ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No...
Transcript of ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No...
Name Pending since Communication exchanged
between RDSO & Vendor
Reson for delay Current status Target
1 Constant Contact PU Side
Bearer Pads for NLB Bogies
10 months NIL - - - -
2 Constant Contact PU Side
Bearer Pads for HS Bogies
10 months NIL - - - -
3 Light Weight Low height 25 T
axle load bogie (LWLH25) & its
components for 25 T axle load
wagons
10 months 1 M/s Siena Engineering Pvt. Ltd. 06-05-2017 Deficiencies advised to firm
vide this office letter dated
28/07/17. Last reminder sent to
firm on 08/09/2017
Delay on firm's account Pending for STR verification May-18
M/s G B Spring Pvt Limited 25-06-2016 STR/capability completed and
deficiencies have been advised
to firm vide this letter dt.
15/05/17 and last reminder
letter sent on 11/08/17.
Delay on firm's account Firm's response for offering
samples for proto testing is
awaited
May-18
M/s Jagdamba Liquefied Steel
Limited
21-06-2016 Deficiencies noted advised to
firm vide this office letters dated
07/09/16, 18/10/16, 23/11/16,
23/12/16 and 18/04/17. Based
on the firm’s compliance dt.
09/08/17 STR verification was
carried out on 12 &13/09/17.
Delay on firm's account Pending at firm’s end for non-
availability of heat treatment
facility & fatigue machine as
per STR verification.
May-18
M/s Oriental Foundry Pvt. Ltd 19-08-2016 After STR verification, the
prototype of side bearers to drg
no WD-12008-S/01 has been
completed. For proto samples
for proto testing of SB to drg no
WD-12007-S/01 yet to be
offered by the firm. Last
reminder sent on 21/11/17 to
firm & requested to confirm
availability of adequate capacity
furnace and confirm the
readiness of samples of SB to
drg no. WD-12007-S/01 for
necessary proto testing
Delay on firm's account Pending at firm’s end for
prototype testing of SB to drg.
no WD-12007-S/01 and non-
availability of furnace of
adequate capacity as per
STR.
Feb-18
M/s Raneka Industries Ltd. 12-10-2016 After satisfactory STR
verification, a team carried out
proto testing & process
verification of side bearers.
During testing proto testing the
samples of have been failed in
respect of physical properties.
On the basis of satisfactory re-
verification of process proto
testing of SB samples and
fatigue testing have been taken
up by this office. Fatigue testing
of sample is in progress
Delay on firm's account Pending at firm’s end for re-
verification and prototype
testing.
Jan-18
WAGON
Details
4 Spring Loaded Side Bearer
Assembly for freight stocks
8 months 6
S. No Item Total no of days
for approval
specified
No of cases
pending
ITEMWISE VENDOR REGISTRATION TIMELINES (Information Compiled on 11th December 2017)
M/s Kalimata Ispat Industries
Pvt Ltd
06-05-2016 STR/ capability has been done
from 22.07.2017 to 23/07/17 &
17.08.2017. Proto testing of SB
to drg no 12008-S/01 has been
completed. Samples of SB to
drg no WD-12007-S/01 are yet
to be offered by the firm for
necessary proto testing. Firm
has been advised to confirm
their readiness vide this office
letter dated 21/11/2017.
Delay on firm's account Pending for prototype testing
at firm’s end.
Jan-18
M/s CHEMIN Springs India Pvt
Ltd
17-05-2017 Deficiencies letter has been
sent on 20/06/17.Last reminder
sent on 01/11/2017.
Delay on firm's account 15 days show cause notice
issued on 05.12.17
Jun-18
5 Non-asbestos ‘L’ type
Composition Brake Blocks for
container flat wagons
36 months (including
type testing & field
trials of 12 months
for both imported &
indegeneous)
1 M/s Hindustan Composites
Limited Aurangabad
02-03-2017 Firm’s letter-
07/07/17, 06/07/2007,
27/07/17, 24/8/17
RDSO letter-
28/03/17, 06/04/17,
16/05/17, 24/08/17
Nomination of RDSO officials
for STR verification-23.05.17
Delay on firm's account Firm vide email dt. 13.11.17
has informed that 840 mm
wheel is expected to reach its
premises by 10.12.17.After the
fitment of wheel it will inform
RDSO about its readiness for
STR verification
Mar-18
6 Non-asbestos ‘L ’type
Composition Brake Blocks for
freight stock with 1000 mm wheel
dia
36 months (including
type testing & field
trials of 12 months
for both imported &
indegeneous)
1 M/s- Wabtec- Texamco Rail
Pvt limited, Kolkata
02-02-2017 Firm’s letter- 03/03/17,
27/04/17, 18/07/17, 10/08/17
RDSO letter- 16/03/17,
20/06/17, 04/08/17, 13.09.17
Delay on firm's account Team of RDSO officials has
been nominated for STR
verification
Feb-19
M/s Daulat Ram Brake
Mfg.Co.Bhopal
19-01-2015 Firm’s letter-
05/05/2015,06/06/2015,01/07/2
015,30/10/
201504/01/201613/08/2016.
RDSO letter-01/05/2015,
26/05/2015,03/06/2015,23/06/2
015,20/10/2015,30/11/2015,31/
01/ 2017
Delay on firm's account 30 days show cause notice
issued on 09.11.17
End of Dec -17
M/s- Wabtec- Texamco Rail
Pvt limited, Kolkata.
13-02-2017 Firm’s letter-03/03/17 RDSO
letter- 16/03/17
Firm has informed that test
results from its Principal are
awaited.
Mar-17
M/s Hindustan Composites
Limited Aurangabad
14-03-2016 Firm’s letter-18/03/2016,
09/06/2016,27/12/2016
RDSO letter-
24/05/2016, 24/08/2016,
27/09/2016
Delay on firm's account (sample failed in dynamometer
test ) : results communicated
to firm-11.08.16 and further
firm has been given 30 days
notice 16/11/2017
Jan-18
M/s Bony Polymers Pvt. Ltd.
Faridabad
27-06-2016 Firm’s letter-
29/06/2016,02/09/2016
RDSO letter-
25/07/16,07/10/2016
Delay on firm's account (sample failed in dynamometer
test ) : results communicated
to firm-30.09.16 and further
firm has been given 30 days
notice 09/11/2017
Jan-18
7 Non-asbestos K-type
Composition Brake Blocks for
freight stock for 1000 mm wheel
36 months (including
type testing & field
trials of 12 months
for both imported &
indegeneous)
2
4 Spring Loaded Side Bearer
Assembly for freight stocks
8 months 6
8 Non-Asbestos K- type
Composition Brake Blocks for
freight stock (840mmwheeldiaa.)
36 months (including
type testing & field
trials of 12 months
for both imported &
indegeneous)
3
Om Besco Super Friction Pvt.
Ltd. Ponta Sahib
12-07-2016 Firm’s letter-
18/07/2016,25/02/2017,22/03/2
017,15/06/2017,08/07/2017
RDSO letter-14/02/2017,
10/03/2017,05/06/2017,02/08/2
017
Delay on firm's account (sample failed in dynamometer
test ) : results communicated
to firm-02.08.17 and further
firm has been given 30 days
notice 16/11/2017
Jan-18
M/s Stone India, Kolkata 29-12-2015 Firm’s letter -
04.01.2016,3.04.2016,
3.05.2016,05.05.2016,
16.05.2016 17.06.2016,
19.07.2016, 03.08.2016
31.08.2016, 12.12.2016
10.02.2017 & 27.06.2017
RDSO letter- 28.01.2017,
14.06.2017, 09.08.2016,
10.10.2016
11.11.206,22.11.2016,
05.01.2017, 15.05.2017,
15.06.2017, 19.07.2017
& 23.08.2017
Approval of STR verification
report-18.7.2016
Approval of QAP for type test-
10.10.16
Delay on firm's account Registration is getting delayed
as the firm is not able to do the
type tests as per specification.
Further 30 days show cause
notice has been given to firm
09/11/2017
Jan-18
M/s-GDR MEKTEK Banglore-
Karnataka( Licensee of M/s-
Escorts Limited)
29-12-2016 Firm’s letter
06.01.2017,07.03.2017,
25.04.2017, 12.05.2017
16.08.2017
RDSO letter-
01.02.17,30.03.17
05.06.17 & 21.08.2017
Approval of STR verification
report-17.08.2017
Delay on firm's account Firm's QAP has been
approved and sent to firm for
manufactures of 5 sets of
BMBS for type testing. Firm
has to confirm their readiness
for the same.
Mar-18
M/s- Advance Diesel Engine
Pvt Limited, Rajkot Gujrat (
Licensee of M/s- Escorts )
30-12-2016 Firm’s letter
03.01.2017,07.01.2017 ,
08.03.2017, 25.042017
22.05.2017, 31.05.2017
RDSO letter-31.01.2017,
29.03.2017 16.06.2017,
21.08.2017 Approval of STR
verification report-17.8.17
Delay on firm's account Firm has submitted QAP to
manufactures of 5 sets of
BMBS for type testing.
Mar-18
M/s- Webtec- Texmaco rail
private Limited Kolkata
10-07-2017 Firm’s letter
03.07.2017,29.08.2017
Delay on firm's account Letter of non confirmity in
respect of compliance of STR
& other documents
communicated to firm for
compliance on 04.10.17
Oct-19
M/s. Jai Multi, Mohali 05-04-2015 Firm’s letter- 18.07.15,14.11.15
15.02.16,27.05.16,
03.09.16,11.04.17, 18.08.17,
RDSO letter-03.06.15,16.09.15,
10.12.15,29.04.16,
25.08.16,23.06.17,
21.07.17(reminder)
Delay on firm's account Registration process got
delayed due to non-installation
of facilities like sand
reclamation plant, solidification
software etc by firm
Jun-1810 Upgraded High Tensile Centre
Buffer Coupler for
BOXNHL/BCNHL wagons
14 months 9
8 Non-Asbestos K- type
Composition Brake Blocks for
freight stock (840mmwheeldiaa.)
36 months (including
type testing & field
trials of 12 months
for both imported &
indegeneous)
3
9 Bogie Mounted Brake System for
freight stock fitted with Casnub
26 months (including
type testing & field
trials of 18 in firsh
case of OEM) & 10
months in case of
licencee of same
OEM
4
M/s. Atul Engg. Udyog, Agra 15-05-2015 Firm’s letter-
15.05.15,01.09.15,
21.03.16,28.06.16 ,12.09.16
RDSO letter- 16.06.15,28.09.15
,17.05.16,29.08.16,
21.07.17(reminder)STR
verification report approved on
24.05.17 Vide letter dt 22.06.17
firm’s QAP approved for
manufacture of 25 sets.
Delay on firm's account Registration process got
delayed due to non-installation
of facilities like sand
reclamation plant, solidification
software etc by firm
Apr-18
M/s Om Besco Rail Product,
Dhanbad
10-11-2015 Firm’s letter-
10.11.15,30.12.15,03.03.16,22.
04.16 ,05.05.16,23.05.16
,22.06.16, RDSO letter-
20.11.15,02.02.16
,19.04.16,18.05.16, Approval of
STR verification report-
05.08.16 mple sent to NML-
12.12.16
Report received from NML-
04.05.17
Delay on firm's account Sample failed in NML testing.
Firm vide letter dt. 01.06.17
advised to submit revised
QAP. Firm’s QAP submitted
vide letter dt. 12.07.17 was
approved vide this office letter
dt. 27.07.17
Jun-18
Kharagpur Metal Reforming
Industries,Kharagpur
18-11-2015 Firm’s letter-
20.04.16,03.01.17,
22.02.17,10.07.17 ,RDSO letter-
18.12.15, STR verification
report approved on 17.08.17,
Firm submitted QAP on
21.08.17,Firm has been
advised to submit revised QAP
Delay on firm's account Firm's revised QAP has been
approved. Firm has confirmed
readiness for type testing of lot
of 25 sets of CBC. Type
testing is in progress
Apr-18
Simplex Casting, Ltd. Bhilai 10-03-2017 Firm’s letter- 14.03.17 , RDSO
letter-
13.04.17,12.07.17(reminder)
Delay on firm's account Pending for STR varification.
Compliance of documents
submitted by the firm is under
scrutiny
Jul-18
Siena Engg Pvt Ltd, Pithampur,
Distt Dhar
06-05-2017 Firm’s letter-09.05.17, 29.08.17
RDSO letter- 05.06.17,
12.07.17 (reminder)
Delay on firm's account STR verification of the firm
has been completed. Firm has
to submit the QAP for approval
for manufacture of 25 sets of
CBC for type testing
Apr-18
Sanmar Foundries limited,
Viralimalai
21-12-2016 Firm’s letter- 18.08.17, RDSO
letter- 08.09.17
Delay on firm's account Pending for STR varification.
Difficiencies advised to firm
are yet to be complied by the
firm
Sep-18
NF Forgings Pvt. Ltd. 12-09-2017 - - Pending for STR varification.
Compliance of documents
submitted by the firm is under
scrutiny
Dec-18
Shree Kedar Metal Foundries 10-12-2017 - - Pending for STR varification.
Compliance of documents
submitted by the firm is under
scrutiny
Feb-19
10 Upgraded High Tensile Centre
Buffer Coupler for
BOXNHL/BCNHL wagons
14 months 9
M/s. Spectra Cast Pvt. Ltd.,
Metoda, Rajkot
13-03-2015 Firm’s letter-
13.03.15,02.06.16,
09.06.17,09.01.17 RDSO letter-
27.03.15,02.06.15, (reminder),
23.11.15(show cause notice),
01.03.17,14.09.17(show cause
notice)
Delay on firm's account Show cause notice has been
given to firm on 14/09/2017 for
compliance before
31/12/2017.
Apr-18
M/s. Dinesh Ispat Pvt. Ltd.,
Bhilai
28-06-2016 Firm’s letter-
23.08.16,02.09.16,25.10.16,
17.05.17,31.05.17 , 21.07.17,
04.08.17 , RDSO letter-
09.08.16,30.09.16, 15.06.17
Delay on firm's account STR verification has been
completed. Noted
deifficiencies has been
communicated to firm.
Mar-18
Sanmar Foundries Limited,
Viralimalai
25-05-2016 Firm’s letter-
25.01.17,18.04.17, RDSO letter-
20.07.16,01.03.17, 11.05.17
Delay on firm's account Show cause notice has been
given to firm on 16/11/2017 for
compliance .
Jun-18
Vikas Hi-tech Casting, Howrah 17-02-2017 Firm’s letter- 10.05.17,14.06.17
, 15.07.17, RDSO letter-
07.04.17,24.05.17,30.06.17,
31.07.17, Nomination of RDSO
officials for STR verification-
17.08.17
Delay on firm's account The QAP for manufacture of
25 Nos of samples has been
approved for necessary type
testing . Firm has to confirmed
its readiness.
Feb-18
M/s Jupiter Alloy steel Ltd.,
Kolkata
01-04-2016 Firm’s letter
23.04.16,08.08.16,28.01.17,
08.03.17, 22.03.17, 24.04.17
RDSO letter 07.06.16,
02.11.16, 21.02.17, 29.03.17,
Approval of STR verification
report-31.07.17
Delay on firm's account Type testing of proto samples
are in progress
Feb-18
Burnstandard, Kolkata 18-04-2016 RDSO letter- 02.11.16,12.07.17 Delay on firm's account Firm's reply on compliance of
noted defficiencies is still
awaited
Sep-18
Raneka Industries Ltd.
Dhar(MP)
15-09-2016 Firm’s letter-
20.02.17,14.04.17,17.06.17,
28.08.17 RDSO letter-
24.03.17,29.05.17, 27.07.17
Delay on firm's account STR verification of the firm
has been completed. Firm has
to submit the QAP for approval
to manufacture of 25 sets of
proto samples for necessary
type testing
Feb-18
Wabtac-texmaco, Kolkata 12-12-2016 Firm’s letter-
26.05.17,03.07.17,02.08.17
,28.08.17, 12.09.17 RDSO
letter- 16.06.17,31.07.17
Delay on firm's account Team has been nominated for
STR verification. Readiness
yet to be confirmed by the firm.
Sep-18
Amstead Steel Foundries
(India) Pvt. Solan (H.P.)
07-03-2017 Firm’s letter 07.03.17,27.07.17 ,
RDSO letter 11.04.17,
12.07.17,17.08.17
Delay on firm's account Noted difficiencies yet to be
complied by the firm.
Reminder issued to firm on
09/11/2017.
Jul-18
Besco(Wagon division),Kolkata 17-05-2017 Firm’s letter 28.06.17,23.08.17
RDSO letter
23.06.17,27.07.17,08.09.17
Delay on firm's account Noted difficiencies yet to be
complied by the firm.
Reminder issued to firm on
11/10/2017.
Sep-18
Name of Firm Applied Since Likely date of
finalisaton/closure (TDC)
Reason for delay
13 Fire retardant upholstery
(C-9901 (Rev.02))
225 days Nil Nil Nil Nil Nil
CARRIAGE
11 Investment Casting items(Lock
,Knuckle thrower ,toggle, Lock
Lift Lever Hook& Universal Lock
Lift Lever Connector for
upgraded CBC
16 months 4
Sr No Item Description Total Nos of days
required for
approval
No of Pending
Cases
(Old refrences)
Details of Cases
12 Upgraded High Capacity Draft
Gear for BOXNHL/BCNHL
wagons
17 months 6
M/s Quadrant EPP SurlonPvt.
Ltd., Ghaziabad
22.03.2016 January 2018 Delay to to non complying
of tech documentation and
design requirements from
Firm side
M/s Rama Engineering Works,
Hyderabad
30.07.2017 January 2018 No delay
Balaji Rubber factory,Pune 28.06.2017 January 2018 No delay
Suyog Rubber (India) Pvt. Ltd. 13.04.2017 February 2018 Due to late submission of
valid factory license16 Double acting Hydraulic Shock
Absorbers for ICF design
Coaching stock for secondary
suspension
(C– 8703 (Rev.02))
250 days 1 GB Equipment, Dehradun 17.10.2016 February 2018 Firm represented for testing
outside due to high charge
of testing in RDSO.
17 Stain proof fire retardant
upholstery cloth
(C-K 610 (Rev.01))
250 days Nil Nil Nil Nil
18 High capacity Thermoplastic
Elastomer Upper and Lower
washer Assembly used in the
Primary suspension of BG
EMU/DMU Coaches
(RDSO/2010/CG-04)
200 days Nil Nil Nil Nil
19 Supply,Installation,Commissionin
g & maintenance of Automic
Fire/Smoke Detection with Alarm
System for IR AC Coaches
(RDSO/2008/CG-04)
200 days Nil Nil Nil Nil
20 Supply,Installation,Commissionin
g & maintenance of „Automic fire
detection cum suppression
system” for Pantry car &
Generator cum Brake Van of
Indian Railway Coaches(ICF and
LHB design)(Tentive for Trial)
(RDSO/2013/CG-06)
200 days Nil Nil Nil Nil
Oriental Vineer, Mumbai 27.12.2016 January 2018 late submission of
documents by the firmPolymer Product, Bangalore 27.05.2017 December 2017 No delay
Elastomer Lining Works
Mumbai
12.07.2017 December 2017 No delay
22 Electro Pneumatic Brake system
for EMU,DMU& MEMU stock of
Indian Railways
(RDSO/2013/CG-03)
250 days NIL NIL NIL NIL
23 Non asbestos based "K" type
high friction composite brake
blocks
for coaches with bogie mounted
Brake system on Indian Railways
(C-9809(Rev.04))
300 days 1 M/s Wabtec Texmaco Rail Pvt.
Ltd. Kolkata
25.05.2017 Dec 2017 No delay
21 Silicon Foam as cushioning
material for IR passenger
coaches
(RDSO /2013/CG-13 Amend-1)
200 days 3
14 High capacity thermoplastic
polyster elastomer (Hytrel) Upper
& Lower Washers used in the
primary suspension for B.G main
line coaches
(C-K409 (Rev.02))
200 days 2
15 Silent Block for Anchor Link of
BG Coache
(C-9406 (Rev.02) )
225 days 2
24 Non asbestos based low friction
composite brake blocks for
application on Coaching stock
of Indian Railways
(C-9907(Rev.0,)
300 days NIL NIL NIL NIL
25 Non asbestos based low friction
composite brake blocks for
application on MG Coaching
stock of Indian Railways
(C-K211(Rev.01 ))
300 days NIL NIL NIL NIL
26 Non- Asbestos based "K"-Type
High friction Composite Brake
blocks for EMU stock of Indian
railways
(C- 9508(Rev.03 ))
300 days 1 M/s Wabtec Texmaco Rail Pvt.
Ltd. Kolkata
03.05.2017 Dec 2017 No delay
27 Distributor Valve with Relay Valve
(RDSO Spec. No. C-K209)
250 days NIL NIL NIL NIL
28 Injection Moulded High
Performance Polymide
“HPPA”(Self
lubricated superior Nylon grade)
Brake Gear Bushes for BG Main
Line Coaches
(RDSO/2009/CG-17(Rev.02))
250 days NIL NIL NIL NIL
29 Axle Mounted Disc Brake System
for LHB type BG Main line
Coaches (RDSO/2011/CG-04
(Rev.01))
225 days
(Indigenous)
300 days (Foreign)
1 M/s DAKO C.Z. a.s. 15.07.2017 March 2018 No delay,
however,Firm's foreign visit
is pending due to Railway
Board sanction and
creation of new policy for
bearing of cost for foreign
visit 30 Self lubricating Polyster Resin
based composite brake gear
bushes to be used in main line
Coaches (BG)
(C-K605(Rev.01 ))
250 days NIL NIL NIL NIL
31 Non Asbestos based Brake Pad
for LHB type Coaches
(RDSO/2013/CG-01)
300 days NIL
M/s Kurimoto, Japan 15.06.2016 March 2018 Firm not provided FEA
analysis and design & M&P
details M/s Wenshang Highway
Locomotives Part Ltd., China
(through Pioneer Fil-med Pvt
Ltd)
30.03.2017 March 2018 Minor defiecienies
observed in FEA report &
QAP, firm's reply is awaited
.
Also foreign visit is
pending due to Railway
Board sanction and
creation of new policy for
bearing of cost for foreign
visit
32 Brake Disc for LHB type Main
line BG Coaches
(RDSO/2015/CG-03)
300 days 4
M/s JWL,Kovis 07.08.2017 July 2018 No delay,
However, Firm's foreign
visit is pending due to
Railway Board sanction and
creation of new policy for
bearing of cost for foreign
visit M/s CRRC, Qishuyan Institute
Company Ltd., China (Through
MGS India Pvt. Ltd.)
28.08.2017 July 2018 Compliance on some minor
defeciencies is awaited and
matter is pending due to
creation of new policy for
bearing of cost for foreign
visit 33 Air Spring Assembly (180 KN
capacity) for High Capacity
Loads used on EMU/DMU
Coaches for ICF Type Bogies
(RDSO STR No. C-K406 Rev. 2
Amendment Slip No.4)
380 days Nil Nil Nil Nil
34 Air Spring Assembly(140 KN
capacity)for Main line / Rajdhani
Coaches for ICF Type Bogies
(RDSO STR No. C-K509 Rev.2
Amendment Slip No.4)
380 days Nil Nil Nil Nil
35 Air Spring Assembly(120 KN
capacity)for Main line / Rajdhani
LHB Coaches for FIAT Type
Bogies
(RDSO STR No. C-K508 Rev. 1
Amendment Slip No. 4)
380 days Nil Nil Nil Nil
36 Air Suspension Control
Equipments for Air Spring
Assembly system with ICF/LHB
type bogie
(RDSO STR No. C-K407 Rev. 2
Amendment Slip No.1)
230 days Nil Nil Nil Nil
37 Air Spring failure Indication cum
Brake Application (FIBA) device
(RDSO STR No. C-K407 Rev.
2 Amendment Slip No.1)
230 days Nil Nil Nil Nil
38 Metal Bonded Conical Rubber
Spring with External Damper for
primary Suspension of EMU
Coaches having ICF bogie
(RDSO STR No.
RDSO/2008/CG-01)
380 days Nil Nil Nil Nil
39 AAR ‘H’ type Tight Lock Coupler
with transition Coupler BG
Passenger coaches.
(RDSO/2009/CG-22 Rev.-1)
225 days nil nil nil nil nil
32 Brake Disc for LHB type Main
line BG Coaches
(RDSO/2015/CG-03)
300 days 4
40 High Tensile Tight Lock Centre
Buffer Coupler with AAR ‘H’ type
Head and Balanced Draft Gear
for fitment of BG Passenger
coaches.
RDSO/2011/CG-03 Rev.-1 (For
regular procurement) and
RDSO/2011/CG-03 Rev.-2 (for
developmental)
225 days nil nil nil nil nil
M/s Vasco Railway
Enterprises, Faridabad
05-05-2016 March 18 Internal test report not yet
submitted.M/s Frontier Alloy Steels Ltd.,
Rania, Kanpur Dehat
15-07-2017 March 18 No dealy
42 Specification for direct mounted
double row self-aligning spherical
roller bearings for use on ICF
type all-coil bogies for passenger
coaches.
(C-8527)
270 days 1 M/s S.C.Rulmenti S.A., 320,
Republicii Street,Barlad-
731108,Romania
03.10.2016 March 2018 Non-compliance by the firm
of documents /
observations
43 Specification for UIC-130 Pre-
sealed, Pre-set and Pre-
lubricated cartridge tapper roller
bearings (CTRB) for use on
coaches of LHB design
(RDSO/2014/CG-02)
270 days nil nil nil nil nil
Target
Name Since
44 Brake System for 3-phase
locomotives
1090 Nil
45 Main Compressor (Lubricated)
for WAG9/WAP5/ WAP7
(1750 LPM Capacity)
540 Nil
46 Oil Free Main Compressor for 3-
Phase Electric & WAP-4
Locomotives (1750 LPM
Capacity)
540 Nil
47 Bearing for traction motor type
HS1050Er /HS15250A
370 Nil
48 Bearings for traction motor
TAO-659
370 1 D. H. Associates, Bangalore 13-Sep-17 20-Sep-18
49 Auxiliary Machine Bearings
(including 3-phase Locomotives
& EMUs)
370 Nil
50 Suspension bearing for
Hitachi/TAO-659 Traction Motor
370 Nil
51 3 Phase Locomotive Traction
Motor Bearing for TM type
6FRA6068
370 Nil
52 3 Phase Locomotive Traction
Motor Bearing of TM type
6FXA7059
370 Nil
53 Suspension Tube Bearings for
WAG9/ WAP7 locomotives
370 Nil
CARRIAGE
Details
41 Scharfenberg Coupler and draw
Gear for EMU Rolling stock for
Calcutta and Bombay Suburban
service (BG 1676 mm).
225 days 2
SN Description of items Total number of
days for approval
No. of cases
54 For WAP5 Locomotives 370 Nil
55 For WAG9/ WAP7 Locomotives 370 Nil
56 Main Gear bearing, Intermediate
Gear bearing, Pinion bearing
370 Nil
57 Spheribloc for three phase
electric locomotive
480 Nil
58 Elastic Ring for three phase
electric locomotive
480 Nil
59 Rubber Components / Kits for E-
70-brake system
1090 Nil
60 Rubber Components /Kits for
CCB system
1090 Nil
61 Cable Transit System with
EPDM Rubber Modules
200 Nil
62 Thin walled flexible elastomeric
cables
with copper conductors
for working voltages
(i) up to 750 volts
and
(ii) above 750 volts up to 1.8/3.0
kv for tap changer electric
locomotives , AC/DC EMU, BG
AC EMU & MEMU/ coaching
stock
( Chemical curing process /
Electron Beam Irradiation curing
process)
370 Nil
63 Thin Walled Cable for 3-phase
locomotives
370 Nil
64 Single Core & Multi Core
a) Elastomeric Cables (for loco &
EMU)
b) HRPVC cables (for EMUs &
coaches)
210 Nil
65 Zero Halogen Low Smoke Cables
for Metro coaches
210 Nil
66 High Reach Pantograph for
Electric locomotives
540 Nil
Name Since
67 Manual Metal Arc Welding
Electrodes, Class A1
300 Nil
68 Manual Metal Arc Welding
Electrodes, Class A2
300 Nil
69 Manual Metal Arc Welding
Electrodes, Class A3
300 Nil
70 Manual Metal Arc Welding
Electrodes, Class A4
300 Nil
71 Manual Metal Arc Welding
Electrodes, Class B1
300 Nil
72 Manual Metal Arc Welding
Electrodes, Class B2
300 Nil
73 Manual Metal Arc Welding
Electrodes, Class B3
300 1 M/s Mishra Dhatu Nigam Ltd.
Hyderabad-50005
11.08.2016 31.07.2018 Less than three vendors,
kept open
Target RemarksS.N. Item Total nos. of days
for approval
No. of cases Details
Pending Vendor Registrations / Vendor Approval details required:
M&C
74 Manual Metal Arc Welding
Electrodes, Class B4
300 1 M/s Mishra Dhatu Nigam Ltd.
Hyderabad-50005
11.08.2016 31.07.2018 Less than three vendors,
kept open GEE Ltd., Howrah(WB) 13.08.2015 31.03.2018
M/s Mishra Dhatu Nigam Ltd.
Hyderabad-50005
11.08.2016 31.07.2018
GEE Ltd., Howrah(WB) 13.08.2015 31.03.2018
M/s Mishra Dhatu Nigam Ltd.
Hyderabad-50005
11.08.2016 31.07.2018
77 Manual Metal Arc Welding
Electrodes, Class D
320 Nil
78 Manual Metal Arc Welding
Electrodes, Class E1
300 1 GEE Ltd., Howrah(WB) 13.08.2015 31.03.2018
79 Manual Metal Arc Welding
Electrodes, Class E2
300 1 GEE Ltd., Howrah(WB) 13.08.2015 31.03.2018
80 Manual Metal Arc Welding
Electrodes, Class F
300 Nil
81 Manual Metal Arc Welding
Electrodes, Class G
300 Nil
82 Manual Metal Arc Welding
Electrodes, Class H4A
300 1 M/s Mishra Dhatu Nigam Ltd.
Hyderabad-50005
11.08.2016 31.07.2018 Less than three vendors,
kept open 83 Manual Metal Arc Welding
Electrodes, Class H4B
300 Nil
84 Manual Metal Arc Welding
Electrodes, Class K
300 Nil
85 Manual Metal Arc Welding
Electrodes, Class L
300 Nil
86 Manual Metal Arc Welding
Electrodes, Class M1
270 Nil
87 Manual Metal Arc Welding
Electrodes, Class M2
270 Nil
88 Manual Metal Arc Welding
Electrodes, Class M3
270 Nil
89 Manual Metal Arc Welding
Electrodes, Class M4
270 Nil
90 Manual Metal Arc Welding
Electrodes, Class M5
270 Nil
91 Manual Metal Arc Welding
Electrodes, Class M6
270 1 M/s Mishra Dhatu Nigam Ltd.
Hyderabad-50005
11.08.2016 31.07.2018 Less than three vendors,
kept open 92 Manual Metal Arc Welding
Electrodes, Class M7
270 1 M/s Mishra Dhatu Nigam Ltd.
Hyderabad-50005
11.08.2016 31.07.2018 Less than three vendors,
kept open 93 Manual Metal Arc Welding
Electrodes, Class N1
240 Nil
94 Manual Metal Arc Welding
Electrodes, Class N2
240 Nil
Shieldarc EquipmentPvt. Ltd.
Kolkata
12.01.2015 31.03.2018
Nouveaux Industries Pvt. Ltd.,
Tirupur(TN)
20.10.2015 31.03.2018
Premier Industrial corporation
Mumbai
11.02.2016 31.03.2018
Accurate weldarc Pvt. Ltd.
Raipur.
25.08.2017 30.06.2018
Shieldarc EquipmentPvt. Ltd.
Kolkata
02.09.2016 31.03.2018
Premier Industrial corporation
Mumbai
11.02.2016 31.03.2018
MW Wire Tech(P) Ltd 08.07.2016 30.04.2018
Accurate weldarc Pvt. Ltd.
Raipur.
25.08.2017 30.06.2018
97 Solid MIG/MAG Welding Filler
Wire, Class IV
320 1 Premier Industrial corporation
Mumbai
11.02.2016 31.03.2018 Nil Vendor, kept open
76 Manual Metal Arc Welding
Electrodes, Class C2
300 2 Less than three vendors,
kept open
75 Manual Metal Arc Welding
Electrodes, Class C1
300 2
95 Solid MIG/MAG Welding Filler
Wire, Class I
300 4
96 Solid MIG/MAG Welding Filler
Wire, Class III
300 4
Nouveaux Industries Pvt. Ltd.,
Tirupur(TN)
20.10.2015 31.03.2018
Premier Industrial corporation
Mumbai
11.02.2016 31.03.2018
Accurate weldarc Pvt. Ltd.
Raipur.
25.08.2017 30.06.2018
Nouveaux Industries Pvt. Ltd.,
Tirupur(TN)
20.10.2015 31.03.2018
Premier Industrial corporation
Mumbai
11.02.2016 31.03.2018
Accurate weldarc Pvt. Ltd.
Raipur.
25.08.2017 30.06.2018
100 Solid MIG/MAG Welding Filler
Wire, Class VIII
300 Nil
101 Flux cored MIG/MAG Welding
Filler Wire with shielded gas, Cl.
I
300 Nil
102 Flux cored MIG/MAG Welding
Filler Wire with shielded gas, Cl.
II
300 1 Royal Arc Electrodes Ltd.,
Valsar (Gujrat)
03.08.2016 31.03.2018 Nil Vendor, kept open
103 Flux cored MIG/MAG Welding
Filler Wire with shielded gas, Cl.
III
300 Nil
104 Flux cored MIG/MAG Welding
Filler Wire with shielded gas, Cl.
IV
320 Nil
105 Flux cored MIG/MAG Welding
Filler Wire with shielded gas, Cl.
V
300 1 Royal Arc Electrodes Ltd.,
Valsar (Gujrat)
03.08.2016 31.03.2018 Nil Vendor, kept open
106 Flux cored MIG/MAG Welding
Filler Wire with shielded gas, Cl.
VI
300 Nil
107 Flux cored MIG/MAG Welding
Filler Wire with shielded gas, Cl.
VII
300 Nil
108 Flux cored MIG/MAG Welding
Filler Wire with shielded gas, Cl.
VIII
300 1 Royal Arc Electrodes Ltd.,
Valsar (Gujrat)
06.10.2015 31.03.2018 Nil Vendor, kept open
Premier Industrial corporation
Mumbai
11.02.2016 30.04.2018
M/S Nouvaux Industries 23.09.2016 31.05.2018
Premier Industrial corporation
Mumbai
11.02.2016 30.04.2018
M/S Nouvaux Industries 23.09.2016 31.05.2018
Premier Industrial corporation
Mumbai
11.02.2016 30.04.2018
M/S Nouvaux Industries 23.09.2016 31.05.2018
Premier Industrial corporation
Mumbai
11.02.2016 31.04.2018
M/S Nouvaux Industries 23.09.2016 31.05.2018
Premier Industrial corporation
Mumbai
11.02.2016 30.04.2018
M/S Nouvaux Industries 23.09.2016 31.05.2018
Premier Industrial corporation
Mumbai
11.02.2016 30.04.2018
M/S Nouvaux Industries 23.09.2016 31.05.2018
115 Portable Digital Ultrasonic Flaw
Detector with A-Scan Storage
300 Nil
98 Solid MIG/MAG Welding Filler
Wire, Class VI
300 3
99 Solid MIG/MAG Welding Filler
Wire, Class VII
300 3
111 Wire for Submerged Arc
Welding Class W-4
320 2
112 Flux for Submerged Arc Welding
Class F-1
320 2
109 Wire for Submerged Arc
Welding Class W-1
320 2
110 Wire for Submerged Arc
Welding Class W-2
320 2
113 Flux for Submerged Arc Welding
Class F-2
320 2
114 Flux for Submerged Arc Welding
Class F-4
320 2
116 Digital Ultrasonic Testing
Equipment for welded rail joints
with coloured LCD TFT screen,
trigonometrical function and A-
Scan storage
300 Nil
117 Digital Ultrasonic Single Rail
Tester with coloured signals and
A- Scan logging along with data
setup .
300 Nil
118 Digital Ultrasonic Double Rail
Tester having contact (sliding)
probes with multi-base trace
lines, coloured signals and A-
scan logging along with data
setup.
300 Nil
119 R/M Paint Red Oxide (ISC-446),
brushing, finishing, glossy
240 1 Shri Karni Chemical Industries 09.09.2016 31.06.2018
PPG Asian Paint pvt ltd,
Tamilnadu
28.07.2016 31.06.2018
Miles Paints (India) Pvt. Ltd. 23.09.2016 31.06.2018
Neo Radiant Paints Pvt. Ltd 15.10.2016 31.06.2018
Sigma Corporation, Chennai 26.08.2015 31.03.2018
Panama Petrochem Ltd,
Mumbai
12.102015 31.03.2018
Balmer Lawrie & Co. Ltd.,
Silvassa
1211.2015 31.03.2018
Target
Name Since
M/s Eastern Track UdyogPvt.
Ltd., Burdwan Distt.-713357
(W.B.)
01.12.16 Nov, 2018
M/s Eden VinimayPvt. Ltd.,
Burdwan Distt.-713357 (W.B.)
01.12.16 Nov, 2018
M/s ALISHAN STEELS
PRIVATE LIMITED,
DURGAPUR
06.12.16 Oct, 2018
M/s TirumalaBalaji Smelters
Private Limited, DURG -
491001 (Chhattisgarh)
21.09.17 Nov, 2018
M/s Indsur Global Limited
(formerly known as HGI), Halol
(Gujarat)
09.12.16 June, 2018
M/s BL CASTINGS,
BARNALA (PUNJAB)
10.12.16 May, 2018
M/s KGN Deccan Engg
Industries Pvt Ltd, Hyderabad
500037
13.12.16 June, 2018
M/s Khetsidas Machine Tool
Works Private Limited
09.01.17 Sept, 2018
123 Elastic Rail Clips 255 Nil
124 Elastic Rail Clips J 255 Nil
125 Glass filled Nylon-66 Insulating
Liners 315 5
M/s Tirupati Rail Engineers,
Faridabad28.01.2016 Mar' 2018
M/s Star Track Fasteners Pvt.
Ltd.07.02.2016 Feb.'2018
Eastern Track Udyog Pvt. Ltd.,
Kolkata
26.04.2016 April' 2018
QA CIVIL Dte.
DetailsNo. of cases
120 Paints based on epoxy and
polyurethane resin for exterior
painting of wagons.
300 3
121 Lubricants for Machinery & plant 300 3
122 Spheroidal Graphite Cast Iron
Insert
300 8
SN Description of items Total number of
days for approval
Sheth & Co. Silvasa 21.03.2017 June' 2018
AG Industries Pvt. Ltd.
Gurgaon.
29.12.2015 Feb.'2018
126 Polyethylene Dowel 255 Nil
Surya Alloys Industries Ltd.,
Kolkata
14.02.17 Aug,2018
M/s Vinar Rubber Udyog, 24.08.15 Jan' 2018
M/s Adityapur Rubber
Industries, Jamshedpur
08.09.15 June, 2018
M/s Ravindra Industries,
Bahadurgarh
30.05.17 June, 2018
Variety Industrial Works Pvt.
Ltd.,14, Kumarpara Road,
05.10.17 Apr, 2018
128 Grooved Rubber Sole Plates
(6 mm thick)321
Nil
M/s Industrial Laminaties
(India) Pvt Ltd Mumbai
28.09.15 Dec, 2018
M/s Ked Sati Iron & Steel Pvt.
Ltd. Kolkata
27.08.15 Aug, 2018
M/s Maruti Heavy Engg. Udyog
, Bharatpur
01.09.15 Sept, 2018
M/s Young India PrestressPvt.
Ltd. Bankura
05.09.15 June, 2018
M/s Ked Sati Iron & Steel Pvt.
Ltd. Kolkata
09.08.15 Oct, 2018
M/s Eastern Track UdyogPvt.
Ltd. Kolkata
14.09.15 Oct, 2018
M/s Hevea Rubber
Technologies Pvt. Ltd.
Kottayam
16.09.15 Sept,2018
M/s Jyoti Cero Rubber ,
Jamshedpur
18.09.15 Sept,2018
131 Metal Liners (Nos.)255 1
M/s Arvind Industries, Kolkata 02.02.2017 March' 2018
132 Glued Insulated Rail Joints 370 Nil
M/s Souvenier International,
Ludhiyana
27.07.2015 June'2018
M/s Ked Sati Iron & Steel Pvt.
Ltd., Kolkata
19.03.2017 June'2018
M/s ASP Pvt. Ltd. ,Howrah 09.10.2016 April'2018
134 Fibre Glass Cloth Woven Roving270
Nil
135 Glue
300
1 M/s Hankel Adhesive
Technology India Pvt. Ltd.,
Pune
17.05.2017 Dec.'2018
136 Fabricated Switches 370 Nil
137 Fabricated Crossings 370 Nil
138 Cast Manganese Steel
Crossings (52 Kg & 60 Kg 1 in
8.5 and 1 in 12) (Nos.)
480 1 M/s Eden Vinimay Pvt Ltd 03.12.16. Mar, 2019
139 Switch Expansion Joints (SEJ)
(sets)357
Nil
140 Single Coil Spring Steel Washer315
Nil
141 Fish Plates & Fish plate
bars(Nos.)255
Nil
142 SSD for OR Curved Switches 400 Nil
Name Since
MOTIVE POWERDetails
TDC
127 Composite Grooved Rubber
Sole Plate (6.2 mm thick)
321
5
133 High Tensile Fish Bolts & Nuts
377
3
S.No. ItemTotal no. of days
for approval No. of cases
129 10 mm thick Grooved rubber
Sole Plates
321
4
130 Nylon Cord Reinforced
Elastomeric Pad
321
4
Motive Power - Engine Items
143
Connecting Rod Bearings,
Specification No. 31PD 5703A,
(Steel Backed) Anti – Friction
Metal Lined (Half Bushing, Con
Rod (Cap Only) & Half Bushing,
Con Rod (Rod Only) for ALCo
locomotives.
200 - - - -
144
Main Bearing Shell (Inter &
Centre) Specification No. 31PD
5703A, (Steel Backed) Anti –
Friction Metal Lined (Main
Bearing Shell (Intermediate Thin
wall Upper & Lower) Bearing
Center Main (Upper & Lower
Halves Thin Wall) for ALCo
locomotives
200 1M/s Saarvam Industries LLP,
Jaipur30.10.2017 May’18
145
Main Bearing, Thrust
Specification No. 31PD 5703
(Steel Backed) Anti – Friction
Metal Lined (Thrust Bearing (
Gen. End Upper) for ALCo
locomotives
200 - - - -
146Bearing-Con Rod for EMD
Locomotives200 - - - -
147Main Bearings for EMD
Locomotives200 1
M/s Saarvam Industries LLP,
Jaipur07.08.2017 Feb’18
Motive Power- Engine System
Items
Filter Air Dryer & MR, for ALCO
& EMD Locomotives200 - - - -
(A) Filter Air Dryer & MR,
for ALCo locomotives200 - - - -
(B) Filter Air Dryer & MR,
for EMD locomotives200 - - - -
149Filter Dyna Cell, for EMD
Locomotives200 - - - -
150Filter element, Brake Panel, for
EMD Locomotives200 - - - -
151Filter element, Fibre Glass, ECC,
for EMD Locomotives200 - - - -
Low Mean Pore Size Primary
& Secondary Fuel Oil Filter
Elements for Diesel Electric
Locomotives-
200 - - - -
(A) Low Mean Pore Size
Primary & Secondary Fuel
Oil Filter Elements for
Diesel Electric Locomotives
(RDSO Drg. No.: SKDP-
3901, 3902)
200 - - - -
(B) Low Mean Pore Size
Primary & Secondary Fuel
Oil Filter Elements for
Diesel Electric Locomotives
(RDSO Drg. No.: SKDP-
3908, 3909)
200 - - - -
148
152
153
10” x 30” Long Life Lube Oil and
Fuel Oil Filter Elements (Two
Piece) for EMD Locomotives
200 - - - -
154
Long Life Lubricating Oil Filter
Element for Locomotive Diesel
Engines
200 - - - -
Filter elements, Pre-cleaner, for
ALCO & EMD Locomotives200 - - - -
(A) Engine Inertial Primary
Filter for ALCo locomotives200 - - - -
(B) Inertial Filter Assembly
for EMD locomotives200 - - - -
(C) Carbody Filter for ALCo
locomotives (For WDG3A &
WDM3D locomotives)
200 - - - -
(D) Carbody Filter for ALCo
locomotives (For WDM2
locomotives)
200 - - - -
Filter elements, Secondry Engine
Air Filters, for ALCO & EMD
Locomotives
200 - - - -
(A) Element Filter for EMD
locomotives200 - - - -
(B) Glass Fibre Bag Filter
for ALCo locomotives200 - - - -
(C) Glass Fibre Secondary
Engine Air Filter for ALCo
locomotives (Deep Design)
200 - - - -
(D) Glass Fibre Secondary
Engine Air Filter for ALCo
locomotives
200 - - - -
Disposable car body filters with
built-in louvers and casing(A) Disposable car body filters
with built-in louvers and casing
forWDG3A, WDM3B, WDM3D and
WDM3A locomotives(B) Disposable car body filters
with built-in louvers and casing
for WDM2 locomotives
M/s Spectrum Filtration Pvt.
Ltd., Howrah11.05.2015 Jan’18
158Soak Back Lube Oil Filter for
EMD Locomotives200 - - - -
159Spin-on Fuel Filter for EMD
Locomotives200 - - - -
160Spin-on Turbocharger Lube Oil
Filter for EMD Locomotives200 - - - -
161Filter element, Suction Strainer,
for EMD Locomotives200 - - - -
162
Filter Paper Media for 10” x 30”
Long Life Lube Oil and Fuel Oil
Filter Elements (Two Piece) for
EMD Locomotives
200 - - - -
163
Filter Paper Media for Long Life
Lubricating Oil Filter Element for
Locomotive Diesel Engines
200 - - - -
155
156
157 200 2
M/s G S Products, Lucknow 04.02.2015 Dec’17
164
Filter Paper Media for Low Mean
Pore Size Primary & Secondary
Fuel Oil Filter Elements for
Diesel Electric Locomotives
200 - - - -
165Filter, compressor Oil spin on, for
EMD locomotives200 - - - -
Filter elements, Pre-cleaner for 200 - - - -
1. Inertial Filter RH for WDG5 200 - - - -
2. Inertial Filter LH for WDG5
locomotives200 - - - -
167Fuel filter element (5 micron) for
WDG5 Locomotives200 - - - -
168Filter, Self cleaning Automatic,
Lube oil, for ALCO Locomotives200 - - - -
Motive Power - Electrical
Machines (DEMU Items)
169
Three Phase AC-AC
Transmission System &
Associated Control Equipment
for 1600 HP Diesel Electric
Multiple Unit
200 - - - -
Motive Power - Electrical
Machines (EMD Locomotive
Items)
170Alternator-Rectifier Traction for
HHP Locomotives200 - - - -
171Rectifier Bank Assembly for HHP
Locomotives200 - - - -
172Traction Alternator for EMD
(WDG5) Locomotives200 - - - -
173
Bearing suspension, Drive End
of Traction Motor for EMD
locomotives
200 - - - -
174
Bearing suspension, Non-Drive
End of Traction Motor for EMD
locomotives
200 - - - -
175
Bearings, Traction Motor- TM
Drive end & TM Non-drive end
for EMD Locomotives
200 - - - -
176Bearing RLR CE for EMD
(WDG5) Locomotives200 - - - -
177Bearing RLR PE for EMD
(WDG5) Locomotives200 - - - -
178Bearings, Traction alternator for
EMD Locomotives200 - - - -
179
3-phase induction motors for
4500 hp,AC- AC WDG4 &
WDP4B diesel electric
Locomotives
200 1 M/s ABB India Ltd., Vadodara 13.06.2016 Feb’18
180
3-Phase squirrel cage
induction motor for 5500 HP
AC-AC WDG5 locomotive,
200 - - - -
181 Axle gear steel (carburizing type) 200 - - - -
182 Pinion gear steel (43 B 17) 200 - - - -
183
Tube Suspension: Housing
bearing kit (consisting 11 items)
for EMD Locomotives
200 - - - -
166
184
Tube Suspension: Housing
bearing kit (consisting 4 items)
for EMD Locomotives
200 - - - -
185
E-Locker/Dustbin Motor Blower
Assly for EMD (WDG5)
Locomotives
200 - - - -
Motive Power - Electrical
Machines (BG ALCo
Locomotive Items
200
Alternator, Traction with Auxiliary
Machines and their sub-
assemblies for Broad Gauge
Diesel Electric ALCO
Locomotives
200 - - - -
(A) Traction Alternator with
Auxiliary Machines and their sub-
assemblies for 3100HP and
3300HP ALCo Locomotives.
200 - - - -
(B) Traction Alternator with
Auxiliary Machines and their sub-
assemblies for 1400HP and
2300HP ALCo Locomotives.
200 - - - -
187
Bearings, roller type of Traction
motor for ALCo locomotives,
NH320 rivetless - Commutator
end; NU330 rivetless - Pinion
end & Alternator / Generator
bearings)
200 - - - -
188
Bearings, Suspension, Traction
Motor for ALCo locomotives
(Roller type)-
200 - - - -
189
Bearings for Traction motor,
ALCo Locomotives- ( NU328 &
NH 318 rivetless)
200 - - - -
190Traction Motor Bellows-
(Leather), for Alco Locomotives200 1
Angel Leathers Pvt. Ltd.,
Jalandhar27.10.2017 Apr’18
191
Traction motor Bellows (moulded
rubber type without fabric)Used
on broad gauge diesel-electric
Locomotives
200 - - - -
192
Fluoroelastomer Insulated Main
Lead & Brush Gear Cables used
in Traction Motors of Diesel
Electric Locomotives
200 - - - -
193 Carbon blocks 200 - - - -
194Kapton covered copper
conductor for traction machines200 - - - -
195Film Polyimide (Kapton / Apical
film or equivalent)200 - - - -
196 Glass tape, Silicon elastomer 200 - - - -
186
197
Motor Complete, DC Traction for
ALCo Locomotives with following
Sub-assemblies: A. Armature, B.
Commutator, C. Commutating
field coils assembly, D. Main field
coils assembly, E. Magnet frame
(machined)
200 - - - -
198Motor Armature, DC Traction for
ALCo200 - - - -
199Motor Commutator, DC Traction
for ALCo200 - - - -
200Motor Commutating Field Coils
assembly, DC Traction for ALCo200 - - - -
201Motor Main Field Coils assembly,
DC traction for ALCo200 - - - -
202Motor Magnet Frame (machined),
DC Traction for ALCo200 - - - -
203Paper Nomex, Untreated of all
grades200 - - - -
204
Alternator mounted rectifier
assembly for AC/DC diesel-
electric locomotives
200 - - - -
205
Resins & varnishes for traction
machines used on Diesel electric
locomotives
200 1M/s Fine Finish Organics Pvt
Ltd., Navi Mumbai22.05.2014 Jan’18
206
Cleaning solvent for electrical
rotating machines of diesel
electric locomotives
200 1M/s Unijules Life Sciences Ltd.,
Nagpur23.11.2016 Feb’18
207 Tape, Kapton adhesive 200 - - - -
208
Class 200 resin-preimpregnated
semi-cured unidirectional
Polyglass banding tapes Used on
traction machines (TG/TM/AG)
of diesel electric Locomotives
and DEMUs
200 - - - -
209Traction Gears, (Case hardened)
for ALCo Locomotives200 - - - -
210Traction Pinions, (Case
hardened) for ALCo Locomotives200 1
Premium Transmission ltd.,
Pune 30.09.2016 Jan’18
211
Tubes & accessories,
Suspension bearing (10
components) For TM 4907 & TM
5002 of ALCo locomotives
200 - - - -
Motive Power - Electrical
Machines (BG ALCO & EMD
Locomotive Items)
212Locomotive insulated wire – sizes
AWG # 3 and smaller200 1
Polycab Wires Pvt Ltd.,
Panchmahals, Gujarat27.10.2017 Apr’18
213Locomotive power cable – sizes
AWG # 1 and larger200 1
Polycab Wires Pvt Ltd.,
Panchmahals, Gujarat27.10.2017 Apr’18
Motive Power - Electrical
Controls Items
214
Nickel Cadmium Starter batteries
for Diesel Locomotives (6V,
150AH Ni-Cd Storage Unit)
200 - - - -
215
Low Maintenance lead acid
Batteries for Diesel Electric
loco engine starting application (8
V, 500 Ah lead acid)
200 - - - -
216
Low Maintenance lead acid
Batteries with PPCP Cell
assembly housed in FRP outer
container for Diesel Electric
locomotives (8V, 450 Ah lead
acid)
200 - - - -
217Microprocessor based Control
system with Automatic Flasher 200 - - - -
M/s Yongji Xinshisu Electric
Equipment Co. Ltd.,
P.R. China
219
Microcontroller based Event
Recorder used on EMD
Locomotive
200 - - - -
Governor MCBG–Micro
Controller Based Governor for
ALCo/DLW/ DMW
200 - - - -
(A) Micro controller based
governor (MCBG) for Application
on ALCo/DLW/DMW 16 cylinder
251 series D- E Locomotives
200 - - - -
(B) Micro controller based
governor (MCBG) for Application
on Microprocessor Controlled
ALCo/DLW 6 cylinder 251 series
WDS6 D- E Locomotives- Spec.
no. MP.0.1700.04 (Rev. 00)
Oct.08
200 - - - -
221Master controller Conventinal
stick type for ALCo Locomotives200 - - - -
222Master Controller Improved stick
type for ALCo Locomotives200 - - - -
Topgrip Instruments Company,
C48, KSSIDC Veerasandra
Industrial estate,
Electronics city PH II , HOSUR
ROAD,
BANGALORE 560100
224Fuel Level Sensor for Diesel
Electric Locomotives200 - - - -
225
Micro controller based Electronic
Speed indicating and Recording
system for Railway application
200 - - - -
226Distributed Power Control
System for HHP Locomotives200 - - - -
1 04.09.2014 July’19
220
223Master Controller of EMD
locomotive200 1 24.11.2017 Jun’18
218
AC-AC Traction Control System
for 4500HP HHP Diesel-Electric
Locomotives
200
227Distributed Power Control
System for Alco Locomotives200 - - - -
228Auxiliary Power Unit for HHP
Locomotives200 - - - -
229
Automatic Control of Engine Stop
with Auxiliary Power Unit-ACES
with APU for Alco Locomotives
200 - - - -
230
Remote Monitoring and
Management of Locomotive and
Trains
200 - - - -
Novius Technologies India Pvt
Ltd, 234, Shiv Kalyan, Near
Ayurvedic Hospital, Sector 27,
Nigdi Pradhikaran, Pune- 411
044
Motive Power – Brake Items
232
Air Dryer, ALCO, HHP & Electric
Locomotives and EMU/DMU/
MEMUs
240 - - - -
233Gauge Complex with Air Flow
Indicator, HHP Locomotives200 - - - -
234
‘’L‟ Type Composition Brake
Block, ALCO & Electric
Locomotives
240 - - - -
235High Friction Composition Brake
Block, HHP locomotives240 - - - -
Brake equipments, ALCO &
Electric Locomotives200 - - - -
(A) Brake equipments, ALCO &
Electric Locomotives200 - - - -
(B) Brake equipments, ALCO &
Electric Locomotives200 - - - -
237
Microprocessor controlled Air
Brake System (Spec. no.
MP.0.01.00.20, Rev 03 August
2016)/ Modular Microprocessor
controlled Air Brake System with
advanced features (Spec. no.
MP.0.01.00.24 Rev 02 August
2016)/ Indigenous
Microprocessor controlled Air
Brake System with versatile
software (Specification No.
MP.0.01.00.23 Rev 0, November-
2009)
200 - - - -
238
Compact (Tri-plate) type IRAB-1
pure air brake and 28 LAV-1 dual
brake panel for diesel
Locomotives
200 - - - -
239
Air Compressor (Enhanced
reliability and M-24 schedule),
ALCO Locomotives
380 - - - -
240Water cooled Air Compressor for
HHP Diesel Locomotives380 - - - -
241Diaphragms VA1B valve, ALCO
Locomotives200 - - - -
07.11.2017 May’18
236
231Loco Cab Video and Voice
Recording System200 1
242Rubber components, Air brake,
ALCO Locomotives200 - - - -
243 Modified hand brake assembly 200 - - - -
Spares for compressor /
expressor, ALCO Locomotives200 - - - -
A. Spares for compressor /
expressor, ALCO
Locomotives
200 - - - -
B. Spares for compressor /
expressor, ALCO
Locomotives
200 - - - -
C. Spares for compressor /
expressor, ALCO
Locomotives
200 - - - -
D. Oil seal (Expressor) 200 - - - -
E. Piston -Diameter 197 mm 200 - - - -
245Spares Upgraded forCompressor
/ Expressor, ALCO Locomotives.200 - - - -
246
Air Flow Measuring Valve and Air
Flow Indicator, ALCO & Electric
Locomotives
200 - - - -
247
Air flow Indicator for
microprocessor controlled brake
on ALCo locomotives
200 - - - -
248Auto drain Valve, ALCO, EMD
and Electric Locomotives200 - - - -
249Feed Valve, ALCo, EMD &
Electric locomotives200 - - - -
250Valve -Emergency Brake for
HHP Locomotive200 - - - -
251
Brake Interface Unit (BIU) for
Train Collision Avoiding System
and Distributed Power Control
system for diesel locomotives
fitted with IRAB class of brake
system
200 - - - -
Motive Power – Bogie Items
252
Bearing Adapter with Journal
Bearing Assembly (without
bushing traction rod) for HHP
Locomotives
200 - - - -
253Journal Bearing Assembly for
WDG5 locomotives200 - - - -
254Fabricated Bogie Frame &
Bolster assembly for locomotives200 - - - -
255Motor Nose Link Bushing for
HHP Locomotives200 1
M/s B.D. Bansal Steel
Industries, Chembur, Mumbai 29.04. 15 Dec’17
256Nose Link Bushing for WDG5
locomotives200 - - - -
257Bushing Rubber for HHP
Locomotives200 1
M/s B.D. Bansal Steel
Industries, Chembur, Mumbai 29.04. 15 Dec’17
244
258Car Body Link Bushing for
WDG5 locomotives200 - - - -
259Bushing Traction Rod for HHP
locomotives200 1
M/s B.D. Bansal Steel
Industries, Chembur, Mumbai 29.04. 15 Dec’17
260Traction rod Bushing for WDG5
locomotives200 - - - -
261 Centre Pivot Block Assembly 200 - - - -
262
Hydraulic Dampers of
WDG3A, WDM3D and
WDM3A (with T.H.S bogies)
and WDM3D (with equalizer
less bogie) locomotives
200 - - - -
263Primary Vertical Damper for HHP
Locomotives200 - - - -
264Primary Vertical Damper for
WDG5 locomotives200 - - - -
265Secondary Yaw Damper for HHP
Locomotives200 - - - -
266Secondary Lateral damper for
WDG5 locomotives200 - - - -
267
Equaliser beams, Compensating
beams & Links of high adhesion
& Equaliser beams (long & short)
of trimount locomotive bogies
200 1
M/s Razzlakshmi Enterprise,
Kona Check Post, Benaras
Road, Howrah
27.07.16 Jan’18
268Journal Axle Box Assembly with
CRU Bearing200 - - - -
269
Journal Axle Box Assembly with
normal and Step Size Roller
Bearing
200 - - - -
270Centre Pivot Liner for
Locomotives200 - - - -
271Spring – Single Coil for HHP
Locomotives200 - - - -
272Coil Spring for WDG5
locomotives200 - - - -
273Rubber Spring Assembly – A &
B, WDP4 Locomotives200 - - - -
274Rubber Spring Assembly WDG4
Locomotives200 - - - -
275Secondary Spring for WDG5
locomotives200 - - - -
276
Thermoplastic polyurethane
spring pads (Happy pads)
for locomotives
200 - - - -
277Truck Frame Assembly for HHP
Locomotives200 - - - -
278Half Cylinder Wear for HHP
locomotives200 - - - -
279Kit for TBU for WDG5
locomotives200 - - - -
280Thrust Pad for WDG5
locomotives200 - - - -
281Lateral Thrust Pad for WDG5
locomotives200 - - - -
282Secondary lateral stop for WDG5
locomotives200 - - - -
Motive Power –Underframe
Items
283Buffer Assembly, Side, High
capacity, Long life200 - - - -
284
Coupler Assembly, H-type
Tight lock for
ALCo/Electric/HHP Passenger
Locomotives
200 1 M/s Bhilai Engg.co.LTD., Bhilai 19.12.2016 May’18
285Coupler E-type for EMD
Locomotives200 1 Shivai Enterprises Pvt. Ltd. 26.10.2017 Apr’18
286Draft Gear Soft with Yoke
Assembly200 1 Atul Engineering Udyog 28.10.205 Jan’18
287Draft gear with Yoke assembly
for EMD Locomotives200 - - - -
288Spring Pads Assembly, Side
Buffer, Long life200 - - - -
289 Spring Rubber, Buffer 200 - - - -
Firm NameSince (Date of
Appln)SN of ED (R) list TDC for disposal
M/s. General Auto Electric
Corporation, Mumbai
03-03-2014 453 30/4/2018
Signotron (India) Pvt Ltd,
Kolkata
05-11-2015 457 30-04-2018
Star Electric Company,
Ludhiana
11-06-2015 455 31-05-2018
P I ENGINEERING WORKS,
Modinagar, Ghaziabad
05-11-2016 454 31-01-2018
Powernetics Equipment I
Private Limited, Navi Mumbai
29/09/2015 456 31-12-2017
291 25 KW ERRU 460 days 1 M/S.PRESSTECH(INDIA)PVT
.LTD, Mumbai
08-08-2016 459 30-06-2018
Powernetics Equipment I
Private Limited, Navi Mumbai
06-11-2014 464 30-06-2018
Hind Rectifier Ltd, Dehradun 05-11-2015 461 31/01/2018
ENERTECH UPS PVT. LTD.,
Pune
31/08/2015 462 31-05-2018
P I ENGINEERING WORKS,
Modinagar, Ghaziabad
08-08-2016 465 31-05-2018
Electronic EQuipment Co Pvt
Ltd, Kolkata
27/02/2017 463 31/05/2018
TROLEX INDIA PVT. LTD., 14/08/2017 468 31/12/2018
Star Electric Company,
Ludhiana
09-04-2017 469 31-03-2018
M/s Autometer Alliance Ltd,
Noida
03-10-2017 466 31-03-2018
M/s Hitachi Hirel, Sanand 18/04/2016 467 31/12/2017
293 120 Ah Battery 370 days Star Battery Ltd, Kolkata 29/01/2016 452 30-06-2018
294 70 Ah Battery 550 days Exide Industries Ltd, Kolkata. 24/11/2016 451 31/01/2018
295 INVERTER 370 days 1 Powernetics Equipment India
Private Limited, Navi Mumbaiu
28/03/2014 460 30-06-2018
PS & EMUDetails
290 4.5 KW ERRU 460 days 5
2
SN ItemTotal no of days
approval specifiedNo of cases
292 4.5 KW RBC 370 days 9
* Specified timeline for disposal (Recommendation for placement of Trial/Developmental Quantity Order to PUs/ ZRs or case closure) of the cases.
NEC Switchgears and Controls 08-08-2016 502 31-12-2017
SUGAN ENGINEERING PVT
LTD
11-02-2016 504 30-04-2018
NAVA NIRMAN
FABRICATION PVT. LTD
08-08-2016 503 30-04-2018
SOM AUTOTECH PVT LTD 11-02-2016 505 31-03-2018
THYRON ENGINEERING
PRIVATE LIMITED
02-11-2014 473 31-12-2017
RONAK INDUSTRIES 25/08/2015 474 30-06-2018
Saini Electrical and
Engineering Works
23/09/2015 470 30-05-2018
SWAGATH ENNG 23/09/2015 471 31-01-2018
FORCE MOTION
TECHNOLOGY LLP
11-06-2015 472 30-06-2018
Billing Through M/s Sterling
and Wilson Energy Systems
Pvt. Ltd under Principal
Manufacturer M/s Sterling
Generators Pvt Ltd
23/10/2015 501 31-03-2018
M/s Daulat Ram , Bhopal 14/08/2017 498 31-03-2018
M/s GEMCO Limited, Mysore 11-12-2016 499 31-03-2018
M/s Tractor India Pvt Ltd,
Asansol
05-11-2016 500 31-03-2018
300 RMPU 370 days 1 DOLAR ENGG INDUSTRIES
PVT. LTD.
07-11-2016 506 31-01-2018
LUMENS AIRCON PVT.LTD 06-09-2015 477 31-12-2018
TROLEX INDIA PVT. LTD., 08-12-2015 478 30-04-2018
INOVTECH 08-07-2015 479 31-12-2017
POWER EQUIPMENT PVT
LTD
29/07/2015 480 31-12-2017
PRICOL ENGINEERING
INDUSTRIES LIMITED
31/08/2015 481 31-05-2018
RSI Switchgear Pvt. Ltd. 23/10/2015 475 31-12-2017
RSI Switchgear Pvt. Ltd. 23/10/2015 476 30-06-2018
AMIT ENGINEERS 23/10/2015 482 31-01-2018
Sidwal Refigeration industries
Private limited
23/10/2015 483 30-04-2018
Craftsman Automation Private
Limited
29/01/2016 484 30-04-2018
M/S ITI LIMITED 04-11-2016 485 31-12-2017
NATIONAL ENTERPRISES 04-11-2016 486 31-12-2017
MAK ENGINEERS INC. 05-11-2016 487 31-03-2018
SHIVALIK FASTNERS PVT.
LTD.
05-11-2016 488 31-03-2018
KONTACT CONSORTIUM
INDIA PVT LTD
07-12-2016 489 30-04-2018
CONQUERENT CONTROL
SYSTEMS
08-08-2016 490 31-03-2018
Star Electric Company 08-08-2016 491 30-06-2018
RAMYAA ELECTRO GEAR
PVT LTD
11-02-2016 492 31-03-2018
ASIAN SWITCHGEAR PVT.
LTD.
11-02-2016 493 31-03-2018
P D STEELS 14/08/2017 494 31-05-2018
MV Electrosystems Private
Limited
31/07/2017 495 30-06-2018
BHAVITRON POWERTEC
PRIVATE LIMITED
14/08/2017 496 30-04-2018
2
auxilary motor RMPU 370 days 5
299 DA set 500 KVA 570 days 4
301
296 500 A IV coupler 370 days 2
298
297 400 A ZS coupler 370 days
SBC to different specs 370 days 23
MODERN RAILTECH 14/08/2017 497 31-07-2018
Name Since
M/s Mittal Batteries Pvt.
Ltd.,Mahboob Nagar-509228,
Telangana State.
02.06.14 31.10.18 sample yet to be offered by
firm
M/s Global Powersource (India)
Pvt Ltd. Mumbai-400086
2015 20.12.17 transferred from PS&EMU
directorate recently.
Documents under scruitny
M/s Southern Batteries pvt.
Ltd.,Bangalore
21.06.17 31.12.17
M/s Mittal Batteries Pvt.
Ltd.,Mahboob Nagar,
Telangana State.
02.06.14 30.09.18 Sample under test
M/s Global Powersource (India)
Pvt Ltd. Mumbai
2015 20.12.17 transferred from PS&EMU
directorate recently.
Documents under scruitny
M/s Southern Batteries pvt.
Ltd.,Bangalore
21.06.17 31.12.17
M/s LEAD ACID Battery Co.
(P) Ltd.Kolkata
12.08.16 31.03.19 sample yet to be offered by
firmM/s Global Powersource (India)
Pvt Ltd. Mumbai
2015 20.12.17 transferred from PS&EMU
directorate recently.
Documents under scruitny
M/s SouthernBatteries pvt.
Ltd.,Bangalore
21.06.17 31.12.17
M/s Global Powersource (India)
Pvt Ltd. Mumbai
2015 20.12.17 transferred from PS&EMU
directorate recently.
Documents under scruitny
M/s LEAD ACID Battery Co.
(P) Ltd.Kolkata
01.04.17 31.03.19 sample yet to be offered by
firmM/s Southern Batteries pvt.
Ltd.,Bangalore
21.06.17 31.12.17
M/s Global Powersource (India)
Pvt Ltd. Mumbai
2015 20.12.17 transferred from PS&EMU
directorate recently.
Documents under scruitny
M/s SouthernBatteries pvt.
Ltd.,Bangalore
21.06.17 31.12.17
307 Battery for Air-conditioning- 450
Ah (MG AC Coaches)
450 days 1 M/s Global Powersource (India)
Pvt Ltd. Mumbai
2015 20.12.17 transferred from PS&EMU
directorate recently.
Documents under scruitny
308 Battery for TR-D Application-
Lead Acid 40Ah -LM
240 days 1 M/s Global Powersource (India)
Pvt Ltd. Mumbai
2015 20.12.17 transferred from PS&EMU
directorate recently.
Documents under scruitny
309 Battery for TR-D Application-
Lead Acid 200Ah -LM
240 days NIL
310 Dry type air filter for air
conditioned coaches Underslung
& conventional RMPU
290 days NIL
311 Dry Type air filter for LHB RMPU 260 days NIL
QA / ELECTRICAL
SN items Total No. of days
specified for
No. of cases Details Target Reason for delay Remarks
301
304 Battery for train lighting-210 Ah 450 days 2
305 Battery for Air-conditioning- 525
Ah
420 days 3
302 Battery for Low Maintenance
Lead Acid Battery 75 Ah for
locomotives (PPCP Container)
450 days 3
303 Battery for EMUs 90 Ah (LM)
(PPCP Container)
450 days 4
SBC to different specs 370 days 23
NOTE: TDC/Total no of days for approval specified include field trial duration wherever stipulated in governing specification.
306 Battery for Air-conditioning- 800
Ah
420 days 2
312 Roof Mounted AC Package Units 190 days NIL
313 AC Control panel for roof
mounted AC package units
190 days NIL
314 M/s DRESPL, Simari (MP) 19.02.13 20.12.17 under capabiltiy
assessementM/s Analog Electronics,
Chennai
06.02.15 31.03.18 Documents for capabiltiy
assessement submitted
late, under scrutiny315 Battery charger for 110 V, 40 Ah
battery
200 days 1 M/s Transtech Power Controls,
Lucknow
02.06.17 30.06.18 Documents for capabiltiy
assessement under
scrutiny316 Battery charger for 110 V, 200
Ah battery
200 days 1 M/s Transtech Power Controls,
Lucknow
02.06.17 30.06.18 Documents for capabiltiy
assessement under
scrutiny317 245 kV Solid Core Post Insulator
Assembly for 220 kV Isolators &
Bus Bars.
300 days NIL
318 132 kV Solid Core Post Insulator
Assembly for 132 kV Isolators &
Bus Bars
300 days NIL
319 110 kV Solid Core Post Insulator
Assembly for 110 kV Isolators &
Bus Bars
300 days NIL
320 66 kV Solid Core Post Insulator
Assembly for 66kV Isolators and
Bus Bars
300 days NIL
321 Post Insulator Cap & Pin stack
for 132 kV Isolators
300 days NIL
322 Post Insulator for 25 kV Isolator
and Bus Bars (RI 6090)
300 days 1 M/s Porcelains Industries ,
Spain
26.04.16 31.10.18 Documents for capabiltiy
assessement submitted
late, under scrutiny323 11 kV Post Insulator 300 days NIL
324 OPERATING ROD
INSULATOR:- Operating Rod
Insulator for 25 kV Isolator
(RI 6260)
300 days 1 M/s Porcelains Industries ,
Spain
26.04.16 31.10.18 Documents for capabiltiy
assessement submitted
late, under scrutiny
325 STAY ARM INSULATOR:-
Porcelain Stay Arm Insulator ( RI
6000-2) (1050mm CD)
300 days 1 M/s Porcelains Industries ,
Spain
26.04.16 31.10.18 Documents for capabiltiy
assessement submitted
late, under scrutiny
326 BRACKET INSULATORS:-
Porcelain Bracket insulator (RI
6030-1) (1050mm CD)
300 days 1 M/s Porcelains Industries ,
Spain
26.04.16 31.10.18 Documents for capabiltiy
assessement submitted
late, under scrutiny
M/s Porcelains Industries ,
Spain
26.04.16 31.10.18 Documents for capabiltiy
assessement submitted
late, under scrutiny
M/s ABI, Halol 10.02.17 31.08.18 capabiltiy assessement
done. Firm to submit
drawings.328 SECTIONING INSULATORS:-
Sectioning Insulator (RI 6110)
(850mm CD)
300 days 1 M/s Porcelains Industries ,
Spain
26.04.16 31.10.18 Documents for capabiltiy
assessement submitted
late, under scrutiny
329 11kV, 70 kN, (Ball & Socket type)
Disc Insulator – 280 mm dia,
CD-430mm(min.)
300 days 1 M/s Bikaner Ceramics Private
Limited, Bikaner
03.10.17 20.12.17 Documents for capabiltiy
assessement under
scrutiny
290 days 2
327 9-TONNE INSULATORS:-
Porcelain 9-tonne Insulators (RI
6020-1) (1050 mm CD)
300 days 2
Electronic Time Delay Relay for
AC coaches
330 11kV, 120kN (Ball & Socket)
Disc Insulator with 280mm dia
CD 430mm(min.)
300 days 1 M/s Bikaner Ceramics Private
Limited, Bikaner
03.10.17 20.12.17 Documents for capabiltiy
assessement under
scrutiny331 Gearless Hand Operated Pulling
and Lifting Machine(0.8t, 1.6t,
3.2t)
190 days NIL
332 Ratchet Lever hoist (Pull Lift)
(0.8 t, 1.6 t, 3.2 t)
190 days NIL
M/s Tirupati PlastomaticsPvt
Ltd , Jaipur
24.02.16 20.12.17 Documents for capabiltiy
assessement under
scrutiny
M/s Quadrant Cables Pvt Ltd.,
Mohali
14.10.16 20.12.17 under Type testing
M/s Polycab Wires Pvt Ltd,
Halol, Gujrat
14.11.16 28.02.18 sample yet to be offered by
firmM/s Thermo Cables Ltd,
Hyderabad Telangana
28.10.16 30.06.18 under capabilty
asessement M/s Hubber&Shuner
AG,(Ebergy& Signal
Transmission), Switzerland
16.11.16 30.06.18 Documents for capabiltiy
assessement submitted
late, under scrutinyLeoni &Studer AG Switzerland 22.02.13 30.06.18 Documents for capabiltiy
assessement submitted
late, under scrutiny
M/s Tirupati Plastomatics Pvt
Ltd , Jaipur
24.02.16 20.12.17 Documents for capabiltiy
assessement under
scrutinyM/s Quadrant Cables Pvt Ltd.,
Mohali
13.10.16 20.12.17 Type testing has done.
M/s Polycab Wires Pvt Ltd,
Halol, Gujrat
26.10.16 28.02.18 uner type testing
M/s Hubber&Shuner
AG,(Ebergy& Signal
Transmission), Switzerland
17.11.16 30.06.18 Documents for capabiltiy
assessement submitted
late, under scrutiny
335 Passenger Elevator 615 days + time
taken by firm to
installed 1 unit of
elevator in Railways
for performance
evaluation
NIL
336 Passenger Escalator 450 days + time
taken by firm to
installed 1 unit of
Escalator in Railways
for performance
evaluation
NIL
Tentative
Target
(excluding
delay on
firm's end)
337
Telecom cable termination Box
(Non-metallic) for indoor use for
specification no.
RDSO/SPN/TC/97/2012, Rev.0
14 M/s Drip Elastotek. Kolkata. 25.02.2013Vendor Dev. suspended due to
Spec. revision.
TELECOM
1. Item has been transferred to
Electrical Loco Directorate on
31.03.2017 from
QA(Electrical) dte.
2. Peding cases of approval
before 01.03.17 are beig dealt
by QA(Electrical dte.)
3. Item is appering in Electrical
Loco dte. vendor list.
334 Thin Walled Cable for 3-phase
locomotives
370 days 5 1. Item has been transferred to
Electrical Loco Directorate on
31.03.2017 from
QA(Electrical) dte.
2. Peding cases of approval
before 01.03.17 are beig dealt
by QA(Electrical dte.)
3. Item is appering in Electrical
Loco dte. vendor list.
SN Item & Specification No.
Total no. of months
Specified for
approval
No. of Cases Firm’s Name
333 Thin walled flexible elastomeric
cables
with copper conductors
for working voltages
(i) up to 750 volts
and
(ii) above 750 volts up to 1.8/3.0
kv for tap changer electric
locomotives , AC/DC EMU, BG
AC EMU & MEMU/ coaching
stock ( Chemical curing process
/ Electron Beam Irradiation curing
370 days 5
Revise total time line for EEM Directorate
In process Since
338
Telecom cable termination Box
(Non-metallic) for indoor use for
specification no.
RDSO/SPN/TC/97/2012, Rev.0
14M/s Balaji Enterprises, New
Delhi15.03.2013
Vendor Dev. suspended due to
Spec. revision.
339
Telecom cable termination Box
(Non-metallic) for indoor use for
specification no.
RDSO/SPN/TC/97/2012, Rev.0
14 3M/s A-One Enterprises,
Gurgaon.13.03.2013
Vendor Dev. suspended due to
Spec. revision.
340
Joint Enclosure for Armoured
Optical Fiber Cable RDSO/ SPN/
TC/68/2014 Rev.1.0
14M/s Roxtec India Pvt. Ltd.
Gurgaon, Haryana16.07.2015
Sample not yet submitted (Jul
2018)
341
Joint Enclosure for Armoured
Optical Fiber Cable RDSO/ SPN/
TC/68/2014 Rev.1.0
14 2M/s AmpsonEngg. Pvt.
Ltd.,Thane11.12.2015 Under clarification
342
Permanently Lubricated HDPE
Duct as per RDSO/SPN/
TC/45/2013, Rev.-2.0
Amendment 1.0
14M/s Kriti Industries (I) Ltd Dhar
(MP)17.05.2016
Sample not yet submitted Nov
18.
343
Permanently Lubricated HDPE
Duct as per
RDSO/SPN/TC/45/2013, Rev.-
2.0 Amendment 1.0
14 M/s Sweta Industries Bhopal 25.02.2017Deficiencies not complied by
firm
345
Permanently Lubricated HDPE
Duct as per
RDSO/SPN/TC/45/2013, Rev.-
2.0 Amendment 1.0&2
14 M/s TijariaPolypipes Ltd. Jaipur 18.05.2017Deficiencies not complied by
firm
346
Permanently Lubricated HDPE
Duct as per
RDSO/SPN/TC/45/2013, Rev.-
2.0 Amendment 1.0&2
14 M/s VeekayPlast Jaipur. 10.08.2017Deficiencies not complied by
firm
347
Permanently Lubricated HDPE
Duct as per
RDSO/SPN/TC/45/2013, Rev.-
2.0 Amendment 1.0&2
14M/s Sadhu Autocom Pvt. Ltd.
Dhar. 26.05.2017
Deficiencies not complied by
firm
348
Permanently Lubricated HDPE
Duct as per
RDSO/SPN/TC/45/2013, Rev.-
2.0 Amendment 1.0&2
14 8M/s Aaram Plastic Private Ltd.
Jaipur.25.07.2017 Case under CCA
349
Permanently Lubricated HDPE
Duct as per
RDSO/SPN/TC/45/2013, Rev.-
2.0 Amendment 1.0&2
14M/s Duraline India Pvt. Ltd.
Thimmapur.30.08.2017
Deficiencies not complied by
firm
Elctronic LC gate telephone
system
RDSO/SPN/TC/51/11, Rev 3.0 2
351
Electronic LC Gate Telephone
System as per
RDSO/SPN/TC/51-11 Rev.3.0
14 M/s EEC Kolkata 21.03.2016Samples not yet submitted by
firm.
12.04.2017 STR not yet complied by Firm.
350 14 M/s RT Vision, NDLS 02.04.2014 18-Mar
344
Permanently Lubricated HDPE
Duct as per
RDSO/SPN/TC/45/2013, Rev.-
2.0 Amendment 1.0&2
14M/s Veer Vissions Pvt. Ltd.
Parwanoo (H.P.)
352
VHF Based Approaching Train
Warning System for Track
Maintainers RDSO/SPN/TC/105-
2015, Rev.0.0
14M/s RT Vision Technologies
Pvt. Ltd.19.02.2016
Samples not yet submitted by
firm.
353
VHF Based Approaching Train
Warning System for Track
Maintainers RDSO/SPN/TC/105-
2015, Rev.0.0
14M/s Sanchar Comm. System,
New Delhi03.03.2016 17-Dec
354
VHF Based Approaching Train
Warning System for Track
Maintainers RDSO/SPN/TC/105-
2015, Rev.0.0
14 4M/s Pulse Communication
Systems Pvt. Ltd.03.03.2016
Samples not yet submitted by
firm.
355
VHF Based Approaching Train
Warning System for Track
Maintainers RDSO/SPN/TC/105-
2015, Rev.0.0
14Sirveen Control System
Hyderabad.01.08.2016
Pending for CCA on firms
account
On-board wireless PA System for
Passenger Trains
(RDSO/SPN/TC/104/2014, Ver.
0.0)
357
True Colour Video-cum-Train
Information Display System
(RDSO/SPN/TC/67/2013 Rev.-3
Amendment -1)
14 M/s EEC Kolkata 21-03-2016Samples not yet submitted by
firm.
True Colour Video-cum-Train
Information Display System(RDSO/SPN/TC/67/2013 Rev.-3
Amendment -1)3
359
True Colour Video-cum-Train
Information Display System
(RDSO/SPN/TC/67/2013 Rev.-3
Amendment -1)
14 M/s FIEM Industries ltd, 30-05-2017Pending for CCA on firms
account
360
Integrated Passenger Information
System as per RDSO/ SPN/
TC/61/2015 Rev-4, Amendt.-1
14 M/s Securinex Nic, Parwanoo 21-04-2017Pending for CCA on firms
account
Integrated Passenger Information
System (RDSO/SPN/ TC/61/2015 Rev-4,
Amendt.-1)3
Integrated Passenger Information
System (RDSO/SPN/ TC/61/2015 Rev-4,
Amendt.-1)
364
SMPS Based Telecom Integrated
Power Supply System (TIPSS)
For Station RDSO/SPN/TC/102-
2013, Ver.1.0
14 2Broadweb Technologies Pvt.
Ltd. Howrah26.05.2017
Deficiencies advised to the firm
on dt. 13.10.2017
Under trial
358 14M/s DAT Infrormatics Pvt. Ltd.
NDLS.21-04-2017
Pending for CCA on firms
account
356 14 1M/s Delta Embedded solutions
Pvt. Ltd pune. 16-11-2016
Sample not yet submitted by
firm. Six months thereafter363
SMPS Based Telecom Integrated
Power Supply System (TIPSS)
For Station RDSO/SPN/TC/102-
2013, Ver.1.0
14M/s Punjab Comm. Ltd., S.A.S
Nagar26/05/2014
362 14M/s ICS Systems Pvt. Ltd.,
NDLS16.10.2017
Pending for CCA on firms
account
361 14M/s Saranya Electronics Pvt.
Ltd. HYD.07-04-2017
Pending for CCA on firms
account
365
Emergency Socket Box FRP
Material RDSO/ SPN/
TC/44/2002 Version 2,
amendment-3.
11 1 Hi-Light Industries Howrah. 20.10.2016 Under CCA.
Name Since
366
Graduated release compressed
air brake equipment for freight
stock
597
-Components of Graduated
release compressed air brake
equipment for Freight &
Coaching stock
292 1G M Dalui & Sons Pvt Ltd,
Howrah28.02.2017 Feb 2018
(a) Auxiliary Reservoirs 292 - - -
(b) Cut off Angle Cock with Vent 292 - - -
(c) Dirt Collector assembly 292 - - -
(d) Air Brake Hose coupling 292 1Jayshree Polymers Export Pvt
Ltd., Pune 17.08.2017 Mar 2018
(e) Guard Emergency Brake
Valve292
- - -
(f) Isolating Cock 292 - - -
(g) Check Valve assembly 292 - - -
292
1. Asean Rubber Products,
Pune 01.07.2016 Jan 2018
2922. Maxim Tubes Co Pvt Ltd,
Gujrat 15.04.2017 Mar 2018
2923. Aristo Transmission Pvt Ltd.,
Raipur 22.11.2016 Dec2017
(i) Pressure gauge for air brake
System 292
- - -
(j)Load sensing Device 292 - - -
367 Brake Cylinder Assembly 322 - - -
368Brake Slack Adjuster and spares
for freight
592+ Field trial (18
months)1
Ravindra Trading Company,
Chennai 20.04.2017 Dec2017
369 Empty Load device 292 - - -
1. Jindal Steel Power Ltd.
Ramgarh (Jharkhand) 05.07.2014 May 2018
2. BMM Ispat Ltd., Bellari,
Karnataka 08.01.2016 Jan 2018
3. Mishra Dhatu Nigam Limited,
Hyderabad 22.03.2017 Jun 2018
4. Goradia Special Steels Ltd,
Raigarh 01.04.2017 Jun 20185. Gerdau Steel India Pvt Ltd.,
Anantpur 23.06.2017 Jan 2018
6. SLR Metalliks Ltd, Bellari 22.03.2017 Jun 2018
371
Spring Steel Rounds to material
Gr. 52Cr4Mo2V and Gr. AISI
8650H
352 1 Mishra Dhatu Nigam Limited,
Hyderabad 22.03.2017 Jun 2018
1. Sunflag Iron & Steel Co.Ltd.
Bhandara 07.06.2017 Jan2019
2. Jayaswal Neco Industries
Ltd. Raipur 09.06.2017 Jan20193. Bhushan Power & Steel Co.
Ltd. Sambalpur 09.06.2017 Jan2019
S.N. ItemTotal Number of
Days for Approval
Number
of Caes
DetailsTarget
QA/MECHANICAL
372
Spring Steel Round for Hot
Coiled Cylindrical Spring for use
in suspension of Indian Railway
Coaches having FIAT Design
Bogies
352 4
(h) Pipes & Joints for Air Brakes 3
370Spring Steel Rounds to material
Gr. 60Si7 and Gr. 55Si7352 6
4. RL Steels & Energy Ltd.,
Aurangabad. 29.06.2017 Jan2019
373
Hot Coiled Helical springs to
material Gr. 60 Si7 and Gr.
52Cr4Mo2V for Freight
442
- - -
374Hot Coiled Helical Springs for
Locomotives
592+ Field trial (24
months)1
Chemin Spring India Pvt. Ltd,
Haridwar07.12.2015 May 2018
1. Rahul Precision Works Pvt
Ltd., Dhar 02.07.2016 May 2018
2. Balaji Rubber Factory, Pune 12.07.2017 May 2018
376Metal Bonded Rubber Pads for
Side Bearer412 1
1. Climax Overseas Pvt Ltd,
Gurgaon.13.06.2016 May 2018
1. Suncreast Industries, Jalkal,
Kolkata29.01.2015 May 2018
2. Rahul Precision Works Pvt.
Ltd, Dhar. 02.02.2016 May 2018
3. Balaji Rubber Factory, Pune 06.07.2017 Jul 2018
1. Climax Overseas Pvt Ltd,
Gurgaon.
12.04.2015 Jun 2018
2. Rahul Precision, Dhar 27.01.2016 Jun 20183. Mandeep Industries,
Lucknow 02.05.2017 Feb 2018
379 Nylon-66 brake gear bushes 322 - - -
1. Suyog Rubber (I) Pvt Ltd,
Nashik17.05.2017 Jan2018
2. Climax overseas Pvt Ltd,
Gurgaon. 09.06.2017 May 2018
3. Balaji Rubber Factory, Pune 12.07.2017 Jul 2018
381Centre Pivot Rubber Bush for
WDP1, WDG3A292
- - -
1. Brand Alloys Private Limited,
Kolkata 03.10.2015 Feb 2018
2. N.K. Iron & Industries, Agra
09.02.2015 Dec 2017
383Alliance II Coupler & its
components442
384
High tensile transition centre
buffer coupler & its component
for BG Wagons & Locomotives
442 1Nava Nirman Fabrication Pvt
Ltd, Kolkata05.07.2017 Aug 2018
385 High Capacity Draft Gear 352 - - -
386 Knuckle pin with washer 292 1Frotier Alloys Steel Ltd, Kanpur
08.08.2017 Feb 2018
387 Yoke Pin 292 1Frotier Alloys Steel Ltd, Kanpur
08.08.2017 Feb 2018
388 Knuckle Thrower 292 - - -
Cast Steel CASNUB bogie and
its components472
- - -
(i) Centre Pivot Assembly (Top &
Bottom)1
Jai Multi Engineering Co.
Mohali 03.12.2016 April 2018
372
Spring Steel Round for Hot
Coiled Cylindrical Spring for use
in suspension of Indian Railway
Coaches having FIAT Design
Bogies
352 4
375Rubber Buffer Spring for Freight
stock292 2
380
Side Bearer (Rubber spring) and
Improved Rubber Side Bearer for
Locomotive Bogies
442+ Field trial (12
months)3
382
High tensile centre buffer coupler
& its components for Freight
stock
442 2
377
Rubber Spring of High Capacity
Draft Gear for Centre Buffer
Coupler of BG Bogie Wagons
352 3
378 Elastomeric Pads 472+ Field trial (12
months)3
389
390
Cast Steel bogies and its
components for CONCOR flat
wagons
472
- - -
391 Spring Plank 292 - - -
1. Rahul Precision Works Pvt.
Ltd., Dhar.02.02.2016 Feb 2018
2. Balaji Rubber Factory, Pune 05.07.2017 April 2018
393 Brake Beam for freight stock 292 - - -1. Super Iron Foundry Pvt ltd.,
Burdwan 16.06.2016 May 20182. Govind Steel Company Ltd.,
Kolkata 28.07.2016 May 2018
3. Maa Foundry Pvt. Ltd.,
Orisha 30.07.2016 May 20184. Natraj Iron & Casting P Ltd,
Dhanbad 17.03.2017 Jun 2018
5. Prakash Iron Foundry, Agra 01.08.2017 Jun 20186. Banglore Malleable Castings
P Ltd, Banglore28.07.2014 Dec 2017
395 Side Frame Key 292 1Britex Engineering Works,
Mumbai 26.05.2017 Mar 2018
396
AAR approved Taper Roller
Cartridge Bearings class E(6”X
11”) complete for use on freight
stock
352
- - -
397 Locking Plate 292 - - -
1. Sterling Bolts Pvt Ltd,
Kolkata01.03.2016 Mar 2018
2. Vinraj Steels Private Limited,
Howrah 22.11.2016 April 2018
3. Shree Ambey Metal
Industries Limited 05.12.2016 Mar 2018
4. Kwality Forge, Jugiana,
Ludhiana 30.05.2017 Mar 2018
399
Three axle cast steel trimount
and flexi-coil bogie frames &
bolsters for BG Locomotives
442
- - -
1. Lal Baba Industrial Corpn,
Howrah28.10.2016 May 2018
2. Frontier Springs Ltd, Kanpur 31.07.2017 April 2018
401 Lubricated taper plug valves 292 - - -
402
Silico-Manganese & Manganese
Steel liners & wear plates for
Bogie and couplers
292 1A.D. Electro Steel Co Pvt Ltd.
Howrah06.09.2016 Dec 2017
403Snubber Assembly for
Locomotives352
- - -
404Cold Rolled Formed Sections for
Freight 382 1
Modern Industries, Sahibabad 30.10.2017 Nov 2018
405Brake Slack Adjuster Type IRSA-
750 for Freight Stock & Spares
592+ Field trial (18
months)1
Ravindra Trading Company,
Chennai 03.12.2016 Dec 2018
406Body Side Wall, End Wall and
Flap Door of BOXNR Wagons442 1 JSL Life Style Ltd, Haryana 17.08.2017 Feb 2018
382 6
398Axle end steel high tensile cap
screws292 4
392 Centre Pivot Washer 292 2
400 Screw Couplings 292 2
394Narrow Jaw, Wide Jaw and
Modified Adapter
1. Precision Industrial System,
Gwalior.18.02.2016 Feb 2018
2. Shri Gurco Ispat, Kanpur 30.06.2017 Jan 20183. Everon Casting Pvt Ltd.,
Coimbatore 18.11.2016 Feb 2018
4. Sanmar Foundories Ltd. 20.01.2017 Jan 20185. Datre Corporation Limited,
Howrah 14.02.2017 Feb 20186. Prragathi Steel Castings Pvt
Ltd,
Shimoga, Karnataka
14.02.2017 Feb 2018
7. Srinathji Ispat Ltd.,
Ghaziabad 12.04.2017 Mar 2018
8. Hind Murti Industries, Punjab 01.05.2017 Mar 20189. Srinivas Engg Auto
Components P Ltd 28.02.2017 Dec 201710. Gallard Steels Ltd.,
Pithapur, Dhar 15.08.2017 Dec 2017
SN Item days No. of cases Name of firm Applied Target *
408 Transformer 450 2 BHEL 20.03.17 30.11.18
Skipper Seil 24.05.17 31.12.18
409 VCB/BM 450 7 Megawin (CB) 17.12.15 30.5.18
Megawin (BM) 17.12.15 30.5.18
SIEMENS 19.12.16 30.11.18
System Control 06.03.17 30.11.18
Megawin CB/SP 01.09.17 31.12.18
Megawin BM/SP 01.09.17 31.12.18
CG Power 22.09.17 31.12.18
410 Panel & Relay 360 1 SIEMENS, Goa 31.5.17 30.6.18
411 SSWR 300 2 Sight & Sound (SS) 5.5 27.12.16 26.6.18
Sight & Sound 8.6 18.12.16 19.6.18
412 ATD 300 9 Sight & Sound ATD 5P 4.4.17 3.6.18
Sight & Sound ATD 3P 4.4.17 3.6.18
Khatri 5P 9.4.17 8.4.18
Khatri 3P 9.4.17 8.4.18
NSS 3P 11.3.17 10.6.18
NSS 2400 24.3.17 23.6.18
Kamgar 5P 10.12.16 9.4.18
Kamgar 3P 31.5.17 30.5.18
Shree Steel 3P 26.4.17 25.6.18
413 Bushings 210 1 Yash 5.2.16 28.2.18
414 Insulators 360 2 ADINATH 16.1.16 30.6.18
Raychem 2.3.16 31.3.18
415 Phase Break 630 5 Narmada 30.4.13 28.6.18
Polyfluro 24.12.14 23.6.18
Siemens 17.5.16 16.10.18
Simpra 1.9.16 30.6.18
Wish 11.7.16 10.10.18
416 Light Weight Section Insulators 630 4 Narmada 5.3.15 4.10.18
Siemens 21.6.16 20.10.18
Simpra 30.5.17 29.6.18
AF Switzerland 17.10.13 16.7.18
417 Section Insulators 630 1 Shree Steel 9.12.15 8.4.18
418 Contact Wire-193 210 1 Airen Metals 5.2.16 15.4.18
419 Contact Wire-107 150 1 Dhruv Cables 20.3.17 28.2.18
420 Catenary 150 3 Dhruv Cables 20.3.17 28.2.18
TRACTION INSTALLATION
407RDSO approved firms for Class
’A’ Foundry247 10
Sri Ram Cables 31.5.17 7.2.18
Santoshi Hyvolt 1.9.17 7.2.18
421 SCADA 360 2 ABB 7.11.16 31.3.18
422 Motorised ISO 210 2 G R Power 7.12.15 15.4.18
Tritech 24.5.17 15.4.18
423 SGCI Fittings 360 2 NSS 9.6.16 8.6.18
Super Engi tech 9.8.17 8.6.18
424 Fittings Forged 360 5 NSS 5.5.16 4.5.18
Modern Engg. 17.4.17 16.6.18
TLP 31.5.17 30.5.18
Mosdorfer India Pvt. Ltd. 28.7.17 27.7.18
Dynamic 1.9.17 31.8.18
425 Spring ATD 450 2 Pfisterer 28.12.16 27.12.18
D2 23.2.16 22.5.18
Tentative time for
aproval
Days Name of vendor Since TDC
426 Double Line Block Instrument 570 Nil Nil Nil
427Single Line Tokenless Block
Instrument Handle Type570 Nil Nil Nil
428Single Line Neale’s Ball Token,
Type ‘A’360 Nil Nil Nil
429Block Bell Equipment Used In
25KV AC Electrified Area360 Nil Nil Nil
430
Filter Unit for Use in Conjuction
With Block Instrument In 25kv,
50 Hz, Ac Traction Areas
330 Nil Nil Nil
431
PVC Insulated Armoured,
Unscreened Underground Power
Cable
390 8
1-Thermo
2-Singla
3-SBEE Cables
4- Fortune Art
5-Ultra Cab
6-MAA Durga Steel
7- Gupta Power
8-Swarn Infratel
09.01.2014
01.05.2015
25.06.2015
12.10.2015
14.12.2015
21.03.2016
15.12.2016
13.02.2017
March-18
Aug-18
April-18
Aug-18
Sept-18
Dec-17
July-18
July-18
432PVC Insulated Railway Signalling
Indoor Single Core Cable 390 3
1-Thermo
2-Gupta power
3-SBEE Cable
02.01.2014
13.05.2015
25.06.2015
April-18
July-18
May-18
433PVC Insulated Railway Signalling
Indoor Multi Core Cable390 2
1-Thermo
2-SBEE Cable
02.01.2014
25.06.2015
April-18
May-18
434
PVC Insulated Armoured,
Unscreened, Underground
Railway Signaling Cable
390 6
1-SBEE Cables (India) Ltd.
2-Ultracab (India) Ltd.
3-Fortune Art Wires,
4-Allied Engg Works
5-CMI Energy Pvt. Ltd.
6-SVARN Infratel Pvt. Ltd.
25.06.2015
25.06.2015
12.10.2015
16.09.2016
19.01.2017
09.02.2017
April-18
Feb-18
June-18
Aug-18
Sept-18
July-18
435Multi Unit Type - Without Side
Light 360 2
1. Varsha Enterprises
2. Tele Signal
14-05-2015
25-07-2016
Dec-17
Dec-17
Details of cases in processItem NameS.No
No. of pending
cases
QA/S&T
Wissan 23.1.17 30.6.18
436 Shunt Signal- Position Light Type 360 Nil Nil Nil
437Route Indicator Direction Type 5
Lamps Unit Arms (1 To 6 Way)390 Nil Nil Nil
438Electric Lamp for Railway
Signalling390 Nil Nil Nil
439Electric Lamp Filament Switching
Unit For Colour Light Signals390 Nil Nil Nil
440
Light Unit- Lamp Holder Unit,
CLS Lamp Holder Unit (For
Tripple Pole Lamp)
330 Nil Nil Nil
441Lenses (Glass)-Clear, Green,
Red, Yellow.330 Nil Nil Nil
442 Roundels- Green, Yellow & Red 330 Nil Nil Nil
443
Signal Colour Light – Lenses
(Polycarbonate) Clear, Red
,Green.
330 Nil Nil Nil
444
Circuit Controller (Modified
Design) Lever and Arm, DW
Lever Circuit Controller (Rotary
Type)
420 Nil Nil Nil
445 Electric Point & Lock Detector 330 Nil Nil Nil
446 Electric Key Transmitter 420 Nil Nil Nil
447
Elecrtic Lever Lock & Circuit
Controller 200 mm stroke
&(D.W.) 40 mm stroke
420 Nil Nil Nil
448Electric Point Machine (Non-
Trailable Type )600 2
1- M/s Sandhu Tachnocrats
(P)Ltd. (220mm)
2- M/s Star electric
Co.,Ludhiana
09.02.2017
09.02.2017
March-19
June-19
449Motors For Electric Point
Machine 360 2
1- M/s Sandhu Tachnocrats
(P)Ltd. (220mm)
2- M/s Star electric
Co.,Ludhiana
22.02.2016
09.02.2017
Oct-18
Aug-18
450 Electric Signal Machine 270 Nil Nil Nil
451 Motor for Electric Signal Machine 360 Nil Nil Nil
452DC IRS Post Type Electric
Signal Reverser 360 Nil Nil Nil
453 S.M.'s Control Frame 360 Nil Nil Nil
454 Top & Bottom Rollers, Nylon-6 360 Nil Nil Nil
455
Non Deteriorating Type of Low
Voltage Electric Fuses For
Railway Signalling
450 11- M/s Super Engg. works 12.05.2016 Nov-18
456
ARA Terminal Blocks And Fuse
Blocks-
Made of PBT/Polycarbonate
360 Nil
Nil Nil
457
Multiway Isolating Terminal
Blocks (Barrier Type) For
Signalling Installations
360 Nil
Nil Nil
458120/160/200 Way TAG Blocks
For Signalling Installations360 Nil
Nil Nil
459Battery Charger For Railway S&T
Installations450 Nil
Nil Nil
460 Track Feed Battery Charger 450 21. Cosine Communication,
2. S&T Workshop, Byculla
24-01-2017
25-01-2017
Aug-18
April-18
461
Dual Bank Charger With Twin
Bank Low Maintenance Lead
Acid Batteries For Use on Block
line Circuit
450 Nil Nil Nil
462
Valve Regulated (Sealed) Lead
Acid Stationary Battery Charger
for Railway S&T Installations
450 Nil Nil Nil
463DC-DC Converter For Railway
S&T Instalations450 2
1. Broadweb Technologies
Private Ltd,
2. Signal Workshop, PTJ
28-04-2017
23-06-2017
Sept-18
Sept-18
464
Inverter For Railway Signaling
Installations For ‘On- Line’
Applications
450 11. Electrostar, Kolkata 21-03-2016 Aug-18
465
‘SITEL’ Primary Cells (Dry,
Lachlanche Type) For Railway
S&T Installations
720 Nil Nil Nil
466
Low Maintenance Lead Acid
Stationary Secondry Cells For
S&T Instalations
1020 3
1- Star batteries
2- Celtek batteries
3. Mittal batteries
26.11.2015
22.04.2016
31.08.2016
June-20
May-20
Jan-20
467
Valve Regulated (Sealed) Lead
Acid Stationary Battery For
Railway S&T Installations
660 2
1- M/s Enersys batteries Pvt
Ltd.
2- M/s NED battery
25.07.2016
10.03.2017
June-19
June-19
468 Solar Photo - Voltaic Module 420 2
1- M/s Sunrise Technology
2- M/s Plaza power
15.09.2015
17.09.2015
Sept-18
Oct-18
469 Colour Light Signal Transformer 450 Nil Nil Nil
470TRANSFORMER 230/110 V
1KVA to 5KVA450 1
1. Broadweb Technologies
Private Ltd
28-04-2017 Oct-18
471
Current Transformer For Lamp
Proving ( H, L & I Types For The
Use in Controlled Signal
Territories)
450 Nil Nil Nil
472
Indication Supply Transformer
(Step Down) For Railway S&T
Installations
450 Nil Nil Nil
473Transformer-Rectifier Set For
Railway S&T Installations450 2
1. Pranava Electronics
2. Electrostar
17-09-2015
21-03-2016
Sept-18
Aug-18
474
Ferro Resonant Type Automatic
AC Voltage Regulator For
Railway signalling Installations
450 Nil Nil Nil
475
RELAYS -- Universal Plug-in
type AC Lamp Proving Relay (M-
to-C Contact) for LED Signal
Lamp
660 1
1. Orient Relay & Equipments
30-09-2016 Jan-19
476
Relays -- Plug-In Type Tractive
Armature, AC Lamp Proving
Relay (Metal-To-Carbon Contact)
Signal Lamp (ON, OFF, ROUTE,
SHUNT ECR)
660 Nil Nil Nil
477Relays - 'Q' Series Neutral Line
(ACI & NON-ACI)660 2
1. Digital Communication &
Control Pvt. Ltd (QN1)
2.Digital Communication &
Control Pvt. Ltd (QNA1)
26-11-2015
17-12-2015
Oct-18
Oct-18
478
Relays – Plug in Type, Track
Relay 9 & 4 Ohm (ACI & Non-
ACI)
660 Nil Nil Nil
479Relays – Special Type ( Metal-to-
Carbon )660 6
S&T Workshop,Podanur
a) QL1
b) QBCA1
Digital Communication &
Control Pvt. Ltd
a) QBA1
b) QL1
Orient Relay & Equipments
a) QN1K
b) QNA1K
20-08-2015
12-08-2016
17-12-2015
17-12-2015
16-09-2016
16-09-2016
Dec-18
June-18
Oct-18
Oct-18
Jan-19
Jan-19
480
Relays - ECRs (Metal-To-Metal
Contact) (ON, OFF, ROUTE &
SHUNT aspect)
660 Nil Nil Nil
481Relays - Neutral Line (Metal-to-
Metal Contact) , (ACI & Non-ACI)660 Nil Nil Nil
482Relays – 3-Position DC Polarized
(Metal to Metal)660 Nil Nil Nil
483Relays – Special Type (Metal to
Metal)660 Nil Nil Nil
484Relay – Metal to Metal 110V AC
LED ECR for LED Signal Lamp 660 Nil Nil Nil
485 Relays – Point Contactor Unit 660 Nil Nil Nil
486Relay Contacts – SIG– (For‘Q’
series plug-in type relays only)450 Nil Nil Nil
487
Choke Coil For Single Rail Track
Circuits On 25 KV 50 Hz AC
Electrified Sections
420 11. Electronics Industrial
Corporation
08-09-2016 Oct-18
488Fail Safe Electronic Time Delay
Device For Railway Signalling540 Nil Nil Nil
489 Electric Lifting Barrier 390 3
1- M/s S&T workshop ,Byculla
2- M/s Signal Workshop,
Gorakhpur
3.M/s Broad web
Technology(p)Ltd.
29.08.2014
30.09.2016
12.12.2016
Feb-18
May-18
Sept-18
490Universal Wayside DTMF
Control Telephone420 Nil Nil Nil
491Emergency Control Room
Equipment420 Nil Nil Nil
492
Light Weight Portable Control
Telephone (4 wire/ 2
wire)
420 Nil Nil Nil
4934-Wire Way Station Control
Telephone 360 Nil Nil Nil
4942 –Wire Way Station Control
Telephone420 Nil Nil Nil
4954-Wire/2 Wire Portable Control
Telephone420 Nil Nil Nil
496 Magneto Telephone 450 Nil Nil Nil
497Desk Type Electronic Magneto
Telephone 420 1
1. Electro Star 22-02-2016 Oct-17
498
Power Supply Unit (PSU)For
Telecom Installations At Way
Side Stations In 25 KV Electrified
Areas
420 1
1. Electro Star 22-02-2016 Oct-17
499
SMPS Based Power Plant For
Indian Railways Telecom
Equipments
420 3
1.Eltek SGS Pvt. Ltd
2. Delta Power Solutions
3. Statcon Power Control Ltd
18-03-2015
29-04-2015
01-03-2017
500
SMPS Based Power Plant For
Indian Railways Telecom
Equipments
420 3
1.Eltek SGS Pvt. Ltd
2. Delta Power Solutions
3. Statcon Power Control Ltd
18-03-2015
29-04-2015
01-03-2017
June-18
Aug-18
Nov-18
501Auto Dialing System From
Emergency Socket 420 Nil Nil Nil
502
V.F. And Signalling
Transformers Used For
Derivation And Termination Of
Underground Telecommunication
Cable Circuits
420 Nil Nil Nil
503
Two/Three V.F Transformers
(2T/3T) For Derivationand
Termination Of Underground
Telecom Cable Circuit
450 Nil Nil Nil
504Six Pin Emergency Plug And
Socket360 Nil Nil Nil
505
Voice Frequency Communication
System For Underground Quad
cable
420 Nil Nil Nil
506Primary Digital Multiplexing
Equipment420 Nil Nil Nil
507
Light Weight Unbreakable
Enginnering Thermoplastic
Material Insulator For Overhead
Telegraph And Telephone
Lines
420 Nil Nil Nil
508
Polythene Insulated Polythene
Seathed Jelly Filled Telephone
Cable with Poly-AL Moisture
Barrier
270 1
1. SPM Power&Telecom 10-09-2014 Oct-18
509
Underground Railway Jelly Filled
Telecom Quad Cables For
Signaling And Telecom
Installations
450 Nil Nil Nil
51024 Fiber Armoured Optic Fiber
Cable450 4
1.HTL Ltd
2.Paramount Wires & Cable
3.Om Optel
4. Himalaya Commu.
30-07-16
30-07-16
21-10-16
25-06-17
Oct-18
Oct-18
Sept-18
Nov-18
5111.4 mm dia Copper Conductor
4/6 Quad Cable450 1
1.RMS Power Solutions 22-06-15 Sep-18
512Fibre Distribution Management
System 360 Nil Nil Nil
513
Thermo Shrink Jointing Kit For
Jointing Underground Quad
Cable (0.9 mm Conductor Dia.)
360 Nil Nil Nil
514Thermo Shrink Jointing Kit For
Jointing Underground PIJF Cable360 Nil Nil Nil
515Digital Clock with GPS
Synchronization420 1
1. Infosoft Digital Design &
Services (P) Ltd
27-01-2014 Apr-18
Name Since516 Fail Safe Electronic Flasher
device as per
RDSO/SPN/173/2002
450 1 M/s Pearl Electronics & Power
system, Roorkee
07-11-2015 Sept. 18
M/s Tirupati Plastomactics
Ltd.Jaipur
25-10-2016 Mar. 18
M/s Rex Polyextrusion Pvt.
Ltd., Sangli
16-11-2016 Feb. 18
M/s Duraline India Pvt. Ltd.,
Neemrana, Alwar
04-05-2017 April'18
M/s Duraline India Pvt. Ltd.,
Neemrana, Telangana
19-09-2017 Sep'18
M/s S&T Workshop
Mettugudda, (SC)
23-06-2015 Dec'18
M/s Statcon Energiaa (P) Ltd. 03-06-2016 Dec'18
519 Data Logger IRS:S-99/2006 450 1 M/s VTL 16.04.14 June, 18
M/s Medha EI634 23.01.15 Dec'18
270 (under cross
approval)
1 Safeconnect Communication
(India) Pvt Ltd
07.09.2017 June, 18
990 (Indegenous
development) Kyosan India Private Limited 17.02.2015 Feb'18
Safeconnect Communication
(India) Pvt Ltd
07.09.2017 June, 18
Siemens Ltd. 30-01-2017 June'18
Honeywell Security & Fire (A
Div of Honeywell International
India Pvt. Ltd.)
10.03.2017 April'18
Ravel Electronics Pvt Ltd 03.04.2017 June'18
PARK TELESOLUTIONS
PVT.LTD
30.05.2017 Aug'18
M/s Siemens Ltd. (ACM 200) 15.12.2015 Apr-18
M/s Vista Information System(P
Ltd) (ESSO M)
23.11.2016 June'18
M/s HBL Power Systems ltd 09.03.2015 Oct' 19
M/s GG Tronics 01.10.2015 Dec'18
M/s Medha 07.08.2013 Apr'18
270 (under cross
approval)
Details Target
517 Double Walled Corrugated
HDPE Duct for Railway Signaling
as per RDSO/SPN/204/2011
Ver.1.1 with amend.1
360 4
SIGNAL
SN Item Total number of days
for finalisation
Number of cases
HBL Power System 07.07.2016 April'19
521 EI (SPN/203)
270 (under cross
approval)
2
518 SMPS based Integrated Power
Supply system (IPS) as per
RDSO/SPN/165/2012
540 2
520 EI (SPN/192) 990 (Indegenous
development)
2
522 Automatic Fire Detection & Alarm
System for Signalling Installation
450 4
523 MSDAC 270 (under cross
approval)
2
840 (Indegenous
development)
3
524 SSDAC
M/s Insys Digital Systems 04.12.2014 July 19
M/s HBL Power Systems ltd 29.03.2014 June 19
S &T Workshop podanur 10.07.2014 Dec 18
M/s Pragati Electrocom Pvt.
Ltd., Gurgaon
28.09.2016 June, 18
M/s JMV LPS Ltd., Noida 29.11.2016 June, 18
M/s Cape Electric Pvt. Ltd.,
Kanya Kumari
22.09.2016 June, 18
M/s Fast Electrode, Pune 29.08.2017 Nov 18
M/s Efftronics 01.01.2016 Feb'18
M/s CLS Industries New Delhi 18.07.2014 Dec'17
M/s Beacon Industries,
Dehradun
15.12.2014 Dec'18
M/s Power Technologies
Corporation, Dehradun
01.08.2014 Jun'18
M/s Virtual Industries 19.07.2016 Dec-18
M/s Konark Industries Pvt. Ltd.,
SBC
08.05.2015 Mar'18
M/s. Trusine Electronics Pvt.
Ltd. New Delhi
28.02.2014 May-18
M/s. Integra Engineering India
Limited, Vadidara
14.03.2015 Dec 17
M/s RT Vision Technologies
(P) Ltd, Noida
08.12.2015 Apr-18
M/s General Auto, Mumbai 04.01.2016 May-18
M/s. System Aids Bangalore 18.11.2016 Jun-18
M/s. Paras Plastics, Mumbai 03.11.2016 Dec-18
M/s. AkshayEngg Kolkata 30.06.2017 Jun 18
M/s. Connectwell Industries
Pvt. Ltd., Mumbai
19.07.2014 Jul-18
M/s. Elmex Electric Pvt Ltd,
Vadodara
21.07.2014 Jul-18
M/s. Wago Limited, Noida 22.07.2014 Jul-18
M/s. Phoenix Contact(I) Pvt.
Ltd., New Delhi
08.08.2014 July 18
Ram Electronics 07.04.2017 Jan'18
Malika International 27.03.2014 Dec 17
Electronic Equipment Company 23.12.2014 Oct'18
Broadweb Technologies 28.01.2016 Oct'18
Hublit Lighting Pvt. Ltd. 24.04.2016 Dec 18
M/s CLS Industries, New Delhi 24.05.2016 Dec'18
M/s Beacon Industries,
Dehradun
15.12.2014 Dec'18
532 Advanced Warning
system(AAWS)
540 1 M/s Siemens 09.02.2015 Jun 18
533 DTMF 450 1 M/s DCC Pvt. Ltd 02.03.2015 Feb 18
534 SSBPAC 810 1 M/s Medha 16.02.2012 Jun-18
535 Track Magnet & Opto coupler
card of Advanced Auxiliary
Warning System(AAWS)
540 1 M/s Medha 14.02.2017 Jul-18
536 Axel counter Based Block
proving by Mux , UAC
810
537 Block Proving by Axel Counter
(BPAC) using UFSBI
810
538 Battery Operated LED based
flashing Tail lamp
450
539 Audio Ferquency Track Circuit 270 (Under cross
approval)
5
524 SSDAC
810 (Indegenous
development)
3
525 Earthing & Bonding system for
signalling equipments
450 4
530 Battery Operated LED based
Torch Light cum Flashing Hand
Signal Lamp
450 5
531 LED Signal Lamps for subsidiary
Colour Light Signals
Specification No.
RDSO/SPN/153
540 2
528 Non-Metallic colour light signal
Housing of various types for
360 2
529 Modular Terminal Blocks, Fuse
terminal blocks & miniature fuse
links as per RDSO/SPN/
189/2004 Rev. 2.0
360 4
526 LED Signal Lamps for Main
Colour Light Signals (Integrated)
Specification No.
RDSO/SPN/199/2010 Rev. 1.0.
540 6
527 Fuse Auto Changeover System
(TYPE-II) (FACS) as per Spec.
No. RDSO/SPN/ 209/2012 Rev.
1.0.
420
540 Push Button Single Line Block
Instrument
360
541 Domino Type contol Panel 360
542 Train Protection and Warning
system
270 (under cross
approval)