ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No...

42
Name Pending since Communication exchanged between RDSO & Vendor Reson for delay Current status Target 1 Constant Contact PU Side Bearer Pads for NLB Bogies 10 months NIL - - - - 2 Constant Contact PU Side Bearer Pads for HS Bogies 10 months NIL - - - - 3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25 T axle load wagons 10 months 1 M/s Siena Engineering Pvt. Ltd. 06-05-2017 Deficiencies advised to firm vide this office letter dated 28/07/17. Last reminder sent to firm on 08/09/2017 Delay on firm's account Pending for STR verification May-18 M/s G B Spring Pvt Limited 25-06-2016 STR/capability completed and deficiencies have been advised to firm vide this letter dt. 15/05/17 and last reminder letter sent on 11/08/17. Delay on firm's account Firm's response for offering samples for proto testing is awaited May-18 M/s Jagdamba Liquefied Steel Limited 21-06-2016 Deficiencies noted advised to firm vide this office letters dated 07/09/16, 18/10/16, 23/11/16, 23/12/16 and 18/04/17. Based on the firm’s compliance dt. 09/08/17 STR verification was carried out on 12 &13/09/17. Delay on firm's account Pending at firm’s end for non- availability of heat treatment facility & fatigue machine as per STR verification. May-18 M/s Oriental Foundry Pvt. Ltd 19-08-2016 After STR verification, the prototype of side bearers to drg no WD-12008-S/01 has been completed. For proto samples for proto testing of SB to drg no WD-12007-S/01 yet to be offered by the firm. Last reminder sent on 21/11/17 to firm & requested to confirm availability of adequate capacity furnace and confirm the readiness of samples of SB to drg no. WD-12007-S/01 for necessary proto testing Delay on firm's account Pending at firm’s end for prototype testing of SB to drg. no WD-12007-S/01 and non- availability of furnace of adequate capacity as per STR. Feb-18 M/s Raneka Industries Ltd. 12-10-2016 After satisfactory STR verification, a team carried out proto testing & process verification of side bearers. During testing proto testing the samples of have been failed in respect of physical properties. On the basis of satisfactory re- verification of process proto testing of SB samples and fatigue testing have been taken up by this office. Fatigue testing of sample is in progress Delay on firm's account Pending at firm’s end for re- verification and prototype testing. Jan-18 WAGON Details 4 Spring Loaded Side Bearer Assembly for freight stocks 8 months 6 S. No Item Total no of days for approval specified No of cases pending ITEMWISE VENDOR REGISTRATION TIMELINES (Information Compiled on 11th December 2017)

Transcript of ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No...

Page 1: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

Name Pending since Communication exchanged

between RDSO & Vendor

Reson for delay Current status Target

1 Constant Contact PU Side

Bearer Pads for NLB Bogies

10 months NIL - - - -

2 Constant Contact PU Side

Bearer Pads for HS Bogies

10 months NIL - - - -

3 Light Weight Low height 25 T

axle load bogie (LWLH25) & its

components for 25 T axle load

wagons

10 months 1 M/s Siena Engineering Pvt. Ltd. 06-05-2017 Deficiencies advised to firm

vide this office letter dated

28/07/17. Last reminder sent to

firm on 08/09/2017

Delay on firm's account Pending for STR verification May-18

M/s G B Spring Pvt Limited 25-06-2016 STR/capability completed and

deficiencies have been advised

to firm vide this letter dt.

15/05/17 and last reminder

letter sent on 11/08/17.

Delay on firm's account Firm's response for offering

samples for proto testing is

awaited

May-18

M/s Jagdamba Liquefied Steel

Limited

21-06-2016 Deficiencies noted advised to

firm vide this office letters dated

07/09/16, 18/10/16, 23/11/16,

23/12/16 and 18/04/17. Based

on the firm’s compliance dt.

09/08/17 STR verification was

carried out on 12 &13/09/17.

Delay on firm's account Pending at firm’s end for non-

availability of heat treatment

 facility & fatigue machine  as

per STR verification.

May-18

M/s Oriental Foundry Pvt. Ltd 19-08-2016 After STR verification, the

prototype of side bearers to drg

no WD-12008-S/01 has been

completed. For proto samples

for proto testing of  SB to drg no

WD-12007-S/01 yet to be

offered by the firm. Last

reminder sent on 21/11/17  to

firm & requested to  confirm

availability of adequate capacity

furnace and confirm the

readiness of samples of SB to

drg no. WD-12007-S/01 for

necessary proto testing 

Delay on firm's account Pending at firm’s end for

prototype testing of SB  to drg.

no WD-12007-S/01 and non-

availability of furnace of

adequate capacity as per

STR.  

Feb-18

M/s Raneka Industries Ltd. 12-10-2016 After satisfactory STR

verification, a team carried out

proto testing & process

verification of side bearers.

During testing proto testing the

samples of have been failed in

respect of physical properties.

On the basis of satisfactory re-

verification of process proto

testing of SB samples and

fatigue testing have been taken

up by this office. Fatigue testing

of sample is in progress

Delay on firm's account Pending at firm’s end for re-

verification and prototype

testing.

Jan-18

WAGON

Details

4 Spring Loaded Side Bearer

Assembly for freight stocks

8 months 6

S. No Item Total no of days

for approval

specified

No of cases

pending

ITEMWISE VENDOR REGISTRATION TIMELINES (Information Compiled on 11th December 2017)

Page 2: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

M/s Kalimata Ispat Industries

Pvt Ltd

06-05-2016 STR/ capability has been done

from 22.07.2017 to 23/07/17 &

17.08.2017. Proto testing of SB

to drg no 12008-S/01 has been

completed. Samples of SB to

drg no WD-12007-S/01 are yet

to be offered by the firm for

necessary proto testing. Firm

has been advised to confirm

their readiness vide this office

letter dated 21/11/2017.

Delay on firm's account Pending for prototype testing

at firm’s end.

Jan-18

M/s CHEMIN Springs India Pvt

Ltd

17-05-2017 Deficiencies letter has been

sent on 20/06/17.Last reminder

sent on 01/11/2017.

Delay on firm's account 15 days show cause notice

issued on 05.12.17

Jun-18

5 Non-asbestos ‘L’ type

Composition Brake Blocks for

container flat wagons

36 months (including

type testing & field

trials of 12 months

for both imported &

indegeneous)

1 M/s Hindustan Composites

Limited Aurangabad

02-03-2017 Firm’s letter-

07/07/17, 06/07/2007,

27/07/17, 24/8/17

RDSO letter-

28/03/17, 06/04/17,

16/05/17, 24/08/17

Nomination of RDSO officials

for STR verification-23.05.17

Delay on firm's account Firm vide email dt. 13.11.17

has informed that 840 mm

wheel is expected to reach its

premises by 10.12.17.After the

fitment of wheel it will inform

RDSO about its readiness for

STR verification

Mar-18

6 Non-asbestos ‘L ’type

Composition Brake Blocks for

freight stock with 1000 mm wheel

dia

36 months (including

type testing & field

trials of 12 months

for both imported &

indegeneous)

1 M/s- Wabtec- Texamco Rail

Pvt limited, Kolkata

02-02-2017 Firm’s letter- 03/03/17,

27/04/17, 18/07/17, 10/08/17

RDSO letter- 16/03/17,

20/06/17, 04/08/17, 13.09.17

Delay on firm's account Team of RDSO officials has

been nominated for STR

verification

Feb-19

M/s Daulat Ram Brake

Mfg.Co.Bhopal

19-01-2015 Firm’s letter-

05/05/2015,06/06/2015,01/07/2

015,30/10/

201504/01/201613/08/2016.

RDSO letter-01/05/2015,

26/05/2015,03/06/2015,23/06/2

015,20/10/2015,30/11/2015,31/

01/ 2017

Delay on firm's account 30 days show cause notice

issued on 09.11.17

End of Dec -17

M/s- Wabtec- Texamco Rail

Pvt limited, Kolkata.

13-02-2017 Firm’s letter-03/03/17 RDSO

letter- 16/03/17

Firm has informed that test

results from its Principal are

awaited.

Mar-17

M/s Hindustan Composites

Limited Aurangabad

14-03-2016 Firm’s letter-18/03/2016,

09/06/2016,27/12/2016

RDSO letter-

24/05/2016, 24/08/2016,

27/09/2016

Delay on firm's account (sample failed in dynamometer

test ) : results communicated

to firm-11.08.16 and further

firm has been given 30 days

notice 16/11/2017

Jan-18

M/s Bony Polymers Pvt. Ltd.

Faridabad

27-06-2016 Firm’s letter-

29/06/2016,02/09/2016

RDSO letter-

25/07/16,07/10/2016

Delay on firm's account (sample failed in dynamometer

test ) : results communicated

to firm-30.09.16 and further

firm has been given 30 days

notice 09/11/2017

Jan-18

7 Non-asbestos K-type

Composition Brake Blocks for

freight stock for 1000 mm wheel

36 months (including

type testing & field

trials of 12 months

for both imported &

indegeneous)

2

4 Spring Loaded Side Bearer

Assembly for freight stocks

8 months 6

8 Non-Asbestos K- type

Composition Brake Blocks for

freight stock (840mmwheeldiaa.)

36 months (including

type testing & field

trials of 12 months

for both imported &

indegeneous)

3

Page 3: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

Om Besco Super Friction Pvt.

Ltd. Ponta Sahib

12-07-2016 Firm’s letter-

18/07/2016,25/02/2017,22/03/2

017,15/06/2017,08/07/2017

RDSO letter-14/02/2017,

10/03/2017,05/06/2017,02/08/2

017

Delay on firm's account (sample failed in dynamometer

test ) : results communicated

to firm-02.08.17 and further

firm has been given 30 days

notice 16/11/2017

Jan-18

M/s Stone India, Kolkata 29-12-2015 Firm’s letter -

04.01.2016,3.04.2016,

3.05.2016,05.05.2016,

16.05.2016 17.06.2016,

19.07.2016, 03.08.2016

31.08.2016, 12.12.2016

10.02.2017 & 27.06.2017

RDSO letter- 28.01.2017,

14.06.2017, 09.08.2016,

10.10.2016

11.11.206,22.11.2016,

05.01.2017, 15.05.2017,

15.06.2017, 19.07.2017

& 23.08.2017

Approval of STR verification

report-18.7.2016

Approval of QAP for type test-

10.10.16

Delay on firm's account Registration is getting delayed

as the firm is not able to do the

type tests as per specification.

Further 30 days show cause

notice has been given to firm

09/11/2017

Jan-18

M/s-GDR MEKTEK Banglore-

Karnataka( Licensee of M/s-

Escorts Limited)

29-12-2016 Firm’s letter

06.01.2017,07.03.2017,

25.04.2017, 12.05.2017

16.08.2017

RDSO letter-

01.02.17,30.03.17

05.06.17 & 21.08.2017

Approval of STR verification

report-17.08.2017

Delay on firm's account Firm's QAP has been

approved and sent to firm for

manufactures of 5 sets of

BMBS for type testing. Firm

has to confirm their readiness

for the same.

Mar-18

M/s- Advance Diesel Engine

Pvt Limited, Rajkot Gujrat (

Licensee of M/s- Escorts )

30-12-2016 Firm’s letter

03.01.2017,07.01.2017 ,

08.03.2017, 25.042017

22.05.2017, 31.05.2017

RDSO letter-31.01.2017,

29.03.2017 16.06.2017,

21.08.2017 Approval of STR

verification report-17.8.17

Delay on firm's account Firm has submitted QAP to

manufactures of 5 sets of

BMBS for type testing.

Mar-18

M/s- Webtec- Texmaco rail

private Limited Kolkata

10-07-2017 Firm’s letter

03.07.2017,29.08.2017

Delay on firm's account Letter of non confirmity in

respect of compliance of STR

& other documents

communicated to firm for

compliance on 04.10.17

Oct-19

M/s. Jai  Multi, Mohali 05-04-2015 Firm’s letter- 18.07.15,14.11.15

15.02.16,27.05.16,

03.09.16,11.04.17, 18.08.17,

RDSO letter-03.06.15,16.09.15,

10.12.15,29.04.16,

25.08.16,23.06.17,

21.07.17(reminder)

Delay on firm's account Registration process got

delayed due to non-installation

of  facilities like sand

reclamation plant, solidification

software etc by firm

Jun-1810 Upgraded High Tensile Centre

Buffer Coupler for

BOXNHL/BCNHL wagons

14 months 9

8 Non-Asbestos K- type

Composition Brake Blocks for

freight stock (840mmwheeldiaa.)

36 months (including

type testing & field

trials of 12 months

for both imported &

indegeneous)

3

9 Bogie Mounted Brake System for

freight stock fitted with Casnub

26 months (including

type testing & field

trials of 18 in firsh

case of OEM) & 10

months in case of

licencee of same

OEM

4

Page 4: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

M/s. Atul Engg. Udyog, Agra 15-05-2015 Firm’s letter-

15.05.15,01.09.15,

21.03.16,28.06.16 ,12.09.16

RDSO letter- 16.06.15,28.09.15

,17.05.16,29.08.16,

21.07.17(reminder)STR

verification report approved on

24.05.17 Vide letter dt 22.06.17

firm’s QAP approved for

manufacture of 25 sets.

Delay on firm's account Registration process got

delayed due to non-installation

of  facilities like sand

reclamation plant, solidification

software etc by firm

Apr-18

M/s  Om Besco Rail Product,

Dhanbad

10-11-2015 Firm’s letter-

10.11.15,30.12.15,03.03.16,22.

04.16 ,05.05.16,23.05.16

,22.06.16, RDSO letter-

20.11.15,02.02.16

,19.04.16,18.05.16, Approval of

STR verification report-

05.08.16 mple sent to NML-

12.12.16

Report received from NML-

04.05.17

Delay on firm's account Sample failed in NML testing.

Firm vide letter dt. 01.06.17

advised to submit revised

QAP. Firm’s QAP submitted

vide letter dt. 12.07.17 was

approved vide this office letter

dt. 27.07.17

Jun-18

Kharagpur Metal Reforming

  Industries,Kharagpur

18-11-2015 Firm’s letter-

20.04.16,03.01.17,

22.02.17,10.07.17 ,RDSO letter-

18.12.15, STR verification

report approved on 17.08.17,

Firm submitted QAP on

21.08.17,Firm has been

advised to submit revised QAP

Delay on firm's account Firm's revised QAP has been

approved. Firm has confirmed

readiness for type testing of lot

of 25 sets of CBC. Type

testing is in progress

Apr-18

Simplex Casting, Ltd. Bhilai 10-03-2017 Firm’s letter- 14.03.17 , RDSO

letter-

13.04.17,12.07.17(reminder)

Delay on firm's account Pending for STR varification.

Compliance of documents

submitted by the firm is under

scrutiny

Jul-18

Siena Engg Pvt Ltd, Pithampur,

Distt Dhar

06-05-2017 Firm’s letter-09.05.17, 29.08.17

RDSO letter- 05.06.17,

12.07.17 (reminder)

Delay on firm's account STR verification of the firm

has been completed. Firm has

to submit the QAP for approval

for manufacture of 25 sets of

CBC for type testing

Apr-18

Sanmar Foundries limited,

Viralimalai

21-12-2016 Firm’s letter- 18.08.17, RDSO

letter- 08.09.17

Delay on firm's account Pending for STR varification.

Difficiencies advised to firm

are yet to be complied by the

firm

Sep-18

NF Forgings Pvt. Ltd. 12-09-2017 - - Pending for STR varification.

Compliance of documents

submitted by the firm is under

scrutiny

Dec-18

Shree Kedar Metal Foundries 10-12-2017 - - Pending for STR varification.

Compliance of documents

submitted by the firm is under

scrutiny

Feb-19

10 Upgraded High Tensile Centre

Buffer Coupler for

BOXNHL/BCNHL wagons

14 months 9

Page 5: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

M/s. Spectra Cast Pvt. Ltd.,

Metoda, Rajkot

13-03-2015 Firm’s letter-

13.03.15,02.06.16,

09.06.17,09.01.17 RDSO letter-

27.03.15,02.06.15, (reminder),

23.11.15(show cause notice),

01.03.17,14.09.17(show cause

notice)

Delay on firm's account Show cause notice has been

given to firm on 14/09/2017 for

compliance before

31/12/2017.

Apr-18

M/s. Dinesh Ispat Pvt. Ltd.,

Bhilai

28-06-2016 Firm’s letter-

23.08.16,02.09.16,25.10.16,

17.05.17,31.05.17 , 21.07.17,

04.08.17 , RDSO letter-

09.08.16,30.09.16, 15.06.17

Delay on firm's account STR verification has been

completed. Noted

deifficiencies has been

communicated to firm.

Mar-18

Sanmar Foundries Limited,

Viralimalai

25-05-2016 Firm’s letter-

25.01.17,18.04.17, RDSO letter-

20.07.16,01.03.17, 11.05.17

Delay on firm's account Show cause notice has been

given to firm on 16/11/2017 for

compliance .

Jun-18

Vikas Hi-tech Casting, Howrah 17-02-2017 Firm’s letter- 10.05.17,14.06.17

, 15.07.17, RDSO letter-

07.04.17,24.05.17,30.06.17,

31.07.17, Nomination of RDSO

officials for STR verification-

17.08.17

Delay on firm's account The QAP for manufacture of

25 Nos of samples has been

approved for necessary type

testing . Firm has to confirmed

its readiness.

Feb-18

M/s Jupiter Alloy steel Ltd.,

Kolkata

01-04-2016 Firm’s letter

23.04.16,08.08.16,28.01.17,

08.03.17, 22.03.17, 24.04.17

RDSO letter 07.06.16,

02.11.16, 21.02.17, 29.03.17,

Approval of STR verification

report-31.07.17

Delay on firm's account Type testing of proto samples

are in progress

Feb-18

Burnstandard, Kolkata 18-04-2016 RDSO letter- 02.11.16,12.07.17 Delay on firm's account Firm's reply on compliance of

noted defficiencies is still

awaited

Sep-18

Raneka Industries Ltd.

Dhar(MP)

15-09-2016 Firm’s letter-

20.02.17,14.04.17,17.06.17,

28.08.17 RDSO letter-

24.03.17,29.05.17, 27.07.17

Delay on firm's account STR verification of the firm

has been completed. Firm has

to submit the QAP for approval

to manufacture of 25 sets of

proto samples for necessary

type testing

Feb-18

Wabtac-texmaco, Kolkata 12-12-2016 Firm’s letter-

26.05.17,03.07.17,02.08.17

,28.08.17, 12.09.17 RDSO

letter- 16.06.17,31.07.17

Delay on firm's account Team has been nominated for

STR verification. Readiness

yet to be confirmed by the firm.

Sep-18

Amstead Steel Foundries

(India) Pvt. Solan (H.P.)

07-03-2017 Firm’s letter 07.03.17,27.07.17 ,

RDSO letter 11.04.17,

12.07.17,17.08.17

Delay on firm's account Noted difficiencies yet to be

complied by the firm.

Reminder issued to firm on

09/11/2017.

Jul-18

Besco(Wagon division),Kolkata 17-05-2017 Firm’s letter 28.06.17,23.08.17

RDSO letter

23.06.17,27.07.17,08.09.17

Delay on firm's account Noted difficiencies yet to be

complied by the firm.

Reminder issued to firm on

11/10/2017.

Sep-18

Name of Firm Applied Since Likely date of

finalisaton/closure (TDC)

Reason for delay

13 Fire retardant upholstery

(C-9901 (Rev.02))

225 days Nil Nil Nil Nil Nil

CARRIAGE

11 Investment Casting items(Lock

,Knuckle thrower ,toggle, Lock

Lift Lever Hook& Universal Lock

Lift Lever Connector for

upgraded CBC

16 months 4

Sr No Item Description Total Nos of days

required for

approval

No of Pending

Cases

(Old refrences)

Details of Cases

12 Upgraded High Capacity Draft

Gear for BOXNHL/BCNHL

wagons

17 months 6

Page 6: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

M/s Quadrant EPP SurlonPvt.

Ltd., Ghaziabad

22.03.2016 January 2018 Delay to to non complying

of tech documentation and

design requirements from

Firm side

M/s Rama Engineering Works,

Hyderabad

30.07.2017 January 2018 No delay

Balaji Rubber factory,Pune 28.06.2017 January 2018 No delay

Suyog Rubber (India) Pvt. Ltd. 13.04.2017 February 2018 Due to late submission of

valid factory license16 Double acting Hydraulic Shock

Absorbers for ICF design

Coaching stock for secondary

suspension

(C– 8703 (Rev.02))

250 days 1 GB Equipment, Dehradun 17.10.2016 February 2018 Firm represented for testing

outside due to high charge

of testing in RDSO.

17 Stain proof fire retardant

upholstery cloth

(C-K 610 (Rev.01))

250 days Nil Nil Nil Nil

18 High capacity Thermoplastic

Elastomer Upper and Lower

washer Assembly used in the

Primary suspension of BG

EMU/DMU Coaches

(RDSO/2010/CG-04)

200 days Nil Nil Nil Nil

19 Supply,Installation,Commissionin

g & maintenance of Automic

Fire/Smoke Detection with Alarm

System for IR AC Coaches

(RDSO/2008/CG-04)

200 days Nil Nil Nil Nil

20 Supply,Installation,Commissionin

g & maintenance of „Automic fire

detection cum suppression

system” for Pantry car &

Generator cum Brake Van of

Indian Railway Coaches(ICF and

LHB design)(Tentive for Trial)

(RDSO/2013/CG-06)

200 days Nil Nil Nil Nil

Oriental Vineer, Mumbai 27.12.2016 January 2018 late submission of

documents by the firmPolymer Product, Bangalore 27.05.2017 December 2017 No delay

Elastomer Lining Works

Mumbai

12.07.2017 December 2017 No delay

22 Electro Pneumatic Brake system

for EMU,DMU& MEMU stock of

Indian Railways

(RDSO/2013/CG-03)

250 days NIL NIL NIL NIL

23 Non asbestos based "K" type

high friction composite brake

blocks

for coaches with bogie mounted

Brake system on Indian Railways

(C-9809(Rev.04))

300 days 1 M/s Wabtec Texmaco Rail Pvt.

Ltd. Kolkata

25.05.2017 Dec 2017 No delay

21 Silicon Foam as cushioning

material for IR passenger

coaches

(RDSO /2013/CG-13 Amend-1)

200 days 3

14 High capacity thermoplastic

polyster elastomer (Hytrel) Upper

& Lower Washers used in the

primary suspension for B.G main

line coaches

(C-K409 (Rev.02))

200 days 2

15 Silent Block for Anchor Link of

BG Coache

(C-9406 (Rev.02) )

225 days 2

Page 7: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

24 Non asbestos based low friction

composite brake blocks for

application on Coaching stock

of Indian Railways

(C-9907(Rev.0,)

300 days NIL NIL NIL NIL

25 Non asbestos based low friction

composite brake blocks for

application on MG Coaching

stock of Indian Railways

(C-K211(Rev.01 ))

300 days NIL NIL NIL NIL

26 Non- Asbestos based "K"-Type

High friction Composite Brake

blocks for EMU stock of Indian

railways

(C- 9508(Rev.03 ))

300 days 1 M/s Wabtec Texmaco Rail Pvt.

Ltd. Kolkata

03.05.2017 Dec 2017 No delay

27 Distributor Valve with Relay Valve

(RDSO Spec. No. C-K209)

250 days NIL NIL NIL NIL

28 Injection Moulded High

Performance Polymide

“HPPA”(Self

lubricated superior Nylon grade)

Brake Gear Bushes for BG Main

Line Coaches

(RDSO/2009/CG-17(Rev.02))

250 days NIL NIL NIL NIL

29 Axle Mounted Disc Brake System

for LHB type BG Main line

Coaches (RDSO/2011/CG-04

(Rev.01))

225 days

(Indigenous)

300 days (Foreign)

1 M/s DAKO C.Z. a.s. 15.07.2017 March 2018 No delay,

however,Firm's foreign visit

is pending due to Railway

Board sanction and

creation of new policy for

bearing of cost for foreign

visit 30 Self lubricating Polyster Resin

based composite brake gear

bushes to be used in main line

Coaches (BG)

(C-K605(Rev.01 ))

250 days NIL NIL NIL NIL

31 Non Asbestos based Brake Pad

for LHB type Coaches

(RDSO/2013/CG-01)

300 days NIL

M/s Kurimoto, Japan 15.06.2016 March 2018 Firm not provided FEA

analysis and design & M&P

details M/s Wenshang Highway

Locomotives Part Ltd., China

(through Pioneer Fil-med Pvt

Ltd)

30.03.2017 March 2018 Minor defiecienies

observed in FEA report &

QAP, firm's reply is awaited

.

Also foreign visit is

pending due to Railway

Board sanction and

creation of new policy for

bearing of cost for foreign

visit

32 Brake Disc for LHB type Main

line BG Coaches

(RDSO/2015/CG-03)

300 days 4

Page 8: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

M/s JWL,Kovis 07.08.2017 July 2018 No delay,

However, Firm's foreign

visit is pending due to

Railway Board sanction and

creation of new policy for

bearing of cost for foreign

visit M/s CRRC, Qishuyan Institute

Company Ltd., China (Through

MGS India Pvt. Ltd.)

28.08.2017 July 2018 Compliance on some minor

defeciencies is awaited and

matter is pending due to

creation of new policy for

bearing of cost for foreign

visit 33 Air Spring Assembly (180 KN

capacity) for High Capacity

Loads used on EMU/DMU

Coaches for ICF Type Bogies

(RDSO STR No. C-K406 Rev. 2

Amendment Slip No.4)

380 days Nil Nil Nil Nil

34 Air Spring Assembly(140 KN

capacity)for Main line / Rajdhani

Coaches for ICF Type Bogies

(RDSO STR No. C-K509 Rev.2

Amendment Slip No.4)

380 days Nil Nil Nil Nil

35 Air Spring Assembly(120 KN

capacity)for Main line / Rajdhani

LHB Coaches for FIAT Type

Bogies

(RDSO STR No. C-K508 Rev. 1

Amendment Slip No. 4)

380 days Nil Nil Nil Nil

36 Air Suspension Control

Equipments for Air Spring

Assembly system with ICF/LHB

type bogie

(RDSO STR No. C-K407 Rev. 2

Amendment Slip No.1)

230 days Nil Nil Nil Nil

37 Air Spring failure Indication cum

Brake Application (FIBA) device

(RDSO STR No. C-K407 Rev.

2 Amendment Slip No.1)

230 days Nil Nil Nil Nil

38 Metal Bonded Conical Rubber

Spring with External Damper for

primary Suspension of EMU

Coaches having ICF bogie

(RDSO STR No.

RDSO/2008/CG-01)

380 days Nil Nil Nil Nil

39 AAR ‘H’ type Tight Lock Coupler

with transition Coupler BG

Passenger coaches.

(RDSO/2009/CG-22 Rev.-1)

225 days nil nil nil nil nil

32 Brake Disc for LHB type Main

line BG Coaches

(RDSO/2015/CG-03)

300 days 4

Page 9: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

40 High Tensile Tight Lock Centre

Buffer Coupler with AAR ‘H’ type

Head and Balanced Draft Gear

for fitment of BG Passenger

coaches.

RDSO/2011/CG-03 Rev.-1 (For

regular procurement) and

RDSO/2011/CG-03 Rev.-2 (for

developmental)

225 days nil nil nil nil nil

M/s Vasco Railway

Enterprises, Faridabad

05-05-2016 March 18 Internal test report not yet

submitted.M/s Frontier Alloy Steels Ltd.,

Rania, Kanpur Dehat

15-07-2017 March 18 No dealy

42 Specification for direct mounted

double row self-aligning spherical

roller bearings for use on ICF

type all-coil bogies for passenger

coaches.

(C-8527)

270 days 1 M/s S.C.Rulmenti S.A., 320,

Republicii Street,Barlad-

731108,Romania

03.10.2016 March 2018 Non-compliance by the firm

of documents /

observations

43 Specification for UIC-130 Pre-

sealed, Pre-set and Pre-

lubricated cartridge tapper roller

bearings (CTRB) for use on

coaches of LHB design

(RDSO/2014/CG-02)

270 days nil nil nil nil nil

Target

Name Since

44 Brake System for 3-phase

locomotives

1090 Nil

45 Main Compressor (Lubricated)

for WAG9/WAP5/ WAP7

(1750 LPM Capacity)

540 Nil

46 Oil Free Main Compressor for 3-

Phase Electric & WAP-4

Locomotives (1750 LPM

Capacity)

540 Nil

47 Bearing for traction motor type

HS1050Er /HS15250A

370 Nil

48 Bearings for traction motor

TAO-659

370 1 D. H. Associates, Bangalore 13-Sep-17 20-Sep-18

49 Auxiliary Machine Bearings

(including 3-phase Locomotives

& EMUs)

370 Nil

50 Suspension bearing for

Hitachi/TAO-659 Traction Motor

370 Nil

51 3 Phase Locomotive Traction

Motor Bearing for TM type

6FRA6068

370 Nil

52 3 Phase Locomotive Traction

Motor Bearing of TM type

6FXA7059

370 Nil

53 Suspension Tube Bearings for

WAG9/ WAP7 locomotives

370 Nil

CARRIAGE

Details

41 Scharfenberg Coupler and draw

Gear for EMU Rolling stock for

Calcutta and Bombay Suburban

service (BG 1676 mm).

225 days 2

SN Description of items Total number of

days for approval

No. of cases

Page 10: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

54 For WAP5 Locomotives 370 Nil

55 For WAG9/ WAP7 Locomotives 370 Nil

56 Main Gear bearing, Intermediate

Gear bearing, Pinion bearing

370 Nil

57 Spheribloc for three phase

electric locomotive

480 Nil

58 Elastic Ring for three phase

electric locomotive

480 Nil

59 Rubber Components / Kits for E-

70-brake system

1090 Nil

60 Rubber Components /Kits for

CCB system

1090 Nil

61 Cable Transit System with

EPDM Rubber Modules

200 Nil

62 Thin walled flexible elastomeric

cables

with copper conductors

for working voltages

(i) up to 750 volts

and

(ii) above 750 volts up to 1.8/3.0

kv for tap changer electric

locomotives , AC/DC EMU, BG

AC EMU & MEMU/ coaching

stock

( Chemical curing process /

Electron Beam Irradiation curing

process)

370 Nil

63 Thin Walled Cable for 3-phase

locomotives

370 Nil

64 Single Core & Multi Core

a) Elastomeric Cables (for loco &

EMU)

b) HRPVC cables (for EMUs &

coaches)

210 Nil

65 Zero Halogen Low Smoke Cables

for Metro coaches

210 Nil

66 High Reach Pantograph for

Electric locomotives

540 Nil

Name Since

67 Manual Metal Arc Welding

Electrodes, Class A1

300 Nil

68 Manual Metal Arc Welding

Electrodes, Class A2

300 Nil

69 Manual Metal Arc Welding

Electrodes, Class A3

300 Nil

70 Manual Metal Arc Welding

Electrodes, Class A4

300 Nil

71 Manual Metal Arc Welding

Electrodes, Class B1

300 Nil

72 Manual Metal Arc Welding

Electrodes, Class B2

300 Nil

73 Manual Metal Arc Welding

Electrodes, Class B3

300 1 M/s Mishra Dhatu Nigam Ltd.

Hyderabad-50005

11.08.2016 31.07.2018 Less than three vendors,

kept open

Target RemarksS.N. Item Total nos. of days

for approval

No. of cases Details

Pending Vendor Registrations / Vendor Approval details required:

M&C

Page 11: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

74 Manual Metal Arc Welding

Electrodes, Class B4

300 1 M/s Mishra Dhatu Nigam Ltd.

Hyderabad-50005

11.08.2016 31.07.2018 Less than three vendors,

kept open GEE Ltd., Howrah(WB) 13.08.2015 31.03.2018

M/s Mishra Dhatu Nigam Ltd.

Hyderabad-50005

11.08.2016 31.07.2018

GEE Ltd., Howrah(WB) 13.08.2015 31.03.2018

M/s Mishra Dhatu Nigam Ltd.

Hyderabad-50005

11.08.2016 31.07.2018

77 Manual Metal Arc Welding

Electrodes, Class D

320 Nil

78 Manual Metal Arc Welding

Electrodes, Class E1

300 1 GEE Ltd., Howrah(WB) 13.08.2015 31.03.2018

79 Manual Metal Arc Welding

Electrodes, Class E2

300 1 GEE Ltd., Howrah(WB) 13.08.2015 31.03.2018

80 Manual Metal Arc Welding

Electrodes, Class F

300 Nil

81 Manual Metal Arc Welding

Electrodes, Class G

300 Nil

82 Manual Metal Arc Welding

Electrodes, Class H4A

300 1 M/s Mishra Dhatu Nigam Ltd.

Hyderabad-50005

11.08.2016 31.07.2018 Less than three vendors,

kept open 83 Manual Metal Arc Welding

Electrodes, Class H4B

300 Nil

84 Manual Metal Arc Welding

Electrodes, Class K

300 Nil

85 Manual Metal Arc Welding

Electrodes, Class L

300 Nil

86 Manual Metal Arc Welding

Electrodes, Class M1

270 Nil

87 Manual Metal Arc Welding

Electrodes, Class M2

270 Nil

88 Manual Metal Arc Welding

Electrodes, Class M3

270 Nil

89 Manual Metal Arc Welding

Electrodes, Class M4

270 Nil

90 Manual Metal Arc Welding

Electrodes, Class M5

270 Nil

91 Manual Metal Arc Welding

Electrodes, Class M6

270 1 M/s Mishra Dhatu Nigam Ltd.

Hyderabad-50005

11.08.2016 31.07.2018 Less than three vendors,

kept open 92 Manual Metal Arc Welding

Electrodes, Class M7

270 1 M/s Mishra Dhatu Nigam Ltd.

Hyderabad-50005

11.08.2016 31.07.2018 Less than three vendors,

kept open 93 Manual Metal Arc Welding

Electrodes, Class N1

240 Nil

94 Manual Metal Arc Welding

Electrodes, Class N2

240 Nil

Shieldarc EquipmentPvt. Ltd.

Kolkata

12.01.2015 31.03.2018

Nouveaux Industries Pvt. Ltd.,

Tirupur(TN)

20.10.2015 31.03.2018

Premier Industrial corporation

Mumbai

11.02.2016 31.03.2018

Accurate weldarc Pvt. Ltd.

Raipur.

25.08.2017 30.06.2018

Shieldarc EquipmentPvt. Ltd.

Kolkata

02.09.2016 31.03.2018

Premier Industrial corporation

Mumbai

11.02.2016 31.03.2018

MW Wire Tech(P) Ltd 08.07.2016 30.04.2018

Accurate weldarc Pvt. Ltd.

Raipur.

25.08.2017 30.06.2018

97 Solid MIG/MAG Welding Filler

Wire, Class IV

320 1 Premier Industrial corporation

Mumbai

11.02.2016 31.03.2018 Nil Vendor, kept open

76 Manual Metal Arc Welding

Electrodes, Class C2

300 2 Less than three vendors,

kept open

75 Manual Metal Arc Welding

Electrodes, Class C1

300 2

95 Solid MIG/MAG Welding Filler

Wire, Class I

300 4

96 Solid MIG/MAG Welding Filler

Wire, Class III

300 4

Page 12: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

Nouveaux Industries Pvt. Ltd.,

Tirupur(TN)

20.10.2015 31.03.2018

Premier Industrial corporation

Mumbai

11.02.2016 31.03.2018

Accurate weldarc Pvt. Ltd.

Raipur.

25.08.2017 30.06.2018

Nouveaux Industries Pvt. Ltd.,

Tirupur(TN)

20.10.2015 31.03.2018

Premier Industrial corporation

Mumbai

11.02.2016 31.03.2018

Accurate weldarc Pvt. Ltd.

Raipur.

25.08.2017 30.06.2018

100 Solid MIG/MAG Welding Filler

Wire, Class VIII

300 Nil

101 Flux cored MIG/MAG Welding

Filler Wire with shielded gas, Cl.

I

300 Nil

102 Flux cored MIG/MAG Welding

Filler Wire with shielded gas, Cl.

II

300 1 Royal Arc Electrodes Ltd.,

Valsar (Gujrat)

03.08.2016 31.03.2018 Nil Vendor, kept open

103 Flux cored MIG/MAG Welding

Filler Wire with shielded gas, Cl.

III

300 Nil

104 Flux cored MIG/MAG Welding

Filler Wire with shielded gas, Cl.

IV

320 Nil

105 Flux cored MIG/MAG Welding

Filler Wire with shielded gas, Cl.

V

300 1 Royal Arc Electrodes Ltd.,

Valsar (Gujrat)

03.08.2016 31.03.2018 Nil Vendor, kept open

106 Flux cored MIG/MAG Welding

Filler Wire with shielded gas, Cl.

VI

300 Nil

107 Flux cored MIG/MAG Welding

Filler Wire with shielded gas, Cl.

VII

300 Nil

108 Flux cored MIG/MAG Welding

Filler Wire with shielded gas, Cl.

VIII

300 1 Royal Arc Electrodes Ltd.,

Valsar (Gujrat)

06.10.2015 31.03.2018 Nil Vendor, kept open

Premier Industrial corporation

Mumbai

11.02.2016 30.04.2018

M/S Nouvaux Industries 23.09.2016 31.05.2018

Premier Industrial corporation

Mumbai

11.02.2016 30.04.2018

M/S Nouvaux Industries 23.09.2016 31.05.2018

Premier Industrial corporation

Mumbai

11.02.2016 30.04.2018

M/S Nouvaux Industries 23.09.2016 31.05.2018

Premier Industrial corporation

Mumbai

11.02.2016 31.04.2018

M/S Nouvaux Industries 23.09.2016 31.05.2018

Premier Industrial corporation

Mumbai

11.02.2016 30.04.2018

M/S Nouvaux Industries 23.09.2016 31.05.2018

Premier Industrial corporation

Mumbai

11.02.2016 30.04.2018

M/S Nouvaux Industries 23.09.2016 31.05.2018

115 Portable Digital Ultrasonic Flaw

Detector with A-Scan Storage

300 Nil

98 Solid MIG/MAG Welding Filler

Wire, Class VI

300 3

99 Solid MIG/MAG Welding Filler

Wire, Class VII

300 3

111 Wire for Submerged Arc

Welding Class W-4

320 2

112 Flux for Submerged Arc Welding

Class F-1

320 2

109 Wire for Submerged Arc

Welding Class W-1

320 2

110 Wire for Submerged Arc

Welding Class W-2

320 2

113 Flux for Submerged Arc Welding

Class F-2

320 2

114 Flux for Submerged Arc Welding

Class F-4

320 2

Page 13: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

116 Digital Ultrasonic Testing

Equipment for welded rail joints

with coloured LCD TFT screen,

trigonometrical function and A-

Scan storage

300 Nil

117 Digital Ultrasonic Single Rail

Tester with coloured signals and

A- Scan logging along with data

setup .

300 Nil

118 Digital Ultrasonic Double Rail

Tester having contact (sliding)

probes with multi-base trace

lines, coloured signals and A-

scan logging along with data

setup.

300 Nil

119 R/M Paint Red Oxide (ISC-446),

brushing, finishing, glossy

240 1 Shri Karni Chemical Industries 09.09.2016 31.06.2018

PPG Asian Paint pvt ltd,

Tamilnadu

28.07.2016 31.06.2018

Miles Paints (India) Pvt. Ltd. 23.09.2016 31.06.2018

Neo Radiant Paints Pvt. Ltd 15.10.2016 31.06.2018

Sigma Corporation, Chennai 26.08.2015 31.03.2018

Panama Petrochem Ltd,

Mumbai

12.102015 31.03.2018

Balmer Lawrie & Co. Ltd.,

Silvassa

1211.2015 31.03.2018

Target

Name Since

M/s Eastern Track UdyogPvt.

Ltd., Burdwan Distt.-713357

(W.B.)

01.12.16 Nov, 2018

M/s Eden VinimayPvt. Ltd.,

Burdwan  Distt.-713357 (W.B.)

01.12.16 Nov, 2018

M/s ALISHAN STEELS

PRIVATE LIMITED,

DURGAPUR

06.12.16 Oct, 2018

M/s TirumalaBalaji Smelters

Private Limited, DURG -

491001 (Chhattisgarh)

21.09.17 Nov, 2018

M/s Indsur Global Limited

(formerly known as HGI), Halol

(Gujarat)

09.12.16 June, 2018

M/s BL CASTINGS,

BARNALA (PUNJAB)

10.12.16 May, 2018

M/s KGN Deccan Engg

Industries Pvt Ltd, Hyderabad

500037

13.12.16 June, 2018

M/s Khetsidas Machine Tool

Works Private Limited

09.01.17 Sept, 2018

123 Elastic Rail Clips 255 Nil

124 Elastic Rail Clips J 255 Nil

125 Glass filled Nylon-66 Insulating

Liners 315 5

M/s Tirupati Rail Engineers,

Faridabad28.01.2016 Mar' 2018

M/s Star Track Fasteners Pvt.

Ltd.07.02.2016 Feb.'2018

Eastern Track Udyog Pvt. Ltd.,

Kolkata

26.04.2016 April' 2018

QA CIVIL Dte.

DetailsNo. of cases

120 Paints based on epoxy and

polyurethane resin for exterior

painting of wagons.

300 3

121 Lubricants for Machinery & plant 300 3

122 Spheroidal Graphite Cast Iron

Insert

300 8

SN Description of items Total number of

days for approval

Page 14: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

Sheth & Co. Silvasa 21.03.2017 June' 2018

AG Industries Pvt. Ltd.

Gurgaon.

29.12.2015 Feb.'2018

126 Polyethylene Dowel 255 Nil

Surya Alloys Industries Ltd.,

Kolkata

14.02.17 Aug,2018

M/s Vinar Rubber Udyog, 24.08.15 Jan' 2018

M/s Adityapur Rubber

Industries, Jamshedpur

08.09.15 June, 2018

M/s Ravindra Industries,

Bahadurgarh

30.05.17 June, 2018

Variety Industrial Works Pvt.

Ltd.,14, Kumarpara Road,

05.10.17 Apr, 2018

128 Grooved Rubber Sole Plates

(6 mm thick)321

Nil

M/s Industrial Laminaties

(India) Pvt Ltd Mumbai

28.09.15 Dec, 2018

M/s Ked Sati Iron & Steel Pvt.

Ltd. Kolkata

27.08.15 Aug, 2018

M/s Maruti Heavy Engg. Udyog

, Bharatpur

01.09.15 Sept, 2018

M/s Young India PrestressPvt.

Ltd. Bankura

05.09.15 June, 2018

M/s Ked Sati Iron & Steel Pvt.

Ltd. Kolkata

09.08.15 Oct, 2018

M/s Eastern Track UdyogPvt.

Ltd. Kolkata

14.09.15 Oct, 2018

M/s Hevea Rubber

Technologies Pvt. Ltd.

Kottayam

16.09.15 Sept,2018

M/s Jyoti Cero Rubber ,

Jamshedpur

18.09.15 Sept,2018

131 Metal Liners (Nos.)255 1

M/s Arvind Industries, Kolkata 02.02.2017 March' 2018

132 Glued Insulated Rail Joints 370 Nil

M/s Souvenier International,

Ludhiyana

27.07.2015 June'2018

M/s Ked Sati Iron & Steel Pvt.

Ltd., Kolkata

19.03.2017 June'2018

M/s ASP Pvt. Ltd. ,Howrah 09.10.2016 April'2018

134 Fibre Glass Cloth Woven Roving270

Nil

135 Glue

300

1 M/s Hankel Adhesive

Technology India Pvt. Ltd.,

Pune

17.05.2017 Dec.'2018

136 Fabricated Switches 370 Nil

137 Fabricated Crossings 370 Nil

138 Cast Manganese Steel

Crossings (52 Kg & 60 Kg 1 in

8.5 and 1 in 12) (Nos.)

480 1 M/s Eden Vinimay Pvt Ltd 03.12.16. Mar, 2019

139 Switch Expansion Joints (SEJ)

(sets)357

Nil

140 Single Coil Spring Steel Washer315

Nil

141 Fish Plates & Fish plate

bars(Nos.)255

Nil

142 SSD for OR Curved Switches 400 Nil

Name Since

MOTIVE POWERDetails

TDC

127 Composite Grooved Rubber

Sole Plate (6.2 mm thick)

321

5

133 High Tensile Fish Bolts & Nuts

377

3

S.No. ItemTotal no. of days

for approval No. of cases

129 10 mm thick Grooved rubber

Sole Plates

321

4

130 Nylon Cord Reinforced

Elastomeric Pad

321

4

Page 15: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

Motive Power - Engine Items

143

Connecting Rod Bearings,

Specification No. 31PD 5703A,

(Steel Backed) Anti – Friction

Metal Lined (Half Bushing, Con

Rod (Cap Only) & Half Bushing,

Con Rod (Rod Only) for ALCo

locomotives.

200 - - - -

144

Main Bearing Shell (Inter &

Centre) Specification No. 31PD

5703A, (Steel Backed) Anti –

Friction Metal Lined (Main

Bearing Shell (Intermediate Thin

wall Upper & Lower) Bearing

Center Main (Upper & Lower

Halves Thin Wall) for ALCo

locomotives

200 1M/s Saarvam Industries LLP,

Jaipur30.10.2017 May’18

145

Main Bearing, Thrust

Specification No. 31PD 5703

(Steel Backed) Anti – Friction

Metal Lined (Thrust Bearing (

Gen. End Upper) for ALCo

locomotives

200 - - - -

146Bearing-Con Rod for EMD

Locomotives200 - - - -

147Main Bearings for EMD

Locomotives200 1

M/s Saarvam Industries LLP,

Jaipur07.08.2017 Feb’18

Motive Power- Engine System

Items

Filter Air Dryer & MR, for ALCO

& EMD Locomotives200 - - - -

(A) Filter Air Dryer & MR,

for ALCo locomotives200 - - - -

(B) Filter Air Dryer & MR,

for EMD locomotives200 - - - -

149Filter Dyna Cell, for EMD

Locomotives200 - - - -

150Filter element, Brake Panel, for

EMD Locomotives200 - - - -

151Filter element, Fibre Glass, ECC,

for EMD Locomotives200 - - - -

Low Mean Pore Size Primary

& Secondary Fuel Oil Filter

Elements for Diesel Electric

Locomotives-

200 - - - -

(A) Low Mean Pore Size

Primary & Secondary Fuel

Oil Filter Elements for

Diesel Electric Locomotives

(RDSO Drg. No.: SKDP-

3901, 3902)

200 - - - -

(B) Low Mean Pore Size

Primary & Secondary Fuel

Oil Filter Elements for

Diesel Electric Locomotives

(RDSO Drg. No.: SKDP-

3908, 3909)

200 - - - -

148

152

Page 16: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

153

10” x 30” Long Life Lube Oil and

Fuel Oil Filter Elements (Two

Piece) for EMD Locomotives

200 - - - -

154

Long Life Lubricating Oil Filter

Element for Locomotive Diesel

Engines

200 - - - -

Filter elements, Pre-cleaner, for

ALCO & EMD Locomotives200 - - - -

(A) Engine Inertial Primary

Filter for ALCo locomotives200 - - - -

(B) Inertial Filter Assembly

for EMD locomotives200 - - - -

(C) Carbody Filter for ALCo

locomotives (For WDG3A &

WDM3D locomotives)

200 - - - -

(D) Carbody Filter for ALCo

locomotives (For WDM2

locomotives)

200 - - - -

Filter elements, Secondry Engine

Air Filters, for ALCO & EMD

Locomotives

200 - - - -

(A) Element Filter for EMD

locomotives200 - - - -

(B) Glass Fibre Bag Filter

for ALCo locomotives200 - - - -

(C) Glass Fibre Secondary

Engine Air Filter for ALCo

locomotives (Deep Design)

200 - - - -

(D) Glass Fibre Secondary

Engine Air Filter for ALCo

locomotives

200 - - - -

Disposable car body filters with

built-in louvers and casing(A) Disposable car body filters

with built-in louvers and casing

forWDG3A, WDM3B, WDM3D and

WDM3A locomotives(B) Disposable car body filters

with built-in louvers and casing

for WDM2 locomotives

M/s Spectrum Filtration Pvt.

Ltd., Howrah11.05.2015 Jan’18

158Soak Back Lube Oil Filter for

EMD Locomotives200 - - - -

159Spin-on Fuel Filter for EMD

Locomotives200 - - - -

160Spin-on Turbocharger Lube Oil

Filter for EMD Locomotives200 - - - -

161Filter element, Suction Strainer,

for EMD Locomotives200 - - - -

162

Filter Paper Media for 10” x 30”

Long Life Lube Oil and Fuel Oil

Filter Elements (Two Piece) for

EMD Locomotives

200 - - - -

163

Filter Paper Media for Long Life

Lubricating Oil Filter Element for

Locomotive Diesel Engines

200 - - - -

155

156

157 200 2

M/s G S Products, Lucknow 04.02.2015 Dec’17

Page 17: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

164

Filter Paper Media for Low Mean

Pore Size Primary & Secondary

Fuel Oil Filter Elements for

Diesel Electric Locomotives

200 - - - -

165Filter, compressor Oil spin on, for

EMD locomotives200 - - - -

Filter elements, Pre-cleaner for 200 - - - -

1. Inertial Filter RH for WDG5 200 - - - -

2. Inertial Filter LH for WDG5

locomotives200 - - - -

167Fuel filter element (5 micron) for

WDG5 Locomotives200 - - - -

168Filter, Self cleaning Automatic,

Lube oil, for ALCO Locomotives200 - - - -

Motive Power - Electrical

Machines (DEMU Items)

169

Three Phase AC-AC

Transmission System &

Associated Control Equipment

for 1600 HP Diesel Electric

Multiple Unit

200 - - - -

Motive Power - Electrical

Machines (EMD Locomotive

Items)

170Alternator-Rectifier Traction for

HHP Locomotives200 - - - -

171Rectifier Bank Assembly for HHP

Locomotives200 - - - -

172Traction Alternator for EMD

(WDG5) Locomotives200 - - - -

173

Bearing suspension, Drive End

of Traction Motor for EMD

locomotives

200 - - - -

174

Bearing suspension, Non-Drive

End of Traction Motor for EMD

locomotives

200 - - - -

175

Bearings, Traction Motor- TM

Drive end & TM Non-drive end

for EMD Locomotives

200 - - - -

176Bearing RLR CE for EMD

(WDG5) Locomotives200 - - - -

177Bearing RLR PE for EMD

(WDG5) Locomotives200 - - - -

178Bearings, Traction alternator for

EMD Locomotives200 - - - -

179

3-phase induction motors for

4500 hp,AC- AC WDG4 &

WDP4B diesel electric

Locomotives

200 1 M/s ABB India Ltd., Vadodara 13.06.2016 Feb’18

180

3-Phase squirrel cage

induction motor for 5500 HP

AC-AC WDG5 locomotive,

200 - - - -

181 Axle gear steel (carburizing type) 200 - - - -

182 Pinion gear steel (43 B 17) 200 - - - -

183

Tube Suspension: Housing

bearing kit (consisting 11 items)

for EMD Locomotives

200 - - - -

166

Page 18: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

184

Tube Suspension: Housing

bearing kit (consisting 4 items)

for EMD Locomotives

200 - - - -

185

E-Locker/Dustbin Motor Blower

Assly for EMD (WDG5)

Locomotives

200 - - - -

Motive Power - Electrical

Machines (BG ALCo

Locomotive Items

200

Alternator, Traction with Auxiliary

Machines and their sub-

assemblies for Broad Gauge

Diesel Electric ALCO

Locomotives

200 - - - -

(A) Traction Alternator with

Auxiliary Machines and their sub-

assemblies for 3100HP and

3300HP ALCo Locomotives.

200 - - - -

(B) Traction Alternator with

Auxiliary Machines and their sub-

assemblies for 1400HP and

2300HP ALCo Locomotives.

200 - - - -

187

Bearings, roller type of Traction

motor for ALCo locomotives,

NH320 rivetless - Commutator

end; NU330 rivetless - Pinion

end & Alternator / Generator

bearings)

200 - - - -

188

Bearings, Suspension, Traction

Motor for ALCo locomotives

(Roller type)-

200 - - - -

189

Bearings for Traction motor,

ALCo Locomotives- ( NU328 &

NH 318 rivetless)

200 - - - -

190Traction Motor Bellows-

(Leather), for Alco Locomotives200 1

Angel Leathers Pvt. Ltd.,

Jalandhar27.10.2017 Apr’18

191

Traction motor Bellows (moulded

rubber type without fabric)Used

on broad gauge diesel-electric

Locomotives

200 - - - -

192

Fluoroelastomer Insulated Main

Lead & Brush Gear Cables used

in Traction Motors of Diesel

Electric Locomotives

200 - - - -

193 Carbon blocks 200 - - - -

194Kapton covered copper

conductor for traction machines200 - - - -

195Film Polyimide (Kapton / Apical

film or equivalent)200 - - - -

196 Glass tape, Silicon elastomer 200 - - - -

186

Page 19: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

197

Motor Complete, DC Traction for

ALCo Locomotives with following

Sub-assemblies: A. Armature, B.

Commutator, C. Commutating

field coils assembly, D. Main field

coils assembly, E. Magnet frame

(machined)

200 - - - -

198Motor Armature, DC Traction for

ALCo200 - - - -

199Motor Commutator, DC Traction

for ALCo200 - - - -

200Motor Commutating Field Coils

assembly, DC Traction for ALCo200 - - - -

201Motor Main Field Coils assembly,

DC traction for ALCo200 - - - -

202Motor Magnet Frame (machined),

DC Traction for ALCo200 - - - -

203Paper Nomex, Untreated of all

grades200 - - - -

204

Alternator mounted rectifier

assembly for AC/DC diesel-

electric locomotives

200 - - - -

205

Resins & varnishes for traction

machines used on Diesel electric

locomotives

200 1M/s Fine Finish Organics Pvt

Ltd., Navi Mumbai22.05.2014 Jan’18

206

Cleaning solvent for electrical

rotating machines of diesel

electric locomotives

200 1M/s Unijules Life Sciences Ltd.,

Nagpur23.11.2016 Feb’18

207 Tape, Kapton adhesive 200 - - - -

208

Class 200 resin-preimpregnated

semi-cured unidirectional

Polyglass banding tapes Used on

traction machines (TG/TM/AG)

of diesel electric Locomotives

and DEMUs

200 - - - -

209Traction Gears, (Case hardened)

for ALCo Locomotives200 - - - -

210Traction Pinions, (Case

hardened) for ALCo Locomotives200 1

Premium Transmission ltd.,

Pune 30.09.2016 Jan’18

211

Tubes & accessories,

Suspension bearing (10

components) For TM 4907 & TM

5002 of ALCo locomotives

200 - - - -

Motive Power - Electrical

Machines (BG ALCO & EMD

Locomotive Items)

212Locomotive insulated wire – sizes

AWG # 3 and smaller200 1

Polycab Wires Pvt Ltd.,

Panchmahals, Gujarat27.10.2017 Apr’18

213Locomotive power cable – sizes

AWG # 1 and larger200 1

Polycab Wires Pvt Ltd.,

Panchmahals, Gujarat27.10.2017 Apr’18

Motive Power - Electrical

Controls Items

Page 20: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

214

Nickel Cadmium Starter batteries

for Diesel Locomotives (6V,

150AH Ni-Cd Storage Unit)

200 - - - -

215

Low Maintenance lead acid

Batteries for Diesel Electric

loco engine starting application (8

V, 500 Ah lead acid)

200 - - - -

216

Low Maintenance lead acid

Batteries with PPCP Cell

assembly housed in FRP outer

container for Diesel Electric

locomotives (8V, 450 Ah lead

acid)

200 - - - -

217Microprocessor based Control

system with Automatic Flasher 200 - - - -

M/s Yongji Xinshisu Electric

Equipment Co. Ltd.,

P.R. China

219

Microcontroller based Event

Recorder used on EMD

Locomotive

200 - - - -

Governor MCBG–Micro

Controller Based Governor for

ALCo/DLW/ DMW

200 - - - -

(A) Micro controller based

governor (MCBG) for Application

on ALCo/DLW/DMW 16 cylinder

251 series D- E Locomotives

200 - - - -

(B) Micro controller based

governor (MCBG) for Application

on Microprocessor Controlled

ALCo/DLW 6 cylinder 251 series

WDS6 D- E Locomotives- Spec.

no. MP.0.1700.04 (Rev. 00)

Oct.08

200 - - - -

221Master controller Conventinal

stick type for ALCo Locomotives200 - - - -

222Master Controller Improved stick

type for ALCo Locomotives200 - - - -

Topgrip Instruments Company,

C48, KSSIDC Veerasandra

Industrial estate,

Electronics city PH II , HOSUR

ROAD,

BANGALORE 560100

224Fuel Level Sensor for Diesel

Electric Locomotives200 - - - -

225

Micro controller based Electronic

Speed indicating and Recording

system for Railway application

200 - - - -

226Distributed Power Control

System for HHP Locomotives200 - - - -

1 04.09.2014 July’19

220

223Master Controller of EMD

locomotive200 1 24.11.2017 Jun’18

218

AC-AC Traction Control System

for 4500HP HHP Diesel-Electric

Locomotives

200

Page 21: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

227Distributed Power Control

System for Alco Locomotives200 - - - -

228Auxiliary Power Unit for HHP

Locomotives200 - - - -

229

Automatic Control of Engine Stop

with Auxiliary Power Unit-ACES

with APU for Alco Locomotives

200 - - - -

230

Remote Monitoring and

Management of Locomotive and

Trains

200 - - - -

Novius Technologies India Pvt

Ltd, 234, Shiv Kalyan, Near

Ayurvedic Hospital, Sector 27,

Nigdi Pradhikaran, Pune- 411

044

Motive Power – Brake Items

232

Air Dryer, ALCO, HHP & Electric

Locomotives and EMU/DMU/

MEMUs

240 - - - -

233Gauge Complex with Air Flow

Indicator, HHP Locomotives200 - - - -

234

‘’L‟ Type Composition Brake

Block, ALCO & Electric

Locomotives

240 - - - -

235High Friction Composition Brake

Block, HHP locomotives240 - - - -

Brake equipments, ALCO &

Electric Locomotives200 - - - -

(A) Brake equipments, ALCO &

Electric Locomotives200 - - - -

(B) Brake equipments, ALCO &

Electric Locomotives200 - - - -

237

Microprocessor controlled Air

Brake System (Spec. no.

MP.0.01.00.20, Rev 03 August

2016)/ Modular Microprocessor

controlled Air Brake System with

advanced features (Spec. no.

MP.0.01.00.24 Rev 02 August

2016)/ Indigenous

Microprocessor controlled Air

Brake System with versatile

software (Specification No.

MP.0.01.00.23 Rev 0, November-

2009)

200 - - - -

238

Compact (Tri-plate) type IRAB-1

pure air brake and 28 LAV-1 dual

brake panel for diesel

Locomotives

200 - - - -

239

Air Compressor (Enhanced

reliability and M-24 schedule),

ALCO Locomotives

380 - - - -

240Water cooled Air Compressor for

HHP Diesel Locomotives380 - - - -

241Diaphragms VA1B valve, ALCO

Locomotives200 - - - -

07.11.2017 May’18

236

231Loco Cab Video and Voice

Recording System200 1

Page 22: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

242Rubber components, Air brake,

ALCO Locomotives200 - - - -

243 Modified hand brake assembly 200 - - - -

Spares for compressor /

expressor, ALCO Locomotives200 - - - -

A. Spares for compressor /

expressor, ALCO

Locomotives

200 - - - -

B. Spares for compressor /

expressor, ALCO

Locomotives

200 - - - -

C. Spares for compressor /

expressor, ALCO

Locomotives

200 - - - -

D. Oil seal (Expressor) 200 - - - -

E. Piston -Diameter 197 mm 200 - - - -

245Spares Upgraded forCompressor

/ Expressor, ALCO Locomotives.200 - - - -

246

Air Flow Measuring Valve and Air

Flow Indicator, ALCO & Electric

Locomotives

200 - - - -

247

Air flow Indicator for

microprocessor controlled brake

on ALCo locomotives

200 - - - -

248Auto drain Valve, ALCO, EMD

and Electric Locomotives200 - - - -

249Feed Valve, ALCo, EMD &

Electric locomotives200 - - - -

250Valve -Emergency Brake for

HHP Locomotive200 - - - -

251

Brake Interface Unit (BIU) for

Train Collision Avoiding System

and Distributed Power Control

system for diesel locomotives

fitted with IRAB class of brake

system

200 - - - -

Motive Power – Bogie Items

252

Bearing Adapter with Journal

Bearing Assembly (without

bushing traction rod) for HHP

Locomotives

200 - - - -

253Journal Bearing Assembly for

WDG5 locomotives200 - - - -

254Fabricated Bogie Frame &

Bolster assembly for locomotives200 - - - -

255Motor Nose Link Bushing for

HHP Locomotives200 1

M/s B.D. Bansal Steel

Industries, Chembur, Mumbai 29.04. 15 Dec’17

256Nose Link Bushing for WDG5

locomotives200 - - - -

257Bushing Rubber for HHP

Locomotives200 1

M/s B.D. Bansal Steel

Industries, Chembur, Mumbai 29.04. 15 Dec’17

244

Page 23: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

258Car Body Link Bushing for

WDG5 locomotives200 - - - -

259Bushing Traction Rod for HHP

locomotives200 1

M/s B.D. Bansal Steel

Industries, Chembur, Mumbai 29.04. 15 Dec’17

260Traction rod Bushing for WDG5

locomotives200 - - - -

261 Centre Pivot Block Assembly 200 - - - -

262

Hydraulic Dampers of

WDG3A, WDM3D and

WDM3A (with T.H.S bogies)

and WDM3D (with equalizer

less bogie) locomotives

200 - - - -

263Primary Vertical Damper for HHP

Locomotives200 - - - -

264Primary Vertical Damper for

WDG5 locomotives200 - - - -

265Secondary Yaw Damper for HHP

Locomotives200 - - - -

266Secondary Lateral damper for

WDG5 locomotives200 - - - -

267

Equaliser beams, Compensating

beams & Links of high adhesion

& Equaliser beams (long & short)

of trimount locomotive bogies

200 1

M/s Razzlakshmi Enterprise,

Kona Check Post, Benaras

Road, Howrah

27.07.16 Jan’18

268Journal Axle Box Assembly with

CRU Bearing200 - - - -

269

Journal Axle Box Assembly with

normal and Step Size Roller

Bearing

200 - - - -

270Centre Pivot Liner for

Locomotives200 - - - -

271Spring – Single Coil for HHP

Locomotives200 - - - -

272Coil Spring for WDG5

locomotives200 - - - -

273Rubber Spring Assembly – A &

B, WDP4 Locomotives200 - - - -

274Rubber Spring Assembly WDG4

Locomotives200 - - - -

275Secondary Spring for WDG5

locomotives200 - - - -

276

Thermoplastic polyurethane

spring pads (Happy pads)

for locomotives

200 - - - -

277Truck Frame Assembly for HHP

Locomotives200 - - - -

278Half Cylinder Wear for HHP

locomotives200 - - - -

279Kit for TBU for WDG5

locomotives200 - - - -

280Thrust Pad for WDG5

locomotives200 - - - -

281Lateral Thrust Pad for WDG5

locomotives200 - - - -

282Secondary lateral stop for WDG5

locomotives200 - - - -

Motive Power –Underframe

Items

Page 24: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

283Buffer Assembly, Side, High

capacity, Long life200 - - - -

284

Coupler Assembly, H-type

Tight lock for

ALCo/Electric/HHP Passenger

Locomotives

200 1 M/s Bhilai Engg.co.LTD., Bhilai 19.12.2016 May’18

285Coupler E-type for EMD

Locomotives200 1 Shivai Enterprises Pvt. Ltd. 26.10.2017 Apr’18

286Draft Gear Soft with Yoke

Assembly200 1 Atul Engineering Udyog 28.10.205 Jan’18

287Draft gear with Yoke assembly

for EMD Locomotives200 - - - -

288Spring Pads Assembly, Side

Buffer, Long life200 - - - -

289 Spring Rubber, Buffer 200 - - - -

Firm NameSince (Date of

Appln)SN of ED (R) list TDC for disposal

M/s. General Auto Electric

Corporation, Mumbai

03-03-2014 453 30/4/2018

Signotron (India) Pvt Ltd,

Kolkata

05-11-2015 457 30-04-2018

Star Electric Company,

Ludhiana

11-06-2015 455 31-05-2018

P I ENGINEERING WORKS,

Modinagar, Ghaziabad

05-11-2016 454 31-01-2018

Powernetics Equipment I

Private Limited, Navi Mumbai

29/09/2015 456 31-12-2017

291 25 KW ERRU 460 days 1 M/S.PRESSTECH(INDIA)PVT

.LTD, Mumbai

08-08-2016 459 30-06-2018

Powernetics Equipment I

Private Limited, Navi Mumbai

06-11-2014 464 30-06-2018

Hind Rectifier Ltd, Dehradun 05-11-2015 461 31/01/2018

ENERTECH UPS PVT. LTD.,

Pune

31/08/2015 462 31-05-2018

P I ENGINEERING WORKS,

Modinagar, Ghaziabad

08-08-2016 465 31-05-2018

Electronic EQuipment Co Pvt

Ltd, Kolkata

27/02/2017 463 31/05/2018

TROLEX INDIA PVT. LTD., 14/08/2017 468 31/12/2018

Star Electric Company,

Ludhiana

09-04-2017 469 31-03-2018

M/s Autometer Alliance Ltd,

Noida

03-10-2017 466 31-03-2018

M/s Hitachi Hirel, Sanand 18/04/2016 467 31/12/2017

293 120 Ah Battery 370 days Star Battery Ltd, Kolkata 29/01/2016 452 30-06-2018

294 70 Ah Battery 550 days Exide Industries Ltd, Kolkata. 24/11/2016 451 31/01/2018

295 INVERTER 370 days 1 Powernetics Equipment India

Private Limited, Navi Mumbaiu

28/03/2014 460 30-06-2018

PS & EMUDetails

290 4.5 KW ERRU 460 days 5

2

SN ItemTotal no of days

approval specifiedNo of cases

292 4.5 KW RBC 370 days 9

* Specified timeline for disposal (Recommendation for placement of Trial/Developmental Quantity Order to PUs/ ZRs or case closure) of the cases.

Page 25: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

NEC Switchgears and Controls 08-08-2016 502 31-12-2017

SUGAN ENGINEERING PVT

LTD

11-02-2016 504 30-04-2018

NAVA NIRMAN

FABRICATION PVT. LTD

08-08-2016 503 30-04-2018

SOM AUTOTECH PVT LTD 11-02-2016 505 31-03-2018

THYRON ENGINEERING

PRIVATE LIMITED

02-11-2014 473 31-12-2017

RONAK INDUSTRIES 25/08/2015 474 30-06-2018

Saini Electrical and

Engineering Works

23/09/2015 470 30-05-2018

SWAGATH ENNG 23/09/2015 471 31-01-2018

FORCE MOTION

TECHNOLOGY LLP

11-06-2015 472 30-06-2018

Billing Through M/s Sterling

and Wilson Energy Systems

Pvt. Ltd under Principal

Manufacturer M/s Sterling

Generators Pvt Ltd

23/10/2015 501 31-03-2018

M/s Daulat Ram , Bhopal 14/08/2017 498 31-03-2018

M/s GEMCO Limited, Mysore 11-12-2016 499 31-03-2018

M/s Tractor India Pvt Ltd,

Asansol

05-11-2016 500 31-03-2018

300 RMPU 370 days 1 DOLAR ENGG INDUSTRIES

PVT. LTD.

07-11-2016 506 31-01-2018

LUMENS AIRCON PVT.LTD 06-09-2015 477 31-12-2018

TROLEX INDIA PVT. LTD., 08-12-2015 478 30-04-2018

INOVTECH 08-07-2015 479 31-12-2017

POWER EQUIPMENT PVT

LTD

29/07/2015 480 31-12-2017

PRICOL ENGINEERING

INDUSTRIES LIMITED

31/08/2015 481 31-05-2018

RSI Switchgear Pvt. Ltd. 23/10/2015 475 31-12-2017

RSI Switchgear Pvt. Ltd. 23/10/2015 476 30-06-2018

AMIT ENGINEERS 23/10/2015 482 31-01-2018

Sidwal Refigeration industries

Private limited

23/10/2015 483 30-04-2018

Craftsman Automation Private

Limited

29/01/2016 484 30-04-2018

M/S ITI LIMITED 04-11-2016 485 31-12-2017

NATIONAL ENTERPRISES 04-11-2016 486 31-12-2017

MAK ENGINEERS INC. 05-11-2016 487 31-03-2018

SHIVALIK FASTNERS PVT.

LTD.

05-11-2016 488 31-03-2018

KONTACT CONSORTIUM

INDIA PVT LTD

07-12-2016 489 30-04-2018

CONQUERENT CONTROL

SYSTEMS

08-08-2016 490 31-03-2018

Star Electric Company 08-08-2016 491 30-06-2018

RAMYAA ELECTRO GEAR

PVT LTD

11-02-2016 492 31-03-2018

ASIAN SWITCHGEAR PVT.

LTD.

11-02-2016 493 31-03-2018

P D STEELS 14/08/2017 494 31-05-2018

MV Electrosystems Private

Limited

31/07/2017 495 30-06-2018

BHAVITRON POWERTEC

PRIVATE LIMITED

14/08/2017 496 30-04-2018

2

auxilary motor RMPU 370 days 5

299 DA set 500 KVA 570 days 4

301

296 500 A IV coupler 370 days 2

298

297 400 A ZS coupler 370 days

SBC to different specs 370 days 23

Page 26: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

MODERN RAILTECH 14/08/2017 497 31-07-2018

Name Since

M/s Mittal Batteries Pvt.

Ltd.,Mahboob Nagar-509228,

Telangana State.

02.06.14 31.10.18 sample yet to be offered by

firm

M/s Global Powersource (India)

Pvt Ltd. Mumbai-400086

2015 20.12.17 transferred from PS&EMU

directorate recently.

Documents under scruitny

M/s Southern Batteries pvt.

Ltd.,Bangalore

21.06.17 31.12.17

M/s Mittal Batteries Pvt.

Ltd.,Mahboob Nagar,

Telangana State.

02.06.14 30.09.18 Sample under test

M/s Global Powersource (India)

Pvt Ltd. Mumbai

2015 20.12.17 transferred from PS&EMU

directorate recently.

Documents under scruitny

M/s Southern Batteries pvt.

Ltd.,Bangalore

21.06.17 31.12.17

M/s LEAD ACID Battery Co.

(P) Ltd.Kolkata

12.08.16 31.03.19 sample yet to be offered by

firmM/s Global Powersource (India)

Pvt Ltd. Mumbai

2015 20.12.17 transferred from PS&EMU

directorate recently.

Documents under scruitny

M/s SouthernBatteries pvt.

Ltd.,Bangalore

21.06.17 31.12.17

M/s Global Powersource (India)

Pvt Ltd. Mumbai

2015 20.12.17 transferred from PS&EMU

directorate recently.

Documents under scruitny

M/s LEAD ACID Battery Co.

(P) Ltd.Kolkata

01.04.17 31.03.19 sample yet to be offered by

firmM/s Southern Batteries pvt.

Ltd.,Bangalore

21.06.17 31.12.17

M/s Global Powersource (India)

Pvt Ltd. Mumbai

2015 20.12.17 transferred from PS&EMU

directorate recently.

Documents under scruitny

M/s SouthernBatteries pvt.

Ltd.,Bangalore

21.06.17 31.12.17

307 Battery for Air-conditioning- 450

Ah (MG AC Coaches)

450 days 1 M/s Global Powersource (India)

Pvt Ltd. Mumbai

2015 20.12.17 transferred from PS&EMU

directorate recently.

Documents under scruitny

308 Battery for TR-D Application-

Lead Acid 40Ah -LM

240 days 1 M/s Global Powersource (India)

Pvt Ltd. Mumbai

2015 20.12.17 transferred from PS&EMU

directorate recently.

Documents under scruitny

309 Battery for TR-D Application-

Lead Acid 200Ah -LM

240 days NIL

310 Dry type air filter for air

conditioned coaches Underslung

& conventional RMPU

290 days NIL

311 Dry Type air filter for LHB RMPU 260 days NIL

QA / ELECTRICAL

SN items Total No. of days

specified for

No. of cases Details Target Reason for delay Remarks

301

304 Battery for train lighting-210 Ah 450 days 2

305 Battery for Air-conditioning- 525

Ah

420 days 3

302 Battery for Low Maintenance

Lead Acid Battery 75 Ah for

locomotives (PPCP Container)

450 days 3

303 Battery for EMUs 90 Ah (LM)

(PPCP Container)

450 days 4

SBC to different specs 370 days 23

NOTE: TDC/Total no of days for approval specified include field trial duration wherever stipulated in governing specification.

306 Battery for Air-conditioning- 800

Ah

420 days 2

Page 27: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

312 Roof Mounted AC Package Units 190 days NIL

313 AC Control panel for roof

mounted AC package units

190 days NIL

314 M/s DRESPL, Simari (MP) 19.02.13 20.12.17 under capabiltiy

assessementM/s Analog Electronics,

Chennai

06.02.15 31.03.18 Documents for capabiltiy

assessement submitted

late, under scrutiny315 Battery charger for 110 V, 40 Ah

battery

200 days 1 M/s Transtech Power Controls,

Lucknow

02.06.17 30.06.18 Documents for capabiltiy

assessement under

scrutiny316 Battery charger for 110 V, 200

Ah battery

200 days 1 M/s Transtech Power Controls,

Lucknow

02.06.17 30.06.18 Documents for capabiltiy

assessement under

scrutiny317 245 kV Solid Core Post Insulator

Assembly for 220 kV Isolators &

Bus Bars.

300 days NIL

318 132 kV Solid Core Post Insulator

Assembly for 132 kV Isolators &

Bus Bars

300 days NIL

319 110 kV Solid Core Post Insulator

Assembly for 110 kV Isolators &

Bus Bars

300 days NIL

320 66 kV Solid Core Post Insulator

Assembly for 66kV Isolators and

Bus Bars

300 days NIL

321 Post Insulator Cap & Pin stack

for 132 kV Isolators

300 days NIL

322 Post Insulator for 25 kV Isolator

and Bus Bars (RI 6090)

300 days 1 M/s Porcelains Industries ,

Spain

26.04.16 31.10.18 Documents for capabiltiy

assessement submitted

late, under scrutiny323 11 kV Post Insulator 300 days NIL

324 OPERATING ROD

INSULATOR:- Operating Rod

Insulator for 25 kV Isolator

(RI 6260)

300 days 1 M/s Porcelains Industries ,

Spain

26.04.16 31.10.18 Documents for capabiltiy

assessement submitted

late, under scrutiny

325 STAY ARM INSULATOR:-

Porcelain Stay Arm Insulator ( RI

6000-2) (1050mm CD)

300 days 1 M/s Porcelains Industries ,

Spain

26.04.16 31.10.18 Documents for capabiltiy

assessement submitted

late, under scrutiny

326 BRACKET INSULATORS:-

Porcelain Bracket insulator (RI

6030-1) (1050mm CD)

300 days 1 M/s Porcelains Industries ,

Spain

26.04.16 31.10.18 Documents for capabiltiy

assessement submitted

late, under scrutiny

M/s Porcelains Industries ,

Spain

26.04.16 31.10.18 Documents for capabiltiy

assessement submitted

late, under scrutiny

M/s ABI, Halol 10.02.17 31.08.18 capabiltiy assessement

done. Firm to submit

drawings.328 SECTIONING INSULATORS:-

Sectioning Insulator (RI 6110)

(850mm CD)

300 days 1 M/s Porcelains Industries ,

Spain

26.04.16 31.10.18 Documents for capabiltiy

assessement submitted

late, under scrutiny

329 11kV, 70 kN, (Ball & Socket type)

Disc Insulator – 280 mm dia,

CD-430mm(min.)

300 days 1 M/s Bikaner Ceramics Private

Limited, Bikaner

03.10.17 20.12.17 Documents for capabiltiy

assessement under

scrutiny

290 days 2

327 9-TONNE INSULATORS:-

Porcelain 9-tonne Insulators (RI

6020-1) (1050 mm CD)

300 days 2

Electronic Time Delay Relay for

AC coaches

Page 28: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

330 11kV, 120kN (Ball & Socket)

Disc Insulator with 280mm dia

CD 430mm(min.)

300 days 1 M/s Bikaner Ceramics Private

Limited, Bikaner

03.10.17 20.12.17 Documents for capabiltiy

assessement under

scrutiny331 Gearless Hand Operated Pulling

and Lifting Machine(0.8t, 1.6t,

3.2t)

190 days NIL

332 Ratchet Lever hoist (Pull Lift)

(0.8 t, 1.6 t, 3.2 t)

190 days NIL

M/s Tirupati PlastomaticsPvt

Ltd , Jaipur

24.02.16 20.12.17 Documents for capabiltiy

assessement under

scrutiny

M/s Quadrant Cables Pvt Ltd.,

Mohali

14.10.16 20.12.17 under Type testing

M/s Polycab Wires Pvt Ltd,

Halol, Gujrat

14.11.16 28.02.18 sample yet to be offered by

firmM/s Thermo Cables Ltd,

Hyderabad Telangana

28.10.16 30.06.18 under capabilty

asessement M/s Hubber&Shuner

AG,(Ebergy& Signal

Transmission), Switzerland

16.11.16 30.06.18 Documents for capabiltiy

assessement submitted

late, under scrutinyLeoni &Studer AG Switzerland 22.02.13 30.06.18 Documents for capabiltiy

assessement submitted

late, under scrutiny

M/s Tirupati Plastomatics Pvt

Ltd , Jaipur

24.02.16 20.12.17 Documents for capabiltiy

assessement under

scrutinyM/s Quadrant Cables Pvt Ltd.,

Mohali

13.10.16 20.12.17 Type testing has done.

M/s Polycab Wires Pvt Ltd,

Halol, Gujrat

26.10.16 28.02.18 uner type testing

M/s Hubber&Shuner

AG,(Ebergy& Signal

Transmission), Switzerland

17.11.16 30.06.18 Documents for capabiltiy

assessement submitted

late, under scrutiny

335 Passenger Elevator 615 days + time

taken by firm to

installed 1 unit of

elevator in Railways

for performance

evaluation

NIL

336 Passenger Escalator 450 days + time

taken by firm to

installed 1 unit of

Escalator in Railways

for performance

evaluation

NIL

Tentative

Target

(excluding

delay on

firm's end)

337

Telecom cable termination Box

(Non-metallic) for indoor use for

specification no.

RDSO/SPN/TC/97/2012, Rev.0

14 M/s Drip Elastotek. Kolkata. 25.02.2013Vendor Dev. suspended due to

Spec. revision.

TELECOM

1. Item has been transferred to

Electrical Loco Directorate on

31.03.2017 from

QA(Electrical) dte.

2. Peding cases of approval

before 01.03.17 are beig dealt

by QA(Electrical dte.)

3. Item is appering in Electrical

Loco dte. vendor list.

334 Thin Walled Cable for 3-phase

locomotives

370 days 5 1. Item has been transferred to

Electrical Loco Directorate on

31.03.2017 from

QA(Electrical) dte.

2. Peding cases of approval

before 01.03.17 are beig dealt

by QA(Electrical dte.)

3. Item is appering in Electrical

Loco dte. vendor list.

SN Item & Specification No.

Total no. of months

Specified for

approval

No. of Cases Firm’s Name

333 Thin walled flexible elastomeric

cables

with copper conductors

for working voltages

(i) up to 750 volts

and

(ii) above 750 volts up to 1.8/3.0

kv for tap changer electric

locomotives , AC/DC EMU, BG

AC EMU & MEMU/ coaching

stock ( Chemical curing process

/ Electron Beam Irradiation curing

370 days 5

Revise total time line for EEM Directorate

In process Since

Page 29: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

338

Telecom cable termination Box

(Non-metallic) for indoor use for

specification no.

RDSO/SPN/TC/97/2012, Rev.0

14M/s Balaji Enterprises, New

Delhi15.03.2013

Vendor Dev. suspended due to

Spec. revision.

339

Telecom cable termination Box

(Non-metallic) for indoor use for

specification no.

RDSO/SPN/TC/97/2012, Rev.0

14 3M/s A-One Enterprises,

Gurgaon.13.03.2013

Vendor Dev. suspended due to

Spec. revision.

340

Joint Enclosure for Armoured

Optical Fiber Cable RDSO/ SPN/

TC/68/2014 Rev.1.0

14M/s Roxtec India Pvt. Ltd.

Gurgaon, Haryana16.07.2015

Sample not yet submitted (Jul

2018)

341

Joint Enclosure for Armoured

Optical Fiber Cable RDSO/ SPN/

TC/68/2014 Rev.1.0

14 2M/s AmpsonEngg. Pvt.

Ltd.,Thane11.12.2015 Under clarification

342

Permanently Lubricated HDPE

Duct as per RDSO/SPN/

TC/45/2013, Rev.-2.0

Amendment 1.0

14M/s Kriti Industries (I) Ltd Dhar

(MP)17.05.2016

Sample not yet submitted Nov

18.

343

Permanently Lubricated HDPE

Duct as per

RDSO/SPN/TC/45/2013, Rev.-

2.0 Amendment 1.0

14 M/s Sweta Industries Bhopal 25.02.2017Deficiencies not complied by

firm

345

Permanently Lubricated HDPE

Duct as per

RDSO/SPN/TC/45/2013, Rev.-

2.0 Amendment 1.0&2

14 M/s TijariaPolypipes Ltd. Jaipur 18.05.2017Deficiencies not complied by

firm

346

Permanently Lubricated HDPE

Duct as per

RDSO/SPN/TC/45/2013, Rev.-

2.0 Amendment 1.0&2

14 M/s VeekayPlast Jaipur. 10.08.2017Deficiencies not complied by

firm

347

Permanently Lubricated HDPE

Duct as per

RDSO/SPN/TC/45/2013, Rev.-

2.0 Amendment 1.0&2

14M/s Sadhu Autocom Pvt. Ltd.

Dhar. 26.05.2017

Deficiencies not complied by

firm

348

Permanently Lubricated HDPE

Duct as per

RDSO/SPN/TC/45/2013, Rev.-

2.0 Amendment 1.0&2

14 8M/s Aaram Plastic Private Ltd.

Jaipur.25.07.2017 Case under CCA

349

Permanently Lubricated HDPE

Duct as per

RDSO/SPN/TC/45/2013, Rev.-

2.0 Amendment 1.0&2

14M/s Duraline India Pvt. Ltd.

Thimmapur.30.08.2017

Deficiencies not complied by

firm

Elctronic LC gate telephone

system

RDSO/SPN/TC/51/11, Rev 3.0 2

351

Electronic LC Gate Telephone

System as per

RDSO/SPN/TC/51-11 Rev.3.0

14 M/s EEC Kolkata 21.03.2016Samples not yet submitted by

firm.

12.04.2017 STR not yet complied by Firm.

350 14 M/s RT Vision, NDLS 02.04.2014 18-Mar

344

Permanently Lubricated HDPE

Duct as per

RDSO/SPN/TC/45/2013, Rev.-

2.0 Amendment 1.0&2

14M/s Veer Vissions Pvt. Ltd.

Parwanoo (H.P.)

Page 30: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

352

VHF Based Approaching Train

Warning System for Track

Maintainers RDSO/SPN/TC/105-

2015, Rev.0.0

14M/s RT Vision Technologies

Pvt. Ltd.19.02.2016

Samples not yet submitted by

firm.

353

VHF Based Approaching Train

Warning System for Track

Maintainers RDSO/SPN/TC/105-

2015, Rev.0.0

14M/s Sanchar Comm. System,

New Delhi03.03.2016 17-Dec

354

VHF Based Approaching Train

Warning System for Track

Maintainers RDSO/SPN/TC/105-

2015, Rev.0.0

14 4M/s Pulse Communication

Systems Pvt. Ltd.03.03.2016

Samples not yet submitted by

firm.

355

VHF Based Approaching Train

Warning System for Track

Maintainers RDSO/SPN/TC/105-

2015, Rev.0.0

14Sirveen Control System

Hyderabad.01.08.2016

Pending for CCA on firms

account

On-board wireless PA System for

Passenger Trains

(RDSO/SPN/TC/104/2014, Ver.

0.0)

357

True Colour Video-cum-Train

Information Display System

(RDSO/SPN/TC/67/2013 Rev.-3

Amendment -1)

14 M/s EEC Kolkata 21-03-2016Samples not yet submitted by

firm.

True Colour Video-cum-Train

Information Display System(RDSO/SPN/TC/67/2013 Rev.-3

Amendment -1)3

359

True Colour Video-cum-Train

Information Display System

(RDSO/SPN/TC/67/2013 Rev.-3

Amendment -1)

14 M/s FIEM Industries ltd, 30-05-2017Pending for CCA on firms

account

360

Integrated Passenger Information

System as per RDSO/ SPN/

TC/61/2015 Rev-4, Amendt.-1

14 M/s Securinex Nic, Parwanoo 21-04-2017Pending for CCA on firms

account

Integrated Passenger Information

System (RDSO/SPN/ TC/61/2015 Rev-4,

Amendt.-1)3

Integrated Passenger Information

System (RDSO/SPN/ TC/61/2015 Rev-4,

Amendt.-1)

364

SMPS Based Telecom Integrated

Power Supply System (TIPSS)

For Station RDSO/SPN/TC/102-

2013, Ver.1.0

14 2Broadweb Technologies Pvt.

Ltd. Howrah26.05.2017

Deficiencies advised to the firm

on dt. 13.10.2017

Under trial

358 14M/s DAT Infrormatics Pvt. Ltd.

NDLS.21-04-2017

Pending for CCA on firms

account

356 14 1M/s Delta Embedded solutions

Pvt. Ltd pune. 16-11-2016

Sample not yet submitted by

firm. Six months thereafter363

SMPS Based Telecom Integrated

Power Supply System (TIPSS)

For Station RDSO/SPN/TC/102-

2013, Ver.1.0

14M/s Punjab Comm. Ltd., S.A.S

Nagar26/05/2014

362 14M/s ICS Systems Pvt. Ltd.,

NDLS16.10.2017

Pending for CCA on firms

account

361 14M/s Saranya Electronics Pvt.

Ltd. HYD.07-04-2017

Pending for CCA on firms

account

Page 31: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

365

Emergency Socket Box FRP

Material RDSO/ SPN/

TC/44/2002 Version 2,

amendment-3.

11 1 Hi-Light Industries Howrah. 20.10.2016 Under CCA.

Name Since

366

Graduated release compressed

air brake equipment for freight

stock

597

-Components of Graduated

release compressed air brake

equipment for Freight &

Coaching stock

292 1G M Dalui & Sons Pvt Ltd,

Howrah28.02.2017 Feb 2018

(a) Auxiliary Reservoirs 292 - - -

(b) Cut off Angle Cock with Vent 292 - - -

(c) Dirt Collector assembly 292 - - -

(d) Air Brake Hose coupling 292 1Jayshree Polymers Export Pvt

Ltd., Pune 17.08.2017 Mar 2018

(e) Guard Emergency Brake

Valve292

- - -

(f) Isolating Cock 292 - - -

(g) Check Valve assembly 292 - - -

292

1. Asean Rubber Products,

Pune 01.07.2016 Jan 2018

2922. Maxim Tubes Co Pvt Ltd,

Gujrat 15.04.2017 Mar 2018

2923. Aristo Transmission Pvt Ltd.,

Raipur 22.11.2016 Dec2017

(i) Pressure gauge for air brake

System 292

- - -

(j)Load sensing Device 292 - - -

367 Brake Cylinder Assembly 322 - - -

368Brake Slack Adjuster and spares

for freight

592+ Field trial (18

months)1

Ravindra Trading Company,

Chennai 20.04.2017 Dec2017

369 Empty Load device 292 - - -

1. Jindal Steel Power Ltd.

Ramgarh (Jharkhand) 05.07.2014 May 2018

2. BMM Ispat Ltd., Bellari,

Karnataka 08.01.2016 Jan 2018

3. Mishra Dhatu Nigam Limited,

Hyderabad 22.03.2017 Jun 2018

4. Goradia Special Steels Ltd,

Raigarh 01.04.2017 Jun 20185. Gerdau Steel India Pvt Ltd.,

Anantpur 23.06.2017 Jan 2018

6. SLR Metalliks Ltd, Bellari 22.03.2017 Jun 2018

371

Spring Steel Rounds to material

Gr. 52Cr4Mo2V and Gr. AISI

8650H

352 1 Mishra Dhatu Nigam Limited,

Hyderabad 22.03.2017 Jun 2018

1. Sunflag Iron & Steel Co.Ltd.

Bhandara 07.06.2017 Jan2019

2. Jayaswal Neco Industries

Ltd. Raipur 09.06.2017 Jan20193. Bhushan Power & Steel Co.

Ltd. Sambalpur 09.06.2017 Jan2019

S.N. ItemTotal Number of

Days for Approval

Number

of Caes

DetailsTarget

QA/MECHANICAL

372

Spring Steel Round for Hot

Coiled Cylindrical Spring for use

in suspension of Indian Railway

Coaches having FIAT Design

Bogies

352 4

(h) Pipes & Joints for Air Brakes 3

370Spring Steel Rounds to material

Gr. 60Si7 and Gr. 55Si7352 6

Page 32: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

4. RL Steels & Energy Ltd.,

Aurangabad. 29.06.2017 Jan2019

373

Hot Coiled Helical springs to

material Gr. 60 Si7 and Gr.

52Cr4Mo2V for Freight

442

- - -

374Hot Coiled Helical Springs for

Locomotives

592+ Field trial (24

months)1

Chemin Spring India Pvt. Ltd,

Haridwar07.12.2015 May 2018

1. Rahul Precision Works Pvt

Ltd., Dhar 02.07.2016 May 2018

2. Balaji Rubber Factory, Pune 12.07.2017 May 2018

376Metal Bonded Rubber Pads for

Side Bearer412 1

1. Climax Overseas Pvt Ltd,

Gurgaon.13.06.2016 May 2018

1. Suncreast Industries, Jalkal,

Kolkata29.01.2015 May 2018

2. Rahul Precision Works Pvt.

Ltd, Dhar. 02.02.2016 May 2018

3. Balaji Rubber Factory, Pune 06.07.2017 Jul 2018

1. Climax Overseas Pvt Ltd,

Gurgaon.

12.04.2015 Jun 2018

2. Rahul Precision, Dhar 27.01.2016 Jun 20183. Mandeep Industries,

Lucknow 02.05.2017 Feb 2018

379 Nylon-66 brake gear bushes 322 - - -

1. Suyog Rubber (I) Pvt Ltd,

Nashik17.05.2017 Jan2018

2. Climax overseas Pvt Ltd,

Gurgaon. 09.06.2017 May 2018

3. Balaji Rubber Factory, Pune 12.07.2017 Jul 2018

381Centre Pivot Rubber Bush for

WDP1, WDG3A292

- - -

1. Brand Alloys Private Limited,

Kolkata 03.10.2015 Feb 2018

2. N.K. Iron & Industries, Agra

09.02.2015 Dec 2017

383Alliance II Coupler & its

components442

384

High tensile transition centre

buffer coupler & its component

for BG Wagons & Locomotives

442 1Nava Nirman Fabrication Pvt

Ltd, Kolkata05.07.2017 Aug 2018

385 High Capacity Draft Gear 352 - - -

386 Knuckle pin with washer 292 1Frotier Alloys Steel Ltd, Kanpur

08.08.2017 Feb 2018

387 Yoke Pin 292 1Frotier Alloys Steel Ltd, Kanpur

08.08.2017 Feb 2018

388 Knuckle Thrower 292 - - -

Cast Steel CASNUB bogie and

its components472

- - -

(i) Centre Pivot Assembly (Top &

Bottom)1

Jai Multi Engineering Co.

Mohali 03.12.2016 April 2018

372

Spring Steel Round for Hot

Coiled Cylindrical Spring for use

in suspension of Indian Railway

Coaches having FIAT Design

Bogies

352 4

375Rubber Buffer Spring for Freight

stock292 2

380

Side Bearer (Rubber spring) and

Improved Rubber Side Bearer for

Locomotive Bogies

442+ Field trial (12

months)3

382

High tensile centre buffer coupler

& its components for Freight

stock

442 2

377

Rubber Spring of High Capacity

Draft Gear for Centre Buffer

Coupler of BG Bogie Wagons

352 3

378 Elastomeric Pads 472+ Field trial (12

months)3

389

Page 33: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

390

Cast Steel bogies and its

components for CONCOR flat

wagons

472

- - -

391 Spring Plank 292 - - -

1. Rahul Precision Works Pvt.

Ltd., Dhar.02.02.2016 Feb 2018

2. Balaji Rubber Factory, Pune 05.07.2017 April 2018

393 Brake Beam for freight stock 292 - - -1. Super Iron Foundry Pvt ltd.,

Burdwan 16.06.2016 May 20182. Govind Steel Company Ltd.,

Kolkata 28.07.2016 May 2018

3. Maa Foundry Pvt. Ltd.,

Orisha 30.07.2016 May 20184. Natraj Iron & Casting P Ltd,

Dhanbad 17.03.2017 Jun 2018

5. Prakash Iron Foundry, Agra 01.08.2017 Jun 20186. Banglore Malleable Castings

P Ltd, Banglore28.07.2014 Dec 2017

395 Side Frame Key 292 1Britex Engineering Works,

Mumbai 26.05.2017 Mar 2018

396

AAR approved Taper Roller

Cartridge Bearings class E(6”X

11”) complete for use on freight

stock

352

- - -

397 Locking Plate 292 - - -

1. Sterling Bolts Pvt Ltd,

Kolkata01.03.2016 Mar 2018

2. Vinraj Steels Private Limited,

Howrah 22.11.2016 April 2018

3. Shree Ambey Metal

Industries Limited 05.12.2016 Mar 2018

4. Kwality Forge, Jugiana,

Ludhiana 30.05.2017 Mar 2018

399

Three axle cast steel trimount

and flexi-coil bogie frames &

bolsters for BG Locomotives

442

- - -

1. Lal Baba Industrial Corpn,

Howrah28.10.2016 May 2018

2. Frontier Springs Ltd, Kanpur 31.07.2017 April 2018

401 Lubricated taper plug valves 292 - - -

402

Silico-Manganese & Manganese

Steel liners & wear plates for

Bogie and couplers

292 1A.D. Electro Steel Co Pvt Ltd.

Howrah06.09.2016 Dec 2017

403Snubber Assembly for

Locomotives352

- - -

404Cold Rolled Formed Sections for

Freight 382 1

Modern Industries, Sahibabad 30.10.2017 Nov 2018

405Brake Slack Adjuster Type IRSA-

750 for Freight Stock & Spares

592+ Field trial (18

months)1

Ravindra Trading Company,

Chennai 03.12.2016 Dec 2018

406Body Side Wall, End Wall and

Flap Door of BOXNR Wagons442 1 JSL Life Style Ltd, Haryana 17.08.2017 Feb 2018

382 6

398Axle end steel high tensile cap

screws292 4

392 Centre Pivot Washer 292 2

400 Screw Couplings 292 2

394Narrow Jaw, Wide Jaw and

Modified Adapter

Page 34: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

1. Precision Industrial System,

Gwalior.18.02.2016 Feb 2018

2. Shri Gurco Ispat, Kanpur 30.06.2017 Jan 20183. Everon Casting Pvt Ltd.,

Coimbatore 18.11.2016 Feb 2018

4. Sanmar Foundories Ltd. 20.01.2017 Jan 20185. Datre Corporation Limited,

Howrah 14.02.2017 Feb 20186. Prragathi Steel Castings Pvt

Ltd,

Shimoga, Karnataka

14.02.2017 Feb 2018

7. Srinathji Ispat Ltd.,

Ghaziabad 12.04.2017 Mar 2018

8. Hind Murti Industries, Punjab 01.05.2017 Mar 20189. Srinivas Engg Auto

Components P Ltd 28.02.2017 Dec 201710. Gallard Steels Ltd.,

Pithapur, Dhar 15.08.2017 Dec 2017

SN Item days No. of cases Name of firm Applied Target *

408 Transformer 450 2 BHEL 20.03.17 30.11.18

Skipper Seil 24.05.17 31.12.18

409 VCB/BM 450 7 Megawin (CB) 17.12.15 30.5.18

Megawin (BM) 17.12.15 30.5.18

SIEMENS 19.12.16 30.11.18

System Control 06.03.17 30.11.18

Megawin CB/SP 01.09.17 31.12.18

Megawin BM/SP 01.09.17 31.12.18

CG Power 22.09.17 31.12.18

410 Panel & Relay 360 1 SIEMENS, Goa 31.5.17 30.6.18

411 SSWR 300 2 Sight & Sound (SS) 5.5 27.12.16 26.6.18

Sight & Sound 8.6 18.12.16 19.6.18

412 ATD 300 9 Sight & Sound ATD 5P 4.4.17 3.6.18

Sight & Sound ATD 3P 4.4.17 3.6.18

Khatri 5P 9.4.17 8.4.18

Khatri 3P 9.4.17 8.4.18

NSS 3P 11.3.17 10.6.18

NSS 2400 24.3.17 23.6.18

Kamgar 5P 10.12.16 9.4.18

Kamgar 3P 31.5.17 30.5.18

Shree Steel 3P 26.4.17 25.6.18

413 Bushings 210 1 Yash 5.2.16 28.2.18

414 Insulators 360 2 ADINATH 16.1.16 30.6.18

Raychem 2.3.16 31.3.18

415 Phase Break 630 5 Narmada 30.4.13 28.6.18

Polyfluro 24.12.14 23.6.18

Siemens 17.5.16 16.10.18

Simpra 1.9.16 30.6.18

Wish 11.7.16 10.10.18

416 Light Weight Section Insulators 630 4 Narmada 5.3.15 4.10.18

Siemens 21.6.16 20.10.18

Simpra 30.5.17 29.6.18

AF Switzerland 17.10.13 16.7.18

417 Section Insulators 630 1 Shree Steel 9.12.15 8.4.18

418 Contact Wire-193 210 1 Airen Metals 5.2.16 15.4.18

419 Contact Wire-107 150 1 Dhruv Cables 20.3.17 28.2.18

420 Catenary 150 3 Dhruv Cables 20.3.17 28.2.18

TRACTION INSTALLATION

407RDSO approved firms for Class

’A’ Foundry247 10

Page 35: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

Sri Ram Cables 31.5.17 7.2.18

Santoshi Hyvolt 1.9.17 7.2.18

421 SCADA 360 2 ABB 7.11.16 31.3.18

422 Motorised ISO 210 2 G R Power 7.12.15 15.4.18

Tritech 24.5.17 15.4.18

423 SGCI Fittings 360 2 NSS 9.6.16 8.6.18

Super Engi tech 9.8.17 8.6.18

424 Fittings Forged 360 5 NSS 5.5.16 4.5.18

Modern Engg. 17.4.17 16.6.18

TLP 31.5.17 30.5.18

Mosdorfer India Pvt. Ltd. 28.7.17 27.7.18

Dynamic 1.9.17 31.8.18

425 Spring ATD 450 2 Pfisterer 28.12.16 27.12.18

D2 23.2.16 22.5.18

Tentative time for

aproval

Days Name of vendor Since TDC

426 Double Line Block Instrument 570 Nil Nil Nil

427Single Line Tokenless Block

Instrument Handle Type570 Nil Nil Nil

428Single Line Neale’s Ball Token,

Type ‘A’360 Nil Nil Nil

429Block Bell Equipment Used In

25KV AC Electrified Area360 Nil Nil Nil

430

Filter Unit for Use in Conjuction

With Block Instrument In 25kv,

50 Hz, Ac Traction Areas

330 Nil Nil Nil

431

PVC Insulated Armoured,

Unscreened Underground Power

Cable

390 8

1-Thermo

2-Singla

3-SBEE Cables

4- Fortune Art

5-Ultra Cab

6-MAA Durga Steel

7- Gupta Power

8-Swarn Infratel

09.01.2014

01.05.2015

25.06.2015

12.10.2015

14.12.2015

21.03.2016

15.12.2016

13.02.2017

March-18

Aug-18

April-18

Aug-18

Sept-18

Dec-17

July-18

July-18

432PVC Insulated Railway Signalling

Indoor Single Core Cable 390 3

1-Thermo

2-Gupta power

3-SBEE Cable

02.01.2014

13.05.2015

25.06.2015

April-18

July-18

May-18

433PVC Insulated Railway Signalling

Indoor Multi Core Cable390 2

1-Thermo

2-SBEE Cable

02.01.2014

25.06.2015

April-18

May-18

434

PVC Insulated Armoured,

Unscreened, Underground

Railway Signaling Cable

390 6

1-SBEE Cables (India) Ltd.

2-Ultracab (India) Ltd.

3-Fortune Art Wires,

4-Allied Engg Works

5-CMI Energy Pvt. Ltd.

6-SVARN Infratel Pvt. Ltd.

25.06.2015

25.06.2015

12.10.2015

16.09.2016

19.01.2017

09.02.2017

April-18

Feb-18

June-18

Aug-18

Sept-18

July-18

435Multi Unit Type - Without Side

Light 360 2

1. Varsha Enterprises

2. Tele Signal

14-05-2015

25-07-2016

Dec-17

Dec-17

Details of cases in processItem NameS.No

No. of pending

cases

QA/S&T

Wissan 23.1.17 30.6.18

Page 36: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

436 Shunt Signal- Position Light Type 360 Nil Nil Nil

437Route Indicator Direction Type 5

Lamps Unit Arms (1 To 6 Way)390 Nil Nil Nil

438Electric Lamp for Railway

Signalling390 Nil Nil Nil

439Electric Lamp Filament Switching

Unit For Colour Light Signals390 Nil Nil Nil

440

Light Unit- Lamp Holder Unit,

CLS Lamp Holder Unit (For

Tripple Pole Lamp)

330 Nil Nil Nil

441Lenses (Glass)-Clear, Green,

Red, Yellow.330 Nil Nil Nil

442 Roundels- Green, Yellow & Red 330 Nil Nil Nil

443

Signal Colour Light – Lenses

(Polycarbonate) Clear, Red

,Green.

330 Nil Nil Nil

444

Circuit Controller (Modified

Design) Lever and Arm, DW

Lever Circuit Controller (Rotary

Type)

420 Nil Nil Nil

445 Electric Point & Lock Detector 330 Nil Nil Nil

446 Electric Key Transmitter 420 Nil Nil Nil

447

Elecrtic Lever Lock & Circuit

Controller 200 mm stroke

&(D.W.) 40 mm stroke

420 Nil Nil Nil

448Electric Point Machine (Non-

Trailable Type )600 2

1- M/s Sandhu Tachnocrats

(P)Ltd. (220mm)

2- M/s Star electric

Co.,Ludhiana

09.02.2017

09.02.2017

March-19

June-19

449Motors For Electric Point

Machine 360 2

1- M/s Sandhu Tachnocrats

(P)Ltd. (220mm)

2- M/s Star electric

Co.,Ludhiana

22.02.2016

09.02.2017

Oct-18

Aug-18

450 Electric Signal Machine 270 Nil Nil Nil

451 Motor for Electric Signal Machine 360 Nil Nil Nil

452DC IRS Post Type Electric

Signal Reverser 360 Nil Nil Nil

453 S.M.'s Control Frame 360 Nil Nil Nil

454 Top & Bottom Rollers, Nylon-6 360 Nil Nil Nil

455

Non Deteriorating Type of Low

Voltage Electric Fuses For

Railway Signalling

450 11- M/s Super Engg. works 12.05.2016 Nov-18

456

ARA Terminal Blocks And Fuse

Blocks-

Made of PBT/Polycarbonate

360 Nil

Nil Nil

457

Multiway Isolating Terminal

Blocks (Barrier Type) For

Signalling Installations

360 Nil

Nil Nil

458120/160/200 Way TAG Blocks

For Signalling Installations360 Nil

Nil Nil

459Battery Charger For Railway S&T

Installations450 Nil

Nil Nil

460 Track Feed Battery Charger 450 21. Cosine Communication,

2. S&T Workshop, Byculla

24-01-2017

25-01-2017

Aug-18

April-18

Page 37: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

461

Dual Bank Charger With Twin

Bank Low Maintenance Lead

Acid Batteries For Use on Block

line Circuit

450 Nil Nil Nil

462

Valve Regulated (Sealed) Lead

Acid Stationary Battery Charger

for Railway S&T Installations

450 Nil Nil Nil

463DC-DC Converter For Railway

S&T Instalations450 2

1. Broadweb Technologies

Private Ltd,

2. Signal Workshop, PTJ

28-04-2017

23-06-2017

Sept-18

Sept-18

464

Inverter For Railway Signaling

Installations For ‘On- Line’

Applications

450 11. Electrostar, Kolkata 21-03-2016 Aug-18

465

‘SITEL’ Primary Cells (Dry,

Lachlanche Type) For Railway

S&T Installations

720 Nil Nil Nil

466

Low Maintenance Lead Acid

Stationary Secondry Cells For

S&T Instalations

1020 3

1- Star batteries

2- Celtek batteries

3. Mittal batteries

26.11.2015

22.04.2016

31.08.2016

June-20

May-20

Jan-20

467

Valve Regulated (Sealed) Lead

Acid Stationary Battery For

Railway S&T Installations

660 2

1- M/s Enersys batteries Pvt

Ltd.

2- M/s NED battery

25.07.2016

10.03.2017

June-19

June-19

468 Solar Photo - Voltaic Module 420 2

1- M/s Sunrise Technology

2- M/s Plaza power

15.09.2015

17.09.2015

Sept-18

Oct-18

469 Colour Light Signal Transformer 450 Nil Nil Nil

470TRANSFORMER 230/110 V

1KVA to 5KVA450 1

1. Broadweb Technologies

Private Ltd

28-04-2017 Oct-18

471

Current Transformer For Lamp

Proving ( H, L & I Types For The

Use in Controlled Signal

Territories)

450 Nil Nil Nil

472

Indication Supply Transformer

(Step Down) For Railway S&T

Installations

450 Nil Nil Nil

473Transformer-Rectifier Set For

Railway S&T Installations450 2

1. Pranava Electronics

2. Electrostar

17-09-2015

21-03-2016

Sept-18

Aug-18

474

Ferro Resonant Type Automatic

AC Voltage Regulator For

Railway signalling Installations

450 Nil Nil Nil

475

RELAYS -- Universal Plug-in

type AC Lamp Proving Relay (M-

to-C Contact) for LED Signal

Lamp

660 1

1. Orient Relay & Equipments

30-09-2016 Jan-19

476

Relays -- Plug-In Type Tractive

Armature, AC Lamp Proving

Relay (Metal-To-Carbon Contact)

Signal Lamp (ON, OFF, ROUTE,

SHUNT ECR)

660 Nil Nil Nil

Page 38: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

477Relays - 'Q' Series Neutral Line

(ACI & NON-ACI)660 2

1. Digital Communication &

Control Pvt. Ltd (QN1)

2.Digital Communication &

Control Pvt. Ltd (QNA1)

26-11-2015

17-12-2015

Oct-18

Oct-18

478

Relays – Plug in Type, Track

Relay 9 & 4 Ohm (ACI & Non-

ACI)

660 Nil Nil Nil

479Relays – Special Type ( Metal-to-

Carbon )660 6

S&T Workshop,Podanur

a) QL1

b) QBCA1

Digital Communication &

Control Pvt. Ltd

a) QBA1

b) QL1

Orient Relay & Equipments

a) QN1K

b) QNA1K

20-08-2015

12-08-2016

17-12-2015

17-12-2015

16-09-2016

16-09-2016

Dec-18

June-18

Oct-18

Oct-18

Jan-19

Jan-19

480

Relays - ECRs (Metal-To-Metal

Contact) (ON, OFF, ROUTE &

SHUNT aspect)

660 Nil Nil Nil

481Relays - Neutral Line (Metal-to-

Metal Contact) , (ACI & Non-ACI)660 Nil Nil Nil

482Relays – 3-Position DC Polarized

(Metal to Metal)660 Nil Nil Nil

483Relays – Special Type (Metal to

Metal)660 Nil Nil Nil

484Relay – Metal to Metal 110V AC

LED ECR for LED Signal Lamp 660 Nil Nil Nil

485 Relays – Point Contactor Unit 660 Nil Nil Nil

486Relay Contacts – SIG– (For‘Q’

series plug-in type relays only)450 Nil Nil Nil

487

Choke Coil For Single Rail Track

Circuits On 25 KV 50 Hz AC

Electrified Sections

420 11. Electronics Industrial

Corporation

08-09-2016 Oct-18

488Fail Safe Electronic Time Delay

Device For Railway Signalling540 Nil Nil Nil

489 Electric Lifting Barrier 390 3

1- M/s S&T workshop ,Byculla

2- M/s Signal Workshop,

Gorakhpur

3.M/s Broad web

Technology(p)Ltd.

29.08.2014

30.09.2016

12.12.2016

Feb-18

May-18

Sept-18

490Universal Wayside DTMF

Control Telephone420 Nil Nil Nil

491Emergency Control Room

Equipment420 Nil Nil Nil

Page 39: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

492

Light Weight Portable Control

Telephone (4 wire/ 2

wire)

420 Nil Nil Nil

4934-Wire Way Station Control

Telephone 360 Nil Nil Nil

4942 –Wire Way Station Control

Telephone420 Nil Nil Nil

4954-Wire/2 Wire Portable Control

Telephone420 Nil Nil Nil

496 Magneto Telephone 450 Nil Nil Nil

497Desk Type Electronic Magneto

Telephone 420 1

1. Electro Star 22-02-2016 Oct-17

498

Power Supply Unit (PSU)For

Telecom Installations At Way

Side Stations In 25 KV Electrified

Areas

420 1

1. Electro Star 22-02-2016 Oct-17

499

SMPS Based Power Plant For

Indian Railways Telecom

Equipments

420 3

1.Eltek SGS Pvt. Ltd

2. Delta Power Solutions

3. Statcon Power Control Ltd

18-03-2015

29-04-2015

01-03-2017

500

SMPS Based Power Plant For

Indian Railways Telecom

Equipments

420 3

1.Eltek SGS Pvt. Ltd

2. Delta Power Solutions

3. Statcon Power Control Ltd

18-03-2015

29-04-2015

01-03-2017

June-18

Aug-18

Nov-18

501Auto Dialing System From

Emergency Socket 420 Nil Nil Nil

502

V.F. And Signalling

Transformers Used For

Derivation And Termination Of

Underground Telecommunication

Cable Circuits

420 Nil Nil Nil

503

Two/Three V.F Transformers

(2T/3T) For Derivationand

Termination Of Underground

Telecom Cable Circuit

450 Nil Nil Nil

504Six Pin Emergency Plug And

Socket360 Nil Nil Nil

505

Voice Frequency Communication

System For Underground Quad

cable

420 Nil Nil Nil

506Primary Digital Multiplexing

Equipment420 Nil Nil Nil

507

Light Weight Unbreakable

Enginnering Thermoplastic

Material Insulator For Overhead

Telegraph And Telephone

Lines

420 Nil Nil Nil

508

Polythene Insulated Polythene

Seathed Jelly Filled Telephone

Cable with Poly-AL Moisture

Barrier

270 1

1. SPM Power&Telecom 10-09-2014 Oct-18

509

Underground Railway Jelly Filled

Telecom Quad Cables For

Signaling And Telecom

Installations

450 Nil Nil Nil

51024 Fiber Armoured Optic Fiber

Cable450 4

1.HTL Ltd

2.Paramount Wires & Cable

3.Om Optel

4. Himalaya Commu.

30-07-16

30-07-16

21-10-16

25-06-17

Oct-18

Oct-18

Sept-18

Nov-18

Page 40: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

5111.4 mm dia Copper Conductor

4/6 Quad Cable450 1

1.RMS Power Solutions 22-06-15 Sep-18

512Fibre Distribution Management

System 360 Nil Nil Nil

513

Thermo Shrink Jointing Kit For

Jointing Underground Quad

Cable (0.9 mm Conductor Dia.)

360 Nil Nil Nil

514Thermo Shrink Jointing Kit For

Jointing Underground PIJF Cable360 Nil Nil Nil

515Digital Clock with GPS

Synchronization420 1

1. Infosoft Digital Design &

Services (P) Ltd

27-01-2014 Apr-18

Name Since516 Fail Safe Electronic Flasher

device as per

RDSO/SPN/173/2002

450 1 M/s Pearl Electronics & Power

system, Roorkee

07-11-2015 Sept. 18

M/s Tirupati Plastomactics

Ltd.Jaipur

25-10-2016 Mar. 18

M/s Rex Polyextrusion Pvt.

Ltd., Sangli

16-11-2016 Feb. 18

M/s Duraline India Pvt. Ltd.,

Neemrana, Alwar

04-05-2017 April'18

M/s Duraline India Pvt. Ltd.,

Neemrana, Telangana

19-09-2017 Sep'18

M/s S&T Workshop

Mettugudda, (SC)

23-06-2015 Dec'18

M/s Statcon Energiaa (P) Ltd. 03-06-2016 Dec'18

519 Data Logger IRS:S-99/2006 450 1 M/s VTL 16.04.14 June, 18

M/s Medha EI634 23.01.15 Dec'18

270 (under cross

approval)

1 Safeconnect Communication

(India) Pvt Ltd

07.09.2017 June, 18

990 (Indegenous

development) Kyosan India Private Limited 17.02.2015 Feb'18

Safeconnect Communication

(India) Pvt Ltd

07.09.2017 June, 18

Siemens Ltd. 30-01-2017 June'18

Honeywell Security & Fire (A

Div of Honeywell International

India Pvt. Ltd.)

10.03.2017 April'18

Ravel Electronics Pvt Ltd 03.04.2017 June'18

PARK TELESOLUTIONS

PVT.LTD

30.05.2017 Aug'18

M/s Siemens Ltd. (ACM 200) 15.12.2015 Apr-18

M/s Vista Information System(P

Ltd) (ESSO M)

23.11.2016 June'18

M/s HBL Power Systems ltd 09.03.2015 Oct' 19

M/s GG Tronics 01.10.2015 Dec'18

M/s Medha 07.08.2013 Apr'18

270 (under cross

approval)

Details Target

517 Double Walled Corrugated

HDPE Duct for Railway Signaling

as per RDSO/SPN/204/2011

Ver.1.1 with amend.1

360 4

SIGNAL

SN Item Total number of days

for finalisation

Number of cases

HBL Power System 07.07.2016 April'19

521 EI (SPN/203)

270 (under cross

approval)

2

518 SMPS based Integrated Power

Supply system (IPS) as per

RDSO/SPN/165/2012

540 2

520 EI (SPN/192) 990 (Indegenous

development)

2

522 Automatic Fire Detection & Alarm

System for Signalling Installation

450 4

523 MSDAC 270 (under cross

approval)

2

840 (Indegenous

development)

3

524 SSDAC

Page 41: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

M/s Insys Digital Systems 04.12.2014 July 19

M/s HBL Power Systems ltd 29.03.2014 June 19

S &T Workshop podanur 10.07.2014 Dec 18

M/s Pragati Electrocom Pvt.

Ltd., Gurgaon

28.09.2016 June, 18

M/s JMV LPS Ltd., Noida 29.11.2016 June, 18

M/s Cape Electric Pvt. Ltd.,

Kanya Kumari

22.09.2016 June, 18

M/s Fast Electrode, Pune 29.08.2017 Nov 18

M/s Efftronics 01.01.2016 Feb'18

M/s CLS Industries New Delhi 18.07.2014 Dec'17

M/s Beacon Industries,

Dehradun

15.12.2014 Dec'18

M/s Power Technologies

Corporation, Dehradun

01.08.2014 Jun'18

M/s Virtual Industries 19.07.2016 Dec-18

M/s Konark Industries Pvt. Ltd.,

SBC

08.05.2015 Mar'18

M/s. Trusine Electronics Pvt.

Ltd. New Delhi

28.02.2014 May-18

M/s. Integra Engineering India

Limited, Vadidara

14.03.2015 Dec 17

M/s RT Vision Technologies

(P) Ltd, Noida

08.12.2015 Apr-18

M/s General Auto, Mumbai 04.01.2016 May-18

M/s. System Aids Bangalore 18.11.2016 Jun-18

M/s. Paras Plastics, Mumbai 03.11.2016 Dec-18

M/s. AkshayEngg Kolkata 30.06.2017 Jun 18

M/s. Connectwell Industries

Pvt. Ltd., Mumbai

19.07.2014 Jul-18

M/s. Elmex Electric Pvt Ltd,

Vadodara

21.07.2014 Jul-18

M/s. Wago Limited, Noida 22.07.2014 Jul-18

M/s. Phoenix Contact(I) Pvt.

Ltd., New Delhi

08.08.2014 July 18

Ram Electronics 07.04.2017 Jan'18

Malika International 27.03.2014 Dec 17

Electronic Equipment Company 23.12.2014 Oct'18

Broadweb Technologies 28.01.2016 Oct'18

Hublit Lighting Pvt. Ltd. 24.04.2016 Dec 18

M/s CLS Industries, New Delhi 24.05.2016 Dec'18

M/s Beacon Industries,

Dehradun

15.12.2014 Dec'18

532 Advanced Warning

system(AAWS)

540 1 M/s Siemens 09.02.2015 Jun 18

533 DTMF 450 1 M/s DCC Pvt. Ltd 02.03.2015 Feb 18

534 SSBPAC 810 1 M/s Medha 16.02.2012 Jun-18

535 Track Magnet & Opto coupler

card of Advanced Auxiliary

Warning System(AAWS)

540 1 M/s Medha 14.02.2017 Jul-18

536 Axel counter Based Block

proving by Mux , UAC

810

537 Block Proving by Axel Counter

(BPAC) using UFSBI

810

538 Battery Operated LED based

flashing Tail lamp

450

539 Audio Ferquency Track Circuit 270 (Under cross

approval)

5

524 SSDAC

810 (Indegenous

development)

3

525 Earthing & Bonding system for

signalling equipments

450 4

530 Battery Operated LED based

Torch Light cum Flashing Hand

Signal Lamp

450 5

531 LED Signal Lamps for subsidiary

Colour Light Signals

Specification No.

RDSO/SPN/153

540 2

528 Non-Metallic colour light signal

Housing of various types for

360 2

529 Modular Terminal Blocks, Fuse

terminal blocks & miniature fuse

links as per RDSO/SPN/

189/2004 Rev. 2.0

360 4

526 LED Signal Lamps for Main

Colour Light Signals (Integrated)

Specification No.

RDSO/SPN/199/2010 Rev. 1.0.

540 6

527 Fuse Auto Changeover System

(TYPE-II) (FACS) as per Spec.

No. RDSO/SPN/ 209/2012 Rev.

1.0.

420

Page 42: ITEMWISE VENDOR REGISTRATION TIMELINES WAGON S. No …rdso.indianrailways.gov.in/works/uploads/File...3 Light Weight Low height 25 T axle load bogie (LWLH25) & its components for 25

540 Push Button Single Line Block

Instrument

360

541 Domino Type contol Panel 360

542 Train Protection and Warning

system

270 (under cross