy Fin. No Total Cost Phy Fin. Phy Fin. No Total Cost
Admn. 10 30.66 8.22 16.74 14.46 70.08
Monitoring 1 3.07 0.82 1.67 1.45 7.01
Evaluation 1 3.07 0.82 1.67 1.45 7.01
EPA 4 12.26 3.29 6.70 5.78 28.03
I & CB 5 15.33 4.11 8.37 7.23 35.04
DPR 1 3.07 0.82 1.67 1.45 7.01
Total (A) 67.45 18.08 36.83 31.81 154.18
(B)(B)(B)(B) Natural resource management
A Conservation measures for arable
land2555 685 1395 1205 5840
1 Earthen Bund for Block A Ha 100 43.50 31 11.68 65 23.79 54 20.54 250 99.51
2 Earthen Bund for Block B Ha 8 1.83 16 2.90 32 5.92 27 5.11 83 15.76
3 Earthen Bund for Block C Ha 40 6.28 32 5.37 49 10.94 39 9.45 160 32.04
4 Earthen Bund for Block D Ha 40 9.46 29 6.60 47 13.45 42 11.62 158 41.13
6 Stone wall Terrace (PRT) Ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
7 Khadin in Arable Land No. 18 86.09 3 12.90 7 26.25 7 22.68 35 147.92
Total Conservation arable Land 147.16 39.45 80.35 69.40 336.36
B
Conservation measures for non arable
land 0 0.00
8 V - dich Ha 40 3.17 10 0.85 16 1.73 15 1.49 81 7.24
9 Staggered Trenches Ha 45 4.43 16 1.18 19 2.42 10 2.09 90 10.12
10 Pasture development Ha 45 23.92 9 6.41 26 13.06 0 11.28 80 54.67
Drainage line treatment 0 0.00
11 Farm pond/ New Nadi No. 6 5.28 3 1.43 3 2.88 3 2.50 15 12.09
12 Loose stone check Dam No. 32 0.00 0 0.00 0 0.00 15 0.00 47 0.00
13 Small Masonary Structure No. 6 0.00 0 0.00 0 0.00 0 0.00 6 0.00
14 Small pond No. 0 0.00 0 0.00 8 0.00 12 0.00 20 0.00
15 Medium Masonary structure No. 1 0.00 0 0.00 0 0.00 0 0.00 1 0.00
Total Non arable Conservation and DLT
(A+B) 36.80 9.87 20.09 17.36 84.12
Total (B) NRM 183.96 49.32 100.44 86.76 420.48
Proposed Development Plan
Proposed Development Plan of Project WC /Gram Panchyat wise
S.No. Activity Unit
GP Bhamolav GP Arain GP Sandolia GP Chota lamba Total
Phy Fin. No Total Cost Phy Fin. Phy Fin. No Total CostS.No. Activity Unit
GP Bhamolav GP Arain GP Sandolia GP Chota lamba Total
( C )( C )( C )( C ) Production System and micro enterprise
Production measures for arable land
1 Agroforestry For Arable Ha 230 4.95 80 1.32 40 2.71 20 2.33 370 11.31
2 Only Horticulture 0.5Ha 15 10.48 4 2.80 5 5.74 5 4.94 29 23.96
3 Vermi compost No. 4 3.78 2 1.01 1 1.11 2 1.78 9 7.68
4 Crop / Fodder Demostration No. 361 6.53 100 1.75 42 3.59 50 3.08 553 14.95
5 Kitchen Garden Kit demonstration Unit No. 184 3.38 82 0.92 40 2.75 50 1.60 356 8.65
Total Production Measures for Arable 29.12 7.80 15.90 13.73 66.55
House hold Production System
6 Tool Kit for land less and SHG No. 36 5.57 43 1.49 11 3.07 7 2.63 97 12.76
7
Agricultural Machinary for Agricultural
activity No. 79 4.05 40 1.09 25 2.18 0 1.91 144 9.23
Total House hold Production System 9.62 2.58 5.25 4.54 0 21.99
Live stock Development 0 0.00
8 Vetinary Camp No. 14 3.16 6 0.85 10 1.72 2 1.49 32 7.22
9 Manger for Cattel No. 200 1.98 75 0.53 60 1.08 27 1.00 362 4.59
10 Bull Distribution No. 1 0.70 1 0.00 1 0.00 0 0.00 3 0.70
11 Mineral mixture 200 1.36 53 0.55 60 1.13 20 0.98 333 4.02
Total live stock Development 7.20 1.93 3.93 3.47 16.53
Total (C) 45.94 12.31 25.08 21.74 105.07
(D) Consolidation 9.25 2.39 5.06 4.37 21.07
Grand Total 306.60 82.10 167.41 144.68 700.80
Action plan prepaired on the basis of SRSAC contour mep of area & field visit in PRA . It dovelopment on need & demand basis.
Table-M(PA)A1: Entry point activities (EPA) as on
(All financial figures in lakh Rs.)1 2 3 4 5 6 7 8 9 10 11
S.
No.State District
Names of
projects
Amount
earmarked
for EPA
Entry Point Activities planned No.Estimated
cost
Expendi
ture
incurred
BalanceExpected
outcome
Actual
outcome
1. Street Solar Light - 32 32 8.00 8.00 0.00
2. Water Supply (Kheli Kota) 1 0.75 0.50 0.25
3. Samsan ghat Tinshed-4 4 4.00 0.80 3.20
4. Samsan ghat Bethak-5 5 12.10 1.50 10.60
5. Water Hut With Water coolar 1 0.80 0.50 0.30
6. Sulabh Complex No.1 1 0.88 0.00 0.88
7. Hatai No.1 1 0.50 0.00 0.50
8. Water supply Tube well No.1 1 1.00 0.00 1.00
28.03 28.03 11.30 16.73
-
Chapter IV. Project Activities
IV. A. Preparatory phase
1 Raj AjmerIWMP-I
Bhamolav
Useful for
Benifeciarys28.03
Covergence :-Covergence :-Covergence :-Covergence :-
Convergence With Mahatma Ghandi National Rural Employment Gurrante Scheme (MNREGA)Convergence With Mahatma Ghandi National Rural Employment Gurrante Scheme (MNREGA)Convergence With Mahatma Ghandi National Rural Employment Gurrante Scheme (MNREGA)Convergence With Mahatma Ghandi National Rural Employment Gurrante Scheme (MNREGA)
Phy Fin. Phy Fin. Phy Fin. Phy Fin. Phy Fin.
1
Farm pond/ New Nadi in Arable
Category IV Ha 26 13.00 18 9.00 48 24.00 38 19.00 130 65.00
2 Khadin in Arable Land No. 16 16.00 5 5.00 8 8.00 5 5.00 34 34.00
3 V - dich Ha 50 7.50 0 0.00 20 3.00 30 4.50 100 15.00
4 Staggered Trenches Ha 40 5.00 40 5.00 40 5.00 40 5.00 160 20.00
5 Pasture development Ha 40 40.00 40 40.00 40 40.00 40 40.00 160 160.00
6 Nadi Disiliting No. 6 25.00 3 12.00 2 8.00 2 8.00 13 53.00
Total MNREGA in IWMP Total MNREGA in IWMP Total MNREGA in IWMP Total MNREGA in IWMP
BhamolavBhamolavBhamolavBhamolav106.50 71.00 88.00 81.50 347.00
Convergence With Agrivultural DepartmentConvergence With Agrivultural DepartmentConvergence With Agrivultural DepartmentConvergence With Agrivultural DepartmentProduction measures for arable
land
1 Crop / Fodder Demostration Ha 60 1.20 30 0.60 15 0.30 20 0.40 125 2.50
2 Only Horticulture 0.5Ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
3
Organic Manure and Micro
Organisims No. 150 0.30 150 0.30 150 0.30 150 0.30 600 1.20
4
Agricultural Machinary for Agricultural
activity No. 10 0.20 6 0.12 5 0.10 5 0.10 26 0.52
5 HDPE Pipe for Irrigation Rm 300 0.50 150 0.25 100 0.15 100 0.15 650 1.05
6 Sprinkler System No. 5 0.85 3 0.50 3 0.50 2 0.35 13 2.20
7 Water kund/ Farm Pond No. 5 3.50 2 1.40 1 0.70 1 0.70 9 6.30
Total Agrivultural Total Agrivultural Total Agrivultural Total Agrivultural
Department in IWMP Department in IWMP Department in IWMP Department in IWMP
BhamolavBhamolavBhamolavBhamolav
6.55 3.17 2.05 2.00 13.77
Total
CONVERGECE PLAN FOR IWMP PROJECT BHAMOLAVCONVERGECE PLAN FOR IWMP PROJECT BHAMOLAVCONVERGECE PLAN FOR IWMP PROJECT BHAMOLAVCONVERGECE PLAN FOR IWMP PROJECT BHAMOLAV
For over all development of watershed area in all field Social, Economic, financial Agricutural, Live
stock management , Living status , Employment generation some actvities will done by other Deparment such as
MNREGS,Agicultura, Vetinary , Rural Development, Water resources (Irrigation) etc is included with project
Actvities So over all development of Watershed area can be achived
S.No. Activity UnitGP Bhamolav GP Arain GP Sandolia GP Chota Lamba
Phy Fin. Phy Fin. Phy Fin. Phy Fin. Phy Fin.
TotalS.No. Activity Unit
GP Bhamolav GP Arain GP Sandolia GP Chota Lamba
Convergence With Vetinary DepartmentConvergence With Vetinary DepartmentConvergence With Vetinary DepartmentConvergence With Vetinary Department 0 0.00
1 Vetinary Camp No. 10 0.80 10 0.80 10 0.80 10 0.80 40 3.20
2 Castration No. 10 0.01 10 0.01 10 0.01 10 0.01 40 0.04
3 AI No. 25 0.02 25 0.02 25 0.02 25 0.02 100 0.08
4 Deworming No. 250 0.00 250 0.00 250 0.00 250 0.00 1000 0.00
5 Fodder Demonstration No. 100 0.20 100 0.20 100 0.20 100 0.20 400 0.80
6 Mineral mixture No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
Total Vetinary Department Total Vetinary Department Total Vetinary Department Total Vetinary Department
in IWMP Jaswantpurain IWMP Jaswantpurain IWMP Jaswantpurain IWMP Jaswantpura 1.03 1.03 1.03 1.03 4.12
TotalTotalTotalTotal ConvegenceConvegenceConvegenceConvegence PlanPlanPlanPlan inininin
IWMP BhamolavIWMP BhamolavIWMP BhamolavIWMP Bhamolav114.08 75.20 91.08 84.53 364.89
STATE RAJASTHAN
BLOCK Arain
AGROCLIMATIC ZONE III A
Name of Watersed Bhamolav
Macro /Micro No 4/1,4/2,3/14,15,16,17,18
Gram Panchyat
GEOGRAPHICAL AREA 5840 Ha
Effective area 5840 Ha
Arable Area 4459 Ha
Non Arable Area 1381 Ha
Total Cost 700.8 Lacs
Unit Cost 0.12 Lacs
(A)
Phy Fin
A I Administration cost 10% 70.08
II Monitoring 1% 7.01
III Evaluation 1% 7.01
Total 84.10B I Preparatory Phase (Entry Point 4% 28.03
II Institution And Capacity Building 5% 35.04
III Preparation of Detailed Project 1% 7.01
Total 70.08Total (A) 22% 154.18
CCCC
C1 Conservation measures for arable land60%
1 Earthen Bund for Block A 250 99.51
2 Earthen Bund for Block B 83 15.76
3 Earthen Bund for Block C 160 32.04
4 Earthen Bund for Block D 158 41.13
6 Khadin in Arable Land 35 147.92
8 Farm pond/ New Nadi in arable Category IV
Total Conservation arable Land 336.36
C2
Conservation measures for non arable
land
8 Staggered Trenches 90 10.12
9 Pasture development 80 54.67
10 V-dich 81 7.24
C3 Drainage line treatment 0 0.00
10 Farm pond/ New Nadi 15 12.09
11 Nadi Disilting
Total Non arable Conservation and DLT
(A+B) 84.12
Total (C) NRM 420.48
By ProjectS.No. Activity
CHAPTER - IV CHAPTER - IV CHAPTER - IV CHAPTER - IV
Activity wise Abstract of cost By ProjectActivity wise Abstract of cost By ProjectActivity wise Abstract of cost By ProjectActivity wise Abstract of cost By Project
Bhamolav,Sandolia, Chota Lamba, Arain
DDDD 15%
D1 Production measures for arable land
1 Agroforestry For Arable 370 11.31
2 Only Horticulture 29 23.96
3 Vermi compost 9 7.68
4 Crop / Fodder Demostration 553 14.95
5 Kitchen Garden Kit demonstration Unit 356 8.65
6 Organic Manure and Micro Organisim
7 HDPE Pipe for Irrigation
8 Water Kund Farm Pond
9 Sprinkler System
Total Production Measures for Arable 66.55
D2 House hold Production System
9 Tool Kit for land less and SHG 97 12.76
10 Agricultural Machinary for Agricultural activity 144 9.23
Total House hold Production System 21.99
D3 Live stock Development
8 Vetinary Camp 32 7.22
9 Manger for Cattel 362 4.59
10 Bull Distribution 1 0.70
11 Mineral mixture 333 4.02
12 Castration 0 0.00
13 AI 0 0.00
14 Deworming 0 0.00
15 Foder Demonstration 0 0.00
Total live stock Development 16.53
Total (D) 105.07
E (E) Consolidation 3% 21.07
Grand Total 700.80
(A)
Phy Fin Phy Fin Phy Fin
A I Administration cost 0.00 0.00 0.00 0.00 0.00 0.00
II Monitoring 0.00 0.00 0.00 0.00 0.00 0.00
III Evaluation 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00
B I Preparatory Phase (Entry Point
Activity) 0.00 0.00 0.00 0.00 0.00 0.00
II Institution And Capacity Building 0.00 0.00 0.00 0.00 0.00 0.00
III Preparation of Detailed Project
Report (DPR) 0.00 0.00 0.00 0.00 0.00 0.00
Total 0.00
Total (A) 0.00 0.00 0.00CCCC
C1 Conservation measures for arable land
1 Earthen Bund for Block A 0 0.00 0 0.00 0 0.00
2 Earthen Bund for Block B 0 0.00 0 0.00 0 0.00
3 Earthen Bund for Block C 0 0.00 0 0.00 0 0.00
4 Earthen Bund for Block D 0 0.00 0 0.00 0 0.00
5 Earthen Bund for Block E 0 0.00 0 0.00 0 0.00
6 Stone wall Terrace (PRT) 0 0.00 0 0.00 0 0.00
7 Khadin in Arable Land 0 0.00 34 34.00 34 34.00
8 Farm pond/ New Nadi in arable Category IV 0 0.00 130 65.00 130 65.00
Total Conservation arable Land 0.00 99.00 99.00
C2
Conservation measures for non arable
land
8 V - dich 0 0.00 100 15.00 100 15.00
9 Staggered Trenches 0 0.00 160 20.00 160 20.00
10 Pasture development 0 0.00 160 160.00 160 160.00
C3 Drainage line treatment 0 0.00 0 0.00 0 0.00
11 Farm pond/ New Nadi 0 0.00 0 0.00 0 0.00
12 Loose stone check Dam 0 0.00 0 0.00 0 0.00
13 Small Masonary Structure 0 0.00 0 0.00 0 0.00
14 Small pond 0 0.00 0 0.00 0 0.00
15 Medium Masonary structure 0 0.00 0 0.00 0 0.00
16 Nadi Disilting 0 0.00 13 53.00 13 53.00
Total Non arable Conservation and DLT
(A+B) 0.00 248.00 248.00
Total (C) NRM 0.00 347.00 347.00
DDDD
D1 Production measures for arable land
1 Agroforestry For Arable 0 0.00 0 0.00 0 0.00
2 Only Horticulture 0 0.00 0 0.00 0 0.00
3 Vermi compost 0 0.00 0 0.00 0 0.00
4 Crop / Fodder Demostration 0 0.00 125 2.50 125 2.50
5 Kitchen Garden Kit demonstration Unit 0 0.00 0 0.00 0 0.00
6 Organic Manure and Micro Organisim 0 0.00 600 1.20 600 1.20
7 HDPE Pipe for Irrigation 0 0.00 650 1.05 650 1.05
8 Water Kund Farm Pond 0 0.00 9 6.30 9 6.30
9 Sprinkler System 0 0.00 13 2.20 13 2.20
Total Production Measures for Arable 0.00 13.25 13.25
D2 House hold Production System
9 Tool Kit for land less and SHG 0 0.00 0 0.00 0 0.00
10 Agricultural Machinary for Agricultural activity 0 0.00 26 0.52 26 0.52
Total House hold Production System 0.00 0.52 0.52
By Convergence Total
Activity wise Abstract of cost by Convergenceof ProjectActivity wise Abstract of cost by Convergenceof ProjectActivity wise Abstract of cost by Convergenceof ProjectActivity wise Abstract of cost by Convergenceof Project
S.No. ActivityBy Convergence
D3 Live stock Development
8 Vetinary Camp 0 0.00 40 3.20 40 3.20
9 Manger for Cattel 0 0.00 0 0.00 0 0.00
10 Bull Distribution 0 0.00 0 0.00 0 0.00
11 Mineral mixture 0 0.00 0 0.00 0 0.00
12 Castration 0 0.00 40 0.04 40 0.04
13 AI 0 0.00 100 0.08 100 0.08
14 Deworming 0 0.00 1000 0.00 1000 0.00
15 Foder Demonstration 0 0.00 400 0.80 400 0.80
Total live stock Development 0.00 4.12 4.12
Total (D) 0.00 17.89 17.89
E (E) Consolidation
Grand Total 0.00 364.89 364.89
STATE RAJASTHAN Dist Ajmer
BLOCK ARAIN
AGROCLIMATIC ZONE III A
Name of Watersed Bhamolav
Macro /Micro No 4/1,2& 3/14,15,16,17,18
Gram Panchyat
GEOGRAPHICAL AREA 5840 Ha
Effective area 5840 Ha
Arable Area 4459 Ha
Non Arable Area 1381 Ha
Total Cost 700.8 Lacs
Unit Cost 0.12 Lacs
(A)
Phy Fin Phy Fin Phy Fin
A I Administration cost 10% 70.08 0.00 0.00 0.10 70.08
II Monitoring 1% 7.01 0.00 0.00 0.01 7.01
III Evaluation 1% 7.01 0.00 0.00 0.01 7.01
Total 84.10 84.10
B I Preparatory Phase (Entry Point
Activity)
4%
28.03 0.00 0.00 0.04 28.03
II Institution And Capacity Building 5% 35.04 0.00 0.00 0.05 35.04
III Preparation of Detailed Project
Report (DPR)
1%
7.01 0.00 0.00 0.01 7.01
Total 70.08 70.08
Total (A) 22% 154.18 0.00 154.18CCCC
C1 Conservation measures for arable land60%
1 Earthen Bund for Block A 250 99.51 0 0.00 250 99.51
2 Earthen Bund for Block B 83 15.76 0 0.00 83 15.76
3 Earthen Bund for Block C 160 32.04 0 0.00 160 32.04
4 Earthen Bund for Block D 158 41.13 0 0.00 158 41.13
5 Khadin in Arable Land 35 147.92 34 34.00 69 181.92
6 Farm pond/ New Nadi in arable Category IV 130 65.00 130 65.00
Total Conservation arable Land 336.36 99.00 435.36
C2
Conservation measures for non arable
land
8 V - dich 81 7.24 100 15.00 181 22.24
9 Staggered Trenches 90 10.12 160 20.00 250 30.12
10 Pasture development 80 54.67 160 160.00 240 214.67
C3 Drainage line treatment 0 0.00 0 0.00 0 0.00
11 Farm pond/ New Nadi 15 12.09 0 0.00 15 12.09
12 Loose stone check Dam 0 0.00 0 0.00 0 0.00
13 Small Masonary Structure 0 0.00 0 0.00 0 0.00
14 Small pond 0 0.00 0 0.00 0 0.00
15 Medium Masonary structure 0 0.00 0 0.00 0 0.00
16 Nadi Disilting 13 53.00 13 53.00
Total Non arable Conservation and DLT
(A+B) 84.12 248.00 332.12
Total (C) NRM 420.48 347.00 767.48
ACTIVITY WISE ABSTRACT OT COST TOTAL BY PROJECT AND ACTIVITY WISE ABSTRACT OT COST TOTAL BY PROJECT AND ACTIVITY WISE ABSTRACT OT COST TOTAL BY PROJECT AND ACTIVITY WISE ABSTRACT OT COST TOTAL BY PROJECT AND
CONVERGENCECONVERGENCECONVERGENCECONVERGENCE
S.No. ActivityBy Project By Covergence Total
Bhamolav, Arain, Sandolia, Chota Lamba
Phy Fin Phy Fin Phy FinS.No. Activity
By Project By Covergence Total
DDDD
D1 Production measures for arable land 15%1 Agroforestry For Arable 370 11.31 0 0.00 370 11.31
2 Only Horticulture 29 23.96 0 0.00 29 23.96
3 Vermi compost 9 7.68 0 0.00 9 7.68
4 Crop / Fodder Demostration 553 14.95 125 2.50 678 17.45
5 Kitchen Garden Kit demonstration Unit 356 8.65 0 0.00 356 8.65
6 Organic Manure and Micro Organisim 600 1.20 600 1.20
7 HDPE Pipe for Irrigation 650 1.05 650 1.05
8 Water Kund Farm Pond 9 6.30 9 6.30
9 Sprinkler System 13 2.20 13 2.20
Total Production Measures for Arable 66.55 13.25 79.80
D2 House hold Production System
9 Tool Kit for land less and SHG 97 12.76 0 0.00 97 12.76
10 Agricultural Machinary for Agricultural activity 144 9.23 26 0.52 170 9.75
Total House hold Production System 21.99 0.52 22.51
D3 Live stock Development
8 Vetinary Camp 32 7.22 40 3.20 72 10.42
9 Manger for Cattel 362 4.59 0 0.00 362 4.59
10 Bull Distribution 1 0.70 0 0.00 1 0.70
11 Mineral mixture 333 4.02 0 0.00 333 4.02
12 Castration 0 0.00 40 0.04 40 0.04
13 AI 0 0.00 100 0.08 100 0.08
14 Deworming 0 0.00 1000 0.00 1000 0.00
15 Foder Demonstration 0 0.00 400 0.80 400 0.80
Total live stock Development 16.53 4.12 20.65
Total (D) 105.07 17.89 122.96
E (E) Consolidation 3% 21.07 21.02
Grand Total 700.80 364.89 1065.64
STATE RAJASTHAN DIST. AJMER
BLOCK ARAIN GEOGRAPHICAL AREA 6058 Ha
AGROCLIMATIC ZONE III A Effective area 5840 Ha
Name of Watersed BHAMOLAV Arable Area 4459 Ha
Macro /Micro No 4/1,23/14,15,16,17,18 Non Arable Area 1381 Ha
Gram Panchyat BHAMOLAV, CHOTA LAMBA, ARAIN, SANDOLIA Total Cost 700.8 Lacs
Unit Cost 0.12 Lacs
(A) Preparatory phase activities capacity building trainings & EPA
% % Fin % Fin % Fin % Fin % Fin % FinAdmn.Admn.Admn.Admn. 10.00 70.08 1.00 7.01 2.00 14.02 2.00 14.02 2.00 14.02 2.00 14.02 1.00 7.01MonitoringMonitoringMonitoringMonitoring 1.00 7.01 0.10 0.70 0.20 1.40 0.20 1.40 0.20 1.40 0.20 1.40 0.10 0.70EvaluationEvaluationEvaluationEvaluation 1.00 7.01 0.00 0.00 0.30 2.10 0.00 0.00 0.35 2.45 0.00 0.00 0.35 2.45EPAEPAEPAEPA 4.00 28.03 4.00 28.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00I & CBI & CBI & CBI & CB 5.00 35.04 1.50 10.51 1.50 10.51 0.50 3.50 1.00 7.01 0.00 0.00 0.50 3.50DPRDPRDPRDPR 1.00 7.01 1.00 7.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00TotalTotalTotalTotal 22.0022.0022.0022.00 154.18 7.607.607.607.60 53.2653.2653.2653.26 4.004.004.004.00 28.0328.0328.0328.03 2.702.702.702.70 18.9218.9218.9218.92 3.553.553.553.55 24.8824.8824.8824.88 2.202.202.202.20 15.4215.4215.4215.42 1.951.951.951.95 13.6713.6713.6713.67
(B) Natural resource management
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
A
Conservation measures for
arable land
1 Earthen Bund for Block A Ha 250 99.51 0 0 0 0 63 24.88 88 34.83 63 24.88 38 14.93
2 Earthen Bund for Block B Ha 83 15.76 0 0 0 0 21 3.94 29 5.52 21 3.94 12 2.36
3 Earthen Bund for Block C Ha 160 32.04 0 0 0 0 40 8.01 56 11.21 40 8.01 24 4.81
4 Earthen Bund for Block D Ha 158 41.13 0 0 0 0 40 10.28 55 14.40 40 10.28 24 6.17
6 Stone wall Terrace (PRT) Ha 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00
7 Khadin in Arable Land No. 35 147.92 0 0 0 0 9 36.98 12 51.77 9 36.98 5 22.19
Total Conservation arable Land 336.36 0.00 0.00 84.09 117.73 84.09 50.45
CHAPTER- V
TOTAL ANNUAL ACTION PLAN
1st year 2nd year 3rd year
Unit
6th year5th year4th year
5th year
1st year 2nd year
4th year
Fin
3rd yearYearwise
COMPONENT WISE & YEARWISE BREAKUP OF WATERSHED ACTIVITIES
Total Provision
6th year
Activity
ActivityActivityActivityActivity
YearwiseYearwiseYearwiseYearwise
Total
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinUnit
6th year5th year4th year1st year 2nd year 3rd yearYearwise
Total Provision
Activity
B
Conservation measures for non
arable land
8 V - dich Ha 81 7.24 0 0 0 0 20 1.81 28 2.53 20 1.81 12 1.09
9 Staggered Trenches Ha 90 10.12 0 0 0 0 23 2.53 32 3.54 23 2.53 14 1.52
10 Pasture development Ha 80 54.67 0 0 0 0 20 13.67 28 19.13 20 13.67 12 8.20
Drainage line treatment 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00
11 Farm pond/ New Nadi No. 15 12.09 0 0 0 0 4 3.02 5 4.23 4 3.02 2 1.81
12 Loose stone check Dam No. 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00
13 Small Masonary Structure No. 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00
14 Small pond No. 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00
15 Medium Masonary structure No. 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00
Total Non arable Conservation
and DLT (A+B) 84.12 0.00 0.00 21.03 29.44 21.03 12.62
Total (B) NRM 420.48 0.00 0.00 105.12 147.17 105.12 63.07
( C )( C )( C )( C ) Production System and micro enterprise
Production measures for arable
land 0.00 0.00
1 Agroforestry For Arable Ha 370 11.31 0 0 0 0 93 2.83 130 3.96 93 2.83 56 1.70
2 Only Horticulture 0.5Ha 29 23.96 0 0 0 0 7 5.99 10 8.39 7 5.99 4 3.59
3 Vermi compost No. 9 7.68 0 0 0 0 2 1.92 3 2.69 2 1.92 1 1.15
4 Crop / Fodder Demostration No. 553 14.95 0 0 0 0 138 3.74 194 5.23 138 3.74 83 2.24
5
Kitchen Garden Kit demonstration
Unit No. 356 8.65 0 0 0 0 89 2.16 125 3.03 89 2.16 53 1.30
Total Production Measures for
Arable 66.55 0.00 0.00 16.64 23.29 16.64 9.98
House hold Production System
6 Tool Kit for land less and SHG No. 97 12.76 0 0 0 0 24 3.19 34 4.47 24 3.19 15 1.91
7
Agricultural Machinary for
Agricultural activity No. 144 9.23 0 0 0 0 36 2.31 50 3.23 36 2.31 22 1.38
Total House hold Production
System 21.99 0.00 0.00 5.50 7.70 5.50 3.30
Live stock Development
8 Vetinary Camp No. 32 7.22 0 0 0 0 8 1.81 11 2.53 8 1.81 5 1.08
9 Manger for Cattel No. 362 4.59 0 0 0 0 91 1.15 127 1.61 91 1.15 54 0.69
10 Bull Distribution No. 1 0.70 0 0 0 0 0 0.18 0 0.25 0 0.18 0 0.11
11 Mineral mixture 333 4.02 0 0 0 0 83 1.01 117 1.41 83 1.01 50 0.60
Total live stock Development 16.53 0.00 0.00 4.13 5.79 4.13 2.48
Total (C) 105.07 0.00 0.00 26.27 36.77 26.27 15.76
(D) Consolidation 21.07 0.00 0.00 0.00 0.00 0.00 21.07
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinUnit
6th year5th year4th year1st year 2nd year 3rd yearYearwise
Total Provision
ActivityGrand Total 700.80 53.26 28.03 150.31 208.82 146.81 113.57
STATE RAJASTHAN DIST. AJMER
BLOCK ARAIN GEOGRAPHICAL AREA 2773 Ha
AGROCLIMATIC ZONE III A Effective area 2555 Ha
Name of Watersed Bhamolav Arable Area 2017 Ha
Macro /Micro No 4/1,2 3/18 Non Arable Area 538 Ha
Gram Panchyat Bhamolav Total Cost 306.6 Lacs
Watershed Committee Bhamolav Unit Cost 0.12 Lacs
(A) Preparatory phase activities capacity building trainings & EPA
% % Fin % Fin % Fin % Fin % Fin % FinAdmn. 10.00 30.66 1.00 3.07 2.00 6.13 2.00 6.13 2.00 6.13 2.00 6.13 1.00 3.07
Monitoring 1.00 3.07 0.10 0.31 0.20 0.61 0.20 0.61 0.20 0.61 0.20 0.61 0.10 0.31Evaluation 1.00 3.07 0.00 0.00 0.30 0.92 0.00 0.00 0.35 1.07 0.00 0.00 0.35 1.07
EPA 4.00 12.26 4.00 12.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00I & CB 5.00 15.33 1.50 4.60 1.50 4.60 0.50 1.53 1.00 3.07 0.00 0.00 0.50 1.53DPR 1.00 3.07 1.00 3.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total 22.0022.0022.0022.00 67.45 7.607.607.607.60 23.3023.3023.3023.30 4.004.004.004.00 12.2612.2612.2612.26 2.702.702.702.70 8.288.288.288.28 3.553.553.553.55 10.8810.8810.8810.88 2.202.202.202.20 6.756.756.756.75 1.951.951.951.95 5.985.985.985.98
(B) Natural resource management
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
A
Conservation measures for
arable land
1 Earthen Bund for Block A Ha 100 43.50 0.00 0.00 25 10.88 35 15.23 25 10.88 15 6.53
2 Earthen Bund for Block B Ha 8 1.83 0.00 0.00 2 0.46 3 0.64 2 0.46 1 0.27
3 Earthen Bund for Block C Ha 40 6.28 0.00 0.00 10 1.57 14 2.20 10 1.57 6 0.94
4 Earthen Bund for Block D Ha 40 9.46 0.00 0.00 10 2.37 14 3.31 10 2.37 6 1.42
5 Earthen Bund for Block E Ha 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00
6 Stone wall Terrace (PRT) Ha 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00
7 Khadin in Arable Land No. 18 86.09 0.00 0.00 5 21.52 6 30.13 5 21.52 3 12.91
Total Conservation arable Land 147.16 0.00 0.00 36.79 51.51 36.79 22.07
FinTotal 1st year
Village Covered
6th year2nd year 3rd year 4th year
COMPONENT WISE & YEARWISE BREAKUP OF WATERSHED ACTIVITIES
GRAM PANCHYAT BHAMOLAV
Activity
Yearwise5th year 6th year
Bhamolav, Dang
2nd year 3rd year 4th year
Activity Unit
Total ProvisionYearwise
1st year 5th year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
6th year2nd year 3rd year 4th year
Activity Unit
Total ProvisionYearwise
1st year 5th year
B
Conservation measures for non
arable land
8 V - dich Ha 40 3.17 10 0.79 14 1.11 10 0.79 6 0.48
9 Staggered Trenches Ha 45 4.43 11 1.11 16 1.55 11 1.11 7 0.66
10 Pasture development Ha 45 23.92 11 5.98 16 8.37 11 5.98 7 3.59
Drainage line treatment 0 0.00 0 0.00 0 0.00 0 0.00
11 Farm pond/ New Nadi No. 6 5.28 2 1.32 2 1.85 2 1.32 1 0.79
12 Loose stone check Dam No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
13 Small Masonary Structure No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0
14 Small pond No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
15 Medium Masonary structure No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
Total Non arable Conservation
and DLT (A+B) 36.80 0.00 0.00 9.20 12.88 9.20 5.52
Total (B) NRM 183.96 0.00 0.00 45.99 64.39 45.99 27.59
( C )( C )( C )( C ) Production System and micro enterprise
Production measures for arable
land
1 Agroforestry For Arable Ha 230 4.95 58 1.24 81 1.73 58 1.24 35 0.74
2 Only Horticulture 0.5Ha 15 10.48 4 2.62 5 3.67 4 2.62 2 1.57
3 Vermi compost No. 4 3.78 1 0.95 1 1.32 1 0.95 1 0.57
4 Crop / Fodder Demostration No. 361 6.53 90 1.63 126 2.29 90 1.63 54 0.98
5
Kitchen Garden Kit demonstration
Unit No. 184 3.38 46 0.85 64 1.18 46 0.85 28 0.51
Total Production Measures for
Arable 29.12 0.00 0.00 7.28 10.19 7.28 4.37
House hold Production System 0 0.006 Tool Kit for land less and SHG No. 36 5.57 9 1.39 13 1.95 9 1.39 5 0.84
7
Agricultural Machinary for
Agricultural activity No. 79 4.05 20 1.01 28 1.42 20 1.01 12 0.61
Total House hold Production
System 9.62 0.00 0.00 2.41 3.37 2.41 1.44
Live stock Development
8 Vetinary Camp No. 14 3.16 4 0.79 5 1.11 4 0.79 2 0.47
9 Manger for Cattel No. 200 1.98 50 0.50 70 0.69 50 0.50 30 0.30
10 Bull Distribution No. 1 0.70 0 0.18 0 0.25 0 0.18 0 0.11
11 Mineral mixture 200 1.36 50 0.34 70 0.48 50 0.34 30 0.20
Total live stock Development 7.20 0.00 0.00 1.80 2.52 1.80 1.08
Total (C) 45.94 0.00 0.00 11.49 16.08 11.49 6.89
(D) Consolidation 9.25 0.00 0.00 0.00 0.00 0.00 9.25
Grand Total 306.60 23.30 12.26 65.75 91.35 64.22 49.71
STATE RAJASTHAN DIST. AJMER
BLOCK ARAIN GEOGRAPHICAL AREA 685 Ha
AGROCLIMATIC ZONE III A Effective area 685 Ha
Name of Watersed BHAMOLAV Arable Area 163 Ha
Macro /Micro No 3/14,15 Non Arable Area 522 Ha
Gram Panchyat ARAIN Total Cost 82.2 Lacs
Watershed Committee ARAIN Unit Cost 0.12 Lacs
(A) Preparatory phase activities capacity building trainings & EPA
% % Fin % Fin % Fin % Fin % Fin % FinAdmn. 10.00 8.22 1.00 0.82 2.00 1.64 2.00 1.64 2.00 1.64 2.00 1.64 1.00 0.82
Monitoring 1.00 0.82 0.10 0.08 0.20 0.16 0.20 0.16 0.20 0.16 0.20 0.16 0.10 0.08Evaluation 1.00 0.82 0.00 0.00 0.30 0.25 0.00 0.00 0.35 0.29 0.00 0.00 0.35 0.29
EPA 4.00 3.29 4.00 3.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00I & CB 5.00 4.11 1.50 1.23 1.50 1.23 0.50 0.41 1.00 0.82 0.00 0.00 0.50 0.41DPR 1.00 0.82 1.00 0.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total 22.0022.0022.0022.00 18.08 6.256.256.256.25 3.293.293.293.29 2.222.222.222.22 2.922.922.922.92 1.811.811.811.81 1.601.601.601.60
(B) Natural resource management
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
A
Conservation measures for
arable land
1 Earthen Bund for Block A Ha 31 11.68 0.00 0.00 8 2.92 10.85 4.09 7.75 2.92 4.65 1.75
2 Earthen Bund for Block B Ha 16 2.90 0.00 0.00 4 0.73 5.60 1.02 4.00 0.73 2.40 0.44
3 Earthen Bund for Block C Ha 32 5.37 0.00 0.00 8 1.34 11.20 1.88 8.00 1.34 4.80 0.81
4 Earthen Bund for Block D Ha 29 6.60 0.00 0.00 7 1.65 10.15 2.31 7.25 1.65 4.35 0.99
5 Earthen Bund for Block E Ha 0 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 Stone wall Terrace (PRT) Ha 0 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 Khadin in Arable Land No. 3 12.90 0.00 0.00 1 3.23 1.05 4.52 0.75 3.23 0.45 1.94
Total Conservation arable Land 39.45 0.00 0.00 9.86 13.81 9.86 5.92
Village Covered
Activity Unit
Total ProvisionYearwise
1st year 5th year 6th year
COMPONENT WISE & YEARWISE BREAKUP OF WATERSHED ACTIVITIES
GRAM PNACHYAT ARAIN
Activity
Yearwise5th year 6th year
FinTotal 1st year 2nd year 4th year
ARAIN
2nd year 3rd year 4th year
3rd year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinActivity Unit
Total ProvisionYearwise
1st year 5th year 6th year2nd year 3rd year 4th year
B
Conservation measures for non
arable land
8 V - dich Ha 10 0.85 3 0.21 3.50 0.30 2.50 0.21 1.50 0.13
9 Staggered Trenches Ha 16 1.18 4 0.30 5.60 0.41 4.00 0.30 2.40 0.18
10 Pasture development Ha 9 6.41 2 1.60 3.15 2.24 2.25 1.60 1.35 0.96
Drainage line treatment 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Farm pond/ New Nadi No. 3 1.43 1 0.36 1.05 0.50 0.75 0.36 0.45 0.21
12 Loose stone check Dam No.
13 Small Masonary Structure No.
14 Small pond No.
15 Medium Masonary structure No.
Total Non arable Conservation
and DLT (A+B) 9.87 0.00 0.00 2.47 3.45 2.47 1.48
Total (B) NRM 49.32 0.00 0.00 12.33 17.26 12.33 7.40
( C )( C )( C )( C ) Production System and micro enterprise
Production measures for arable
land
1 Agroforestry For Arable Ha 80 1.32 20 0.33 28.00 0.46 20.00 0.33 12.00 0.20
2 Only Horticulture 0.5Ha 4 2.80 1 0.70 1.40 0.98 1.00 0.70 0.60 0.42
3 Vermi compost No. 2 1.01 1 0.25 0.70 0.35 0.50 0.25 0.30 0.15
4 Crop / Fodder Demostration No. 100 1.75 25 0.44 35.00 0.61 25.00 0.44 15.00 0.26
5
Kitchen Garden Kit demonstration
Unit No. 82 0.92 21 0.23 28.70 0.32 20.50 0.23 12.30 0.14Total Production Measures for
Arable 7.80 0.00 0.00 1.95 2.73 1.95 1.17
House hold Production System 0 0.006 Tool Kit for land less and SHG No. 43 1.49 11 0.37 15.05 0.52 10.75 0.37 6.45 0.22
7
Agricultural Machinary for
Agricultural activity No. 40 1.09 10 0.27 14.00 0.38 10.00 0.27 6.00 0.16Total House hold Production
System 2.58 0.00 0.00 0.65 0.90 0.65 0.39
Live stock Development
8 Vetinary Camp No. 6 0.85 2 0.21 2.10 0.30 1.50 0.21 0.90 0.13
9 Manger for Cattel No. 75 0.53 19 0.13 26.25 0.19 18.75 0.13 11.25 0.08
10 Bull Distribution No. 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Mineral mixture 53 0.55 13 0.14 18.55 0.19 13.25 0.14 7.95 0.08
Total live stock Development 1.93 0.00 0.00 0.48 0.68 0.48 0.29
Total (C) 12.31 0.00 0.00 3.08 4.31 3.08 1.85
(D) Consolidation 2.39 0.00 0.00 0.00 0.00 0.00 2.392.392.392.39Grand Total 82.10 6.25 3.29 17.63 24.49 17.22 13.24
STATE RAJASTHAN DIST. AJMER
BLOCK ARAIN GEOGRAPHICAL AREA 1395 Ha
AGROCLIMATIC ZONE III A Effective area 1395 Ha
Name of Watersed BHAMOLAV Arable Area 1187 Ha
Macro /Micro No 3\17 Non Arable Area 208 Ha
Gram Panchyat SANDOLIA Total Cost 167.4 Lacs
Watershed Committee SANDOLIA Unit Cost 0.12 Lacs
(A) Preparatory phase activities capacity building trainings & EPA
% % Fin % Fin % Fin % Fin % Fin % FinAdmn. 10.00 16.74 1.00 1.67 2.00 3.35 2.00 3.35 2.00 3.35 2.00 3.35 1.00 1.67
Monitoring 1.00 1.67 0.10 0.17 0.20 0.33 0.20 0.33 0.20 0.33 0.20 0.33 0.10 0.17Evaluation 1.00 1.67 0.00 0.00 0.30 0.50 0.00 0.00 0.35 0.59 0.00 0.00 0.35 0.59
EPA 4.00 6.70 4.00 6.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00I & CB 5.00 8.37 1.50 2.51 1.50 2.51 0.50 0.84 1.00 1.67 0.00 0.00 0.50 0.84DPR 1.00 1.67 1.00 1.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total 22.0022.0022.0022.00 36.83 12.7212.7212.7212.72 6.706.706.706.70 4.524.524.524.52 5.945.945.945.94 3.683.683.683.68 3.263.263.263.26
(B) Natural resource management
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
A
Conservation measures for
arable land
1 Earthen Bund for Block A Ha 65 23.79 0.00 0.00 16 5.95 23 8.33 16 5.95 10 3.57
2 Earthen Bund for Block B Ha 32 5.92 0.00 0.00 8 1.48 11 2.07 8 1.48 5 0.89
3 Earthen Bund for Block C Ha 49 10.94 0.00 0.00 12 2.74 17 3.83 12 2.74 7 1.64
4 Earthen Bund for Block D Ha 47 13.45 0.00 0.00 12 3.36 16 4.71 12 3.36 7 2.02
5 Earthen Bund for Block E Ha 0 0.00 0.00 0.0 0 0.00 0 0.00 0 0.00 0 0.00
6 Stone wall Terrace (PRT) Ha 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00
7 Khadin in Arable Land No. 7 26.25 0.00 0.00 2 6.56 2 9.19 2 6.56 1 3.94
Total Conservation arable Land 80.35 0.00 0.00 20.09 28.12 20.09 12.05
B
Conservation measures for non
arable land
8 V - dich Ha 16 1.73 0.00 0.00 4 0.43 6 0.61 4 0.43 2 0.269 Staggered Trenches Ha 19 2.42 0.00 0.00 0 0.00 0 0.00 0 0.00 19 2.4210 Pasture development Ha 26 13.06 0.00 0.00 0 0.00 0 0.00 0 0.00 26 13.06
2nd year 3rd year 4th year 5th year 6th year
Total 1st year 2nd year 3rd year 4th year
Activity Unit
Total ProvisionYearwise
1st year
Village Covered
SANDOLIA
5th year 6th yearFin
COMPONENT WISE & YEARWISE BREAKUP OF WATERSHED ACTIVITIES
GRAM PNACHYAT SANDOLIA
Activity
Yearwise
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
2nd year 3rd year 4th year 5th year 6th year
Activity Unit
Total ProvisionYearwise
1st year
Drainage line treatment
11 Farm pond/ New Nadi No. 3 2.88 0.00 0.00 1 0.72 1.05 1.01 0.75 0.72 0.45 0.43
12 Loose stone check Dam No.
13 Small Masonary Structure No.
14 Small pond No.
15 Medium Masonary structure No.
Total Non arable Conservation
and DLT (A+B) 20.09 0.00 0.00 1.15 1.61 1.15 16.17
Total (B) NRM 100.44 0.00 0.00 21.24 29.74 21.24 28.22
( C )( C )( C )( C ) Production System and micro enterprise
Production measures for arable
land
1 Agroforestry For Arable Ha 40 2.71 0.00 0.00 10 0.68 14 0.95 10 0.68 6 0.41
2 Only Horticulture 0.5Ha 5 5.74 0.00 0.00 1 1.44 2 2.01 1 1.44 1 0.86
3 Vermi compost No. 4 1.11 0.00 0.00 1 0.28 1 0.39 1 0.28 1 0.17
4 Crop / Fodder Demostration No. 42 3.59 0.00 0.00 11 0.90 15 1.26 11 0.90 6 0.54
5
Kitchen Garden Kit demonstration
Unit No. 40 2.75 0.00 0.00 10 0.69 14 0.96 10 0.69 6 0.41Total Production Measures for
Arable 15.90 0.00 0.00 3.98 5.57 3.98 2.39
House hold Production System 0 0.006 Tool Kit for land less and SHG No. 11 3.07 0.00 0.00 3 0.77 4 1.07 3 0.77 2 0.46
7
Agricultural Machinary for
Agricultural activity No. 25 2.18 0.00 0.00 6 0.55 9 0.76 6 0.55 4 0.33Total House hold Production
System 5.25 0.00 0.00 1.31 1.84 1.31 0.79
Live stock Development
8 Vetinary Camp No. 10 1.72 0.00 0.00 3 0.43 4 0.60 3 0.43 2 0.26
9 Manger for Cattel No. 60 1.08 0.00 0.00 15 0.27 21 0.38 15 0.27 9 0.16
10 Bull Distribution No. 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00
11 Mineral mixture 60 1.13 0.00 0.00 15 0.28 21 0.40 15 0.28 9 0.17
Total live stock Development 3.93 0.00 0.00 0.98 1.38 0.98 0.59
Total (C) 25.08 0.00 0.00 6.27 8.78 6.27 3.76
(D) Consolidation 5.06 0.00 0.00 0.00 0.00 0.00 5.065.065.065.06Grand Total 167.41 12.72 6.70 32.03 44.46 31.19 40.31
STATE RAJASTHAN DIST. AJMER
BLOCK ARAIN GEOGRAPHICAL AREA 1205 Ha
AGROCLIMATIC ZONE III A Effective area 1205 Ha
Name of Watersed BHAMOLAV Arable Area 1092 Ha
Macro /Micro No 3\16 Non Arable Area 113 Ha
Gram Panchyat CHOTA LAMBA Total Cost 144.6 Lacs
Watershed Committee CHOTA LAMBA Unit Cost 0.12 Lacs
(A) Preparatory phase activities capacity building trainings & EPA
% % Fin % Fin % Fin % Fin % Fin % FinAdmn. 10.00 14.46 1.00 1.45 2.00 2.89 2.00 2.89 2.00 2.89 2.00 2.89 1.00 1.45
Monitoring 1.00 1.45 0.10 0.14 0.20 0.29 0.20 0.29 0.20 0.29 0.20 0.29 0.10 0.14Evaluation 1.00 1.45 0.00 0.00 0.30 0.43 0.00 0.00 0.35 0.51 0.00 0.00 0.35 0.51
EPA 4.00 5.78 4.00 5.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00I & CB 5.00 7.23 1.50 2.17 1.50 2.17 0.50 0.72 1.00 1.45 0.00 0.00 0.50 0.72DPR 1.00 1.45 1.00 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total 22.0022.0022.0022.00 31.81 10.9910.9910.9910.99 5.785.785.785.78 3.903.903.903.90 5.135.135.135.13 3.183.183.183.18 2.822.822.822.82
(B) Natural resource management
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
A
Conservation measures for
arable land
1 Earthen Bund for Block A Ha 54 20.54 0.00 0.00 14 5.14 19 7.19 14 5.14 8 3.08
2 Earthen Bund for Block B Ha 27 5.11 0.00 0.00 7 1.28 9 1.79 7 1.28 4 0.77
3 Earthen Bund for Block C Ha 39 9.45 0.00 0.00 10 2.36 14 3.31 10 2.36 6 1.42
4 Earthen Bund for Block D Ha 42 11.62 0.00 0.00 11 2.91 15 4.07 11 2.91 6 1.74
5 Earthen Bund for Block E Ha 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00
6 Stone wall Terrace (PRT) Ha 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00
7 Khadin in Arable Land No. 7 22.68 0.00 0.00 2 5.67 2 7.94 2 5.67 1 3.40
Total Conservation arable Land 69.40 0.00 0.00 17.35 24.29 17.35 10.41
B
Conservation measures for non
arable land
8 V - dich Ha 15 1.49 0.00 0.00 4 0.37 5 0.52 4 0.37 2 0.22
9 Staggered Trenches Ha 10 2.09 0.00 0.00 0 0.00 5 0.65 5 0.60 0 0.84
10 Pasture development Ha 30 11.28 0.00 0.00 0 0.00 0 0.00 0 0.00 30 11.28
COMPONENT WISE & YEARWISE BREAKUP OF WATERSHED ACTIVITIES
GRAM PANCHYAT CHOTA LAMBA
Activity
YearwiseTotal 1st year 2nd year
Fin3rd year
Activity Unit
Total ProvisionYearwise
1st year 6th year
4th year 5th year 6th year
Village Covered
Chota lamba
2nd year 3rd year 4th year 5th year
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinActivity Unit
Total ProvisionYearwise
1st year 6th year2nd year 3rd year 4th year 5th year
Drainage line treatment
11 Farm pond/ New Nadi No. 3 2.50 0.00 0.00 1 0.63 1 0.88 1 0.63 0 0.38
12 Loose stone check Dam No.
13 Small Masonary Structure No.
14 Small pond No.
15 Medium Masonary structure No.
Total Non arable Conservation
and DLT (A+B) 17.36 0.00 0.00 1.00 2.05 1.60 12.72
Total (B) NRM 86.76 0.00 0.00 18.35 26.34 18.95 23.13
( C )( C )( C )( C ) Production System and micro enterprise
Production measures for arable
land
1 Agroforestry For Arable Ha 20 2.33 0.00 0.00 5 0.58 7 0.82 5 0.58 3 0.35
2 Only Horticulture 0.5Ha 5 4.94 0.00 0.00 0 0.00 2 0.45 3 0.47 0 4.02
3 Vermi compost No. 2 1.78 0.00 0.00 0 0.00 1 0.30 0 0.00 1 1.48
4 Crop / Fodder Demostration No. 50 3.08 0.00 0.00 10 0.12 20 0.18 12 0.20 8 2.58
5
Kitchen Garden Kit demonstration
Unit No. 50 1.60 0.00 0.00 0 0.00 20 0.18 20 0.18 10 1.24Total Production Measures for
Arable 13.73 0.00 0.00 0.70 1.93 1.43 9.67
House hold Production System 0.00
6 Tool Kit for land less and SHG No. 7 2.63 0.00 0.00 2 0.66 2 0.92 2 0.66 1 0.39
7
Agricultural Machinary for
Agricultural activity No. 20 1.91 0.00 0.00 0 0.00 0 0.00 0 0.00 20 1.91Total House hold Production
System 4.54 0.00 0.00 0.66 0.92 0.66 2.30
Live stock Development
8 Vetinary Camp No. 12 1.49 0.00 0.00 3 0.37 4 0.52 3 0.37 2 0.22
9 Manger for Cattel No. 35 1.00 0.00 0.00 9 0.25 12 0.35 9 0.25 5 0.15
10 Bull Distribution No. 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00
11 Mineral mixture 20 0.98 0.00 0.00 5 0.25 7 0.34 5 0.25 3 0.15
Total live stock Development 3.47 0.00 0.00 0.87 1.21 0.87 0.52
Total (C) 21.74 0.00 0.00 2.23 4.06 2.96 12.49
(D) Consolidation 4.37 0.00 0.00 0.00 0.00 0.00 4.37
Grand Total 144.68 10.99 5.78 24.48 35.53 25.09 42.81
Table-M(PA)A1: Entry point activities (EPA) as on
(All financial figures in lakh Rs.)1 2 3 4 5 6 7 8 9 10 11
S. No. State DistrictNames of
projects
Amount
earmark
ed for
EPA
Entry Point Activities plannedEstimated
cost
Expendit
ure
incurred
BalanceExpected
outcome
Actual
outcome
1. Street Solar Light - 32 Unit 8.00 8.00 0.00
2. Samsan Ghat Tinshed -4 Nos. 4.00 0.80 3.20
3. Samsan Ghat Bethak -5 Nos. 12.10 1.50 10.60
4. Water Supply Tube well - 1 Nos. 1.00 0.00 1.00
5. Water coolar with purify with water
Hut- 1 Nos.0.80 0.50 0.30
6.Kheli Kota - 1 Nos. 0.75 0.50 0.25
7.Sulabh Complex 0.88 0.00 0.88
8 Hatai No-1 0.50 0.00 0.50
28.03 28.03 11.30 16.23
Chapter IV. Project Activities
IV. A. Preparatory phase
1 Raj Ajmer
IWMP-I
(Bhamolav)
P.S. Arain
28.03Useful for
Benifeciarys-
Name of site Bhamolav
5.22 1.5
5
77
10
2.5
2
1
10
2
20
Je dqy Je dqy
1-
6 2 2 2.5 60.000 /ku QhV60.000 /ku QhV1.699 /ku eh- 91.00 91.00 154.59 154.59
2-
v HW 6 2.00 2.00 0.50 12.000 /ku QhV0.340 /ku eh- 320.00 1597.00 108.72 542.60
3
6 2.00 2.00 1.50 36.000 /ku QhV2 16.25 1.00 1.00 32.500 /ku QhV2 10.00 1.00 1.00 20.000 /ku QhV
Pillar 6 1.25 1.25 7.00 65.625 /ku QhV154.125 /ku QhV4.364 /ku eh- 357.00 1273.00 1557.88 5555.12
6-
6 5.00 7.00 210.000 oxZQhV2 16.25 3.00 97.500 oxZQhV2 10.00 3.00 60.000 oxZQhV
367.500 oxZQhV10.405 oxZ eh- 69.90 122.00 727.32 1269.43
Model EstimateModel EstimateModel EstimateModel EstimateVermi CompostVermi CompostVermi CompostVermi Compost
jkf'k
uhao esa 1-5 xgjkbZ rd feVVh dh [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk] cxy dkslaokjuk] [kqnh feêh dks ckgj fudkyuk] uhao Hkjus ds ckn [kkyh LFkkuksa dks iqu% feêh lsHkjuk rFkk cph gqbZ feêh dks 50 ehVj dh nwjh rd fuLrkj.k djukA (Item no. 2b, 190c, 2c
)
lhesUV daØhV uhao ;k Q'kZ esa 40 fe- eh- ukHkh; eki dh iRFkj fxÍh@bZV fxÍh] lhesUVjsr elkyk esa 1 lhesUV % 4 jsr % 8 fxÍh vuqikr eas feykdj Mkyuk rFkk dqVkbZ djuk]rjkbZ lesrA Jfed fefJrA (Item No. 192)
dz-la- y- pkS- Åa-
csj}k iRFkj dh fpukbZ 1%6 vuqikr lhesaV&ctjh elkys esaAuhao esa (Item No. 191a)
ek=k bdkbZnj
fooj.k la-
lhesaV IykLVj nhokj ij 1%6 vuqikr es lhesaV&ctjh feykdj dj tksMksa dks dqjsnus rFkkrjkbZ lfgr 20 fe-eh-A (Item no. 73a)
7-
150.000 fdxkz 9.20 58.30 1380.00 8745.00
8
14 14 6.00 3.00 252.000 oxZQhV252.000 oxZQhV
23.412 oxZ eh- 20.00 343.00 468.23 8030.17
82.500 Vu 800.00 2000.00
930.000 fdxkz 80.00 2400.00
10
20.00 Bed 250.00 5000.00
4396.74 33696.91
4396.74 33696.91
1010.91
34708
12.7% 4400
87.3% 30310
34710
6 fe-eh- eksVkbZ es ukyhnkj ,LosLVl lhesaV dh pnjksa dks bLikr ds ts ;k,y gqd rFkk uV oksYV ls yxkuk o vkiwfÙkZ djukA dSph rFkk ijfyu dhHkqxrku vyx ls gksxkA
Cow dung
;ksx
;ksx
tksM+ 3 % dfUVu tsalhdqy ;ksx dqy ;ksx dqy ;ksx dqy ;ksx
ykxr Je en esa ------------------------------
ykxr lkexzh en esa ---------------------------
dqy ;ksx dqy ;ksx dqy ;ksx dqy ;ksx
fxzy@xsV vkfn es yksgs dk dk;Z ftlesa likV] dksfu;k] Vh rFkk ukyhnkj¼psuy½] dks dkVuk] p<+kuk rFkk yxkuk vkfnA
Worms @ 3 kg per ton
Formation of vermin bed with agro-waste, cow dung and
worms
4.5.2 Khakhara making
Technical Details
Sr. No. Total cost
1 15000
2 5000
3 20000
4 60
Table No. 4.7.5 : Kitchen garden Technical details:
Sr. No. Quantity Unit Total cost
1 5 Packet 100
2 1 Nos. 700
3 Fertilizers and
pesticides, Weeding
100 100
900
Activity Rate
Vegetable seeds 20
Bucket drip kits 700
6 Packaging cost 100
260
Total cost 40260
b. Variable cost
Raw material
(Wheat) per day
4 kg 15
5 Labour, Electricity 100
Khakhara making
machine
10 2000
40000
Milling Machine 1 15000
Dough making
machine
1 5000
Particulars Quantity Rate
a. Fixed cost
4.5.8 Tailoring work
“Garment and Tailor made the gentleman” these English proverbs for tailoring work importance. Clothes are important for human being. In this business Trainee and knowledge of tailoring work is easily helpful to get employment.
i. Market management: In tailoring work there is no problem of marketing of readymade cloths. Generally making clothes persons buy clothes and give to Taylor and take the ready clothes.
ii. Production process: Necessary of customer for clothes takes map for markings and then cutting. Then on tailoring machine fitting button, clip chain.
iii. Production capacity: Daily production capacity is of Rs.700. Considering 50 per cent production at start daily production capacity will be Rs. 350.
iv. Following things are required for getting licence
1. One who is having tailoring as family business can apply.
2. Required Diploma in tailoring and cutting Course (It should be government recognized.)
3. Widow/Person should be applying in special case.
4. Training should be cleared from government approved training centre.
It is self employment work so salary will be calculated as a net profit 1900 Rs per month
Sr. No. Total
Cost (Rs.)
1 35000/-
2 8000/-
3 3000/-
4 2000/-
5 3000/-
6 5000/-
1 4500/-
2 1000/-
3 150/-
4 100/-
5 500/-
6 150/-
6400/- 6400/-
Total 62400 ≈ 65000
Lease house 1 500/-
Friction cost 1 150/-
Power fuel cost 1 150/-
Repair cost 1 100/-
Variable cost Raw Material 1 4500/-
Salary cost per one
person
1 1000/-
Others 1 5000/-
Total 17500/- 56000/-
Scissors tap, Iron or
Other Equipments
1 2000/-
Furniture 1 3000/-
Electric Motor ¼
H.P.
10 800/-
Cutting table /board 1 3000/-
Details No. Price Rs.
Fixed cost
Tailoring Machine 10 3500/-
Table No. 4.7.4 : Chaff cutter
Sr. No. Activity Quantity Unit Rate Total cost
1 Chaff
cutter
1 Nos. 20000 20000
4.5.10 Papad making
Table No. 4.7.9 : Papad making
Sr. No Prices Rs.
1 12000/-
2 8000/-
3 -
4 1000/-
5 1000/-
6 Installatio
n,Founda
3000/-
Total 25000
Equipments
Rake,Different Size
Of Jars
Papad Preparation
Set
-
Details No
Milling Machine
With Electric Motor
1
Pastearize Dasta
Machine With
Electric Motor
1
50nos. chap cutter
benifisheriese dist. X 2000 =
1,00,000.
Garment and Tailor made the gentleman” these English proverbs for tailoring work importance. Clothes are important for human being. In this business Trainee and knowledge of tailoring work is easily helpful to get employment.
In tailoring work there is no problem of marketing of readymade cloths. Generally making clothes persons buy clothes and give to Taylor and take the ready clothes.
Necessary of customer for clothes takes map for markings and then cutting. Then on tailoring machine fitting button, clip chain.
Daily production capacity is of Rs.700. Considering 50 per cent production at start daily production capacity will be Rs. 350.
2. Required Diploma in tailoring and cutting Course (It should be government recognized.)
It is self employment work so salary will be calculated as a net profit 1900 Rs per month
Garment and Tailor made the gentleman” these English proverbs for tailoring work importance. Clothes are important for human being. In this business Trainee and knowledge of tailoring work is easily helpful to get employment.
In tailoring work there is no problem of marketing of readymade cloths. Generally making clothes persons buy clothes and give to Taylor and take the ready clothes.
Table 4.8.1 : Model for A Vermi-compost Unit
Sr. No Amount
(Rs.)
1 1000
2 1500
3 3125
4 1000
5 2000
2500
7 2000
8 8000
9 2400
10 5000
Cost for 8 cycles Rs. 2,28,200
Formation of vermin
bed with agro-
waste, cow dung
and worms
20 bed 250
11 Miscellaneous
Total cost Rs. 28,525
Cow dung 10 ton 800
Worms @ 3 kg per
ton
30 kg 80
6 Shovels, spades, crowbars, iron baskets,
Weighing scale (100
kg capacity)
1 2000
Binding wire for
tying wooden ballies
& mats
20 Kg 50
Labour charges for
erection of sheds
20 100
Wooden (4 m long) 25 60
Shade mats for
covering the roof
125 25
Particulars Quantity Rate (Rs.)
Wooden ballies (3 m
long)
20 50
IWMP-Bhamolav Karni Computer
P- 8
tyxzg.k {ks= ds lalk/ku
¼v½ yksx ,ao mudk jgu-lgu %&
tyxzg.k {ks= esa jgus okys yksx T;knkrj vf’kf{kr ,ao xjhch dh js[kk ls uhps
thou&;kiu djrs gSA bu yksaxksa dh vkfFkZd fLFkfr vPNh ugha gksus ds dkj.k T;knkrj
yksx Ñf"k ,ao i'kq/ku ls viuh vkthfodk pykrs gSA
¼Ck½ Hkwfe ,ao mldk mi;ksx %&
tyxzg.k {ks= esa miyC/k vf/kdrj Hkwfe catj ]iFkjhyh] o vuqi;ksxh gSA Hkwfe dk
fooj.k vyx ls n’kkZ;k x;k gSA bl Hkwfe dk mi;ksx Ñf"k] i'kq/ku] pkjkxkg] ty
laj{k.k] jkLrs] vkcknh ds mi;ksx esa fd;k tkrk gSA
¼l½ ikuh dk cgko ,ao mldk mi;ksx %&
tyxzg.k {ks= esa xSj eqefdu lery Hkwfe ij ikuh ds cgko dks jksdus ds fy, dksbZ
ty laxzg.k dk;Z ugha djok;s x;s gSA Hkwfe dk <yku yxHkx 1 ls 4 izfr’kr gS vr%
vf/kdrj ikuh cgqr rsth ls cgdj vius lkFk [ksr dh mitkÅ feV̀Vh ysdj pyk
tkrk gSA blh dkj.k ifj;kstuk dh vf/kdre Hkwfe catj gSA ifj;kstuk {kS= es d`f"k o
vd`f"k ;ksX; Hkwfe ij Hkwlaj{k.k ds dk;Z ugh djok;s x;s gSA vr% bl {ks= es e`nk dk
dVko lokZf/kd gSA dqN ikuh fdlkuksa ds [ksr esa ls xqtjrk gS] ftllss mi;ksxh Hkwfe
dk dVko gksrk gS D;ksafd [ksrksa esa fdlh izdkj ds tyxzg.k fodkl dk;Z ugha fd;s x;s
gSA
IWMP-Bhamolav Karni Computer
P- 9
¼n½ izkÑfrd ouLifr ,ao mldk ?kuRo %&
izkÑfrd :i ls miyC/k ouLifr;ksa esa nwj nwj rd QSyh gqbZ foyk;rh ccwy ]dSj]
vkdM+s] cSj [kstM+h] bR;knh gSa] ,ao mudk ?kuRo 'kwU; ds yxHkx gSA
¼;½ Qlysa ,ao mudk mRiknu %&
;gk¡ ij flQZ o"kkZ ij vk/kkfjr Qlysa [kjhQ esa cktjk] Xokj] eDdk] ewax mxkbZ tkrh
gS ftudh izfr gSDVs;j mRiknu {kerk cgqr gh de gSA o"kkZ ds le; ij ugha gksus
vf/kdk’kr;k Qlysa pkSiV gks tkrh gS rFkk vdky dh fLFkfr mRiUu gks tkrh gSA
fdlkuks dks oSKkfud tkudjh de gkus ds dkj.k vPNs cht o [kkn ds mi;ksx dk
izpyu bl {kS= es de gSA vHkh Hkh ikjEikfjd :i ls [ksrh dh tkrh gSA
¼j½ i'kq/ku ,ao mudk mRiknu %&
i'kq/ku esa HkSal] xk;] cSy] HksM+] cdjh vkfn ikys tkrs gS] ftudh o`f} cgqr gh de
ek=k esa gksrh gS ,oa muls gksus okyk nw/k o Åu dk mRiknu Hkh cgqr de gS] D;ksafd
xkao okys ns”kh uLy ds i'kq j[krs gSA pkjs dh leqfpr O;oLFkk u gksus ls i'kq/ku dkQh
fucZy ,ao vLoLFk ik;k tkrk gSA xkao es vkoxeu ds lk/kuks dk vHkko gSA i”kq
fpfdRlky; xkao ls dkQh nwj gSA vr% tkuoj fpfdRlk ds vHkko ds dkj.k vDlj
chekj jgrs gSA
AA tyxzg.k viukvks ] le`f}
ykvksAA
IWMP-Bhamolav Karni Computer
P- 10
mRiknu esa vkus okyh leL;kvksa dk fo1ys"k.k
¼v½ feÍh laca/kh leL;k;sa %&
{kS= esa ouLifr cgqr de gS] vf/kdk’k Hkwfe iFkjhyh o catj gSA tehu es <yko 3
ls 5 izfr”kr gksus ds dkj.k o’kkZ dk ikuh cgwr rsth ls cgdj tkrk gS cgrk ikuh
vius lkFk mitkm fefÍ dks cgkdj ys tkrk gSA o"kZ Hkj rst gokvksa dk nkSj pyrk
jgrk gS ftlls feV~Vh dk gok }kjk {kj.k Hkh a gksrk g]S o"kkZ ds ikuh dk laj{k.k ugha
gksus ls Hkwfe dk dVko gksrk gS] ftlls mijh ijr dh mi;ksxh feV~Vh cgdj pyh tkrh
gSA xk¡o ds lehi Hkwfe ij ouLifr ugha gksus ds dkj.k feÍh dk {kj.k gks x;k gS ,ao
Hkwfe ,dne catj gks xbZ gSA
¼c½ ikuh laca/kh leL;k;sa %&
Hkw ty bl {ks= es cgqr xgjk gS rFkk vyx vyx tehu ds vuqlkj {ks= esa dsoy
[kkjk ikuh gh miyC/k gSA xk¡o esa clh vkcknh ds fy;s tynk; foHkkx }kjk ikuh dh
gksnh cukbZ gqbZ gS] ftlesa ikuh dHkh dHkkj vkrk gSA ftlls fd eos”kh rks I;kls ejrs gS
lkFk lkFk turk dks Hkh dkQh nwjh ls iqjkus dqvksa o gS.MiEia ls ikuh ykuk iM+rk gSA
xk¡o esa gj le; ikuh dh leL;k cuh jgrh gSA xfeZ;ks es ihus ds ikuh dh leL;k
lokZf/kd jgrh gSA
¼l½ ouLifr laca/kh leL;k;sa %&
xk¡o esa tykÅ ydM+h dh vko”drk] tula[;k o`f} ds lkFk lkFk c<+usa ls o
i'kq/ku dk ncko c<us ls ouLifr dk ?kuRo ?kV x;k gSA mldh mRiknu {kerk u"V gks
x;h gSA
IWMP-Bhamolav Karni Computer
P- 11
¼n½ Ñf"k] i'kq/ku ,ao vU; mRiknu laca/kh leL;k;sa %&
{ks= esa o"kkZ de gksus] mUur fdLe ds chtksa dk mi;ksx ugha djus ukMh dk lj{k.k
ugha djus vkSj moZjdks] [kkn ,oa fdVuk”kd dk mi;ksx ugh djus ls Ñf"k mit dh
ek=k dkQh de gSA mUur uLy ds i'kq/ku ds vHkko ,ao mRiknu {kerk o xk¡o esa i'kqvksa
dh la[;k ds vuqlkj larqyu ugha gksus ls i'kq/ku dh mRikndrk esa foifjr vlj iM+rk
gSA xk¡o esa f”k{kk dk vHkko ,ao vkfFkZd fLFkfr detksj gksus ls xzkeokfl;ksa dk vius
iq”rSuh /ka/ks dks NksM+dj jkstxkj ds lk/kuksa dh [kkst esa 'kgj dh vkSj iyk;u gks jgk
gSA
mRiknu esa vkus okyh leL;kvksa ds fujkdj.k ds rduhdh
mik;
¼v½ feÍh laca/kh leL;kvksa ds fujkdj.k ds mik; %&
feV~Vh dk laj{k.k djus ds fy, ,oe~ gok dh xfr ds izHkko dks de djus ds fy;s
ouLifr] o`{kkjksi.k dj c<+kbZ tkosxhA rFkk ikuh ls Hkwfe ds dVko dks jksdus ds fy,
ikuh dh <ky ds foijhr cUM cuk;s tk;saxs tkss Hkwfe dk dVko jksdus es lgk;d gksxsA
Hkwfe ij tgk¡ fdlh Hkh izdkj dh Qly dk”rdkj ugha mxk ikrk gS] esa o`{kkjksi.k dj
?kkl dk chtkjksi.k dj feV~Vh dks cgus ls jksduk ,ao mldk LFkk;h :i ls fLFkjhdj.k
djus ds iz;kl fd;s tk;saxsA iFkjhyh o <ykonkj Hkwfe ij LVªsxMZ VªsUpst cukdj Hkwfe
dk dVko jksdus dk iz;kl fd;k tk;sxkA vd`f’k ;ksX; Hkwfe ij <yko ds foifjr oh
fMp cuk;h tksxh rkfd Hkwfe dk dVko jksdk tk ldsA ukyks es txg txg ywt LVksu
psd Mse ] iDds psd Mse] cuk;s tk;sxs] ukys ds fLFkjhdj.k dk;Z djok;k tk;sxk rkfd
ukyks es ikuh dh xfr de jgs o e`nk dk dVko ugh gksA bl izdkj ¼[ksr dk ikuh
[ksr es ]dqM dk ikuh dqM es o xkao dk ikuh xko es ½ dh dgkor dks pfjrkFkZ djus
dk iz;kl bl ifj;kstuk de ek/;e ls fd;k tk;sxkA
IWMP-Bhamolav Karni Computer
P- 12
[ksr dk ikuh [ksr esa A dqM dk ikuh dqM
esaAA xkao dk ikuh xko esaAA
¼c½ ikuh laca/kh leL;kvksa ds fujkdj.k ds mik; %&
o"kkZ ds ikuh dk vf/kdre~ mi;ksx djus ds fy, dk”rdkjksa ds [ksrksa esa cUMhx dk
dk;Z rFkk tgk¡ ij ikuh dk <ky de gS rFkk tehu lery gS ogk¡ ij [kMhu dk
fuekZ.k djok;k tk;sxk ftlls [ksr dk ikuh [ksr esa dgkor pfjrkFkZ gks ldsA blds
vfrfjDr bl {ks= esa cuh ukfM;ksa dks xgjk djok;k tkdj mudh Hkjko {kerk dks
c<k;k tk;sxkA ukMh ds tyxzg.k {ks= esa Hkw laj{k.k dk;Z lEiUu djok;s tk;saxs ftlls
ml ukMh esa feV~Vh vkus dh j¶rkj de gks ldsA ifj;kstuk {kS= es fLFkr ukyks es ywt
LVksu psd Mse ] eslujh psd Mse] ,fudV]ukyk fLfFkjhdj.k dk dk;Z djok;k tkosxkA
blh izdkj d`f’k o vd`f’k Hkwfe es fLFkr ukyks es ladu iks.M ] feÍh ds c.M bR;kfn
cuok;s tkosxsA
¼l½ ouLifr laca/kh leL;kvksa ds fujkdj.k ds mik; %&
c<+rh gqbZ tula[;k dh ekax dh iwfrZ gsrq ljdkjh ,ao futh Hkwfe ij l?ku
o`{kkjksi.k djok;k tkdj ouLifr dh mRiknu {kerk c<+kbZ tk ldrh gSA pkjkxkgksa ds
fodkl ds fy, ?kkl dk chtkjksi.k futh Hkwfe ,ao ljdkjh Hkwfe ij fd;k tk;sxkA
dk”dkjks dks le; le; ij izf”k{k.k ds ek/;e ls vPNk pkjk mxkus gsrq iszfjr fd;k
tk;sxkA
¼n½ Ñf"k] i'kq/ku ,ao vU; mRiknu lacaf/kr leL;kvksa ds fujkdj.k ds
mik; %&
IWMP-Bhamolav Karni Computer
P- 13
mUur fdLe ds chtksa dk mi;ksx ,ao o"kkZ ds ikuh dk iw.kZ lnqi;ksx gsrq cUMhx
dk dk;Z djok;k tk;saxkA mUur [kkn] moZjd ,ao dhVuk”kd nokvksa ds mi;ksx gsrq
dk”rdkjksa dks iszfjr fd;k tk;sxkA mUur uLy ds i'kq/ku gsrq xk¡o esa detksj uj
i'kqvksa dk cU/;kdj.k djok;k tk;sxk ,oa vPNh uLy ds uj i'kqvksa dh [kjhn djokbZ
tk;sxhA pkjk mRiknu gsrq vPNs fdLe dh ?kkl tsls lsou ?kkl ds chtksa dk mi;ksx]
xkspj ,ao futh Hkwfe ij fd;k tk;sxkA xkao esa f”k{kk dk izlkj] cpr izksRlkgu ,ao
ifjokj dY;k.k ;kstukvksa dk izpkj izlkj fd;k tkdj xkaookfl;ksa dh vKkurk ,ao
fu/kZurk dks nwj djus ds iz;kl bl ;kstuk ds ek/;e ls fd;k tk;sxkA ftlls
xkWooklh vius iq”rSuh /kU/kksa ds lkFk lkFk vU; mRiknd dk;ksZa esa tqM+ ldsA o xkoa
okfl;ks dk i”kqvks ds pkjs ikuh dh O;oLFkk o jkstxkj dh ryk”k es iyk;u de gksA
ty gh thou gSA
IWMP-Bhamolav Karni Computer
P- 14
tyxzg.k fodkl
dk;Zdze
IWMP-Bhamolav Karni Computer
P- 15
,d ifjp;
tyxzg.k {kS= D;k gS
tylaxzg.k {kS= ;k tyxzg.k {kS= ,d Hkw& tyh; bZdkbZ gS] ftles ty cgdj ,d
fuf”pr LFkku ij vkrk gSA ty laxzg.k i}fr ifj;kstuk vk/kkfjr gS vkSj ;g ;Fkk
LFkku e`nk tFkk ty laj{k.k + ouhdj.k vkfn ds ioZr f”k[kj ls /kkVh dh vksj cgko
iz.kkyh gSA tylaxzg.k ifj;kstuk es fodkl dh ,d bZdkb es lkekU;r% yxHkx 500
gSDVs;j dk tylaxzg.k ¼okVj “ksM½ “kkfey gksxk A rFkkfi HkkSxksfyd fLFkfr ] xkao
ds vkdkj vkfn dks /;ku es j[krs gq;s ifj;kstuk ds okLrfod {kS= es fHkUurk gks
ldrh gSA ty lxzg.k {kS= ds p;u ds fy;s Hkwfe mi;ksx @Hkwfe vkPNknu ] ty Hkw
vkd`fr ] e`nk vkfn tSls fofHkUu fo’k;ks ds lac/k es mixzg vkdMks ls rS;kj ekufp=
dks dke es yk;k tkrk gSaA ifj;kstuk dk eq[; y{; ousrj catj Hkwfe rFkk
lqfuf”pr lw[kk izo.k {kS= rFkk e:Hkwfe okys {kS=ks dks fodflr djuk gSA
tyxzg.k {ks= ds eq[; mís1;
tyxzg.k {ks= esa Hkw&lj{k.k dks jksdus ds fy;s Hkw laj{k.k dk;ksZa esa c.Mhx dk dk;Z
djk;k tk;saxkA blds lekukUrj o`{kkjksi.k djuk] pkjk mRiknu djuk] is;ty ds
ikjEifjd Jksrksa dks lq/kkj dj o"kkZ ds ikuh dk iw.kZ lnqi;ksx djuk ,ao i;kZoj.k lUrqyu
IWMP-Bhamolav Karni Computer
P- 16
cuk;s j[kuk ;kstuk dk eq[; m}s”; gSA blds vfrfjDr xzkeokfl;ksa ds vkfFkZd Lrj esa
lq/kkj] f”k{kk eas lq/kkj] [ksrh dks oSKkfud rjhds ls djuk] vPNh uLy ds i'kq/ku dks
viukuk] xzkeokfl;ksa esa cpr dh Hkkouk tkxzr djuk ,ao ifjokj dY;k.k rFkk lekt
dY;k.k dk;ksZ esa lkewfgd :i ls xk¡o esa cSBdsa vk;ksftr dj dk;Z ;kstuk dks eatwjh nsuk
vkfn Tkyxzg.k {ks= dk eq[; m}s”; gSA
bl ;kstuk ds vUrxZr jkstxkj ds vf/kd volj iSnk djuk] izkÑfrd lalk/kuksa dk
leqfpr mi;ksx djuk ,ao vk; ds u;s lk/ku mRiUu djuk m}s’; esa 'kkfey gSA
;kstuk dh ikWp lky dh vof/k ds nkSjku mRiUu gq, lalk/kuksa dk xzke okfl;ksa }kjk
Hkfo"; esa Lo;a }kjk la/kkfjr fd;k tkuk ,ao fodkl dh vklku ,ao de [kphZyh rduhdh]
xk¡o esa miyC/k lalk/kuksa ls fodflr djuk bl ifj;kstuk ds m}s’;ksa esa 'kkfey gSA bl
;kstuk ds lQy fdz;kUo;u ls fu%lUnsg Hkwfe dk lq/kkj ,ao xzke dk lexz fodkl gksxkA
xkao dk ikuh xkao es A
dqM dk ikuh dqM esA
[ksr dk ikuh [ksr esaAA
IWMP-Bhamolav Karni Computer
P- 17
&% ifj;kstuk dk;kZUo;u laLFkk ds drZO; %&
ifj;kstuk dk;kZUo;u laLFkk pkj lnL;h ty xzg.k fodkl ny dks dk;Z ij
yxk;sxh ] xkze iapk;r dks yksxks }kjk va”knku gsrq vko”;d izLrko ikfjr djus
ds fy;s izfjr djsxh] xkzeh.k lgHkkfxrk ewY;kdau djsxh] tylaxzg.k fodkl dh
;kstuk rS;kj djus lkeqnkf;d laxBu rFkk xkzeh.k leqnk; ds fy;s izf”k{k.k dh
O;oLFkk djus tu laxzg.k fodkl ls lacf/kr dk;ksZ ds fy;s rdfudh ekxZn”kZu
rFkk i;Zos{k.k lqfo/kk miyC/k djkus ] ifj;kstuk ys[kks dh tkWp djus rFkk mUgs
izekf.kr djus de ykxr okyh izks/kksfxdh dks viukus ds fy;s vuqla/kku gsrw
dk;Zokgh vkjEHk djus vkSj Lons”khs rdfudh izkIr djus mUgs viukus ] lexz
ifj;kstuk dk;ZUo;u ij fuxjkuh j[kus rFkk leh{kk djus ,ao ifj;kstuk vof/k ds
nksSjku l`ftr ifjlEifr;ks ds ifj;kstuk iqjh gksus ds i”pkr lapkyu rFkk j[k
j[kko vksj fodkl ds fy;s laLFkxr iazc/k LFkkfir djus dk dk;Z djsxhA
ty taxy tehu vksj thouA
IWMP-Bhamolav Karni Computer
P- 18
bu pkjks dk j[kks larqyuAA
&% ifj;kstuk fd;kUo;u izfdz;k %&
1 tyxzg.k {ks= esa miyC?k HkkSfrd lalk?kuksa ds vk/kkj ij lkekftd ,ao vkfFkZd
mRFkku dh :ijs[kk xzke iapk;r o ykHkkfFkZ;ks ds }kjk tyxzg.k fodkl ny ds
lnL;ks ds lg;ksx ls rS;kj djuk rS;kj djukA
2 tyxzg.k {ks= esa fofHkUu leqnk;ksa ds lkFk ifj;kstuk fdz;kUo;u ds lEcU?k esa
tkudkjh dk vknku iznku ekfld cSBd djds djuk A
3 Hkw&losZ{k.k }kjk Hkwfe dk oxhZdj.k djuk rFkk Hkwfe dk mipkj djukA
4 de ykxr dh izHkkodkjh ,ao nksgjkbZ tk ldus okyh mRiknu iz.kkyh dk izpkj
izlkj izf”k{k.k ,oe~ ckgz; Hkze.k }kjk djukA
5 losZ{k.k ds vk?kkj ij vk/kkjHkwr lqfo?kkvksa dks miyC/k djokukA
6 tyxzg.k {ks= fodkl Iyku rS;kj djukA
mijksDr izfdz;k,a viukrs gq, ljdkjh ,ao iapk;r Hkwfe ij xzkeiapk;r ds ek?;e ls
rFkk futh Hkwfe ij Lo;a Ñ"kd @ miHkksDrk leqg }kjk ifj;kstuk dk;Z lEikfnr djk;s
tk;saxsA
tu lgHkkfxrk
ifj;kstuk dk Åns'; tu lgHkkfxrk ds ek?;e ls ;kstuk rS;kj djuk] fdz;kfUofr
djuk ,ao lkeqnkf;d lalk?kuksa ds izcU?k ,ao vuqorhZ dk;ksZ dk nkf;Ro xzkeLrjh; tyxzg.k
desVh@xkze iapk;r dks lkSiuk gSA blds vUrxZr xzke lHkk vk;ksftr dj miHkksDrk lewg
IWMP-Bhamolav Karni Computer
P- 19
o Loa; lgk;rk lewg dk p;u rFkk tyxzg.k ykHkkfFkZ;ks dh ekfld cSBd o o"kZ esa nks
ckj xkze lHkk vk;ksftr fd;k tkuk Hkh lfEefyr gSA ifj;kstuk dh xfrfof/k;ksa esa ;kstuk
cukus rFkk izca/k forj.k vkfn esa efgykvksa dh lgHkkfxrk lqfuf”pr djus ds fy;s efgyk
psruk tkxzr djus ds iz;kl Hkh ifj;kstuk esa 'kkfey fd;s x;s gSaA
IWMP-Bhamolav Karni Computer
P- 20
tyxzg.k fodkl ny
rdfudh Kku dks vke turk rd igq¡pkus o ifj;kstuk ds dk;Z rdfudh n`f"V ls Bhd
,ao izHkkoh cukus ds fy;s ljdkj dh vksj ls rdfudh fo’ks”kKksa dks bl ny esa 'kkfey fd;k
x;k gSA blesa ls ,d fo’ks”kK dks ny dk yhMj fu;qDr fd;k x;k gSA tyxzg.k fodkl ny esa
fuEukuqlkj pkj fo"k; fo’ks”kK gSa tks fd le; le; ij dk;ksZa ds fdz;kUo;u esa rdfudh
ekxZn”kZu nsrs jgsaxs A
1- vfHk;kaf=dh fo”ks’kK
2- ikS/k fo”ks’kK
3- lekt 'kkL=h
4- i'kq fo”ks’kK
ty xzg.k laLFkk o tyxzg.k desVh
¼leku dk;Z funsZf1kdk o’kZ 2008½
ekxZfunZf”kdk o’kZ 2008 ds vuqlkj tyxzg.k milfefr gh tyxzg.k {ks= ds
lokZxh.k fodkl gsrq gh tyxzg.k laLFkk o tyxzg.k desVh dk dk;Z djsxh {kS= ds lHkh
miHkksDrk leqgksa] Lo;a lgk;rk leqgksa ,ao ykHkkfFkZ;ks ds vkeaf=r lnL;ksa dks feykdj
Tkyxzg.k {ks= dk euksu;u fd;k x;k gSA ;g laLFkk {kS= esa djk;sa tkus okys dk;ksZa dks
vfUre :i nsdj dk;Z djkus ds fy;s miHkksDrk lewg o Lao; lgk;rk lewg dks funsZf”kr
djsxh rFkk djk;s x;s dk;ksZ dk le;≤ ij fufj{k.k dj lq>ko Hkh nsrh jgsxhA blds
vykok Tkyxzg.k {ks= ij dk;ksZa dh ns[k js[k djus] izxfr ,ao fglkc vuqeksnu] miHkksDrk
leqgksa @ Lo;a lgk;rk leqgksa dk xBu djus dk nkf;Ro gksxkA
IWMP-Bhamolav Karni Computer
P- 21
miHkksDrk leqg o Loa; lgk;rk lewg }kjk djok;s x;s dk;ksZ dk Hkqxrku
tyxzg.k mi lfefr lfpo }kjk dk;Z dk ewY;kadu dj fd;k tk;sxkA Hkqxrku tyxzg.k
{kS= ds fudVre jk’Vªh;d`r cSad esa la;qDr [kkrk [kksyokdj ,ao lapkyu xkze iapk;r
lajiap] tyxzg.k milfer lfpo o dfu’B vfHk;Urk@ lgk;d vfHk;Urk ds la;qDr
gLrk{kjksa }kjk fd;k tkuk gSA tyxzg.k milfefr dk;ksZ dk fdz;kUo;u djk,xh ,ao
izfrfnu dk;ksZa dh ns[k js[k djsxh rFkk le; le; ij ifj;kstuk fdzz;kUo;u ,tsUlh dks
izxfr ds ckjs esa voxr djk;sxhA o le; le; ij ekfld cSBd ifj;kstuk {kS= ds
ykHkkfFkZ;ks dh cqykdj dk;ksZ dh izxfr ls voxr djk;sxh o cSBd es fy;s x;s dk;ksZ ds
izLrko ds vuqlkj dk;Z djok;sxhA
tylaxzg.k lfpo rFkk Loa; lsod %&
tylaxzg.k lfpo Hkkjr ljdkj ds }kjk tkjh gfj;kyh ekxZfunZf”kdk ds vuqlkj
xkze iapk;r lfpo gh tylaxzg.k lfpo dk dk;Z djsxkA tylaxzg.k lfpo ifj;kstuk
dk;Zdykiks ds lHkh fjdkMksZ dk la/kkj.k djsxk tyxzg.k {ks= es djok;s tkys okys dk;ksZ dk
izLrko ds vuqlkj fdz;kUo;u djok;sxk djok;s x;s dk;Z dk eki dj Hkqxrku dh dk;Zokgh
iw.kZ ikjnf”kZrk ds lkFk djsxkA le; le; ij tyxzg.k ykHkkfFkZ;ks dh cSBd dk vk;kstu
djsxk rFkk ys[ks dk la/kkj.k djsxkA ;fn xkze iapk;r vko”;d le>s rks lfpo dh
lgk;rk ds fy;s vf/kdre nks Loa; lsod dks fu;qä fd;k tk ldrk gSA
ty laxzg.k ifj;kstuk [kkrk %&
tylaxzg.k lfefr fdlh Hkh jk’Vªh;d`r cSad dh LFkkuh; “kk[kk es ty xzg.k
lfefr xkze iapk;r ------- ds uke ls [kkrk [kksysxh A bl [kkrs dk lapkyu xkze iapk;r
lajiap] tyxzg.k milfer lfpo o dfu’B vfHk;Urk@ lgk;d vfHk;Urk l;qä :i ls
fd;k tk;sxkA
ty laxzg.k fodkl fuf/k [kkrk %&
ty laxzg.k fodkl fuf/k ds fy;s ykHkfFkZ;ks ls ikzIr va”knku dks tek djok;k
tk;sxkA o ifj;kstuk vof/k i”pkr ikzIr jkf”k dks ifj;kstuk ds nkSjku l`ftr
IWMP-Bhamolav Karni Computer
P- 22
ifjlEifr;ks dh j[k j[kko ds fy;s [kpZ fd;k tkosxkA ykHkkfFksZ;ks ls muds [ksr ij djok;s
dk;kZs dh ykxr dk 10 izfr”kr lkekU; tkfr ls o 5 izfr”kr vuqlwfpr tkfr o
vuqlwfpr tu tkfr ls v”kanku fy;k tkosxk A blh izdkj lkeqnkf;d Hkwfe ij fd;s x;s
dk;ksZ dh ykxr dk 5 izfr”kr va”knku fy;k tk;sxkA izkIr va”knku dks ty laxzg.k
fodkl fuf/k [kkrs es tek djok;k tkosxk A
ty taxy tehu vksj thouA
bu pkjks dk j[kks larqyuAA
IWMP-Bhamolav Karni Computer
P- 23
Model Estimate of Tool Kit
Household Production System ( for Marginal farmer and Land less labour )
Service sector- Tool Kit Specification Trade wise Detail of tools requirement in one set
1. One set of carpentry tools COST RS. 4000/ Kit
S.No. Name of tools Specification Quantity
1 Hand saw Size 15” 1 No
2 Hand saw Size 12” 1 No
3 Screw driver Size 8”x25mm 1 No
4 Combination pliers Size 8”Make – Taparia 1 No
5 Charsi with handle Size 25 mm 1 No
6 Charsi with handle Size 18 mm 1 No
7 Charsi with handle Size 10 mm 1 No
8 Wooden Randda Big- Made of Sagwan 1 No
9 Wooden Randda Small – Made of Sagwan 1 No
10 File half round Make JK 1 No
11 File regular Make JK 1 No
12 Tee Bar carpenter frame
(shikanja) for wooden frame
Size 4’x2” 1 No
13 Stone silly Size 6”- ISI Mark 1 No
14 Basola with handle Weight 800 gram 1 No
15 Ball peen harmmer Weight 300 gram Make Ambica 1 No
16 Cross peen hammer Weight 500 gram – Make Ambica 1 No
17 Measurement tape Size 10 feet- Make Freeman 1 No
18 Pincer Size 200 mm- 1 No
19 Girmit Size ½ “ 1 No
20 Tri Square Size 8” 1 No
21 Hand Operated drill Size ¼ “ 1 No
22 Steel box for Tools Size( 22”x11”) – G.I. sheet 1 No
2. One set of Mason tools COST RS. 2000/ Kit
S.No. Name of tools Specification Quantity
1 Karni Size – Big- 1 No
2 Karni Size – small 1 No
3 Mashtar wooden Size 36” Made of Sagwan 1 No
4 Mashtar wooden Size 24 “ Made of Sagwan 1 No
5 Mashtar wooden Size 15” Made of Sagwan 1 No
6 Gurmala 1 No
7 Soot 1 No
8 Sabbal Heavy iron 1 No
9 L shape measurement (Gunia) 1 No
10 Level pipe(25 foot) 5 mm 1 No
11 Chiesal Size 6” , 8” Make – Taparia 1 No
12 Ball pine hammer Weight 500 gm Make – Ambica 1 No
13 Cross pine hammer Weight 300 gm Make – Ambica 1 No
14 Aluminium rib Size 60” x 4”x 1.5” 1 No
15 Measurement tape Size 10 feet Make – Freemans 1 No
16 Canvas bag for above tools Made of Heavy canvas 1 No
3 . One set of Pottery Tools COST RS. 12000/ Kit
S.No. Name of tools Specification Quantity
1 Clay lump beating hammer MS pat. Size – D 100 – 120 mm
x T5-6mm. with iron pipe handle
1
2 Wooden hammer(Thapa) Sheesam Wood. Size – D6-7”x
T1.25”. handle- L6”
1
3 Tasla MS Sheet. Size- D15”. SWG-20
1
4 Spade (Phawda) MS sheet. Size L 10 “x w10”.
SWGT-20. fitted with Wooden
Handle
1
5 Kamdai Wooden Size- 2”x 1-1.25”
approx. Arc. Shap
6 Pindi Cement Various Sizes
3
7 Decoration tools MS (Banki, Sua. Piyali. Patti)
8
8 Decoration Wheel Size- H 16” x D 12-15”. Tripod
Structure. Fitted with double Ball
Bearing. Iron sheet 5 mm
1
9 Manual Potter Wheel Outer Dia- inner plate size – D-
300mm x T-20mm. T-WT- 17 kg
minimum (Casted iron body).
Tripod Casted Iron Structure with
Ball bearing. 2 nos. of outer rings
made of T or steal of 12 mm Dia.
Cross Wooden Support Structure.
1
10 Electric Potter wheel Structure dimension
(25”x16”x16”) iron angle (iron
angle structure 35-5) casted iron
wheel dia 23”. Ball bearing -2
(6206) sealed. Shaft dia 2”. V-
belt pully, WT 23-25 kg.
1
4. One set of Footwear(Mojari) Tools COST RS. 12000/ Kit
S.No. Name of tools Specification Quantity
1 Hummer Ball Pane Drop forged steel. Induction
hardened. Seasoned wood handle.
WT- 300 gms with wooden
handle. Nylon hammer (L 240
mm. head size L80x D300mm)
2 Wooden Block Size- L 18”x W4”x T 4” 1
3 Pincer Size – 8” 1
4 Scissors Size- 9”. Steel Body. Brass
Handle
1
5 Bodam / Shoe anvil Graded CI with 3 phases. WT – 4
kg . approx.
1
6 Cutting Blade Set (Ramp) Steel with Wooden Handle. Size-
L 150x W30X T6mm
set
7 Stitching Awl Steel with Sheesham Wood
Handle
1
8 Sharpening Stone Size- 150x50x25mm. 109 no. 1
9 Shoe measuring Tape Size—2’ fibre/ good quality
plastic material
1
10 Lock Punch Set Steel 1
11 Eye let setting tool Steel 1
12 Round whole punch set Steel, Size – L 100 Range- 1 to
10
1 set(10
pcs.)
13 Design punch Set En-9 steel. Size – L100 1 set(3
pcs.)
14 Zig zag Steel Scissors Steel, Size- 81/2”. Grooves on
cutting edge.
1
15 Pattern Cutting Knife Steel, Size – 6” 1
16 PP Block Size- L 6” x W 6” x T 20mm 1
17 Steel Scale Size-12” and 24” 1
18 Leather Scraping Brush Size- 8” with wooden Handle 1
19 Adhesive Brush Size- 10 mm. 12 mm. 25 mm 1
20 Spring Divider Steel- Size 9” 1
21 Sant Steel- H 6” WT – 1 kg. 1
22 Sizzeore Passing Steel- Size 8” 1
23 Thread Cutter Steel with plaste handle. Size- L
100 mm
1
24 Number sety Steel Set of 10
25 Capsol Punch Size (8-10-12-16) Set
26 Brush Size 10 mm. 12mm.25mm 1
Machine Tools 1
27 HD Flat Bad Swing Machine 31 K. Branded Company 1
5. One set of Blacksmith Tools COST RS. 6000/ Kit
S.No. Name of tools Specification Quantity
1 Big Hammer Ghon – 5 kg 1
2 Hammer Ghon – 1 kg 1
3 Hammer Ghon – ½ kg 1
4 Anvil- chouka Ghon – 10 kg 1
5 Chisel- 3 Nos Ghon – 1 kg,500 kg.
750gm
1
6 Meaurement tape 3 MTR 1
7 Tringle 6” 1
8 Plie Taparia 8” 1
9 Scra drive 10” Tapana 1
10 Tin 10” 1
11 Hand operated electric hand
drill
- 1
12 Sansasi- flat and round - 1
13 Table Vice - 1
14 Haksa Frame Poland type - 1
6 One set of Cycle Mechanic Tools COST RS. 6000/ Kit
S.No. Name of tools Specification Quantity
1 Hammer 500gm 60.00
2 Hammer 1 kg 100.00
3 Plies 8” Taparia 180.00
4 Screw driver Taparia 6”-8”-12” 250.00
5 Pincer- 6” 6” 100.00
6 Nose plier-6” 6” 100
7 Alignment equipment cycle wheel 1000
8 Anivil – Chowka 5 kg 500.00
9 Screw wrench 10” 150.00
10 Hexa Frame polaud type 120.00
11 Spanner Set fix type 8 pcs 8 pcs 380.00
12 Electric hand drill machine 2000.00
13 Hand Skipper 10” 100.00
14 Solution 50.00
15 Water Pump Plier 100.00
16 Punch 6” 50.00
17 Hand Scissors 8” 120.00
18 Oil cane 250 gm 80.00
1 20 gSDVj 1.90
2 2200 ehVj 1.10
3 1.485 oxZ eh-4 12000 ehVj 0.80 DCB
5 0.12 oxZ eh- 1.20
5 8000 la[;k 0.20
6 3300 la[;k
la[;k yEckbZ pkSM+kbZ xgjkbZek=k
Je lkexzh
lfgr1
100 ehVj 1 12000 12000 14.11 14.11
i 100 ehVj 2 2200 4400 56.43 56.43
ii 100 ehVj 2 12000 24000 56.43 56.43
i ?k-eh- 1 2200 1089 91.35 91.35
Contour Furrow
Mkx csfyax dk dk;Z 2-5 ls 5-0 lseh xgjkbZ
rdehuk
dk;Z fooj.k
dz-la- fooj.k
lhek Mksyh (Ditch cum Bund)
njbdkbZ
dUVwj Qjkslhek Mksyh (Ditch cum Bund) fuekZ.k gsrq uhao Vsªapsp es feêh dh[kqnkbZ dk dk;Z] [kqnh gqbZ feêh dk fuLrkj.k rFkk lery djukA
dBksj feV~Vh esa 0.50
ek=k
MEihysoy@,&Qzse }kjk 8&15 ehVj nwjh ij dUVwj ykbZu dk ysvkmV nsuk
dk;Z dk uke %&
2
3
iks/kksa dh la[;klhek Mksyh ij rhu drkjks es chtkjksi.k
pkjkxkg fodkl dk;Z
Hkwfe dk {ks=QyHkwfe dh lhek dh yEckbZlhek Mksyh (Ditch cum Bund)dk {ks=Qy ¼dzkWl lsD'ku½dUVwj Qjks dh yEckbZdUVwj Qjks dk {ks=Qy ¼dzkWl lsD'ku½
?k-eh- 1 2200 1089 91.35 91.35
ii fo?kfVr pV~Vku@eqjZe ?k-eh- 1 2200 2178 131.62 131.62
i ?k-eh- 1 12000 480 91.35 91.35
ii ?k-eh- 1 12000 960 131.62 131.62
5 la[;k 8000 8000 0 3.37
1
i la[;k 2000 2000 5.00 5.00
ii la[;k 6000 6000 9.90 9.90
2 1000 ikS/kksa8000 8000 0.00 334.00
3la[;k 8000 8000 0.27 0.27
3 la[;k
la[;k 2000 2000 2.20 2.97
la[;k 6000 6000 2.70 3.65
4
la[;k 2000 2000 1.76 1.76
la[;k 6000 6000 2.43 2.43
5 1000 yhVj
720000
720000 0 15.69
fo?kfVr pV~Vku@eqjZe
45x45x45 lsehs uki ds xM~<+s djuk
dBksj feV~Vh esa
ikS/kkjksi.k dk;Z
dBksj feV~Vh esa
Fkkoyk cukukA de ls de 50 ls- eh-v)ZO;kl dk
dBksj feV~Vh esa
dadj@ eqje feV~Vh esa
flMfyx dh p<+kbZ o mrjkbZ dk;Z D;kjh esa tekus lfgrA
dBksj feV~Vh esa
dBksj feV~Vh esa 0.50
0.99
dadj@ eqje feV~Vh esaikS/kks dk okgu }kjk ifjogu 10 fdeh- rd
ikS/kksa dh ykxr
0.04
0.08
dUVwj Qjks fuekZ.k gsrq uhao Vsªapsp es feêh dh [kqnkbZ dk dk;Z] [kqnh gqbZfeêh dk fuLrkj.k rFkk lery djukA
ikuh dk ifjogu
dadj@ eqje feV~Vh esa
ikS/kkjksi.k djuk
4
6
la[;k yEckbZ pkSM+kbZ xgjkbZek=k
Je lkexzh
lfgr
dz-la- fooj.k njbdkbZ ek=k
6 la[;k 48000 48000 1.76 1.76
7
la[;k 16000 16000 1.22 1.22
7 100 ukspst
3300 3300 126.97 126.97
8100 ehVj 12000 12000 70.54 70.54
9fd-xzk- 4.125 4.125 0 50.00
10 fd-xzk- 160 160 0 50.00
11 fd-xzk- 160 160 18.34 18.3412 1000 ukspst 1554000 1554000 105.81 105.81
13 Nos 3285 3285 135.00 135.00
?kkl cht dh fder ¼/kke.k] LVkbZyksa bR;kfn½ ¼cktkj nj ls½
cht mipkj isysV cukus ¼fNMdko½ cht nj 6& 8 fdyks @ gS-
iks/kksa fuMkbZ xqMkbZ djukA 15 ls-eh- xgjkbZ rd rFkk 45 ls- eh- v)ZO;kl rd ( two times )
lhek Mksyh (Ditch cum Bund) uksfpax }kjk okfudh ikS/kks dh cqokbZ
¼cht mipkj lfgr½ c.M @ QjksZ ij ?kkl chtks dh cqokbZ ¼?kkl ,oa okfudh cht izkslksfi;l@ ikfdWax lksfu;k vkfn½
ikS/kks dks miyC/k ikuh fiykuk
?kkl chtks dh cqokbZ @ ysX;qe cht uksfpax }kjk
okfudh cht dh fder¼cktkj nj ls½
pkSdhnkjh dk;Z ifj;kstuk lekfIr rd¼rhu o"kZ rd½
mi ;ksx
dUVhtsUlh 3 izfr'kr
dqy ;ksx
Je lkexzh lfgr
1693.20 1693.20
2482.92 2482.92
13543.20 13543.20
99480.15 99480.15
jkf'k ¼:-esa½
99480.15 99480.15
286668.36 286668.36
43848.00 43848.00
126355.20 126355.20
0.00 26960.00
10000.00 10000.00
59400.00 59400.00
0.00 2672.00
2160.00 2160.00
4400.00 5940.00
16200.00 21900.00
3520.00 3520.00
14580.00 14580.00
0.00 11296.80
Je lkexzh lfgrjkf'k ¼:-esa½
84480.00 84480.00
19520.00 19520.00
4190.01 4190.01
8464.80 8464.80
0.00 206.25
0.00 8000.00
2934.40 2934.40
164428.74 164428.74
443475.00 443475.00
1411823.98 1468199.03
44045.97
1411823.98 1512245.00
1512200
1411800
100400
1512200
lkexzh
;ksx
JeSay.Rs.
ABSTRACT OF COST Name of watershed – Bhamolav I (IWMP) Name of Work – Household Production & Micro Enterprises Name of Village : Area:
S.No. Name of Activity Quntity
Unit
Rate
Amount
1. Service sector :- 1. Carpenter
No.
4000
2. Black smith
No. 6000
3. Cycle repair
No. 6000
4.Potten
No. 12000
5. Mason No.
2000
6. Foot wear
No. 12000
2.
Small Live Stock (25+1=26 No) (i) Sheep(20+1=21No.) (ii) Goat(10+1=11No.)
No. No.
38000 28000
3.
Other Micro Enterprises.
No.
L.S.
TOTAL
ABSTRACT OF COST Name of watershed – BhamolavI(IWMP) Name of Work – Live Stock Management Name of Village : Area:
S.No. Name of Activity Quantity
Unit
Rate
Amount
1. Animal Health Camp(One Day) (Medicine, Doctor Honorariums, Vehicle and Publicity Charges ) 10 No. 10000 100000.00
2
Manger(For Cattle Feeding ) No.
500
3
Buffalo Bulls Distribution 1 No. 70000
Total No.
12000