Designed, prepared & provided By: ITDA group Train the Trainers Course.
ITDA KR Puram Visit (West Godavari, India)
-
Upload
ashish-chandra -
Category
Education
-
view
2.002 -
download
5
description
Transcript of ITDA KR Puram Visit (West Godavari, India)
ITDA KR Puram Visit,West Godavari (AP)
15th – 16th May, 2012Submitted by –
State Coordinator (TE & KGBV), SSA
Agenda of the visit
• Toilet Inspection Visit• To inform and discuss with PO ITDA, KR Puram
and PO SSA (RVM), West Godavari about Out of School Children issues & Education Fortnight
• To fill up the gaps between SSA (RVM) and Tribal Welfare Department
Main points observed
• Running water is available in all the schools visited• The toilet inspection format* - has minor discrepancies in
figures – e.g. number of toilets in the list prepared by ITDA Project
Management Resource Centre (PMRC) not matching with field observations of Tribal Coordinator
– Primary schools have not been covered in the format• Some of the toilets are not maintained or have bushes around
them preventing access• Door repair work is required in some of the schools• Sanitation Format (covering all schools) not yet sent from PO
ITDA to PO RVM office – deadline was 16th May* - SSA (RVM) sent a toilet inspection format on 3rd May to PO RVMs & PO ITDAs, the format is attached on the last slide
TWA PS K Bothappagudem
• Doors need repair
Lankallapalle PS & HS
• Adjacent Primary School not covered in the toilet inspection format
GPS Duddukuru
• Primary School not covered in the toilet inspection format
HS & PS Tellamvarigu
• 1 door to be repaired
TW Doramidi HS
• As per list 3 toilets, in actual 20
Gubbisamamidi PS
• Toilets poorly maintained
TW HS Antarvediguda
• Students are not able to access toilets because of bushes
• Toilets poorly maintained
HS Chegondapalli
• Toilets poorly maintained
• 5 toilets in actual, but not in the toilet inspection format
HS Badigudem
• Not in the list• Lot of repair work is required• Dangerous construction (shown
on the next page)
TWA UP Itikalaka
• The toilet inspection format has 5 toilets, but during the field visit we observed 12 toilets
Toilet Inspection Format*
SI.No District MandalCategory of
School
Name of the School
and code No
SMC Accoun
t No
Total No. of Existin
g Toilets
Status of Toilets As per
enrolment how many Toilets
units required
No. of Toilets sanctioned /
Progress
(under construction)
No. of Defunct Toilets to be
made functional
Remarks
Out of Column (4)
No. of Functio
nal Toilets
No. of Non
Functional
Toilets
Enrolment
strength in the
school
No. of Toilets require
d
No.
Amount
Required
(8-5-9)
Officials met during the visit
• Collector, West Godavari• PO ITDA, KR Puram• PO RVM, West Godavari
Thank youFor queries: please email to [email protected]